CN201620768U - Self-spraying and lifting combined pipe column - Google Patents
Self-spraying and lifting combined pipe column Download PDFInfo
- Publication number
- CN201620768U CN201620768U CN2010201230031U CN201020123003U CN201620768U CN 201620768 U CN201620768 U CN 201620768U CN 2010201230031 U CN2010201230031 U CN 2010201230031U CN 201020123003 U CN201020123003 U CN 201020123003U CN 201620768 U CN201620768 U CN 201620768U
- Authority
- CN
- China
- Prior art keywords
- cable
- oil pipe
- magnetic scale
- lifting
- electric pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005507 spraying Methods 0.000 title abstract 4
- 238000012360 testing method Methods 0.000 claims abstract description 7
- 238000007664 blowing Methods 0.000 claims description 16
- 239000007788 liquid Substances 0.000 claims description 11
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000011010 flushing procedure Methods 0.000 abstract description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 239000003208 petroleum Substances 0.000 abstract description 2
- 238000011084 recovery Methods 0.000 abstract description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The self-spraying and lifting combined pipe column is applied to oil testing and production testing operation of petroleum geological exploration and development. The lower end of the oil pipe is connected with an underground safety valve, the lower end of the underground safety valve is connected with a cable-passing packer, the lower end of the cable-passing packer is connected with an automatic flow divider through the oil pipe, the lower end of the automatic flow divider is connected with a check valve, the lower end of the check valve is connected with an electric submersible pump, the lower end of the electric submersible pump is connected with a magnetic scale preventer, the lower end of the magnetic scale preventer is connected with the oil pipe, a centralizer is fixed on the oil pipe at the lower end of the magnetic scale preventer, and the lower end of the oil pipe at the. The effect is as follows: the self-spraying, lifting, well-flushing and well-killing operation of the pipe column can be completed in one trip. The underground Y-shaped electric pump lifting pipe column is replaced, the underground pipe column structure is simplified, the combined operation of self-spraying and lifting in the beach area is realized, the initial investment of exploration and development is reduced, the engineering construction speed is accelerated, the investment recovery is accelerated, and the investment risk is reduced.
Description
Technical field
The utility model relates to the formation testing pilot production technology of petroleum geology exploration and exploitation, and particularly the connection that adopts one-trip string to finish blowing and electric pump lifting is made special-purpose down-hole string.
Background technology
What adopt in the formation testing pilot production process of oil exploration and exploitation at present, is Y type electric pump lifting tubing string.The complex structure of Y type electric pump lifting tubing string, the wellhead assembly of Pei Heing is also very complicated with it.Y type electric pump lifting tubing string is in the use of down-hole, complex operation, should not operate, and a complete set of equipment and instrument all need be introduced, execute-in-place also must carry out the technological guidance by foreign side, blowout preventer can't be installed in the whole operation process particularly, potential safety hazard is big, cost is high.
The utility model content
The purpose of this utility model is: provide a kind of blowing and lifting connection to make tubing string, replace present Y type electric pump lifting tubing string, simplify tubular column structure, the blowing and the electric submersible pump connection of realization Haiti, beach district oil gas well are constructed, and adopt one-trip string to finish operations such as blowing, lifting, well-flushing, kill-job.
The technical solution adopted in the utility model is: blowing and lifting connection are made tubing string, mainly by horn mouth, centralizer, the magnetic scale control device, submersible electric pump, ball-and-seat, automatic flow divider, cable-passing packer, storm valve, liquid controling pipe line and cable are formed, it is characterized in that: the lower end at oil pipe is connected with storm valve, on the inlet of the upper surface of storm valve, be connected with liquid controling pipe line, the lower end of storm valve connects cable-passing packer, on the inlet of the upper surface of cable-passing packer, be connected with liquid controling pipe line, the lower end of cable-passing packer is connected with automatic flow divider by oil pipe, automatically the lower end of flow divider is connected with ball-and-seat, the lower end of ball-and-seat connects submersible electric pump, pass cable-passing packer for submersible electric pump provides the cable of electric energy and transmission test signal, be connected with submersible electric pump.The lower end of submersible electric pump connects the magnetic scale control device, and the lower end of magnetic scale control device connects oil pipe, is fixed with centralizer on the oil pipe of magnetic scale control device lower end, is connected with horn mouth in the oil pipe lower end of magnetic scale control device lower end.
A whole set of blowing and lifting connection are made the tubing string G.I.H, and bell-mouthed position should be on the top of oil reservoir.Centralizer, magnetic scale control device and horn mouth belong to auxiliary downhole tool, assist to finish operations such as oil recovery, well-flushing, kill-job.Storm valve and cable-passing packer belong to the downhole safety parts, play protection down-hole string safety effect.Submersible electric pump and ball-and-seat are the main underground components that recovers the oil and produce, and finishing recovers the oil produces.Automatically flow divider is the critical piece of well-flushing, uses in the west longitude process.Blowing and lifting connection is made tubing string can realize that one-trip string finishes operations such as blowing, lifting, well-flushing, kill-job.
The beneficial effects of the utility model: the utility model blowing and lifting connection is made tubing string, can realize that one-trip string finishes blowing, lifting, well-flushing, kill job.Replace down-hole Y type electric pump lifting tubing string, simplify the down-hole string structure, realization Haiti, beach district's blowing and lifting connection are constructed, reduce the investment of exploration and initial stage of development, accelerate engineering construction speed, accelerate investment and reclaim, reduce investment risk, improve sea, beach oil field prospecting exploitation whole economic efficiency.
Description of drawings
Fig. 1 is that the utility model blowing and lifting connection are made the tubular column structure schematic diagram.
Among the figure, 1. horn mouth, 2. centralizer, 3. magnetic scale control device, 4. submersible electric pump, 5. ball-and-seat, 6. flow divider automatically, 7. cable-passing packer, 8. storm valve, 9. liquid controling pipe line, 10. oil pipe, 11. cables.
The specific embodiment
Embodiment 1: blowing and lifting connection with a bite oil well are example as tubing string, and the utility model is described in further detail.8 mouthfuls of wells on probation are respond well.
Consult Fig. 1.The utility model blowing and lifting connection is made tubing string, mainly by horn mouth 1, centralizer 2, magnetic scale control device 3, submersible electric pump 4, ball-and-seat 5, the automatic flow divider 6 of ADV, cable-passing packer 7, storm valve 8,1/4 " form by liquid controling pipe line 9 and cable 11.
The lower end of cable-passing packer 7 is connected with an automatic flow divider 6 of ADV by oil pipe 10, the lower end of the automatic flow divider 6 of ADV is connected with a ball-and-seat 5, the lower end of ball-and-seat 5 connects a submersible electric pump 4, pass cable-passing packer 7 for submersible electric pump 4 provides the cable 11 of electric energy and transmission test signal, be connected with submersible electric pump 4; The upper end of cable 11 is connected to well head always.The lower end of submersible electric pump 4 connects a magnetic scale control device 3, and the lower end of magnetic scale control device 3 connects oil pipe 10, is fixed with centralizer 2 on the oil pipe 10 of magnetic scale control device 3 lower ends, is connected with a horn mouth 1 in oil pipe 10 lower ends of magnetic scale control device 3 lower ends.The position of horn mouth 1 is on the top of oil reservoir.
Claims (1)
1. blowing and lifting connection is made tubing string, mainly by horn mouth (1), centralizer (2), magnetic scale control device (3), submersible electric pump (4), ball-and-seat (5), automatic flow divider (6), cable-passing packer (7), storm valve (8), liquid controling pipe line (9) and cable (11) are formed, it is characterized in that: be connected with storm valve (8) in the lower end of oil pipe (10), on the upper surface inlet of storm valve (8), be connected with liquid controling pipe line (9), the lower end of storm valve (8) connects cable-passing packer (7), on the upper surface inlet of cable-passing packer (7), be connected with liquid controling pipe line (9), the lower end of cable-passing packer (7) is connected with automatic flow divider (6) by oil pipe (10), automatically the lower end of flow divider (6) is connected with ball-and-seat (5), the lower end of ball-and-seat (5) connects submersible electric pump (4), pass cable-passing packer (7) for submersible electric pump (4) provides the cable (11) of electric energy and transmission test signal, be connected with submersible electric pump (4); The lower end of submersible electric pump (4) connects magnetic scale control device (3), the lower end of magnetic scale control device (3) connects oil pipe (10), on the oil pipe (10) of magnetic scale control device (3) lower end, be fixed with centralizer (2), be connected with horn mouth (1) in oil pipe (10) lower end of magnetic scale control device (3) lower end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201230031U CN201620768U (en) | 2010-03-03 | 2010-03-03 | Self-spraying and lifting combined pipe column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201230031U CN201620768U (en) | 2010-03-03 | 2010-03-03 | Self-spraying and lifting combined pipe column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201620768U true CN201620768U (en) | 2010-11-03 |
Family
ID=43024224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201230031U Expired - Lifetime CN201620768U (en) | 2010-03-03 | 2010-03-03 | Self-spraying and lifting combined pipe column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201620768U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103573194A (en) * | 2013-11-05 | 2014-02-12 | 中国海洋石油总公司 | Production string optimization device for oil well in case of electric submersible pump gas-locking |
CN103806878A (en) * | 2012-11-05 | 2014-05-21 | 中国石油化工股份有限公司 | Offshore no-killing electric pump lifting process pipe string |
CN104179477A (en) * | 2013-05-24 | 2014-12-03 | 中国石油化工股份有限公司 | Electric pump oil production technology pipe column utilizing continuous oil pipe suspension |
CN105298427A (en) * | 2015-11-19 | 2016-02-03 | 中国石油集团西部钻探工程有限公司 | Mechanical wellhead suspension device and blowing-to-mechanical-extraction integrated device |
CN108729885A (en) * | 2018-04-12 | 2018-11-02 | 中国海洋石油集团有限公司 | A kind of noble metal antiscale electric submersible pump producing tubular column |
-
2010
- 2010-03-03 CN CN2010201230031U patent/CN201620768U/en not_active Expired - Lifetime
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806878A (en) * | 2012-11-05 | 2014-05-21 | 中国石油化工股份有限公司 | Offshore no-killing electric pump lifting process pipe string |
CN103806878B (en) * | 2012-11-05 | 2016-05-11 | 中国石油化工股份有限公司 | Not kill-job of sea electric pump lifting technology tubing string |
CN104179477A (en) * | 2013-05-24 | 2014-12-03 | 中国石油化工股份有限公司 | Electric pump oil production technology pipe column utilizing continuous oil pipe suspension |
CN104179477B (en) * | 2013-05-24 | 2016-06-15 | 中国石油化工股份有限公司 | Coiled tubing hangs electric motor drive oil pump system process pipe string |
CN103573194A (en) * | 2013-11-05 | 2014-02-12 | 中国海洋石油总公司 | Production string optimization device for oil well in case of electric submersible pump gas-locking |
CN103573194B (en) * | 2013-11-05 | 2015-08-26 | 中国海洋石油总公司 | Electric submersible pump gas lock oil well production string optimization device |
CN105298427A (en) * | 2015-11-19 | 2016-02-03 | 中国石油集团西部钻探工程有限公司 | Mechanical wellhead suspension device and blowing-to-mechanical-extraction integrated device |
CN105298427B (en) * | 2015-11-19 | 2017-12-08 | 中国石油集团西部钻探工程有限公司 | Mechanical wellhead hookup and blowing favourable turn adopt integrated apparatus |
CN108729885A (en) * | 2018-04-12 | 2018-11-02 | 中国海洋石油集团有限公司 | A kind of noble metal antiscale electric submersible pump producing tubular column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110397428B (en) | Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well | |
CN106285617B (en) | Gas water horizontal well completion method | |
CN104832208B (en) | Anti-collapse method for long-distance horizontal hole drilling in soft coal seam of underground coal mine | |
CN102116140B (en) | Construction method for enhancing extraction effect of ground coal bed gas | |
CN104806217B (en) | Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group | |
CN104533288B (en) | A kind of fish spicule shape multilevel branch horizontal well shale gas reservoir that bores is drilled the method that well is with increasing production | |
CN201212387Y (en) | Gas injection, gas production and brine discharge integration process pipe column for underground gas storage | |
CN201620768U (en) | Self-spraying and lifting combined pipe column | |
CN202338294U (en) | Self-blowing and mechanical production integrated intelligent well completion pipe string | |
US20130037272A1 (en) | Method and system for well access to subterranean formations | |
CN204002696U (en) | A kind of full intelligent well completion device | |
US8899333B2 (en) | Submarine device | |
CN110306965A (en) | A kind of method for increasing for coal bed gas low yield wellblock | |
CN104790918A (en) | Method for mining coal bed gas from cluster well and horizontal well combined ground under complex terrain condition | |
CN202900175U (en) | Pressure measuring well completion pipe string for suspension pressure gauge of gas storage | |
CN203164441U (en) | Portable air bag isolation drilling pressured water tester | |
CN105089552A (en) | Fully intelligent well completion method of oil (gas) field production well | |
US20150041126A1 (en) | Bypass steam injection and production completion system | |
CN206071468U (en) | Process pipe column for judging water outlet position and water incoming direction of horizontal well | |
CN203239303U (en) | Exploitation device for injection and production in the same well | |
CN107387020A (en) | A kind of common device for picking of two gas | |
CN204283371U (en) | Well completion pipe string | |
CN103628848B (en) | Multidirectional interlayer displacement in flooding oil production method and system | |
CN207296957U (en) | A kind of two gas are total to device for picking | |
CN206600155U (en) | A kind of Continuous Circulation Drilling System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20101103 |