CN201620768U CN2010201230031U CN201020123003U CN201620768U CN 201620768 U CN201620768 U CN 201620768U CN 2010201230031 U CN2010201230031 U CN 2010201230031U CN 201020123003 U CN201020123003 U CN 201020123003U CN 201620768 U CN201620768 U CN 201620768U
Authority
CN
China
Prior art keywords
cable
oil pipe
magnetic scale
lifting
electric pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201230031U
Other languages
Chinese (zh)
Inventor
王宏声
陈桂和
于庆国
郭海涛
金海峰
刘宗环
张守国
路明远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2010201230031U priority Critical patent/CN201620768U/en
Application granted granted Critical
Publication of CN201620768U publication Critical patent/CN201620768U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The self-spraying and lifting combined pipe column is applied to oil testing and production testing operation of petroleum geological exploration and development. The lower end of the oil pipe is connected with an underground safety valve, the lower end of the underground safety valve is connected with a cable-passing packer, the lower end of the cable-passing packer is connected with an automatic flow divider through the oil pipe, the lower end of the automatic flow divider is connected with a check valve, the lower end of the check valve is connected with an electric submersible pump, the lower end of the electric submersible pump is connected with a magnetic scale preventer, the lower end of the magnetic scale preventer is connected with the oil pipe, a centralizer is fixed on the oil pipe at the lower end of the magnetic scale preventer, and the lower end of the oil pipe at the. The effect is as follows: the self-spraying, lifting, well-flushing and well-killing operation of the pipe column can be completed in one trip. The underground Y-shaped electric pump lifting pipe column is replaced, the underground pipe column structure is simplified, the combined operation of self-spraying and lifting in the beach area is realized, the initial investment of exploration and development is reduced, the engineering construction speed is accelerated, the investment recovery is accelerated, and the investment risk is reduced.

Description

Blowing and lifting connection are made tubing string
Technical field
The utility model relates to the formation testing pilot production technology of petroleum geology exploration and exploitation, and particularly the connection that adopts one-trip string to finish blowing and electric pump lifting is made special-purpose down-hole string.
Background technology
What adopt in the formation testing pilot production process of oil exploration and exploitation at present, is Y type electric pump lifting tubing string.The complex structure of Y type electric pump lifting tubing string, the wellhead assembly of Pei Heing is also very complicated with it.Y type electric pump lifting tubing string is in the use of down-hole, complex operation, should not operate, and a complete set of equipment and instrument all need be introduced, execute-in-place also must carry out the technological guidance by foreign side, blowout preventer can't be installed in the whole operation process particularly, potential safety hazard is big, cost is high.
The utility model content
The purpose of this utility model is: provide a kind of blowing and lifting connection to make tubing string, replace present Y type electric pump lifting tubing string, simplify tubular column structure, the blowing and the electric submersible pump connection of realization Haiti, beach district oil gas well are constructed, and adopt one-trip string to finish operations such as blowing, lifting, well-flushing, kill-job.
The technical solution adopted in the utility model is: blowing and lifting connection are made tubing string, mainly by horn mouth, centralizer, the magnetic scale control device, submersible electric pump, ball-and-seat, automatic flow divider, cable-passing packer, storm valve, liquid controling pipe line and cable are formed, it is characterized in that: the lower end at oil pipe is connected with storm valve, on the inlet of the upper surface of storm valve, be connected with liquid controling pipe line, the lower end of storm valve connects cable-passing packer, on the inlet of the upper surface of cable-passing packer, be connected with liquid controling pipe line, the lower end of cable-passing packer is connected with automatic flow divider by oil pipe, automatically the lower end of flow divider is connected with ball-and-seat, the lower end of ball-and-seat connects submersible electric pump, pass cable-passing packer for submersible electric pump provides the cable of electric energy and transmission test signal, be connected with submersible electric pump.The lower end of submersible electric pump connects the magnetic scale control device, and the lower end of magnetic scale control device connects oil pipe, is fixed with centralizer on the oil pipe of magnetic scale control device lower end, is connected with horn mouth in the oil pipe lower end of magnetic scale control device lower end.
A whole set of blowing and lifting connection are made the tubing string G.I.H, and bell-mouthed position should be on the top of oil reservoir.Centralizer, magnetic scale control device and horn mouth belong to auxiliary downhole tool, assist to finish operations such as oil recovery, well-flushing, kill-job.Storm valve and cable-passing packer belong to the downhole safety parts, play protection down-hole string safety effect.Submersible electric pump and ball-and-seat are the main underground components that recovers the oil and produce, and finishing recovers the oil produces.Automatically flow divider is the critical piece of well-flushing, uses in the west longitude process.Blowing and lifting connection is made tubing string can realize that one-trip string finishes operations such as blowing, lifting, well-flushing, kill-job.
The beneficial effects of the utility model: the utility model blowing and lifting connection is made tubing string, can realize that one-trip string finishes blowing, lifting, well-flushing, kill job.Replace down-hole Y type electric pump lifting tubing string, simplify the down-hole string structure, realization Haiti, beach district's blowing and lifting connection are constructed, reduce the investment of exploration and initial stage of development, accelerate engineering construction speed, accelerate investment and reclaim, reduce investment risk, improve sea, beach oil field prospecting exploitation whole economic efficiency.
Description of drawings
Fig. 1 is that the utility model blowing and lifting connection are made the tubular column structure schematic diagram.
Among the figure, 1. horn mouth, 2. centralizer, 3. magnetic scale control device, 4. submersible electric pump, 5. ball-and-seat, 6. flow divider automatically, 7. cable-passing packer, 8. storm valve, 9. liquid controling pipe line, 10. oil pipe, 11. cables.
The specific embodiment
Embodiment 1: blowing and lifting connection with a bite oil well are example as tubing string, and the utility model is described in further detail.8 mouthfuls of wells on probation are respond well.
Consult Fig. 1.The utility model blowing and lifting connection is made tubing string, mainly by horn mouth 1, centralizer 2, magnetic scale control device 3, submersible electric pump 4, ball-and-seat 5, the automatic flow divider 6 of ADV, cable-passing packer 7, storm valve 8,1/4 " form by liquid controling pipe line 9 and cable 11.
Oil pipe 10 is arranged in sleeve pipe, and oil pipe 10 tops are connected to well head.Be connected with a storm valve 8 in the lower end of oil pipe 10, " liquid controling pipe line 9,1/4 " liquid controling pipe line 9 upper ends that on the inlet of the upper surface of storm valve 8, are connected with 1/4 be connected to well head always.The lower end of storm valve 8 connects a cable-passing packer 7, " the liquid controling pipe line 9 that is connected with 1/4 on the inlet of the upper surface of cable-passing packer 7.
The lower end of cable-passing packer 7 is connected with an automatic flow divider 6 of ADV by oil pipe 10, the lower end of the automatic flow divider 6 of ADV is connected with a ball-and-seat 5, the lower end of ball-and-seat 5 connects a submersible electric pump 4, pass cable-passing packer 7 for submersible electric pump 4 provides the cable 11 of electric energy and transmission test signal, be connected with submersible electric pump 4; The upper end of cable 11 is connected to well head always.The lower end of submersible electric pump 4 connects a magnetic scale control device 3, and the lower end of magnetic scale control device 3 connects oil pipe 10, is fixed with centralizer 2 on the oil pipe 10 of magnetic scale control device 3 lower ends, is connected with a horn mouth 1 in oil pipe 10 lower ends of magnetic scale control device 3 lower ends.The position of horn mouth 1 is on the top of oil reservoir.

Claims (1)

1. blowing and lifting connection is made tubing string, mainly by horn mouth (1), centralizer (2), magnetic scale control device (3), submersible electric pump (4), ball-and-seat (5), automatic flow divider (6), cable-passing packer (7), storm valve (8), liquid controling pipe line (9) and cable (11) are formed, it is characterized in that: be connected with storm valve (8) in the lower end of oil pipe (10), on the upper surface inlet of storm valve (8), be connected with liquid controling pipe line (9), the lower end of storm valve (8) connects cable-passing packer (7), on the upper surface inlet of cable-passing packer (7), be connected with liquid controling pipe line (9), the lower end of cable-passing packer (7) is connected with automatic flow divider (6) by oil pipe (10), automatically the lower end of flow divider (6) is connected with ball-and-seat (5), the lower end of ball-and-seat (5) connects submersible electric pump (4), pass cable-passing packer (7) for submersible electric pump (4) provides the cable (11) of electric energy and transmission test signal, be connected with submersible electric pump (4); The lower end of submersible electric pump (4) connects magnetic scale control device (3), the lower end of magnetic scale control device (3) connects oil pipe (10), on the oil pipe (10) of magnetic scale control device (3) lower end, be fixed with centralizer (2), be connected with horn mouth (1) in oil pipe (10) lower end of magnetic scale control device (3) lower end.
CN2010201230031U 2010-03-03 2010-03-03 Self-spraying and lifting combined pipe column Expired - Lifetime CN201620768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201230031U CN201620768U (en) 2010-03-03 2010-03-03 Self-spraying and lifting combined pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201230031U CN201620768U (en) 2010-03-03 2010-03-03 Self-spraying and lifting combined pipe column

Publications (1)

Publication Number Publication Date
CN201620768U true CN201620768U (en) 2010-11-03

Family

ID=43024224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201230031U Expired - Lifetime CN201620768U (en) 2010-03-03 2010-03-03 Self-spraying and lifting combined pipe column

Country Status (1)

Country Link
CN (1) CN201620768U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103573194A (en) * 2013-11-05 2014-02-12 中国海洋石油总公司 Production string optimization device for oil well in case of electric submersible pump gas-locking
CN103806878A (en) * 2012-11-05 2014-05-21 中国石油化工股份有限公司 Offshore no-killing electric pump lifting process pipe string
CN104179477A (en) * 2013-05-24 2014-12-03 中国石油化工股份有限公司 Electric pump oil production technology pipe column utilizing continuous oil pipe suspension
CN105298427A (en) * 2015-11-19 2016-02-03 中国石油集团西部钻探工程有限公司 Mechanical wellhead suspension device and blowing-to-mechanical-extraction integrated device
CN108729885A (en) * 2018-04-12 2018-11-02 中国海洋石油集团有限公司 A kind of noble metal antiscale electric submersible pump producing tubular column

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806878A (en) * 2012-11-05 2014-05-21 中国石油化工股份有限公司 Offshore no-killing electric pump lifting process pipe string
CN103806878B (en) * 2012-11-05 2016-05-11 中国石油化工股份有限公司 Not kill-job of sea electric pump lifting technology tubing string
CN104179477A (en) * 2013-05-24 2014-12-03 中国石油化工股份有限公司 Electric pump oil production technology pipe column utilizing continuous oil pipe suspension
CN104179477B (en) * 2013-05-24 2016-06-15 中国石油化工股份有限公司 Coiled tubing hangs electric motor drive oil pump system process pipe string
CN103573194A (en) * 2013-11-05 2014-02-12 中国海洋石油总公司 Production string optimization device for oil well in case of electric submersible pump gas-locking
CN103573194B (en) * 2013-11-05 2015-08-26 中国海洋石油总公司 Electric submersible pump gas lock oil well production string optimization device
CN105298427A (en) * 2015-11-19 2016-02-03 中国石油集团西部钻探工程有限公司 Mechanical wellhead suspension device and blowing-to-mechanical-extraction integrated device
CN105298427B (en) * 2015-11-19 2017-12-08 中国石油集团西部钻探工程有限公司 Mechanical wellhead hookup and blowing favourable turn adopt integrated apparatus
CN108729885A (en) * 2018-04-12 2018-11-02 中国海洋石油集团有限公司 A kind of noble metal antiscale electric submersible pump producing tubular column

Similar Documents

Publication Publication Date Title
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
CN106285617B (en) Gas water horizontal well completion method
CN104832208B (en) Anti-collapse method for long-distance horizontal hole drilling in soft coal seam of underground coal mine
CN102116140B (en) Construction method for enhancing extraction effect of ground coal bed gas
CN104806217B (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN104533288B (en) A kind of fish spicule shape multilevel branch horizontal well shale gas reservoir that bores is drilled the method that well is with increasing production
CN201212387Y (en) Gas injection, gas production and brine discharge integration process pipe column for underground gas storage
CN201620768U (en) Self-spraying and lifting combined pipe column
CN202338294U (en) Self-blowing and mechanical production integrated intelligent well completion pipe string
US20130037272A1 (en) Method and system for well access to subterranean formations
CN204002696U (en) A kind of full intelligent well completion device
US8899333B2 (en) Submarine device
CN110306965A (en) A kind of method for increasing for coal bed gas low yield wellblock
CN104790918A (en) Method for mining coal bed gas from cluster well and horizontal well combined ground under complex terrain condition
CN202900175U (en) Pressure measuring well completion pipe string for suspension pressure gauge of gas storage
CN203164441U (en) Portable air bag isolation drilling pressured water tester
CN105089552A (en) Fully intelligent well completion method of oil (gas) field production well
US20150041126A1 (en) Bypass steam injection and production completion system
CN206071468U (en) Process pipe column for judging water outlet position and water incoming direction of horizontal well
CN203239303U (en) Exploitation device for injection and production in the same well
CN107387020A (en) A kind of common device for picking of two gas
CN204283371U (en) Well completion pipe string
CN103628848B (en) Multidirectional interlayer displacement in flooding oil production method and system
CN207296957U (en) A kind of two gas are total to device for picking
CN206600155U (en) A kind of Continuous Circulation Drilling System

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20101103