CN202900175U - Pressure measuring well completion pipe string for suspension pressure gauge of gas storage - Google Patents

Pressure measuring well completion pipe string for suspension pressure gauge of gas storage Download PDF

Info

Publication number
CN202900175U
CN202900175U CN 201220366128 CN201220366128U CN202900175U CN 202900175 U CN202900175 U CN 202900175U CN 201220366128 CN201220366128 CN 201220366128 CN 201220366128 U CN201220366128 U CN 201220366128U CN 202900175 U CN202900175 U CN 202900175U
Authority
CN
China
Prior art keywords
pipe
oil pipe
gas storage
pressure
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220366128
Other languages
Chinese (zh)
Inventor
李旭梅
胡相君
王效明
刘明
张华光
邵媛
何华
郭思文
胡开斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN 201220366128 priority Critical patent/CN202900175U/en
Application granted granted Critical
Publication of CN202900175U publication Critical patent/CN202900175U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a gas storage hangs pressure gauge pressure measurement well completion tubular column, shut off, protective case and monitor well bottom pressure in succession in order to realize the pit fast and design, its top-down by oil pipe, flowing nipple joint A, subsurface safety valve, flowing nipple joint B, oil pipe, circulation sliding sleeve, oil pipe, the sealed assembly of anchoring, the permanent packer of hydraulic pressure seat seal, mill and extend a section of thick bamboo, oil pipe, shutoff seat and connect, oil pipe, perforated pipe, hang and connect and the horn mouth is constituteed. After the pipe column is put into the gas storage reservoir injection and production well, the requirements of quick turn-off and protection of the injection and production well can be met, a circulation channel of fluid in the well is established, the upper part and the lower part of the pipe column are isolated mutually, procedures such as sealing pressure test and packer setting are completed, and technical support is provided for later-stage snubbing operation. The pipe column is matched with the hanging and seating joint, so that the underground electronic pressure gauge can be conveniently fished, the underground dynamic pressure measurement is implemented, and technical measures are provided for the safe operation analysis of the gas storage.

Description

Gas storage hangs pressure gauge pressure measurement completion tubular column
Technical field
The utility model relates to a kind of gas storage and hangs pressure gauge pressure measurement completion tubular column, belongs to gas well completion string technology field.
Background technology
Setting up gas storage is a kind of effective measures of guaranteeing natural gas safety and steady air feed, can regulate the imbalance between supply and demand of summer in winter on the one hand, when accident appears in long-distance transport pipes, can bring into play the effect of emergent air feed on the other hand.Gas storage also is the important leverage of national energy security, has great importance to promoting quick, the safe and orderly development of national petroleum gas business.
Summary of the invention
The purpose of this utility model is to provide a kind of gas storage to hang pressure gauge pressure measurement completion tubular column; this tubing string energy protective casing; turn-off fast the realization down-hole; implement for protection liquid and continuous monitoring bottom pressure, satisfy that the gas storage injection-production column jacket is simple in structure, performance safety, reliable in function and cheaply requirement.
Concrete technical scheme of the present utility model is as follows:
Gas storage hangs pressure gauge pressure measurement completion tubular column from top to bottom by forming with lower member:
Oil pipe+pipe nipple A+ the storm valve that the flows+pipe nipple B+ oil pipe+circulation slide sleeve+oil pipe+grappling seal assembly+hydraulic setting permanent packer+milling exntension tubs+oil pipe+shutoff of flowing is located joint+oil pipe+pipe with holes+suspension and is located joint+horn mouth;
Flow pipe nipple A and mobile pipe nipple B and storm valve with the footpath; Storm valve connects ground control system by liquid controling pipe line; The grappling seal assembly connects the hydraulic setting permanent packer in the insert-seal mode; Suspension is located and is hung downhole electronic pressure bomb in the joint.
After this tubing string is lowered to the gas storage injection-production well, can satisfy that gas field gas storage injection-production well turn-offs fast and the demand of protective casing, can set up the circulation canal of borehole fluid with the circulation slide sleeve of string matching, for all kinds of cycle operations provide condition.Throw stifled blanking plug by steel wire operation and be located the joint in shutoff, can make the tubing string upper and lower part isolated mutually, finish the operations such as sealing pressure testing and packer setting, for the later stage snubbing serving provides technical support.The string matching suspension is located joint and can be made things convenient for the pulling downhole electronic pressure bomb, implements the down-hole dynamic pressure measurement, for the gas storage Safety Operation Analysis provides technical measures.
Description of drawings
Fig. 1 is that gas storage hangs pressure gauge pressure measurement completion tubular column structural representation.
The specific embodiment
With reference to Fig. 1 embodiment of the present utility model is further specified:
Embodiment:
Gas storage hangs pressure gauge pressure measurement completion tubular column from top to bottom by forming such as lower member:
The mobile pipe nipple B13+ oil pipe 1 circulation slide sleeve 4+ oil pipe 1+ grappling seal assembly 5+ hydraulic setting permanent packer 6 milling exntension tubs 7+ oil pipe 1+ shutoff of the mobile pipe nipple A2+ storm valve 3+ of oil pipe 1+ are located joint 8+ oil pipe 1+ pipe 9+ suspension with holes and are located joint 10+ horn mouth 11.
Flow pipe nipple A2 and mobile pipe nipple B13 and storm valve 3 with the footpath, can reduce notes, adopt process mesohigh fluid to the erosion of storm valve 3, prolong the application life of storm valve 3.
Storm valve 3 is connected with ground control system by the steel liquid controling pipe line, by the fluid pressure in the control liquid controling pipe line, realizes the opening and closing of storm valve 3, reaches the purpose of down-hole open and close well.
By steel wire operation, utilize special tool open and close circulation slide sleeve 4, can realize that oil jacket is communicated with, and reaches the purpose of liquid-circulating in the well.
Utilize the anchor fluke anchoring string of grappling seal assembly 5, and adopt the insert-seal mode to be connected with hydraulic setting permanent packer 6 upper ends, realize the fixing of tubing string, reduce and annotate displacement and the wriggling of adopting tubing string in the process.Realize this packer setting in sleeve pipe by the hydraulic setting mode, realize the purpose of shutoff oil jacket annular space.
In later stage kill-job or the not kill-job well workover process, after hydraulic setting permanent packer 6 top tubing strings trip out, can be lowered to special tool the packing element outer wall of hydraulic setting permanent packer 6 is carried out milling, simultaneously can connect milling exntension tubs 7, hydraulic setting permanent packer 6 and bottom tubing string thereof are tripped out smoothly.
Steel wire operation is lowered to special instrument, can be located joint 8 places in shutoff and realize shutoff in the tubing string, but the fluid,matching compacting shows setting of hydraulic setting permanent packer 6, can be used with circulation slide sleeve 4, sets up liquid-circulating in the well; Also can cooperate operation device under pressure to realize with pressure lower tubular column.
By the steel wire operation mode, downhole electronic pressure bomb 12 instruments such as grade can be lowered to, hang on to hang and be located in the joint 10, realize dynamic pressure measurement and the various functions of downhole instrument, for the gas storage Safety Operation Analysis provides technical measures.After joint 10 shutoff were located in suspension, pipe 9 with holes can be set up down-hole notes, gas production circulation road.
Horn mouth 11 can be reserved larger chamfering in the completion tubular column lower end, be convenient to being lowered to and tripping out in oil pipe of through tubing equipment or equipment.

Claims (1)

1. a gas storage hangs pressure gauge pressure measurement completion tubular column, it is characterized in that this tubing string is from top to bottom by forming such as lower member:
Oil pipe (1)+pipe nipple A (the 2)+storm valve (3) that flows+pipe nipple B (13)+oil pipe (1)+circulation slide sleeve (4)+oil pipe (1)+grappling seal assembly (5)+hydraulic setting permanent packer (6)+milling exntension tubs (7)+oil pipe (the 1)+shutoff of flowing is located joint (8)+oil pipe (1)+pipe with holes (9)+suspension and is located joint (10)+horn mouth (11);
Pipe nipple A (2) and mobile pipe nipple B (13) and storm valve (3) together footpath flow; Storm valve (3) connects ground control system by liquid controling pipe line; Grappling seal assembly (5) connects hydraulic setting permanent packer (6) in the insert-seal mode; Suspension is located and is hung downhole electronic pressure bomb (12) in the joint (10).
CN 201220366128 2012-07-26 2012-07-26 Pressure measuring well completion pipe string for suspension pressure gauge of gas storage Expired - Fee Related CN202900175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220366128 CN202900175U (en) 2012-07-26 2012-07-26 Pressure measuring well completion pipe string for suspension pressure gauge of gas storage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220366128 CN202900175U (en) 2012-07-26 2012-07-26 Pressure measuring well completion pipe string for suspension pressure gauge of gas storage

Publications (1)

Publication Number Publication Date
CN202900175U true CN202900175U (en) 2013-04-24

Family

ID=48120858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220366128 Expired - Fee Related CN202900175U (en) 2012-07-26 2012-07-26 Pressure measuring well completion pipe string for suspension pressure gauge of gas storage

Country Status (1)

Country Link
CN (1) CN202900175U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104879167A (en) * 2015-04-27 2015-09-02 中国石油天然气股份有限公司 Method for rebuilding gas storage and layered injection and production system thereof
CN106285498A (en) * 2015-05-29 2017-01-04 中国石油天然气股份有限公司 Gas storage injection and production string and method using same
CN106401537A (en) * 2016-11-16 2017-02-15 中国石油大学(华东) Well completion pipe string of underground gas storage well and well completion method
CN107060703A (en) * 2017-06-28 2017-08-18 中国石油集团渤海钻探工程有限公司 Multiple expansion sand control screen well completion technique tubular pile in a kind of sleeve pipe
CN112647857A (en) * 2019-10-12 2021-04-13 中国石油化工股份有限公司 Injection-production string and well completion method using same
CN116006159A (en) * 2021-10-22 2023-04-25 中国石油化工股份有限公司 Monitoring device for gas storage monitoring well and application method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104879167A (en) * 2015-04-27 2015-09-02 中国石油天然气股份有限公司 Method for rebuilding gas storage and layered injection and production system thereof
CN106285498A (en) * 2015-05-29 2017-01-04 中国石油天然气股份有限公司 Gas storage injection and production string and method using same
CN106285498B (en) * 2015-05-29 2018-10-16 中国石油天然气股份有限公司 Gas storage injection and production string and method using same
CN106401537A (en) * 2016-11-16 2017-02-15 中国石油大学(华东) Well completion pipe string of underground gas storage well and well completion method
CN107060703A (en) * 2017-06-28 2017-08-18 中国石油集团渤海钻探工程有限公司 Multiple expansion sand control screen well completion technique tubular pile in a kind of sleeve pipe
CN112647857A (en) * 2019-10-12 2021-04-13 中国石油化工股份有限公司 Injection-production string and well completion method using same
CN112647857B (en) * 2019-10-12 2022-11-25 中国石油化工股份有限公司 Injection-production string and well completion method using same
CN116006159A (en) * 2021-10-22 2023-04-25 中国石油化工股份有限公司 Monitoring device for gas storage monitoring well and application method thereof
CN116006159B (en) * 2021-10-22 2024-09-24 中国石油化工股份有限公司 Monitoring device for gas storage monitoring well and application method thereof

Similar Documents

Publication Publication Date Title
CN202900175U (en) Pressure measuring well completion pipe string for suspension pressure gauge of gas storage
CN101775977B (en) Dual-tube injection well safety production string
CN204703876U (en) Bridge type concentric separate injection pipe column
CN202731863U (en) Long-acting separate-layer water injection string for directional well
CN103643931A (en) Completion and fracture integrated pipe column of offshore openhole horizontal well and construction method of pipe column
CN102454381B (en) Oil-gas reservoir barefoot well cementing and completion method and device
CN204457756U (en) Horizontal well segment pressure and pressure drop test pipe column
CN203756146U (en) Sleeve protecting setting water injection integrated pipe column
CN203626759U (en) Production pipe column with electric submersible pump and jet pump jointly lifted
CN203452734U (en) Integrated production and wax removing and prevention pipe column for high-pressure gas well
CN103806878B (en) Not kill-job of sea electric pump lifting technology tubing string
CN205858311U (en) A kind of bore hole staged fracturing completion tubular column
CN104179477B (en) Coiled tubing hangs electric motor drive oil pump system process pipe string
CN201620768U (en) Self-spraying and lifting combined pipe column
CN203939477U (en) Integrated tubular column for oil testing and well completion operation
CN203394480U (en) Oil-water well layering acidizing device
CN201679489U (en) Double-pipe separated injection safety production pipe column
CN204371262U (en) Balanced type throttler
CN204082115U (en) Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure
CN202745939U (en) Coiled tubing hanger
CN201620839U (en) Pressurized operation production string for natural gas well
CN205225206U (en) A pumping device for beam -pumping unit well surveying well
CN205297515U (en) Coiled tubing drags hydraulic jet fracturing unit
CN204782960U (en) Integrated tubular column of water water injection sand control is adopted to individual well
CN203626689U (en) Well head protection sealing connection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20210726