US4799348A - Method and equipment for making a rigid slab enabling to carry a building - Google Patents

Method and equipment for making a rigid slab enabling to carry a building Download PDF

Info

Publication number
US4799348A
US4799348A US06/847,408 US84740886A US4799348A US 4799348 A US4799348 A US 4799348A US 84740886 A US84740886 A US 84740886A US 4799348 A US4799348 A US 4799348A
Authority
US
United States
Prior art keywords
shuttering
floor
recoverable
elements
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US06/847,408
Inventor
Max Brami
Pierre Mazarguil
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US4799348A publication Critical patent/US4799348A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements

Definitions

  • the invention relates to a process for economically forming a concrete, flooring constructed on an earth platform and bearing on pin point foundations, as well as apparatus for implementing this process.
  • a construction without a basement, and in particular individual houses without a basement, are generally erected on perimetric walls built on the ground, or at least to the regulation frost free depth, with concrete poured between these walls to form a non supporting floor.
  • a more interesting solution in so far as insulation, both to cold and dampness, is concerned consists in forming a cavity, i.e.in forming a supporting floor independent of the ground and resting on the perimetric walls. This solution is of course more costly than the preceding one, since it requires perimetric walls to be built to a great height.
  • the object of the present invention is to overcome the drawbacks of the known solutions outlined above and it proposes providing all the advantages of the cavity by using a particularly economic process.
  • the process of the invention consists in forming pin point foundations, either by means of wells concreted to the regulation depth or on the resisting layers of the ground, or by means of micro-piles, these foundations being set up in a regular pattern defined by the dimensions of the floor to be formed and the weight of the building, in levelling the ground at the level of said pin point foundations, disposing on the ground thus prepared a recoverable shuttering at the periphery of the floor to be formed then non recoverable shuttering elements in the center for forming the ribs of the floor with possibly means for connecting these elements together so as to ensure the continuity of each rib, disposing elements for sealing, insulating and spacing the bottoms of beams and ribs between the rows of non recoverable shuttering elements, reinforcing the periphery and rib beams, disposing a reinforcement trellis for the floor, then pouring concrete over the assembly thus formed, generally by pumping.
  • the process allows regular through passages to be formed in the web of the periphery beams and girders for ventilating underneath the floor, or possibly for passing ducts therethrough which might have been forgotten before pouring of the concrete.
  • the apparatus for implementing the process comprises non recoverable shuttering elements made from a light and strong material.
  • These non recoverable shuttering elements may for example be formed by blocks of expanded plastic material foam, or from cardboard caissons reinforced by a cell like network.
  • the cardboard caissons have the advantage of being delivered flat and are set up in volume on the work site, without requiring special tools, with reinforcing cross pieces.
  • the non recoverable shuttering elements are fitted end to end by means of special elements, called connection elements, for forming a rib continuity. These special elements may form shuttering for an intermediate cross beam reinforcing the rigidity of the floor.
  • the shuttering elements could be square so as to form a "honeycomb" floor if the conditions of use or load require it.
  • connection elements may comprise reservations serving as through passages perpendicular to the ribs.
  • the rigidity of the floor is obtained by the height of the ribs, formed economically because of the low cost of the non recoverable shuttering.
  • the non recoverable shuttering elements may receive devices for spacing the strengthening trellis work of the floor.
  • the spacers may be fitted to one or more trellis work layers.
  • spacer elements which define the width of the beams.
  • These spacer elements may be made from baryta cardboard, for sealing the capillary rise through the ribs.
  • the spacer elements of the shuttering may have a U shaped profile, have a complementary insulation on the under face and comprise pieces for spacing the reinforcement.
  • the reinforcement of the beams will be symmetrical and will be calculated for the rib with the longest reach.
  • a resilient material may be advantageously disposed which confers an antiseismic character on the construction.
  • the rib bottoms may be made flush with the level of the highest point.
  • the outer, perimetric shuttering is then formed in two parts, a first part being flush with the level of the floor bottom and with the foundations, so as to thus define an irregular volume which may be filled provisionally by sand or by a powdery material, supporting the bottom of the floor and the non recoverable shuttering, and a second part formed by vertical side shuttering elements of a thickness of the ribs increased by that of the compression floor, allowing casting of the floor.
  • the process of the invention is particularly usable when, during casting of the floor on an earth platform, study of the bearing structure of the floor requires the construction of beams or longitudinal members of a height greater than the thickness of the floor. Up to present, such a construction assumed:
  • the floor and the bearing structure in a single casting.
  • excavations are made corresponding to the beams or longitudinal members to be obtained, whose bottom is levelled, non recoverable shuttering is placed in these excavations and fixed to the reinforcements of the beams of longitudinal members to be obtained, this non recoverable shuttering retaining the filling earth while being maintained, by wedging means, correctly spaced with respect to the steel work of these reinforcements, then the non recoverable shuttering for forming the ribs of the floor as explained above are disposed on the ground between the beams or longitudinal members, then the concrete is poured, thus forming in a single operation the beams or longitudinal members and the floor itself.
  • the shuttering may be formed with any light and rigid material such as cardboard, wood fiber, plastic material or similar.
  • the choice of shuttering material will depend on the nature of the soil. The closer the soil may be cleanly cut to a dimension very close to that of the beam or longitudinal member to be formed (and thus there will be less filling), the lighter the shuttering may be. On the other hand, the more the soil is powdery, the wider the excavation and there is some filling up and the more rigid the material must be and the greater the number of wedges or spacers.
  • the shuttering may receive internally sealing which will prevent possible infiltration through underpressure, thus allowing the construction of a sealed lining.
  • FIG. 1 is a perspective view partially in vertical section, of a floor obtained in accordance with the process of the present invention
  • FIGS. 2 to 4 are schematical perspective views showing the successive constructional phases, in a variant of the process of the invention of a part of a floor with buried support beams.
  • FIG. 1 there are shown at 1 concrete filled wells forming foundations going down to the resistant layers of the soil. Although only two wells 1 are visible in the Figure, it will be readily understood that there is a well at each corner of the floor to be formed. Between wells 1, the ground 2 is flattened and levelled at the level of the pin point foundations formed by wells 1.
  • On ground 2 recoverable shuttering 4 is disposed at the periphery of the floor 3 to be formed.
  • non recoverable shuttering elements 5 are disposed connected together by connection elements 6 for ensuring the continuity of the ribs of the floor.
  • the non recoverable shuttering elements are formed by cardboard caissons delivered flat and set up in volume on the worksite, with reinforcing cross pieces, without requiring special tools.
  • connection element 6 could comprise through passages perpendicular to the ribs.
  • spacer elements 7 which define the width of the beam.
  • the spacer elements 7 are formed from bituminous cardboard, to insure sealing and prevent using a writer through the ribs, and have a U shaped profile.
  • Elements 7 comprise on their underface an insulation 8, for example polystyrene, and may have spacers (not shown in the drawings) for the reinforcement of the beams. Through passages 9 are reserved in the spacer elements 7.
  • spacer members 10 formed by pieces of cardboard for separating the shuttering 5 from the reinforcement trellis work 11 of the floor 3.
  • the concrete is poured, which is preferably achieved by means of a pump. After drying, only the side shuttering 4 is recoverable.
  • elements 12 of a resilient material may be advantageously disposed between the pin point foundations 1 and the rigid floor 3 so as to confer on the construction an anti-seismic character.
  • FIGS. 2 to 4 a variant of the process of the invention has been shown for constructing a floor comprising bearing beams of a height greater than that of the floor and intended to be partially buried in the ground.
  • the surface of the ground which has been levelled is shown at 21, at 22 an excavation for receiving a beam and on the well levelled bottom 23 of which is placed the structure 24 of the beam encased in a non recoverable shuttering 25.
  • Structure 24 is formed by a metal trellis work and non recoverable shuttering 25 consists of a sheet of cardboard in the shape of a U.
  • the spacers 26 of the trellis work of reinforcement 24 are advantageously fixed to shuttering 25, so that this latter may be readily positioned at the same time as the trellis work.
  • the part of shuttering 25 extending above the buried level of the beam is folded back over the ground 21, and for this the vertical sides of the shutter 25 have a pre-cut 28 formed at the level of the floor to be cast.
  • the concrete 29 is then poured so as to form the beam and the floor at one and the same time, the pressure of the concrete during pouring being exerted on the filling earth.
  • Advantageously shuttering 25 may be provided with a sealing inner coating for preventing possible infiltration through under pressure and thus forming a sealed lining.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Building Environments (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Pin point foundations are formed, the ground is flattened and levelled at the level of these foundations, peripheral recoverable shuttering is disposed on the ground and continuous rows of non recoverable shuttering defining the ribs are disposed at the center. The rows of shuttering are spaced apart by baryte cardboard elements providing sealing and insulation. On the upper face of the non recoverable shuttering are disposed means for spacing the trellis work reinforcing the floor. Then the concrete is poured by pumping and, after drying out the floor, only the peripheral shuttering is recovered.

Description

The invention relates to a process for economically forming a concrete, flooring constructed on an earth platform and bearing on pin point foundations, as well as apparatus for implementing this process.
A construction without a basement, and in particular individual houses without a basement, are generally erected on perimetric walls built on the ground, or at least to the regulation frost free depth, with concrete poured between these walls to form a non supporting floor. A more interesting solution in so far as insulation, both to cold and dampness, is concerned consists in forming a cavity, i.e.in forming a supporting floor independent of the ground and resting on the perimetric walls. This solution is of course more costly than the preceding one, since it requires perimetric walls to be built to a great height.
The object of the present invention is to overcome the drawbacks of the known solutions outlined above and it proposes providing all the advantages of the cavity by using a particularly economic process.
The process of the invention consists in forming pin point foundations, either by means of wells concreted to the regulation depth or on the resisting layers of the ground, or by means of micro-piles, these foundations being set up in a regular pattern defined by the dimensions of the floor to be formed and the weight of the building, in levelling the ground at the level of said pin point foundations, disposing on the ground thus prepared a recoverable shuttering at the periphery of the floor to be formed then non recoverable shuttering elements in the center for forming the ribs of the floor with possibly means for connecting these elements together so as to ensure the continuity of each rib, disposing elements for sealing, insulating and spacing the bottoms of beams and ribs between the rows of non recoverable shuttering elements, reinforcing the periphery and rib beams, disposing a reinforcement trellis for the floor, then pouring concrete over the assembly thus formed, generally by pumping.
The process allows regular through passages to be formed in the web of the periphery beams and girders for ventilating underneath the floor, or possibly for passing ducts therethrough which might have been forgotten before pouring of the concrete.
It will be understood that, providing the pin point foundations have been provided at a sufficient level, the process o the invention allows a basement to be formed subsequently, if such should prove desirable one day, without underpinning the building and so at very low cost.
According to the invention, the apparatus for implementing the process comprises non recoverable shuttering elements made from a light and strong material. These non recoverable shuttering elements may for example be formed by blocks of expanded plastic material foam, or from cardboard caissons reinforced by a cell like network. The cardboard caissons have the advantage of being delivered flat and are set up in volume on the work site, without requiring special tools, with reinforcing cross pieces.
The non recoverable shuttering elements are fitted end to end by means of special elements, called connection elements, for forming a rib continuity. These special elements may form shuttering for an intermediate cross beam reinforcing the rigidity of the floor. By extension of this idea, the shuttering elements could be square so as to form a "honeycomb" floor if the conditions of use or load require it.
The connection elements may comprise reservations serving as through passages perpendicular to the ribs.
The rigidity of the floor is obtained by the height of the ribs, formed economically because of the low cost of the non recoverable shuttering.
In their upper part, the non recoverable shuttering elements may receive devices for spacing the strengthening trellis work of the floor. Depending on the nature of the floor to be formed, the spacers may be fitted to one or more trellis work layers.
Between the rows of non recoverable shuttering elements are disposed spacer elements which define the width of the beams. These spacer elements may be made from baryta cardboard, for sealing the capillary rise through the ribs. The spacer elements of the shuttering may have a U shaped profile, have a complementary insulation on the under face and comprise pieces for spacing the reinforcement. The reinforcement of the beams will be symmetrical and will be calculated for the rib with the longest reach.
Between the pin point foundations and the rigid floor, a resilient material may be advantageously disposed which confers an antiseismic character on the construction.
In accordance with the invention, in the case of uneven or rocky ground, the rib bottoms may be made flush with the level of the highest point. For this, with the pin point foundations themselves made flush with this level, the outer, perimetric shuttering is then formed in two parts, a first part being flush with the level of the floor bottom and with the foundations, so as to thus define an irregular volume which may be filled provisionally by sand or by a powdery material, supporting the bottom of the floor and the non recoverable shuttering, and a second part formed by vertical side shuttering elements of a thickness of the ribs increased by that of the compression floor, allowing casting of the floor. After this latter has dried and the shuttering has been removed, the sand is eliminated naturally.
The process of the invention is particularly usable when, during casting of the floor on an earth platform, study of the bearing structure of the floor requires the construction of beams or longitudinal members of a height greater than the thickness of the floor. Up to present, such a construction assumed:
an overdepth of the excavations, allowing positioning of lateral shuttering;
shuttering and casting of the structure;
removal of the shuttering and filling to the low level of the floor;
casting of the floor.
According to an extension of the process of the invention, it is possible to form the floor and the bearing structure in a single casting. For this, excavations are made corresponding to the beams or longitudinal members to be obtained, whose bottom is levelled, non recoverable shuttering is placed in these excavations and fixed to the reinforcements of the beams of longitudinal members to be obtained, this non recoverable shuttering retaining the filling earth while being maintained, by wedging means, correctly spaced with respect to the steel work of these reinforcements, then the non recoverable shuttering for forming the ribs of the floor as explained above are disposed on the ground between the beams or longitudinal members, then the concrete is poured, thus forming in a single operation the beams or longitudinal members and the floor itself.
The purpose of the non recoverable shuttering surrounding the reinforcement of the beams or longitudinal members used in accordance with the process of the invention, is:
to give to the buried part of the beams or longitudinal members a clean surface condition;
to retain the filling earth at a good distance from the steel work because of the presence of the wedges;
to arrange so that the pressure of the concrete during casting is exerted on the filling earth.
The shuttering may be formed with any light and rigid material such as cardboard, wood fiber, plastic material or similar. The choice of shuttering material will depend on the nature of the soil. The closer the soil may be cleanly cut to a dimension very close to that of the beam or longitudinal member to be formed (and thus there will be less filling), the lighter the shuttering may be. On the other hand, the more the soil is powdery, the wider the excavation and there is some filling up and the more rigid the material must be and the greater the number of wedges or spacers.
Advantageously, the shuttering may receive internally sealing which will prevent possible infiltration through underpressure, thus allowing the construction of a sealed lining.
For a better understanding of the process of the invention and of the means required for implementing same, two preferred embodiments will be described hereafter, by way of example with non limiting character, with reference to the accompanying schematical diagram in which:
FIG. 1 is a perspective view partially in vertical section, of a floor obtained in accordance with the process of the present invention;
FIGS. 2 to 4 are schematical perspective views showing the successive constructional phases, in a variant of the process of the invention of a part of a floor with buried support beams.
Referring to FIG. 1, there are shown at 1 concrete filled wells forming foundations going down to the resistant layers of the soil. Although only two wells 1 are visible in the Figure, it will be readily understood that there is a well at each corner of the floor to be formed. Between wells 1, the ground 2 is flattened and levelled at the level of the pin point foundations formed by wells 1.
On ground 2 recoverable shuttering 4 is disposed at the periphery of the floor 3 to be formed. In the center, non recoverable shuttering elements 5 are disposed connected together by connection elements 6 for ensuring the continuity of the ribs of the floor. In the example shown, the non recoverable shuttering elements are formed by cardboard caissons delivered flat and set up in volume on the worksite, with reinforcing cross pieces, without requiring special tools.
Although it has not been shown in the drawings, the connection element 6 could comprise through passages perpendicular to the ribs.
Between the shuttering rows 5, forming the ribs of the floor 3, are disposed spacer elements 7 which define the width of the beam. The spacer elements 7 are formed from bituminous cardboard, to insure sealing and prevent using a writer through the ribs, and have a U shaped profile. Elements 7 comprise on their underface an insulation 8, for example polystyrene, and may have spacers (not shown in the drawings) for the reinforcement of the beams. Through passages 9 are reserved in the spacer elements 7.
On the upper face of the non recoverable shuttering elements 5 are disposed spacer members 10, formed by pieces of cardboard for separating the shuttering 5 from the reinforcement trellis work 11 of the floor 3.
Then the concrete is poured, which is preferably achieved by means of a pump. After drying, only the side shuttering 4 is recoverable.
It will be noted that elements 12 of a resilient material may be advantageously disposed between the pin point foundations 1 and the rigid floor 3 so as to confer on the construction an anti-seismic character.
Referring to FIGS. 2 to 4, a variant of the process of the invention has been shown for constructing a floor comprising bearing beams of a height greater than that of the floor and intended to be partially buried in the ground. In these Figures the surface of the ground which has been levelled is shown at 21, at 22 an excavation for receiving a beam and on the well levelled bottom 23 of which is placed the structure 24 of the beam encased in a non recoverable shuttering 25. Structure 24 is formed by a metal trellis work and non recoverable shuttering 25 consists of a sheet of cardboard in the shape of a U. The spacers 26 of the trellis work of reinforcement 24 are advantageously fixed to shuttering 25, so that this latter may be readily positioned at the same time as the trellis work.
As shown in FIG. 3, between the excavation 22 and shuttering 25 is filled with earth 27 or sand, the shuttering being held at the correct distance from reinforcement 24 by the spacers 26. It will be readily understood that the volume of filling required depends on the excavation which has been carried out, which depends on the nature of the ground and on the holding power of the earth. This excavation will be made as close as possible to the dimensions of the shuttering 25 if the earth holds well. The nature of the soil consequently conditions the choice of the shuttering material. The closer the ground may be cut to a size very close to that of the beam to be formed, the lighter the shuttering may be, whereas the more the soil is powdery, the wider the excavation and the more rigid the shuttering material will have to be.
After filling (FIG. 3), the part of shuttering 25 extending above the buried level of the beam is folded back over the ground 21, and for this the vertical sides of the shutter 25 have a pre-cut 28 formed at the level of the floor to be cast.
After positioning of the reinforcement elements and of the lateral shuttering elements (not shown in the drawings) as well as the non recoverable shuttering elements 30 (shown in FIG. 4), in accordance with the process of the invention described in FIG. 3, the concrete 29 is then poured so as to form the beam and the floor at one and the same time, the pressure of the concrete during pouring being exerted on the filling earth.
Advantageously shuttering 25 may be provided with a sealing inner coating for preventing possible infiltration through under pressure and thus forming a sealed lining.
It will be understood that the above description has been given simply by way of example, without limitative character, and that constructional additions or modifications may be made without departing from the scope and spirit of the invention defined by the following claims.

Claims (8)

We claim:
1. Process for constructing a ribbed and rigid floor slab for supporting a construction, which comprises the following steps:
(a) forming pin-point foundations at least at the periphery of the floor slab to be formed;
(b) preparing flat and levelled ground at the level of the pin-point foundations;
(c) disposing recoverable shuttering elements on the ground thus prepared, at the periphery of the floor slab to be formed;
(d) disposing on the ground surface, within said recoverable peripheral shuttering elements, parallel rows of non-recoverable shuttering elements which engage the ground by their whole lower face, said rows of non-recoverable shuttering elements being intended to form the ribs of the floor slab to be formed;
(e) disposing between the rows of non-recoverable shuttering elements U-shaped spacing elements made of a sealing material and of which the lower face engages the ground;
(f) disposing a metal trellis work on the upper face of the non-recoverable shuttering elements for reinforcing the floor slab to be formed; and
(g) pouring concrete over the assembly thus formed.
2. Process according to claim 1 wherein said pin-point foundations comprise wells dug to the resistant layers of the ground and filled with concrete.
3. Process according to claim 1 for constructing a rigid floor slab on an uneven or rocky soil, wherein the pin-point foundations are flush with the level of the highest point of the soil, the peripheral shuttering elements are formed in two parts, a first part being flush with the level of the bottom of the floor slab to be formed and with the foundations while defining an irregular volume to be filled temporarily by means of sand or powderly material supporting the bottom of the floor and the non-recoverable shuttering, and the second part being formed by vertical shuttering elements of the thickness of the ribs plus a compression floor allowing the floor to be cast, and wherein the floor is then dried and the shuttering removed, the sand being eliminated naturally.
4. Process according to claim 1 for obtaining a slab floor comprising bearing beams of a height greater than that of the slab floor, wherein, after levelling of the soil and before positioning of the shuttering elements for the slab floor, excavations are made in the ground for housing the beams supporting the slab floor, a reinforcement element for said beams, contained inside a non-recoverable shuttering element, is disposed in each excavation, the region between the excavation and the non-recoverable shuttering element is filled in and the part of the non-recoverable shuttering extending above the buried level of the beam is folded back over the ground so that, after positioning of the outer shuttering elements and of the internal component elements of the floor slab, the floor and the beams are cast in a single operation.
5. Processing according to claim 4 wherein wedging means are used to hold the shuttering element at a suitable distance from the reinforcement during filling in.
6. Process according to claim 4 wherein means are used for spacing the reinforcement, said means being fixed to the shuttering element, in order to allow ready positioning of this latter at the same time as said reinforcement.
7. Process according to claim 4 wherein a material with a rigid and light surface, such as cardboard, wood fiber or plastic material is used for constructing the non-recoverable shuttering element.
8. Process according to claim 4 wherein the shuttering element receives inwardly a sealing coating.
US06/847,408 1984-06-19 1985-06-18 Method and equipment for making a rigid slab enabling to carry a building Expired - Fee Related US4799348A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR8409595 1984-06-19
FR8409595A FR2566031B1 (en) 1984-06-19 1984-06-19 METHOD AND APPARATUS FOR THE PRODUCTION OF A RIGID SLAB FOR CARRYING A CONSTRUCTION

Publications (1)

Publication Number Publication Date
US4799348A true US4799348A (en) 1989-01-24

Family

ID=9305200

Family Applications (1)

Application Number Title Priority Date Filing Date
US06/847,408 Expired - Fee Related US4799348A (en) 1984-06-19 1985-06-18 Method and equipment for making a rigid slab enabling to carry a building

Country Status (11)

Country Link
US (1) US4799348A (en)
EP (1) EP0185065B1 (en)
JP (1) JPH0699975B2 (en)
AU (1) AU4492485A (en)
CA (1) CA1302111C (en)
DE (1) DE3573284D1 (en)
FR (1) FR2566031B1 (en)
IL (1) IL75525A (en)
MA (1) MA20457A1 (en)
OA (1) OA08206A (en)
WO (1) WO1986000358A1 (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5010711A (en) * 1988-04-28 1991-04-30 Batio Gilford P Foundation leveling and equalization system
US5352064A (en) * 1991-04-26 1994-10-04 Plasti-Fab Ltd. Collapsible spacer
US5657587A (en) * 1995-09-07 1997-08-19 Rm Base Company Floating accessible areaway system
US5664377A (en) * 1994-07-14 1997-09-09 Angelo; Arthur Apparatus and method to a ground surface foundation
US5794393A (en) * 1996-05-29 1998-08-18 Fearn; Richard Neil Concrete foundation wall form apparatus and method
US5934036A (en) * 1996-11-01 1999-08-10 Gallagher, Jr.; Daniel P. Insulated concrete slab assembly
US6256954B1 (en) 1998-06-11 2001-07-10 N.V. Bekaert S.A. Combination reinforcement for floor on piles
US6269602B1 (en) * 1997-02-12 2001-08-07 N.V. Bekaert S.A. Combination reinforcement for floor on piles
GB2385071A (en) * 2002-02-06 2003-08-13 Insulslab Ltd Building foundation with insulating members
EP1335073A2 (en) * 2002-02-06 2003-08-13 Insulslab Limited Foundations
US20040221528A1 (en) * 2003-02-14 2004-11-11 David Gruhlke Grade board skirt
US20060016150A1 (en) * 2004-07-22 2006-01-26 Andre Fournier Paperboard formwork and method for forming concrete structures
US20080008538A1 (en) * 2005-05-05 2008-01-10 Timdil, Inc. Foundation system
CN102071808A (en) * 2011-01-13 2011-05-25 中建四局第三建筑工程有限公司 Anti-floating positioning method and structure for core mould pipe
GB2543513A (en) * 2015-10-20 2017-04-26 Bryden Wood Tech Ltd Building system

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU591816B2 (en) * 1986-10-23 1989-12-14 Nicola Leonardis Improvements relating to building foundation form work
FR2609302B1 (en) * 1987-01-07 1992-05-29 Brami Max LOW-DENSITY CARRYING STRUCTURES COMPRISING THREADS AND THIN SLABS OF REINFORCED CONCRETE
AU585743B2 (en) * 1987-01-23 1989-06-22 Theta Developments Pty. Ltd. Improved void form
FR2619589B1 (en) * 1987-08-17 1989-11-17 Riche Daniel METHOD FOR PARASISMIC CONSTRUCTION OF REINFORCED CONCRETE BUILDINGS
NZ240185A (en) * 1990-10-11 1993-11-25 Robert Cameron Reid Concrete floor system with metal formwork and bar chairs
JPH083463Y2 (en) * 1991-04-03 1996-01-31 三井ホーム株式会社 Basic structure of building
AU710541B1 (en) * 1999-02-17 1999-09-23 Neumann Steel Pty Limited Monolithic concrete raft slabs

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1165985A (en) * 1912-12-07 1915-12-28 Corrugated Bar Company Tile-concrete floor.
US1353373A (en) * 1919-07-30 1920-09-21 Adams Pond Company Inc Concrete construction
US1775234A (en) * 1927-06-20 1930-09-09 Ernest O Brostrom Concrete building construction
US1892311A (en) * 1930-05-26 1932-12-27 Macdonald Alexander Simpson Hollow core or block for use in concrete structures
US2282452A (en) * 1938-10-28 1942-05-12 Brown Horatio Whittemore Method of constructing the foundations of cellarless houses
US2298184A (en) * 1941-05-31 1942-10-06 Rosenberg Herbert J Von Building and floor foundation
GB563428A (en) * 1942-11-19 1944-08-15 Sidney Herbert Todd Building units
US2453609A (en) * 1944-11-17 1948-11-09 Republic Steel Corp Areaway wall
US2677165A (en) * 1950-10-27 1954-05-04 Sonoco Products Co Concrete form and method of molding concrete columns therewith
CA544163A (en) * 1957-07-30 W. Rumble Roy Building methods
US2911794A (en) * 1955-11-04 1959-11-10 Louis O Pearson Retaining wall
US3166871A (en) * 1962-02-23 1965-01-26 P L Montemurro Apparatus for setting a fence post in concrete
US3316721A (en) * 1964-07-06 1967-05-02 George E Heilig Tensioned retaining wall for embankment
US3468094A (en) * 1968-02-05 1969-09-23 Campbell Res Corp Building erection system
US3543458A (en) * 1967-12-27 1970-12-01 Kenneth E Guritz Monolithic floor structure with air passages
US3555751A (en) * 1968-08-16 1971-01-19 Robert M Thorgusen Expansible construction form and method of forming structures
US3797800A (en) * 1971-06-02 1974-03-19 E Loy Portable reusable form for concrete foundations
FR2233857A5 (en) * 1973-06-14 1975-01-10 Maymont Paul Temporary retaining or stabilising wall - has front panels anchored by a chain link mesh embedded in the soil
DE2757465A1 (en) * 1977-12-22 1979-06-28 Schraudenbach Paul Dipl Rer Ho Noise screen slope support body - holds soil to allow growth of plants and has divided hollow cylindrical unit with base closing one end
US4179104A (en) * 1975-05-08 1979-12-18 Development Finance Corporation Of New Zealand Mechanical attenuator
US4211504A (en) * 1976-06-24 1980-07-08 Sivachenko Eugene W High strength corrugated metal plate and method of fabricating same
US4341491A (en) * 1976-05-07 1982-07-27 Albert Neumann Earth retaining system
US4365451A (en) * 1980-01-08 1982-12-28 Nelson Lynn S Poured adobe building construction and method of forming same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE786543A (en) * 1971-07-22 1973-01-22 Williams Geoffrey M J C O Scot PERFECTED PROCESS FOR THE MANUFACTURE OF CONCRETE STRUCTURES
FR2200866A6 (en) * 1972-06-20 1974-04-19 Martinez Andre Profile trays for casting concrete cladding panels - incorporating zones of a mortar with low density filler for accepting fastenings
DE2545206A1 (en) * 1975-10-09 1977-04-21 Wilhelm Ing Grad Vogt FORMWORK ELEMENT FOR CONCRETE DIVIDER
FR2505906A1 (en) * 1981-05-14 1982-11-19 Antoine Vercelletto Reinforced concrete foundations suspended over thermal insulation - made by casting onto intermediate water-impermeable film

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA544163A (en) * 1957-07-30 W. Rumble Roy Building methods
US1165985A (en) * 1912-12-07 1915-12-28 Corrugated Bar Company Tile-concrete floor.
US1353373A (en) * 1919-07-30 1920-09-21 Adams Pond Company Inc Concrete construction
US1775234A (en) * 1927-06-20 1930-09-09 Ernest O Brostrom Concrete building construction
US1892311A (en) * 1930-05-26 1932-12-27 Macdonald Alexander Simpson Hollow core or block for use in concrete structures
US2282452A (en) * 1938-10-28 1942-05-12 Brown Horatio Whittemore Method of constructing the foundations of cellarless houses
US2298184A (en) * 1941-05-31 1942-10-06 Rosenberg Herbert J Von Building and floor foundation
GB563428A (en) * 1942-11-19 1944-08-15 Sidney Herbert Todd Building units
US2453609A (en) * 1944-11-17 1948-11-09 Republic Steel Corp Areaway wall
US2677165A (en) * 1950-10-27 1954-05-04 Sonoco Products Co Concrete form and method of molding concrete columns therewith
US2911794A (en) * 1955-11-04 1959-11-10 Louis O Pearson Retaining wall
US3166871A (en) * 1962-02-23 1965-01-26 P L Montemurro Apparatus for setting a fence post in concrete
US3316721A (en) * 1964-07-06 1967-05-02 George E Heilig Tensioned retaining wall for embankment
US3543458A (en) * 1967-12-27 1970-12-01 Kenneth E Guritz Monolithic floor structure with air passages
US3468094A (en) * 1968-02-05 1969-09-23 Campbell Res Corp Building erection system
US3555751A (en) * 1968-08-16 1971-01-19 Robert M Thorgusen Expansible construction form and method of forming structures
US3797800A (en) * 1971-06-02 1974-03-19 E Loy Portable reusable form for concrete foundations
FR2233857A5 (en) * 1973-06-14 1975-01-10 Maymont Paul Temporary retaining or stabilising wall - has front panels anchored by a chain link mesh embedded in the soil
US4179104A (en) * 1975-05-08 1979-12-18 Development Finance Corporation Of New Zealand Mechanical attenuator
US4341491A (en) * 1976-05-07 1982-07-27 Albert Neumann Earth retaining system
US4211504A (en) * 1976-06-24 1980-07-08 Sivachenko Eugene W High strength corrugated metal plate and method of fabricating same
DE2757465A1 (en) * 1977-12-22 1979-06-28 Schraudenbach Paul Dipl Rer Ho Noise screen slope support body - holds soil to allow growth of plants and has divided hollow cylindrical unit with base closing one end
US4365451A (en) * 1980-01-08 1982-12-28 Nelson Lynn S Poured adobe building construction and method of forming same

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5010711A (en) * 1988-04-28 1991-04-30 Batio Gilford P Foundation leveling and equalization system
US5352064A (en) * 1991-04-26 1994-10-04 Plasti-Fab Ltd. Collapsible spacer
US5664377A (en) * 1994-07-14 1997-09-09 Angelo; Arthur Apparatus and method to a ground surface foundation
US5657587A (en) * 1995-09-07 1997-08-19 Rm Base Company Floating accessible areaway system
US5794393A (en) * 1996-05-29 1998-08-18 Fearn; Richard Neil Concrete foundation wall form apparatus and method
US5934036A (en) * 1996-11-01 1999-08-10 Gallagher, Jr.; Daniel P. Insulated concrete slab assembly
US6269602B1 (en) * 1997-02-12 2001-08-07 N.V. Bekaert S.A. Combination reinforcement for floor on piles
US6256954B1 (en) 1998-06-11 2001-07-10 N.V. Bekaert S.A. Combination reinforcement for floor on piles
GB2385071A (en) * 2002-02-06 2003-08-13 Insulslab Ltd Building foundation with insulating members
EP1335073A2 (en) * 2002-02-06 2003-08-13 Insulslab Limited Foundations
EP1335073A3 (en) * 2002-02-06 2004-06-09 Insulslab Limited Foundations
GB2385071B (en) * 2002-02-06 2005-09-07 Insulslab Ltd Foundations
US20040221528A1 (en) * 2003-02-14 2004-11-11 David Gruhlke Grade board skirt
US20060016150A1 (en) * 2004-07-22 2006-01-26 Andre Fournier Paperboard formwork and method for forming concrete structures
US20080008538A1 (en) * 2005-05-05 2008-01-10 Timdil, Inc. Foundation system
CN102071808A (en) * 2011-01-13 2011-05-25 中建四局第三建筑工程有限公司 Anti-floating positioning method and structure for core mould pipe
CN102071808B (en) * 2011-01-13 2012-09-26 中建四局第三建筑工程有限公司 Anti-floating positioning method and structure for core mould pipe
GB2543513A (en) * 2015-10-20 2017-04-26 Bryden Wood Tech Ltd Building system

Also Published As

Publication number Publication date
IL75525A (en) 1989-07-31
DE3573284D1 (en) 1989-11-02
FR2566031B1 (en) 1988-01-29
JPH0699975B2 (en) 1994-12-12
EP0185065A1 (en) 1986-06-25
WO1986000358A1 (en) 1986-01-16
OA08206A (en) 1987-10-30
JPS61502477A (en) 1986-10-30
MA20457A1 (en) 1985-12-31
AU4492485A (en) 1986-01-24
EP0185065B1 (en) 1989-09-27
IL75525A0 (en) 1985-10-31
FR2566031A1 (en) 1985-12-20
CA1302111C (en) 1992-06-02

Similar Documents

Publication Publication Date Title
US4799348A (en) Method and equipment for making a rigid slab enabling to carry a building
CA1124541A (en) Multi-purpose precast concrete panels and methods of constructing concrete structures employing the same
US6503025B1 (en) Precast concrete beam element and methods of making and installing same
US5367845A (en) System for building a structure
KR102102919B1 (en) Retaining wall and construction method thereof
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
KR101212619B1 (en) Cavity box type foundation
US6220789B1 (en) Integrated excavation shoring building foundation method
EP0141465B1 (en) A method of building a foundation, and shuttering unit for the application of said method
EP0016478A2 (en) Wall made of a plurality of pre cast cementitious panels
KR200263961Y1 (en) Sectional block for retaining wall building
US20030131544A1 (en) Precast concrete beam element and methods of making and installing same
JP3778392B2 (en) Basic block
JP3804063B2 (en) Reinforcement structure and reinforcement method of foundation structure in building
KR100488501B1 (en) Straight retaining wall having a shelf using H-shaped piles and constructing method thereof
EP1310601A2 (en) Foundation raft
US4594825A (en) Cantilevered support member and foundation unit
WO2002025026A1 (en) Improvements in and relating to shuttering
JPH07310329A (en) Foundation structure of building and construction method thereof
JPH0610339A (en) Landslide protection wall made of reinforced concrete and construction thereof
KR200302360Y1 (en) Straight retaining wall having a shelf using H-shaped piles
JP3401282B2 (en) Construction method of soil between unit type buildings
JP3284009B2 (en) Building with basement
JPS6011175Y2 (en) Prefabricated retaining wall
JP2615344B2 (en) Foundation using expanded polystyrene and its construction method

Legal Events

Date Code Title Description
FPAY Fee payment

Year of fee payment: 4

SULP Surcharge for late payment
FPAY Fee payment

Year of fee payment: 8

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
FP Lapsed due to failure to pay maintenance fee

Effective date: 20010124

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362