US3645102A - Telescoping lining and support structure and method for lining tunnels and shafts - Google Patents

Telescoping lining and support structure and method for lining tunnels and shafts Download PDF

Info

Publication number
US3645102A
US3645102A US101875A US3645102DA US3645102A US 3645102 A US3645102 A US 3645102A US 101875 A US101875 A US 101875A US 3645102D A US3645102D A US 3645102DA US 3645102 A US3645102 A US 3645102A
Authority
US
United States
Prior art keywords
lining
segments
tunnel
segment
chordal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US101875A
Inventor
Nicholas Chlumecky
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Commercial Shearing Inc
Commercial Shearing and Stamping Co
Original Assignee
Commercial Shearing Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Commercial Shearing Inc filed Critical Commercial Shearing Inc
Application granted granted Critical
Publication of US3645102A publication Critical patent/US3645102A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit

Definitions

  • ABSTRACT A novel telescoping lining and support structure and method for lining tunnels and shafts is provided in which a plurality of first chordal segments are drawn into a tunnel or shaft hole in a reduced diameter state of compression, expanded diametrically one after another in place in said tunnel or shaft and keyed in the expanded state by a second smaller chordal segment which completes an annular ring segment with the first chordal segment in place.
  • SHEET 3 BF 3 INVENTOR Nicholas Chlumecky TELESCOIING LIININ'G AND SUPPORT STRUCTURE AND METHOD FOR LINING TUNNELS AND SHAFTS This invention relates to a telescoping lining and support structure and method for lining tunnels and shafts and particularly to a much improved method of supporting and lining tunnels and shafts which are made by mining and tunneling methods.
  • Underground tunnels and shafts such as vehicular tunnels, underwater tubes, sewer and pollutant control tunnels, subways and similar structures must be provided with a supporting lining.
  • One method of accomplishing this uses concrete pipe which is jacked with heavy pressure into the earth by means of substantial hydraulic jacks which must abut against a very strong base or wall which is usually located in a shaft because such jacking would be difficult if the pipe has to be pushed from a structure on a flat surface. As the pipe is pushed ahead, earth is excavated at the front end of the tunnel ahead of the pipe which is then moved ahead.
  • any further tunneling by pipe jacking becomes impossible and tunneling can then only proceed by methods other than pipe jacking.
  • Another problem is that at times due to the heavy jacking load, pipe components break up and require their removal with costly repair. While pipe jacking is successful in suitable locations in earth, it is limited in range since the jacking thrust can move but a limited lineal footage of pipe. When load or drag, despite lubrication of the outside wall of the pipe, increases to a point where the pipe may be damaged by the pressure applied, the jacking must be discontinued.
  • the present invention provides a novel and significant improvement over the presently used method which was described above.
  • the invention provides a tunnel lining which can be telescoped through the installed lining without the need for heavy jacking members which require a strong abutment.
  • the tunnel lining of the present invention does not require costly drilling methods for the injection of lubricating matter to the outside of the tunnel lining.
  • this invention provides a telescoping tunnel lining which does not depend on specially favorable earth formations through which the tunnel is mined and which is not affected by work stoppages or other delays which cause seizure of a moving lining.
  • the present tunnel lining can be telescoped towards the tunnel face without exerting excessive and damaging pressures on lining components as they are moved ahead.
  • the present invention provides a lining which does not require a large shaft from which the tunnel can be started.
  • the lining of the present invention can be moved into the tunnel without a need to disconnect and reconnect utility lines, ventilation pipes and track.
  • the present invention provides a method of lining a tunnel in which a plurality of first chordal segments are drawn into a tunnel in the compressed state, expanded one after another in place and keyed by a smaller second chordal segment to form an annular segment in place.
  • the segments are provided with grout holes through which grout is pumped to fill the void behind the segments.
  • the segments are moved into place by drawing with a cable, by means of hydraulic cylinders or by other equivalent means.
  • the segments may be made of any strong elastic material such as steel, reinforced plastic, reinforced concrete of the like material.
  • the first chordal segments preferably include an angle greater than 230".
  • FIG. 1 is a longitudinal section through a tunnel embodying my method for telescoping a lining into a tunnel;
  • FIG. 2 shows the cross section of the tunnel on the line II- II showing the manner in which the lining is telescoped and where the lining upon expansion and completion consists of three pieces per ring;
  • FIG. 3 shows an elevational view of the tunnel track with support frame for carrying utility lines
  • FIG. 4 is an end elevationalview of a telescoping lining member of FIG. 1 in compressed condition for insertion in a tunnel; taken on line IV -IV of FIG. 1
  • FIG. 5 shows a cross section of a second embodiment of telescoping lining where the track is contained by the telescoping lining and where each ring consists of two pieces;
  • FIG. 6 shows a fragmentary cross section of a third embodiment of lining according to my invention.
  • FIG. 7 shows a plan view of trapezoidal-shaped bottom segments of tunnel lining with square joints used in the embodiment of FIG. 6;
  • FIG. 8 shows a fragmentary cross section of trapezoidalshaped bottom segments upon assembly with joints which have a tongue and groove configuration
  • FIG. 9 is a plan view of the trapezoidal-shaped bottom segments of the embodiment of FIG. 7;
  • FIG. 10 shows a cross section of a spline joint which could be used instead of other joint configurations of this invention
  • FIG. 11 illustrates a cross section of another type of joint assembly of this invention.
  • FIG. 12 depicts a cross section of a joint with asymmetrical keeper and seal of this invention
  • FIG. 13 shows a cross section of a tongue and groove joint of this invention
  • FIG. 14 illustrates a cross section of a joint with an H-section as a stabilizer to keep edges in line
  • FIG. 15 shows an assembly with square edge with bolt and washer assembly to keep edges of joints in exact alignment
  • FIG. 16 shows tongue-and-groove joint with holes for temporary use to draw longitudinal or vertical joints together
  • FIG. 17 is another embodiment of my invention shown in end elevation.
  • FIG. 18 is still another embodiment of my invention in end elevation.
  • FIG. I I have shown a general arrangement of the telescoping tunnel lining installation showing an arcuate segment 10 being lowered by crane 111 into vertical shaft 12 in front of horizontal shaft 13. Segment It) is joined to other segments 10 already inserted within assembled lining 14 by drawing together temporarily lower ends IS with cable or chain 16 as shown by FIG. 4 showing cross section of segment being lowered into shaft 12. Once segment is inserted within tunnel lining 14 temporary cable 16 is removed. Clamp 17 is then fastened to the trailing edge of segment 10. Clamps 17 are attached to cables 18 which run over sheave 19 which is mounted on shield 20. Cables 18 run out inside tunnel lining 14 to sheaves 21 and double drum winch 22.
  • FIG. 2 shows a cross section of the telescoping lining arrangement of FIG. 1 and particularly the manner in which the various elements of the invention are related to each other. It shows how segment 10 which may consist of strong elastic material such as steel, reinforced plastic or reinforced concrete is located and held confined within upper expanded lining segment 10 and bottom lining segments 23 and 24. It shows also how frame 26 which carries powerlines 25 as well as piping 30 and ventilation line 28 is fastened to track 27. Segments are furnished with grout holes 31 to fill the void between limits of tunnel excavation 32 with grout 33. Telescoping segments 10 are pulled into tunnel by clamp 17 which is attached to winch cables 18 that run over sheave 19 which is attached to tunnel shield.
  • segment 10 which may consist of strong elastic material such as steel, reinforced plastic or reinforced concrete is located and held confined within upper expanded lining segment 10 and bottom lining segments 23 and 24. It shows also how frame 26 which carries powerlines 25 as well as piping 30 and ventilation line 28 is fastened to track 27. Segments are furnished with grout holes 31 to fill the void between limits
  • FIG. 5 I have illustrated a method of telescoping segments 101 with maximum circumference into completed tunnel lining 101 such that only one key segment 102 is required upon expansion of segment 100 to the diameter of tunnel lining 161.
  • track 103 has to rest on segment 100.
  • This method of telescoping is suitable for relatively small diameter tunnels where the weight of muck car 104 is not excessive.
  • FIG. '7 I show a plan view of parallelogram-shaped segment 110 and trapezoidal-shaped segment 111 suitably shaped for installation of trapezoidal segment 112 so that as the segments 110 and 111 are slid longitudinally, they will require a minimum of space ahead of completed portions of the lining.
  • FIG. 6 shows how the assembled segments are arranged as related to a fragmentary view of the lining cross section.
  • FIG. 9 I show a plan view of the parallelogram segments 121 and two trapezoidal segments 122 with tongueand-groove shaped joint 123 to assure proper alignment of segments through their joints.
  • FIG. 8 shows a fragmentary cross section of telescoping segment in relation to assembled lining 124.
  • FIG. 10 to FIG. 16 describe variousjoints which could be suitable for use with the telescoping lining 130.
  • FIG. 10 is a spline joint with spline 131 inserted in grooves 132.
  • For sealing groove 132 could be filled with sealant material 133 which forms a bond between spline 131 and lining 130.
  • FIG. 15 shows squarejoints 151 held in alignment during as sembly by means of temporary bolts 152 and washers 153.
  • FIG. 16 shows a fragmentary plan view of a tongue-andgroove joint before it is drawn together.
  • holes 161 are drilled through lining 162.
  • Dowels (not shown) are then inserted temporarily in hole 161 to draw thejoint together with a clamp (not shown).
  • FIGS. 10 to 16 show also locations of sealing or bonding material 164 which may consist of epoxy or other suitable compounds.
  • FIGS. 17 and 18 show other embodiments in which a segment 200 is passed through the lined tunnel and expanded and fastened to an overlapping bottom member 201 by bolts 202 or alternatively by bottom segments 203 and splice plate 204.
  • a method of lining a tunnel and the like comprising the steps of:

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A novel telescoping lining and support structure and method for lining tunnels and shafts is provided in which a plurality of first chordal segments are drawn into a tunnel or shaft hole in a reduced diameter state of compression, expanded diametrically one after another in place in said tunnel or shaft and keyed in the expanded state by a second smaller chordal segment which completes an annular ring segment with the first chordal segment in place.

Description

llnited States Patent Chlumeclty Fell1 .29,1972
[54] TELESQOPIING LINJING AND @IIPPORT STRUOMJRE AND METHOU FOR MINING TUNNELS AND SHAFTS ['72] Inventor: Nicholas Chlumeclry, Poland, Ohio [73] Assignee: Commercial Shearing & Stamping Com- [22] Filed: Dec. 28, 1970 21 Appl. No.: 101,375
[52] US. Cl. ..61/42, 61/45 R [51] Int. Cl .Elllg 5/02 [58] Field of Search ..61/84, 85, 42, 43, 45; 299/11, 299/31, 33
[56] References Cited UNITED STATES PATENTS 1,137,442 4/1915 Abbott ..61/45 R 1,372,856 3/1921 Winterbottom. ..61/42 1,751,147 3/1930 Hackley ..61/45 R 3,206,824 9/1965 Cerutti ..61/42 X FOREIGN PATENTS OR APPLICATIONS 3/1955 France ..6l/45 R 1,163,356 4/1958 France ..61/84 1,278,994 11/1961 France ..6l/84 10,193 11/1932 Australia.. ..61/45 R Primary ExaminerDennis L. Taylor Attorney-'Buell, Blenko & Ziesenheim [57] ABSTRACT A novel telescoping lining and support structure and method for lining tunnels and shafts is provided in which a plurality of first chordal segments are drawn into a tunnel or shaft hole in a reduced diameter state of compression, expanded diametrically one after another in place in said tunnel or shaft and keyed in the expanded state by a second smaller chordal segment which completes an annular ring segment with the first chordal segment in place.
4 Claims, 18 Drnwlng Figures PATENTEDFEBZS I972 3, 645, 102
sum 1 OF 3 INVENTOR 5; Nicholas Chlumecky Pmmearaazema 3,645; 102
SHEET 3 BF 3 INVENTOR Nicholas Chlumecky TELESCOIING LIININ'G AND SUPPORT STRUCTURE AND METHOD FOR LINING TUNNELS AND SHAFTS This invention relates to a telescoping lining and support structure and method for lining tunnels and shafts and particularly to a much improved method of supporting and lining tunnels and shafts which are made by mining and tunneling methods.
Underground tunnels and shafts, such as vehicular tunnels, underwater tubes, sewer and pollutant control tunnels, subways and similar structures must be provided with a supporting lining. The quicker the tunnel can be lined and completed for the support of surrounding earth and exclusion of water, the better. One method of accomplishing this uses concrete pipe which is jacked with heavy pressure into the earth by means of substantial hydraulic jacks which must abut against a very strong base or wall which is usually located in a shaft because such jacking would be difficult if the pipe has to be pushed from a structure on a flat surface. As the pipe is pushed ahead, earth is excavated at the front end of the tunnel ahead of the pipe which is then moved ahead. Besides the difficulty of requiring heavy jacking equipment, the pipe which is being jacked ahead must be lubricated on the outside usually by drilling holes from the surface and by injecting a mixture of water and bentonite. Drilling of the injection holes is costly because it must be done at relatively close intervals and because it interferes often with utilities and right of way on surface in congested city locations. Another disadvantage of the present method of pipe jacking is that it requires specially favorable conditions in relation to the earth through which the pipe is to be jacked. If the tunnel has to be driven through earth which contains many boulders or rock, or if the earth settles forcefully on the jacked pipe, due to labor delays or other factors such as insufficient bentonite lubrication, any further tunneling by pipe jacking becomes impossible and tunneling can then only proceed by methods other than pipe jacking. Another problem is that at times due to the heavy jacking load, pipe components break up and require their removal with costly repair. While pipe jacking is successful in suitable locations in earth, it is limited in range since the jacking thrust can move but a limited lineal footage of pipe. When load or drag, despite lubrication of the outside wall of the pipe, increases to a point where the pipe may be damaged by the pressure applied, the jacking must be discontinued. Furthermore, most accurate aligning of the jacked pipe must be observed and maintained because misalignment will cause complete seizure and stoppage of the pipe being jacked making any further tunnel advance impossible with this method. Another problem is the handling of power cables, ventilation ducts and other utilities which have to be carried forward to the working face of the tunnel. The pipe elements which are jacked into the earth have to be placed against the last element which was pushed in. In order to join the next pipe element, all above utility lines and often also the track for cars which haul out the excavated earth have to be disconnected and after placing the pipe element all these utilities have to be reconnected before the tunnel advance can be resumed. In summary, the present art of pipe jacking in tunneling is subject to many hazards, laborious efforts, high costs and considerable limitations.
The present invention provides a novel and significant improvement over the presently used method which was described above. In addition the invention provides a tunnel lining which can be telescoped through the installed lining without the need for heavy jacking members which require a strong abutment. The tunnel lining of the present invention does not require costly drilling methods for the injection of lubricating matter to the outside of the tunnel lining. Furthermore this invention provides a telescoping tunnel lining which does not depend on specially favorable earth formations through which the tunnel is mined and which is not affected by work stoppages or other delays which cause seizure of a moving lining. The present tunnel lining can be telescoped towards the tunnel face without exerting excessive and damaging pressures on lining components as they are moved ahead. Moreover the present invention provides a lining which does not require a large shaft from which the tunnel can be started. The lining of the present invention can be moved into the tunnel without a need to disconnect and reconnect utility lines, ventilation pipes and track.
The present invention provides a method of lining a tunnel in which a plurality of first chordal segments are drawn into a tunnel in the compressed state, expanded one after another in place and keyed by a smaller second chordal segment to form an annular segment in place. Preferably the segments are provided with grout holes through which grout is pumped to fill the void behind the segments. The segments are moved into place by drawing with a cable, by means of hydraulic cylinders or by other equivalent means. The segments may be made of any strong elastic material such as steel, reinforced plastic, reinforced concrete of the like material. The first chordal segments preferably include an angle greater than 230".
In the foregoing general description I have set out certain objects, advantages and purposes of my invention. Other advantages and purposes of this invention will be described hereafter and will become apparent to those who are skilled in the art of tunneling when considering the following description with accompanying drawings in which:
FIG. 1 is a longitudinal section through a tunnel embodying my method for telescoping a lining into a tunnel;
FIG. 2 shows the cross section of the tunnel on the line II- II showing the manner in which the lining is telescoped and where the lining upon expansion and completion consists of three pieces per ring;
FIG. 3 shows an elevational view of the tunnel track with support frame for carrying utility lines;
FIG. 4 is an end elevationalview of a telescoping lining member of FIG. 1 in compressed condition for insertion in a tunnel; taken on line IV -IV of FIG. 1
FIG. 5 shows a cross section of a second embodiment of telescoping lining where the track is contained by the telescoping lining and where each ring consists of two pieces;
FIG. 6 shows a fragmentary cross section of a third embodiment of lining according to my invention;
FIG. 7 shows a plan view of trapezoidal-shaped bottom segments of tunnel lining with square joints used in the embodiment of FIG. 6;
FIG. 8 shows a fragmentary cross section of trapezoidalshaped bottom segments upon assembly with joints which have a tongue and groove configuration;
FIG. 9 is a plan view of the trapezoidal-shaped bottom segments of the embodiment of FIG. 7;
FIG. 10 shows a cross section of a spline joint which could be used instead of other joint configurations of this invention;
FIG. 11 illustrates a cross section of another type of joint assembly of this invention;
FIG. 12 depicts a cross section of a joint with asymmetrical keeper and seal of this invention;
FIG. 13 shows a cross section of a tongue and groove joint of this invention;
FIG. 14 illustrates a cross section of a joint with an H-section as a stabilizer to keep edges in line;
FIG. 15 shows an assembly with square edge with bolt and washer assembly to keep edges of joints in exact alignment;
FIG. 16 shows tongue-and-groove joint with holes for temporary use to draw longitudinal or vertical joints together;
FIG. 17 is another embodiment of my invention shown in end elevation; and
FIG. 18 is still another embodiment of my invention in end elevation.
Referring to FIG. I, I have shown a general arrangement of the telescoping tunnel lining installation showing an arcuate segment 10 being lowered by crane 111 into vertical shaft 12 in front of horizontal shaft 13. Segment It) is joined to other segments 10 already inserted within assembled lining 14 by drawing together temporarily lower ends IS with cable or chain 16 as shown by FIG. 4 showing cross section of segment being lowered into shaft 12. Once segment is inserted within tunnel lining 14 temporary cable 16 is removed. Clamp 17 is then fastened to the trailing edge of segment 10. Clamps 17 are attached to cables 18 which run over sheave 19 which is mounted on shield 20. Cables 18 run out inside tunnel lining 14 to sheaves 21 and double drum winch 22. As the installation of tunnel lining 14 proceeds, segments 10 are pulled ahead within shield and expanded and assembled with second segments 23 and 24 which complete the bottom of tunnel lining 14. Power lines 25 are carried by frames 26. Frames 26 are bolted to track 27. In shaft 12, powerlines 25 run under track 27 so that they will not interfere with the lowering and insertion of segment 10 within tunnel lining 14. Frames 26 can then be used also to carry ventilation pipe 28 to the working face 29 of the tunnel.
FIG. 2 shows a cross section of the telescoping lining arrangement of FIG. 1 and particularly the manner in which the various elements of the invention are related to each other. It shows how segment 10 which may consist of strong elastic material such as steel, reinforced plastic or reinforced concrete is located and held confined within upper expanded lining segment 10 and bottom lining segments 23 and 24. It shows also how frame 26 which carries powerlines 25 as well as piping 30 and ventilation line 28 is fastened to track 27. Segments are furnished with grout holes 31 to fill the void between limits of tunnel excavation 32 with grout 33. Telescoping segments 10 are pulled into tunnel by clamp 17 which is attached to winch cables 18 that run over sheave 19 which is attached to tunnel shield.
In FIG. 5 I have illustrated a method of telescoping segments 101 with maximum circumference into completed tunnel lining 101 such that only one key segment 102 is required upon expansion of segment 100 to the diameter of tunnel lining 161. For this method, track 103 has to rest on segment 100. This method of telescoping is suitable for relatively small diameter tunnels where the weight of muck car 104 is not excessive.
In the embodiment of FIG. '7 I show a plan view of parallelogram-shaped segment 110 and trapezoidal-shaped segment 111 suitably shaped for installation of trapezoidal segment 112 so that as the segments 110 and 111 are slid longitudinally, they will require a minimum of space ahead of completed portions of the lining. FIG. 6 shows how the assembled segments are arranged as related to a fragmentary view of the lining cross section.
In the embodiment of FIG. 9 I show a plan view of the parallelogram segments 121 and two trapezoidal segments 122 with tongueand-groove shaped joint 123 to assure proper alignment of segments through their joints. FIG. 8 shows a fragmentary cross section of telescoping segment in relation to assembled lining 124.
FIG. 10 to FIG. 16 describe variousjoints which could be suitable for use with the telescoping lining 130. FIG. 10 is a spline joint with spline 131 inserted in grooves 132. For sealing groove 132 could be filled with sealant material 133 which forms a bond between spline 131 and lining 130.
FIG. 15 shows squarejoints 151 held in alignment during as sembly by means of temporary bolts 152 and washers 153.
FIG. 16 shows a fragmentary plan view of a tongue-andgroove joint before it is drawn together. As a means of drawing thejoint together, holes 161 are drilled through lining 162. Dowels (not shown) are then inserted temporarily in hole 161 to draw thejoint together with a clamp (not shown).
FIGS. 10 to 16 show also locations of sealing or bonding material 164 which may consist of epoxy or other suitable compounds.
FIGS. 17 and 18 show other embodiments in which a segment 200 is passed through the lined tunnel and expanded and fastened to an overlapping bottom member 201 by bolts 202 or alternatively by bottom segments 203 and splice plate 204.
In the foregoing specification I have set out certain preferred embodiments of my invention however, it will be understood that this invention may be otherwise embodied within the scope of the following claims.
Iclaim:
1. A method of lining a tunnel and the like comprising the steps of:
a. tunneling a shaft into the earth,
b. carrying a plurality of first chordal segments into said tunnel shaft as tunneling progresses, said first segments being reduced in diameter by compression, expanding said segments diametrically one after another in place in said shaft,
c. inserting a second chordal segment between the ends of said expanded first chordal segment to form an annular segment, and
d. continuing to insert compressed first segments through said completed rings and expanding the same in place one after another to complete a lining.
2. A method as claimed in claim 1 wherein the first chordal segments are provided with spaced openings and grout is pumped therethrough to fill any voids between the completed annular segments and the tunnel shaft.
3. A method as claimed in claim 1 wherein the first chordal segments are carried into place by pulling with a cable and winch.
4. A method as claimed in claim 1 wherein the first chordal segments are carried into place by hydraulic jacks.

Claims (4)

1. A method of lining a tunnel and the like comprising the steps of: a. tunneling a shaft into the earth, b. carrying a plurality of first chordal segments into said tunnel shaft as tunneling progresses, said first segments being reduced in diameter by compression, expanding said segments diametrically one after another in place in said shaft, c. inserting a second chordal segment between the ends of said expanded first chordal segment to form an annular segment, and d. continuing to insert compressed first segments through said completed rings and expanding the same in place one after another to complete a lining.
2. A method as claimed in claim 1 wherein the first chordal segments are provided with spaced openings and grout is pumped therethrough to fill any voids between the completed annular segments and the tunnel shaft.
3. A method as claimed in claim 1 wherein the first chordal segments are carried into place by pulling with a cable and winch.
4. A method as claimed in claim 1 wherein the first chordal segments are carried into place by hydraulic jacks.
US101875A 1970-12-28 1970-12-28 Telescoping lining and support structure and method for lining tunnels and shafts Expired - Lifetime US3645102A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10187570A 1970-12-28 1970-12-28

Publications (1)

Publication Number Publication Date
US3645102A true US3645102A (en) 1972-02-29

Family

ID=22286890

Family Applications (1)

Application Number Title Priority Date Filing Date
US101875A Expired - Lifetime US3645102A (en) 1970-12-28 1970-12-28 Telescoping lining and support structure and method for lining tunnels and shafts

Country Status (11)

Country Link
US (1) US3645102A (en)
JP (1) JPS5620438B1 (en)
AT (1) AT321977B (en)
AU (1) AU2812171A (en)
BE (1) BE766064A (en)
CA (1) CA947520A (en)
CH (1) CH546312A (en)
DE (1) DE2120178C3 (en)
FR (1) FR2126661A5 (en)
GB (1) GB1354741A (en)
NL (1) NL7105475A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0692606A1 (en) * 1994-07-13 1996-01-17 CENTRE D'ETUDES DE L'ENERGIE NUCLEAIRE, établissement d'utilité publique Method for lining a tunnel
EP0728974A1 (en) * 1995-02-24 1996-08-28 Kawasaki Steel Corporation Buried pipe laying method
BE1009528A3 (en) * 1995-08-08 1997-04-01 Verstraeten Beheersmij Bv Method for making a cladded underground tunnel
US5626442A (en) * 1995-10-24 1997-05-06 Boyer, Inc. Pipe rehabilitation system and methods
US5676491A (en) * 1995-02-24 1997-10-14 Kawasaki Steel Corporation Buried pipe laying method
EP0881359A1 (en) * 1997-05-28 1998-12-02 Herrenknecht GmbH Method and arrangement for constructing a tunnel by using a driving shield
US6494437B1 (en) 1995-10-24 2002-12-17 Mark L. Boyer Boom mounted winch
US20090293979A1 (en) * 2006-10-24 2009-12-03 Kenneth Latimer Scott Method of lining pre-existing pipes or passages and apparatus therefor
CN102477866A (en) * 2010-11-25 2012-05-30 中铁十八局集团有限公司 Template trolley with good ventilation performance
CN104632250A (en) * 2014-12-17 2015-05-20 北京工业大学 Prefabricated tunnel lining structure of inverted segments for round foundation pit and construction method of prefabricated tunnel lining structure
CN108397208A (en) * 2018-05-07 2018-08-14 中国铁建重工集团有限公司 A kind of double-shielded TBM
CN108590676A (en) * 2018-03-22 2018-09-28 辽宁三三工业有限公司 A kind of shield machine front carriage track platform
CN108915724A (en) * 2018-09-27 2018-11-30 中铁十九局集团轨道交通工程有限公司 A kind of section of jurisdiction stabilisation system and method for full face rock tunnel boring machine construction
CN109882195A (en) * 2019-03-27 2019-06-14 浙江大学城市学院 A kind of assembled big cross section rectangle pipe jacking tube coupling and construction method
CN113669083A (en) * 2021-10-08 2021-11-19 中铁第一勘察设计院集团有限公司 Tunnel repairing structure based on load conversion and cap type and construction method thereof
CN113847036A (en) * 2021-10-25 2021-12-28 安徽理工大学 Double-wall seat structure for deep drilling shaft after well wall bottom breaking and construction method
US20220178471A1 (en) * 2019-03-22 2022-06-09 Kubota Corporation Pipe transport device and pipe joining method inside pipeline construction shaft

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2103684B (en) * 1981-08-07 1985-09-04 Commercial Shearing Tunnel liners
US4830536A (en) * 1981-08-07 1989-05-16 Commercial Shearing, Inc. Method and apparatus for tunnel lining
FR2523627A1 (en) * 1982-03-22 1983-09-23 Campenon Bernard METHOD FOR CONFORTING ARCHES OR SIMILAR CONSTRUCTIONS
JPS5998747U (en) * 1982-12-24 1984-07-04 セイレイ工業株式会社 Side plate structure in threshing machine
CN112302662B (en) * 2020-10-29 2022-10-14 中铁上海工程局集团有限公司 Construction method of artificial backfill shallow-buried tunnel passing through highway
CN117662178B (en) * 2023-12-29 2024-06-18 中交城乡建设规划设计研究院有限公司 Ultra-shallow buried large-section underground passage pushing system and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1137442A (en) * 1914-05-08 1915-04-27 Gheen R Abbott Mold for constructing concrete tunnels.
US1372856A (en) * 1919-09-02 1921-03-29 Winterbottom Joseph Method of building sewers and tunnels
US1751147A (en) * 1929-03-11 1930-03-18 Roy C Hackley Method of lining tunnels with concrete and apparatus therefor
FR1099147A (en) * 1954-02-11 1955-08-30 Siplast Waterproofing of concrete or masonry structures subjected to hydrostatic pressures that can go in both directions, in particular waterproofing of water supply galleries to hydraulic power stations
FR1163356A (en) * 1954-08-19 1958-09-25 Rolling or movable formwork hanger for concreting barrel vaults, tunnels, galleries or shafts
FR1278994A (en) * 1961-02-01 1961-12-15 Ramset Italiana S P A Method and device for carrying out underground galleries made of cast material on site
US3206824A (en) * 1963-02-15 1965-09-21 October Corp Apparatus for forming a tunnel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1137442A (en) * 1914-05-08 1915-04-27 Gheen R Abbott Mold for constructing concrete tunnels.
US1372856A (en) * 1919-09-02 1921-03-29 Winterbottom Joseph Method of building sewers and tunnels
US1751147A (en) * 1929-03-11 1930-03-18 Roy C Hackley Method of lining tunnels with concrete and apparatus therefor
FR1099147A (en) * 1954-02-11 1955-08-30 Siplast Waterproofing of concrete or masonry structures subjected to hydrostatic pressures that can go in both directions, in particular waterproofing of water supply galleries to hydraulic power stations
FR1163356A (en) * 1954-08-19 1958-09-25 Rolling or movable formwork hanger for concreting barrel vaults, tunnels, galleries or shafts
FR1278994A (en) * 1961-02-01 1961-12-15 Ramset Italiana S P A Method and device for carrying out underground galleries made of cast material on site
US3206824A (en) * 1963-02-15 1965-09-21 October Corp Apparatus for forming a tunnel

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0692606A1 (en) * 1994-07-13 1996-01-17 CENTRE D'ETUDES DE L'ENERGIE NUCLEAIRE, établissement d'utilité publique Method for lining a tunnel
BE1008489A3 (en) * 1994-07-13 1996-05-07 Centre Etd Energie Nucleaire Process for producing a coated tunnel.
EP0728974A1 (en) * 1995-02-24 1996-08-28 Kawasaki Steel Corporation Buried pipe laying method
US5676491A (en) * 1995-02-24 1997-10-14 Kawasaki Steel Corporation Buried pipe laying method
BE1009528A3 (en) * 1995-08-08 1997-04-01 Verstraeten Beheersmij Bv Method for making a cladded underground tunnel
US5626442A (en) * 1995-10-24 1997-05-06 Boyer, Inc. Pipe rehabilitation system and methods
US6494437B1 (en) 1995-10-24 2002-12-17 Mark L. Boyer Boom mounted winch
EP0881359A1 (en) * 1997-05-28 1998-12-02 Herrenknecht GmbH Method and arrangement for constructing a tunnel by using a driving shield
US8191580B2 (en) * 2006-10-24 2012-06-05 Sekisui Chemical Co., Ltd. Method of lining pre-existing pipes or passages and apparatus therefor
US20090293979A1 (en) * 2006-10-24 2009-12-03 Kenneth Latimer Scott Method of lining pre-existing pipes or passages and apparatus therefor
CN102477866A (en) * 2010-11-25 2012-05-30 中铁十八局集团有限公司 Template trolley with good ventilation performance
CN104632250A (en) * 2014-12-17 2015-05-20 北京工业大学 Prefabricated tunnel lining structure of inverted segments for round foundation pit and construction method of prefabricated tunnel lining structure
CN108590676A (en) * 2018-03-22 2018-09-28 辽宁三三工业有限公司 A kind of shield machine front carriage track platform
CN108590676B (en) * 2018-03-22 2020-04-28 辽宁三三工业有限公司 Front trailer rail platform of shield machine
CN108397208A (en) * 2018-05-07 2018-08-14 中国铁建重工集团有限公司 A kind of double-shielded TBM
CN108397208B (en) * 2018-05-07 2024-05-07 中国铁建重工集团股份有限公司 Double-shield TBM
CN108915724A (en) * 2018-09-27 2018-11-30 中铁十九局集团轨道交通工程有限公司 A kind of section of jurisdiction stabilisation system and method for full face rock tunnel boring machine construction
US20220178471A1 (en) * 2019-03-22 2022-06-09 Kubota Corporation Pipe transport device and pipe joining method inside pipeline construction shaft
CN109882195A (en) * 2019-03-27 2019-06-14 浙江大学城市学院 A kind of assembled big cross section rectangle pipe jacking tube coupling and construction method
CN113669083B (en) * 2021-10-08 2023-10-10 中铁第一勘察设计院集团有限公司 Tunnel repairing structure based on load conversion and cap type and construction method thereof
CN113669083A (en) * 2021-10-08 2021-11-19 中铁第一勘察设计院集团有限公司 Tunnel repairing structure based on load conversion and cap type and construction method thereof
CN113847036A (en) * 2021-10-25 2021-12-28 安徽理工大学 Double-wall seat structure for deep drilling shaft after well wall bottom breaking and construction method

Also Published As

Publication number Publication date
BE766064A (en) 1971-09-16
DE2120178B2 (en) 1973-06-14
NL7105475A (en) 1972-06-30
AU2812171A (en) 1972-11-02
DE2120178C3 (en) 1974-01-10
AT321977B (en) 1975-04-25
DE2120178A1 (en) 1972-07-13
JPS5620438B1 (en) 1981-05-13
FR2126661A5 (en) 1972-10-06
CA947520A (en) 1974-05-21
GB1354741A (en) 1974-06-05
CH546312A (en) 1974-02-28

Similar Documents

Publication Publication Date Title
US3645102A (en) Telescoping lining and support structure and method for lining tunnels and shafts
CN110985025B (en) Method for reconstructing shield tunnel to carry out mine construction
CN108590695B (en) Communication channel shield construction method and communication channel
US11739639B2 (en) Composite support structure, construction system, and method
US9964235B2 (en) Supporting structures for pipelines and the like
CN109869159A (en) A kind of shield construction method of service channel
CN112324474B (en) Tunnel contact channel rapid construction method based on telescopic steel pipe sheet
CN204677221U (en) A kind of tunnel moves supporting and protection structure
CN107288666B (en) A kind of pipeline original position Serial regulation system and method for adjustment
US3818710A (en) Tunnel liners
CN113374931B (en) Non-excavation capacity-expansion method for old urban pipeline
KR100800028B1 (en) Method for constructing a tunnel using front jacking construction method
CN114320313A (en) Air-pushing dragging type pipe jacking machine escaping construction method
US3768267A (en) Telescoping lining and support structure and method for lining tunnels and shafts
CN114704272B (en) Construction method of underground tunnel with first building and then digging
CN115012944A (en) Vertical shaft construction device and construction method
CN108756932A (en) A kind of method for tunnel construction of new supporting structure
CN110671114B (en) Recovery type round vertical shaft supporting device and method
CN113982597A (en) Tunnel excavation construction method suitable for strong-water-permeability unconsolidated formation in karst subsidence area
CN111720131A (en) Method for breaking reinforced concrete tunnel portal by shield and construction device
KR102712580B1 (en) Construction method of underground structure
CN106958448A (en) A kind of shallow tunnel construction method and system
CN219953344U (en) Sealing device for shield originating steel sleeve
CN214741349U (en) Shield constructs section of jurisdiction structure that shield constructs quick-witted thrust city tunnel and prevent section of jurisdiction come-up
CN221973537U (en) Double-seal shield launching box