CN107288666B - A kind of pipeline original position Serial regulation system and method for adjustment - Google Patents

A kind of pipeline original position Serial regulation system and method for adjustment Download PDF

Info

Publication number
CN107288666B
CN107288666B CN201710666724.3A CN201710666724A CN107288666B CN 107288666 B CN107288666 B CN 107288666B CN 201710666724 A CN201710666724 A CN 201710666724A CN 107288666 B CN107288666 B CN 107288666B
Authority
CN
China
Prior art keywords
pipeline
tube coupling
jacking
original position
antipriming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710666724.3A
Other languages
Chinese (zh)
Other versions
CN107288666A (en
Inventor
王剑锋
吕品
黄莹峰
梁辉
赵强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Road and Bridge Group Co Ltd
Original Assignee
Shanghai Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Road and Bridge Group Co Ltd filed Critical Shanghai Road and Bridge Group Co Ltd
Priority to CN201710666724.3A priority Critical patent/CN107288666B/en
Publication of CN107288666A publication Critical patent/CN107288666A/en
Application granted granted Critical
Publication of CN107288666B publication Critical patent/CN107288666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/44Hydraulic, pneumatic, or hydraulic-pneumatic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of pipeline original position Serial regulation systems, including the antipriming of the adjacent tube coupling junction of pipeline is arranged in and the grouting device of the lower section injection slurries in the tube coupling of sinking and for downward immersed tube section is arranged in, it further include jacking apparatus, the jacking apparatus includes extending along duct orientation and being supported on the lifting beam in inner wall of the pipe and lower end is supported on lifting beam, upper end can be resisted against multiple hydraulic cylinders in inner wall of the pipe, and a part of the lifting beam is located at the sinking section of pipeline.The adjustment system has jacking apparatus, and pipeline homing as much as possible can be made by the top lift of hydraulic cylinder, improves the effect of Serial regulation.

Description

A kind of pipeline original position Serial regulation system and method for adjustment
Technical field
The present invention relates to the LFM signal field in situ of the underground pipings such as more river more particularly to a kind of Serial regulation in situ systems System and method of adjustment.
Background technique
In underground piping or Tunnel Engineering, for building or building the pipeline of completion, due to extraneous factor Effect so that the tube coupling of composition pipeline generates offset or sinks, cause originally linear pipeline be deformed.
Pipeline original position Serial regulation construction method (hereinafter referred to as " linear adjusting method ") refer to using certain equipment and Adjustment of the technological means to generating on mobile tube coupling progress position, so that the pipeline being deformed is restored to linear state.
Domestic linear adjusting method is mainly used in " Shield-bored tunnels ", and main method to be applied is slip casting skill Art, i.e., to tunnel structure outside the soil body carry out slip casting, the pressure and its dilatancy transmitted by slurries adjust tunnel structure Position, and solidification to adjust the tunnel result behind position and stablizes after being condensed using slurries.For example, Shanghai rail transit Shield-tunneling construction of No. 2 line running tunnels due to creating No. 11 lines thereunder, under causing No. 2 line partial regions of top to occur It is heavy.Grouting method then is carried out in sinking tunnel bottom and carries out Serial regulation, the tunnel structure of sedimentation is jacked, so that tunnel is whole Reply original linear state.
Pipe jacking construction technique and traditional Shield Construction Technique are close but not exactly the same, therefore can use for reference shield tunnel The LFM signal construction method in road, but need to be modified and adjusted according to the uniqueness of jacking construction.Pipe jacking method and shield The maximum difference of structure engineering method is: the pipeline or tunnel structure of shield method after front digging machine excavation can by pipeline or Tunnel structure is fixedly mounted, and push pipe rule needs to push using the tube coupling before subsequent tube coupling jacking and always always, Before pipeline perforation, all tube couplings all remain motion state.Therefore, different from shield method, pipe jacking method is focused on reducing The friction of pipeline outer wall structure and soil layer forms the mud film of effective lubrication drag reduction between pipeline and soil layer, is very heavy It wants.
1) current linear adjusting method is mainly comprised the steps that the tube coupling sealing to sink on pipeline;2) to sinking Tube coupling at grouting in soil mass.But the prior art for executing above-mentioned two step has the disadvantages that
1. traditional shield grouting means are not suitable for pipe-jacking project
Different from shield method, before pipeline is not penetrated completion, all tube couplings require in the earth formation pipe jacking method Movement, it is therefore necessary to keep the lubricity between pipeline outer wall and soil layer, keep the formation of pipeline periphery soil layer mud film.
Injection water method for slurry is built in tunnel or pipeline in shield method and is often used, and corresponding theoretical and apply skill Art is mature.Although injection cement grout exchanges homogeneous tube road or tunnel structure has a significant effect, cement grout meeting Condensation hardening can seriously destroy the formation of mud film, cause resistance mistake in pipeline jack-in process if applied in push bench process Greatly.Therefore traditional shield grouting means are not particularly suited in the LFM signal of push pipe, need to be added according to the characteristics of pipe jacking method With improve and perfect.
2. traditional antipriming is not suitable for LFM signal construction
Pipeline is made of the linking of tube coupling one by one, and poor contact easily generates crack between tube coupling, and extraneous water and soil is caused to seep Enter.Therefore often measures of preventing water is used to the contact zone between tube coupling.Traditional antipriming is only for static pipeline For, if tube coupling moves or dislocate, often antipriming can fail.And in the Serial regulation of pipeline original position, tube coupling meeting Biggish movement occurs, while to guarantee to keep good water-stagnating effect before and after tube coupling is mobile, it is therefore desirable to using special Seal installation optimizes processing.
3. settling amount is big, single means are not able to satisfy the needs adjusted in situ
The deflection of pipeline or tunnel that traditional Serial regulation means are often directed to is smaller, when the adjustment amount of pipeline is more than When certain value, the requirement of jacking duct height is often not achieved using single adjustment means.
Meanwhile limitation is suffered from using the means of adjustment pipeline in the stratum for passing through river, while being contemplated that and adjusting During whole, function influence of the extraneous Water And Earth Pressures to pipeline.And these factors Engineering Projects passing before often all It is not involved with.
4. more river pipeline complex geologic conditions, correlation engineering case is few, lacks corresponding theory research
Traditional pipeline and Tunnel Engineering is often in the good region of geological condition, however as the hair of urban construction Exhibition, some engineerings in complex geological condition also gradually increase.The more river pipeline engineering engineering that then belongs to complex geologic conditions Project.Since the theoretical research and referential Engineering Projects, the more difficulty of construction of Jiang Guandao that lack related maturation are non- Chang great.
Stratum in river bottom, moisture content is high and hydraulic pressure is high, once pipeline leaks in construction process, underground water Pipeline can be poured in mud, is done great damage.The axis bending or deformation that more Jiang Guandao occurs, often caused by building Pipeline leaks in the process, and pipeline water and soil is caused to pour in.Since around water and soil pours in inside pipeline, pipeline is caused Surrounding soil Stratum Loss is serious, thus section of tubing structure is caused to be sunk, and due to part tube coupling uneven subsidence, leads to pipeline Axis bending, deformation.
Summary of the invention
The main purpose of the present invention is to provide a kind of pipeline original position Serial regulation system and method for adjustment, the system and sides Method can adapt to pipeline commissioning caused by different factors, and keep the Serial regulation effect of pipeline more preferable using multiple means.
To achieve the above objectives, the technical solution adopted by the present invention are as follows: a kind of pipeline original position Serial regulation system, including set Set the adjacent tube coupling junction of pipeline antipriming and sinking is set tube coupling in and be used for downward immersed tube section lower section Inject the grouting device of slurries, which is characterized in that further include jacking apparatus, the jacking apparatus includes extending along duct orientation And be supported on the lifting beam in inner wall of the pipe and lower end be supported on lifting beam, upper end can be resisted against it is multiple in inner wall of the pipe Hydraulic cylinder, a part of the lifting beam are located at the sinking section of pipeline.
Preferably, the length of the lifting beam be greater than sinking pipeline length, the both ends of the lifting beam be supported on it is non-under On the inner wall in immersed tube road.
Preferably, the lifting beam is supported on the inner wall of pipeline by jacking pedestal, and the upper end of the hydraulic cylinder passes through Jacking boots plate be resisted against on the inner wall of pipeline, it is described jacking pedestal and jacking boots plate and pipeline contact surface it is arc-shaped.
Preferably, the antipriming includes internal expension ring antipriming, and the internal expension ring antipriming includes for by two The waterstop and the two sides of waterstop are respectively fixed to the pressing plate on the adjacent tube coupling that the junction of adjacent tube coupling covers.
Preferably, after waterstop is fixed on two adjacent tube couplings by pressing plate, the waterstop is in the radial direction side along tube coupling There is inside protrusion upwards.
Preferably, agent is pasted in oiling between the waterstop and tube coupling.
Preferably, the antipriming includes inflatable antipriming, and the inflatable antipriming includes coaxially setting The type inflatable waterstop and sealing packing setting the steel collar in pipeline and being arranged on steel collar periphery, it is described inflatable The outer diameter of formula waterstop and sealing packing is greater than the internal diameter of pipeline.
Preferably, a certain proportion of polyacrylamide is is incorporated into shape in bentonite by the slurries that the grouting device uses At mixed serum.
Preferably, the injection slurry of the grouting device is drawn out in the soil layer below pipeline by conduit, the conduit Serum outlet end is sealed using flexible tape.
Preferably, the adjustment system further includes being arranged on adjacent tube coupling and adjacent tube coupling being applied to the power moved toward one another Drawknot device.
Compared with prior art, the invention has the following advantages:
1) the adjustment system increases in the purpose that the prior art realizes jacking by grouting device is arranged in pipeline Jacking apparatus, which passes through the hydraulic cylinder being arranged on jacking girder steel and realizes jacking, and rigidity is good, and then can reach Preferably jacking effect;And by being used cooperatively with grouting device, when jacking while to the lower section of pipeline inject slurries In time to fill the gap between pipeline and soil layer, pipeline is formed and is supported, and then can be realized better Serial regulation Effect;
2) slurries of grouting device use mixing liquid, while guaranteeing to pipeline support, will not hinder pipeline Axial movement;
3) antipriming of the adjustment system is used cooperatively using internal expension ring antipriming and inflatable antipriming, is used Multiple means carry out sealing, can reach better water-stagnating effect.
Detailed description of the invention
Fig. 1 is the perspective view of internal expension ring antipriming of the invention
Fig. 2 is the sectional view of internal expension ring antipriming and tube wall cooperation of the invention
Fig. 3 is the sectional view of inflatable antipriming and tube wall cooperation of the invention
Fig. 4 is the structure chart of grouting device of the invention
Fig. 5 be jacking apparatus of the invention from end when view
Fig. 6 is the side view of jacking apparatus of the invention
Fig. 7 is the installation diagram of drawknot device of the invention on tube wall
Fig. 8 is the cross-sectional view of drawknot device of the invention
Fig. 9 is structure chart when drawknot device of the invention is observed along the axial direction of pipeline
Figure 10-12 is the course of work of the hydraulic cylinder of jacking apparatus of the invention
Specific embodiment
It is described below for disclosing the present invention so that those skilled in the art can be realized the present invention.It is excellent in being described below Embodiment is selected to be only used as illustrating, it may occur to persons skilled in the art that other obvious modifications.
Embodiment one
A kind of pipeline original position Serial regulation system, including multiple antiprimings 1, jacking apparatus 2 and grouting device 4.Institute It states antipriming 1 and the junction of adjacent tube coupling in sinking pipeline is set to fill up the gap generated because tube coupling 600 misplaces, together When can also play the role of sealing.The jacking apparatus 2 is arranged in pipeline the tube coupling 600 of sinking is lifted to original Position, the grouting device 4 is to the lower section soil layer slip casting after being lifted to the tube coupling 600 of sinking.
As shown in Figure 1, the antipriming 1 uses internal expension ring antipriming, each internal expension ring antipriming includes one A rubber pad waterstop 11 and two arc keeper plate of steels 12, the rubber pad waterstop 11 have certain width, are fitted in On the inner wall of two adjacent and dislocation tube couplings 600, the gap that such rubber pad waterstop 11 can misplace is filled up, and energy Enough prevent the water in extraneous soil layer from entering in pipeline.The two sides of rubber pad waterstop 11 are provided with an arc keeper plate of steel 12 Rubber pad waterstop 11 to be fixed on the tube coupling 600 of two dislocation.Specifically, the arc keeper plate of steel 12 by it is multiple not The tempering screw 13 that becomes rusty is fixed on corresponding tube coupling 600.Meanwhile can also be prevented by the extruding of arc keeper plate of steel 12 water from Binding face between tube coupling 600 and arc keeper plate of steel 12 is flowed into tube coupling 600
As shown in Fig. 2, when in order to guarantee that the gap between two adjacent and dislocation tube couplings 600 changes in a certain range Rubber pad waterstop 11 will not be had an impact, the rubber pad waterstop 11 is after being fixed on tube coupling 600, with two tube couplings Between the corresponding position in gap at formed towards pipeline center protrusion 14, protrusion 14 between two tube couplings 600 gap change Change plays buffer function, avoids and is stretched and damaged to rubber pad waterstop 11 during gap changes. Two arc keeper plate of steels 12 are fixed by the rubber fastening band 11 for being located at raised 14 two sides respectively.
It, can be by rubber pad waterstop 11 in order to further prevent water to enter in pipeline from the gap of two tube couplings 600 It is adhered on the inner wall of tube coupling 600 by pasting agent.
Jacking apparatus 2 is installed after the installation for completing antipriming 1, the tube coupling 600 of sinking is jacked.
As seen in figs. 5-6, the jacking apparatus 2 includes jacking hydraulic cylinder 21, jacking girder steel 22, jacking pedestal 23 and top Boots plate 24 is risen, the jacking girder steel 22 extends along the axis of pipeline.And the length of girder steel 22 is jacked slightly larger than sinking pipeline Length, the jacking girder steel 22 is supported on the inner wall below pipeline by multiple jacking pedestals 23, part of to jack base Seat 23 is supported on the non-sinker area of pipeline, is arranged at jacking pedestal 23, Jin Eryou in the non-sinker area of pipeline commissioning area two sides Have always from the support in normal position pipeline in jacking girder steel 22, and then can guarantee that jack girder steel 22 has always Normal position.
The lower end of the hydraulic cylinder 21 is supported on jacking girder steel 22, and upper end is resisted against above pipeline by jacking boots plate 24 Inner wall on, and then the jacking to sinking tube coupling 600 is realized by the elongation of hydraulic cylinder 21, keeps the tube coupling 600 extensive as much as possible Multiple normal position.The one side that the jacking boots plate 24 is contacted with inner wall of the pipe is the arc and pipeline of cambered surface and the cambered surface Inner wall is consistent, and the top lift of hydraulic cylinder 21 can be enable to be applied to pipeline as homogeneously as possible by jacking boots plate 24 On, prevent stress concentrate and cause partial region top lift excessive, more than pipeline ultimate bearing capacity and destroy.It is described Jacking pedestal 23 has same effect.
Specifically, the jacking girder steel 22 is spliced using H profile steel, has two rows, in the jacking girder steel 22 of each row On be provided with multiple hydraulic cylinders 21, and the hydraulic cylinder 21 on two rows of jacking girder steels 22 is parallel to each other two-by-two and relative under not The center line in immersed tube road is symmetrically to guarantee the symmetry of support force.And the adjacent hydraulic cylinder 21 being located on same jacking girder steel 22 The distance between the identical uniformity to guarantee pipeline stress in the axial direction.
As shown in figure 4, the grouting device 4 includes conduit 41 and high-pressure soil sand pump (not shown), the high-pressure soil sand pump Outlet be connected with the arrival end of conduit 41 by high-pressure hose, tube wall of the outlet end of the conduit 41 below pipeline is stretched The outside of pipeline is arrived out, and the entrance of the high-pressure soil sand pump is connected with the device for storing slurries, and then high-pressure soil sand pump will be starched Liquid is sent to conduit 41 and is discharged to outside pipeline.The middle part of the conduit 41 is provided with latus rectum ball valve 42 so that conduit 41 can be with When close and be connected.
Grouting device 4 first drills on duct wall in installation process, smears anchoring adhesive around drilling later, finally inserts Enter conduit 41.Since anchoring adhesive and concrete and metal material can be good at combining, and after its condensation cure, intensity is almost Equivalent reinforced steel bar strength, therefore can effectively fill up the gap between drilling and metal tube.However, if anchoring adhesive once flows into Metal tube will be blocked to inside metal tube, after solidification and is difficult to dredge, and therefore, in order to prevent such a situation from occurring, led Before the insertion drilling of pipe 41, is sealed in insertion one end using flexible tape, prevent anchoring adhesive to be flowed into pipe, and flexible tape Anti-pressure ability is small, and during high-pressure injection later, injection material can break through flexible tape under high pressure, is smoothly injected into Pipeline external.
The junction of the conduit 41 and high-pressure hose is provided with packing antipriming 43, passes through packing antipriming 43 It can be improved the bearing capacity of junction, and then prevent junction from leaking.
The slurries are that have the bentonite of certain lubrication drag reduction property and mix a certain proportion of polyacrylamide wherein The mixed serum of amine (PAM), which has the following characteristics that 1) be injected into stratum after, can to pipeline generate one orientation On jacking stress;2) in transport with certain mobility, while there is certain stabilization again after being injected into the soil body Property, and then the mixed serum can squeeze into the soil body by conduit, but enter after stratum, it will not expand around on a large scale It dissipates, therefore after injecting the mixed serum, pipeline will not sink again in a short time;3) drag reduction with height lubricates Performance, pipeline be still able to after carrying out Serial regulation continue jacking, will not between pipeline and stratum lubricity and The formation of mud sleeve has an impact.
Meanwhile as Figure 7-9, in order to preferably achieve the purpose that Serial regulation, the adjustment system further includes setting Pipeline drawknot device 3 in the junction in adjacent tube coupling 600.The pipeline drawknot device includes being separately positioned on two adjacent tubes The drawknot screw 32 that drawknot pedestal 31 on section 600 is connected with by two drawknot pedestals 31, is provided on the drawknot pedestal 31 Mounting hole 34, the drawknot pedestal 31 are fixed on the inner wall of tube coupling 600 by penetrating bolt in mounting hole 34, the drawknot Pedestal 31 is the consistent arc-shaped base of inner wall arc with tube coupling 600.It is additionally provided with connecting plate 33 on the drawknot pedestal 31, The through-hole passed through for drawknot screw 32 is provided on connecting plate 33, during installation, the drawknot bottom on two adjacent tube couplings 600 Threaded hole on seat 31 is oppositely arranged, and the drawknot screw 32 is placed through on the drawknot pedestal 31 on two adjacent tube couplings 600 Through-hole has screwed nut at the both ends of drawknot screw 32, and nut is resisted against the outside of drawknot pedestal 31 and then passes through rotation Stubborn nut can make the drawknot pedestal 31 being located on two adjacent tube couplings 600 constantly close to the gap made between two tube couplings 600 in turn Position when constantly reducing, and then two-phase union 600 being made to be restored to non-sinking as much as possible.
Specifically, it is provided with pipeline drawknot device 3 in the junction of all adjacent tube couplings 600 of sinking pipeline, and Multiple pipeline drawknot devices 3, multiple pipeline drawknots of same junction are provided in the junction of each adjacent tube coupling 600 Device 3 is uniformly arranged the uniformity to guarantee 600 stress of tube coupling in circumferencial direction.
Embodiment two
The difference of embodiment two and embodiment one is that antipriming uses inflatable antipriming 5 to replace internal expension ring Antipriming.
The inflatable antipriming includes that diameter is slightly less than the steel collar 51 of internal diameter of the pipeline and steel collar 51 is arranged in Inflatable watertight rubber band 52 and compressible sealing packing 53 on circumferential surface, and be all provided in steel collar 51 along axial two sides Inflatable watertight rubber band 51 and sealing packing 53 is equipped with to cooperate with tube coupling 600 adjacent with two respectively and then connect tube coupling 600 The clearance seal at place is connect, and the inflatable watertight rubber band 52 and compressible sealing packing 53 are in steel collar 51 and pipeline Inner wall between be extruded with tube wall be in close contact so that realize sealing effect.
The case where being more than 20cm for the gap between adjacent dislocation tube coupling 600, it can suitably increase inflatable sealing The quantity of rubber strip 52 or compressible sealing packing 53, for example, adding two on the basis of internal one of sealing packing 53 Road inflatable watertight rubber band 52.When increasing inflatable watertight rubber band, each watertight rubber band 52 of reasonable Arrangement and sealing The position of packing 53, blending bolt are fixed, prevent watertight rubber band 52 and sealing packing 53 because be not fixed firmly by due to fall off.
Larger due to misplacing between tube coupling 600, the bell and spigot 56 for connecting tube coupling is often fallen off, for this purpose, in steel bushing It is provided with the valve 54 with the gap area of adjacent 600 junction of tube coupling on ring 51, is filled by valve into gap a large amount of Tail seal grease of shield 55, to reinforce water-stagnating effect.Wherein, the company that the bell and spigot 56 connects 600 to seal two adjacent tubes Place is met, when tube coupling 600 misplaces larger, bell and spigot 56 cannot play the effect of sealing, just need to inject tail seal grease of shield at this time 55 to play certain water-stagnating effect.
Inflatable antipriming 5 in the embodiment is suitable for tube coupling and misplaces larger situation, and interior in embodiment one Tensioner ring antipriming is adapted to the lesser situation of tube coupling dislocation, and in the pipeline of the same sinking, some tube coupling misalignments Seriously, some tube coupling misalignments are slight, therefore, may use simultaneously in the pipeline of the same sinking and arrive internal expension ring sealing Device and inflatable antipriming.
The method of adjustment of the adjustment system is as follows:
Step 1: installation antipriming
Misplacing, lighter tube coupling installs internal expension ring antipriming, is first laid with rubber pad waterstop 11, utilizes arc later Keeper plate of steel 12 pushes down waterstop two sides, is finally fixed with bolt.For the tube coupling installation inflatable sealing dress for misplacing more serious It sets, first with the gap between 52 sealed tube wall of inflatable watertight rubber band and steel collar 51, later in inflatable watertight rubber Inside with 52 increases compressible sealing packing 53 together, finally fills tail seal grease of shield between the gap of adjacent tube coupling 55 are sealed.
Before antipriming is installed, need first to clear up installation site to reach better water-stagnating effect.
Step 2: installation drawknot device
In the tube coupling of production pipeline, the preformed hole of installation drawknot pedestal 31 is reserved on tube coupling, is provided in preformed hole Internal screw thread.When installing drawknot device, first the mounting hole on drawknot pedestal 31 is aligned with preformed hole and is installed by screw solid It is fixed, drawknot screw 32 is then each passed through the through-hole hole on the drawknot pedestal 31 being mounted on adjacent tube coupling and by screwing position Drawknot is realized in the nut on drawknot screw 32.
Step 3: installation grouting device
Firstly, drilling outward from inner wall of the pipe, the hole bored is to infuse native hole, but not drill through, and reserves 5cm pipe thickness (if drilling through, extraneous water and soil can pour in pipe);Then native hole is infused in cleaning, and the inside is prevented to be mixed into impurity effect subsequent operation;It connects Pour into effective reinforcement glue, and the conduit of grouting device 41 is inserted into the native hole of note, effective reinforcement glue intensity is waited to reach design requirement;So Afterwards, latus rectum ball valve 42 is installed, and native hole will be infused and drilled through, is poured in prevent hole from drilling through rear extraneous water and soil, ball valve should be closed in time; Finally, corresponding packing sealing and high-pressure hose are installed in 41 top of conduit.High-pressure hose is connected with high-pressure soil sand pump, note Soil material (mixed serum) is injected into the soil layer below pipeline by high-pressure soil sand pump, conduit 41.
The mixed serum of injection is deployed using bentonite original soil, water and polyacrylamide (PAM), slump control In 100mm between 130mm.Slurries are mixed and stirred using mortar mixer, are fitted into reservoir bag later, be transported to inside pipeline to With.
Step 4: the structure for installing jacking apparatus above-mentioned attaches it in pipeline 600.
When carrying out pipeline original position LFM signal, successively start drawknot device, grouting device and jacking apparatus, and During adjustment, it is adjusted in the order described above repeatedly and is to the last restored to position that is in situ or needing.
The raising order of jacking process can be carried out specifically according to field condition, preferably using behind first centre two sides it is suitable Sequence is jacked, and concrete operations are as follows:
Firstly, as shown in Figure 10, the hydraulic cylinder (3,4,5, No. 6 hydraulic cylinders) of starting jacking apparatus intermediate region is pushed up It rises, while injecting mixed serum, observation jacking situation to sinking section tube coupling (18 to No. 22 tube couplings in figure) using high-pressure soil sand pump; Later, as shown in figure 11, intermediate hydraulic cylinder, starting left side hydraulic cylinder (5-8 hydraulic cylinder), while immersed tube section note soil downwards are withdrawn (19 to No. 23 tube couplings in figure);Finally, as shown in figure 12, withdrawing left side hydraulic cylinder, (No. 1-4 hydraulic for starting right side hydraulic cylinder Cylinder), and immersed tube section infuses native (17 to No. 21 tube couplings in figure) downwards.The moment is wanted to pay attention to observing pipe seam variation and seep during jacking Leak situation.
Entire jacking process slowly carries out, and pipeline should observe variable quantity, the tube coupling in tube coupling gap in time during jacking Jacking amount, accurate recording note soil amount, jacking amount data according to the native sequence of the data of continuous renewal guidance beating then and beat soil Amount, makes this section of sedimentation pipe nodel line close to straight line.
The packing impaction state that observation inflatable antipriming is needed during jacking, in the motion process of pipeline jacking, Pipeline is linear to change, and packing pine excessively will affect its water-stagnating effect, and tension will limit the motility of tube coupling;
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and Improvement is both fallen in the range of claimed invention.The present invention claims protection scope by appended claims and its Equivalent defines.

Claims (9)

1. a kind of pipeline original position Serial regulation system, antipriming and setting including the adjacent tube coupling junction of pipeline is arranged in The grouting device of lower section injection slurries in the tube coupling of sinking and for downward immersed tube section, which is characterized in that further include jacking Device, the jacking apparatus include extending along duct orientation and being supported on the lifting beam in inner wall of the pipe and lower end is supported on top Rise beam on, upper end can be resisted against the multiple hydraulic cylinders in inner wall of the pipe, a part of the lifting beam is located at the sinking of pipeline Section,
Wherein, the lifting beam is supported on the inner wall of pipeline by jacking pedestal, and the upper end of the hydraulic cylinder passes through jacking boots Plate is resisted against on the inner wall of pipeline, it is described jacking pedestal and jacking boots plate and pipeline contact surface it is arc-shaped.
2. a kind of pipeline original position Serial regulation system according to claim 1, which is characterized in that the length of the lifting beam Greater than the length of sinking pipeline, the both ends of the lifting beam are supported on the inner wall of non-sinking pipeline.
3. according to a kind of pipeline original position Serial regulation system described in claim 1, which is characterized in that the antipriming includes interior Tensioner ring antipriming, the internal expension ring antipriming include for by the waterstop of the junctions of two adjacent tube couplings covering and will be only The two sides of water band are respectively fixed to the pressing plate on the adjacent tube coupling.
4. according to a kind of pipeline original position Serial regulation system as claimed in claim 3, which is characterized in that fix waterstop in pressing plate After on to two adjacent tube couplings, the waterstop has inside protrusion along tube coupling in the radial direction.
5. according to a kind of pipeline original position Serial regulation system as claimed in claim 4, which is characterized in that the waterstop and tube coupling it Between oiling paste agent.
6. according to a kind of described in any item pipeline original position Serial regulation systems of claim 1-5, which is characterized in that the sealing dress It sets including inflatable antipriming, the inflatable antipriming includes that the steel collar being placed coaxially in pipeline and setting exist The outer diameter of type inflatable waterstop and sealing packing on steel collar periphery, the type inflatable waterstop and sealing packing is big In the internal diameter of pipeline.
7. according to a kind of described in any item pipeline original position Serial regulation systems of claim 1-5, which is characterized in that the slip casting dress The slurries that use are set as a certain proportion of polyacrylamide is incorporated into the mixed serum formed in bentonite.
8. according to a kind of pipeline original position Serial regulation system as claimed in claim 7, which is characterized in that the slurries of the grouting device It is drawn out in the soil layer below pipeline by conduit, the serum outlet end of the conduit is sealed using flexible tape.
9. according to a kind of described in any item pipeline original position Serial regulation systems of claim 1-5, which is characterized in that further include setting Apply the drawknot device of the power moved toward one another on adjacent tube coupling and by adjacent tube coupling.
CN201710666724.3A 2017-08-07 2017-08-07 A kind of pipeline original position Serial regulation system and method for adjustment Active CN107288666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710666724.3A CN107288666B (en) 2017-08-07 2017-08-07 A kind of pipeline original position Serial regulation system and method for adjustment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710666724.3A CN107288666B (en) 2017-08-07 2017-08-07 A kind of pipeline original position Serial regulation system and method for adjustment

Publications (2)

Publication Number Publication Date
CN107288666A CN107288666A (en) 2017-10-24
CN107288666B true CN107288666B (en) 2019-04-16

Family

ID=60104699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710666724.3A Active CN107288666B (en) 2017-08-07 2017-08-07 A kind of pipeline original position Serial regulation system and method for adjustment

Country Status (1)

Country Link
CN (1) CN107288666B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108488535A (en) * 2018-06-20 2018-09-04 上海公路桥梁(集团)有限公司 A kind of inflatable sealing internal expension ring device for repairing underground piping infiltration
CN109340454B (en) * 2018-09-27 2020-09-04 上海公路桥梁(集团)有限公司 Reinforced concrete jacking pipe deviation rectifying method
CN109538824B (en) * 2018-12-28 2024-06-18 中国电建集团福建省电力勘测设计院有限公司 Heavy-calibre reinforced concrete electric power push pipe structure that little camber curve jacking was used
CN109949690B (en) * 2019-03-28 2024-05-07 广州市市政工程设计研究总院有限公司 Vertical jacking model test device and method for shield vertical shaft

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005330654A (en) * 2004-05-18 2005-12-02 Sanwa Kizai Co Ltd Existing buried pipe updating device
CN200943500Y (en) * 2006-08-07 2007-09-05 上海市隧道工程轨道交通设计研究院 Tunnel treatment system for adapting to large uneven precipitation or stagger of stratum
CN102305089A (en) * 2011-09-21 2012-01-04 上海隧道工程股份有限公司 Beam lifting device of shield pipe piece splicing machine
CN102889428A (en) * 2012-10-18 2013-01-23 北京隆科兴非开挖工程有限公司 Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN204899932U (en) * 2015-08-28 2015-12-23 中铁十四局集团第四工程有限公司 Perpendicular jacking equipment in water intaking riser hole in water intaking tunnel
CN105908785A (en) * 2016-06-02 2016-08-31 中铁隧道集团二处有限公司 Sunken pipe butt joint GINA water stop belt longitudinal limiting pull rod device under high water difference condition

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005330654A (en) * 2004-05-18 2005-12-02 Sanwa Kizai Co Ltd Existing buried pipe updating device
CN200943500Y (en) * 2006-08-07 2007-09-05 上海市隧道工程轨道交通设计研究院 Tunnel treatment system for adapting to large uneven precipitation or stagger of stratum
CN102305089A (en) * 2011-09-21 2012-01-04 上海隧道工程股份有限公司 Beam lifting device of shield pipe piece splicing machine
CN102889428A (en) * 2012-10-18 2013-01-23 北京隆科兴非开挖工程有限公司 Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN204899932U (en) * 2015-08-28 2015-12-23 中铁十四局集团第四工程有限公司 Perpendicular jacking equipment in water intaking riser hole in water intaking tunnel
CN105908785A (en) * 2016-06-02 2016-08-31 中铁隧道集团二处有限公司 Sunken pipe butt joint GINA water stop belt longitudinal limiting pull rod device under high water difference condition

Also Published As

Publication number Publication date
CN107288666A (en) 2017-10-24

Similar Documents

Publication Publication Date Title
CN107288666B (en) A kind of pipeline original position Serial regulation system and method for adjustment
US3645102A (en) Telescoping lining and support structure and method for lining tunnels and shafts
CN103410161A (en) Slant grouting control steel anchor pipe frame and construction method thereof
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN105804076A (en) Pre-stressed anchor cable and foundation pit supporting pre-stressed anchor cable construction method
CN104912065A (en) Underwater anchor pile construction method
CN108662281B (en) Pipe jacking device and pipe jacking construction method
CN217841648U (en) Existing shield stratum grouting reinforcement system based on WSS construction method for tunnel downward penetration
CN112112654A (en) Isolation plate structure in upper soft and lower hard stratum and construction method thereof
CN211973480U (en) Grouting anchor rod
CN105297737B (en) A kind of bag type paste miniature pressure bearing pile of controllable range of grouting
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN113153379B (en) Tunnel waterproof and drainage system and construction process
CN108662282B (en) Pipe jacking device for sludge land and pipe jacking construction method
CN212225238U (en) Device for controlling pipe jacking construction settlement
CN102134861A (en) Method for testing precast pile in soil body
CN106838463A (en) The fastener inserts and usage of longitudinal integral rigidity after raising rectangular top plumber
CA3217077C (en) Single-layer shaft lining with joint sealing structure and grouting system and its construction method
CN105605335A (en) Large-caliber prestressed steel cylinder concrete pipe for jacking construction
CN206206982U (en) The lubricant fill nipple of push-bench thixotropic slurry conveyance conduit
CN105065774B (en) A kind of underground piping branch connects construction method
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN202989919U (en) Pressure-bearing water-sand-layer anchor rod mounting structure
CN215949527U (en) Hole sealing, grouting and water plugging reinforcing device for anchor cable holes in roadway water sprinkling area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant