Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US305003A
Inventor
Burchardt Kurt
Kaufmann Wilhelm
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US305003A priority Critical patent/US3226894A/en
Application granted granted Critical
Publication of US3226894A publication Critical patent/US3226894A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/10Buildings forming part of cooling plants
    • E04H5/12Cooling towers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/22Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material with parts being prestressed
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S261/00Gas and liquid contact apparatus
    • Y10S261/11Cooling towers

Definitions

  • This invention relates to cooling towers, and relates more particularly to cooling tower structures of concrete made of prefabricated-building elements.
  • the construction of the cooling tower with prefabricated parts has the advantage that the individual elements can be manufactured economically on a production line in a factory to precise specifications by procedures including vibration of the concrete.
  • the high quality vibrated parts of small cross section enable a lightweight concrete structure contrary to heavy columns and beams when cast in situ.
  • the buildingelements can be of comparatively small sizes and weight to enable an easy handling. The erection canbe carried out in repetitive series of simple steps. 7
  • the instant construction avoids any exposed steel parts.
  • the outer and inner walls are manufactured also of easily exchangeable elements, for instance they are'made of asbestos cement, and fastened to the concrete structure.
  • the concrete structure supports also the tower filling, for instance grid decks, water distribution system, drift eliminators, etc., thereby rendering unnecessary any additional construction.
  • the grid decks may serve as scaffolding during erection of the tower.
  • the load carrying construction parts support the grid decks, thereby rendering any additional construction unnecessary.
  • the present invention consists in the novel construction, arrangement and combination of various devices, elements and parts, as set forth in the claims hereof, one embodiment of the same being illustrated in the accompanying drawings and described in the specification.
  • FIG. 1 is an elevational view, partly in vertical section, of a cooling tower structure assembly, in accordance with the invention
  • FIG. 2 is a fragmentary large scale sectional view of parts of the assembled cooling tower frame structure
  • FIG. 3 is a fragmentary schematic perspective view of parts of the cooling tower structure, with the outer wall plates removed in part;
  • FIG. 4 is a large scale fragmentary sectional detail view of a building element embodiment, showing a detail A. of FIG. 2;
  • FIG. 5a is a front elevational view of a building elep the ends of two elements interconnected by one stressing ment embodiment
  • FIG. 5b which has been selected for illustration in the FIG. 5b is an end elevational view thereof;
  • FIG. 5c is a plan view thereof
  • FIG. 6a is a front elevational view similar to FIG. 5a, but of an embodiment of a different building element
  • FIG. 6b is an end elevational view of FIG. 6a seen in the direction of the arrow B;
  • FIG. 60 is an end elevational view of the element of FIG. 6a, but seen in the direction of the arrow C;
  • FIG. 6d is a plan view thereof
  • FIG. 7a is a front elevational view of an embodiment of still another building element. 1
  • FIG. 7b is an end view thereof
  • FIG. is a plan view thereof
  • FIG. 8a is an elevational view of a wall plate element
  • FIG. 8b is a sectional view taken on line VIIIb+- VIIIb of FIG. S a. p
  • FIG. 9 is a perspective view of part of the cooling tower showing the arrangement of a staircase.
  • a cooling tower with a number of layers formed by the grid decks and supported by the. horizontally extending parts of the building elements.
  • the tower carries a top plate 1.
  • a foundation which includes a bottom 3 and upright parts including a rim or flange 2.
  • the foundation serves at the same time as a water basin.
  • the foundation is composed of concrete and anchors, by means of plates 5, the lowermost of the stressing elements 4.
  • Each of the stressing elements 4 includes a rod of high-grade steel, over. which the building elements are inserted.
  • joint or layer of cement 6 Between the various building elements of each column, there is joint or layer of cement 6 (FIGS. 2 and 4).
  • he frame construction of the cooling tower has been erected from building elements selected from a small group of building elements. 1
  • FIGS. 5a to 70 There are essentially four types of concrete prefabricated building elements used, three types of which designated X, Y, Z are shown in FIGS. 5a to 70 and the fourth type element W is shown in FIG. 2.
  • Each type of building element may appear intwo different forms or embodiments, as explained below.
  • Each of the building elements has a vertical portion 7, 7, 7" that defines on its interior a vertical passage or bore 9 in which there is disposed a stressing'rod 4, but the rod does not completely fill out the volume of the passage or bore 9, so
  • the building element X has a long vertical portion 7 which carries about midway of its height two oppositely disposed horizontal arms 8.
  • the building elements X are used throughout the tower structure, except for the corner columns and for some of the external columns and for the top part of the tower.
  • FIGS. 5a, 5b and 5c there is shown one form or embodiment of the building element X.
  • the vertical portion 7 of this embodiment has at its lowermost end a tapered recess 29 (FIG. 5a) of the pas,- sage 9, to receive a bushing 23 (FIG. 4) for interconnecting two superposed rods 4.
  • the passage 9 in vertical portion 7 of this embodiment furthermore, has its upper end enlarged to provide a cylindrical recess 14 (FIG. 5a)
  • the upper element of said two elements forms the second embodiment of the element X having a similar cylindrical recess at the bottom of the passage 9 of the vertical portion 7 for receiving the sleeve which operates as a seal.
  • Said second embodiment has an annular dish-shaped member 30 (FIG. 4) which is embedded near the top in the vertical portion 7.
  • the member 36 is disposed substantially horizontally, and may be of steel sheet or the like.
  • the vertical portion 7 has immediately above the member 30 a conical recess 32 for engagement of a taper 13 of a nut 12 and for supporting a stress generating means (not shown) for stressing of the stress rods 4.
  • the building element Y has a long vertical portion 7' similar to that of the element X with, however, but a single horizontal arm extending on only one side about midway of the height of the vertical portion 7'.
  • These building elements Y are used to form the corner columns and some of the other external columns of the tower structure (FIG. 3), except for the top part of the tower, with the arms 8 projecting at one side.
  • the elements forming the external columns there may be chosen elements X positioned to have the second arm 8 extending beyond the confines of the tower wall surface in order to attach thereto a staircase (FIG. 9).
  • the building element Y similar to the building eleent X, comes in two forms or embodiments one, which is shown in FIGS.
  • the building element Z is used for the topmost part of the tower (see FIG. 2), and has a vertical portion 7" which is shorter than that of the elements X or Y, and carries two opposite horizontal arms 8, the upper surface of which is flush with the upper surface of the vertical portion 7".
  • the building element Z also comes in two forms or embodiments: one, that is shown in FIGS. 7a-c, and which has a tapered recess 29 at the bottom and a cylindrical recess 14 at the top of the vertical portion '7"; and the other embodiment has a cylindrical recess at the bottom, and a tapered recess 32 near the top of the vertical portion 7" above an embedded annular member 30.
  • the fourth type building element W is shown at the top left side of'FIG. 2. It is like the element Z but has only one arm 8 formed on a short vertical portion 7". It forms the top elements for the corner columns and for some of the other external columns otherwise built up of elements Y. Similar to the other building elements, the building element W may also appear in two different forms or embodiments.
  • the arms 8 of the elements X and Z are of equal length while the length of the single arms 8 of the elements Y and W is equal to the length of the arms 8 of the said elements X and Z.
  • This not only greatly facilitates the construction because the workman can operate according to very simple prescriptions but also has the great advantage that the distribution of the bending moments resulting from the wind load, which is the greatest load occurring at the cooling tower, has its zero value there, where the ends of the arms are connected with each other, the maximum value of the moment lying at the spot where the horizontal arms 8 emerge from the vertical portion. Due to the fact that the horizontal portions of the elements in one layer extend perpendicularly to the horizontal portions of the elements in the adjacent layers, the cooling tower structure is able to take up the wind forces from all directions. The load resulting from the wind forces on the horizontal arms is much greater than the moments resulting from the static load because said static load mainly results from the grid decks.
  • the vertical portions 7 and '7' have a length corresp n g o the distan e between c rre p nd ng regions of the horizontal portions of vertically adjacent layers.
  • the triangular momcntlines of the columns which are the result of the horizontal wind load have their maximum values at the junctions of vertical and horizontal parts of two adjacent layers, having the horizontal parts extending in the same direction, while the minimum value or zero point is at the junction of the vertical and horizontal parts of the elements of the layer extending in between the two mentioned layers.
  • the individual building elements may be formed with. the aid of cores and forms. Due to the fact that the ele-- ments with two horizontal arms have said arms extending: ing the same plane, the forms remain simple whilst trans-- portation costs can be kept low.
  • the rods 4 will be stressed.
  • the said hexagonal nut 12 which has a downward taper 13 (FIG. 4).
  • annular substantially horizontal dish-shaped member 30 against which the taper portion 13 of the nut 12 bears. The purpose of the member 30 is to distribute the vertical stress forces of the rod 4 as well as the transverse forces occurring in the concrete owing to the stress exerted on the end by the rod 4.
  • the stress force is permanently fixed by threading down the nut 12, after which the apparatus secured to the upper end of the rod 4 for stressing it is removed. Subsequently, a binder, such as cement paste, will be injected into the passages 9 through an injection opening 15.
  • the passages 9, in order to permit the complete filling by the binder, are provided with ventilating apertures (not shown).
  • Each of the stressing rods 4 preferably protrudes through two or more superposed building elements of the type X, Y, Z and W, and each rod is provided with threads at its opposite ends and may be prolongated by the threaded bushings 23 (FIG. 4) which are disposed at the point of abutment of two building elements.
  • the arms 8 of the elements of two laterally adjoining columns are so dimensioned relative to the space between two adjoining columns that they define between their free end surfaces a gap 17 which has a length of approximately 4 inches.
  • a gap 17 which has a length of approximately 4 inches.
  • the reinforcing wire ends 18 will then be interconnected, for instance, by welding, and thereafter the gap 17 will be filled up with a cement that is quick-hardening and subject to but little shrinking.
  • the surfaces of the free end portions 16 of the arms 8 are preferably rough or roughened, in order to promote a good adhesion of the filling cement,
  • Each plate 19 has a height of about one-half of the height of the vertical portion 7 (FIGS. 5a and 5b) and is of rectangular shape and has a length corresponding to the space between two adjoining columns formed of superposed building elements.
  • the plates have, however, off-set horizontal end surfaces 21, each forming a shoulder for proper overlapping of vertically adjoining plates 19.
  • the grid decks may be placed during the erection of the tower and if made, for instance, of wood may serve as a scaffold for the further build-up of the frame structure.
  • the vertical portions 7" or the elements Z and W reach only to the height of the upper surfaces of the arms 8.
  • the rods 4 of the external building columns which protrude beyond the top of the building elements, will serve to hold a flange beam 24 which encircles the tower and, furthermore, to hold the ends of roof plates 25 as well as of molding beams 26 that are placed over the roof plates 25.
  • the rods 4 of the exterior building columns may serve either directly as railing parts or as supports for a railing that may encircle the top of the tower.
  • a suspension rod (not shown) may be threaded onto the thread of a rod 4 to serve as a rearward anchor for an outrigger (not shown) which maybe erected on the roof of the tower, for use for instance for the exchange of machinery forming part of the blower system.
  • FIG. 9 shows that a staircase 28 can be easily secured to the outwardly extending horizontal arms 8 of the building elements X which are positioned at suitable locations in the outer columns for supporting the staircase.
  • a cooling tower comprising a frame structure formed of a plurality of horizontally spaced vertical columns of prefabricated concrete elements stacked in layers, each of the concrete elements being monolithic and having a vertical column-forming portion with at least one horizontal beam extending at right angles to the columnforrning portion and within the same plane as the columnforming portion, the horizontal beam being of a length substantially equal to one half the distance between adjacent horizontally spaced vertical columns and having its end connected to the end of a horizontal beamof an adjacent said vertical column, the elements in one layer portions of elements in the same layer in other columns, all the horizontal beam parts of the elements in one layer extending in a direction perpendicular to the direction in which all of the horizontal beam parts of the concrete elements in layers just above and just below said one layer extend, the vertical column-forming portions of said elements being of a length about equal to the distance between corresponding regions of the horizontal portions of vertically adjacent layers.
  • each columnfornnng portion having a passage extending longitudinally therethrough from end to end and a stressing member extending through said passage and engaging at least the lower and upper column-forming portion of the column through which the stressing member extends to prestress the column.
  • each columnforming portion having a passage extending longitudinally therethrough from end to end and a stressing member extending through said passage and connected to the stressing member passing through the concrete element immediately below and engaging the columnaforming portion through which the stressing member extends to prestress the column.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)

Description

Jan. 4, 1966 Filed Aug. 27, 1965 K. BURCHARDT ETAL CONCRETE COOLING TOWER 6 Sheets-Sheet 1 INVENTORS KURT fiunc/mnor AND W/LHELM KAuFMAA/A/ ATTORNEY Jan. 4, 1966 K. BURCHARDT ETAL 3,225,894
CONCRETE COOLING TOWER Filed Aug. 27, 1965 6 Sheets-Sheet 2 ll-In j INVENTORS Uf?7' Bum/mm? All/D W/l. 115m AAUFMA :wv BY J- JW ATTORNEY Jan. 4, 1966 K. BURCHARDT ETAL 3,226,894
CONCRETE COOLING TOWER 6 Sheets-Sheet 3 Filed Aug. 2'7, 1963 Mm m m V W KURT fiunaHAnor A/VD W/LHELM KAUFMAN ATTORNEY K. BURCHARDT ETAL 3,226,894
CONCRETE COOLING TOWER Jan. 4, 1 966 6 Sheets-Sheet 4 Filed Aug. 27, 1963 INVENTORS Kum- Uficfi/MDT 4/10 MLHELM K4 UFMA NA/ ATTORNEY Jan. 4, 1966 K. BURCHARDT ETAL 3,226,394
CONCRETE COOLING TOWER 6 Sheets-Sheet 5 Fild .Aug. 27, 1965 INVENTORS K087 @mcfiA/wr 4m.
MLHELM ffAz/FMM/n BY 42%; J JW ATTORNEY K. BURCHARDT ETAL 3,226,894
CONCRETE COOLING TOWER 6 Sheets-Sheet 6 Jan. 4, 1966 Filed Aug 27, 1963 INVENTORS KURT BURCH/480T AND W/LHELM KAUFMAN/v ATTORNEY United States Patent T CONCRETE COOLING TOWER Kurt Burchardt, I-Iamburg-Othmarschen, and Wilhelm Kaufmann, Hamburg-Blankenese, Germany, assignors to Ernst Kirchner, Hamburg-Blankenese, Germany, a firm Filed Aug. 27, 19 63, Ser. No. 305,003 7 Claims. (Cl. 52-223) This is a continuation-in-part of application Serial No. 648,070, filed March 25, 1957, and now abandoned.
This invention relates to cooling towers, and relates more particularly to cooling tower structures of concrete made of prefabricated-building elements.
While cooling towers have heretofore been made of concrete, usually cast on site, with attendant great height and heavy construction, in most of these instances substantially all of the load carrying has been assigned to the outer walls. s a
In contrast hereto, it is among theprincipal objects of the present invention to provide a cooling tower struc-. ture made of prefabricated concrete standard parts which enables a nearly equal distribution of wind and static load throughout the entire cooling tower area. The columns composed of superposed building elements are stressed after emplacement by highgrade steel stressing rods, after which the hollow spaces, into which the stressing rods are placed, are filled with a binder material.
The construction of the cooling tower with prefabricated parts has the advantage that the individual elements can be manufactured economically on a production line in a factory to precise specifications by procedures including vibration of the concrete. The high quality vibrated parts of small cross section enable a lightweight concrete structure contrary to heavy columns and beams when cast in situ. Furthermore the buildingelements can be of comparatively small sizes and weight to enable an easy handling. The erection canbe carried out in repetitive series of simple steps. 7
The instant construction avoids any exposed steel parts. The outer and inner walls are manufactured also of easily exchangeable elements, for instance they are'made of asbestos cement, and fastened to the concrete structure. The concrete structure supports also the tower filling, for instance grid decks, water distribution system, drift eliminators, etc., thereby rendering unnecessary any additional construction.
The grid decks may serve as scaffolding during erection of the tower. The load carrying construction parts support the grid decks, thereby rendering any additional construction unnecessary. a
With the above and other objects of the invention in view, the present invention consists in the novel construction, arrangement and combination of various devices, elements and parts, as set forth in the claims hereof, one embodiment of the same being illustrated in the accompanying drawings and described in the specification.
In the accompanying drawings,
FIG. 1 is an elevational view, partly in vertical section, of a cooling tower structure assembly, in accordance with the invention; s
FIG. 2 is a fragmentary large scale sectional view of parts of the assembled cooling tower frame structure;
FIG. 3 is a fragmentary schematic perspective view of parts of the cooling tower structure, with the outer wall plates removed in part;
FIG. 4 is a large scale fragmentary sectional detail view of a building element embodiment, showing a detail A. of FIG. 2;,
FIG. 5a is a front elevational view of a building elep the ends of two elements interconnected by one stressing ment embodiment;
' bodiments which has been selected for illustration in the FIG. 5b is an end elevational view thereof;
FIG. 5c is a plan view thereof;
FIG. 6a isa front elevational view similar to FIG. 5a, but of an embodiment of a different building element;
FIG. 6b is an end elevational view of FIG. 6a seen in the direction of the arrow B;
FIG. 60 is an end elevational view of the element of FIG. 6a, but seen in the direction of the arrow C;
FIG. 6d is a plan view thereof;
FIG. 7a is a front elevational view of an embodiment of still another building element; 1
FIG. 7b is an end view thereof;
FIG. is a plan view thereof;
FIG. 8a is an elevational view of a wall plate element;
FIG. 8b is a sectional view taken on line VIIIb+- VIIIb of FIG. S a. p
FIG. 9 is a perspective view of part of the cooling tower showing the arrangement of a staircase.
In carrying the invention into effect in one of the emaccompanying drawings and for description in this specification, and referring now particularly to 'FIG. 1, there is provided a cooling tower with a number of layers formed by the grid decks and supported by the. horizontally extending parts of the building elements. At
the top, the tower carries a top plate 1.
As best shown in FIGS. 1 and 2, there is provided a foundation which includes a bottom 3 and upright parts including a rim or flange 2. The foundation serves at the same time as a water basin. The foundation is composed of concrete and anchors, by means of plates 5, the lowermost of the stressing elements 4. Each of the stressing elements 4 includes a rod of high-grade steel, over. which the building elements are inserted. Between the various building elements of each column, there is joint or layer of cement 6 (FIGS. 2 and 4).
, he frame construction of the cooling tower has been erected from building elements selected from a small group of building elements. 1
There are essentially four types of concrete prefabricated building elements used, three types of which designated X, Y, Z are shown in FIGS. 5a to 70 and the fourth type element W is shown in FIG. 2. Each type of building element, may appear intwo different forms or embodiments, as explained below. Each of the building elements has a vertical portion 7, 7, 7" that defines on its interior a vertical passage or bore 9 in which there is disposed a stressing'rod 4, but the rod does not completely fill out the volume of the passage or bore 9, so
that there remains after the insertion of the rod 4 an annular space between the surfaces of the passage 9 and of the rod 4.
The building element X has a long vertical portion 7 which carries about midway of its height two oppositely disposed horizontal arms 8. The building elements X are used throughout the tower structure, except for the corner columns and for some of the external columns and for the top part of the tower. In FIGS. 5a, 5b and 5c there is shown one form or embodiment of the building element X. The vertical portion 7 of this embodiment has at its lowermost end a tapered recess 29 (FIG. 5a) of the pas,- sage 9, to receive a bushing 23 (FIG. 4) for interconnecting two superposed rods 4. The passage 9 in vertical portion 7 of this embodiment, furthermore, has its upper end enlarged to provide a cylindrical recess 14 (FIG. 5a)
Patented Jan. 4, 1966' rod. The upper element of said two elements forms the second embodiment of the element X having a similar cylindrical recess at the bottom of the passage 9 of the vertical portion 7 for receiving the sleeve which operates as a seal. Said second embodiment has an annular dish-shaped member 30 (FIG. 4) which is embedded near the top in the vertical portion 7. The member 36 is disposed substantially horizontally, and may be of steel sheet or the like. The vertical portion 7 has immediately above the member 30 a conical recess 32 for engagement of a taper 13 of a nut 12 and for supporting a stress generating means (not shown) for stressing of the stress rods 4.
The building element Y has a long vertical portion 7' similar to that of the element X with, however, but a single horizontal arm extending on only one side about midway of the height of the vertical portion 7'. These building elements Y are used to form the corner columns and some of the other external columns of the tower structure (FIG. 3), except for the top part of the tower, with the arms 8 projecting at one side. For some of the elements forming the external columns, however, there may be chosen elements X positioned to have the second arm 8 extending beyond the confines of the tower wall surface in order to attach thereto a staircase (FIG. 9). The building element Y, similar to the building eleent X, comes in two forms or embodiments one, which is shown in FIGS. 6ad, having a tapered recess 29 at the bottom and a cylindrical recess 14 at the top of the vertical portion 7 and the other embodiment having a cylin drical recess at the bottom and a tapered recess 32 near the top of the vertical portion 7 above an embedded annular member 30.
The building element Z is used for the topmost part of the tower (see FIG. 2), and has a vertical portion 7" which is shorter than that of the elements X or Y, and carries two opposite horizontal arms 8, the upper surface of which is flush with the upper surface of the vertical portion 7". The building element Z also comes in two forms or embodiments: one, that is shown in FIGS. 7a-c, and which has a tapered recess 29 at the bottom and a cylindrical recess 14 at the top of the vertical portion '7"; and the other embodiment has a cylindrical recess at the bottom, and a tapered recess 32 near the top of the vertical portion 7" above an embedded annular member 30.
The fourth type building element W is shown at the top left side of'FIG. 2. It is like the element Z but has only one arm 8 formed on a short vertical portion 7". It forms the top elements for the corner columns and for some of the other external columns otherwise built up of elements Y. Similar to the other building elements, the building element W may also appear in two different forms or embodiments.
The arms 8 of the elements X and Z are of equal length while the length of the single arms 8 of the elements Y and W is equal to the length of the arms 8 of the said elements X and Z. This not only greatly facilitates the construction because the workman can operate according to very simple prescriptions but also has the great advantage that the distribution of the bending moments resulting from the wind load, which is the greatest load occurring at the cooling tower, has its zero value there, where the ends of the arms are connected with each other, the maximum value of the moment lying at the spot where the horizontal arms 8 emerge from the vertical portion. Due to the fact that the horizontal portions of the elements in one layer extend perpendicularly to the horizontal portions of the elements in the adjacent layers, the cooling tower structure is able to take up the wind forces from all directions. The load resulting from the wind forces on the horizontal arms is much greater than the moments resulting from the static load because said static load mainly results from the grid decks.
Further, the vertical portions 7 and '7' have a length corresp n g o the distan e between c rre p nd ng regions of the horizontal portions of vertically adjacent layers. This means that the triangular momcntlines of the columns which are the result of the horizontal wind load have their maximum values at the junctions of vertical and horizontal parts of two adjacent layers, having the horizontal parts extending in the same direction, while the minimum value or zero point is at the junction of the vertical and horizontal parts of the elements of the layer extending in between the two mentioned layers. This means that at the points where the vertical portions are interconnected, there is a small load but this load can be neglected, especially when the elements are pressed upon each other by the stressing rods.
The individual building elements may be formed with. the aid of cores and forms. Due to the fact that the ele-- ments with two horizontal arms have said arms extending: ing the same plane, the forms remain simple whilst trans-- portation costs can be kept low.
In the process of erection, there is first put a layer of cement 6 onto the upright parts of the foundation, and then building elements X and Y are inserted over the lowermost stress rods 4 and rest on the cement 6, form-- ing the lowermost series or layer of building elements. Another layer of cement 6 is added to the top of the lowermost building elements, and the next series or layer of building elements X and Y is then superposed on the building elements of the lowermost series, but with their arms 8 at right angles to the direction of the arms 8 of the lowermost series. The vertical portions 7 and 7 of the building element layers are superposed in such a manner that the passages or bores 9 are in vertical alignment and the rods 4 are provided with the hollow sleeves It) at the level of the layer 6 between the superposed vertical portions.
After one or several layers of these building elements have been emplaced, the rods 4 will be stressed. For this purpose, there is mounted at the free upper end of a rod 4 the said hexagonal nut 12 which has a downward taper 13 (FIG. 4). In the upper region on the interior of the vertical portions 7, 7' of some of the building element embodiments, as previously described, there is embedded an annular substantially horizontal dish-shaped member 30, against which the taper portion 13 of the nut 12 bears. The purpose of the member 30 is to distribute the vertical stress forces of the rod 4 as well as the transverse forces occurring in the concrete owing to the stress exerted on the end by the rod 4. After the stressing of the rod 4, the stress force is permanently fixed by threading down the nut 12, after which the apparatus secured to the upper end of the rod 4 for stressing it is removed. Subsequently, a binder, such as cement paste, will be injected into the passages 9 through an injection opening 15. The passages 9, in order to permit the complete filling by the binder, are provided with ventilating apertures (not shown).
Each of the stressing rods 4 preferably protrudes through two or more superposed building elements of the type X, Y, Z and W, and each rod is provided with threads at its opposite ends and may be prolongated by the threaded bushings 23 (FIG. 4) which are disposed at the point of abutment of two building elements.
The arms 8 of the elements of two laterally adjoining columns are so dimensioned relative to the space between two adjoining columns that they define between their free end surfaces a gap 17 which has a length of approximately 4 inches. Into this gap 17 there protrude the bent ends 18 of the reinforcing wires of the arms 8. The reinforcing wire ends 18 will then be interconnected, for instance, by welding, and thereafter the gap 17 will be filled up with a cement that is quick-hardening and subject to but little shrinking. The surfaces of the free end portions 16 of the arms 8 are preferably rough or roughened, in order to promote a good adhesion of the filling cement,
Subsequently, there will be mounted the outer wall plates 19 (FIGS. 3 and 8a and 817). Each plate 19 has a height of about one-half of the height of the vertical portion 7 (FIGS. 5a and 5b) and is of rectangular shape and has a length corresponding to the space between two adjoining columns formed of superposed building elements. The plates have, however, off-set horizontal end surfaces 21, each forming a shoulder for proper overlapping of vertically adjoining plates 19.
The grid decks (not shown) may be placed during the erection of the tower and if made, for instance, of wood may serve as a scaffold for the further build-up of the frame structure.
Following the erection of two layers of building elements, the worker will first prolongate the rods 4 by means of the threaded bushings 23. Thereafter, the operations of the first two layers will be repeated for the next two layers. r
In the top layer, the vertical portions 7" or the elements Z and W reach only to the height of the upper surfaces of the arms 8. The rods 4 of the external building columns, which protrude beyond the top of the building elements, will serve to hold a flange beam 24 which encircles the tower and, furthermore, to hold the ends of roof plates 25 as well as of molding beams 26 that are placed over the roof plates 25. Still furthermore, the rods 4 of the exterior building columns may serve either directly as railing parts or as supports for a railing that may encircle the top of the tower. Moreover, a suspension rod (not shown) may be threaded onto the thread of a rod 4 to serve as a rearward anchor for an outrigger (not shown) which maybe erected on the roof of the tower, for use for instance for the exchange of machinery forming part of the blower system.
FIG. 9 shows that a staircase 28 can be easily secured to the outwardly extending horizontal arms 8 of the building elements X which are positioned at suitable locations in the outer columns for supporting the staircase.
We wish it to be understood that we do not desire to be limited to the exact details of construction shown and described, for obvious modifications will occur to a person skilled in the art.
Having thus described the invention, what we claim as new and desire to be secured by Letters Patent is as follows:
1. A cooling tower comprising a frame structure formed of a plurality of horizontally spaced vertical columns of prefabricated concrete elements stacked in layers, each of the concrete elements being monolithic and having a vertical column-forming portion with at least one horizontal beam extending at right angles to the columnforrning portion and within the same plane as the columnforming portion, the horizontal beam being of a length substantially equal to one half the distance between adjacent horizontally spaced vertical columns and having its end connected to the end of a horizontal beamof an adjacent said vertical column, the elements in one layer portions of elements in the same layer in other columns, all the horizontal beam parts of the elements in one layer extending in a direction perpendicular to the direction in which all of the horizontal beam parts of the concrete elements in layers just above and just below said one layer extend, the vertical column-forming portions of said elements being of a length about equal to the distance between corresponding regions of the horizontal portions of vertically adjacent layers.
2. A cooling tower as claimed in claim 1, each columnfornnng portion having a passage extending longitudinally therethrough from end to end and a stressing member extending through said passage and engaging at least the lower and upper column-forming portion of the column through which the stressing member extends to prestress the column.
3. A cooling tower as claimed in claim 1, each columnforming portion having a passage extending longitudinally therethrough from end to end and a stressing member extending through said passage and connected to the stressing member passing through the concrete element immediately below and engaging the columnaforming portion through which the stressing member extends to prestress the column.
4. A cooling tower as claimed in claim 1, said horizontal beam being located about midway of the height of the column-forming portion.
5. A cooling tower as claimed in claim 2, the horizontal beam being located about midway of the height of the column-forming portion.
6. A cooling tower as claimed in claim 3, the horizontal beam being located about midway of the height of the column-forming portion.
7. A cooling tower as claimed in claim 6, the columnforming portions of the concrete elements of the uppermost layer in each column having a shorter length and terminating at a level corresponding to that of the horizontal beams of said uppermost layer of the frame structure.
References Cited by the Examiner UNITED STATES PATENTS 972,595 10/1910 Belles 18284 X 1,734,771 11/1929 Mitchell 52227 2,419,843 4/1947 Marten 52-73 X 2,898,097 8/1959 Goldsmith 261108 FOREIGN PATENTS 167,653 5/ 1956 Australia.
543,866 3/1942 Great Britain.
559,237 2/ 1944 Great Britain.
603,695 6/1948 Great Britain.
626,097 7/1949 Great Britain.
667,682 3/1952 Great Britain.
OTHER REFERENCES Engineering News-Record, TA1.E61, April 18, 1946, pages 88-90.
RICHARD W. COOKE, IR., Primary Examiner.
JACOB L. NACKENOFF, Examiner.

Claims (1)

1. A COOOLING TOWER COMPRISING A FRAME STRUCTURE FORMED OF A PLURALITY OF HORIZONTALLY SPACED VERTICAL COLUMNS OF PREFABRICATED CONCRETE ELEMENTS STACKED IN LAYERS, EACH OF THE CONCRETE ELEMENTS BEING MONOLITHIC AND HAVING A VERTICAL COLUMN-FORMING PORTION WITH AT LEAST ONE HORIZONTAL BEAM EXTENDING AT RIGHT ANGLES TO THE COLUMNFORMING PORTION AND WITHIN THE SAME PLANE AT THE COLUMNFORMING PORTION, THE HORIZONTAL BEAM BEING OF A LENGTH SUBSTANTIALLY EQUAL TO ONE HALF THE DISTANCE BETWEEN ADJACENT HORIZONTALLY SPACED VERTICAL COLUMNS AND HAVING ITS END CONNECTED TO THE END OF A HORIZONTAL BEAM OF AN ADJACENT SAID VERTICAL COLUMN, THE ELEMENTS IN ONE LAYER OF ONE COLUMN BEING AT THE SAME LEVEL AS CORRESPONDING ELEMENTS AT THE CORRESPONDING LAYER IN OTHER COLUMNS AND HAVING THEIR HORIZONTAL PORTIONS PARALLEL TO THE HORIZONTAL PORTIONS OF ELEMENTS IN THE SAME LAYER IN OTHER COLUMNS, ALL THE HORIZONTAL BEAM PARTS OF THE ELEMENTS IN ON LAYER EXTENDING IN A DIRECTION PERPENDICULAR TO THE DIRECTION IN WHICH ALL OF THE HORIZONTAL BEAM PARTS OF THE CONCRETE ELEMENTS IN LAYERS JUST ABOVE AND JUST BELOW SAID ONE LAYER EXTEND, THE VERTICAL COLUMN-FORMING PORTIONS OF SAID ELEMENTS BEING OF A LENGTH ABOUT EQUAL TO THE DISTANCE BETWEEN CORRESPONDING REGIONS OF THE HORIZONTAL PORTIONS OF VERTICALLY ADJACENT LAYERS.
US305003A 1963-08-27 1963-08-27 Concrete cooling tower Expired - Lifetime US3226894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US305003A US3226894A (en) 1963-08-27 1963-08-27 Concrete cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US305003A US3226894A (en) 1963-08-27 1963-08-27 Concrete cooling tower

Publications (1)

Publication Number Publication Date
US3226894A true US3226894A (en) 1966-01-04

Family

ID=23178881

Family Applications (1)

Application Number Title Priority Date Filing Date
US305003A Expired - Lifetime US3226894A (en) 1963-08-27 1963-08-27 Concrete cooling tower

Country Status (1)

Country Link
US (1) US3226894A (en)

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3300942A (en) * 1964-02-10 1967-01-31 Dravco Corp Method of constructing natural draft cooling tower
US3355357A (en) * 1964-06-17 1967-11-28 Atomic Energy Authority Uk Prestressed concrete pressure vessels for use in nuclear installations
US3395515A (en) * 1964-03-16 1968-08-06 William Stanley Lovely Cooling towers
US3466823A (en) * 1967-11-27 1969-09-16 Seamus Dowling Space form skeleton structures made of prefabricated tri-axial interlocking building elements having non-rigid force distributing connectors
US3503170A (en) * 1968-08-14 1970-03-31 Shelley W Shelley Modular post-tensioned overlapped staggered building construction
US3633328A (en) * 1968-10-17 1972-01-11 Preload Co Inc Pressurized storage tank
US3648990A (en) * 1968-11-05 1972-03-14 Robert J Stoker Cooling tower
US3678644A (en) * 1970-09-08 1972-07-25 Wates Ltd Method of gaining pre-cast concrete panels
US3684057A (en) * 1971-06-04 1972-08-15 Horace Eppinette Portable stairway
US3779523A (en) * 1972-03-08 1973-12-18 Ecodyne Corp Concrete cooling tower
US3782061A (en) * 1972-03-23 1974-01-01 A Minutoli Concrete building construction with improved post tensioning means
US3785095A (en) * 1971-07-16 1974-01-15 E Verner Multi-unit folding slab construction
US3813835A (en) * 1972-05-30 1974-06-04 E Rice Modular multiple story structure and module therefor
US3834681A (en) * 1972-08-17 1974-09-10 Marley Co Fireproof, prefab fill support structure for cooling tower
US3867805A (en) * 1972-05-18 1975-02-25 Kajima Corp Method of forming joint construction of precast concrete columns and beams
US3917765A (en) * 1972-03-08 1975-11-04 Ecodyne Corp Concrete cooling tower
US4003450A (en) * 1974-04-25 1977-01-18 Kenngott Gmbh & Co. Kg Small structural building component
US4033081A (en) * 1975-05-16 1977-07-05 Perkins Jr Fred M Modular building system
US4059931A (en) * 1976-01-29 1977-11-29 Mongan William T Building framing system for post-tensioned modular building structures
US4136492A (en) * 1973-06-04 1979-01-30 Willingham John H Industrialized building construction
US4173103A (en) * 1974-12-04 1979-11-06 Sargis Sargis E Light-weight structural system and modular concrete building components therefor
US4296048A (en) * 1980-04-01 1981-10-20 Sim William J Support bracket for distribution panel for cooling towers and the like
US4299785A (en) * 1979-06-20 1981-11-10 Coignet S.A. Induced draft cooling tower with improved outer support structure
US4318256A (en) * 1978-05-16 1982-03-09 Boonman Cornelis Johannes F Anchor construction for prestressing members
EP0059680A2 (en) * 1981-01-15 1982-09-08 Richmond Screw Anchor Co., Inc. Rebar splicing and anchoring
US4543218A (en) * 1984-07-17 1985-09-24 Ceramic Cooling Tower Company Cooling tower with concrete support structure, fiberglass panels, and a fan supported by the liquid distribution system
US4572711A (en) * 1983-05-23 1986-02-25 Stresswall International, Inc. Prestressed component retaining wall system
US4637903A (en) * 1985-10-30 1987-01-20 Ceramic Cooling Tower Company Lightweight cooling tower
US4655646A (en) * 1986-06-16 1987-04-07 Stresswall International, Inc. Multitiered, rigid tieback, essentially vertical retaining wall system
EP0295939A2 (en) * 1987-06-18 1988-12-21 Parma Oy Concrete framework system and method and apparatus for farbrication of system-compatible columns
FR2644814A1 (en) * 1989-03-24 1990-09-28 Aboulfadl Jamal METHOD FOR PRODUCING STRUCTURES AND STRUCTURE OBTAINED, IN PARTICULAR WOOD, FOR THE PRODUCTION OF BUILDINGS
US5545356A (en) * 1994-11-30 1996-08-13 Tower Tech, Inc. Industrial cooling tower
US5675943A (en) * 1995-11-20 1997-10-14 Southworth; George L. Lateral load-resisting structure having self-righting feature
US5958306A (en) * 1997-10-16 1999-09-28 Curtis; Harold D. Pre-collectors for cooling towers
US6497401B2 (en) * 1999-08-23 2002-12-24 Delta Cooling Towers, Inc. Molded cooling tower
US20030033772A1 (en) * 2001-08-20 2003-02-20 Matthew Russell Methods and apparatus for building tall vertical structures
US20130019545A1 (en) * 2006-08-07 2013-01-24 Andrew Buchanan Engineered Wood Construction System for High Performance Structures
US12077964B2 (en) * 2020-03-26 2024-09-03 Felix Sorkin Intermediate anchor assembly

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US972595A (en) * 1910-04-13 1910-10-11 Reuben O Belles Counterbalanced stairway or ladder.
US1734771A (en) * 1928-04-04 1929-11-05 Refrigeration Corp Of America Refrigerator construction
GB543866A (en) * 1940-09-17 1942-03-17 Helge Ingerslev Improvements in or relating to cooling towers
GB559237A (en) * 1942-06-05 1944-02-10 London Ferro Concrete Company Improvements in or relating to building structures
US2419843A (en) * 1944-12-09 1947-04-29 Elmer W Marten Building construction
GB603695A (en) * 1944-11-03 1948-06-21 Carlos Wets Improvements in frameworks and process of making frameworks of concrete or like stony material
GB626097A (en) * 1947-03-13 1949-07-08 Structural & Mechanical Dev En Improvements relating to the assembly of precast concrete structural units
GB667682A (en) * 1949-04-16 1952-03-05 Davenport Engineering Company Improvements in or relating to packings for water cooling and like towers
US2898097A (en) * 1957-12-09 1959-08-04 Hudson Engineering Corp Cooling tower

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US972595A (en) * 1910-04-13 1910-10-11 Reuben O Belles Counterbalanced stairway or ladder.
US1734771A (en) * 1928-04-04 1929-11-05 Refrigeration Corp Of America Refrigerator construction
GB543866A (en) * 1940-09-17 1942-03-17 Helge Ingerslev Improvements in or relating to cooling towers
GB559237A (en) * 1942-06-05 1944-02-10 London Ferro Concrete Company Improvements in or relating to building structures
GB603695A (en) * 1944-11-03 1948-06-21 Carlos Wets Improvements in frameworks and process of making frameworks of concrete or like stony material
US2419843A (en) * 1944-12-09 1947-04-29 Elmer W Marten Building construction
GB626097A (en) * 1947-03-13 1949-07-08 Structural & Mechanical Dev En Improvements relating to the assembly of precast concrete structural units
GB667682A (en) * 1949-04-16 1952-03-05 Davenport Engineering Company Improvements in or relating to packings for water cooling and like towers
US2898097A (en) * 1957-12-09 1959-08-04 Hudson Engineering Corp Cooling tower

Cited By (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3300942A (en) * 1964-02-10 1967-01-31 Dravco Corp Method of constructing natural draft cooling tower
US3395515A (en) * 1964-03-16 1968-08-06 William Stanley Lovely Cooling towers
US3355357A (en) * 1964-06-17 1967-11-28 Atomic Energy Authority Uk Prestressed concrete pressure vessels for use in nuclear installations
US3466823A (en) * 1967-11-27 1969-09-16 Seamus Dowling Space form skeleton structures made of prefabricated tri-axial interlocking building elements having non-rigid force distributing connectors
US3503170A (en) * 1968-08-14 1970-03-31 Shelley W Shelley Modular post-tensioned overlapped staggered building construction
US3633328A (en) * 1968-10-17 1972-01-11 Preload Co Inc Pressurized storage tank
US3648990A (en) * 1968-11-05 1972-03-14 Robert J Stoker Cooling tower
US3678644A (en) * 1970-09-08 1972-07-25 Wates Ltd Method of gaining pre-cast concrete panels
US3684057A (en) * 1971-06-04 1972-08-15 Horace Eppinette Portable stairway
US3785095A (en) * 1971-07-16 1974-01-15 E Verner Multi-unit folding slab construction
US3917765A (en) * 1972-03-08 1975-11-04 Ecodyne Corp Concrete cooling tower
US3779523A (en) * 1972-03-08 1973-12-18 Ecodyne Corp Concrete cooling tower
US3782061A (en) * 1972-03-23 1974-01-01 A Minutoli Concrete building construction with improved post tensioning means
US3867805A (en) * 1972-05-18 1975-02-25 Kajima Corp Method of forming joint construction of precast concrete columns and beams
US3813835A (en) * 1972-05-30 1974-06-04 E Rice Modular multiple story structure and module therefor
US3834681A (en) * 1972-08-17 1974-09-10 Marley Co Fireproof, prefab fill support structure for cooling tower
US4136492A (en) * 1973-06-04 1979-01-30 Willingham John H Industrialized building construction
US4003450A (en) * 1974-04-25 1977-01-18 Kenngott Gmbh & Co. Kg Small structural building component
US4173103A (en) * 1974-12-04 1979-11-06 Sargis Sargis E Light-weight structural system and modular concrete building components therefor
US4033081A (en) * 1975-05-16 1977-07-05 Perkins Jr Fred M Modular building system
US4059931A (en) * 1976-01-29 1977-11-29 Mongan William T Building framing system for post-tensioned modular building structures
US4318256A (en) * 1978-05-16 1982-03-09 Boonman Cornelis Johannes F Anchor construction for prestressing members
US4368607A (en) * 1978-05-16 1983-01-18 Boonman Cornelis J F Anchor construction for prestressing members
US4299785A (en) * 1979-06-20 1981-11-10 Coignet S.A. Induced draft cooling tower with improved outer support structure
US4296048A (en) * 1980-04-01 1981-10-20 Sim William J Support bracket for distribution panel for cooling towers and the like
EP0059680A2 (en) * 1981-01-15 1982-09-08 Richmond Screw Anchor Co., Inc. Rebar splicing and anchoring
EP0059680A3 (en) * 1981-01-15 1982-10-13 Richmond Screw Anchor Co., Inc. Rebar splicing and anchoring
US4572711A (en) * 1983-05-23 1986-02-25 Stresswall International, Inc. Prestressed component retaining wall system
US4543218A (en) * 1984-07-17 1985-09-24 Ceramic Cooling Tower Company Cooling tower with concrete support structure, fiberglass panels, and a fan supported by the liquid distribution system
EP0168525A2 (en) * 1984-07-17 1986-01-22 Ceramic Cooling Tower Company Cooling tower with concrete support structure, fiberglass panels, and a fan supported by the liquid distribution system
EP0168525A3 (en) * 1984-07-17 1986-10-08 Ceramic Cooling Tower Company Cooling tower with concrete support structure, fiberglass panels, and a fan supported by the liquid distribution system
US4637903A (en) * 1985-10-30 1987-01-20 Ceramic Cooling Tower Company Lightweight cooling tower
US4655646A (en) * 1986-06-16 1987-04-07 Stresswall International, Inc. Multitiered, rigid tieback, essentially vertical retaining wall system
EP0295939A3 (en) * 1987-06-18 1989-12-13 Parma Oy Concrete framework system and method and apparatus for farbrication of system-compatible columns
EP0295939A2 (en) * 1987-06-18 1988-12-21 Parma Oy Concrete framework system and method and apparatus for farbrication of system-compatible columns
FR2644814A1 (en) * 1989-03-24 1990-09-28 Aboulfadl Jamal METHOD FOR PRODUCING STRUCTURES AND STRUCTURE OBTAINED, IN PARTICULAR WOOD, FOR THE PRODUCTION OF BUILDINGS
WO1990011417A1 (en) * 1989-03-24 1990-10-04 Jamal Eddine Aboulfadl Structure, in particular made of wood and process for its production
US5545356A (en) * 1994-11-30 1996-08-13 Tower Tech, Inc. Industrial cooling tower
US5675943A (en) * 1995-11-20 1997-10-14 Southworth; George L. Lateral load-resisting structure having self-righting feature
US5958306A (en) * 1997-10-16 1999-09-28 Curtis; Harold D. Pre-collectors for cooling towers
US6497401B2 (en) * 1999-08-23 2002-12-24 Delta Cooling Towers, Inc. Molded cooling tower
US20030033772A1 (en) * 2001-08-20 2003-02-20 Matthew Russell Methods and apparatus for building tall vertical structures
US20130019545A1 (en) * 2006-08-07 2013-01-24 Andrew Buchanan Engineered Wood Construction System for High Performance Structures
US8935892B2 (en) * 2006-08-07 2015-01-20 Prestressed Timber Limited Engineered wood construction system for high performance structures
US12077964B2 (en) * 2020-03-26 2024-09-03 Felix Sorkin Intermediate anchor assembly

Similar Documents

Publication Publication Date Title
US3226894A (en) Concrete cooling tower
US3490191A (en) Method for erecting buildings
US3782061A (en) Concrete building construction with improved post tensioning means
US3828513A (en) Method of erecting a multi-story building and apparatus therefor
US2618146A (en) Reinforced concrete column, bracket, and beam joint
US10837173B2 (en) Beam-column connection structure and method of making the same
TWI592546B (en) Architecture structure and its construction method
US9279260B2 (en) Modular panel concrete form for self-lifting concrete form system
US4060948A (en) Structural frame for a building
TWI689652B (en) Beam-slab structure and construction method
US3722159A (en) Prefabricated concrete structure
US3692446A (en) Apparatus for forming and lifting multi-story columns in one story increments
US2420427A (en) Precast reinforced concrete members
US3999735A (en) Concrete pouring forms for uniting building units
CN113718753B (en) Anchor underground continuous wall foundation assembled type intermediate wall and construction method
KR100547591B1 (en) Pier coping part pre-assembly method
US865336A (en) Building structure.
US3374592A (en) Precast column with shear-head sections
CN112854577A (en) Self-formwork-supporting cast-in-place floor and construction method thereof
US3292329A (en) Building construction
CN115717453A (en) Continuous construction method for multi-layer cantilever beam
EP0058851B1 (en) Building structure of prefabricated elements
CN210712904U (en) Tower crane foundation structure
US1052918A (en) Monolithic cementitious structure.
JPH06228915A (en) Strut of elevated bridge, etc., and construction method thereof