US20100064600A1 - Transportable building - Google Patents
Transportable building Download PDFInfo
- Publication number
- US20100064600A1 US20100064600A1 US12/621,875 US62187509A US2010064600A1 US 20100064600 A1 US20100064600 A1 US 20100064600A1 US 62187509 A US62187509 A US 62187509A US 2010064600 A1 US2010064600 A1 US 2010064600A1
- Authority
- US
- United States
- Prior art keywords
- building
- roof
- location
- panel
- floor panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/344—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts
- E04B1/3442—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts folding out from a core cell
Definitions
- the present invention relates to transportable buildings and in particular to manufactured or pre-built housing.
- a principal constraint in the design of manufactured housing is the strict dimensional limit set by road transport authorities for ordinary unescorted loads. For example, while it is possible to transport new manufactured homes in Australia having a width of 5 m, and a maximum height of 4.8 m, this typically requires expensive permits, escorts and set routes, and regulations confine travel times to daylight hours. In Australia and most countries, permits, escorts and/or set routes, and restrictions on time of travel, can be avoided only if the width load dimension is limited to 2.5 m and the height load dimension is limited to 4.8 m, less the height of a truck tray, which is normally 1.0 m.
- manufactured housing If the manufactured housing is required to be transported overseas, it must comply with International Shipping Organisation (ISO) width dimensional limitations, which are more restrictive than the above referenced domestic limitations. Thus, in Australia, manufactured housing is such that the buildings or modules either require over-dimensional permits and escorts, or are severely restricted in their design and size by the width dimensional limits Export housing, if attempted, is restricted by the ISO dimensional limitations.
- ISO International Shipping Organization
- over-dimensional buildings are typically not suitable for dual occupancy sites, provision of granny flats or house extensions, if the permanent location of the over-dimensional building is not easily accessible due to access width restrictions.
- over-dimensional buildings are not generally suitable for individual on-site housing, holiday housing, permanent housing such as country, coastal and suburban retirement villages or mining town accommodation.
- Australian patent application 16482/95, Australian patent 539799 and UK patent application 2257170 disclose manufactured housing with hinged or extendible roof, verandah or alcove elements.
- Australian patent application 71019/87 discloses a demountable building assembly which is adaptable to form one or more transportable containers. Building panels are stored in the containers.
- U.S. Pat. No. 4,635,412 discloses an assembly which folds to shipping container dimensions and includes multiple hinged panels to form, for example, an enlarged floor area. Extension floor panels hinge down on each side of the assembly and frame assemblies in turn hinge up from the outer edges of the extension floor panels.
- 5,237,784 discloses a transportable container which has the form of a shipping container and includes foldable walls which are designed to form an enlarged floor and ceiling.
- Australian patent 720059 discloses an arrangement in which a core of the house is transportable as a shipping container.
- U.S. Pat. No. 4,891,919 discloses a shipping container having hinge-down extension floor panels and hinge-up outer side walls that are designed to unfold to form a house.
- International patent publication WO 93/20297 discloses a shipping container that forms a central zone of a house. Further zones are formed by hinging out extension floors and roof extensions, and hinging up outer side walls.
- Transportable housing is also provided in the form of kit housing. Like manufactured housing, some kit housing utilises shipping containers, while other kit housing utilises purpose-built structures which typically have the dimensions of shipping containers.
- U.S. Pat. No. 5,447,000 discloses an open frame which mimics a shipping container. The open frame structure can be incorporated into a subsequent house or dismantled to provide building components for the subsequent house
- kit housing is usually cheaper to purchase, considerable time and greater effort and expertise is typically required to erect a house using kit housing compared with manufactured housing. Every component must be coded, often in several languages, in an elaborate kit manual adding to the complexity and difficulty of construction relative to manufactured housing. Manufactured housing is therefore more suitable for locations where building expenses are high, services such as power or accommodation are non-existent, or building expertise is limited. Furthermore, while warranties to protect the purchaser are required by law in Australia and other countries such as USA, United Kingdom and Canada for standard and manufactured housing, they are not possible for kit housing, leaving the buyer with no comeback or guarantee. A guarantee is required by lending authorities, and therefore kit housing is difficult to fund with loan money.
- the present invention provides a transportable building system comprising:
- the invention further provides a transportable building which is at least partially erected and in this condition arranged for transportation to a building location on its side, and for re-orientation at the building location so that it is correctly oriented relative to a support at the building location.
- the transportable building is not necessarily transported on its side.
- the transported at least partially erected building preferably forms a box structure about an enclosed space, more preferably free of protrusions or extensions.
- the step of orientating the at least partially erected building so that it is correctly orientated relative to its support can be carried out before, after or simultaneously with the step of locating the at least partially erected building on the support at the building location.
- the at least partially erected building is, while transported on its side, within dimensional limits for unescorted transport at any time of day or night.
- the invention takes advantage of the requirement that the minimum ceiling height within a building (eg. 2.1 m in Australia for wet areas) is slightly less than the standard international maximum width for road transport, 2.5 m.
- the difference between these two standards can accommodate two floor panels and two roof panels of total combined thickness no greater than 400 mm (ie. average maximum per panel of 100 mm), leaving a potential wet area height in excess of 21. m.
- the transportable building is at the building location it is required to be positioned on a support and, if necessary, attached thereto.
- a partially erected transportable building is then unfolded becoming fully erected.
- Completing erection can involve unfolding components of the transportable building and/or attachment of building components which may be transported within the transported erected portion of the building.
- Unfolding of the transportable building preferably involves pivoting of hinged pre-constructed portions of the building, which may be panels and may take the form of floor, wall and/or roof portions, from a folded position to an unfolded, erected position.
- pivot mountings may in some instances be hinge arrangements that allow relative displacement of the floor, wall or roof portions in the unfolded position. This displacement may be for widening the building in its erected state, or to enhance the compactness of the transported erected portion of the building.
- the floor, wall and roof portions may be panels which respectively form part of a floor, wall and roof. Suitably, the panels are arranged to unfold into locating relationship with adjacent panels or other building components for attachment thereto to complete floors, walls and roofs of the fully erected building. Some of the panels, eg. roof panels in particular, may not be hinged and these unhinged panels are preferably transported separately within or on top of the transported erected portion of the building, for extraction and installation during subsequent full erection of the building. Some of the hinged panels may also be transported separately within the building for subsequent hinged attachment to pre-erected panels of the erected portion of the transportable building.
- the invention provides a transportable building, including:
- the first and second structural components may typically respectively be a floor component of the at least partially erected building, and an extension floor component.
- the building may include a panel which is positionable (eg. by being hingedly mounted) in the erected building as a verandah roof. This panel is conveniently nestable within an opening in a panel that serves as a wall in the. erected structure.
- a method of erecting a building from a transported folded condition having a plurality of wall components and a first roof component supported thereby including:
- the invention includes coupling said roof components by a plurality of link means that space said roof components and serve as hinges during said raising step.
- the at least partially erected building is substantially fully erected, so that once the transportable building is located and orientated at the building location, the hinged or other panels simply have to be appropriately positioned to fully erect it.
- the transportable building is preferably substantially wired prior to transportation.
- the electrical wiring is preferably located within one or more panel cavities and enclosed therein by removable cover plates. Wiring can then be completed in the process of fully erecting the transportable building.
- the process of locating, orientating and fully erecting (including completing wiring) a typical 2 bedroom house which includes a mezzanine floor should take two workmen less than one day to complete.
- the transportable building may include structure that serves as a mezzanine floor in the erected building.
- this mezzanine floor is selectively set back from a wall in one or more rooms and wall means, eg. a pivotably mounted wall portion, is positionable to be upstanding from the set back edge to define a partial cathedral ceiling.
- wall means eg. a pivotably mounted wall portion
- an average ceiling height for the room greater than 2.1 m can be achieved while maintaining 2.1 m under the mezzanine floor.
- a mezzanine height at the roof-line ridge of 2 m can also be achieved, as discussed-earlier.
- the invention provides a transportable building, including:
- the building components may comprise structural members or elements.
- the panels incorporate structural members of the building such as walls or roof sections pre-made in panel form.
- the structural members may comprise bearers, joists, studs, rafters or other beams.
- structural members are transported within the transportation container and incorporated into the fully erected building at the building location.
- Structural elements other than those incorporated into the panels are preferably transported within the transported erected portion of the building and may include items such as bolts, nails, screws, hold down straps, structural or other timber or steel components which may be required in addition to the hinged or other panels, to fully erect the building, and items such as windows, sliding doors, kitchen cupboards, structural extensions, and ridge or barge capping.
- the transportable building may comprise any known building components or techniques.
- the floor of the transportable building is preferably constructed using lightweight steel or timber bearers and joists which, when appropriately interconnected, provide joist flooring surfaces which lie in substantially the same plane as adjacent surfaces of the bearers.
- Such a bearer/joist arrangement reduces the overall height of the building thereby increasing the height of rooms of the transportable building.
- suitable such bearer/joist arrangements include steel c-beam bearers, and corresponding steel or timber joists, ends of these joists being arranged to fit into internal channels of the c-beams.
- An alternative construction utilises frames of welded or otherwise joined square hollow-section steel beams.
- Fixtures of the erected portion of the building may be transported in their desired location. Alternatively, they are contained within the transported partially erected building and moved to their desired location for fixture thereto during the process of fully erecting the building. Any necessary plumbing is preferably installed, perhaps totally, as part of the process of building the partially erected building.
- the partially erected building can initially be orientated relative to its support so that it is correctly orientated, rather than being on its side as it was during transportation, it is preferred that it is initially orientated relative to its support in the same manner as it was during transportation.
- a floor portion of the transportable building which preferably forms a base of the transportation container, may then be hingedly attached to its support. The transportable building can then be unfolded from this sideways orientation by pivoting the erected portion relative to the supported floor portion until the erected portion is also supported via its support.
- the at least partially erected building preferably provides a storage space in its lower region.
- the storage space is preferably positioned adjacent the floor portion and is preferably suitable for storing at least some of the building components which are transported therein but do not form part of the erected portion of the transportable building.
- the storage space is preferably accessed by opening a hinged roof panel, facilitating removal of long or large panels, or fittings such as cabinets, windows, doors, and ridge or barge capping.
- the transportable building may be arranged for attachment to another transportable building to form a building which is a combination of two or more transportable buildings.
- the transportable building may be arranged to attach to a permanent building to extend it.
- the transportable building preferably comprises lifting means to be engaged by a crane for moving it onto and off the transportation vehicle, and if necessary, for manoeuvring it to the correct orientation or upright position in the process of fully erecting the building.
- the lifting means may comprise lugs or forklift pockets or projecting attachment brackets. In remote areas, where it is difficult to use or obtain cranes, it is possible to manoeuvre the partially erected building over the stumps and lower the building with jacks. A lightweight truck crane can then lift or lower the roof, wall and floor panels into position.
- the transportable building may be, for example, a transportable house or other dwelling, shelter, commercial building, or shed.
- the transported partially erected building has dimensions, eg. width dimensions, of an international standard cargo shipping container and includes a load-bearing frame and floor, walls and roof panels.
- the transported partially erected building may have the cast steel corner fittings, or similar, typical of an international standard cargo shipping it which the container can be stacked on other similar containers for shipping or storage.
- ISO International Shipping Organisation
- CSC International Convention for Safe Containers
- ABS American Bureau of Shipping
- the fully erected building may be fastened down to concrete pads or footings, including where desired, fastenings such as, for example, cyclonic tie-down rods, to additionally anchor the lower corner fittings to the pads or footings.
- fastenings such as, for example, cyclonic tie-down rods
- FIG. 1 is a perspective view of a transportable house according to an embodiment of the invention, positioned on a trailer for transport to a building location;
- FIG. 2 is a cross-sectional view of the transportable house in the on-trailer position of FIG. 1 ;
- FIG. 3 is a composite view of the transportable house shown of FIG. 1 being lifted off the trailer by a crane, re-oriented and placed in foundation stumps in its final position;
- FIG. 4 is a sequence of diagrams A to E showing the principal steps in opening up the house, supported on stumps, to its enlarged condition;
- FIG. 5 is a perspective view of the enlarged house supported by stumps in its final position, between diagram D and E in FIG. 4 , prior to fitting the ridge capping;
- FIGS. 6 and 7 are a vertical cross-sectional view and a plan view respectively of the hinging arrangement that couples the two main roof panels;
- FIGS. 8 and 9 are respective front and side elevational views showing the form and movement of the hinging arrangement that supports the extension floor panel;
- FIG. 10 is a cross-sectional view of the enlarged house, depicting the verandah and the hinged mounting of a side panel for the mezzanine floor;
- FIG. 11 is a side elevational view of the verandah arrangement, with a hinge-up roof extension.
- FIG. 12 is a cross-sectional view of an alternative embodiment that uses separate roof segments without a conventional gable ridge, and has a parapet at one or both ends of the house.
- the transportable house 6 in its folded configuration on its side on a trailer 10 , generally comprises an erected generally rectangular unit having the appearance and form of a box structure 8 about an enclosed space.
- a window 12 is formed in end walls 14 of the transportable house 6 and windows 16 and 18 are formed in sidewall 20 .
- a door 22 is positioned approximately midway along the length of the sidewall 20 .
- the transportable house 6 therefore comprises a pre-erected or pre-assembled unit comprising the end walls 14 and an external side wall 20 .
- it also comprises floor panels 40 , 51 , roof panels 56 and 58 , an external side wall 52 , and an internal wall panel 54 (see FIG. 4 ) which is positioned opposite the side wall 20 .
- roof panels 56 / 58 are shown in a partially open position in FIG. 1 for removal of materials from inside the transportable house 6 , they are closed during transport so that they lie in a vertical plane.
- the floor panel 51 also lies in a vertical plane, while side walls 20 , 52 and internal wall panel 54 lie in a horizontal plane.
- the pre-erected portion of the transportable house 6 is therefore positioned on trailer 10 on its side so that the floor panel 51 , roof panels 56 / 58 , side walls 20 , 52 and internal wall panel 54 , as positioned on the trailer 10 , lie in planes perpendicular to planes they would normally lie in.
- the pre-erected box structure of the transportable house 6 is approximately 2.5 m high and approximately 3.6 m wide. This is how the structure is prepared at the manufacturer's factory site: it is then re-orientated by crane and placed on its side on trailer 10 for transport to the purchaser's erecting site. This means that in its sideways orientation, as positioned on a trailer 10 , it is 3.6 m above the supporting surface of the trailer 10 and 2.5 m wide. These measurements are within Australian and international road transport dimensional limits for unescorted transport at any time of day or night, ie. they are within the dimensional limits if permits, escorts, set routes and travel time confined to daylight hours are to be avoided. House 6 in the form of pre-erection box structure 8 is thereby readily transportable from a factory site on a truck trailer 10 . It is built at such a site in its correctly oriented position and then orientated onto its side onto trailer 10 .
- the box structure can be transported in its “right side up” condition, with the floor 51 on the trailer.
- the pre-erected portion and hinged or other panel support structures of the transportable house are formed of welded galvanised steel frames. However, as would be readily apparent to a person skilled in the relevant art, they could also be formed of corresponding timber structural members, or a combination of steel and timber structural members. Likewise, the panels themselves can be formed of steel or timber, or a combination thereof. The panels could also comprise panels typically known as sandwich type panels.
- transportable house 6 essentially involves unfolding of hinged roofs, floor and wall panels of the transportable house 6 , and attachment of other panels, structural members and elements that are contained within the transportable house 6 .
- roof panels 56 and 58 may be pivoted upwardly via hinges 24 and 26 and propped in an open position by suitable posts 28 ( FIG. 1 ). With the roof panels 56 and 58 in this open position, building components, such as ridge capping 59 , which are required to fully erect the transportable house 6 , can be easily removed from the inside 30 of the pre-erected box structure of transportable house 6 .
- a crane 32 is used to lift the-transportable house 6 from the trailer 10 ( FIGS. 2 and 3 ). As shown in FIG. 4A the transportable house 6 can be lifted from the trailer 10 and placed on three rows of stumps 36 , 37 and 38 (located in pre-drilled concreted holes 39 ) so that a floor panel 51 is positioned on the stumps 36 , 37 and 38 . The floor panel 40 is then subsequently pivoted downwardly to be supported by stumps 34 , to increase the floor area provided by floor panel 51 by approximately 60%.
- the transportable house 6 is lifted by the crane 32 and placed on the row of stumps 34 and 36 so that it is supported by them on its side and orientated the same way as it was on the trailer 10 .
- the floor 40 is left in place and the rest of the structure is pivoted onto stumps 37 , 38 .
- the partially unfolded transportable house 6 comprises external side walls 20 and 52 , a pair of end walls (not shown), an internal wall 54 and two roof panels 56 and 58 .
- External sidewall 52 is pivoted upwardly ( FIG. 4B ) from a position in which it rests on floor panel 40 , via hinges 62 , which are positioned along an outer longitudinal edge of floor panel 40 .
- a roof is erected by moving the outer roof panel 56 off roof panel 58 and placing it, supported, on the top of raised wall panel 52 .
- Roof panels 56 , 58 are then coupled at the centre line of the house by hinge link configurations 68 (described further below).
- a crane fitted to hinges 68 is employed to draw the centre edges 56 a , 58 a of roof panels 56 , 58 upwardly to form a roofline ridge fixed by means of support beams 66 ( FIGS. 4D , 5 , 6 and 7 ).
- panel 56 pivots upwardly about hinge pins such as bolts 57 at its outer end, but panel 56 slides over the top of wall panel 52 .
- Hinge links 68 ( FIGS. 6 and 7 ) allow lateral separation of the opposed edges 56 a , 58 a of panels 56 , 58 in the finished structure and thereby facilitate a higher roof pitch and a wider house.
- the higher roof pitch may accommodate a habitable mezzanine space, which is acceptable accommodation in some types of dwellings.
- the resultant gap 61 can be closed by suitable ridge capping 59 .
- Hinge links 68 comprise respective twin-plate arms 200 bolted to the opposite edges 56 a , 58 a ( FIG. 4D ) of roof panels 56 , 58 , and hingedly coupled by hinge pin links 57 : a crane hook can be fitted at this point to draw up to the roof panels.
- Non-hinged panels and building members and elements which were removed from the inside 30 of the transportable house 6 are then used to complete the erected house.
- the internal wall 54 is offset from a region where floors panels 40 and 51 join. This positioning of the wall 54 enables a storage space 74 (see FIG. 4 ) to be provided in a lower region (during transport) of the house 6 for storage of building panels, members and elements.
- the fully erected house 76 may include an optional verandah 102 formed of a roof extension 104 which is positioned approximately centrally of the length of the house 76 .
- the roof extension 104 is supported, by its outer longitudinal edge 105 , by posts 107 .
- Roof extension 104 is hingedly supported from a top plate or top beam 103 of side wall 52 ( FIG. 10 ) so that, on site, it can be swung up and supported on posts 107 .
- roof extension 104 In its transport position 104 ′, roof extension 104 is nested in a corresponding opening 105 in wall 52 ( FIG. 11 ) and suspended from overhead beam or top plate 103 of the wall by a sequence of hinges 101 .
- opening 105 is closed up by a preformed double window set 116 transported in storage space 74 ( FIG. 4B ).
- verandah roof extension 104 is fixed to the original structure without increasing the width or height of the box structure during transport (depending on the orientation of transport).
- FIGS. 8 and 9 illustrate a modification of the above-described transportable house that incorporates an embodiment of the second aspect of the invention, and achieves dimensional advantages in the erected house without increasing the outer dimensions of the transported house.
- This modification is depicted in enlarged detail in FIGS. 8 and 9 , and involves attaching floor panel 40 to floor panel 51 in a triangular displacement hinge configuration 62 so that floor panel 40 can be dropped over the edge of floor panel 51 from a position standing upright on the floor panel, and then displaced away from the floor panel.
- Hinge configurations 62 one at each end of the house—comprise an isosceles triangle of steel plate links 162 , 163 , 164 that form two couplings between hinge axis 166 , adjacent the side edge 168 of floor panel 51 , and a pivot mounting 170 , on a right angular bracket 172 fixed to the outside main face of extension floor panel 40 .
- the shorter base link 162 of the triangle is one of these couplings, long enough for the bottom edge face 41 of panel 40 to rest on panel 51 .
- the other coupling consists of links 163 , 164 is an initial V-connection 173 pinned together at 174 .
- Panel 40 pivots outwardly and downwardly about hinge axis 166 until it is flush and aligned with panel 40 .
- Link 162 is now detached and the V-connection 173 straightened out to move panel 40 away from panel 51 .
- the resultant gap 175 which may, for example, be 1 m or more across, is filled in by one or more floor panel inserts 178 .
- Links 163 , 164 can be wholly removed, once floor panels 40 , 51 are fastened in place, so as not to interfere with the attachment of cladding to the building.
- hinged links 162 , 163 , 164 allow lateral separation of floor 51 from panel 40 ( FIGS. 8 and 9 ) in the finished structure and thereby, together with roof hinge 68 ( FIGS. 6 and 7 ), facilitate the widening of the living space.
- the transportable house 6 includes a mezzanine floor 103 which is essentially identical in floor area to the floor panel 51 which is positioned directly below.
- the mezzanine floor 103 is accessible via a ladder ( 320 ).
- Mezzanine floor 103 can alternatively be formed in a wide T-shape, eg. to fully cover a centrally located bathroom but only the inner half of bedrooms to either side.
- a hinged panel 304 can be swung from a suspended position within each room to a raised position 304 ′ in which it is fixed to roof panel 58 . This creates a partial cathedral ceiling 305 in each bedroom (thus increasing the average ceiling height). This cathedral ceiling is facilitated by the relatively steep pitch of roof panels 56 , 58 .
- the total height for transport including the combined thickness of floor panels 51 , mezzanine floor 103 and roof panel 56 with ceiling height, can be kept at 2.5 m or less, the maximum transportable width, ie. the structure is within the width limit when transported on its side.
- the average ceiling height in the bedrooms such as room 306 can be 2.4 m or greater: 2.4 m is the Australian minimum for “habitable” areas.
- all wiring can now be completed prior to transport as lighting downlights can be installed under the mezzanine and not in the folding roof sections.
- FIG. 12 depicts an alternative embodiment, incorporating the fourth aspect of the invention.
- a gabled roof is not attempted but instead side wall 20 ′ and internal wall 54 ′ extend higher, are capped by a top panel 158 defining the box structure, and are linked interiorly by a transverse fixed panel 155 below panel 158 .
- Floor panel 40 ′, side wall 52 ′, and verandah roof 104 ′ hinge into place as with the previous embodiment.
- the roof is formed by lifting top panel 158 over the top edge of wall 54 ′, fixing it in a sloping position at 158 ′ to wall 54 ′ and resting it on the top of side wall 52 ′.
- transverse fixed panel 155 defines, between it and removable top panel 158 , a storage space 300 (eg. for panels as shown) that becomes an open skillion roof-top zone in the fully erected house (sloping from rear to front in the diagram), behind a parapet 153 defined by the upper parts of side wall 20 ′ and internal wall 54 ′, and by end wall segments (not shown).
- a storage space 300 eg. for panels as shown
- parapet 153 defined by the upper parts of side wall 20 ′ and internal wall 54 ′, and by end wall segments (not shown).
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Tents Or Canopies (AREA)
- Residential Or Office Buildings (AREA)
Abstract
A transportable building system including at least partially erecting a building, transporting the at least partially erected building on its side to a building location, locating the at least partially erected building on a support at the building location, and orientating the at least partially erected building so that it is correctly orientated relative to its support. Further disclosed is a transportable building, including a first structural component, a second structural component and a hinge coupling the first and second structural components whereby the second structural component is pivotable between a folded position and an unfolded erected position of the building. The hinge is reconfigurable to allow the second structural component to be relatively displaced away from the first structural component in the unfolded erected position of the second structural component.
Description
- This Application is a divisional application and claims the benefit under 35 U.S.C. §120 of U.S. application Ser. No. 10/515,790, entitled “TRANSPORTABLE BUILDING” filed on Mar. 13, 2006, which is a national stage application of PCT/AU2003/000658 filed on May 29, 2003, each of which is herein incorporated by reference in its entirety.
- The present invention relates to transportable buildings and in particular to manufactured or pre-built housing.
- It is known to pre-construct housing or commercial building units at a base yard and subsequently transport them, either whole or in two or more modules, to a client's allotment. Such buildings are typically referred to as manufactured or pre-built housing and for reference purposes will subsequently be referred to as manufactured housing.
- A principal constraint in the design of manufactured housing is the strict dimensional limit set by road transport authorities for ordinary unescorted loads. For example, while it is possible to transport new manufactured homes in Australia having a width of 5 m, and a maximum height of 4.8 m, this typically requires expensive permits, escorts and set routes, and regulations confine travel times to daylight hours. In Australia and most countries, permits, escorts and/or set routes, and restrictions on time of travel, can be avoided only if the width load dimension is limited to 2.5 m and the height load dimension is limited to 4.8 m, less the height of a truck tray, which is normally 1.0 m.
- If the manufactured housing is required to be transported overseas, it must comply with International Shipping Organisation (ISO) width dimensional limitations, which are more restrictive than the above referenced domestic limitations. Thus, in Australia, manufactured housing is such that the buildings or modules either require over-dimensional permits and escorts, or are severely restricted in their design and size by the width dimensional limits Export housing, if attempted, is restricted by the ISO dimensional limitations.
- Aside from the issue of additional cost, access of over-dimensional buildings to building sites is more restricted. For example, over-dimensional buildings are typically not suitable for dual occupancy sites, provision of granny flats or house extensions, if the permanent location of the over-dimensional building is not easily accessible due to access width restrictions. Further, over-dimensional buildings are not generally suitable for individual on-site housing, holiday housing, permanent housing such as country, coastal and suburban retirement villages or mining town accommodation.
- Whether manufactured housing is designed beyond or within the transport dimensional limits, a variety of design approaches and features have been proposed to enhance the subsequent erected building while minimising its dimensions during transit.
- For example, Australian patent application 16482/95, Australian patent 539799 and UK patent application 2257170 disclose manufactured housing with hinged or extendible roof, verandah or alcove elements. Australian patent application 71019/87 discloses a demountable building assembly which is adaptable to form one or more transportable containers. Building panels are stored in the containers. U.S. Pat. No. 4,635,412 discloses an assembly which folds to shipping container dimensions and includes multiple hinged panels to form, for example, an enlarged floor area. Extension floor panels hinge down on each side of the assembly and frame assemblies in turn hinge up from the outer edges of the extension floor panels. U.S. Pat. No. 5,237,784 discloses a transportable container which has the form of a shipping container and includes foldable walls which are designed to form an enlarged floor and ceiling. Australian patent 720059 discloses an arrangement in which a core of the house is transportable as a shipping container.
- There is also manufactured housing that utilises shipping containers. U.S. Pat. No. 4,891,919 discloses a shipping container having hinge-down extension floor panels and hinge-up outer side walls that are designed to unfold to form a house. International patent publication WO 93/20297 discloses a shipping container that forms a central zone of a house. Further zones are formed by hinging out extension floors and roof extensions, and hinging up outer side walls.
- Housing a standard shipping container dimension of 2.1 m ceiling height cannot be approved due to building regulation requirements for a minimum or average ceiling height of 2.4 m in all habitable rooms other than wet areas.
- Transportable housing is also provided in the form of kit housing. Like manufactured housing, some kit housing utilises shipping containers, while other kit housing utilises purpose-built structures which typically have the dimensions of shipping containers. U.S. Pat. No. 5,447,000 discloses an open frame which mimics a shipping container. The open frame structure can be incorporated into a subsequent house or dismantled to provide building components for the subsequent house
- While kit housing is usually cheaper to purchase, considerable time and greater effort and expertise is typically required to erect a house using kit housing compared with manufactured housing. Every component must be coded, often in several languages, in an elaborate kit manual adding to the complexity and difficulty of construction relative to manufactured housing. Manufactured housing is therefore more suitable for locations where building expenses are high, services such as power or accommodation are non-existent, or building expertise is limited. Furthermore, while warranties to protect the purchaser are required by law in Australia and other countries such as USA, United Kingdom and Canada for standard and manufactured housing, they are not possible for kit housing, leaving the buyer with no comeback or guarantee. A guarantee is required by lending authorities, and therefore kit housing is difficult to fund with loan money.
- It is an object of the invention to provide improved manufactured housing that is of optimum dimensions during transport but enhanced size and form on erection. It is also preferable that erection be achievable easily and quickly.
- In a first aspect, the present invention provides a transportable building system comprising:
-
- at least partially erecting a building;
- transporting the at least partially erected building on its side to a building location; locating the at least partially erected building on a support at the building location; and
- orientating the at least partially erected building so that it is correctly orientated relative to its support.
- In its first aspect, the invention further provides a transportable building which is at least partially erected and in this condition arranged for transportation to a building location on its side, and for re-orientation at the building location so that it is correctly oriented relative to a support at the building location.
- It is emphasised that, in other aspects of the invention later described, the transportable building is not necessarily transported on its side.
- The transported at least partially erected building preferably forms a box structure about an enclosed space, more preferably free of protrusions or extensions.
- The step of orientating the at least partially erected building so that it is correctly orientated relative to its support can be carried out before, after or simultaneously with the step of locating the at least partially erected building on the support at the building location.
- Preferably, the at least partially erected building is, while transported on its side, within dimensional limits for unescorted transport at any time of day or night.
- In a preferred arrangement, the invention takes advantage of the requirement that the minimum ceiling height within a building (eg. 2.1 m in Australia for wet areas) is slightly less than the standard international maximum width for road transport, 2.5 m. Thus, with the partially erected building transported on its side, the difference between these two standards can accommodate two floor panels and two roof panels of total combined thickness no greater than 400 mm (ie. average maximum per panel of 100 mm), leaving a potential wet area height in excess of 21. m.
- Once the transportable building is at the building location it is required to be positioned on a support and, if necessary, attached thereto. A partially erected transportable building is then unfolded becoming fully erected. Completing erection can involve unfolding components of the transportable building and/or attachment of building components which may be transported within the transported erected portion of the building. Unfolding of the transportable building preferably involves pivoting of hinged pre-constructed portions of the building, which may be panels and may take the form of floor, wall and/or roof portions, from a folded position to an unfolded, erected position.
- These pivot mountings may in some instances be hinge arrangements that allow relative displacement of the floor, wall or roof portions in the unfolded position. This displacement may be for widening the building in its erected state, or to enhance the compactness of the transported erected portion of the building. The floor, wall and roof portions may be panels which respectively form part of a floor, wall and roof. Suitably, the panels are arranged to unfold into locating relationship with adjacent panels or other building components for attachment thereto to complete floors, walls and roofs of the fully erected building. Some of the panels, eg. roof panels in particular, may not be hinged and these unhinged panels are preferably transported separately within or on top of the transported erected portion of the building, for extraction and installation during subsequent full erection of the building. Some of the hinged panels may also be transported separately within the building for subsequent hinged attachment to pre-erected panels of the erected portion of the transportable building.
- In a second aspect, the invention provides a transportable building, including:
-
- a first structural component;
- a second structural component; and
- hinge means coupling said first and second structural component whereby the second component is pivotable between a folded position and an unfolded erected position of said building
- wherein said hinge means is reconfigurable to allow said second component to be relatively displaced away from said first component in said unfolded erected position of the second component.
- In this second aspect, the first and second structural components may typically respectively be a floor component of the at least partially erected building, and an extension floor component.
- The building may include a panel which is positionable (eg. by being hingedly mounted) in the erected building as a verandah roof. This panel is conveniently nestable within an opening in a panel that serves as a wall in the. erected structure.
- In a third aspect of the invention, there is provided a method of erecting a building from a transported folded condition having a plurality of wall components and a first roof component supported thereby, including:
-
- folding out a wall component;
- repositioning a second roof component so that it is at least in part supported by said folded-out wall component, and lies with an edge opposed to an edge of the first components;
- jointly raising said edges of said roof components to a position defining a roof-line ridge; and
- fixing said roof components at said position defining a roof-line ridge.
- By this method, it is possible to achieve a ceiling height at the roof-line ridge up to 2 metres, allowing a mezzanine floor thereunder to provide a habitable space.
- Advantageously, in its third aspect, the invention includes coupling said roof components by a plurality of link means that space said roof components and serve as hinges during said raising step.
- Suitably, the at least partially erected building is substantially fully erected, so that once the transportable building is located and orientated at the building location, the hinged or other panels simply have to be appropriately positioned to fully erect it.
- The transportable building is preferably substantially wired prior to transportation. The electrical wiring is preferably located within one or more panel cavities and enclosed therein by removable cover plates. Wiring can then be completed in the process of fully erecting the transportable building. The process of locating, orientating and fully erecting (including completing wiring) a typical 2 bedroom house which includes a mezzanine floor should take two workmen less than one day to complete.
- The transportable building may include structure that serves as a mezzanine floor in the erected building. Advantageously, this mezzanine floor is selectively set back from a wall in one or more rooms and wall means, eg. a pivotably mounted wall portion, is positionable to be upstanding from the set back edge to define a partial cathedral ceiling. By this means, in the case where the transported erected portion of the building is to be within the aforementioned 2.5 m width limit, an average ceiling height for the room greater than 2.1 m can be achieved while maintaining 2.1 m under the mezzanine floor. A mezzanine height at the roof-line ridge of 2 m can also be achieved, as discussed-earlier.
- In a further aspect, the invention provides a transportable building, including:
-
- a plurality of wall components and roof means supported thereby,
- wherein said roof means includes:
- a first roof component that is supported by said wall components during transport as an outer roof component, and is displaceable at a building location to provide a roof component for a folded-out part of the building, and
- a second roof component supported by said wall components relative to said first roof component to define a storage space during transport and a rooftop zone on said displacement of the first roof component.
- The building components may comprise structural members or elements. Suitably, the panels incorporate structural members of the building such as walls or roof sections pre-made in panel form. The structural members may comprise bearers, joists, studs, rafters or other beams. Alternatively, structural members are transported within the transportation container and incorporated into the fully erected building at the building location. Structural elements other than those incorporated into the panels are preferably transported within the transported erected portion of the building and may include items such as bolts, nails, screws, hold down straps, structural or other timber or steel components which may be required in addition to the hinged or other panels, to fully erect the building, and items such as windows, sliding doors, kitchen cupboards, structural extensions, and ridge or barge capping.
- The transportable building may comprise any known building components or techniques. For example, the floor of the transportable building is preferably constructed using lightweight steel or timber bearers and joists which, when appropriately interconnected, provide joist flooring surfaces which lie in substantially the same plane as adjacent surfaces of the bearers. Such a bearer/joist arrangement reduces the overall height of the building thereby increasing the height of rooms of the transportable building. Examples of suitable such bearer/joist arrangements include steel c-beam bearers, and corresponding steel or timber joists, ends of these joists being arranged to fit into internal channels of the c-beams. An alternative construction utilises frames of welded or otherwise joined square hollow-section steel beams.
- Fixtures of the erected portion of the building may be transported in their desired location. Alternatively, they are contained within the transported partially erected building and moved to their desired location for fixture thereto during the process of fully erecting the building. Any necessary plumbing is preferably installed, perhaps totally, as part of the process of building the partially erected building.
- While the partially erected building can initially be orientated relative to its support so that it is correctly orientated, rather than being on its side as it was during transportation, it is preferred that it is initially orientated relative to its support in the same manner as it was during transportation. A floor portion of the transportable building, which preferably forms a base of the transportation container, may then be hingedly attached to its support. The transportable building can then be unfolded from this sideways orientation by pivoting the erected portion relative to the supported floor portion until the erected portion is also supported via its support.
- The at least partially erected building preferably provides a storage space in its lower region. The storage space is preferably positioned adjacent the floor portion and is preferably suitable for storing at least some of the building components which are transported therein but do not form part of the erected portion of the transportable building. The storage space is preferably accessed by opening a hinged roof panel, facilitating removal of long or large panels, or fittings such as cabinets, windows, doors, and ridge or barge capping.
- The transportable building may be arranged for attachment to another transportable building to form a building which is a combination of two or more transportable buildings. Alternatively, the transportable building may be arranged to attach to a permanent building to extend it.
- The transportable building preferably comprises lifting means to be engaged by a crane for moving it onto and off the transportation vehicle, and if necessary, for manoeuvring it to the correct orientation or upright position in the process of fully erecting the building. The lifting means may comprise lugs or forklift pockets or projecting attachment brackets. In remote areas, where it is difficult to use or obtain cranes, it is possible to manoeuvre the partially erected building over the stumps and lower the building with jacks. A lightweight truck crane can then lift or lower the roof, wall and floor panels into position.
- The transportable building may be, for example, a transportable house or other dwelling, shelter, commercial building, or shed.
- Suitably, the transported partially erected building has dimensions, eg. width dimensions, of an international standard cargo shipping container and includes a load-bearing frame and floor, walls and roof panels. The transported partially erected building may have the cast steel corner fittings, or similar, typical of an international standard cargo shipping it which the container can be stacked on other similar containers for shipping or storage.
- By international standard cargo shipping container is meant a container that meets International Shipping Organisation (ISO) requirements for the International Convention for Safe Containers (CSC) and the American Bureau of Shipping (ABS). These standards include requirements for the size and strength of containers; suitable sizes for the present purpose would be those referred to as 20 ft and 40 ft containers.
- For additional structural stability the fully erected building may be fastened down to concrete pads or footings, including where desired, fastenings such as, for example, cyclonic tie-down rods, to additionally anchor the lower corner fittings to the pads or footings.
- The invention will now be further described, by way of example only, with reference to the accompanying drawings, in which:
-
FIG. 1 is a perspective view of a transportable house according to an embodiment of the invention, positioned on a trailer for transport to a building location; -
FIG. 2 is a cross-sectional view of the transportable house in the on-trailer position ofFIG. 1 ; -
FIG. 3 is a composite view of the transportable house shown ofFIG. 1 being lifted off the trailer by a crane, re-oriented and placed in foundation stumps in its final position; -
FIG. 4 is a sequence of diagrams A to E showing the principal steps in opening up the house, supported on stumps, to its enlarged condition; -
FIG. 5 is a perspective view of the enlarged house supported by stumps in its final position, between diagram D and E inFIG. 4 , prior to fitting the ridge capping; -
FIGS. 6 and 7 are a vertical cross-sectional view and a plan view respectively of the hinging arrangement that couples the two main roof panels; -
FIGS. 8 and 9 are respective front and side elevational views showing the form and movement of the hinging arrangement that supports the extension floor panel; -
FIG. 10 is a cross-sectional view of the enlarged house, depicting the verandah and the hinged mounting of a side panel for the mezzanine floor; -
FIG. 11 is a side elevational view of the verandah arrangement, with a hinge-up roof extension; and -
FIG. 12 is a cross-sectional view of an alternative embodiment that uses separate roof segments without a conventional gable ridge, and has a parapet at one or both ends of the house. - Referring to
FIGS. 1 and 2 , thetransportable house 6, in its folded configuration on its side on atrailer 10, generally comprises an erected generally rectangular unit having the appearance and form of abox structure 8 about an enclosed space. Awindow 12 is formed inend walls 14 of thetransportable house 6 andwindows sidewall 20. Adoor 22 is positioned approximately midway along the length of thesidewall 20. Thetransportable house 6 therefore comprises a pre-erected or pre-assembled unit comprising theend walls 14 and anexternal side wall 20. As will be explained in greater detail below, it also comprisesfloor panels roof panels external side wall 52, and an internal wall panel 54 (seeFIG. 4 ) which is positioned opposite theside wall 20. - Although the
roof panels 56/58 are shown in a partially open position inFIG. 1 for removal of materials from inside thetransportable house 6, they are closed during transport so that they lie in a vertical plane. Thefloor panel 51 also lies in a vertical plane, whileside walls internal wall panel 54 lie in a horizontal plane. The pre-erected portion of thetransportable house 6 is therefore positioned ontrailer 10 on its side so that thefloor panel 51,roof panels 56/58,side walls internal wall panel 54, as positioned on thetrailer 10, lie in planes perpendicular to planes they would normally lie in. - The pre-erected box structure of the
transportable house 6 is approximately 2.5 m high and approximately 3.6 m wide. This is how the structure is prepared at the manufacturer's factory site: it is then re-orientated by crane and placed on its side ontrailer 10 for transport to the purchaser's erecting site. This means that in its sideways orientation, as positioned on atrailer 10, it is 3.6 m above the supporting surface of thetrailer 10 and 2.5 m wide. These measurements are within Australian and international road transport dimensional limits for unescorted transport at any time of day or night, ie. they are within the dimensional limits if permits, escorts, set routes and travel time confined to daylight hours are to be avoided.House 6 in the form ofpre-erection box structure 8 is thereby readily transportable from a factory site on atruck trailer 10. It is built at such a site in its correctly oriented position and then orientated onto its side ontotrailer 10. - If it is preferred to avoid re-orientation, and the aforementioned restrictions are acceptable, the box structure can be transported in its “right side up” condition, with the
floor 51 on the trailer. - The pre-erected portion and hinged or other panel support structures of the transportable house are formed of welded galvanised steel frames. However, as would be readily apparent to a person skilled in the relevant art, they could also be formed of corresponding timber structural members, or a combination of steel and timber structural members. Likewise, the panels themselves can be formed of steel or timber, or a combination thereof. The panels could also comprise panels typically known as sandwich type panels.
- Other features of the
transportable house 6 will be described in the course of describing erection of thetransportable house 6 which essentially involves unfolding of hinged roofs, floor and wall panels of thetransportable house 6, and attachment of other panels, structural members and elements that are contained within thetransportable house 6. - On arrival at the building location or erection site and before the
transportable house 6 is craned or forklifted off thetrailer 10,roof panels FIG. 1 ). With theroof panels transportable house 6, can be easily removed from the inside 30 of the pre-erected box structure oftransportable house 6. - Once all of the removable building components have been removed from the
transportable house 6, acrane 32 is used to lift the-transportable house 6 from the trailer 10 (FIGS. 2 and 3 ). As shown inFIG. 4A thetransportable house 6 can be lifted from thetrailer 10 and placed on three rows ofstumps floor panel 51 is positioned on thestumps floor panel 40 is then subsequently pivoted downwardly to be supported bystumps 34, to increase the floor area provided byfloor panel 51 by approximately 60%. - In an alternative delivery sequence, the
transportable house 6 is lifted by thecrane 32 and placed on the row ofstumps trailer 10. Thefloor 40 is left in place and the rest of the structure is pivoted ontostumps - With the
transportable house 6 supported on the stumps, it is typically secured to those stumps by hold down straps (not shown). One end of the straps is secured, via a bolt, tofloor panel 51 and the other ends of the straps are similarly attached, via bolts, to the stumps. - Referring to
FIG. 4B , with thetransportable house 6 partially unfolded so thatfloors panels transportable house 6 comprisesexternal side walls internal wall 54 and tworoof panels External sidewall 52 is pivoted upwardly (FIG. 4B ) from a position in which it rests onfloor panel 40, via hinges 62, which are positioned along an outer longitudinal edge offloor panel 40. A roof is erected by moving theouter roof panel 56 offroof panel 58 and placing it, supported, on the top of raisedwall panel 52.Roof panels hinges 68 is employed to draw the centre edges 56 a, 58 a ofroof panels FIGS. 4D , 5, 6 and 7). In this action,panel 56 pivots upwardly about hinge pins such asbolts 57 at its outer end, butpanel 56 slides over the top ofwall panel 52. - Hinge links 68 (
FIGS. 6 and 7 ) allow lateral separation of theopposed edges panels resultant gap 61 can be closed by suitable ridge capping 59. Hinge links 68 comprise respective twin-plate arms 200 bolted to theopposite edges FIG. 4D ) ofroof panels - Non-hinged panels and building members and elements which were removed from the inside 30 of the
transportable house 6 are then used to complete the erected house. Referring toFIG. 4 , it can be seen that theinternal wall 54 is offset from a region wherefloors panels wall 54 enables a storage space 74 (seeFIG. 4 ) to be provided in a lower region (during transport) of thehouse 6 for storage of building panels, members and elements. - The fully erected
house 76 may include anoptional verandah 102 formed of aroof extension 104 which is positioned approximately centrally of the length of thehouse 76. Theroof extension 104 is supported, by its outerlongitudinal edge 105, byposts 107.Roof extension 104 is hingedly supported from a top plate ortop beam 103 of side wall 52 (FIG. 10 ) so that, on site, it can be swung up and supported onposts 107. In itstransport position 104′,roof extension 104 is nested in acorresponding opening 105 in wall 52 (FIG. 11 ) and suspended from overhead beam ortop plate 103 of the wall by a sequence ofhinges 101. After the roof extension is raised intoposition 104 on site, opening 105 is closed up by a preformed double window set 116 transported in storage space 74 (FIG. 4B ). In this way,verandah roof extension 104 is fixed to the original structure without increasing the width or height of the box structure during transport (depending on the orientation of transport). -
FIGS. 8 and 9 illustrate a modification of the above-described transportable house that incorporates an embodiment of the second aspect of the invention, and achieves dimensional advantages in the erected house without increasing the outer dimensions of the transported house. This modification is depicted in enlarged detail inFIGS. 8 and 9 , and involves attachingfloor panel 40 tofloor panel 51 in a triangulardisplacement hinge configuration 62 so thatfloor panel 40 can be dropped over the edge offloor panel 51 from a position standing upright on the floor panel, and then displaced away from the floor panel.Hinge configurations 62—one at each end of the house—comprise an isosceles triangle of steel plate links 162, 163, 164 that form two couplings betweenhinge axis 166, adjacent theside edge 168 offloor panel 51, and a pivot mounting 170, on a rightangular bracket 172 fixed to the outside main face ofextension floor panel 40. Theshorter base link 162 of the triangle is one of these couplings, long enough for the bottom edge face 41 ofpanel 40 to rest onpanel 51. The other coupling consists oflinks connection 173 pinned together at 174. -
Panel 40 pivots outwardly and downwardly abouthinge axis 166 until it is flush and aligned withpanel 40.Link 162 is now detached and the V-connection 173 straightened out to movepanel 40 away frompanel 51. Theresultant gap 175, which may, for example, be 1 m or more across, is filled in by one or more floor panel inserts 178.Links floor panels - It will be appreciated that hinged
links floor 51 from panel 40 (FIGS. 8 and 9 ) in the finished structure and thereby, together with roof hinge 68 (FIGS. 6 and 7 ), facilitate the widening of the living space. - Referring to
FIGS. 5 and 11 , thetransportable house 6 includes amezzanine floor 103 which is essentially identical in floor area to thefloor panel 51 which is positioned directly below. Themezzanine floor 103 is accessible via a ladder (320).Mezzanine floor 103 can alternatively be formed in a wide T-shape, eg. to fully cover a centrally located bathroom but only the inner half of bedrooms to either side. A hingedpanel 304 can be swung from a suspended position within each room to a raisedposition 304′ in which it is fixed toroof panel 58. This creates apartial cathedral ceiling 305 in each bedroom (thus increasing the average ceiling height). This cathedral ceiling is facilitated by the relatively steep pitch ofroof panels - It will be seen that, if the bathroom has a ceiling height of 2.1 m, the Australian minimum for wet areas, the total height for transport, including the combined thickness of
floor panels 51,mezzanine floor 103 androof panel 56 with ceiling height, can be kept at 2.5 m or less, the maximum transportable width, ie. the structure is within the width limit when transported on its side. Moreover, because ofcathedral ceiling 305, the average ceiling height in the bedrooms such asroom 306 can be 2.4 m or greater: 2.4 m is the Australian minimum for “habitable” areas. Still further, all wiring can now be completed prior to transport as lighting downlights can be installed under the mezzanine and not in the folding roof sections. -
FIG. 12 depicts an alternative embodiment, incorporating the fourth aspect of the invention. Here, a gabled roof is not attempted but insteadside wall 20′ andinternal wall 54′ extend higher, are capped by atop panel 158 defining the box structure, and are linked interiorly by a transverse fixedpanel 155 belowpanel 158.Floor panel 40′,side wall 52′, andverandah roof 104′ hinge into place as with the previous embodiment. In this case, however, the roof is formed by liftingtop panel 158 over the top edge ofwall 54′, fixing it in a sloping position at 158′ to wall 54′ and resting it on the top ofside wall 52′. - During transport, transverse fixed
panel 155 defines, between it and removabletop panel 158, a storage space 300 (eg. for panels as shown) that becomes an open skillion roof-top zone in the fully erected house (sloping from rear to front in the diagram), behind aparapet 153 defined by the upper parts ofside wall 20′ andinternal wall 54′, and by end wall segments (not shown).
Claims (24)
1. A transportable building system, including:
at least partially erecting a building to form a box structure including a floor panel and an internal wall panel about an enclosed space;
orientating the box structure to a position on its side;
transporting the box structure on its side to a building location;
re-orientating the box structure at the building location to locate the at least partially erected building on a support at the building location so that it is correctly orientated relative to its support; and
hingedly re-positioning an extension floor panel from a retracted location parallel to said internal wall panel to an unretracted location that increases the floor area provided by said floor panel of the box structure.
2. A system according to claim 1 , wherein the step of re-orientating the at least partially erected building so that it is correctly orientated relative to its support is carried out before the step of locating the at least partially erected building on the support at the building location.
3. A system according to claim 1 , wherein the step of re-orientating the at least partially erected building so that it is correctly orientated relative to its support is carried out after the step of locating the at least partially erected building on the support at the building location.
4. A system according to claim 1 , wherein the step of re-orientating the at least partially erected building so that it is correctly orientated relative to its support is carried out substantially simultaneously with the step of locating the at least partially erected building on the support at the building location.
5. A system according to claim 1 , wherein the at least partially erected building is, while transported on its side, within width and length dimensional limits for unescorted transport at any time of day or night.
6. A system according to claim 5 , wherein the at least partially erected building has, while transported on its side, the width dimensions of an international standard cargo shipping container and includes a load-bearing frame and floor, walls and roof panels.
7. A system according to claim 1 , further including completing erection of the building at the building location.
8. A system according to claim 7 , wherein completing erection includes unfolding out pre-constructed components of the building including said extension floor panel.
9. A system according to claim 8 , wherein said folded out components are or include panels.
10. A system according to claim 8 , wherein said building includes:
a first structural component;
a second structural component; and
hinge means coupling said first and second structural components whereby the second structural component is pivotable between a folded position and an unfolded erected position of said building;
and wherein said hinge means is reconfigured to allow said second structural component to be relatively displaced away from said first structural component in said unfolded erected position of the second structural component.
11. A system according to claim 10 , wherein said first and second structural components respectively comprise a floor component of the at least partially erected building, and an extension floor component.
12. A system according to claim 10 , wherein said hinge means is reconfigured by detachment of a link of said hinge means that prevents said relative displacement of the second structural component away from the first structural component.
13. A system according to claim 8 , wherein said folded-out components include a panel which is positioned in the erected building as a verandah roof.
14. A system according to claim 13 , wherein said panel positioned as a verandah roof is nestable within an opening in a panel that serves as a wall in the erected structure.
15. A system according to claim 8 , including:
folding out a wall component;
repositioning a second roof component so that it is at least in part supported by said folded-out wall component, and lies with an edge opposed to an edge of a first roof component;
jointly raising said edges of said roof components to a position defining a roof-line ridge; and
fixing said roof components at said position defining a roof-line ridge.
16. A system according to claim 8 , wherein said building includes a plurality of wall components and roof means supported thereby, and wherein said roof means includes:
a first roof component that is supported by said wall components during transport as an outer roof component, and is displaced at said building location to provide a roof for a folded-out part of the building, and
a second roof component supported by said wall components relative to said first roof component to define a storage space during transport and a rooftop zone on said displacement of the first roof component
17. A system according to claim 9 , wherein further panels are attached after said unfolding out of pre-constructed components.
18. A system according to claim 17 , wherein said further panels include end walls.
19. A system according to claim 8 , wherein said unfolding out of pre-constructed components includes hingedly re-positioning a wall panel from a retracted location parallel to said extension floor panel in its unretracted location, to an upstanding location in which it forms an external wall of the building.
20. A system according to claim 1 , wherein plumbing is installed in the partially erected building prior to transporting the box structure to a building location.
21. A transportable building system, including:
at least partially erecting a building to form a box structure having a first floor panel and an internal wall panel about an enclosed space;
transporting the box structure to a building location;
re-positioning an extension floor panel from a retracted location during transport parallel to said internal wall panel to an unretracted location that increases the floor area provided by said first floor panel of the box structure, said extension floor panel being displaced away from said first floor panel in said unretracted location to form a gap therebetween, and filling said gap with one or more floor panel inserts.
22. A transportable building system according to claim 21 , wherein, in said retracted location, said extension floor panel rests upright on its edge on said first floor panel adjacent said internal wall panel.
23. A transportable building, including:
a box structure having a first floor panel and an internal wall panel about an enclosed space;
an extension floor panel repositionable from a retracted location during transport parallel to said internal wall panel to an unretracted location that increases the floor area provided by said first floor panel of the box structure, said extension floor panel being displaced away from said first floor panel in said unretracted location to form a gap therebetween; and
one or more floor panel inserts for filling said gap.
24. A transport building system according to claim 23 , wherein, in said retracted location, said extension floor panel rests upright on its edge on said first floor panel adjacent said internal wall panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/621,875 US20100064600A1 (en) | 2002-05-29 | 2009-11-19 | Transportable building |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AUPS2648A AUPS264802A0 (en) | 2002-05-29 | 2002-05-29 | Transportable building |
AU2002951693A AU2002951693A0 (en) | 2002-09-24 | 2002-09-24 | Transportable building |
PCT/AU2003/000658 WO2003100182A1 (en) | 2002-05-29 | 2003-05-29 | Transportable building |
US10/515,790 US7631460B2 (en) | 2002-05-29 | 2003-05-29 | Transportable building |
US12/621,875 US20100064600A1 (en) | 2002-05-29 | 2009-11-19 | Transportable building |
Related Parent Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AU2003/000658 Division WO2003100182A1 (en) | 2002-05-29 | 2003-05-29 | Transportable building |
US11/515,790 Division US20070052310A1 (en) | 2005-09-06 | 2006-09-06 | Fluid pump and electric motor, and manufacturing method for the same |
Publications (1)
Publication Number | Publication Date |
---|---|
US20100064600A1 true US20100064600A1 (en) | 2010-03-18 |
Family
ID=29585028
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/515,790 Expired - Fee Related US7631460B2 (en) | 2002-05-29 | 2003-05-29 | Transportable building |
US12/621,875 Abandoned US20100064600A1 (en) | 2002-05-29 | 2009-11-19 | Transportable building |
US12/621,902 Abandoned US20100064601A1 (en) | 2002-05-29 | 2009-11-19 | Transportable building |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/515,790 Expired - Fee Related US7631460B2 (en) | 2002-05-29 | 2003-05-29 | Transportable building |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/621,902 Abandoned US20100064601A1 (en) | 2002-05-29 | 2009-11-19 | Transportable building |
Country Status (3)
Country | Link |
---|---|
US (3) | US7631460B2 (en) |
AU (2) | AU2003229385B2 (en) |
WO (1) | WO2003100182A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090266006A1 (en) * | 2008-04-23 | 2009-10-29 | Gyory Janos B | Modular assembly |
US20100269419A1 (en) * | 2008-04-23 | 2010-10-28 | Modular Container Solutions Llc | Modular assembly |
US10793998B2 (en) * | 2018-08-07 | 2020-10-06 | Levi Strauss & Co. | Outdoor retail space structure |
US20230103008A1 (en) * | 2020-03-19 | 2023-03-30 | Nrb Inc. | Method for constructing relocatable building by using modules |
Families Citing this family (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7596909B1 (en) * | 2006-01-12 | 2009-10-06 | Glenn Gillen | Prefabricated building having a pre-cast concrete chain wall foundation |
US20080236055A1 (en) * | 2007-03-30 | 2008-10-02 | Laprise Daniel | Foldable habitation |
US20090193722A1 (en) * | 2008-02-01 | 2009-08-06 | Carlson Eric T | Event structures |
US8291647B2 (en) | 2008-03-05 | 2012-10-23 | Joseph Esposito | Self-contained structure configurable as a shipping container and as a dwelling |
US20090223143A1 (en) * | 2008-03-05 | 2009-09-10 | Joseph Esposito | Prefabricated containerized housing |
US8141304B2 (en) * | 2009-02-05 | 2012-03-27 | Kangna Nelson Shen | Prefabricated container house |
WO2010132989A1 (en) | 2009-05-19 | 2010-11-25 | Habitaflex Concept Inc. | Foldable roof for foldable habitation and method of handling and stacking foldable habitations |
CA2774102A1 (en) * | 2009-09-23 | 2011-03-31 | Blu Homes, Inc. | Foldable building units |
US20110296778A1 (en) | 2010-06-08 | 2011-12-08 | Collins Arlan E | Pre-manufactured utility wall |
US9027307B2 (en) | 2010-06-08 | 2015-05-12 | Innovative Building Technologies, Llc | Construction system and method for constructing buildings using premanufactured structures |
US8950132B2 (en) | 2010-06-08 | 2015-02-10 | Innovative Building Technologies, Llc | Premanufactured structures for constructing buildings |
CA2801287C (en) | 2010-06-08 | 2018-03-20 | Arlan E. Collins | Lift-slab construction system and method for constructing multi-story buildings using pre-manufactured structures |
BR112013002862A2 (en) | 2010-08-06 | 2019-09-24 | Blu Homes Inc | folding building units |
JP2013538960A (en) * | 2010-10-01 | 2013-10-17 | ブルー ホームズ,インコーポレイテッド | Buildings formed with complementary building assembly units and methods for their construction |
CA2825759A1 (en) | 2011-01-26 | 2012-08-02 | Blu Homes, Inc. | Dual-side unfolding building modules |
US8720126B2 (en) * | 2012-05-07 | 2014-05-13 | Jack Dempsey Stone & Rapid Fabrications Ip Llc | Transportable, expandable containers and emergency structures for habitat and field use |
US9085890B2 (en) | 2011-05-05 | 2015-07-21 | Rapid Fabrications IP LLC | Collapsible transportable structures and related systems and methods |
US20120325198A1 (en) * | 2011-06-23 | 2012-12-27 | Bacigalupo Joseph G | Expeditionary palletized kitchen system |
US8615934B1 (en) * | 2011-10-07 | 2013-12-31 | Stephen C. Webb | Panelized portable shelter |
AU2013202348B2 (en) * | 2012-04-03 | 2016-05-19 | Stratco (Australia) Pty Limited | A Verandah Assembly |
WO2014022651A1 (en) * | 2012-08-01 | 2014-02-06 | Matthew Merchant | Modular living structure |
WO2015150843A2 (en) * | 2014-04-01 | 2015-10-08 | Noah House Kft. | Mobile house utilising renewable energy |
US10364572B2 (en) | 2014-08-30 | 2019-07-30 | Innovative Building Technologies, Llc | Prefabricated wall panel for utility installation |
KR101991055B1 (en) | 2014-08-30 | 2019-06-19 | 이노베이티브 빌딩 테크놀러지스 엘엘씨 | Floor and ceiling panel for use in buildings |
JP6186085B2 (en) | 2014-08-30 | 2017-08-30 | イノベイティブ ビルディング テクノロジーズ,エルエルシー | Prefabricated partition and end walls |
CA2895310C (en) | 2014-08-30 | 2017-08-01 | Arlan Collins | Interface between a floor panel and a panel track |
US10260250B2 (en) | 2014-08-30 | 2019-04-16 | Innovative Building Technologies, Llc | Diaphragm to lateral support coupling in a structure |
MX2017006191A (en) | 2014-11-12 | 2017-07-31 | Baylor College Medicine | Mobile clinics. |
AU2015271969B2 (en) * | 2014-11-12 | 2021-04-29 | Paul Breen | Safety guard apparatus |
AU2017229471B2 (en) | 2016-03-07 | 2019-08-08 | Innovative Building Technologies, Llc | Waterproofing assemblies and prefabricated wall panels including the same |
CA3015815C (en) | 2016-03-07 | 2021-01-05 | Innovative Building Technologies, Llc | A pre-assembled wall panel for utility installation |
WO2017156011A1 (en) | 2016-03-07 | 2017-09-14 | Innovative Building Technologies, Llc | Prefabricated demising wall with external conduit engagement features |
KR102192042B1 (en) | 2016-03-07 | 2020-12-17 | 이노베이티브 빌딩 테크놀러지스 엘엘씨 | Floor and ceiling panels for slab-free floor systems in buildings |
US10378201B2 (en) | 2016-10-17 | 2019-08-13 | Troy Coombes | Collapsible modular building |
WO2018081562A1 (en) * | 2016-10-28 | 2018-05-03 | Kieffer Anthony | Energy producing modular portable expandable building structure incorporating modified shipping containers |
US10648169B2 (en) | 2017-04-26 | 2020-05-12 | New House International Corp. | Packaged container housing structure and construction method |
US10415263B2 (en) * | 2017-04-26 | 2019-09-17 | New House International Corp | Packaged container housing structure and construction method |
US10487493B2 (en) | 2017-05-12 | 2019-11-26 | Innovative Building Technologies, Llc | Building design and construction using prefabricated components |
US11098475B2 (en) | 2017-05-12 | 2021-08-24 | Innovative Building Technologies, Llc | Building system with a diaphragm provided by pre-fabricated floor panels |
US10724228B2 (en) | 2017-05-12 | 2020-07-28 | Innovative Building Technologies, Llc | Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls |
US10323428B2 (en) | 2017-05-12 | 2019-06-18 | Innovative Building Technologies, Llc | Sequence for constructing a building from prefabricated components |
US10167624B1 (en) * | 2017-08-31 | 2019-01-01 | Craig Hodgetts | Mobile shelter and method of erecting the same |
US11879257B2 (en) | 2020-12-26 | 2024-01-23 | Steve T. Everett | Shipping container based portable temporary/relief housing unit |
US20220396947A1 (en) * | 2021-03-30 | 2022-12-15 | John D. Moore | Compactible and foldable Drop shop building |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2052757A (en) * | 1933-08-07 | 1936-09-01 | Pacific Lumber Co | Summer cottage |
US3653165A (en) * | 1970-04-22 | 1972-04-04 | Charles A West | Expandable building with telescoping enclosures and hingedly connected barriers |
US4232488A (en) * | 1979-03-30 | 1980-11-11 | Hanley William F | Portable stage |
US4660332A (en) * | 1983-05-05 | 1987-04-28 | Shanni International, Inc. | Prefabricated folding structure |
US5237784A (en) * | 1990-12-06 | 1993-08-24 | Lohr Industrie | Shelter container fit for habitation with extendible inner volume |
US5327698A (en) * | 1992-10-14 | 1994-07-12 | Century Industries, Inc. | Mobile erectable stage and sound shell |
US5461832A (en) * | 1994-05-09 | 1995-10-31 | Smith; Gene A. | Transportable foldable building and method of erecting a transportable foldable building |
US5765316A (en) * | 1996-09-17 | 1998-06-16 | Kavarsky; Raymond R. | Building module, collapsible for transport and expandable for use |
US6035583A (en) * | 1994-01-26 | 2000-03-14 | Papke; William R. | Extruded building and method and apparatus related to same |
US6070367A (en) * | 1997-08-01 | 2000-06-06 | Sico Incorporated | Folding stage |
US20030056446A1 (en) * | 2001-09-26 | 2003-03-27 | Napier Donald Stewart | Transportable building with higher roof |
US6763633B2 (en) * | 2002-01-25 | 2004-07-20 | Roger Côté | Portable enclosure |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3519306A (en) * | 1968-06-19 | 1970-07-07 | Charles H Young | Extendable and retractable support member |
US3774956A (en) * | 1971-11-22 | 1973-11-27 | R Barlow | Parallel attachable, two story expandable, trailable building structures |
FR2312610A1 (en) * | 1975-05-30 | 1976-12-24 | Foldaway Res Int | Hinged prefabricated building frame - has U-section parallel uprights linked by cross members with hinged joints |
US3983665A (en) * | 1975-09-24 | 1976-10-05 | Burkin Homes Corporation | Foldable and transportable home |
DE2655677C3 (en) * | 1976-12-08 | 1979-12-20 | Klemens Dipl.-Ing. 3470 Hoexter Sauer | Kit for a transportable prefabricated house, especially a residential house |
FR2521195A1 (en) * | 1982-02-08 | 1983-08-12 | Masliah P | TRANSPORTABLE HOUSING |
CA1204911A (en) * | 1983-09-02 | 1986-05-27 | Romeo Julien, Jr. | Folding house |
DE3412245A1 (en) * | 1984-04-02 | 1984-12-06 | Arthur 8078 Eichstätt Förster | Structural elements composed of box-shaped components which are fitted into one another, are mutually encased, or enclose one another so as to be capable of pivoting |
ZA854379B (en) * | 1985-02-07 | 1986-01-29 | Shanni Int Inc | Prefabricated folding structure |
IT1217014B (en) * | 1987-02-25 | 1990-03-14 | Beyer Thomas | PREFABRICATED HOUSING UNIT |
ES2008278A6 (en) | 1987-10-19 | 1989-07-16 | Villela Torrelles Javier | Method and apparatus for the reduction of calcaneo fractures. (Machine-translation by Google Translate, not legally binding) |
US5143417A (en) * | 1991-07-05 | 1992-09-01 | Starcraft Rv, Inc. | Shelving unit for collapsible campers |
RU2032034C1 (en) * | 1992-01-31 | 1995-03-27 | Арендное предприятие "Центральный научно-исследовательский институт организации и механизации и технической помощи строительству" | Block-container |
US6223479B1 (en) * | 1998-03-13 | 2001-05-01 | Stoeckli Jakob | Extendable and retractable building and mechanism for extending and retracting |
AU767231B2 (en) | 1999-05-05 | 2003-11-06 | Kentucky Napier Homes Pty Ltd | Transportable building with higher roof |
US6383242B1 (en) * | 2000-03-07 | 2002-05-07 | Pacific Environmental Systems | Mobile enclosure unit |
-
2003
- 2003-05-29 US US10/515,790 patent/US7631460B2/en not_active Expired - Fee Related
- 2003-05-29 AU AU2003229385A patent/AU2003229385B2/en not_active Ceased
- 2003-05-29 WO PCT/AU2003/000658 patent/WO2003100182A1/en not_active Application Discontinuation
-
2008
- 2008-11-12 AU AU2008243219A patent/AU2008243219A1/en not_active Abandoned
-
2009
- 2009-11-19 US US12/621,875 patent/US20100064600A1/en not_active Abandoned
- 2009-11-19 US US12/621,902 patent/US20100064601A1/en not_active Abandoned
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2052757A (en) * | 1933-08-07 | 1936-09-01 | Pacific Lumber Co | Summer cottage |
US3653165A (en) * | 1970-04-22 | 1972-04-04 | Charles A West | Expandable building with telescoping enclosures and hingedly connected barriers |
US4232488A (en) * | 1979-03-30 | 1980-11-11 | Hanley William F | Portable stage |
US4660332A (en) * | 1983-05-05 | 1987-04-28 | Shanni International, Inc. | Prefabricated folding structure |
US5237784A (en) * | 1990-12-06 | 1993-08-24 | Lohr Industrie | Shelter container fit for habitation with extendible inner volume |
US5327698A (en) * | 1992-10-14 | 1994-07-12 | Century Industries, Inc. | Mobile erectable stage and sound shell |
US6035583A (en) * | 1994-01-26 | 2000-03-14 | Papke; William R. | Extruded building and method and apparatus related to same |
US5461832A (en) * | 1994-05-09 | 1995-10-31 | Smith; Gene A. | Transportable foldable building and method of erecting a transportable foldable building |
US5765316A (en) * | 1996-09-17 | 1998-06-16 | Kavarsky; Raymond R. | Building module, collapsible for transport and expandable for use |
US6070367A (en) * | 1997-08-01 | 2000-06-06 | Sico Incorporated | Folding stage |
US20030056446A1 (en) * | 2001-09-26 | 2003-03-27 | Napier Donald Stewart | Transportable building with higher roof |
US6763633B2 (en) * | 2002-01-25 | 2004-07-20 | Roger Côté | Portable enclosure |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090266006A1 (en) * | 2008-04-23 | 2009-10-29 | Gyory Janos B | Modular assembly |
US20100269419A1 (en) * | 2008-04-23 | 2010-10-28 | Modular Container Solutions Llc | Modular assembly |
US7882659B2 (en) | 2008-04-23 | 2011-02-08 | Modular Container Solutions Llc | Modular assembly |
US8347560B2 (en) | 2008-04-23 | 2013-01-08 | Modular Container Solutions Llc | Modular assembly |
US8826601B2 (en) | 2009-10-22 | 2014-09-09 | Modular Container Solutions Llc | Modular assembly |
US10793998B2 (en) * | 2018-08-07 | 2020-10-06 | Levi Strauss & Co. | Outdoor retail space structure |
US11479907B2 (en) * | 2018-08-07 | 2022-10-25 | Levi Strauss & Co. | Outdoor retail space structure |
US20230085629A1 (en) * | 2018-08-07 | 2023-03-23 | Levi Strauss & Co. | Retail Structure with Shipping Container Space |
US11885066B2 (en) * | 2018-08-07 | 2024-01-30 | Levi Strauss & Co. | Retail structure with shipping container space |
US20230103008A1 (en) * | 2020-03-19 | 2023-03-30 | Nrb Inc. | Method for constructing relocatable building by using modules |
US12037780B2 (en) * | 2020-03-19 | 2024-07-16 | Nrb Inc. | Method for constructing relocatable building by using modules |
Also Published As
Publication number | Publication date |
---|---|
AU2003229385B2 (en) | 2008-08-21 |
AU2008243219A1 (en) | 2008-12-04 |
US20100064601A1 (en) | 2010-03-18 |
AU2003229385A1 (en) | 2003-12-12 |
US20060225369A1 (en) | 2006-10-12 |
WO2003100182A1 (en) | 2003-12-04 |
US7631460B2 (en) | 2009-12-15 |
WO2003100182A8 (en) | 2004-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7631460B2 (en) | Transportable building | |
US5950373A (en) | Transportable structure kit | |
AU2014253661B2 (en) | Prefabricated foldable building module | |
CN101109192B (en) | Convertible building | |
CA2833840C (en) | Modular living unit | |
US8943759B2 (en) | Dual-side unfoldable building modules | |
US11846108B2 (en) | Convertible shipping container | |
JP2013532784A (en) | Folding construction unit | |
CN116075617A (en) | Modular foldable building system and method | |
US20230148153A1 (en) | Modular Garage and System for Transport | |
US20030056446A1 (en) | Transportable building with higher roof | |
WO2021217196A1 (en) | Transportable habitable fold out structure | |
AU2011202177C1 (en) | Transportable Building | |
CN221567469U (en) | Folding house | |
US20220274519A1 (en) | Foldable roof for movable habitation | |
AU767231B2 (en) | Transportable building with higher roof | |
JP3138812B2 (en) | Connecting panel for building and building method using the same | |
CN117721914A (en) | Construction method of folding house | |
AU2004200422A1 (en) | Transportable building with higher roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |