JPH02286593A - Hanging hook of steel pipe for steel tower - Google Patents
Hanging hook of steel pipe for steel towerInfo
- Publication number
- JPH02286593A JPH02286593A JP10458489A JP10458489A JPH02286593A JP H02286593 A JPH02286593 A JP H02286593A JP 10458489 A JP10458489 A JP 10458489A JP 10458489 A JP10458489 A JP 10458489A JP H02286593 A JPH02286593 A JP H02286593A
- Authority
- JP
- Japan
- Prior art keywords
- pin
- receiving member
- pin receiving
- main body
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 62
- 239000010959 steel Substances 0.000 title claims abstract description 62
- 238000003780 insertion Methods 0.000 claims abstract description 52
- 230000037431 insertion Effects 0.000 claims abstract description 52
- 238000000034 method Methods 0.000 description 7
- 239000000725 suspension Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- JOYRKODLDBILNP-UHFFFAOYSA-N Ethyl urethane Chemical compound CCOC(N)=O JOYRKODLDBILNP-UHFFFAOYSA-N 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、送電線鉄塔、通信鉄塔、気象観測鉄塔等の建
設工事において、鉄塔を組み立てる鋼管材をクレーンに
て吊り上げるときに、吊りワイヤを鋼管のフランジに係
止するための吊り金具に関するものである。DETAILED DESCRIPTION OF THE INVENTION (Industrial Field of Application) The present invention is applicable to the construction of power transmission line towers, communication towers, weather observation towers, etc., when the steel pipes used to assemble the towers are lifted up by a crane. This invention relates to a hanging fitting for securing to a flange of a steel pipe.
(従来の技術)
送電線等の鉄塔では、4本の支柱を、鋼管を接続して組
み立てることがある。この鋼管は、多数のボルト挿通孔
を有する接続用フランジを両端に備えている。そして、
鉄塔の建設に当たっては、このフランジを突き合わせて
ボルトにて接続し、順次上方へ組み上げていく。鋼管は
順次クレーンにて吊り上げて組み上げていくが、従来、
クレーンの吊りワイヤを鋼管に係止するには、フランジ
のボルト挿通孔にアイボルトを取り付けて、これに吊り
ワイヤのフックを掛けたり、吊りワイヤの先端のシャッ
クルを直接フランジのボルト挿通孔に掛けたり、あるい
は吊りワイヤを直接鋼管に巻きつけるなどの方法がとら
れている。(Prior Art) In a steel tower such as a power transmission line, four pillars are sometimes assembled by connecting steel pipes. This steel pipe is equipped with connecting flanges at both ends that have numerous bolt insertion holes. and,
When constructing a steel tower, these flanges are butted together, connected with bolts, and then assembled upwards one after another. Steel pipes are sequentially lifted and assembled using a crane, but conventionally,
To lock a crane's suspension wire to a steel pipe, attach an eye bolt to the bolt insertion hole of the flange and hang the hook of the suspension wire on this, or hang the shackle at the end of the suspension wire directly to the bolt insertion hole of the flange. Alternatively, methods such as winding a suspension wire directly around a steel pipe have been used.
このような方法によるときは、吊り上げた鋼管をボルト
にて固定した後、作業者が鋼管をよじ登って吊りワイヤ
を鋼管から外す必要があり、かつこの間クレーンは停止
して待機しなければならない。When using this method, after securing the lifted steel pipe with bolts, a worker must climb up the steel pipe and remove the lifting wire from the steel pipe, and during this time the crane must stop and wait.
(発明が解決しようとする課題)
上記従来の吊りワイヤの掛は止め方法は、極めて作業効
率の悪いものである。(Problems to be Solved by the Invention) The above-mentioned conventional method for hanging and stopping hanging wires is extremely inefficient.
従って本発明は、吊り上げた鋼管を下部鋼管上に仮止め
したら、即座に下方からの操作で吊りワイヤを鋼管から
外すことができるので、作業者が鋼管をよじ登る必要が
なく、・クレーンの待機時間も可及的に短縮することが
できる鋼管の吊り金具を提供することを課題としている
。Therefore, in the present invention, once the hoisted steel pipe is temporarily fixed on the lower steel pipe, the lifting wire can be immediately removed from the steel pipe by operating from below, eliminating the need for the worker to climb up the steel pipe, and reducing crane standby time. The object of the present invention is to provide a hanging fitting for steel pipes that can be shortened as much as possible.
(課題を解決するための手段)
本発明においては、上記課題を解決するため、本体2に
、クレーンの吊りワイヤWに係止するための引き手3を
取り付け、また本体2に挿入ビン4を軸線方向に移動自
在に貫通させ、本体2から突出した先端側を鋼管Pのボ
ルト挿通孔りに挿入できるようにし、さらに本体2には
、ピン受け部材5を取り付け、これに挿入ピン4の先端
部を抜き差し自在に貫通させ、挿入ピン4の先端部を貫
通させた状態で本体2との間に閉ループを形成すること
ができるようにし、挿入ピン4は、ばねのような付勢部
材6によって先端側へ付勢し、挿入ピン4の基端側には
、挿入ピン4引き抜き用の操作ロープ7を係止し、かつ
引き手3とピン受け部材5とは、互いに一体回転するよ
うに本体2に軸着し、引き手3が荷重を受けたときに回
転モーメントが生じてピン受け部材5がピン4との係合
状態を保つように相互延出角度を設定し、またピン4が
ピン受け部材5を貫通した状態において、ピン4がピン
受け部材5に当接してその回動を阻止するが、ピン4が
ピン受け部材5から抜け出た状態において、ピン受け部
材5が自由に回動して閉ループを開くことできるように
、ピン4とピン受け部材5の貫通孔15との相互関係を
設定した。(Means for Solving the Problems) In the present invention, in order to solve the above problems, a puller 3 is attached to the main body 2 for locking to the hanging wire W of the crane, and an insertion bin 4 is attached to the main body 2. The pin receiving member 5 is attached to the main body 2, and the tip of the insertion pin 4 is inserted into the main body 2 so as to be movable in the axial direction. A closed loop can be formed between the insertion pin 4 and the main body 2 with the tip of the insertion pin 4 inserted and removed freely. An operating rope 7 for pulling out the insertion pin 4 is secured to the proximal end of the insertion pin 4, and the puller 3 and the pin receiving member 5 are attached to the main body so as to rotate integrally with each other. 2, and the mutual extension angle is set so that when the puller 3 receives a load, a rotational moment is generated and the pin receiving member 5 maintains the engaged state with the pin 4, and the pin 4 is connected to the pin 4. When the pin 4 passes through the receiving member 5, it comes into contact with the pin receiving member 5 to prevent its rotation, but when the pin 4 comes out of the pin receiving member 5, the pin receiving member 5 freely rotates. The mutual relationship between the pin 4 and the through hole 15 of the pin receiving member 5 is set so that a closed loop can be opened.
(作 用)
本発明の吊り金具1は、第3図に示すように、lII管
Pを吊り上げるために、クレーンの吊りワイヤWの先端
に取付けて用いる。吊り金具1は、第4図Aに示すよう
に、地上に横たえられた鋼管Pのフランジfに取付ける
。鋼管Pのフランジfへの取付けは、次のようにして行
う。まず、付勢部材6の付勢力に抗してピン4をピン受
け部材5から引き抜き、ピン受け部材5を引き手3と一
体に第1図において時計方向へ回動させ、ピン4と本体
2との間を開放する(第1図仮想線)。そしてピン4の
先端側をフランジfのボルト挿通孔りへ挿入する。次い
で、ピン4を引き抜いた状態のまま、ピン受け部材5を
引き手3と一体に第1図において時計方向へ回動復元さ
せた後、ピン4を復元させて、その先端側をピン受け部
材5に貫通させ、ピン4と本体2との間を閉じる。この
状態において、ピン受け部材5は、それを貫通するピン
4が邪魔して回動することができない。従って、ピン4
と本体2との間は、ピン4を引き抜かなければ開放する
ことができず、このため吊り金具は自然にフランジfか
ら脱落することがない。このようにして吊り金具を鋼管
Pに取付けたら、第3図のように、クレーンによって鋼
管Pを吊り上げる。鋼管Pを吊り上げて、引き手3が荷
重を受けているときには、これと一体のピン受け部材5
に回転モーメントが生じて、ピン受け部材5がピン4と
の係合状態を保っており、従って、ピン4と本体2との
間は、開放することがなく、吊り金具はフランジfから
脱落することがない。吊り上げた鋼管Pを固定済みの他
の鋼管P上に持ち来して。(Function) As shown in FIG. 3, the hanging fitting 1 of the present invention is used by being attached to the tip of a hanging wire W of a crane in order to lift the III pipe P. The hanging fitting 1 is attached to a flange f of a steel pipe P lying on the ground, as shown in FIG. 4A. The steel pipe P is attached to the flange f in the following manner. First, the pin 4 is pulled out from the pin receiving member 5 against the urging force of the urging member 6, and the pin receiving member 5 is rotated clockwise in FIG. (phantom line in Figure 1). Then, insert the tip end of the pin 4 into the bolt insertion hole of the flange f. Next, with the pin 4 still pulled out, the pin receiving member 5 is rotated together with the pull handle 3 in the clockwise direction in FIG. 5 to close the space between the pin 4 and the main body 2. In this state, the pin receiving member 5 cannot be rotated because the pin 4 passing through it is obstructed. Therefore, pin 4
The space between and the main body 2 cannot be opened unless the pin 4 is pulled out, so that the hanging fitting does not naturally fall off from the flange f. After the hanging fittings are attached to the steel pipe P in this manner, the steel pipe P is lifted up by a crane as shown in FIG. When the steel pipe P is lifted and the puller 3 is receiving a load, the pin receiving member 5 integrated with the puller 3
A rotation moment is generated, and the pin receiving member 5 maintains the engaged state with the pin 4. Therefore, the space between the pin 4 and the main body 2 does not open, and the hanging fitting falls off from the flange f. Never. Bring the lifted steel pipe P onto another fixed steel pipe P.
フランジfを突合せ、ボルトにて仮止めしたら、クレー
ンを操作して吊りワイヤWを緩め、引き手3を無負荷状
態にする。この状態で、第4図Bのように、地上あるい
はフランジfの接続部付近から操作ロープ7を引いてピ
ン4をピン受け部材5から引き抜くと、ピン受け部材5
は支えを失って回動自由になる。そこで、操作ロープ7
をさらに引くと、第4図C′のように、ピン4がフラン
ジfのボルト挿通孔りから抜けて5ピン受け部材5がフ
ランジfの上面に当接する。同時にピン受け部材5はフ
ランジfの上面によって相対的に押し上げられて第1図
において反時計方向へ回動し、ピン4と本体2との間が
開放し、第4図りのように、吊り金具1はフランジfか
ら難なく外れる。After the flanges f are butted together and temporarily fastened with bolts, the crane is operated to loosen the hanging wire W and the puller 3 is placed in an unloaded state. In this condition, as shown in FIG.
loses its support and becomes free to rotate. Therefore, the operation rope 7
When further pulled, the pin 4 comes out of the bolt insertion hole of the flange f, and the five-pin receiving member 5 comes into contact with the upper surface of the flange f, as shown in FIG. 4C'. At the same time, the pin receiving member 5 is pushed up relatively by the upper surface of the flange f and rotates counterclockwise in FIG. 1 can be easily removed from the flange f.
(実施例)
図について本発明の詳細な説明する。第1図は吊り金具
の正面図、第2図は吊り金具の側面図、第3図は鋼管吊
り上げ状態の正面図、第4図Aは吊り金具の装着作業状
態を示す説明図、第4図B。(Example) The present invention will be described in detail with reference to the figures. Figure 1 is a front view of the hanging bracket, Figure 2 is a side view of the hanging bracket, Figure 3 is a front view of the steel pipe being lifted, Figure 4A is an explanatory diagram showing the hanging bracket being installed, Figure 4 B.
C,Dは吊り金具の取外し過程を順を追って示す説明図
である。C and D are explanatory diagrams showing the process of removing the hanging fitting in order.
第1図乃至第4図において、吊り金具1は、はぼL字状
の本体2と、クレーンの吊りワイヤWに係止するために
本体2に取付けられた引き手3と、本体2を軸線方向に
移動自在に貫通する挿入ピン4と、−挿入ピン4の先端
部を抜き差し自在に貫通させことができるように本体2
に取付けられたピン受け部材5と、挿入ピン4を先端側
へ付勢するように本体2に取付けられた付勢部材6と、
挿入ピン引き抜くために挿入ピンの基端側に係止された
操作ロープ7とを具備している。In FIGS. 1 to 4, the hanging fitting 1 includes an L-shaped main body 2, a puller 3 attached to the main body 2 for locking to a hanging wire W of a crane, and an axis line of the main body 2. The insertion pin 4 is inserted into the main body 2 so that the tip of the insertion pin 4 can be freely inserted and removed.
a pin receiving member 5 attached to the main body 2; a biasing member 6 attached to the main body 2 so as to bias the insertion pin 4 toward the distal end;
It is provided with an operating rope 7 that is latched to the base end side of the insertion pin in order to pull out the insertion pin.
本体2は、鋼管Pのフランジ部fに掛けられるフック部
8と、このフック部8の一端側から直角に延出する吊支
部9とから成り、全体がほぼL字状をなしている。本体
2の鋼管Pに当接する部分には、鋼管Pの損傷を防止す
るため、ゴム、ウレタン等の弾性部材16が貼付されて
いる。The main body 2 is composed of a hook part 8 that is hung on a flange part f of a steel pipe P, and a hanging branch 9 that extends at right angles from one end of the hook part 8, and has a substantially L-shape as a whole. An elastic member 16 made of rubber, urethane, etc. is attached to the portion of the main body 2 that comes into contact with the steel pipe P in order to prevent damage to the steel pipe P.
挿入ピン4は、軸線方向に移動自在に、また90°の範
囲で軸周りに正逆回転自在に、本体2のフック部8を貫
通している。フック部8を貫通した挿入ピン4は、吊支
部9と平行に伸びており、先端側をフランジ部fのボル
ト挿通孔りに挿入することができるようになっている。The insertion pin 4 passes through the hook portion 8 of the main body 2 so as to be movable in the axial direction and rotatable in the forward and reverse directions around the axis within a range of 90 degrees. The insertion pin 4 passing through the hook portion 8 extends parallel to the hanging support 9, and its tip end can be inserted into the bolt insertion hole of the flange portion f.
挿入ピン4の基端側は、ストッパ10によって、フック
部8に対して先端方向へ抜け止めされている。挿入ピン
4の基端側の側面には、軸線方向に伸びるガイド11溝
と、このガイド溝の先端に連続して直角方向に向い、ピ
ン4の四半周にわたって伸びる係合溝12とが設けられ
ている。一方フツク部8内には、ストッパピン13が先
端をピン4方向に付勢して設けられており、その先端は
ピン4の溝11゜12に摺動自在にはまっている。従っ
て、挿入ピン4を軸線方向に基端側へ引き抜くと、スト
ッパピン13がガイド溝11に沿って相対摺動し、ガイ
ド溝11の先端に到って挿入ピン4の引き出しを阻止す
る。ここで挿入ピン4を軸周りに90゜回転させると、
ストッパピン13が係合溝12内に進入し、この状態で
挿入ピン4の復元を阻止する。The proximal end of the insertion pin 4 is prevented from coming off in the distal direction with respect to the hook portion 8 by a stopper 10. The proximal side surface of the insertion pin 4 is provided with a guide groove 11 extending in the axial direction, and an engagement groove 12 extending continuously from the tip of the guide groove in a perpendicular direction and extending over a quarter circumference of the pin 4. ing. On the other hand, a stopper pin 13 is provided in the hook portion 8 with its tip biased in the direction of the pin 4, and its tip is slidably fitted into the grooves 11 and 12 of the pin 4. Therefore, when the insertion pin 4 is pulled out in the axial direction toward the proximal end, the stopper pin 13 relatively slides along the guide groove 11 and reaches the tip of the guide groove 11 to prevent the insertion pin 4 from being pulled out. Now, if the insertion pin 4 is rotated 90 degrees around the axis,
The stopper pin 13 enters into the engagement groove 12 and prevents the insertion pin 4 from returning to its original state in this state.
引き手3とピン受け部材5とは、ボス14を介して一体
に構成されており、本体2の吊支部9の一端に回転自在
に軸着されている6ピン受け部材5は、吊支部9に対し
て直角方向に延出した状態で、挿入ピン4の先側を貫通
させるピン受け孔14を備えている。引き手3とピン受
け部材5とは、ボス14から所定角度をなして半径方向
に延出しており、引き手3が荷重を受けたときにピン受
け部材5に回転モーメントが生じてピン受け部材5が挿
入ピン4との係合状態を保つように設定されている。引
き手3とピン受け部材5との間の角度は、吊り上げ時の
吊りワイヤWと本体2との間の角度に依存している。ま
た、挿入ピン4がピン受け部材5の孔15を貫通した状
態においては、ピン4が孔15の内周に当接するので、
ピン受け部材5は回動することができず、ピン4がピン
受け部材5から抜け出た状態において、ピン受け部材5
が自由に回動してピン4と本体1との間を開く(第1図
仮想線)ことできるように寸法設定されている。The puller 3 and the pin receiving member 5 are integrally formed via the boss 14, and the 6-pin receiving member 5 rotatably attached to one end of the hanging portion 9 of the main body 2 is connected to the hanging portion 9. A pin receiving hole 14 is provided which extends perpendicularly to the pin receiving hole 14 and allows the tip of the insertion pin 4 to pass through the pin receiving hole 14. The puller 3 and the pin receiving member 5 extend in the radial direction from the boss 14 at a predetermined angle, and when the puller 3 receives a load, a rotational moment is generated in the pin receiving member 5 and the pin receiving member 5 is set so as to maintain the engagement state with the insertion pin 4. The angle between the puller 3 and the pin receiving member 5 depends on the angle between the hanging wire W and the main body 2 during lifting. Furthermore, when the insertion pin 4 passes through the hole 15 of the pin receiving member 5, the pin 4 comes into contact with the inner periphery of the hole 15.
The pin receiving member 5 cannot rotate, and when the pin 4 is pulled out from the pin receiving member 5, the pin receiving member 5 cannot be rotated.
The dimensions are set so that the pin 4 can freely rotate to open the space between the pin 4 and the main body 1 (phantom line in FIG. 1).
付勢部材6はぜんまいばねから成り、本体2内に設けら
れている。ぜんまいばねの一端は本体2に、また他端は
ストッパ10に夫々係止され、挿入ピン4を先端側へ付
勢している。The biasing member 6 is made of a clockwork spring and is provided within the main body 2. One end of the mainspring spring is locked to the main body 2, and the other end is locked to the stopper 10, respectively, and urges the insertion pin 4 toward the distal end side.
挿入ピン4の基端側には、操作ロープ7が係止されてい
る。操作ロープ7は下方へ垂れ下がり、これを下方から
引くことによって、挿入ピン4の先端側をピン受け部材
5から引き抜くことができるようになっている。An operating rope 7 is locked to the proximal end of the insertion pin 4. The operating rope 7 hangs downward, and by pulling it from below, the tip side of the insertion pin 4 can be pulled out from the pin receiving member 5.
この実施例の吊り金具1は、第3図に示すように、鋼管
Pを吊り上げるために、クレーンの吊りワイヤWの先端
に取付けて用いる。吊り金具1は、第4図Aに示すよう
に、地上に横たえられた鋼管Pのフランジfに取付ける
。鋼管Pのフランジfへの取付けは、次のようにして行
う。まず、付勢部材6の付勢力に抗して挿入ピン4をピ
ン受け部材5から引き抜き、90°回転させてピン4の
係合溝12に、本体2のストッパピン12を係合させ、
挿入ピン4を止めておく。そして、ピン受け部材5を引
き手3と一体に第1図において時計方向へ回動させ、ピ
ン4と本体2との間を開放する(第1図仮想線)。そし
てピン4の先端側をフランジfのボルト挿通孔りへ挿入
する(第4図A)。As shown in FIG. 3, the hanging fitting 1 of this embodiment is used by being attached to the tip of a lifting wire W of a crane in order to lift a steel pipe P. The hanging fitting 1 is attached to a flange f of a steel pipe P lying on the ground, as shown in FIG. 4A. The steel pipe P is attached to the flange f in the following manner. First, the insertion pin 4 is pulled out from the pin receiving member 5 against the biasing force of the biasing member 6, rotated by 90 degrees, and the stopper pin 12 of the main body 2 is engaged with the engagement groove 12 of the pin 4.
Fix the insertion pin 4. Then, the pin receiving member 5 is rotated together with the pull handle 3 clockwise in FIG. 1 to open the space between the pin 4 and the main body 2 (phantom line in FIG. 1). Then, insert the tip end of the pin 4 into the bolt insertion hole of the flange f (Fig. 4A).
次いで、ピン4をピン受け部材5を引き手3と一体に第
1図において時計方向へ回動復元させた後、ピン4を先
とは反対方向へ90°回転させてストッパピン12との
係合を解き、付勢力によって復元させて、その先端側を
ピン受け部材5に貫通させ、ピン4と本体2との間を閉
じる(第3図)。Next, after rotating the pin 4 and the pin receiving member 5 together with the puller 3 in the clockwise direction in FIG. The pin 4 is uncoupled and restored by a biasing force, and the distal end thereof is passed through the pin receiving member 5, thereby closing the space between the pin 4 and the main body 2 (FIG. 3).
この状態において、ピン受け部材5は、それを貫通する
ピン4が邪魔して回動することができない。In this state, the pin receiving member 5 cannot be rotated because the pin 4 passing through it is obstructed.
従って、ピン4と本体2との間は、ピン4を引き抜かな
ければ開放することができず、このため吊り金具は自然
にフランジfから脱落することがない。このようにして
吊り金具1を鋼管Pに取付けたら、第3図のように、ク
レーンによって鋼管Pを吊り上げる。鋼管Pを吊り上げ
て、引き手3が荷重を受けているときには、これと一体
のピン受け部材5に回転モーメントが生じて、ピン受け
部材5がピン4との係合状態を保っており、従って、ピ
ン4と本体2との間は、開放することがなく、吊り金具
はフランジfから脱落することがない。Therefore, the space between the pin 4 and the main body 2 cannot be opened unless the pin 4 is pulled out, so that the hanging fitting does not naturally fall off from the flange f. After the hanging fitting 1 is attached to the steel pipe P in this manner, the steel pipe P is lifted up by a crane as shown in FIG. When the steel pipe P is lifted and the puller 3 is receiving a load, a rotational moment is generated in the pin receiving member 5 which is integrated with the puller 3, and the pin receiving member 5 maintains the engaged state with the pin 4. , the space between the pin 4 and the main body 2 will not open, and the hanging fitting will not fall off from the flange f.
吊り上げた鋼管Pを固定済みの他の鋼管P上に持ち来し
て、フランジfl突合せ、ボルトにて仮止めしたら、ク
レーンを操作して吊りワイヤWを緩め、引き手3を無負
断状態にする。この状態で、第4図Bのように、地上あ
るいはフランジfの接続部付近から操作ロープ7を引い
てピン4をピン受け部材5から引き抜くと、ピン受け部
材5は支えを失って回動自由になる。そこで、操作ロー
プ7をさらに引くと、第4図Cのように、ピン4がフラ
ンジfのボルト挿通孔りから抜けて、ピン受け部材5が
フランジfの上面に当接する6同時にピン受け部材5は
フランジfの上面によって相対的に押し上げられて第1
図において反時計方向へ回動し、ピン4と本体2との間
が開放し、第4図りのように、吊り金具1はフランジf
から難なく外れる。Bring the lifted steel pipe P onto another fixed steel pipe P, butt the flanges fl, and temporarily fasten them with bolts. Operate the crane to loosen the lifting wire W and put the puller 3 in an unloaded state. do. In this state, as shown in FIG. 4B, when the operating rope 7 is pulled from the ground or near the connection of the flange f and the pin 4 is pulled out from the pin receiving member 5, the pin receiving member 5 loses its support and is free to rotate. become. Then, when the operating rope 7 is further pulled, the pin 4 comes out of the bolt insertion hole of the flange f, and the pin receiving member 5 comes into contact with the upper surface of the flange f, as shown in FIG. 4C.6 At the same time, the pin receiving member 5 is relatively pushed up by the upper surface of the flange f and the first
It rotates counterclockwise in the figure, and the space between the pin 4 and the main body 2 is opened, and as shown in the fourth diagram, the hanging fitting 1 is attached to the flange f.
It comes off easily.
第5図には、本発明の他の実施例を示す。なお同図にお
いて、先の実施例のものと同一符号は実質的に同一の構
成部分を指すものとする。この実施例は、第6図の如く
、鋼管Pを先の実施例とは異なる方法で吊り上げる場合
にも適用することができるようにしたものである。即ち
、鉄塔の建設においては、第6図に示すように鋼管Pを
予め面組みして吊り上げる場合がある。この場合には、
吊りワイヤWと吊り金具1の本体2とのなす角度が第3
図の実施例の場合と異なるから、先の実施例の吊り金具
1を用いると、鋼管Pを吊り上げたときに、ピン受け部
材5がピン4から抜ける方向の回転力を受けてしまう、
従って、この実施例では、引き手3とピン受け部材5と
の角度を実質的に変更することができるように、引き手
3を扇型に構成し、これにピン受け部材5との角度の異
なる2つのワイヤ係止孔17,18を設けた。係止孔1
7に吊りワイヤWを係止すれば、先の実施例と同様に用
いることができる。そして、吊りワイヤWを係止孔18
に係止すれば、第6図のような吊り上げ方法をとる場合
にも、ピン受け部材5にピン4との係合状態を保つ方向
の回転モーメントが生じるから安全に使用することがで
きる。第5図の実施例においては、付勢部材6がコイル
スプリングから成る。なお、第5図において第1図乃至
第4図におけるものと同一の符号は同一の楕成部を指す
ものとする。FIG. 5 shows another embodiment of the invention. In the figure, the same reference numerals as in the previous embodiment refer to substantially the same components. This embodiment can also be applied to the case where the steel pipe P is lifted by a method different from that of the previous embodiment, as shown in FIG. That is, in the construction of a steel tower, there are cases where steel pipes P are assembled in advance and hoisted, as shown in FIG. In this case,
The angle between the hanging wire W and the main body 2 of the hanging fitting 1 is the third
Since this is different from the case of the embodiment shown in the figure, if the hanging fitting 1 of the previous embodiment is used, when the steel pipe P is lifted, the pin receiving member 5 will receive a rotational force in the direction of coming off the pin 4.
Therefore, in this embodiment, the pull handle 3 is configured in a fan shape so that the angle between the pull handle 3 and the pin receiving member 5 can be substantially changed. Two different wire locking holes 17 and 18 were provided. Locking hole 1
If the hanging wire W is locked to 7, it can be used in the same manner as in the previous embodiment. Then, attach the hanging wire W to the locking hole 18.
If the pin 4 is locked, even when the lifting method shown in FIG. 6 is used, a rotational moment is generated in the pin receiving member 5 in a direction to maintain the engaged state with the pin 4, so that it can be used safely. In the embodiment of FIG. 5, the biasing member 6 consists of a coil spring. In FIG. 5, the same reference numerals as those in FIGS. 1 to 4 refer to the same elliptical parts.
(発明の効果)
以上のように本発明においては、本体2に、クレーンの
吊りワイヤWに係止するための引き手3を取り付け、ま
た本体2に挿入ピン4を軸線方向に移動自在に貫通させ
、本体2から突出した先端側を鋼管Pのボルト挿通孔り
に挿入できるようにし、さらに本体2には、ピン受け部
材5を取り付け、これに挿入ピン4の先端部を抜き差し
自在に貫通させ、挿入ピン4の先端部を貫通させた状態
で本体2との間に閉ループを形成することができるよう
にし、挿入ピン4は、ばねのような付勢部材6によって
先端側へ付勢し、挿入ピン4の基端側には、挿入ピン4
引き抜き用の操作ロープ7を係止し、かつ引き手3とピ
ン受け部材5とは、互いに一体回転するように本体2に
軸着し、引き手3が荷重を受けたときに回転モーメント
が生じてピン受け部材5がピン4との係合状態を保つよ
うに相互延出角度を設定し、またピン4がピン受け部材
5を貫通した状態において、ピン4がピン受け部材5に
当接してその回動を阻止するが、ピン4がピン受け部材
5から抜け出た状態において、ピン受け部材5が自由に
回動して閉ループを開くことできるように、ピン4とピ
ン受け部材5の貫通孔15との相互関係を設定して鉄塔
用鋼管の吊り金具を構成したため、吊り上げた鋼管Pを
下方の鋼管P上に仮止めしたら、作業者が鉄塔をよじ登
ることなく、即座に下方からの操作で吊りワイヤWを鋼
管Pから外すことができ、クレーンの待機時間も可及的
に短縮することができるという効果を奏する。(Effects of the Invention) As described above, in the present invention, the main body 2 is provided with a puller 3 for locking the suspension wire W of the crane, and the insertion pin 4 is inserted through the main body 2 so as to be movable in the axial direction. The main body 2 is fitted with a pin receiving member 5, through which the distal end of the insertion pin 4 can be freely inserted and removed. , so that a closed loop can be formed between the insertion pin 4 and the main body 2 in a state where the distal end thereof is penetrated, and the insertion pin 4 is urged toward the distal end side by a biasing member 6 such as a spring, The insertion pin 4 is attached to the proximal end of the insertion pin 4.
The operating rope 7 for pulling out is locked, and the puller 3 and pin receiving member 5 are pivoted to the main body 2 so as to rotate integrally with each other, and when the puller 3 receives a load, a rotational moment is generated. The mutual extension angle is set so that the pin receiving member 5 maintains the engaged state with the pin 4, and when the pin 4 passes through the pin receiving member 5, the pin 4 abuts on the pin receiving member 5. The through hole between the pin 4 and the pin receiving member 5 prevents the rotation, but allows the pin receiving member 5 to freely rotate and open a closed loop when the pin 4 is pulled out of the pin receiving member 5. Since the hanging fittings for steel pipes for steel towers are configured by setting the mutual relationship with 15, once the lifted steel pipe P is temporarily fixed on the steel pipe P below, the worker can immediately operate it from below without having to climb the tower. The suspension wire W can be removed from the steel pipe P, and the crane's standby time can be shortened as much as possible.
図面は本発明の実施例を示すもので、第1図は吊り金具
の正面図、第2図は吊り金具の側面図、第3図は鋼管吊
り上げ状態の正面図、第4図Aは吊り金具の装着作業状
態を示す説明図、第4図B。
C,Dは吊り金具の取外し過程を順を追って示す説明図
、第5図は本発明の他の実施例を示す正面図、第6図は
鋼管の他の吊り上げ方法を示す説明図である。
7 ・
f ・
h ・
P ・
W・
操作ロープ
フランジ
ボルト挿通孔
鋼管
吊りワイヤ
・・吊り金具
・・本体
・・引き手
・・挿入ピン
・・ピン受け部材
・・付勢部材
苓1甲
ス
第5図
「′The drawings show an embodiment of the present invention, and Fig. 1 is a front view of the hanging fitting, Fig. 2 is a side view of the hanging fitting, Fig. 3 is a front view of the steel pipe in a suspended state, and Fig. 4A is the hanging fitting. FIG. 4B is an explanatory view showing the state of the installation work. C and D are explanatory diagrams showing the step-by-step process of removing the hanging fittings, FIG. 5 is a front view showing another embodiment of the present invention, and FIG. 6 is an explanatory diagram showing another method for lifting a steel pipe. 7 ・ f ・ h ・ P ・ W・ Operation rope flange Bolt insertion hole Steel pipe hanging wire・Hanging fitting・Main body・Puller・Insertion pin・Pin receiving member・Biasing member figure"'
Claims (2)
えた鉄塔用鋼管をクレーンにて吊り上げるための吊り金
具であって、 前記鋼管の荷重を支持する本体と、 前記クレーンの吊りワイヤに係止するために前記本体に
取付けられた引き手と、 前記本体を軸線方向に移動自在に貫通し、本体から突出
した先端側を前記鋼管のボルト挿通孔に挿入可能で、基
端側において本体に対して抜け止めされた挿入ピンと、 前記挿入ピンの先端部を抜き差し自在に貫通させ、挿入
ピンの先端部を貫通させた状態で前記本体との間に閉ル
ープを形成することができるように本体に取付けられた
ピン受け部材と、 前記挿入ピンを先端側へ付勢するように前記本体に取付
けられた付勢部材と、 前記挿入ピンの先端側を前記ピン受け部材から引き抜く
と共に、前記鋼管のボルト挿通孔から引き抜くために、
挿入ピンの基端側に係止された操作ロープとを具備し、 前記引き手とピン受け部材とは、互いに一体回転自在に
前記本体に軸着され、引き手が荷重を受けたときに回転
モーメントが生じてピン受け部材が前記ピンとの係合状
態を保つように相互延出角度が設定されており、 前記ピンが前記ピン受け部材を貫通した状態において、
ピンがピン受け部材に当接してその回動を阻止するが、
ピンがピン受け部材から抜け出た状態において、ピン受
け部材が自由に回動して前記閉ループを開くことできる
ように、ピンとピン受け部材の貫通孔との相互関係が設
定されていることを特徴とする鉄塔用鋼管の吊り金具。(1) A lifting fitting for hoisting a steel tower steel pipe with a large number of bolt insertion holes in the connecting flanges at both ends, which is connected to a main body supporting the load of the steel pipe and a lifting wire of the crane. a puller attached to the main body in order to stop the puller; and a puller that passes through the main body movably in the axial direction, a distal end protruding from the main body can be inserted into a bolt insertion hole of the steel pipe, and a proximal end is attached to the main body. The main body is configured such that a closed loop can be formed between the insertion pin that is prevented from coming off, and the main body with the tip of the insertion pin inserted and removed freely. an attached pin receiving member; an urging member attached to the main body so as to urge the insertion pin toward the distal end side; and a bolt of the steel pipe when the distal end side of the insertion pin is pulled out from the pin receiving member. To pull it out from the insertion hole,
an operating rope latched to the proximal end side of the insertion pin; the puller and the pin receiving member are pivotally connected to the main body so as to be able to rotate integrally with each other; and the puller rotates when the puller receives a load. The mutual extension angle is set such that a moment is generated and the pin receiving member maintains an engaged state with the pin, and in a state where the pin passes through the pin receiving member,
The pin comes into contact with the pin receiving member and prevents its rotation, but
A mutual relationship between the pin and the through hole of the pin receiving member is set so that the pin receiving member can freely rotate to open the closed loop when the pin is pulled out of the pin receiving member. Hanging fittings for steel pipes for steel towers.
実質的に変更できるように、ピン受け部材との角度の異
なる複数の吊りワイヤ係止部を備えていることを特徴と
する鉄塔用鋼管の吊り金具。(2) A steel tower characterized in that the puller is provided with a plurality of hanging wire locking portions having different angles with the pin receiving member so that the mutual angle with the pin receiving member can be substantially changed. Hanging fittings for steel pipes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10458489A JP2745322B2 (en) | 1989-04-26 | 1989-04-26 | Hanging fittings for steel pipes for steel towers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10458489A JP2745322B2 (en) | 1989-04-26 | 1989-04-26 | Hanging fittings for steel pipes for steel towers |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH02286593A true JPH02286593A (en) | 1990-11-26 |
JP2745322B2 JP2745322B2 (en) | 1998-04-28 |
Family
ID=14384486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10458489A Expired - Fee Related JP2745322B2 (en) | 1989-04-26 | 1989-04-26 | Hanging fittings for steel pipes for steel towers |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2745322B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102502394A (en) * | 2011-08-23 | 2012-06-20 | 中建三局建设工程股份有限公司 | Portable steel tube material hoisting hook assembly |
CN104261240A (en) * | 2014-09-30 | 2015-01-07 | 南车戚墅堰机车车辆工艺研究所有限公司 | Automatic lifting tool |
CN110454109A (en) * | 2019-08-12 | 2019-11-15 | 中国石油集团川庆钻探工程有限公司长庆钻井总公司 | Blowout prevention hose hanging apparatus and hanging method in a kind of well control |
CN113371589A (en) * | 2021-07-20 | 2021-09-10 | 二重(德阳)重型装备有限公司 | Quenching hoisting tool for special-shaped flange forging |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200467345Y1 (en) | 2012-09-14 | 2013-06-07 | 진 영 이 | A pile lifting structrue |
KR101272430B1 (en) | 2012-09-14 | 2013-06-07 | 진 영 이 | A pile lifting structrue |
-
1989
- 1989-04-26 JP JP10458489A patent/JP2745322B2/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102502394A (en) * | 2011-08-23 | 2012-06-20 | 中建三局建设工程股份有限公司 | Portable steel tube material hoisting hook assembly |
CN104261240A (en) * | 2014-09-30 | 2015-01-07 | 南车戚墅堰机车车辆工艺研究所有限公司 | Automatic lifting tool |
CN110454109A (en) * | 2019-08-12 | 2019-11-15 | 中国石油集团川庆钻探工程有限公司长庆钻井总公司 | Blowout prevention hose hanging apparatus and hanging method in a kind of well control |
CN113371589A (en) * | 2021-07-20 | 2021-09-10 | 二重(德阳)重型装备有限公司 | Quenching hoisting tool for special-shaped flange forging |
CN113371589B (en) * | 2021-07-20 | 2022-03-22 | 二重(德阳)重型装备有限公司 | Quenching hoisting tool for special-shaped flange forging |
Also Published As
Publication number | Publication date |
---|---|
JP2745322B2 (en) | 1998-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH02286593A (en) | Hanging hook of steel pipe for steel tower | |
US10227216B2 (en) | Tool lifting devices, oilfield flange lifting safety devices, and related methods of use | |
EP2513494B1 (en) | A clamping device | |
JP2833679B2 (en) | Hook device for lifting heavy objects | |
JP2007153583A (en) | Hook device | |
JPH0539188A (en) | Heavy object hoisting hook device | |
JPH07215658A (en) | Hoisting hook device for crane | |
JP2612431B2 (en) | Ball removal hook | |
JP6917048B2 (en) | Kaishakunin arm, and a crane arm with a kaishakunin arm | |
US2617677A (en) | Pipe sling | |
JP2832453B2 (en) | Hanging hook device for cranes | |
JP3171729B2 (en) | Panel hanging tool | |
JPH08277086A (en) | Automatic hook | |
JPH10273280A (en) | Automatic suspension hook putting off device | |
JP4002664B2 (en) | Hook device for lifting heavy objects | |
JP2500475B2 (en) | Suspension fitting connection mechanism with quick release | |
JP2018002396A (en) | Sling hand hook bar | |
JPH0725580A (en) | Panel suspending tool | |
JP2003341974A (en) | Hoisting device, hoisting member and hoisting metal fitting | |
JP7580013B1 (en) | Elevator fixed rod gripping device and main rope replacement method | |
JP3081641U (en) | Hanging hook | |
JPH0967079A (en) | Hook device for suspending heavy object | |
JP2741245B2 (en) | Suspension equipment for cranes | |
JP2003321189A (en) | Remote operation type suspension tool | |
JPH04112607A (en) | Outer ring enlarging come-along and locking unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |