JP2004017450A - Injection equipment - Google Patents

Injection equipment Download PDF

Info

Publication number
JP2004017450A
JP2004017450A JP2002174850A JP2002174850A JP2004017450A JP 2004017450 A JP2004017450 A JP 2004017450A JP 2002174850 A JP2002174850 A JP 2002174850A JP 2002174850 A JP2002174850 A JP 2002174850A JP 2004017450 A JP2004017450 A JP 2004017450A
Authority
JP
Japan
Prior art keywords
injection
cylinder
resin
measurement
start position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002174850A
Other languages
Japanese (ja)
Inventor
Masaaki Konno
今野 政昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP2002174850A priority Critical patent/JP2004017450A/en
Publication of JP2004017450A publication Critical patent/JP2004017450A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To prevent nonuniformity in the density of a molding material to be filled in a cavity space. <P>SOLUTION: This equipment has a first cylinder member, an injection member, a second cylinder member connected to a prescribed position of the first cylinder member and a plasticizing member. A connecting member making the first and second cylinder members communicate with each other is opened, on the second cylinder member side, at a start position of metering set in the rear at a prescribed distance from an advance limit position of the injection member. In a metering process, the molding material in the second cylinder member is supplied to the vicinity of the start position of metering in the first cylinder member through the intermediary of the connecting member and moved forward from the start position through the first cylinder member. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、射出装置に関するものである。
【0002】
【従来の技術】
従来、プリプラ式の射出装置においては、第1の加熱シリンダ、及び該第1の加熱シリンダの前端の所定の箇所に、連通管を介して連結させられた第2の加熱シリンダを備える。前記第1の加熱シリンダ内には、プランジャが進退自在に配設され、第2の加熱シリンダ内には、スクリューが回転自在に配設される。第2の加熱シリンダの後端には、成形材料としての樹脂を供給するためのホッパが取り付けられる。
【0003】
そして、計量工程時に、第2の加熱シリンダ内においてスクリューが回転させられ、ホッパから供給された樹脂が溶融させられ、前方に移動させられ、前記連通管を介して第1の加熱シリンダ内に供給される。それに伴って、第1の加熱シリンダ内において前進限位置に置かれたプランジャが樹脂の圧力で後退させられ、計量が行われる。そして、プランジャより前方に所定の量の樹脂が蓄えられ、前記プランジャが計量完了位置に到達すると、前記スクリューの回転が停止させられ、計量工程が完了される。
【0004】
また、射出工程時に、前記第1の加熱シリンダ内においてプランジャを前進させると、第1の加熱シリンダの前端に取り付けられた射出ノズルから樹脂が射出され、金型装置のキャビティ空間に充填(てん)される。そして、前記プランジャが前進限位置に到達すると、射出工程が完了される。
【0005】
【発明が解決しようとする課題】
しかしながら、前記従来の射出装置においては、計量工程時に、第2の加熱シリンダ内の樹脂は、前記連通管を介して第1の加熱シリンダ内の前端の近傍に供給され、第1の加熱シリンダ内を前方から後方に向けて移動させられるので、射出工程時に、最も後に第1の加熱シリンダ内に供給された樹脂が最も先に射出ノズルから射出され、最も先に第1の加熱シリンダ内に供給された樹脂が最も後に射出ノズルから射出されることになる。すなわち、後入れ先出しの射出が行われる。
【0006】
したがって、最も先に第1の加熱シリンダ内に供給された樹脂は長い距離を移動させられ、最も後に第1の加熱シリンダ内に供給された樹脂は短い距離を移動させられるので、キャビティ空間に充填される樹脂の流動履歴にばらつきが生じ、樹脂の温度分布及び圧力分布にばらつきが生じてしまう。その結果、キャビティ空間に充填された樹脂の密度にばらつきが生じ、成形品の品質が低下してしまう。
【0007】
ところで、射出工程が完了するときに、前記プランジャは第1の加熱シリンダ内において前進限位置に置かれるが、このとき、プランジャの前端が射出ノズルの内周面に当たらないように、プランジャが射出ノズルの内周面に当たる位置より所定の距離(クッション量)だけ後方に前進限位置が設定されるようになっている。この場合、射出工程が完了したときに、第1の加熱シリンダにおいて前記連通管の開口とプランジャの前端との間に樹脂が残留することになり、次のショットに向けて計量工程が開始されると、プランジャが後退させられるのに伴って、残留した樹脂が後方に移動させられてしまう。したがって、残留した樹脂を第1の加熱シリンダ外に排出することができず、劣化して変色したり、変質したりするとともに、変色したり、変質したりした樹脂が何らかの理由で射出ノズルから射出されると、成形品の品質が低下してしまう。
【0008】
本発明は、前記従来の射出装置の問題点を解決して、キャビティ空間に充填される成形材料の密度にばらつきが生じたり、変色したり、変質したりした成形材料が射出ノズルから射出されたりすることがなく、成形品の品質を向上させることができる射出装置を提供することを目的とする。
【0009】
【課題を解決するための手段】
そのために、本発明の射出装置においては、第1のシリンダ部材と、該第1のシリンダ部材内において進退自在に配設された射出部材と、前記第1のシリンダ部材の所定の位置に連結された第2のシリンダ部材と、該第2のシリンダ部材内において回転自在に配設された可塑化部材とを有する。
【0010】
そして、前記第1、第2のシリンダ部材を連通させる連結部材は、第2のシリンダ部材側において、該射出部材の前進限位置より所定の距離だけ後方に設定された計量開始位置で開口させられる。
【0011】
本発明の他の射出装置においては、さらに、前記連結部材に、第2のシリンダ部材内の成形材料に背圧を加えるための弁部材が配設される。
【0012】
本発明の更に他の射出装置においては、さらに、前記射出部材を計量開始位置に置いた状態で前記可塑化部材を回転させる計量処理手段を有する。
【0013】
本発明の更に他の射出装置においては、さらに、前記計量処理手段は、計量工程を完了する際に、前記射出部材の背圧に従って射出部材を計量完了位置に置く。
【0014】
本発明の更に他の射出装置においては、さらに、前記計量開始位置と計量完了位置とが一致する。
【0015】
本発明の更に他の射出装置においては、さらに、前記計量完了位置が計量開始位置より後方に位置させられる。
【0016】
【発明の実施の形態】
以下、本発明の実施の形態について図面を参照しながら詳細に説明する。
【0017】
図1は本発明の実施の形態における射出装置の概略図、図2は本発明の実施の形態における射出装置の計量工程を開始したときの状態を示す図、図3は本発明の実施の形態における射出装置の計量工程を完了したときの状態を示す図、図4は本発明の実施の形態における射出装置の射出工程を完了したときの状態を示す図である。
【0018】
図において、43は射出装置であり、該射出装置43は、図示されない金型装置及び図示されない型締装置と共に図示されない射出成形機フレーム上に配設される。前記金型装置は、固定金型及び可動金型から成り、前記型締装置は、前記射出成形機フレームに固定された固定プラテン、可動プラテン、トグル機構、及び該トグル機構を作動させる型締用の駆動部としての型締用モータを備え、該型締用モータを駆動してトグル機構を作動させることによって可動プラテンを進退させ、前記金型装置の型閉じ、型締め及び型開きを行う。なお、型締めが行われると、可動金型と固定金型との間にキャビティ空間が形成される。
【0019】
前記射出装置43は、第1のシリンダ部材としての第1の加熱シリンダ47、該第1の加熱シリンダ47内において進退(図において左右方向に移動)自在に配設された射出部材としてのプランジャ21、該プランジャ21を進退させる計量・射出用の駆動部としての射出シリンダ49、前記第1の加熱シリンダ47の所定の箇所に連結され、連結位置から斜め上方に向けて延在させられ、成形材料としての樹脂を溶融させて第1の加熱シリンダ47に供給する第2のシリンダ部材としての第2の加熱シリンダ51、該第2の加熱シリンダ51内において回転自在に配設された可塑化部材としてのスクリュー22、該スクリュー22を回転させるための可塑化用の駆動部としての油圧モータ59、第2の加熱シリンダ51の後端(図1及び4において右端)の近傍に取り付けられ、前記第2の加熱シリンダ51内にペレット状の樹脂を供給するホッパ25等を有する。前記射出装置43は、図示されない射出装置移動機構によって前記固定プラテンに対して進退させられ、前進(図において左方に移動)時にノズルタッチを行うことができるようになっている。
【0020】
前記第1の加熱シリンダ47は、シリンダ部46、及び該シリンダ部46の前端(図において左端)に取り付けられた射出ノズル48を備え、前記シリンダ部46の外周には、シリンダ部46内の樹脂を加熱し、溶融状態を保つための加熱部材としてヒータh1、h2が配設され、前記射出ノズル48の外周には、射出ノズル48内の樹脂を加熱し、溶融状態を保つための加熱部材としてヒータh3が配設され、図示されない制御部によって通電が制御される。また、前記射出ノズル48の前端には、ノズル口23が形成される。
【0021】
前記第2の加熱シリンダ51は、シリンダ部57、及び該シリンダ部57の前端と前記第1の加熱シリンダ47とを連結する連結部材としての連通管58を備え、前記シリンダ部57の外周には、第2の加熱シリンダ51内に供給された樹脂を加熱し、溶融させるための加熱部材としてヒータh4〜h6が配設され、前記制御部によって通電が制御される。そして、前記連通管58は前記第1、第2の加熱シリンダ47、51内を連通させるための連通路31を備え、該連通路31に、切換弁、制御弁等の機能を有する弁部材32が配設される。該弁部材32は、前記制御部によって所定の図示されないアクチュエータを駆動することにより開閉し、第1、第2の加熱シリンダ47、51間の連通路31を選択的に連通させ、遮断したり、開口度を調整して通過する樹脂の流量を制御したりすることができる。
【0022】
なお、本実施の形態において、弁部材32としてボールバルブが使用されるようになっているが、該ボールバルブに代えて、ニードル弁、スライド機構等を使用することもできる。
【0023】
前記第1の加熱シリンダ47には、プランジャ21の前進限位置、該前進限位置より所定の距離だけ後方(図において右方)に設定された、計量工程を開始するための第1の計量設定位置としての計量開始位置が設定され、前記プランジャ21は、前記射出シリンダ49を駆動することによって進退させられ、図4に示されるように前進限位置に置かれたり、図2に示されるように計量開始位置に置かれたりする。
【0024】
なお、前記連通路31は、第1の加熱シリンダ47側において、前記計量開始位置で開口させられ、第2の加熱シリンダ51側において、前記シリンダ部57の前端で開口させられる。前記計量開始位置は、第1の加熱シリンダ47内において、計量に必要な樹脂の量を確保することができるように、ノズル口23から所定の距離だけ後方に設定される。
【0025】
また、射出工程が完了するときに、前記プランジャ21は前記前進限位置に置かれるが、このとき、プランジャ21の前端が射出ノズル48の内周面に当たらないように、プランジャ21が射出ノズル48の内周面に当たる位置より所定の距離だけ後方に前記前進限位置が設定される。
【0026】
前記スクリュー22は、スクリュー本体26、及び該スクリュー本体26の外周に螺(ら)旋状に形成されたフライト27を備え、該フライト27に沿って螺旋状の溝28が形成される。また、前記スクリュー22には、後方から前方(図1及び4において左方)にかけて順に、ホッパ25から落下した樹脂が供給される供給部、供給された樹脂を圧縮しながら溶融させる圧縮部、及び溶融させられた樹脂を一定量ずつ計量する計量部が形成される。前記スクリュー本体26の外径は、供給部において比較的小さくされ、圧縮部において後方から前方にかけて徐々に大きくされ、計量部において比較的大きくされる。したがって、第2の加熱シリンダ51の内周面とスクリュー本体26の外周面との間の間隙(げき)は、前記供給部において比較的大きくされ、圧縮部において後方から前方にかけて徐々に小さくされ、計量部において比較的小さくされる。
【0027】
本実施の形態においては、射出用の駆動部として射出シリンダ49を使用し、可塑化用の駆動部として油圧モータ59を使用するようになっているが、射出シリンダ49、油圧モータ59等に代えてサーボモータ等の電動機を使用することもできる。なお、図1及び4において、61は前記プランジャ21と射出シリンダ49の出力軸とを連結するためのカプラ、62は前記スクリュー22と油圧モータ59の出力軸とを連結するためにカプラである。
【0028】
前記構成の射出装置において、計量工程が開始される前に、前記プランジャ21は図2に示されるように計量開始位置に置かれ、前記制御部は、前記アクチュエータを駆動し、連通路31内を所定の流量の樹脂が流れるように、弁部材32に所定の開口度を設定する。そして、計量工程が開始されると、前記制御部の図示されない計量処理手段は、計量処理を行い、前記プランジャ21を計量開始位置においた状態で油圧モータ59を駆動し、スクリュー22を回転させる。それに伴って、ホッパ25内の樹脂は、第2の加熱シリンダ51内に供給され、更に供給部に供給される。供給部に供給された樹脂は、スクリュー22の回転に伴って溝28内を前進し、圧縮部において半溶融状態になり、計量部において完全に溶融させられて液状になり、連通路31を通って第1の加熱シリンダ47内に供給され、図2の矢印に示されるように、第1の加熱シリンダ47内を計量開始位置より前方に向けて流れ、プランジャ21より前方に蓄えられる。
【0029】
なお、この間、第2の加熱シリンダ51内においては、スクリュー22が回転させられるのに伴って、樹脂は前方に移動しようとするが、連通路31における樹脂の流量が弁部材32によって制限され、絞られる。すなわち、第2の加熱シリンダ51内の樹脂に、前記開口度に応じた背圧を加えることができるので、可塑化する樹脂の密度を均一にすることができる。その結果、成形品の品質を向上させることができる。
【0030】
ところで、前記プランジャ21より後方には、所定の箇所に図示されない圧力検出部としての圧力センサが配設され、前記第1の加熱シリンダ47内の樹脂の圧力を検出し、検出信号を制御部に送るようになっている。そして、前記プランジャ21より前方に十分な樹脂が蓄えられ、前記圧力センサによって検出された圧力が閾(しきい)値以上になると、前記制御部は、アクチュエータを駆動し、図3に示されるように、弁部材32を閉じて連通路31を遮断するとともに、油圧モータ59の駆動を停止させてスクリュー22の回転を停止させる。前記圧力センサによって検出された圧力が閾値以上になって弁部材32が閉じられ、連通管31が遮断されても、前記プランジャ21より前方の圧力が閾値に保持されるとは限らず、その後も高くなり続けることがある。
【0031】
そこで、前記圧力センサによって検出された圧力が閾値に保持される場合には、計量完了位置と計量開始位置とが一致させられ、前記計量完了位置がそのまま計量開始位置にされる。一方、前記圧力センサによって検出された圧力が閾値に保持されず、その後も高くなり続け、閾値より高い圧力がプランジャ21に作用する場合、前記計量処理手段は、前記射出シリンダ49を駆動して、プランジャ21を図3の矢印方向に後退(図において右方に移動)させて前記圧力センサによって検出された圧力が閾値に保持されるようにする。この場合、計量完了位置が計量開始位置より後方に位置させられる。そして、計量完了位置で圧力センサによって検出された圧力が閾値になると、前記計量処理手段は、計量工程を完了する。
【0032】
なお、前記プランジャ21より前方の圧力が高く、第1の加熱シリンダ47内に供給される樹脂の速度が高い場合には、計量完了位置が計量開始位置より十分に後方に位置させられる。
【0033】
この場合、圧力センサによって検出された圧力が閾値以上になると、前記プランジャ21は計量開始位置から計量完了位置まで所定の距離だけ後退させられるので、計量を確実に行うことができる。
【0034】
続いて、前記制御部は、アクチュエータを駆動し、図4に示されるように、弁部材32を閉じて第1、第2の加熱シリンダ47、51間を遮断した状態を保持する。そして、前記制御部の図示されない射出処理手段は、射出処理を行い、射出シリンダ49を駆動し、プランジャ21を図4の矢印に示されるように前進限位置に向けて前進させる。それに伴って、プランジャ21より前方に蓄えられた樹脂は、射出ノズル48によって射出され、キャビティ空間に充填される。
【0035】
前記プランジャ21が前進限位置に到達すると、前記射出処理手段は、射出シリンダ49の駆動を停止させ、プランジャ21を停止させ、射出工程を完了する。そして、前記計量処理手段は、射出シリンダ49を駆動し、次のショットのために前記プランジャ21を後退させて計量開始位置に置く。
【0036】
このように、計量工程時に、第2の加熱シリンダ51内の樹脂は、前記連通路31を介して第1の加熱シリンダ47内におけるプランジャ21の計量開始位置の近傍に供給され、第1の加熱シリンダ47内を計量開始位置から前方に向けて移動させられるので、射出工程時に、最も先に第1の加熱シリンダ47内に供給された樹脂が最も先に射出ノズル48から射出され、最も後に第1の加熱シリンダ47内に供給された樹脂が最も後に射出ノズル48から射出されることになる。すなわち、先入れ先出しの射出が行われる。
【0037】
したがって、最も先に第1の加熱シリンダ47内に供給された樹脂、及び最も後に第1の加熱シリンダ47内に供給された樹脂は、同じ距離だけ移動させられるので、キャビティ空間に充填される樹脂の流動履歴にばらつきが生じないだけでなく、樹脂の温度分布及び圧力分布にもばらつきが生じない。その結果、キャビティ空間に充填された樹脂の密度にばらつきが生じるのを防止することができるので、成形品の品質を向上させることができる。
【0038】
また、射出工程が完了するときに、前記プランジャ21の前端が射出ノズル48の内周面に当たらないように前進限位置が設定されるので、射出工程が完了したときに、樹脂は、プランジャ21の前端の近傍に残留することになる。ところが、残留する位置は連通路31の開口より前方であるので、次のショットに向けて計量工程が開始されても、プランジャ21の後退に伴って残留した樹脂が後方に移動することはない。したがって、残留した樹脂を次のショットで第1の加熱シリンダ47外に確実に排出することができるので、樹脂が劣化して変色したり、変質したりすることがなくなる。その結果、成形品の品質を向上させることができる。
【0039】
なお、本発明は前記実施の形態に限定されるものではなく、本発明の趣旨に基づいて種々変形させることが可能であり、それらを本発明の範囲から排除するものではない。
【0040】
【発明の効果】
以上詳細に説明したように、本発明によれば、射出装置においては、第1のシリンダ部材と、該第1のシリンダ部材内において進退自在に配設された射出部材と、前記第1のシリンダ部材の所定の位置に連結された第2のシリンダ部材と、該第2のシリンダ部材内において回転自在に配設された可塑化部材とを有する。
【0041】
そして、前記第1、第2のシリンダ部材を連通させる連結部材は、第2のシリンダ部材側において、該射出部材の前進限位置より所定の距離だけ後方に設定された計量開始位置で開口させられる。
【0042】
この場合、前記第1、第2のシリンダ部材を連通させる連結部材は、第2のシリンダ部材側において、射出部材の前進限位置より所定の距離だけ後方に設定された計量開始位置で開口されるので、計量工程時に、第2のシリンダ部材内の成形材料は、前記連結部材を介して第1のシリンダ部材内における射出部材の計量開始位置の近傍に供給され、第1のシリンダ部材内を計量開始位置から前方に向けて移動させられる。したがって、射出工程時に、最も先に第1のシリンダ部材内に供給された成形材料が最も先に射出ノズルから射出され、最も後に第1のシリンダ部材内に供給された成形材料が最も後に射出ノズルから射出されることになる。すなわち、先入れ先出しの射出が行われる。
【0043】
その結果、最も先に第1のシリンダ部材内に供給された成形材料、及び最も後に第1のシリンダ部材内に供給された成形材料は、同じ距離だけ移動させられるので、キャビティ空間に充填される成形材料の流動履歴にばらつきが生じないだけでなく、成形材料の温度分布及び圧力分布にもばらつきが生じない。また、キャビティ空間に充填された成形材料の密度にばらつきが生じるのを防止することができるので、成形品の品質を向上させることができる。
【0044】
そして、射出工程が完了するときに、前記射出部材の前端が射出ノズルの内周面に当たらないように前進限位置が設定されるので、射出工程が完了したときに、成形材料は、前記距離の分だけ射出されず、射出部材の前端の近傍に残留することになる。ところが、残留する位置は連結部材の開口より前方であるので、次のショットに向けて計量工程が開始されても、射出部材の後退に伴って残留した成形材料が後方に移動することはない。したがって、残留した成形材料を次のショットで第1のシリンダ部材外に確実に排出することができるので、成形材料が劣化して変色したり、変質したりすることがなくなる。その結果、成形品の品質を向上させることができる。
【0045】
本発明の他の射出装置においては、さらに、前記連結部材に、第2のシリンダ部材内の成形材料に背圧を加えるための弁部材が配設される。
【0046】
この場合、第2のシリンダ部材内の成形材料に背圧を加えることができるので、可塑化する成形材料の密度を均一にすることができる。その結果、成形品の品質を向上させることができる。
【図面の簡単な説明】
【図1】本発明の実施の形態における射出装置の概略図である。
【図2】本発明の実施の形態における射出装置の計量工程を開始したときの状態を示す図である。
【図3】本発明の実施の形態における射出装置の計量工程を完了したときの状態を示す図である。
【図4】本発明の実施の形態における射出装置の射出工程を完了したときの状態を示す図である。
【符号の説明】
21  プランジャ
22  スクリュー
32  弁部材
43  射出装置
47、51  第1、第2の加熱シリンダ
58  連通管
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an injection device.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, a pre-plastic injection apparatus includes a first heating cylinder and a second heating cylinder connected to a predetermined position at a front end of the first heating cylinder via a communication pipe. A plunger is disposed in the first heating cylinder so as to be able to move forward and backward, and a screw is rotatably disposed in the second heating cylinder. A hopper for supplying a resin as a molding material is attached to a rear end of the second heating cylinder.
[0003]
Then, during the weighing step, the screw is rotated in the second heating cylinder, the resin supplied from the hopper is melted, moved forward, and supplied into the first heating cylinder via the communication pipe. Is done. Along with this, the plunger placed at the forward limit position in the first heating cylinder is retracted by the pressure of the resin, and weighing is performed. Then, a predetermined amount of resin is stored in front of the plunger, and when the plunger reaches the measurement completion position, the rotation of the screw is stopped, and the measurement process is completed.
[0004]
Further, when the plunger is advanced in the first heating cylinder during the injection step, the resin is injected from the injection nozzle attached to the front end of the first heating cylinder, and the resin is charged into the cavity space of the mold apparatus. Is done. Then, when the plunger reaches the forward limit position, the injection process is completed.
[0005]
[Problems to be solved by the invention]
However, in the conventional injection device, during the measuring step, the resin in the second heating cylinder is supplied to the vicinity of the front end in the first heating cylinder through the communication pipe, and the resin in the first heating cylinder is supplied. Is moved from the front to the rear, so that during the injection step, the resin supplied last in the first heating cylinder is injected first from the injection nozzle, and is supplied first in the first heating cylinder. The injected resin will be injected from the injection nozzle most recently. That is, a last-in first-out injection is performed.
[0006]
Therefore, the resin supplied first into the first heating cylinder is moved a long distance, and the resin supplied last into the first heating cylinder is moved a short distance, so that the cavity space is filled. Variations occur in the flow history of the applied resin, and variations occur in the temperature distribution and pressure distribution of the resin. As a result, the density of the resin filled in the cavity space varies, and the quality of the molded product deteriorates.
[0007]
By the way, when the injection step is completed, the plunger is placed at the forward limit position in the first heating cylinder. At this time, the plunger is moved so that the front end of the plunger does not hit the inner peripheral surface of the injection nozzle. The forward limit position is set rearward by a predetermined distance (cushion amount) from a position corresponding to the inner peripheral surface of the nozzle. In this case, when the injection step is completed, the resin remains in the first heating cylinder between the opening of the communication pipe and the front end of the plunger, and the measurement step is started for the next shot. Then, as the plunger is retracted, the remaining resin is moved backward. Therefore, the remaining resin cannot be discharged out of the first heating cylinder, and is deteriorated and discolored or deteriorated, and the discolored or deteriorated resin is injected from the injection nozzle for some reason. In such a case, the quality of the molded product is deteriorated.
[0008]
The present invention solves the problems of the conventional injection device, and the density of the molding material filled in the cavity space varies, the color of the material is changed, or the deteriorated molding material is injected from the injection nozzle. It is an object of the present invention to provide an injection device capable of improving the quality of a molded product without performing the same.
[0009]
[Means for Solving the Problems]
For this purpose, in the injection device of the present invention, the first cylinder member, the injection member arranged to be able to advance and retreat within the first cylinder member, and the first cylinder member are connected to a predetermined position of the first cylinder member. A second cylinder member, and a plasticizing member rotatably disposed in the second cylinder member.
[0010]
The connecting member that communicates the first and second cylinder members is opened at the second cylinder member side at a measurement start position set a predetermined distance behind the forward limit position of the injection member. .
[0011]
In another injection device of the present invention, a valve member for applying a back pressure to the molding material in the second cylinder member is further provided in the connecting member.
[0012]
In still another injection device of the present invention, the injection device further includes a measurement processing unit that rotates the plasticizing member in a state where the injection member is located at the measurement start position.
[0013]
In still another injection device of the present invention, the weighing means places the injection member at a weighing completion position in accordance with the back pressure of the injection member when completing the weighing step.
[0014]
In still another injection device of the present invention, the weighing start position and the weighing completion position further match.
[0015]
In still another injection device of the present invention, the weighing completion position is further located behind the weighing start position.
[0016]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0017]
FIG. 1 is a schematic diagram of an injection device according to an embodiment of the present invention, FIG. 2 is a diagram illustrating a state when a measuring process of the injection device according to the embodiment of the present invention is started, and FIG. 3 is an embodiment of the present invention. And FIG. 4 is a diagram showing a state when the injection step of the injection device according to the embodiment of the present invention is completed.
[0018]
In the drawing, reference numeral 43 denotes an injection device, and the injection device 43 is disposed on an injection molding machine frame (not shown) together with a mold device (not shown) and a mold clamping device (not shown). The mold device is composed of a fixed mold and a movable mold, and the mold clamping device is a fixed platen fixed to the injection molding machine frame, a movable platen, a toggle mechanism, and a mold clamping apparatus for operating the toggle mechanism. A mold clamping motor is provided as a drive unit, and the movable platen is advanced and retracted by driving the mold clamping motor to operate a toggle mechanism, thereby performing mold closing, mold clamping and mold opening of the mold apparatus. When the mold is clamped, a cavity space is formed between the movable mold and the fixed mold.
[0019]
The injection device 43 includes a first heating cylinder 47 serving as a first cylinder member, and a plunger 21 serving as an injection member which is disposed in the first heating cylinder 47 so as to be able to advance and retreat (move in the left-right direction in the figure). An injection cylinder 49 serving as a metering / injection drive unit for moving the plunger 21 forward and backward, is connected to a predetermined portion of the first heating cylinder 47, and extends obliquely upward from the connection position to form a molding material. A second heating cylinder 51 serving as a second cylinder member that melts the resin and supplies the first heating cylinder 47 to the first heating cylinder 47, and a plasticizing member rotatably disposed in the second heating cylinder 51. , A hydraulic motor 59 as a plasticizing drive unit for rotating the screw 22, and a rear end of the second heating cylinder 51 (FIGS. 1 and 4). Mounted near the Oite rightmost), having a pelletized resin supply hopper 25 or the like in said second heating cylinder 51. The injection device 43 is moved forward / backward with respect to the fixed platen by an injection device moving mechanism (not shown), and can perform nozzle touch when moving forward (moving leftward in the figure).
[0020]
The first heating cylinder 47 includes a cylinder portion 46 and an injection nozzle 48 attached to a front end (a left end in the figure) of the cylinder portion 46, and a resin in the cylinder portion 46 is provided on an outer periphery of the cylinder portion 46. The heaters h1 and h2 are disposed as heating members for heating the resin and maintaining the molten state, and on the outer periphery of the injection nozzle 48, as a heating member for heating the resin in the injection nozzle 48 and maintaining the molten state. The heater h3 is provided, and energization is controlled by a control unit (not shown). A nozzle port 23 is formed at the front end of the injection nozzle 48.
[0021]
The second heating cylinder 51 includes a cylinder portion 57 and a communication pipe 58 as a connecting member that connects the front end of the cylinder portion 57 and the first heating cylinder 47. The heaters h4 to h6 are provided as heating members for heating and melting the resin supplied into the second heating cylinder 51, and the energization is controlled by the control unit. The communication pipe 58 is provided with a communication passage 31 for communicating the insides of the first and second heating cylinders 47 and 51, and the communication passage 31 has a valve member 32 having functions such as a switching valve and a control valve. Is arranged. The valve member 32 is opened and closed by driving a predetermined actuator (not shown) by the control unit, and selectively communicates and shuts off the communication passage 31 between the first and second heating cylinders 47 and 51. It is possible to control the flow rate of the passing resin by adjusting the opening degree.
[0022]
In the present embodiment, a ball valve is used as the valve member 32. However, a needle valve, a slide mechanism, or the like may be used instead of the ball valve.
[0023]
In the first heating cylinder 47, a first weighing setting for starting a weighing process, which is set at a forward limit position of the plunger 21 and a predetermined distance behind (to the right in the drawing) from the forward limit position. A weighing start position as a position is set, and the plunger 21 is moved forward and backward by driving the injection cylinder 49, and is placed at a forward limit position as shown in FIG. 4 or as shown in FIG. Or placed at the weighing start position.
[0024]
The communication passage 31 is opened at the measurement start position on the first heating cylinder 47 side, and is opened at the front end of the cylinder portion 57 on the second heating cylinder 51 side. The measurement start position is set at a predetermined distance behind the nozzle port 23 so as to secure the amount of resin required for measurement in the first heating cylinder 47.
[0025]
When the injection step is completed, the plunger 21 is placed at the forward limit position. At this time, the plunger 21 is moved to the injection nozzle 48 so that the front end of the plunger 21 does not hit the inner peripheral surface of the injection nozzle 48. The forward limit position is set rearward by a predetermined distance from a position corresponding to the inner peripheral surface of the vehicle.
[0026]
The screw 22 includes a screw body 26 and a flight 27 formed in a spiral shape on the outer circumference of the screw body 26, and a spiral groove 28 is formed along the flight 27. Also, the screw 22 has a supply unit to which the resin dropped from the hopper 25 is supplied in order from the rear to the front (left side in FIGS. 1 and 4), a compression unit to compress the supplied resin and melt it, and A measuring section for measuring a fixed amount of the melted resin is formed. The outer diameter of the screw body 26 is made relatively small in the supply section, gradually increased from the rear to the front in the compression section, and made relatively large in the metering section. Therefore, the gap (gap) between the inner peripheral surface of the second heating cylinder 51 and the outer peripheral surface of the screw main body 26 is relatively large in the supply unit, and is gradually reduced from the rear to the front in the compression unit, It is relatively small in the metering section.
[0027]
In the present embodiment, the injection cylinder 49 is used as the injection drive unit, and the hydraulic motor 59 is used as the plasticization drive unit, but instead of the injection cylinder 49, the hydraulic motor 59, etc. Thus, an electric motor such as a servomotor can be used. 1 and 4, reference numeral 61 denotes a coupler for connecting the plunger 21 and the output shaft of the injection cylinder 49, and reference numeral 62 denotes a coupler for connecting the screw 22 and the output shaft of the hydraulic motor 59.
[0028]
In the injection device having the above-described configuration, before the weighing process is started, the plunger 21 is placed at the weighing start position as shown in FIG. 2, and the control unit drives the actuator to move the inside of the communication passage 31. A predetermined opening degree is set in the valve member 32 so that a predetermined amount of resin flows. Then, when the weighing process is started, the weighing means (not shown) of the control unit performs the weighing process, drives the hydraulic motor 59 with the plunger 21 at the weighing start position, and rotates the screw 22. Along with that, the resin in the hopper 25 is supplied into the second heating cylinder 51 and further supplied to the supply unit. The resin supplied to the supply unit advances in the groove 28 with the rotation of the screw 22, enters a semi-molten state in the compression unit, is completely melted in the measuring unit, becomes liquid, and passes through the communication passage 31. As shown by an arrow in FIG. 2, the liquid is supplied to the first heating cylinder 47, flows in the first heating cylinder 47 forward from the measurement start position, and is stored forward of the plunger 21.
[0029]
During this time, in the second heating cylinder 51, the resin tends to move forward with the rotation of the screw 22, but the flow rate of the resin in the communication passage 31 is restricted by the valve member 32, Squeezed. That is, since a back pressure according to the opening degree can be applied to the resin in the second heating cylinder 51, the density of the plasticized resin can be made uniform. As a result, the quality of the molded product can be improved.
[0030]
By the way, a pressure sensor as a pressure detecting unit (not shown) is provided at a predetermined position behind the plunger 21, detects the pressure of the resin in the first heating cylinder 47, and sends a detection signal to the control unit. It is supposed to be sent. When a sufficient amount of resin is stored in front of the plunger 21 and the pressure detected by the pressure sensor becomes equal to or greater than a threshold value, the control unit drives the actuator, as shown in FIG. Then, the valve member 32 is closed to shut off the communication passage 31, and the drive of the hydraulic motor 59 is stopped to stop the rotation of the screw 22. Even if the pressure detected by the pressure sensor becomes equal to or higher than the threshold value and the valve member 32 is closed and the communication pipe 31 is shut off, the pressure in front of the plunger 21 is not necessarily maintained at the threshold value, and thereafter. May keep getting higher.
[0031]
Therefore, when the pressure detected by the pressure sensor is maintained at the threshold value, the weighing completion position and the weighing start position are matched, and the weighing completion position is directly set as the weighing start position. On the other hand, when the pressure detected by the pressure sensor is not held at the threshold value and continues to increase thereafter, and the pressure higher than the threshold value acts on the plunger 21, the measurement processing unit drives the injection cylinder 49, The plunger 21 is moved backward (moved rightward in the figure) in the direction of the arrow in FIG. 3 so that the pressure detected by the pressure sensor is maintained at a threshold value. In this case, the weighing completion position is located behind the weighing start position. Then, when the pressure detected by the pressure sensor at the measurement completion position becomes a threshold value, the measurement processing means completes the measurement process.
[0032]
When the pressure in front of the plunger 21 is high and the speed of the resin supplied into the first heating cylinder 47 is high, the measurement completion position is located sufficiently behind the measurement start position.
[0033]
In this case, when the pressure detected by the pressure sensor becomes equal to or higher than the threshold value, the plunger 21 is retracted by a predetermined distance from the measurement start position to the measurement completion position, so that the measurement can be reliably performed.
[0034]
Subsequently, the control unit drives the actuator to close the valve member 32 and maintain a state in which the first and second heating cylinders 47 and 51 are shut off, as shown in FIG. Then, an injection processing unit (not shown) of the control unit performs an injection process, drives the injection cylinder 49, and advances the plunger 21 toward the forward limit position as indicated by an arrow in FIG. Along with this, the resin stored in front of the plunger 21 is injected by the injection nozzle 48 and filled in the cavity space.
[0035]
When the plunger 21 reaches the forward limit position, the injection processing means stops driving the injection cylinder 49, stops the plunger 21, and completes the injection process. Then, the weighing processing means drives the injection cylinder 49 to retreat the plunger 21 for the next shot and place the plunger 21 at the weighing start position.
[0036]
As described above, at the time of the measuring step, the resin in the second heating cylinder 51 is supplied to the vicinity of the measuring start position of the plunger 21 in the first heating cylinder 47 via the communication path 31 and the first heating is performed. Since the inside of the cylinder 47 is moved forward from the measurement start position, at the time of the injection process, the resin supplied into the first heating cylinder 47 is injected first from the injection nozzle 48 first, and the The resin supplied into one heating cylinder 47 is injected from the injection nozzle 48 most recently. That is, a first-in first-out injection is performed.
[0037]
Therefore, the resin supplied first into the first heating cylinder 47 and the resin supplied last into the first heating cylinder 47 are moved by the same distance, so that the resin filled in the cavity space is filled. Not only does not cause a variation in the flow history, but also does not vary in the temperature distribution and the pressure distribution of the resin. As a result, it is possible to prevent the density of the resin filled in the cavity space from being varied, thereby improving the quality of the molded product.
[0038]
When the injection step is completed, the forward end position is set so that the front end of the plunger 21 does not contact the inner peripheral surface of the injection nozzle 48. In the vicinity of the front end. However, since the remaining position is ahead of the opening of the communication passage 31, even if the measuring process is started for the next shot, the remaining resin does not move backward with the retreat of the plunger 21. Therefore, the remaining resin can be reliably discharged to the outside of the first heating cylinder 47 in the next shot, so that the resin is not deteriorated to be discolored or deteriorated. As a result, the quality of the molded product can be improved.
[0039]
It should be noted that the present invention is not limited to the above-described embodiment, but can be variously modified based on the gist of the present invention, and they are not excluded from the scope of the present invention.
[0040]
【The invention's effect】
As described above in detail, according to the present invention, in the injection device, the first cylinder member, the injection member disposed to be able to advance and retreat in the first cylinder member, and the first cylinder A second cylinder member connected to a predetermined position of the member; and a plasticizing member rotatably disposed within the second cylinder member.
[0041]
The connecting member that communicates the first and second cylinder members is opened at the second cylinder member side at a measurement start position set a predetermined distance behind the forward limit position of the injection member. .
[0042]
In this case, the connecting member that allows the first and second cylinder members to communicate with each other is opened at the second cylinder member side at a measurement start position that is set a predetermined distance behind the forward limit position of the injection member. Therefore, at the time of the measuring step, the molding material in the second cylinder member is supplied to the vicinity of the measurement start position of the injection member in the first cylinder member via the connecting member, and the inside of the first cylinder member is measured. It is moved forward from the start position. Therefore, at the time of the injection step, the molding material supplied first into the first cylinder member is injected first from the injection nozzle, and the molding material supplied last into the first cylinder member is injected last from the injection nozzle. It will be ejected from. That is, a first-in first-out injection is performed.
[0043]
As a result, the molding material supplied first into the first cylinder member and the molding material supplied last into the first cylinder member are moved by the same distance, so that the cavity space is filled. Not only does the flow history of the molding material vary, but also the temperature distribution and the pressure distribution of the molding material do not vary. In addition, since it is possible to prevent the density of the molding material filled in the cavity space from being varied, it is possible to improve the quality of the molded product.
[0044]
When the injection step is completed, the forward end position is set so that the front end of the injection member does not hit the inner peripheral surface of the injection nozzle. And remains in the vicinity of the front end of the injection member. However, since the remaining position is in front of the opening of the connecting member, even if the measuring step is started for the next shot, the remaining molding material does not move backward with the retreat of the injection member. Therefore, the remaining molding material can be reliably discharged to the outside of the first cylinder member in the next shot, so that the molding material is not deteriorated and discolored or deteriorated. As a result, the quality of the molded product can be improved.
[0045]
In another injection device of the present invention, a valve member for applying a back pressure to the molding material in the second cylinder member is further provided in the connecting member.
[0046]
In this case, since a back pressure can be applied to the molding material in the second cylinder member, the density of the plasticizing molding material can be made uniform. As a result, the quality of the molded product can be improved.
[Brief description of the drawings]
FIG. 1 is a schematic view of an injection device according to an embodiment of the present invention.
FIG. 2 is a diagram illustrating a state when a measuring step of the injection device according to the embodiment of the present invention is started.
FIG. 3 is a diagram illustrating a state when a measuring step of the injection device according to the embodiment of the present invention is completed.
FIG. 4 is a diagram showing a state when the injection process of the injection device according to the embodiment of the present invention is completed.
[Explanation of symbols]
21 Plunger 22 Screw 32 Valve member 43 Injection device 47, 51 First and second heating cylinder 58 Communication pipe

Claims (6)

(a)第1のシリンダ部材と、
(b)該第1のシリンダ部材内において進退自在に配設された射出部材と、
(c)前記第1のシリンダ部材の所定の位置に連結された第2のシリンダ部材と、
(d)該第2のシリンダ部材内において回転自在に配設された可塑化部材とを有するとともに、
(e)前記第1、第2のシリンダ部材を連通させる連結部材は、第2のシリンダ部材側において、該射出部材の前進限位置より所定の距離だけ後方に設定された計量開始位置で開口させられることを特徴とする射出装置。
(A) a first cylinder member;
(B) an injection member disposed to be able to advance and retreat within the first cylinder member;
(C) a second cylinder member connected to a predetermined position of the first cylinder member;
(D) a plasticizing member rotatably disposed in the second cylinder member;
(E) The connecting member for communicating the first and second cylinder members is opened at the metering start position set a predetermined distance behind the forward limit position of the injection member on the second cylinder member side. An injection device, characterized in that it can be used.
前記連結部材に、第2のシリンダ部材内の成形材料に背圧を加えるための弁部材が配設される請求項1に記載の射出装置。The injection device according to claim 1, wherein a valve member for applying a back pressure to the molding material in the second cylinder member is provided in the connection member. 前記射出部材を計量開始位置に置いた状態で前記可塑化部材を回転させる計量処理手段を有する請求項1又は2に記載の射出装置。The injection device according to claim 1, further comprising a measurement processing unit configured to rotate the plasticizing member in a state where the injection member is located at a measurement start position. 前記計量処理手段は、計量工程を完了する際に、前記射出部材の背圧に従って射出部材を計量完了位置に置く請求項1〜3のいずれか1項に記載の射出装置。The injection device according to any one of claims 1 to 3, wherein the measurement processing unit places the injection member at a measurement completion position in accordance with a back pressure of the injection member when completing the measurement process. 前記計量開始位置と計量完了位置とが一致する請求項4に記載の射出装置。The injection device according to claim 4, wherein the measurement start position and the measurement completion position match. 前記計量完了位置が計量開始位置より後方に位置させられる請求項4に記載の射出装置。The injection device according to claim 4, wherein the measurement completion position is located behind the measurement start position.
JP2002174850A 2002-06-14 2002-06-14 Injection equipment Pending JP2004017450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002174850A JP2004017450A (en) 2002-06-14 2002-06-14 Injection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002174850A JP2004017450A (en) 2002-06-14 2002-06-14 Injection equipment

Publications (1)

Publication Number Publication Date
JP2004017450A true JP2004017450A (en) 2004-01-22

Family

ID=31173715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002174850A Pending JP2004017450A (en) 2002-06-14 2002-06-14 Injection equipment

Country Status (1)

Country Link
JP (1) JP2004017450A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009255452A (en) * 2008-04-18 2009-11-05 Toyo Mach & Metal Co Ltd Preplasticating injection molding machine
JP2015150686A (en) * 2014-02-10 2015-08-24 株式会社デンソー Plasticizing injection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009255452A (en) * 2008-04-18 2009-11-05 Toyo Mach & Metal Co Ltd Preplasticating injection molding machine
JP2015150686A (en) * 2014-02-10 2015-08-24 株式会社デンソー Plasticizing injection device

Similar Documents

Publication Publication Date Title
US6241932B1 (en) Method and system for reducing polymer degradation products in two stage injection molding machines
JP3620380B2 (en) Injection molding machine for thermoplastic resin
EP1034912B1 (en) Thermoplastic resin injection molding machine
JP5022734B2 (en) Injection molding machine
JP3427170B2 (en) Injection molding machine
JP2019177684A (en) Injection molding machine
JP3173359B2 (en) Operation method for screw prepra injection device
JP2004017450A (en) Injection equipment
JP2007001268A (en) Preplasticizing type injection molding apparatus
JPH11240052A (en) Method for operating injection molding machine
JP4820162B2 (en) Screw, injection device and pressure member
JPH07214611A (en) Control method for suck-back action in injection molding machine
JP3725802B2 (en) Injection device
JP2612087B2 (en) Injection molding machine
JP5083656B2 (en) Forced opening of check ring in injection molding machine
JP3127391B2 (en) Pre-plastic injection molding machine and control method therefor
JPH07214618A (en) Check ring opening/closing device in injection molding machine
JP2000117776A (en) Injection nozzle
JPH08197596A (en) Weighing method before molding rising of injection molding machine and control device of injection molding machine
JPH11245271A (en) Injection control method of injection molding machine
JPH11227016A (en) Control of injection molding machine
JP2871988B2 (en) Injection molding machine
JP3359142B2 (en) Check ring opening and closing device in injection molding machine
JP2001179788A (en) Method for preventing stagnation of cushion resin in preplastification type injection molding machine
JP2006182000A (en) Molding method and molding apparatus of injection molding machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050607

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061221

A131 Notification of reasons for refusal

Effective date: 20070116

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Effective date: 20070522

Free format text: JAPANESE INTERMEDIATE CODE: A02