GB2358032A - Heave compensation system for rough sea drilling - Google Patents

Heave compensation system for rough sea drilling Download PDF

Info

Publication number
GB2358032A
GB2358032A GB0000006A GB0000006A GB2358032A GB 2358032 A GB2358032 A GB 2358032A GB 0000006 A GB0000006 A GB 0000006A GB 0000006 A GB0000006 A GB 0000006A GB 2358032 A GB2358032 A GB 2358032A
Authority
GB
United Kingdom
Prior art keywords
blow
conduit
extendable
heave
out preventer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0000006A
Other versions
GB2358032B (en
GB0000006D0 (en
Inventor
Peter Airey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEDCO FOREX INTERNAT Inc
Original Assignee
SEDCO FOREX INTERNAT Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEDCO FOREX INTERNAT Inc filed Critical SEDCO FOREX INTERNAT Inc
Priority to GB0000006A priority Critical patent/GB2358032B/en
Publication of GB0000006D0 publication Critical patent/GB0000006D0/en
Publication of GB2358032A publication Critical patent/GB2358032A/en
Application granted granted Critical
Publication of GB2358032B publication Critical patent/GB2358032B/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/064Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
    • E21B19/004Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
    • E21B19/006Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform including heave compensators

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The system comprises a blowout preventer (BOP)13 above the water line with a first telescopic joint 12 between the BOP 13 and a floating drilling rig 101 and a second telescopic joint 20 installed below the BOP. The upper joint 12 is used to compensate for momentary heave (e.g. wave) motion while the lower joint 20 is used to compensate for heave motions of longer time period (e.g. tides).

Description

16.048 2358032 Method and Apparatus for Drilling Subsea Wells This
invention relates to subsea wells, and concerns in particular subsea oil wells and the methods and apparatus by which they are operatively connected to a floating drilling rig positioned on the sea surface above the well head.
BACKGROUND OF THE INVENTION
With the maturing of hydrocarbon reserves found and produced onshore using land based rigs and well, there has been considerable attention attracted to the drilling and production of oil and gas wells located in water. In the early period of offshore drilling and in relatively shallow water, wells could be drilled from bottom founded, fixed rigs. Traditionally, jackup rigs consisting of barge-shaped hulls with three or four (sometimes more) structural or tubular legs have been used for shallow water drilling operations.
As hydrocarbon exploration and production moves into ever deeper waters, the industry is relying more and more on the use of floating rigs. As used herein, a "floating rig" is any structure that moves vertically (heave motion) with respect to a point on the seabed. Floating rigs include drilling ships and vessels and semisubmersible rigs (semi-subs). Excluded from this definition are other so-called "compliant" platforms such as Tension Leg Platforms (TLP), which are restricted in their reaction to wave and wind forces by load or tension bearing connections pinned to sea floor. Floating rigs respond essentially unrestricted to first order wave forces and rely on a passive spread catenary'anchor mooring system or on an active controlled-thruster dynamic positioning system to maintain a relatively steady proximity to a point on the sea floor.
16.048 2 moving drilling operation to a floating rig requires a major change in the placing of the blowout preventer (BOP) and other equipment connected the BOP, such as wellhead, choke and kill lines, and control systems. Until recently, it was common practice in offshore drilling to place the BOP on the seabed as what is commonly referred to as "subsea" BOP. In case where the pressure inside the well increases suddenly ("kick"), the BOP is activated to rapidly shut the well, i.e., confining the high pressure within the well in order to protect the operating personnel and equipment on the surface.
Conventionally, the required operative connection between the subsea BOP and the drilling rig is effected using a large-bore thick-walled pipe of steel or composite material known as a "riser". The riser has to withstand static loads exerted for example by the its own weight and weight of the drilling mud circulated through it. In water depths above 1000 meters, for example, the volume of the riser begins to exceed the volume of the well. In addition, the riser has to withstand dynamic loads which are typically caused by wave induced forces.
To compensate wave motion, it is known to suspend a support ring below the vessel by constant tension cables in order to keep the riser under tension. A telescopic joint lands in the support ring and connects to a conduit that extends to the vessel. The telescopic joint is often referred to as "slip joint" The tension is maintained by the mechanical connection between the top of the riser and a number of hydraulic or hydro- pneumatic cylinders maintained under approximately constant pressure by means of an air or air/hydraulic accumulator. The cylinders maintain tension on reeled wire ropes or chains that are reeved around sheaves at the blind and rod ends of each cylinder.
The free end of the wire rope or chain is then passed to the outer (or fixed) barrel of the riser slip joint where it is 16.048 3 secured to the support ring. Because of the compensating motion of the tensioner cylinders, the effective length of the rope or chain thus varies with the motion of the platform while maintaining tension on the fixed section of the drilling riser 5 anchored at its lower end to the wellhead.
The inner (or free) barrel of the riser slip joint is fixed to the platform to move vertically with the heave of the platform, barge, or vessel, resulting in a varying length of riser.
While the rope and pulley form of tensioners is the generally accepted technology, various proposals have been made to incorporate a fluid powered heave compensation and tensioner system into the slip joint.
Telescopic joints are for example described in the United States Patents Nos. 4,367,981g; 4,615,542; 5,069,488; 5,727,630,and in the International Patent Application WO 97/43516. In particular %488 describes a pressure and volume balanced design for a hydraulically operated slip joint placed below a BOP permanently placed on the deck of a floating production platform.
Further variants of slip joints are known such as two-stroke telescopic joints with two inner barrel. The two-stroke joint exploits the available travel of the joint slightly better than the conventional one-stroke slip joint, however at the expense of an increased number of seals.
Recent advances in deep water drilling saw the BOP being placed above the water line within the moon pool area of the drilling vessel. The so-called "surface" or "dry" BOP rests on the riser or casing tubulars and is suspended by a tensioner system similar to the one used for seabed BOPs. A slip joint landed on top of the BOP stack compensates wave-induced heave motion.
Current attempts to expand the operational window for the surface BOP technology into geographical areas with rougher seas 16.048 4 are restricted due to a lack of adequate heave compensation. Rougher seas require a heave compensation system with an increased travel compared to the existing systems.
To appreciate the problem of increasing travel in the conventional slip joint system, it is worth noting that the slip joint is placed between the BOP and the drill deck of the floating vessel. To lower the position of the BOP would mean a higher risk of submerging the BOP. In order to maintain operability of the BOP under submerged conditions, the operator may be forced to exchange the normal surface ("dry") BOP against a "wet" BOP stack that is designed for subsea operation, thus sacrificing a big economical advantage of the surface BOP technology. On the other hand, it is not possible to raise the height-above-water of the floating drilling vessel without decreasing the stability of the vessel.
To overcome this problem, it has been contemplated to place the slip joint below the BOP and to install the BOP permanently on the floating rig. Placing the slip joint below the BOP, obviously obviates most of the slip joint's travel or stroke limitations. However, a slip joint located below the BOP has to withstand the maximum pressure of the BOP, i.e., requires the same pressure rating as the BOP to prevent failure in a blow-out situation. Even though the above-cited US Patent No 5,069,488 discloses a theoretical high-pressure telescopic joint for a BOP permanently installed on a mobile production platform, the inventor is not aware of any successful implementation of this high pressure slip joint. The problems relating to the implementation of such a high pressure slip joint are at least partly due to the various dynamic loads on the high pressure seals. They must be capable of handling simultaneously high pressure, rapid translation (due to heave) and bending (due to offset, roll and pitch). At present it appears that the industry is not willing to adopt the high pressure slip joint, in spite of its obvious benefits.
16.048 It remains therefore a task to provide a technically reliable motion compensation system for rough sea drilling operations while employing surface (dry) BOP stacks and avoiding the use of the expensive subsea rated (wet) BOP equipment. 5 SUMMARY OF THE INVENTION
In accordance with the present invention, there is provided a heave compensating system comprising a high pressure telescopic joint located below the BOP stack combined with a standard low pressure slip joint above the BOP stack.
Underlying the invention is an analysis of the various types of motions of a drilling vessel. A standard slip joint stroke has to allow for the following motions: heave, offset (rig lateral displacement), tides, riser setting height space-out, and subsea latching/unlatching stroke. When considering the nature of these displacements it was noticed that heave is the only truly 20,dynamic" displacement, with a period of several seconds. The other displacements to be allowed for in the total stroke are either "one-time" adjustments, (space out, latching /unlatching), or of a long periodic nature (tides, offset etc.).
The powered telescopic joint, though not capable of compensation all motions of the vessel, would be sufficient to offset the motions of long periodic nature. It can stroke in or out initially to allow for riser setting height. Subsequently it can be adjusted to allow for tides, offset and unlatching. The adjustments would be made in order to place the standard low pressure slip joint in the optimum stroke position to accommodate the heave. Below or above the slip joint would also be the location of the flex joint to handle the bending load.
Obviously, the total travel or stroke of the combined high and low pressure telescopic joints can be within limits divided between the two joints. For most cases, a 1:1 distribution of 16.048 6 the total travel is preferred. However, deviations from this ratio might be favorable under particular conditions.
Advantageously, the present motion compensating system is combined with a known riser tensioning system to maintain a constant upwardly pulling force on the riser. It is feasible to have the tensioner system connected to the riser at a point below the high pressure joint. Under these conditions, the high pressure joint would not experience the pulling force of the tensioner. However, in a preferred embodiment of the invention the riser tensioning system is fixed to a point above the high pressure telescopic joint. In this embodiment the travel of the tensioner system is equal the (smaller) travel of the low pressure slip joint.
Therefore, while the high pressure powered telescopic joint in accordance with the invention still has to accommodate pressure and some bending, it no longer has to handle high velocity axial reciprocation whilst under pressure. In fact it could alternatively termed "adjustable riser section". Typically, it would be hydraulically powered, and can be mechanically locked in any position. However other means of displacement can be envisaged to set the high pressure telescopic joint, such as rack and pinion drive, linear electric or magneto -electric drives. Control could be manual or automatic taking the BOP/Rig relative positions as input.
The high pressure telescopic joint can be designed as a pressure balanced device or non-balanced. The latter variant is preferred because it simplifies significantly the design of the joint.
In a further preferred embodiment of the present invention, the high pressure joint comprises a plurality of axially reciprocating members arranged around the outer circumference of the riser pipe (or its extension). The reciprocating members can be for example hydraulic cylinders. The advantage of having the load on the high pressure riser distributed over a plurality of 16.048 7 smaller reciprocating members lies in an inherent redundancy of the system. If one or more members fail, e.g., due to the leakage of a seal, the compensation system can still be operated, albeit with a reduced maximum power. 5 These and other features of the invention, preferred embodiments and variants thereof, possible applications and advantages will become appreciated and understood by those skilled in the art from the following detailed description and drawings.
DRAWINGS FIGs. 1A,B illustrate a prior art system for offshore drilling having a BOP suspended at the moon pool level of a drilling rig; FIG. 2 shows details of a heave compensation system in accordance with the invention; FIGs. 3A,B show design details of two variants of a slip joint to be employed below the BOP in accordance with the novel heave compensation system; FIGs. 4A,B show design details of two variants of a pressure balanced slip joint to be employed in accordance with the novel heave compensation system; and FIGs. 5 and 6 show the novel heave compensation system under various operating conditions.
16.048 8 MODE (S) FOR CARRYING OUT THE INVENTION FIG. 1B shows in simplified format an example of a known floating drilling platform (semi submersible) as used in surface 5 BOP drilling operations.
The floating rig shown is a twin-hulled column stabilized semisubmersible 10 comprising a deck 101, columns 102 and two hulls (pontoons) 103. Attached to the pontoons are thrusters 104 to position the rig relatively to the sea floor. The deck 101 comprises typical installations including the derrick 105, crew quarters 106, a helipad 107, cranes 108 and lifeboats 109. Below the main deck 101 there is shown a lower deck 11 surrounding the moon pool.
The floating rig 10 is connected to a subsea borehole (not shown) via a (low pressure) slip joint 12, a blow-out preventer (BOP) stack 13 and a marine riser 14. The riser is kept from buckling by a riser tensioner system comprising pairs of hydraulically separable sheave wheels 15 over which ropes 151 are reeled to pull the riser 14 with a constant upwardly directed force.
A more detailed view of the known floating system is shown in FIG. 1B. In FIG. IB a part of the rig floor 101 is shown. Attached to the bottom of the rig floor is the inner barrel 121 of the low pressure slip joint 12. The outer barrel 122 of the slip joint is connected at its lower end to a flexible or ball joint 123. The flex joint is mounted on the BOP stack 13. The lower end of the BOP lead into the top section of the marine riser 14. Tensioner ropes 151 are pulling the frame of the BOP stack maintaining the riser under tension. At the level of the moon pool guiding rails 111 are shown that restrict the motion of the BOP 13. The guiding rails 111 are fixed to the moon pool deck 11.
16.048 9 The travel or stroke of the low pressure slip joint is assumed to be 25 ft. Ideally the neutral position of the BOP is set to 12.5 ft of stroke such that the BOP 13 is approximately level with the moon pool deck 11. It is immediately obvious that increasing the maximum stroke of the slip joint to 50 ft would lower the neutral position of the BOP 13 to 25 ft below the drilling deck 101 and 12.5 ft below the moon pool 11 and hence precariously close to the water line 17. Any heave compensation would submerge the BOP and may require the exchange of the "dry" rated BOP stack against a more expensive "wet" rated one.
Referring now to FIG. 2, an example in accordance with the present invention is illustrated. It is perhaps best understood when viewed together with FIG.1B. The same reference numerals are used in both figures to denote identical or equivalent elements.
While most elements of FIG. 2 are described above, a high pressure telescopic joint 20 is now introduced between the bottom end of the BOP 13 and the upper part of the riser 14. The telescopic joint 20 has an array 21 of hydraulic cylinders symmetrically arranged around the outer circumference of its external cylinder or casing 22. Piston rods 211 are secured at the upper part of the inner cylinder 23 of the telescopic joint 20.
The array 21 of hydraulic cylinders communicates via a flexible pressure hose 241 with a hydraulic pump 24 located on the moon pool deck 11.
The ropes 151 of the riser tensioners are fixed to the frame of the BOP 13. As a consequence, the high pressure telescopic joint 16.048 has to bear (and balance) the pulling force of the tensioner system.
A conventional slip joint 12 with a flex joint 123 is provided to connect the upper part of the BOP 13 with the drill deck 101 as described above with reference to FIG. 1B.
By employing the motion compensation system of FIG. 2, the operator can adjust the relative position of the BOP 13 by means of controlling the pressure of the hydraulic fluid within the array of hydraulic cylinders 21. An increase in pressure forces the piston rods downward and hence closes the telescopic joint 20. Further operating modes of the new motion compensation system are outlined below, after first describing some possible variants of the telescopic joint 20.
Referring now to FIG. 3A, the load-bearing variant of the high pressure telescopic joint is described in greater detail. FIG.
3A shows a vertical and horizontal cross-section through a middle plane of the telescopic joint 20. The joint has eight identical hydraulic cylinders 21 arranged symmetrically around the circumference of the external cylinder 22. The lower end of the external cylinder is provided with a connector 221 for fixing the telescopic joint to the riser. Above the connector 221 is a flange 222 for mounting the hydraulic cylinders 21.
Engaged with the inner wall of the external cylinder 22 is the inner cylinder 23 of the telescopic joint. Gliding seals 223 are provided to enable a pressure sealed sliding motion of the inner cylinder 23 relative to the outer cylinder 22. The seals are provided with wipers or flushing devices to minimize contamination with mud or cuttings of the drilling process.
Mounted on the top end of the inner cylinder 23 is a f lange 231 to secure the piston rods 211 of the hydraulic cylinders 21.
16.048 Located above the flange 231 is a connector 232 adapted to be f ixed to the lower end or the BOP stack.
Pistons 212 divide the hydraulic cylinders 21 into a lower chamber or compartment 213 and an upper chamber 214. The lower chamber 213 is kept at ambient pressure, while the upper chamber 214 is connected to pump 24 that provides pressurized hydraulic fluid.
The present example of the telescopic joint 20 has an inner diameter of 12.C and an outer diameter (including the hydraulic cylinders 21) of 46". The hydraulic cylinders 21 are designed with a working pressure of 5,000 psi, which translates into a working pressure of the telescopic joint 20 of 8, 000 psi. The tensile load is 1,600 kips. The joint 20 has a closed length of ft and an open length of 60 ft, providing a maximum stroke or travel of 25 ft.
A variant of the above example is shown in FIG. 3B. The high pressure telescopic joint of FIG. 3B differs from the one of FIG. 3A in that the connection points 224 of the ropes 151 of the riser tensioner have been moved from the BOP frame to the external cylinder 22 of the telescopic joint. Hence the upwardly directed pulling force is acting directly onto the riser, thus relieving the strain on the joint and its hydraulic system.
The FIGs 4A and 4B illustrate pressure balanced variants of the telescopic joints of FIGs 3A and 3B, i.e., in a load-bearing and a non-load-bearing embodiment, respectively.
In a pressure balanced joint the internal pressure is neutralized resulting in a net zero force on the inner cylinder 23, regardless of the internal pressure.
16.048 To achieve this balance, the external cylinder 22 has a wider section (bore) 225 providing a pressure sealed annular compartment. The outer wall of the internal cylinder 23 forms the inner wall of compartment. An annular sealed flange 234 acts as a piston dividing the compartment into an upper chamber 226 and a lower chamber 227. The upper chamber 226 communicates with the interior of the joint through bores located directly above the flange 234. Hence, the pressure within the upper chamber 226 equals the pressure within the riser pipe. Bores through the wall of the external cylinder at the bottom level of the lower chamber 227 ensure that the lower chamber is kept at ambient pressure.
To balance the pressure in the telescopic joint the effective area of the flange 234 is made equal the cross-sectional area of the internal cylinder.
An array of ten hydraulic cylinders 21 is arranged around the circumference of the external cylinder 22 of the high pressure telescopic joint. The design and function of those ten cylinders is identical to the hydraulic cylinders described in the examples above (FIG. 3A).
A variant of the pressurebalanced variant of FIG 4A is illustrated by FIG. 4B. The new variant is not load-bearing. Similar to the example of FIG. 3B, riser ropes 151 are attached to the external cylinder 22 of the telescopic joint 20. The other features of this variant are identical to those described with reference to FIG. 4A above.
The remaining FIGs. 5 and 6 illustrate how the two joints can be operated.
16.048 In FIG. 5 it is assumed that the high pressure telescopic joint is fully closed, e.g. at low tide. The heave motion caused by the waves is compensated by the slip joint above the BOP. The center drawing of FIG. 5 shows the slip joint in its neutral position. The drawing to the left and right illustrate the rig fully heaved down and up respectively. It should be noted that during the short period of the heave, the state of the high pressure telescopic joint is not altered.
In FIG. 6 it is assumed that the high pressure telescopic joint is fully expanded, e.g. at high tide. Additionally the rig is at its maximum offset from the wellbore tilting the riser and BOP. The slip joint above the BOP again solely compensates the heave motion caused by the waves. As above, the center drawing of FIG 5 shows the slip joint in its neutral position. The drawing to the left and right illustrate the rig fully heaved down and up respectively. Again, during the short period of the heave, the state of the high pressure telescopic joint is not altered.
Between the two extremes of FIGs. 5 and 6, that is between the left hand drawing of FIG. 5 and the right hand drawing of FIG. 6, the rig moved by 50 ft with respect to the wellbore.
16.048

Claims (14)

1. A heave compensating apparatus for a floating drilling rig; comprising a conduit section of extendable length adapted to be located above a blow-out preventer stack; and a further conduit of extendable length adapted to be located below said blow-out preventer stack.
2. A heave compensating apparatus according to claim 1 comprising a blow-out preventer stack rated to withstand a blowout pressure and being under operational conditions installed within a conduit system extending from the floating drilling rig into a subsea wellbore, said conduit is system enabling the circulation of drilling fluids from said floating rig into said wellbore and back to the surface, wherein said blow-out preventer stack is under operational conditions located above the water line.
3. A heave compensating apparatus according to claim 1, wherein an extension of the extendable conduit above the blow-out preventer is independent of the extension of the extendable conduit below the blow-out preventer stack.
4. A heave compensating apparatus according to claim 1, the extendable conduit above the blow-out preventer is adapted to extend or contract with heave motions of the rig having a short time period and the extendable conduit below the blow-out preventer stack is adapted to extend or contract with heave motions of the vessel having a long time period.
5. A heave compensating apparatus according to claim 1, wherein the extendable conduit above the blowout preventer is adapted to expand and contract in accordance with a momentary position of the floating rig with respect to the 16.048 - 15 seabed while the length of the extendable conduit below the blow-out preventer is maintained for finite time intervals.
6. A heave compensating apparatus according to claim 1, wherein the extendable conduit below the blow-out preventer stack is a telescopic joint rated at the blowout pressure of the blow-out preventer stack and associated with a power source adapted to provide energy to actively set said extendible conduit at a predetermined length.
7. A heave compensating apparatus according to claim 1, comprising a tensioner system capable of maintaining conduits between the floating rig and a well bore at seabed level under constant tension and a power source adapted to provide energy to actively set the extendable conduit section below the blowout preventer stack at a predetermined length.
8. A heave compensating apparatus according to claim 1, wherein the extendable conduit located below the blowout preventer stack comprises an inner cylinder, an external cylinder and a plurality of reciprocating members arranged around the outer circumference of external cylinder.
9. A heave compensating apparatus according to claim 1, wherein the extendable conduit located below the blowout preventer stack comprises an inner cylinder, an external cylinder, a gilding sealing system between said inner and said outer cylinder and a plurality of hydraulic cylinders circumferentially arranged around the external cylinder and having piston rods attached to a flange of the inner cylinder.
16.048
10. A heave compensating apparatus according to claim 1, wherein the extendable conduit above the blow-out preventer stack is a slip joint.
11. A method of compensating heave while operating a floating drilling rig; comprising the steps of mounting a conduit section of extendable length above a blow-out preventer stack; and mounting a further conduit of extendable length below said blow-out preventer stack.
12. A heave compensating method according to claim 11, wherein a momentary length of the extendable conduit above the blow-out preventer is adjusted independently of a momentary length of the extendable conduit below the blow-out preventer stack.
13. A heave compensating method according to claim 11, further comprising the steps of constantly adjusting the length of the extendable conduit above the blow-out preventer with heave motions of the rig having with a short time period while setting the length the extendable conduit below the blow-out preventer stack in accordance with a predetermined heave height and maintaining said length for a longer time period.
14. A heave compensating method according to claim 11, using a tensioner system to maintain conduits between the floating rig and a well bore at seabed level under constant tension and a power source to actively set the extendable conduit section below the blowout preventer stack at a predetermined length.
GB0000006A 2000-01-05 2000-01-05 Method and apparatus for drillig subsea wells Expired - Lifetime GB2358032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB0000006A GB2358032B (en) 2000-01-05 2000-01-05 Method and apparatus for drillig subsea wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0000006A GB2358032B (en) 2000-01-05 2000-01-05 Method and apparatus for drillig subsea wells

Publications (3)

Publication Number Publication Date
GB0000006D0 GB0000006D0 (en) 2000-02-23
GB2358032A true GB2358032A (en) 2001-07-11
GB2358032B GB2358032B (en) 2002-03-27

Family

ID=9883103

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0000006A Expired - Lifetime GB2358032B (en) 2000-01-05 2000-01-05 Method and apparatus for drillig subsea wells

Country Status (1)

Country Link
GB (1) GB2358032B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002088515A1 (en) * 2001-04-30 2002-11-07 Woodside Energy Limited Offshore delivery line support
EP1316671A1 (en) * 2001-11-30 2003-06-04 Control Flow Inc. Co-linear tensioner and methods for assembling production and drilling risers using same
WO2004044374A1 (en) * 2002-11-12 2004-05-27 National Oilwell Norway As Two-part telescopic tensioner for risers at a floating installation for oil and gas production
WO2005038188A3 (en) * 2003-10-08 2006-12-28 Nat Oilwell Inc Inline compensator for a floating drilling rig
WO2008127125A2 (en) * 2007-04-16 2008-10-23 Marine Cybernetics System and method for testing drilling control systems
WO2009061211A3 (en) * 2007-11-09 2009-08-13 Fmc Kongsberg Subsea As Riser system comprising pressure control means
WO2009126940A2 (en) 2008-04-10 2009-10-15 Weatherford/Lamb, Inc. Landing string compensator
WO2010125031A1 (en) * 2009-04-27 2010-11-04 Statoilhydro Asa Pressure joint
WO2011026897A3 (en) * 2009-09-02 2011-06-30 Aker Oilfield Services Operation As Telescopic riser joint
CN102140887A (en) * 2010-01-28 2011-08-03 长江大学 Hydraulic winch-free well repairing machine
WO2012016947A3 (en) * 2010-08-06 2012-09-27 Fmc Kongsberg Subsea As Method and system for performing well operations
CN101709646B (en) * 2009-12-02 2012-12-26 江苏省无锡探矿机械总厂有限公司 Floating drilling device of offshore drill
WO2013062736A1 (en) * 2011-10-05 2013-05-02 Seahorse Equipment Corp Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
AU2012201418B2 (en) * 2008-04-10 2015-04-09 Weatherford Technology Holdings, Llc Landing string compensator
WO2016142656A3 (en) * 2015-03-06 2016-11-24 Oil States Industries (Uk) Limited Valved tree member for a riser system and telescoping device for inclusion in a riser system
US10060207B2 (en) 2011-10-05 2018-08-28 Helix Energy Solutions Group, Inc. Riser system and method of use
US11466521B2 (en) * 2019-02-25 2022-10-11 Osbit Limited Platform assembly

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2013680B1 (en) * 2014-10-24 2016-10-05 Itrec Bv Offshore drilling system, vessel and method.

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3917006A (en) * 1972-09-29 1975-11-04 Smith International Floorlevel motion compensator
US5069488A (en) * 1988-11-09 1991-12-03 Smedvig Ipr A/S Method and a device for movement-compensation in riser pipes
WO1998058152A1 (en) * 1997-06-17 1998-12-23 Sofitech N.V. Method and apparatus for drilling subsea wells

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3917006A (en) * 1972-09-29 1975-11-04 Smith International Floorlevel motion compensator
US5069488A (en) * 1988-11-09 1991-12-03 Smedvig Ipr A/S Method and a device for movement-compensation in riser pipes
WO1998058152A1 (en) * 1997-06-17 1998-12-23 Sofitech N.V. Method and apparatus for drilling subsea wells

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002088515A1 (en) * 2001-04-30 2002-11-07 Woodside Energy Limited Offshore delivery line support
EP1316671A1 (en) * 2001-11-30 2003-06-04 Control Flow Inc. Co-linear tensioner and methods for assembling production and drilling risers using same
WO2004044374A1 (en) * 2002-11-12 2004-05-27 National Oilwell Norway As Two-part telescopic tensioner for risers at a floating installation for oil and gas production
CN100360764C (en) * 2002-11-12 2008-01-09 挪威国立奥伊威尔有限公司 Two-part telescopic tensioner for risers at a floating installation for oil and gas production
US7373985B2 (en) 2002-11-12 2008-05-20 National Oilwell Norway As Two-part telescopic tensioner for risers at a floating installation for oil and gas production
WO2005038188A3 (en) * 2003-10-08 2006-12-28 Nat Oilwell Inc Inline compensator for a floating drilling rig
US7231981B2 (en) 2003-10-08 2007-06-19 National Oilwell, L.P. Inline compensator for a floating drill rig
WO2008127125A2 (en) * 2007-04-16 2008-10-23 Marine Cybernetics System and method for testing drilling control systems
WO2008127125A3 (en) * 2007-04-16 2008-12-11 Marine Cybernetics System and method for testing drilling control systems
EP2535503A3 (en) * 2007-11-09 2013-07-10 FMC Kongsberg Subsea AS Riser system comprising pressure control means.
WO2009061211A3 (en) * 2007-11-09 2009-08-13 Fmc Kongsberg Subsea As Riser system comprising pressure control means
US9022127B2 (en) 2007-11-09 2015-05-05 Fmc Kongsberg Subsea As Riser system comprising pressure control means
WO2009126940A2 (en) 2008-04-10 2009-10-15 Weatherford/Lamb, Inc. Landing string compensator
EP2650465A1 (en) 2008-04-10 2013-10-16 Weatherford/Lamb Inc. Landing string compensator
US9353603B2 (en) 2008-04-10 2016-05-31 Weatherford Technology Holdings, Llc Landing string compensator
EP2444588A3 (en) * 2008-04-10 2012-08-01 Weatherford/Lamb, Inc. Landing string compensator
WO2009126940A3 (en) * 2008-04-10 2009-11-26 Weatherford/Lamb, Inc. Landing string compensator
AU2012201418B2 (en) * 2008-04-10 2015-04-09 Weatherford Technology Holdings, Llc Landing string compensator
US8733447B2 (en) 2008-04-10 2014-05-27 Weatherford/Lamb, Inc. Landing string compensator
EP2589744A1 (en) * 2008-04-10 2013-05-08 Weatherford/Lamb Inc. Landing String Compensator
WO2010125031A1 (en) * 2009-04-27 2010-11-04 Statoilhydro Asa Pressure joint
NO343576B1 (en) * 2009-04-27 2019-04-08 Statoil Petroleum As Pressure splice device for use with a floating installation coupled to a rigid riser and method for providing such pressure splice
US9605495B2 (en) 2009-04-27 2017-03-28 Statoil Petroleum As Pressure joint
US9121227B2 (en) 2009-09-02 2015-09-01 Aker Oilfield Services Operation As Telescopic riser joint
WO2011026897A3 (en) * 2009-09-02 2011-06-30 Aker Oilfield Services Operation As Telescopic riser joint
CN101709646B (en) * 2009-12-02 2012-12-26 江苏省无锡探矿机械总厂有限公司 Floating drilling device of offshore drill
CN102140887A (en) * 2010-01-28 2011-08-03 长江大学 Hydraulic winch-free well repairing machine
WO2012016947A3 (en) * 2010-08-06 2012-09-27 Fmc Kongsberg Subsea As Method and system for performing well operations
US9091137B2 (en) 2010-08-06 2015-07-28 Fmc Kongsberg Subsea As Method and system for performing well operations
KR101600155B1 (en) * 2011-10-05 2016-03-04 씨호스 이퀴프먼트 코포레이션 Method for drilling a plurality of subsea wells from a stationary floating vessel, an offshore drilling vessel, a drilling riser transport system, and an offshore vessel
US9238943B2 (en) 2011-10-05 2016-01-19 Seahorse Equipment Corp Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
CN104136704A (en) * 2011-10-05 2014-11-05 海马设备公司 Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
WO2013062736A1 (en) * 2011-10-05 2013-05-02 Seahorse Equipment Corp Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
US9458671B2 (en) 2011-10-05 2016-10-04 Seahorse Equipment Corp Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
GB2506761A (en) * 2011-10-05 2014-04-09 Seahorse Equip Corp Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
CN107654192A (en) * 2011-10-05 2018-02-02 单浮标系泊设施公司 For the method and device of multiple submarine wells to be drilled through from offshore platforms at single place
US10060207B2 (en) 2011-10-05 2018-08-28 Helix Energy Solutions Group, Inc. Riser system and method of use
KR20130138853A (en) * 2011-10-05 2013-12-19 씨호스 이퀴프먼트 코포레이션 Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
WO2016142656A3 (en) * 2015-03-06 2016-11-24 Oil States Industries (Uk) Limited Valved tree member for a riser system and telescoping device for inclusion in a riser system
EP3409883A1 (en) * 2015-03-06 2018-12-05 Oil States Industries (UK) Ltd A telescopic device for inclusion in a riser system
US11466521B2 (en) * 2019-02-25 2022-10-11 Osbit Limited Platform assembly

Also Published As

Publication number Publication date
GB2358032B (en) 2002-03-27
GB0000006D0 (en) 2000-02-23

Similar Documents

Publication Publication Date Title
US4176722A (en) Marine riser system with dual purpose lift and heave compensator mechanism
US4351261A (en) Riser recoil preventer system
GB2358032A (en) Heave compensation system for rough sea drilling
US4272059A (en) Riser tensioner system
US4913238A (en) Floating/tensioned production system with caisson
CA2609027C (en) Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells
US9562403B2 (en) Riser tensioner conductor for dry-tree semisubmersible
US7703534B2 (en) Underwater seafloor drilling rig
US6691784B1 (en) Riser tensioning system
US8613322B2 (en) Method for motion compensation during active intervention operations
US4537533A (en) Installation and levelling of subsea templates
US4473323A (en) Buoyant arm for maintaining tension on a drilling riser
US4545437A (en) Drilling riser locking apparatus and method
KR100634989B1 (en) Floating offshore construction, and floating element
US20080251258A1 (en) Tubing Support Assembly, Vessel And Method Of Deploying Tubing
US8540460B2 (en) System for supplemental tensioning for enhanced platform design and related methods
US8684090B2 (en) Slip connection with adjustable pre-tensioning
US4626137A (en) Submerged multi-purpose facility
US3211224A (en) Underwater well drilling apparatus
KR101792706B1 (en) Riser and floating drillship the same
WO1998058152A1 (en) Method and apparatus for drilling subsea wells
AU2012359006B2 (en) Offshore well drilling system with nested drilling risers
Tarełko Power take-off systems of offshore rig power plants
Manson Particular Specifications that can be Envisaged for Drilling Equipment Usable at Great Water Depths and Under Hostile Environmental Conditions
Xu et al. Conceptual Design for Utilizing Buoyancy Can to Support Spar Drilling Riser

Legal Events

Date Code Title Description
PE20 Patent expired after termination of 20 years

Expiry date: 20200104