CN211735285U - A hang well structure upside down for earth dam hole of collapsing is handled - Google Patents
A hang well structure upside down for earth dam hole of collapsing is handled Download PDFInfo
- Publication number
- CN211735285U CN211735285U CN201922280981.0U CN201922280981U CN211735285U CN 211735285 U CN211735285 U CN 211735285U CN 201922280981 U CN201922280981 U CN 201922280981U CN 211735285 U CN211735285 U CN 211735285U
- Authority
- CN
- China
- Prior art keywords
- hanging
- pit
- inverted
- fore shaft
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The patent of the utility model discloses a hang well structure upside down that is used for earth dam hole of collapsing to handle, concretely relates to hydraulic engineering's technical field. The utility model provides an overhead pit structure for earth dam pit collapse is handled, includes the overhead pit, and the part coincidence forms inside hollow coincidence region between per two adjacent overhead pits, and the inside distribution in coincidence region has support piece, and the overhead pit comprises a plurality of overhead pit walls, and the top of overhead pit wall is equipped with reinforced concrete fore shaft collar tie beam and fore shaft crossbeam. Adopt the utility model discloses the technique has overcome present dam body and has appeared the dam body restoration excavation volume after collapsing big, strut the degree of difficulty big, the deep difficulty scheduling problem of handling the construction, can be used to the restoration and the reinforcement that the clay core dam body collapsed the hole.
Description
Technical Field
The utility model relates to a hydraulic engineering's technical field, in particular to a hang well structure that falls that is used for earth dam hole collapse to handle.
Background
Earth dams are mostly adopted in the construction of reservoir dams in various places in China, and for the earth dams, drainage facilities are arranged at the downstream of the earth dams to drain water seepage of dam bodies and dam foundations and protect downstream dam feet from being washed. However, if a pit is collapsed on the dam, leakage often occurs on a post-dam drainage facility (such as a drainage ridge, a drainage facility formed by piling up sand, broken stones and rock blocks at the toe of the dam) and a simple, convenient and effective treatment scheme is not available at present, so that the repaired dam can normally operate for a long time and the post-dam drainage facility does not leak in the long-term operation process.
SUMMERY OF THE UTILITY MODEL
The utility model provides a hang well structure that falls that is used for earth dam hole of collapsing to solve present dam body and appear collapsing behind the hole dam body restoration excavation volume big, strut the degree of difficulty big, the deep problem of handling the construction difficulty.
In order to achieve the above purpose, the technical scheme of the utility model is as follows: the utility model provides a hang-over well structure for earth dam collapse hole is handled, includes a plurality of diameter the same hang-over well, every two are adjacent hang-over well between the partial coincidence form inside hollow coincidence region, the inside distribution in coincidence region has a plurality of support piece, hang-over well comprises a plurality of hang-over well walls, the top of hanging-over well wall is equipped with reinforced concrete fore shaft collar beam and fore shaft crossbeam.
Furthermore, the upper part of the inverted well wall is also provided with a bulge. The inverted well wall is combined with the dam body more firmly by virtue of the bulges, and the stability of the repaired collapsed pit is enhanced.
Furthermore, the inverted well wall, the locking collar beam and the locking beam are integrally formed. The strength of the inverted well wall can be enhanced through the integral forming manufacturing, so that the strength of the dam body after repair is enhanced.
Further, the support member is pine. The pine is adopted as the support piece, so that the material is convenient to obtain, the price is low, and the repair cost is favorably reduced.
Further, the fore shaft crossbeam sets up at two overhead kick-up shaft coincidence area's top, the shape of fore shaft crossbeam is inverted trapezoid, fore shaft circle roof beam sets up the overhead kick-up shaft top at the left and right sides respectively, the plane shape of fore shaft circle roof beam is the annular shape, one side of fore shaft circle roof beam is equipped with the opening, the both ends of fore shaft circle roof beam opening part are connected with the both ends of fore shaft crossbeam.
Can stabilize its loose soil body on every side through fore shaft crossbeam and fore shaft collar tie beam effectual when collapsing hole excavation, the artifical excavation of being convenient for to can combine inseparabler between each overhead hanging well, be convenient for strengthen the holistic intensity of overhead hanging well.
The beneficial effect of this scheme: 1. by adopting the scheme, the repair of the dam body collapsed pit can be realized, and the safety of the dam body is ensured; 2. the hanging well is used as a support measure for pit collapse excavation in the early stage and is used as an important part for dam body reinforcement in the later stage, and the function of an inverted hanging well is increased.
Drawings
FIG. 1 is a plan view of an overhead well in example 1;
fig. 2 is a cross-sectional view of the inverted well wall in example 1.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments:
reference numerals in the drawings of the specification include: the well comprises an inverted well 1, an inverted well wall 2, a support piece 3, a locking port cross beam 4 and a locking port ring beam 5.
Examples
As shown in figures 1 and 2: the utility model provides a hang-over well structure for earth dam collapse hole is handled, includes the same hang-over well 1 of a plurality of diameters, and the partial coincidence forms inside hollow coincidence region between per two adjacent hang-over well 1, and the inside distribution of coincidence region has a plurality of support piece 3, and support piece 3 is the pine, adopts the pine to draw materials as support piece 3 convenient, the low price, is favorable to reducing prosthetic cost. The inverted well 1 is composed of a plurality of inverted well walls 2, a reinforced concrete fore shaft ring beam 5 and an fore shaft beam 4 are arranged at the top of each inverted well wall 2, inclined planes which are deviated into the inverted well 1 are arranged at the beam bottoms of the fore shaft ring beam 5 and the beam bottoms of the fore shaft beam 4, and the inverted well walls 2 which are positioned above and the inverted well walls 2 which are positioned below are adhered together when concrete is poured in every two adjacent inverted well walls 2.
The outer side of the upper portion of the hanging well wall 2 is further provided with a protrusion, so that the hanging well wall 2 is combined with a dam body more firmly by means of the protrusion, and the stability of the repaired collapsed pit is enhanced. The inverted well wall 2 and the bulges are integrally formed by reinforced concrete, so that the strength of the inverted well wall 2 is enhanced, and the strength of the dam body after repair is enhanced. Three supporting pieces 3 are fixed in the overlapping area corresponding to each reverse hanging well wall 2, which is beneficial to enhancing the supporting strength of the reverse hanging well wall 2 on the same layer.
The top of coincidence region is equipped with fore shaft crossbeam 4 on two overhead hung wells 1, and the shape of fore shaft crossbeam 4 is inverted trapezoidal, and the top of two overhead hung wells 1 of the left and right sides all is equipped with fore shaft collar tie-beam 5, and one side of every fore shaft collar tie-beam 5 all is equipped with the opening, and the plane shape of fore shaft collar tie-beam 5 is the annular shape, and the both ends of fore shaft collar tie-beam 5 opening part link together with the both ends of fore shaft crossbeam 4. Can stabilize its loose soil body on every side through fore shaft crossbeam 4 and fore shaft collar tie beam 5 effectual when collapsing the pit excavation, the artifical excavation of being convenient for to can combine inseparabler between each overhead pit 1, be convenient for strengthen the holistic intensity of overhead pit 1.
The construction method of the inverted well comprises the following steps,
s102, using the structure of the hanging well 1, arranging the hanging well 1 at a collapsed pit of a dam body, wherein the collapsed pit can be completely covered by the hanging well 1; because the inverted well 1 consists of a plurality of inverted well walls 2, when the inverted well is excavated manually, workers can pour the inverted well walls 2 while excavating, and the poured inverted well walls 2 can play a role in supporting;
s104, controlling the excavation depth of the inverted well 1 in the step S102 to reach the bedrock control;
s106, performing foundation cleaning treatment on the dam foundation strongly weathered layer in the S104, and pouring thick plain concrete back cover on the bedrock;
and S108, backfilling cohesive soil into the inverted well 1 in the S106 and tamping.
Finally, drilling a grouting hole on the dam foundation, and then injecting cement into the grouting hole by adopting a curtain grouting method; the seepage-proofing performance of the dam body near the collapsed pit can be enhanced by grouting holes and curtain grouting.
In this embodiment: the dam of the red reservoir in the east of Yuexi county in Anhui province is a clay core-wall sand-shell dam, the top elevation of which is 230.9m, the top width is 6.0 m, and the maximum dam height is 36.1 m. On 19 th of 2002, when the water level of the reservoir reaches 225.0 meters, a collapse pit appears at a position of 55 meters away from the right end of the dam facing the water slope, 3.6 meters away from the wave wall and 229.9 meters from the height, and the section of the collapse pit is 1.4 meters multiplied by 1.0 meter. And after the collapse dangerous case occurs, a leakage point appears at the downstream behind the dam, the leakage point is located at 1/3 on the right side of the main river channel, the elevation is about 190 meters, the caliber is 8 centimeters, and the water yield is 2-3 m 3/h.
Four inverted hanging wells 1 with the diameter of 2.3 meters are adopted at the collapsed pit to form a well group, each inverted hanging well 1 is internally provided with a plurality of inverted hanging well walls 2 with the thickness of 20 centimeters and the height of 1.3 meters, and the inverted hanging well walls 2 are integrally cast by reinforced concrete. The excavation depth of the inverted well 1 is 20 m to reach the bedrock control. Before backfilling the inverted well 1, cleaning the dam foundation strong weathering layer, pouring 0.3 m of plain concrete on the surface of the foundation rock to seal the bottom, finally backfilling the inverted well 1 with cohesive soil, and tamping the cohesive soil. The dam modified and reinforced by the scheme is normal in operation up to now. The collapse pit of the red reservoir dam of the east is inspected and processed by the aid of the hanging well 1, construction is simple, inspection is visual, and processing effect is good.
The above are merely examples of the present invention, and common general knowledge of known specific structures and/or characteristics of the embodiments is not described herein in an excessive amount. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.
Claims (5)
1. The utility model provides a hang well structure upside down for dam collapse hole is handled which characterized in that: the hanging well comprises a plurality of hanging wells with the same diameter, every two adjacent hanging wells are partially overlapped to form an inner hollow overlapped area, a plurality of supporting pieces are distributed in the overlapped area, each hanging well comprises a plurality of hanging well walls, and a reinforced concrete locking ring beam and a locking cross beam are arranged at the top of each hanging well wall.
2. The structure of the inverted shaft for the treatment of the collapse pit of the earth dam as claimed in claim 1, wherein: the upper part of the hanging well wall is also provided with a bulge.
3. The structure of the inverted shaft for the treatment of the collapse pit of the earth dam as claimed in claim 2, wherein: the inverted well wall, the locking collar beam and the locking beam are integrally formed.
4. The structure of the inverted shaft for the treatment of the collapse pit of the earth dam as claimed in claim 1, wherein: the support member is pine.
5. A hanging well structure for dam collapse treatment according to any one of claims 1 to 4, wherein: the fore shaft crossbeam is arranged at the top of the coinciding area of the two inverted hanging wells, the fore shaft crossbeam is inverted trapezoid, the fore shaft ring beam is respectively arranged at the tops of the inverted hanging wells at the left side and the right side, the planar shape of the fore shaft ring beam is circular ring shape, one side of the fore shaft ring beam is provided with an opening, and the two ends of the opening of the fore shaft ring beam are connected with the two ends of the fore shaft crossbeam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922280981.0U CN211735285U (en) | 2019-12-18 | 2019-12-18 | A hang well structure upside down for earth dam hole of collapsing is handled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922280981.0U CN211735285U (en) | 2019-12-18 | 2019-12-18 | A hang well structure upside down for earth dam hole of collapsing is handled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211735285U true CN211735285U (en) | 2020-10-23 |
Family
ID=72869415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922280981.0U Active CN211735285U (en) | 2019-12-18 | 2019-12-18 | A hang well structure upside down for earth dam hole of collapsing is handled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211735285U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924363A (en) * | 2019-12-18 | 2020-03-27 | 安庆市水利水电规划设计院 | Inverted hanging well structure for treating soil dam collapse pit and construction method thereof |
CN116446331A (en) * | 2023-04-07 | 2023-07-18 | 山东乾元工程集团有限公司 | River levee pit rescue device and method |
-
2019
- 2019-12-18 CN CN201922280981.0U patent/CN211735285U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924363A (en) * | 2019-12-18 | 2020-03-27 | 安庆市水利水电规划设计院 | Inverted hanging well structure for treating soil dam collapse pit and construction method thereof |
CN116446331A (en) * | 2023-04-07 | 2023-07-18 | 山东乾元工程集团有限公司 | River levee pit rescue device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108914931B (en) | Assembled vertical shield annular foundation pile and construction method | |
CN205742213U (en) | Foundation pit supporting construction | |
CN110080254B (en) | drainage slide-resistant pile-water guide culvert structure for slope reinforcement and construction method | |
CN102434717B (en) | Construction method of joist steel pipe-jacking work pit | |
CN104846841B (en) | Anti-floating construction method for basements without uplift piles | |
CN108331000A (en) | Caisson sinking construction method | |
CN112695803B (en) | Supporting and water-stopping construction method for pipe-jacking working well and pipe ditch on beach | |
CN110397057A (en) | A kind of soft soil area Self-sinking type steel open caisson support system and method | |
CN104264683B (en) | Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition | |
CN211735285U (en) | A hang well structure upside down for earth dam hole of collapsing is handled | |
CN105569051A (en) | Foundation pit support system of sandy pebble boulder geological stratification and construction method | |
CN204001146U (en) | Prefabricated reinforced concrete temporary drainage ditch | |
CN112095644A (en) | Deep foundation pit water intercepting and draining device and construction method thereof | |
CN102839691A (en) | Quick sealing method and device for sandless cement pipe deep well dewatering wellhead | |
CN110080169A (en) | A kind of construction method reclaimed fields from the sea utilized based on basement | |
CN104099946A (en) | Novel jacking pipe intersegment overhaul well | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN101793027A (en) | Core-grouted static pressure anchor rod pile | |
CN102220764B (en) | Construction method of deep foundation pit bracing system | |
CN107059904A (en) | A kind of underground pipe gallery ponding well excavation method | |
CN109779640A (en) | A kind of shield launching portal breaking construction method | |
CN203768925U (en) | Seal device for dewatering well in foundation pit | |
CN102493810B (en) | Grouting construction process of pipeline inclined shaft engineering | |
CN110670613B (en) | Foundation pit elevator shaft water seepage prevention structure and construction method thereof | |
CN110616719A (en) | Quick construction method for U-shaped groove of upper-span existing culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |