CN209144676U - A kind of bridge construction flowing water top of the slope face trowelling machine - Google Patents

A kind of bridge construction flowing water top of the slope face trowelling machine Download PDF

Info

Publication number
CN209144676U
CN209144676U CN201822008339.2U CN201822008339U CN209144676U CN 209144676 U CN209144676 U CN 209144676U CN 201822008339 U CN201822008339 U CN 201822008339U CN 209144676 U CN209144676 U CN 209144676U
Authority
CN
China
Prior art keywords
frame
flowing water
bridge construction
wheel
screeding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822008339.2U
Other languages
Chinese (zh)
Inventor
李昌生
洪成林
杨晓辉
昝世辉
包烨明
徐付平
温辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN201822008339.2U priority Critical patent/CN209144676U/en
Application granted granted Critical
Publication of CN209144676U publication Critical patent/CN209144676U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

A kind of bridge construction flowing water top of the slope face trowelling machine, belong to railroad bridge construction equipment field, it is time-consuming can to solve existing highway bridge construction flowing water top of the slope face floating, low efficiency, the problem of construction quality difference, including screeding and compaction mold, plate vibrator, connecting rod, frame I and frame II, plate vibrator is located on screeding and compaction mold, frame II is located at the top of frame I, the bottom of frame I is equipped with directive wheel, the bottom of frame II is equipped with traveling wheel, one end of connecting rod is connect with screeding and compaction mold, the other end passes through frame I, the end face of one end of frame I is equipped with motor, the output axis connection speed reducer of motor, the output shaft of speed reducer is equipped with gear, gear is connected with chain wheel I by transmission chain, chain wheel I is connected with chain wheel II by transmission chain, chain wheel II is connect with traveling wheel, the top end surface of frame II is equipped with screw rod elevator, silk The screw rod of bar elevator passes through frame II and connect with the top end surface of frame I.The utility model can be such that construction efficiency and quality significantly improves.

Description

A kind of bridge construction flowing water top of the slope face trowelling machine
Technical field
The utility model belongs to railroad bridge technical field of construction equipment, and in particular to a kind of bridge construction flowing water top of the slope Face trowelling machine.
Background technique
Railroad bridge Roadway Construction, in sleeper basis intermediate region, basic top surface is provided with flowing water slope, the basis top in beam face Generally all compacting smoothes out in face, bigger using manual compaction's floating workload, large area screeding and compaction labor intensive and time, makes It being compacted with mechanical troweling, work surface is smaller, and big machinery can not be unfolded, simultaneously because it is provided with sleeper and non-fragment orbit basis, There cannot be big disturbance to sleeper basis.
Summary of the invention
The utility model smoothes out the problem of time-consuming, low efficiency, construction quality difference for existing highway bridge construction flowing water top of the slope face, A kind of strong construction flowing water top of the slope face trowelling machine is provided, the utility model is that one kind can be compacted smooth out automatically, it works continuously, machine The trowelling machine of toolization construction.
The utility model adopts the following technical solution:
A kind of bridge construction flowing water top of the slope face trowelling machine, including screeding and compaction mold, plate vibrator, connecting rod, frame I With frame II, plate vibrator is located on screeding and compaction mold, and frame II is located at the top of frame I, and the bottom of frame I, which is equipped with, leads To wheel, the bottom of frame II is equipped with traveling wheel, and one end of connecting rod is connect with screeding and compaction mold, and the other end passes through frame I, frame The end face of I one end is equipped with motor, and the output shaft of motor is connected with speed reducer, and the output shaft of speed reducer is equipped with gear, and gear is logical It crosses transmission chain and is connected with chain wheel I, chain wheel I is connected with chain wheel II by transmission chain, and chain wheel II is connect with traveling wheel, the top of frame II End surface is equipped with screw rod elevator, and the screw rod of screw rod elevator passes through frame II and connect with the top end surface of frame I.
The screeding and compaction mold is matched with flowing water top of the slope surface construction.It can play the role of screeding and compaction.
The plate vibrator is located at the center of screeding and compaction mold.The work of vibration processes uniform force can be played With.
Spring is cased on the connecting rod.Can play will not take up rack in vibration processes, guarantee the work of effect of vibrating With.
The quantity of the connecting rod is four, centered on plate vibrator, is arranged in the surrounding of plate vibrator.
The screw rod elevator is located at the center of frame II.It can play the role of not shifting in lifting process.
The axis of the traveling wheel and the axis of directive wheel are mutually perpendicular to.
The beneficial effects of the utility model are as follows:
1. the utility model structure is simple, easy to use.
2. the utility model can realize continuous uninterrupted construction, working efficiency is improved.
3. the utility model is time saving and energy saving, manpower and expenses of labour are saved, liberation labour, speed is fast, the advantages such as high-efficient. In certain high-speed railway bridge surface flowing water top of the slope surface construction, traditional flowing water top of the slope face pressure smoothes out manual work in fact and constructs daily 20 ~ 30m, needs Want 6 ~ 8 people of personnel or so;Constructed 40 ~ 50m daily after being constructed using the utility model, needs 2 people of personnel, construction efficiency and quality It significantly improves.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of the utility model;
Fig. 2 is the side structure schematic view of the utility model;
Fig. 3 is the overlooking structure diagram of the utility model;
Wherein: 1- screeding and compaction mold;2- plate vibrator;3- connecting rod;4- frame I;5- frame II;6- directive wheel;7- Traveling wheel;8- motor;9- speed reducer;10- gear;11- chain wheel I;12- chain wheel II;13- screw rod elevator.
Specific embodiment
In conjunction with attached drawing, the utility model is described further.
A kind of bridge construction flowing water top of the slope face trowelling machine, including screeding and compaction mold 1, plate vibrator 2, connecting rod 3, frame Frame I 4 and frame II 5, plate vibrator 2 are located on screeding and compaction mold 1, and frame II 5 is located at the top of frame I 4, frame I 4 Bottom is equipped with directive wheel 6, and the bottom of frame II 5 is equipped with traveling wheel 7, and one end of connecting rod 3 is connect with screeding and compaction mold 1, another End is equipped with motor 8 across frame I 4, the end face of one end of frame I 4, and the output shaft of motor 8 is connected with speed reducer 9, speed reducer 9 Output shaft is equipped with gear 10, and gear 10 is connected with chain wheel I 11 by transmission chain, and chain wheel I 11 is connected with chain wheel II by transmission chain 12, chain wheel II 12 is connect with traveling wheel 7, and the top end surface of frame II 5 is equipped with screw rod elevator 13, the screw rod of screw rod elevator 13 It is connect across frame II 5 with the top end surface of frame I 4.
The screeding and compaction mold 1 is matched with flowing water top of the slope surface construction.It can play the role of screeding and compaction.
The plate vibrator 2 is located at the center of screeding and compaction mold 1.Vibration processes uniform force can be played Effect.
Spring is cased on the connecting rod 3.Can play will not take up rack in vibration processes, guarantee the work of effect of vibrating With.
The quantity of the connecting rod 3 is four, centered on plate vibrator 2, is arranged in the surrounding of plate vibrator 2.
The screw rod elevator 13 is located at the center of frame II 5.It can play the role of not shifting in lifting process.
The axis of the traveling wheel 7 and the axis of directive wheel 6 are mutually perpendicular to.
In the utility model, screeding and compaction mold 1 generally uses steel plate bent into shape according to the flowing water top of the slope surface construction gradient, Plate vibrator 2 is used to vibrating compacting concrete, and frame I 4 fixed screeding and compaction mold 1 using connecting rod 3, can be with when vibration Power of vibrating effectively is transmitted, traveling wheel 7 is that rubber wheel needs flexible rubber wheel, do not damage sleeper directly with sleeper basis face contact Surface of base, directive wheel 6 are rolled along the side wall of self-compaction sleeper base concrete, play the role of detent and guiding, and motor passes Dynamic system keeps traveling speed excessive, and general control is per minute in 3~5m, according to experiment adjustment transmission ratio parameter and use The height of driving form, II 5 connection wire rod elevator 13 of frame, adjustable compaction tool smoothes out quality to grasp compacting.
Continuous uninterrupted construction may be implemented in the utility model, and the beginning first assembles the utility model, is placed on sleeper basis Then top surface adjusts directive wheel, do not interfere with sleeper basis side wall to control compacting grinding tool, adjust mold height, make at mold In height appropriate, several millimeters generally more than theoretical absolute altitude, after the concrete perfusion of flowing water slope basis, first do one it is preliminary Rough control, is then turned on trowelling machine, and first vibrator screeding and compaction is opened in debugging, is then turned on walking, observes smearing effect, together When observation screeding and compaction appearance and smooth out quality, traveling speed can be adjusted according to smearing effect, make trowelling machine traveling, pressure Real, floating is in the balanced operation or work standard coordinated, while wanting recording parameters, at different speeds observation compacting floating Quality.
The utility model carries traveling, may be implemented continuously to construct, using plate vibrator and holddown spring by mold pressure Tangible top of concrete can make different compressions according to construction and smooth out mold, top of the rack traveling along non-fragment orbit basis Face, and side wall positioning and guiding and detent along basic two sides prevent rack traveling from dislocating and deviating, in screeding and compaction and walk scanning frequency Reach dynamic balancing between degree.

Claims (7)

1. a kind of bridge construction flowing water top of the slope face trowelling machine, it is characterised in that: including screeding and compaction mold (1), plate vibration Device (2), connecting rod (3), frame I (4) and frame II (5), plate vibrator (2) are located on screeding and compaction mold (1), frame II (5) it is located at the top of frame I (4), the bottom of frame I (4) is equipped with directive wheel (6), and the bottom of frame II (5) is equipped with traveling wheel (7), one end of connecting rod (3) is connect with screeding and compaction mold (1), and the other end passes through frame I (4), the end of one end of frame I (4) Face is equipped with motor (8), and the output shaft of motor (8) is connected with speed reducer (9), and the output shaft of speed reducer (9) is equipped with gear (10), tooth Wheel (10) is connected with chain wheel I (11) by transmission chain, and chain wheel I (11) is connected with chain wheel II (12), chain wheel II by transmission chain (12) it is connect with traveling wheel (7), the top end surface of frame II (5) is equipped with screw rod elevator (13), the silk of screw rod elevator (13) Bar passes through frame II (5) and connect with the top end surface of frame I (4).
2. a kind of bridge construction according to claim 1 flowing water top of the slope face trowelling machine, it is characterised in that: the floating pressure Real mold (1) matches with flowing water top of the slope surface construction.
3. a kind of bridge construction according to claim 1 flowing water top of the slope face trowelling machine, it is characterised in that: the plate vibration Dynamic device (2) are located at the center of screeding and compaction mold (1).
4. a kind of bridge construction according to claim 1 flowing water top of the slope face trowelling machine, it is characterised in that: the connecting rod (3) spring is cased on.
5. a kind of bridge construction according to claim 1 flowing water top of the slope face trowelling machine, it is characterised in that: the connecting rod (3) quantity is four, centered on plate vibrator (2), is arranged in the surrounding of plate vibrator (2).
6. a kind of bridge construction according to claim 1 flowing water top of the slope face trowelling machine, it is characterised in that: the screw rod mentions Rise the center that machine (13) are located at frame II (5).
7. a kind of bridge construction according to claim 1 flowing water top of the slope face trowelling machine, it is characterised in that: the traveling wheel (7) axis of axis and directive wheel (6) is mutually perpendicular to.
CN201822008339.2U 2018-12-03 2018-12-03 A kind of bridge construction flowing water top of the slope face trowelling machine Active CN209144676U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822008339.2U CN209144676U (en) 2018-12-03 2018-12-03 A kind of bridge construction flowing water top of the slope face trowelling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822008339.2U CN209144676U (en) 2018-12-03 2018-12-03 A kind of bridge construction flowing water top of the slope face trowelling machine

Publications (1)

Publication Number Publication Date
CN209144676U true CN209144676U (en) 2019-07-23

Family

ID=67288714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822008339.2U Active CN209144676U (en) 2018-12-03 2018-12-03 A kind of bridge construction flowing water top of the slope face trowelling machine

Country Status (1)

Country Link
CN (1) CN209144676U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112978250A (en) * 2021-02-23 2021-06-18 中铁十九局集团第三工程有限公司 Vibrating device and leveling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112978250A (en) * 2021-02-23 2021-06-18 中铁十九局集团第三工程有限公司 Vibrating device and leveling device

Similar Documents

Publication Publication Date Title
CN211817755U (en) Wall surface scraping device for building construction
CN107700467A (en) A kind of adjustable continuous rammer
CN202718370U (en) Concrete wall space leveling device
CN209144676U (en) A kind of bridge construction flowing water top of the slope face trowelling machine
CN201065634Y (en) Automatic plastering machine
CN209211461U (en) Slope concrete pouring is from rising mould plate
CN2298278Y (en) Combined vibrating spreading machine
CN208702166U (en) A kind of infrastructure vibratory concrete device
CN207240430U (en) The vibrating forming machine of base of high-speed railway plate construction
CN207109589U (en) Formula concrete vibrating beam is spelled certainly in being constructed applied to Deck concrete pavement layer
CN215359042U (en) Concrete distributing device for prefabricated wallboard
CN209053096U (en) A kind of accurate piling machine driven piles on a large scale
CN215210973U (en) Vibrating apparatus for water conservancy construction
CN207700007U (en) A kind of parameter adjustable type multifunction vibration molding machine
CN209717288U (en) A kind of burnishing device
CN211006254U (en) Town road construction device of levelling that shakes
CN206157584U (en) Track template is used in bridge construction
CN203684029U (en) Pre-implantation device of concrete expansion joint boards
CN214882783U (en) A slip casting equipment for town road construction
CN218562012U (en) Cast-in-place foam concrete road base tectorial membrane device of making level
CN212684268U (en) Vibration forming device for pouring nonmetal sound absorption plate
CN221460874U (en) Underground pneumatic vibration level device
CN221682393U (en) Cement laying device for building construction
CN110924272A (en) Bridge pavement vibration compaction device
CN211340307U (en) Road surface leveling device for highway construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant