CN108773519A - A kind of PVC pipe binding apparatus - Google Patents

A kind of PVC pipe binding apparatus Download PDF

Info

Publication number
CN108773519A
CN108773519A CN201810664843.XA CN201810664843A CN108773519A CN 108773519 A CN108773519 A CN 108773519A CN 201810664843 A CN201810664843 A CN 201810664843A CN 108773519 A CN108773519 A CN 108773519A
Authority
CN
China
Prior art keywords
pvc pipe
adhesive tape
pipeline
cylinder
annulus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810664843.XA
Other languages
Chinese (zh)
Inventor
王晨晨
陆书建
周聪
卢杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma Sean Nan Ma Intelligent Manufacturing Research Institute Ltd
Original Assignee
Ma Sean Nan Ma Intelligent Manufacturing Research Institute Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma Sean Nan Ma Intelligent Manufacturing Research Institute Ltd filed Critical Ma Sean Nan Ma Intelligent Manufacturing Research Institute Ltd
Priority to CN201810664843.XA priority Critical patent/CN108773519A/en
Publication of CN108773519A publication Critical patent/CN108773519A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B27/00Bundling particular articles presenting special problems using string, wire, or narrow tape or band; Baling fibrous material, e.g. peat, not otherwise provided for
    • B65B27/10Bundling rods, sticks, or like elongated objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B13/00Bundling articles
    • B65B13/02Applying and securing binding material around articles or groups of articles, e.g. using strings, wires, strips, bands or tapes
    • B65B13/04Applying and securing binding material around articles or groups of articles, e.g. using strings, wires, strips, bands or tapes with means for guiding the binding material around the articles prior to severing from supply
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B13/00Bundling articles
    • B65B13/18Details of, or auxiliary devices used in, bundling machines or bundling tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/42Arranging and feeding articles in groups by roller-ways

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Basic Packing Technique (AREA)

Abstract

A kind of PVC pipe binding apparatus,Belong to PVC pipe automated packaging equipment technical field,Including supplied materials mechanism,PVC pipe group array mechanism is arranged in the side of supplied materials mechanism,PVC pipe is on supplied materials mechanism kinematic to the first pipeline,First pipeline,Wrapping machine is linearly arranged successively,PVC pipe group array mechanism is arranged in the surface of the first pipeline,Wrapping machine includes winding machine support,Annulus,Adhesive tape feeding machanism,Rubber belt clamping mechanism and adhesive tape cutting mechanism,Arch brace frame is used to support annulus and annulus can be rotated relative to arch brace frame,Electric rotating machine drives annulus around own axis,PVC pipe group is moved to from the first pipeline on the second pipeline across annulus,Adhesive tape feeding machanism is rotated together with annulus,Adhesive tape feeding machanism is for providing adhesive tape,Rubber belt clamping mechanism is used to that adhesive tape to be clamped in the gap of bundling twice,Sealing-tape machine cutting mechanism is used to cut off adhesive tape after primary winding;The device can carry out automatic bundling to PVC pipe after extrusion.

Description

A kind of PVC pipe binding apparatus
Technical field
The invention belongs to PVC pipe automated packaging equipment technical fields, and in particular to a kind of PVC pipe binding apparatus.
Background technology
It when the tubing smaller to diameter being needed to pack in the prior art, is typically carried out, is grasped by artificial mode When making, the tubing for first choosing preset quantity is placed in parallel together, bands together to form single bundle by more tubing using tie Tubing group.
Manually to PVC pipe into bundling, bundling it is less efficient, the quality of bundling by operation it is horizontal influenced it is irregular It is uneven, while as automatic packaging deepens continuously industrial each corner, seeking the packaging of high-efficient automatic to substitute Hand-filling has become industrial mainstream.
Invention content
The present invention in view of the above technical problems, provides a kind of PVC pipe binding apparatus, which can be to after extrusion PVC pipe carries out automatic bundling, reduces artificial participation, improves production efficiency.
The technical solution adopted by the present invention is as follows:A kind of PVC pipe binding apparatus, including supplied materials mechanism, PVC pipe group are whole Row mechanism and wrapping machine, PVC pipe group array mechanism are arranged in the side of supplied materials mechanism, and PVC pipe is with supplied materials mechanism kinematic Onto the first pipeline, the first pipeline, wrapping machine and the second pipeline are linearly arranged successively, PVC pipe group array mechanism It is arranged in the surface of the first pipeline, PVC pipe group array mechanism is used to carry out the PVC pipe group on the first pipeline whole Row, wrapping machine are used to carry out bundling to PVC pipe group, and wrapping machine includes winding machine support, annulus, adhesive tape feeding machanism, adhesive tape Clamping device and adhesive tape cutting mechanism, arch brace frame are mounted on the upper surface of winding machine support, and annulus and arch brace frame are same Axis is installed, and arch brace frame is used to support annulus and annulus can be rotated relative to arch brace frame, and electric rotating machine is mounted on and twines Around the lower part of machine support, for electric rotating machine for driving annulus around own axis, PVC pipe group passes through annulus from the first conveying Line moves on the second pipeline, and adhesive tape feeding machanism is arranged on annulus, and adhesive tape feeding machanism is rotated together with annulus, adhesive tape Feeding machanism is arranged for providing adhesive tape, rubber belt clamping mechanism in the side of winding machine support, and rubber belt clamping mechanism is used for two Adhesive tape is clamped in the gap of secondary bundling, and adhesive tape cutting mechanism is arranged in the lower face of winding machine support, and sealing-tape machine cutting mechanism is used for Adhesive tape is cut off after primary winding.
Further, supplied materials mechanism includes that rack is carried out on slope, and the input terminal that rack is carried out on slope is higher than its output end, and slope is come Rack and the contact surface of PVC pipe are inclined surface, and PVC pipe enters the input terminal that rack is carried out on slope, PVC pipe using slope come The difference in height at rack both ends is carried out rack through slope and is entered on the first pipeline.
Further, supplied materials mechanism further includes the identical blocking mechanism of multiple structures, and multiple blocking mechanisms are along the first conveying The direction of motion setting of line comes on slope on rack, and blocking mechanism includes the first vertical cylinder and countercheck rod, the first vertical cylinder Come on rack mounted on slope, countercheck rod is mounted in the cylinder rod of the first vertical cylinder, and contact of the rack with PVC pipe is carried out on slope Face is provided with through-hole, and countercheck rod can move up and down in through-holes under the drive of the first vertical cylinder.
Further, PVC pipe group array mechanism includes several splicing grooves, several splicing grooves are along the first pipeline The direction of motion is arranged, and splicing groove is used to limit PVC pipe and falls into the region on the first pipeline and limit the rank street of PVC pipe group Face shape, the mounting height of splicing groove cannot influence PVC pipe group and be moved with the first pipeline.
Further, PVC pipe group array mechanism further includes multiple obvolvent mechanisms, the structure of multiple obvolvent mechanisms it is identical and The direction of motion along the first pipeline is arranged, and hold-fast body includes two structure identical half obvolvent mechanisms, half hold-fast body pair Title is arranged in the both sides of the first pipeline, and half obvolvent mechanism includes the first straight trip cylinder and holding pawl, the first straight trip cylinder installation In the rack of the first pipeline, holds pawl tightly and be mounted in the cylinder rod of the first straight trip cylinder, two first cylinders bands respectively of keeping straight on Dynamic two holdings pawl relative motion.
Further, adhesive tape feeding machanism includes mounting post and trussed shore, and mounting post is installed in rotation on the end of annulus On face, trussed shore is fixed on the same end face of annulus, and adhesive tape is nested in mounting post and is rotated together with mounting post, and adhesive tape is stretched Outlet bypasses trussed shore, and the one side of the non-gluing of external part of adhesive tape is contacted with trussed shore.
Further, rubber belt clamping mechanism includes the second straight trip cylinder and third is kept straight on cylinder, the second straight trip cylinder and the Three straight trip cylinders are mounted on the upper surface of winding machine support by column, and the first gripping block, the second gripping block install second respectively Keep straight on the output end of cylinder, third straight trip cylinder, the first gripping block, the second gripping block under the drive of corresponding cylinder respectively with glue The non-coated face of band, the contact of adhesive tape coated face, for the cylinder rod direction of motion of the second straight trip cylinder perpendicular to the non-coated face of adhesive tape, third is straight The cylinder rod direction of promoting the circulation of qi cylinder is parallel with adhesive tape coated face.
Further, adhesive tape cutting mechanism includes the second vertical cylinder, and the second vertical cylinder is mounted on winding machine support, Cutoff tool is mounted in the cylinder rod of the second vertical cylinder.
Further, the second pipeline uses roller bed type pipeline, and notch plate is arranged between two roller-ways, leads between roller-way It crosses V belt translation or chain drive carrys out passing power, notch plate is mounted in the rack of the second pipeline, the mounting height of notch plate PVC pipe group cannot be hindered to be moved with the second pipeline, PVC pipe group is contacted with the two sides of notch plate, and notch plate is for steady Determine the cross-sectional shape of PVC pipe group.
Beneficial effects of the present invention:Device setting slope carrys out rack and PVC pipe is transported on the first pipeline, PVC Tubing group array mechanism carries out permutation to the rank street face of PVC pipe group, and wrapping machine carries out multistage bundling to PVC pipe group, and second Pipeline is for conveying PVC pipe group, while the second pipeline has passed through the part of annulus to provide support PVC pipe group, should The high degree of automation set reduces artificial participation, improves production efficiency.
Description of the drawings
Fig. 1 is the entirety perspective view of apparatus of the present invention.
Fig. 2 is the dimensional structure diagram of supplied materials mechanism in apparatus of the present invention.
Fig. 3 is the dimensional structure diagram of the first pipeline and its upper-part in apparatus of the present invention.
Fig. 4 is that Fig. 3 embezzles the dimensional structure diagram for closing mechanism.
Fig. 5 is the dimensional structure diagram of wrapping machine in apparatus of the present invention.
Fig. 6 is the partial structural diagram on the second pipeline in apparatus of the present invention.
In figure:In figure:1. supplied materials mechanism;110. rack is carried out on slope;111. through-hole;120. blocking mechanism;121. countercheck rod; 122. the first vertical cylinder;2.PVC tubing array mechanisms;210. splicing groove;220. obvolvent mechanisms;221. first straight trip cylinders; 222. full tight pawls;3. the first pipeline;4. wrapping machine;410. arch brace framves;420. annulus;430. adhesive tape feeding machanisms; 431. mounting post;432. trussed shore;440. rubber belt clamping mechanisms;441. second straight trip cylinders;442. first gripping blocks;443. the Two gripping blocks;444. thirds straight trip cylinder;450. winding machine supports;460. adhesive tape cutting mechanisms;461. second vertical cylinders; 462. cutoff tool;5 second pipelines;510. notch plate.
Specific implementation mode
The packing specification of the PVC pipe selected in the present embodiment is 3 rows, and often capable quantity is followed successively by 3,4,3, The quantity of single PVC pipe group is 10, and the quantity of PVC pipe group is not limited by above-mentioned quantity.
As shown in Figure 1, shown in Figure 5, a kind of PVC pipe winding and film covering device, including supplied materials mechanism 1, PVC pipe group lining-up machine Structure 2, wrapping machine 4, PVC pipe group array mechanism 2 is arranged in the side of supplied materials mechanism 1, after the extruded equipment of PVC pipe squeezes out, PVC pipe is moved to supplied materials mechanism 1 on the first pipeline 3, the first pipeline 3, wrapping machine 4, the second pipeline 6 and film Linearly setting, PVC pipe group array mechanism 2 are arranged in the surface of the first pipeline 3, PVC pipe group permutation feed 7 successively Mechanism 2 is used to carry out permutation to the PVC pipe group on the first pipeline 3, and wrapping machine 4 is used to carry out bundling to PVC pipe group, twine Include winding machine support 450, annulus 420, adhesive tape feeding machanism 430, rubber belt clamping mechanism 440 and adhesive tape cutting mechanism around machine 4 460, arch brace frame 410 is mounted on the upper surface of winding machine support 450, and annulus 420 is pacified with 410 coaxial line of arch brace frame Dress, arch brace frame 410 is used to support annulus 420 and annulus 420 can be rotated relative to arch brace frame 410, electric rotating machine peace Mounted in the lower part of winding machine support 450, for electric rotating machine for driving annulus 420 around own axis, PVC pipe group passes through circle Ring 420 is moved to from the first pipeline 3 on the second pipeline 5, and adhesive tape feeding machanism 430 is arranged on annulus, adhesive tape feeding machine Structure 430 is rotated together with annulus 420, and adhesive tape feeding machanism 430 is being wound for providing adhesive tape, the setting of rubber belt clamping mechanism 440 The side of machine support 450, rubber belt clamping mechanism 440 are used to that adhesive tape to be clamped in the gap wound twice, and adhesive tape cutting mechanism 460 is set It sets in the lower face of winding machine support 450, sealing-tape machine cutting mechanism 460 is used to cut off adhesive tape after primary winding.
As shown in Fig. 2, supplied materials mechanism 1 carrys out rack 110 including slope, the input terminal of rack 110 is carried out higher than its output in slope The contact surface of rack 110 and PVC pipe is carried out for inclined surface in end, slope, and after the extruded equipment of PVC pipe, PVC pipe enters slope Carry out the input terminal of rack, PVC pipe is defeated into first come rack 110 through slope come the difference in height at 110 both ends of rack using slope In line sending 3, after the extruded equipment of PVC pipe squeezes out, the temperature of PVC pipe is higher, and it is preferably metal material that rack 110 is carried out on slope Matter, PVC pipe are carried out rack 110 along slope and are moved, and the heat dissipation of PVC pipe is conducive to.
As shown in Fig. 2, supplied materials mechanism 1 further includes the identical blocking mechanism 120 of multiple structures, 120 edge of multiple blocking mechanisms The direction of motion setting of first pipeline 3 comes on slope on rack 110, and blocking mechanism 120 includes the first vertical cylinder 122 and resistance Bar 121, the first vertical cylinder 122 are come mounted on slope on rack 110, and countercheck rod 121 is mounted on the first vertical cylinder 122 In cylinder rod, rack 110 is carried out on slope and the contact surface of PVC pipe is provided with through-hole 111, and countercheck rod 121 is in the first vertical cylinder 122 It can move up and down in through-hole 111 under driving;Multiple blocking mechanisms 120 move synchronously, the pvc pipe on the first pipeline 3 After material quantity reaches preset value, countercheck rod 121 stretches out under the drive of the first vertical cylinder 122, and blocking PVC pipe enters first Pipeline 3, blocking mechanism 120 are used to control the sequence that PVC pipe enters the first pipeline 3.
First pipeline 3 uses roller bed type pipeline, motor to be transferred power on roller-way by tape handler, roller-way Between pass through Lian Chuan work(mechanism drive roller-way on material movement.
As shown in figure 3, PVC pipe group array mechanism 2 includes several splicing grooves 210, several splicing grooves 210 are along first The direction of motion of pipeline 3 is arranged, and splicing groove 210 is for limiting region and restriction that PVC pipe is fallen on the first pipeline 3 The rank street face shape of PVC pipe group, the mounting height of splicing groove 210 cannot influence PVC pipe group and be moved with the first pipeline 3, The rank street face of splicing groove 210 is the isosceles trapezoid of inverted upper end opening in the present embodiment, and the upper end of isosceles trapezoid is big, lower end Small, two lateral surfaces of PVC pipe group are in contact with two medial surfaces of splicing groove, two lateral surface uniform forces of PVC pipe group.
As shown in figure 4, in order to reduce the influence being subject to during exercise to PVC pipe group shape while control PVC pipe group It is longitudinally wide, PVC pipe group array mechanism 2 further includes multiple obvolvent mechanisms 220, the structure of multiple obvolvent mechanisms 220 Identical and be arranged along the direction of motion of the first pipeline 3, hold-fast body 220 includes two structure identical half obvolvent mechanisms, and half Hold-fast body is symmetricly set on the both sides of the first pipeline 3, and half obvolvent mechanism is including the first straight trip cylinder 221 and holds pawl 222 tightly, First straight trip cylinder 221 is mounted in the rack of the first pipeline 3, holds the cylinder rod that pawl 222 is mounted on the first straight trip cylinder 221 tightly On, two first straight trip cylinders 221 drive two holding pawl phases 222 to movement respectively, the PVC pipe on the first pipeline 3 After the quantity of group reaches 10, two are held tightly pawl 222 is close to each other fits respectively with two lateral surfaces of PVC pipe group, pvc pipe Material group stress, to the external surface shape of further regular PVC pipe.
As shown in figure 5, adhesive tape feeding machanism 430 includes mounting post 431 and trussed shore 432, mounting post 431 is rotationally pacified Mounted in the right end face of annulus 420, trussed shore 432 is fixed in the right end face of annulus 420, and adhesive tape is nested in mounting post 431 It can rotate above and around mounting post 431, adhesive tape external part bypasses trussed shore 432, the one side of the non-gluing of adhesive tape external part and traction Column 432 contacts.
As shown in figure 5, rubber belt clamping mechanism 440 includes the second straight trip cylinder 441, third straight trip cylinder 444, the second straight trip Cylinder 441 and third straight trip cylinder 444 are mounted on the upper surface of winding machine support 450, the first gripping block 442, the by column Two gripping blocks 443 install the output end of the second straight trip cylinder 441, third straight trip cylinder 444, the first gripping block 442, second respectively Gripping block 443 divides 441 not contacted with the non-coated face of adhesive tape, adhesive tape coated face under the drive of corresponding cylinder, the second straight trip cylinder For the 441 cylinder rod direction of motion perpendicular to the non-coated face of adhesive tape, the cylinder rod direction of third straight trip cylinder 444 and adhesive tape coated face are flat Row.
As shown in figure 5, adhesive tape cutting mechanism 460 includes the second vertical cylinder 461, the second vertical cylinder 461 is mounted on and twines On machine support 450, cutoff tool 462 is mounted in the cylinder rod of the second vertical cylinder 461.
When rubber belt clamping mechanism 440 needs that adhesive tape is clamped, third vertical cylinder 444 first reaches predeterminated position and is located at adhesive tape The left side of external part position to be held, the second vertical cylinder 441 stretch out, the first gripping block 442, the second gripping block 443 respectively with Two side contacts of adhesive tape external part, to which adhesive tape external part to be clamped between the first gripping block 442 and the second gripping block 443.
The initial position of wrapping machine 4 is as follows:Manually adhesive tape is nested in the mounting post 431 of adhesive tape feeding machanism 430, glue The second vertical cylinder 461 with cutting mechanism 460 does not extend out, and cutoff tool 462 is in low level, is manually clamped in adhesive tape external part In rubber belt clamping mechanism 460, the clip position of rubber belt clamping mechanism reserves a distance, pvc pipe with the end of adhesive tape external part Material group moves to when bundling position needs to carry out bundling, and annulus 420 drives adhesive tape feeding machanism 430 to rotate 3/4ths circles, Adhesive tape section of stretching out is contacted with PVC pipe group, to the outer surface of the upper PVC pipe group of adhesive tape winding, the second vertical cylinder 441 and the The direction of motion of three vertical cylinders, 444 return, the second gripping block 443 is vertical with the glue-coated surface of adhesive tape external part, and second clamps The movement locus that block 443 leaves adhesive tape coated face is parallel with adhesive tape coated face, while adhesive tape is moved with annulus 420, and second compresses Block 443 is detached from the winding path that adhesive tape coated face will not be to adhesive tape along PVC pipe group and produces bigger effect.
The initial position of wrapping machine 4 is that adhesive tape is mounted in the mounting post of adhesive tape feeding machanism 430, rubber belt clamping mechanism 460 clamping adhesive tape external parts, the second vertical cylinder 461 of adhesive tape cutting mechanism 460 do not extend out, and the action process of wrapping machine 4 is such as Under:After a.PVC tubing groups move to the predeterminated position of wrapping machine 4,6 stop motion of the first pipeline 3 and the second pipeline;B. it revolves Rotating motor drives annulus to rotate, and adhesive tape increases around own axis, adhesive tape outreach in adhesive tape feeding machanism 430;C. glue After band is contacted with the lateral surface of PVC pipe group, the second straight trip cylinder 441, third straight trip cylinder 444 in rubber belt clamping mechanism 440 Return, annulus 420 drive adhesive tape feeding machanism 430 to continue to wind to PVC pipe group;D. after winding reaches pre- fixing turn, annulus 420 stop operating, and rubber belt clamping mechanism 440 is stretched out so that adhesive tape external part is clamped, and adhesive tape is cut by adhesive tape cutting mechanism 460 It is disconnected.
Wherein, the off-position of adhesive tape is the clip position of adhesive tape external part to one between the terminal of adhesive tape section of stretching out Point.
As shown in fig. 6, the second pipeline 5 uses roller bed type pipeline, notch plate is set between two roller-ways(510), By V belt translation or chain drive come passing power between roller-way, notch plate 510 is mounted in the rack of the second pipeline 5, slot The mounting height of oralia 510 cannot hinder influence PVC pipe group to be moved with the second pipeline 6, PVC pipe group and notch plate 510 Two sides contact, notch plate 510 is used to stablize the cross-sectional shape of PVC pipe group, and the rank street face of notch plate 510 is preferably Inverted upper end opening isosceles trapezoid, isosceles trapezoid is in upper end is big, lower end is small, notch plate and 510 and the two sides of PVC pipe group Contact, discontinuity leads to the cross of the PVC pipe group of bundling when can prevent PVC pipe group from being moved with the second pipeline 5 Cross sectional shape changes.
PVC pipe group is by circular motion to the second pipeline 5, the second pipeline 5 has the effect that:For transporting PVC pipe group, as PVC pipe group passes through the part of annulus to be on the increase, the contact area of the first pipeline and PVC pipe group Reduction can cause frictional force to reduce;The part of annulus has been passed through to provide support PVC pipe group, PVC pipe group has passed through annulus Part form the structure of similar cantilever beam, influenced by PVC pipe group its own gravity, if do not provide support will produce compared with Big degree of disturbing, it is unfavorable to the bundling of wrapping machine 4.
The action process of the device is as follows:A.PVC tubing group is moved to through supplied materials mechanism 1 on the first pipeline 3;B. when After PVC pipe quantity in one conveying 3 reaches the quantity of single bundle PVC pipe group, PVC pipe group array mechanism 2 to PVC pipe into Row shaping;During c.PVC tubing group moves to the second pipeline 5 through the first pipeline 3, wrapping machine 4 carries out PVC pipe group Multistage bundling.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field Art personnel are enlightened by it, without departing from the spirit of the invention, without creatively designing and the technical solution Similar frame mode and embodiment, is within the scope of protection of the invention.

Claims (9)

1. a kind of PVC pipe binding apparatus, it is characterised in that:Including
Supplied materials mechanism(1);
PVC pipe group array mechanism(2)And wrapping machine(4):The PVC pipe group array mechanism(2)It is arranged in supplied materials mechanism(1) Side, PVC pipe is with supplied materials mechanism(1)Move to the first pipeline(3)On, the first pipeline(3), wrapping machine(4)And Second pipeline(5)Linearly setting successively, PVC pipe group array mechanism(2)It is arranged in the first pipeline(3)Surface, PVC pipe group array mechanism(2)For to the first pipeline(3)On PVC pipe group carry out permutation, wrapping machine(4)For right PVC pipe group carries out bundling, the wrapping machine(4)Including winding machine support(450), annulus(420), adhesive tape feeding machanism (430), rubber belt clamping mechanism(440)And adhesive tape cutting mechanism(460), disk supporting rack(410)Mounted on winding machine support (450)Upper surface, annulus(420)With disk supporting rack(410)Coaxial line is installed, disk supporting rack(410)It is used to support circle Ring(420)And annulus(420)It being capable of opposed discs supporting rack(410)Rotation, electric rotating machine are mounted on winding machine support(450)'s Lower part, electric rotating machine is for driving annulus(420)Around own axis, PVC pipe group passes through annulus(420)From described first Pipeline(3)Move to second pipeline(5)On, adhesive tape feeding machanism(430)It is arranged on disk, adhesive tape feeding machanism (430)With annulus(420)It rotates together, adhesive tape feeding machanism(430)For providing adhesive tape, rubber belt clamping mechanism(440)Setting In winding machine support(450)Side, rubber belt clamping mechanism(440)For adhesive tape, belt cutting to be clamped in the gap wound twice Breaking mechanism(460)Setting is in winding machine support(450)Lower face, sealing-tape machine cutting mechanism(460)For in primary winding knot Adhesive tape is cut off after beam.
2. PVC pipe according to claim 1 winds film covering device, it is characterised in that:The supplied materials mechanism(1)Including oblique Rack is carried out on slope(110), rack is carried out on slope(110)Input terminal be higher than its output end, rack is carried out on slope(110)With PVC pipe Contact surface is inclined surface, and PVC pipe enters slope and carrys out rack(110)Input terminal, PVC pipe is using slope come rack(110) The difference in height at both ends carrys out rack through slope(110)Into the first pipeline(3).
3. PVC pipe according to claim 2 winds film covering device, it is characterised in that:The supplied materials mechanism(1)Further include The identical blocking mechanism of multiple structures(120), multiple blocking mechanisms(120)Along the first pipeline(3)The direction of motion setting exist Rack is carried out on slope(110)On, the blocking mechanism(120)Including the first vertical cylinder(122)And countercheck rod(121), first is perpendicular Straight cylinder(122)Carry out rack mounted on slope(110)On, countercheck rod(121)Mounted on the first vertical cylinder(122)Cylinder rod On, rack is carried out on slope(110)It is provided with through-hole with the contact surface of PVC pipe(111), countercheck rod(121)In the first vertical cylinder (122)Drive under can be in through-hole(111)Middle up and down motion.
4. PVC pipe according to claim 1 winds film covering device, it is characterised in that:The PVC pipe group array mechanism (2)Including several splicing grooves(210), several splicing grooves(210)Along the first pipeline(3)The direction of motion setting, it is described Splicing groove(210)The first pipeline is fallen into for limiting PVC pipe(3)On region and limit PVC pipe group rank street face shape The mounting height of shape, the splicing groove cannot hinder PVC pipe group with the first pipeline(3)Movement.
5. according to claim(1)The PVC pipe winds film covering device, it is characterised in that:The PVC pipe group lining-up machine Structure(2)Further include multiple obvolvent mechanisms(220), multiple obvolvent mechanisms(220)Structure it is identical and along the first pipeline(3)Fortune Dynamic direction setting, obvolvent mechanism(220)Including two structure identical half obvolvent mechanisms, half obvolvent mechanism is symmetricly set on first Pipeline(3)Both sides, half obvolvent mechanism include first straight trip cylinder(221)And hold pawl tightly(222), the first straight trip cylinder (221)Mounted on the first pipeline(3)Rack on, hold tightly pawl(222)Mounted on the first straight trip cylinder(221)Cylinder rod on, Two first straight trip cylinders(221)Two holding pawl phases are driven respectively(222)To movement.
6. PVC pipe according to claim 1 winds film covering device, it is characterised in that:The adhesive tape feeding machanism(430) Including mounting post(431)And trussed shore(432), mounting post(431)It is installed in rotation on annulus(420)End face on, traction Column(432)It is fixed on annulus(420)Same end face on, adhesive tape is nested in mounting post(431)On with mounting post(431)Turn together Dynamic, adhesive tape external part bypasses trussed shore(432), the one side and trussed shore of the non-gluing of adhesive tape external part(432)Contact.
7. PVC pipe according to claim 1 winds film covering device, it is characterised in that:The rubber belt clamping mechanism(440) Including the second straight trip cylinder(441)And third straight trip cylinder(444), the second straight trip cylinder(441)And third straight trip cylinder(444) It is mounted on winding machine support by column(450)Upper surface, the first gripping block(442), the second gripping block(443)It installs respectively Second straight trip cylinder(441), third keep straight on cylinder(444)Output end, the first gripping block(442), the second gripping block(443)? It is contacted respectively with the non-coated face of adhesive tape, adhesive tape coated face under the drive of corresponding cylinder, the second straight trip cylinder(441)The fortune of middle cylinder rod Dynamic direction is perpendicular to the non-coated face of adhesive tape, third straight trip cylinder(444)The direction of motion of middle cylinder rod is parallel with adhesive tape coated face.
8. PVC pipe according to claim 1 winds film covering device, it is characterised in that:The adhesive tape cutting mechanism(460) Including the second vertical cylinder(461), the second vertical cylinder(461)Mounted on winding machine support(450)On, cutoff tool(462)Peace Mounted in the second vertical cylinder(461)Cylinder rod on.
9. PVC pipe according to claim 1 winds film covering device, it is characterised in that:Second pipeline(5)Using Notch plate is arranged between two roller-ways in roller bed type pipeline(510), transmitted by V belt translation or chain drive between roller-way dynamic Power, notch plate(510)Mounted on the second pipeline(5)Rack on, notch plate(510)Mounting height cannot hinder pvc pipe Material group is with the second pipeline(5)Movement, PVC pipe group and notch plate(510)Two sides contact, notch plate(510)For steady Determine the cross-sectional shape of PVC pipe group.
CN201810664843.XA 2018-06-25 2018-06-25 A kind of PVC pipe binding apparatus Pending CN108773519A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810664843.XA CN108773519A (en) 2018-06-25 2018-06-25 A kind of PVC pipe binding apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810664843.XA CN108773519A (en) 2018-06-25 2018-06-25 A kind of PVC pipe binding apparatus

Publications (1)

Publication Number Publication Date
CN108773519A true CN108773519A (en) 2018-11-09

Family

ID=64025544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810664843.XA Pending CN108773519A (en) 2018-06-25 2018-06-25 A kind of PVC pipe binding apparatus

Country Status (1)

Country Link
CN (1) CN108773519A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109823595A (en) * 2019-04-11 2019-05-31 霸州市成朗龙骨设备有限公司 Adhesive tape enwinding device and control method
CN112027170A (en) * 2020-09-01 2020-12-04 湖南国盛服饰有限公司 Packaging device for clothing production line and use method thereof
CN113386992A (en) * 2021-06-22 2021-09-14 长春工程学院 Automatic bundling machine for automobile wire harness corrugated pipe

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102390557A (en) * 2011-07-15 2012-03-28 永高股份有限公司 Automatic winding and packaging mechanism of plastic pipe protective film
CN102642633A (en) * 2012-04-27 2012-08-22 深圳大学 Bundling device of automatic packaging machine of tube
CN203544409U (en) * 2013-10-31 2014-04-16 凌中水 Automatic tube packaging machine
CN105366089A (en) * 2015-11-17 2016-03-02 广东联塑机器制造有限公司 Winding device for banding pipes
CN105883049A (en) * 2016-06-17 2016-08-24 项金凤 Pipe clamping device of automatic pipe packing machine
CN205855311U (en) * 2016-05-20 2017-01-04 佛山市九一自动化科技有限公司 Multitube device of full automatic packaging
CN106477099A (en) * 2016-11-18 2017-03-08 上海海弋机电科技有限公司 Line style tubing packer
CN206288293U (en) * 2016-11-18 2017-06-30 上海海弋机电科技有限公司 Line style tubing binding apparatus
CN207403996U (en) * 2017-11-08 2018-05-25 陕西理工大学 A kind of automatic bundler
CN108100348A (en) * 2017-12-27 2018-06-01 高飞 A kind of plastic tube manages binding apparatus automatically
CN208616260U (en) * 2018-06-25 2019-03-19 马鞍山南马智能制造研究所有限公司 A kind of PVC pipe binding apparatus

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102390557A (en) * 2011-07-15 2012-03-28 永高股份有限公司 Automatic winding and packaging mechanism of plastic pipe protective film
CN102642633A (en) * 2012-04-27 2012-08-22 深圳大学 Bundling device of automatic packaging machine of tube
CN203544409U (en) * 2013-10-31 2014-04-16 凌中水 Automatic tube packaging machine
CN105366089A (en) * 2015-11-17 2016-03-02 广东联塑机器制造有限公司 Winding device for banding pipes
CN205855311U (en) * 2016-05-20 2017-01-04 佛山市九一自动化科技有限公司 Multitube device of full automatic packaging
CN105883049A (en) * 2016-06-17 2016-08-24 项金凤 Pipe clamping device of automatic pipe packing machine
CN106477099A (en) * 2016-11-18 2017-03-08 上海海弋机电科技有限公司 Line style tubing packer
CN206288293U (en) * 2016-11-18 2017-06-30 上海海弋机电科技有限公司 Line style tubing binding apparatus
CN207403996U (en) * 2017-11-08 2018-05-25 陕西理工大学 A kind of automatic bundler
CN108100348A (en) * 2017-12-27 2018-06-01 高飞 A kind of plastic tube manages binding apparatus automatically
CN208616260U (en) * 2018-06-25 2019-03-19 马鞍山南马智能制造研究所有限公司 A kind of PVC pipe binding apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109823595A (en) * 2019-04-11 2019-05-31 霸州市成朗龙骨设备有限公司 Adhesive tape enwinding device and control method
CN112027170A (en) * 2020-09-01 2020-12-04 湖南国盛服饰有限公司 Packaging device for clothing production line and use method thereof
CN113386992A (en) * 2021-06-22 2021-09-14 长春工程学院 Automatic bundling machine for automobile wire harness corrugated pipe

Similar Documents

Publication Publication Date Title
CN208616260U (en) A kind of PVC pipe binding apparatus
CN208616259U (en) A kind of PVC pipe bundling and film covering device
CN108657498A (en) A kind of PVC pipe bundling and film covering device
CN108773519A (en) A kind of PVC pipe binding apparatus
US4125423A (en) Reinforced plastic tapered rod products and the method and apparatus for producing same
US5307609A (en) Apparatus for wrapping and method therefor
CN104443483B (en) Annular is wrapping machine automatically
CN106629189B (en) A kind of adjusting means of steel band unreeling machine
CN105366089A (en) Winding device for banding pipes
KR102098091B1 (en) A Wire Autobinding Packaging Device
CN105110098B (en) With the strip soft material strapper of fast removal function
CN105107688B (en) Automatically dropping glue feeding device
CN208344606U (en) A kind of winding binding apparatus for battery modules
CN104952611A (en) Winding machine and winding method
CN108725876A (en) A kind of PVC pipe film covering device
CN103224049B (en) A kind of firework paper tube adhesive tape packing apparatus
CN108438879A (en) A kind of machinery automation processing, which is used, is convenient for grabbing device
CN105437292A (en) Automatic jacketing machine
CN1217825C (en) System and device for packing container
CN207061401U (en) Full-automatic three station twines membrane coiler
CN112478874B (en) Packing belt subpackaging device and subpackaging method
CN104724541A (en) Cable winding device
CN208616269U (en) A kind of PVC pipe film covering device
CN208531624U (en) A kind of machinery automation processing, which is used, is convenient for grabbing device
CN107777004A (en) A kind of medicine bottle double-sided labeller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181109

WD01 Invention patent application deemed withdrawn after publication