CN106400857B - For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile - Google Patents

For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile Download PDF

Info

Publication number
CN106400857B
CN106400857B CN201611157439.0A CN201611157439A CN106400857B CN 106400857 B CN106400857 B CN 106400857B CN 201611157439 A CN201611157439 A CN 201611157439A CN 106400857 B CN106400857 B CN 106400857B
Authority
CN
China
Prior art keywords
pile
test
iron ball
counter
test pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611157439.0A
Other languages
Chinese (zh)
Other versions
CN106400857A (en
Inventor
汤斌
周亚杰
费建武
阮洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201611157439.0A priority Critical patent/CN106400857B/en
Publication of CN106400857A publication Critical patent/CN106400857A/en
Application granted granted Critical
Publication of CN106400857B publication Critical patent/CN106400857B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a kind of model equipments and method for the inaccessible degree of soil plug in in-site measurement opening pile, its device includes test pile, anchoring pile, datum line beam and counter-force slot, there is opening in the lower end of the test pile, bearing sheet is fixed at the top of the test pile, jack is set on the bearing sheet, the top of the jack is equipped with load transducer, the top of the jack is against the lower face of the counter-force slot, magnetic stand is provided on the horizontal reference beam, it installs to measure the electronic centigrade scale of the bearing sheet displacement on the magnetic stand, the load transducer is connected with numerical value dynamometer, the test pile is equipped with preformed hole, the test pile is internally provided with interior iron ball, the interior iron ball is connected with cord, the cord is connected through preformed hole and with the outer iron ball outside test pile.Simple structure of the present invention, operation is easy, convenience in transport and handling, low to the requirement of required experimental enviroment, can determine that the opening pile occlusion degree under all kinds of soil properties.

Description

For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile
Technical field
The present invention relates to geotechnical engineering pile foundation field, more specifically to one kind in in-site measurement opening pile The model equipment and method of the inaccessible degree of soil plug.
Background technology
Pile foundation is widely used under soft layer area and skyscraper, and type is divided into steel-pipe pile, concrete prefabricated Stake, the pile pile of different materials are all divided into closing pile and opening pile.Existing research open-end pipe pile soil plug effect uses scene more In-situ test, but actual needs of the field test due to meet engineering in the future, often invest it is huge and try grind during by All larger in various test parameters, the equipment taken will be more complicated, and experiment is difficult to be in full swing, in the case, live mould Type experiment can save substantial amounts of human and material resources and financial resources, and due to being field test, obtained result also complies with actual conditions, This brings larger advantage to the solution of problem.Piling equipment, counterforce device and the soil at scene fill in height measuring device and are frequently not It is exactly complicated for operation that volume is larger, and rear current cost is higher, spends the time more, installation is complicated.
The content of the invention
The technical problem to be solved in the present invention is, provide a kind of easy disassembly, experimentation cost it is low for in-site measurement The model equipment and method of the inaccessible degree of soil plug in opening pile.
The technical solution adopted by the present invention to solve the technical problems is:Construction is a kind of for soil in in-site measurement opening pile The model equipment of the inaccessible degree of plug, including test pile, anchoring pile, datum line beam and counter-force slot, the test pile be located at two anchoring piles it Between, the counter-force slot and datum line beam are mounted on the anchoring pile, and the datum line beam is located at below counter-force slot, under the test pile There is opening at end, and bearing sheet is fixed at the top of the test pile, jack, the top of the jack are set on the bearing sheet Equipped with load transducer, the top of the jack is against the lower face of the counter-force slot, is provided on the horizontal reference beam Magnetic stand, installation is for measuring the electronic centigrade scale of the bearing sheet displacement, the load transducer on the magnetic stand Be connected with numerical value dynamometer, the test pile is equipped with preformed hole, and the test pile is internally provided with interior iron ball, the interior iron ball with Cord connects, and the cord is connected through preformed hole and with the outer iron ball outside test pile.
In said program, the counter-force slot is equipped with rectangular opening, and the anchoring pile passes through rectangular opening, and the anchoring pile passes through support Lock and caging bolt are fixed, and the support lock includes four tablets, and the both ends of the tablet are equipped with crotch, and one end is fixed on counter-force On slot, the other end is hooked in anchoring pile top open part, and the caging bolt is fixed on the anchoring pile, and the caging bolt lower end is supported Firmly counter-force slot.
In said program, the bearing sheet is welded on the test pile.
In said program, the interior iron ball and outer iron ball are solid iron ball.
In said program, the datum line beam is fixed on by platform bolt on the anchoring pile.
The method of the inaccessible degree of soil plug, comprises the following steps in a kind of in-site measurement opening pile:
The model equipment for the inaccessible degree of soil plug in in-site measurement opening pile in S1, assembling claim 1;By anchoring pile It is fixed in soil, is made marks with marking pen on test pile along pile body every 100mm;
S2, stretch cord and have interaction force between interior iron ball and outer iron ball, measure out the outer cord of test pile with a yardstick Length Ls
S3, by jack by test pile press-in soil, test pile often buries 100mm, repeats step S2 and measures test pile The length L of outer cordsn;Soil plug height change H=Lsn-Ls, the filling rate IFR=dL that soil is filled in is calculateds/100×100 (%);
The loading force of jack is measured during S4, jack pressurization by numerical value dynamometer, passes through electronic centigrade scale Measure the displacement deflection of experiment stake top;
The ultimate vertical bearing capacity of S5, measurement with the long opening pile of similary stake footpath, stake and closing pile, and be compared.
Implement the model equipment and method for the inaccessible degree of soil plug in in-site measurement opening pile of the present invention, have following Advantageous effect:
1st, simple structure of the present invention, operation is easy, convenience in transport and handling, low to the requirement of required experimental enviroment, can determine that Opening pile occlusion degree under all kinds of soil properties.
2nd, bearing sheet can provide larger instrument workbench face, be conveniently operated.
3rd, the mode of the fixed counter-force slot of support lock is simple and convenient, allows counter-force slot that can preferably be fixed on institute before providing counter-force Position is needed, while is removed and installed conveniently.
4th, hanging set up of datum line beam can allow magnetic stand hanging, avoid earth shock and percentage meter reading is done It disturbs.
5th, counter-force slot will not generate big deformation by caging bolt /V while larger counter-force is provided.
Description of the drawings
Below in conjunction with accompanying drawings and embodiments, the invention will be further described, in attached drawing:
Fig. 1 is structure diagram of the present invention for the model equipment of the inaccessible degree of soil plug in in-site measurement opening pile;
Fig. 2 is the structure diagram of datum line beam;
Fig. 3 is the structure diagram of counter-force slot.
Specific embodiment
In order to which the technical features, objects and effects to the present invention are more clearly understood, now compare attached drawing and be described in detail The specific embodiment of the present invention.
As shown in Figure 1-Figure 3, include in the present invention for the model equipment of the inaccessible degree of soil plug in in-site measurement opening pile Test pile 1, anchoring pile 2, counter-force slot 3, caging bolt 4, support lock 5, datum line beam 6, platform bolt 7, load transducer 8, jack 9th, bearing sheet 10, magnetic stand 11, electronic centigrade scale 12, test pile preformed hole 13, interior iron ball 14, cord 15, digital force-measuring instrument 16th, soil plug 17, outer iron ball 18 in stake.
At interval, one meter of two points squeeze into two anchoring piles 2, and anchoring pile 2 is seamless steel pile pile, and intensity is higher, are used to support anti- Power apparatus squeezes into test pile 1 in two 2 centre places of anchoring pile, and three piles is kept to be located on the same line, 3 He of counter-force slot Datum line beam 6 is mounted on anchoring pile 2.Stake is upright when during squeezing into the embedded depth of this three pile and stake being controlled to bury Yu Tuzhong.1 one end of test pile is opening, and the soil body can enter during piling.
The top of test pile 1 is fixed with bearing sheet 10, and jack 9 is set on bearing sheet 10, and the top of jack 9 is equipped with lotus Set sensor 8, the top of jack 9 are against the lower face of counter-force slot 3, magnetic stand 11, magnetic force are provided on horizontal reference beam 6 It installs to measure the electronic centigrade scale 12 of 10 displacement of bearing sheet on gauge stand 11.Hanging magnetic stand 11 can cause electronics percentage 12 reading of table will be more accurate, reduces the interference of external condition.Load transducer 8 is connected with numerical value dynamometer 16, can be surveyed Measure the loading force of jack 9, the application of control load.
Test pile 1 is equipped with preformed hole 13, and test pile 1 is internally provided with interior iron ball 14, and interior iron ball 14 is connected with cord 15, carefully Rope 15 is connected through preformed hole 13 and with the outer iron ball 18 outside test pile 1.Interior iron ball 14 and outer iron ball 18 are solid iron ball. The height of soil plug 17 can be measured by interior iron ball 14, outer iron ball 18 and cord 15.
Datum line beam 6 is located at 3 lower section of counter-force slot, and datum line beam 6 is fixed on by platform bolt 7 on anchoring pile 2.Counter-force slot 3 is slot Steel shape can provide larger counter-force without being deformed, and channel steel bottom both ends are provided with rectangular opening, square in symmetric position The short side dimension in shape hole should be greater than the diameter of anchoring pile 2.Anchoring pile 2 passes through rectangular opening, and anchoring pile 2 is solid by supporting lock 5 and caging bolt 4 Fixed, support lock 5 is stated including four tablets, and the both ends of tablet are equipped with crotch, and one end is fixed on counter-force slot 3, and the other end is hooked in anchor 2 top open parts of stake, caging bolt 4 are fixed on anchoring pile 2, and 4 lower end of caging bolt props up counter-force slot 3, to limit counter-force slot 3 It is vertically movable, larger counter-force is provided.
Bearing sheet 10 is made, can be held during piling is buried using long 150mm and width 100mm, the steel plate of thick 15mm By all impacts without generating excessive deformation, while that the other instruments on bearing sheet 10 is enabled to be in is same for larger area On axis, be conducive to the accuracy of experiment.
Datum line beam 6 by anchoring pile 2 reserve hole after, can suspension frame be arranged on 1 both ends of test pile, convenient for the frame of magnetic stand 11 If providing basis to the reading accuracy of dial gauge 12, it can utmostly reduce influence of the ground surface vibration to 12 reading of dial gauge.
The present invention also provides a kind of methods of the inaccessible degree of soil plug in in-site measurement opening pile, comprise the following steps:
The model equipment for the inaccessible degree of soil plug in in-site measurement opening pile in S1, assembling claim 1;By anchoring pile It is fixed in soil, is made marks with marking pen on test pile along pile body every 100mm;
S2, stretch cord and have interaction force between interior iron ball and outer iron ball, measure out the outer cord of test pile with a yardstick Length;
S3, by jack by test pile press-in soil, test pile often buries 100mm, repeats step S2 and measures test pile The length of outer cord;The value added of cord length is the growth height L of soil plugs, the filling rate IFR=that soil is filled in is calculated dLs/ 100 × 100 (%);.
The loading force of jack is measured during S4, jack pressurization by numerical value dynamometer, passes through electronic centigrade scale Measure the displacement deflection of experiment stake top;
The ultimate vertical bearing capacity of S5, measurement with the long opening pile of similary stake footpath, stake and closing pile, and be compared.
The present invention provides a specific measurement embodiment is as follows:
Using apparatus of the present invention, some row are carried out for the distinctive gray structure clay in China coastal area and have been open Soil plug height in-site measurement experiment in stake.During experiment, the measurement of multigroup Model Pile has been carried out.Such as:Measure a stake footpath The soil plug height change situation of 40mm, the steel-pipe pile of the long 1200mm of stake during piling.On pile body one is done every 100mm Mark is 11 group echos, the high unearthed face 100mm of stake in total.For the measurement of origin test pile, every group of soil plug height for 102, 94、83、76、72、61、76、63、60、58、57(mm)。
According to formula IFR=dLs/ 100 × 100 (%) acquire the inaccessible degree of soil plug in stake, the final IFR of this test pile It is not entirely shut close to 60%, measures similary stake footpath further according to scene and the long opening pile ultimate vertical bearing capacity of stake is 6.1kN, and the ultimate vertical bearing capacity of closing pile is 7.5kN, the bearing capacity of opening pile is significantly less than closing pile, when soil plug in stake When entirely shutting, it is believed that the ultimate bearing capacity of opening pile is equal to the bearing capacity of closing pile, and the two numerical value difference is little.This experiment Difference is larger between the bearing capacity of stake, also can obtain according to IFR, and soil plug, which is in, in stake does not entirely shut.
The embodiment of the present invention is described above in conjunction with attached drawing, but the invention is not limited in above-mentioned specific Embodiment, above-mentioned specific embodiment is only schematical rather than restricted, those of ordinary skill in the art Under the enlightenment of the present invention, present inventive concept and scope of the claimed protection are not being departed from, can also made very much Form, these are belonged within the protection of the present invention.

Claims (5)

1. a kind of model equipment for the inaccessible degree of soil plug in in-site measurement opening pile, including test pile, anchoring pile, datum line beam and Counter-force slot, the test pile are located between two anchoring piles, and the counter-force slot and datum line beam are mounted on the anchoring pile, the benchmark Beam is located at below counter-force slot, and there is opening in the lower end of the test pile, which is characterized in that is fixed with cushion cap at the top of the test pile Plate sets jack on the bearing sheet, and the top of the jack is equipped with load transducer, and the top of the jack is against The lower face of the counter-force slot is provided with magnetic stand on the datum line beam, and installation is described for measuring on the magnetic stand The electronic centigrade scale of bearing sheet displacement, the load transducer are connected with numerical value dynamometer, and the test pile is equipped with preformed hole, The test pile is internally provided with interior iron ball, and the interior iron ball is connected with cord, the cord through preformed hole and with positioned at experiment Outer iron ball connection outside stake, the counter-force slot are equipped with rectangular opening, and the anchoring pile passes through rectangular opening, and the anchoring pile is locked by supporting It is fixed with caging bolt, the support lock includes four tablets, and the both ends of the tablet are equipped with crotch, and one end is fixed on counter-force slot On, the other end is hooked in anchoring pile top open part, and the caging bolt is fixed on the anchoring pile, and the caging bolt lower end props up Counter-force slot.
2. the model equipment according to claim 1 for the inaccessible degree of soil plug in in-site measurement opening pile, feature exists In the bearing sheet is welded on the test pile.
3. the model equipment according to claim 1 for the inaccessible degree of soil plug in in-site measurement opening pile, feature exists In the interior iron ball and outer iron ball are solid iron ball.
4. the model equipment according to claim 1 for the inaccessible degree of soil plug in in-site measurement opening pile, feature exists In the datum line beam is fixed on by platform bolt on the anchoring pile.
5. a kind of method of the inaccessible degree of soil plug in in-site measurement opening pile, which is characterized in that comprise the following steps:
The model equipment for the inaccessible degree of soil plug in in-site measurement opening pile in S1, assembling claim 1;Anchoring pile is fixed In soil, made marks with marking pen on test pile along pile body every 100mm;
S2, stretch cord and have interaction force between interior iron ball and outer iron ball, measure out the length of the outer cord of test pile with a yardstick Ls
S3, by jack by test pile press-in soil, test pile often buries 100mm, repeat step S2 measure it is thin outside test pile The length L of ropesn;Soil plug height change H=Lsn-Ls, the filling rate IFR=dL that soil is filled in is calculateds/ 100 × 100 (%);
The loading force of jack is measured during S4, jack pressurization by numerical value dynamometer, is measured by electronic centigrade scale Test the displacement deflection of stake top;
The ultimate vertical bearing capacity of S5, measurement with the long opening pile of similary stake footpath, stake and closing pile, and be compared.
CN201611157439.0A 2016-12-15 2016-12-15 For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile Expired - Fee Related CN106400857B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611157439.0A CN106400857B (en) 2016-12-15 2016-12-15 For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611157439.0A CN106400857B (en) 2016-12-15 2016-12-15 For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile

Publications (2)

Publication Number Publication Date
CN106400857A CN106400857A (en) 2017-02-15
CN106400857B true CN106400857B (en) 2018-05-29

Family

ID=58087797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611157439.0A Expired - Fee Related CN106400857B (en) 2016-12-15 2016-12-15 For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile

Country Status (1)

Country Link
CN (1) CN106400857B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836317B (en) * 2017-02-24 2018-07-03 同济大学 A kind of pile sinking model test apparatus for considering soil plug effect and its application
CN106884441B (en) * 2017-04-11 2022-08-23 青岛理工大学 Visual uncovered double-walled model tubular pile test device
CN110243272B (en) * 2019-07-12 2021-01-29 福州大学 Test device and method for measuring height of suction foundation penetration soil plug and water plug

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2284673B (en) * 1993-12-08 1997-01-08 Precision Monitoring & Control Pile-testing apparatus
GB2429059B (en) * 2005-07-29 2008-07-30 Peter Hammond Soil testing apparatus
CN102587423B (en) * 2012-03-02 2014-04-16 中国石油大学(华东) Test method of depth testing device for driven type soil plugs of steel pipe piles of ocean platforms
CN205224129U (en) * 2015-12-21 2016-05-11 武汉科技大学 Single pile basis vertical bearing capacity's experiment detection device
CN105424913B (en) * 2015-12-29 2017-04-19 中国科学院武汉岩土力学研究所 Test apparatus for simulating soil plugging effect generated in pile sinking process of open tube pile
CN105862941A (en) * 2016-05-24 2016-08-17 武汉科技大学 Model device and method for measuring time effect of bearing capacity of pile foundations on site

Also Published As

Publication number Publication date
CN106400857A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN104374648B (en) A kind of experimental rig and method for testing dynamic shear characteristic between pile tube and the slip casting soil body
CN101832993B (en) Semi-module test box for dynamic compaction reinforced foundation model test
CN103674706A (en) Pullout and model dual-purpose test device for reinforced earth structure of tire as well as test measurement method
CN107938722B (en) The field testing procedure that horizontal whirl-sprayed pile influences Vertical Bearing Capacity of Pile Foundation
CN204590104U (en) A kind of bath scaled model experimental device of simulating self-balance testing pile method
CN110567870B (en) Pile soil interface friction visualization test device and method
CN106400857B (en) For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile
CN111796072B (en) High-steep slope vibrating table test system under rainfall condition and construction test method thereof
CN108505548A (en) A kind of Piled Embankments stake soil loading ratio experimental rig and test method
CN111287228A (en) Self-balancing method for detecting vertical compression static load and negative frictional resistance of single pile
CN106351267A (en) Pile foundation bearing characteristic model testing device under down-pressing static load effect
CN105332394A (en) Testing device for researching resistance of uplift piles on abrupt gush damage mechanism of foundation pits
CN207348118U (en) A kind of suction barrel base for model test
CN106013267B (en) A kind of vertical anti-pulling concrete model stake and its method of construction and application
CN110130422A (en) A kind of construction method of unit for single-pile vertical anti-pulling static test equipment
CN203629965U (en) Dual-purpose testing device of tire reinforced soil structure drawing model
CN210917492U (en) Multidirectional-loading expansive soil pile foundation experimental device
KR100526015B1 (en) Pledge monitor for cone penetration test
CN206428731U (en) Model equipment for the inaccessible degree of soil plug in in-site measurement opening pile
CN113029780A (en) Soil slope filling process simulation method and device
CN208586595U (en) A kind of soil lateral pressure monitoring device
CN206521775U (en) A kind of pile foundation bearer properties model test apparatus pushed under action of static load
CN206721943U (en) A kind of pile foundation displacement auxiliary detection device
CN215296993U (en) Multi-connected rock-soil in-situ shear testing device for full-stress path tracking
CN210315475U (en) Measure model box of static soil pressure coefficient

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Tang Bin

Inventor after: Zhou Yajie

Inventor after: Fei Jianwu

Inventor after: Ruan Yang

Inventor before: Zhou Yajie

Inventor before: Tang Bin

Inventor before: Fei Jianwu

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529