CN103997789B - A kind of physical uplink control channel resource allocation methods and base station - Google Patents

A kind of physical uplink control channel resource allocation methods and base station Download PDF

Info

Publication number
CN103997789B
CN103997789B CN201310054136.6A CN201310054136A CN103997789B CN 103997789 B CN103997789 B CN 103997789B CN 201310054136 A CN201310054136 A CN 201310054136A CN 103997789 B CN103997789 B CN 103997789B
Authority
CN
China
Prior art keywords
pucch
band
resource
frequency resource
base station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310054136.6A
Other languages
Chinese (zh)
Other versions
CN103997789A (en
Inventor
焦慧颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Spreadtrum Communications Shanghai Co Ltd
Research Institute of Telecommunications Transmission Ministry of Industry and Information Technology
Original Assignee
Spreadtrum Communications Shanghai Co Ltd
Research Institute of Telecommunications Transmission Ministry of Industry and Information Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Spreadtrum Communications Shanghai Co Ltd, Research Institute of Telecommunications Transmission Ministry of Industry and Information Technology filed Critical Spreadtrum Communications Shanghai Co Ltd
Priority to CN201310054136.6A priority Critical patent/CN103997789B/en
Publication of CN103997789A publication Critical patent/CN103997789A/en
Application granted granted Critical
Publication of CN103997789B publication Critical patent/CN103997789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

This application discloses a kind of physical uplink control channel PUCCH resource distribution methods, this method comprises: base station is since the both ends for the uplink band that each FDD cell shares, frequency resource is sequentially allocated for N number of FDD cell, it is transmitted for PUCCH 2/2a/2b and PUCCH 1/1a/1b, and remaining frequency resource is used for PUSCH transmission.Based on same inventive concept, the application also proposes a kind of base station, can be avoided collision problem of multiple FDD cells when using same uplink control channel.

Description

A kind of physical uplink control channel resource allocation methods and base station
Technical field
This application involves field of communication technology, in particular to a kind of physical uplink control channel (PUCCH) resource point Method of completing the square and base station.
Background technique
Long term evolution (Long Term Evolution, LTE) project is the evolution of 3G, it improves and enhances the sky of 3G Middle access technology, using orthogonal frequency division multiplexing (Orthogonal Frequency Division Multiplexing, OFDM) Sole criterion with multiple-input and multiple-output (Multi-input Multi-output, MIMO) as its wireless network evolution.
The main performance target of 3GPP LTE project include: 20MHz spectral bandwidth be capable of providing downlink 100Mbps, on The peak rate of row 50Mbps;Improve the performance of Cell Edge User;Improve cell capacity;Reduce system delay, user plane Internal unidirectional transmission time delay is lower than 5ms, controls plane and is lower than 50ms from sleep state to state of activation transit time, from resident shape The transit time of state to state of activation is less than 100ms;Support the MPS process of 100Km radius;It can be 350Km/h high-speed mobile The access service of user offer > 100kbps;Support pairs of or non-paired frequency spectrum, and flexibly configurable 1.25MHz to 20MHz is more Kind bandwidth.
When operator has in pairs with not pairs of frequency range, flexible use spectrum is very important.In order to integrate point Scattered frequency spectrum achievees the purpose that abundant working frequency, has the method for many flexible use spectrums, including carrier aggregation technology, has The UE of carrier aggregation capacity can polymerize unpaired band downlink in such a way that carrier wave polymerize to reach high-speed down data The purpose of transmission, this method are more demanding to terminal grade.
Another method is that azygous frequency range may be used as frequency division duplex (Frequency Division Duplexing, FDD) band downlink, be paired into a new FDD frequency range with the uplink band of other FDD in pairs.Referring to Fig. 1, Fig. 1 are the structural schematic diagram that not pairs of frequency range and pairs of frequency range form new FDD frequency range.In Fig. 1, the first of FDD cell 1 Uplink band and the first band downlink are the pairs of frequency ranges of FDD, and the azygous band downlink as FDD is in FDD cell 2 Second band downlink.The second band downlink and the first uplink band are also now paired into a new FDD frequency range.
It is said from terminal point, there are two LTE FDD cells, when two cells use identical ascending resource, by It is sent on a up-link carrier in the uplink control channel of two cells, therefore, the terminal of two cells is in the same PRB pair Collision can be clashed when upper transmission, when using identical ascending resource there are multiple cells, this conflict collision will It can be more.
Summary of the invention
In view of this, the application provides a kind of physical uplink control channel resource allocation methods and base station, can keep away Exempt from collision problem of multiple FDD cells when using same uplink control channel.
In order to solve the above technical problems, the technical scheme of the present invention is realized as follows:
A kind of physical uplink control channel resource allocation methods are applied to same uplink band and different band downlinks On base station in the LTE network of pairing, when any uplink band matches clock synchronization, the money of the uplink band with N number of band downlink Source is shared by the corresponding N number of FDD cell of N number of band downlink, comprising:
Since the both ends of the uplink band, it is sequentially allocated frequency resource for N number of FDD cell, is used for PUCCH2/2a/ 2b and PUCCH 1/1a/1b transmission, and remaining frequency resource is used for PUSCH transmission, wherein for the distribution of each FDD cell PUCCH 2/2a/2b and PUCCH 1/1a/1b are symmetrical at the both ends of the uplink band.
Preferably, the method further includes:
It in the cell for last dividing frequency resource, distributes between PUCCH 2/2a/2b and PUCCH 1/1a/1b, distribution RB transmission of the frequency resource for PUCCH 1/1a/1b and PUCCH 2/2a/2b mixing.
A kind of base station can be applied in the LTE network that same uplink band is matched from different band downlinks, base station packet It includes: configuration unit and allocation unit;
The configuration unit matches clock synchronization with N number of band downlink for configuring any uplink band, the uplink band Resource is shared by the corresponding N number of FDD cell of N number of band downlink;
The allocation unit is small for N number of FDD for since the both ends of the uplink band of the configuration of described dispensing unit Area is sequentially allocated frequency resource, transmits for PUCCH 2/2a/2b and PUCCH 1/1a/1b, and remaining frequency resource is used In PUSCH transmission, wherein be the PUCCH 2/2a/2b and PUCCH1/1a/1b of each FDD cell distribution the two of the uplink band It holds symmetrical.
Preferably,
The allocation unit is further used for distributing PUCCH2/2a/2b in the FDD cell for last dividing frequency resource Between PUCCH 1/1a/1b, RB transmission of the dividing frequency resource for PUCCH 1/1a/1b and PUCCH 2/2a/2b mixing.
In conclusion the application by base station since each FDD cell share uplink band both ends, for N number of FDD Cell is sequentially allocated frequency resource, transmits for PUCCH 2/2a/2b and PUCCH 1/1a/1b, and by remaining frequency resource For PUSCH transmission, collision problem of multiple FDD cells when using same uplink control channel can be avoided.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that not pairs of frequency range and pairs of frequency range form new FDD frequency range;
Fig. 2 is physical uplink control channel resource allocation methods flow diagram in the specific embodiment of the invention;
Fig. 3 is physical uplink control channel resource allocation structure schematic diagram in the specific embodiment of the invention;
Fig. 4 is the structural schematic diagram for being applied to the base station of above-mentioned technology in the specific embodiment of the invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, right hereinafter, referring to the drawings and the embodiments, Scheme of the present invention is described in further detail.
A kind of physical uplink control channel resource allocation methods are proposed in the embodiment of the present invention, are applied to same uplink On the base station in LTE network that frequency range is matched from different band downlinks, base station is distinguished by the resource location of uplink control channel Different community can be avoided collision problem of multiple FDD cells when using same uplink control channel.
Referring to fig. 2, Fig. 2 is that physical uplink control channel resource allocation methods process is shown in the specific embodiment of the invention It is intended to.Specific steps are as follows:
Step 201, when any uplink band matches clock synchronization with N number of band downlink, the frequency resource of the uplink band is by under N number of The corresponding N number of FDD cell of line frequency section shares.
Step 202, base station is sequentially allocated frequency resource since the both ends of the uplink band for N number of FDD cell, uses It is transmitted in PUCCH 2/2a/2b and PUCCH 1/1a/1b.
Base station is PUCCH 2/2a/2b and the PUCCH 1/1a/1b of each FDD cell distribution at the both ends pair of the uplink band Claim distribution.Wherein, what PUCCH 2/2a/2b was carried is the feedback information of CSI, in system configuration, the number of this part resource Amount is relatively-stationary, therefore they are distributed in as the outside of the frequency band where the frequency resource of each cell distribution, resource Particular number semi-static instruction is carried out by high-level signaling.
PUCCH 1/1a/1b carrying is scheduling request information and the ACK information to downlink data, and resource quantity is dynamic Variation, it is related to the quantity of the downlink data sent in cell, therefore by its point in the uplink control channel design in standard It fits over close to the position of center frequency, facilitates the transmission that the frequency resource of system spare is used for PUSCH.But in the present embodiment For the small allocating frequency resource of multiple FDD, therefore, only for closest to the FDD cell distribution of center frequency in the upstream band PUCCH 1/1a/1b can play the role of this.
In the frequency domain resource of occupied 1 RB-pair, PUCCH 2/2a/2b and PUCCH 1/1a/1b are used The mode of code point is further multiplexed multiple PUCCH channels.Therefore when the PUCCH 2/2a/2b channel quantity of configuration is occupied When number of resources is not RB-pair integral multiple, incited somebody to action in the intersection of PUCCH 2/2a/2b and PUCCH 1/1a/1b frequency domain There are them in certain 1 RB-pair in a manner of code point the case where mixed transport.
Base station is distributed between PUCCH 2/2a/2b and PUCCH 1/1a/1b in the cell for last dividing frequency resource, RB transmission of the dividing frequency resource for PUCCH 1/1a/1b and PUCCH 2/2a/2b mixing.I.e. from the uplink band both ends When starting allocating frequency resource small for each FDD, the FDD cell of last dividing frequency resource, i.e. distance are used for transmission PUSCH biography The FDD cell of the adjacent frequency resource allocation of defeated frequency.
Base station is mixed in the frequency resource allocation closest to PUSCH to PUCCH 1/1a/1b and PUCCH 2/2a/2b RB, it is close also for the format of the physical uplink control channel of same standard in order to save resource overhead, convenient for processing.
Step 203, remaining frequency resource is used for Physical Uplink Shared Channel (PUSCH) transmission by base station.
The content that the application is indicated by signaling indicates the PUCCH of multiple cells compared with standard compared to signaling is increased 1/1a/1b and PUCCH 2/2a/2b, and PUCCH 1/ is indicated in the nearest FDD cell of the center frequency apart from the uplink band The RB of 1a/1b and PUCCH 2/2a/2b mixing.
Therefore it is provided in the specific embodiment of the invention by distinguishing the upload control for each cell for sharing the uplink control channel Source avoids the collision problem that different FDD cells share the uplink control channel to distinguish the uplink control channel of each cell.
Below with N for 2, i.e., when two FDD cells share a uplink band, for frequency resource allocation, come specifically It is bright how to realize physical uplink control channel resource allocation methods.It is object in the specific embodiment of the invention referring to Fig. 3, Fig. 3 Manage uplink control channel resource distribution structure schematic diagram.
As seen from Figure 3, it is 1 dividing frequency resource of cell since the both ends of the uplink band, distributes for cell for passing The frequency resource of defeated PUCCH2/2a/2b and PUCCH 1/1a/1b, and the resource of first distribution transmission PUCCH 2/2a/2b, after The resource of distribution transmission PUCCH 1/1a/1b, what it is in the upstream band is in symmetrical distribution.After being distributed for FDD cell 1, it is FDD cell 2 is distributed, and distributes the mode of PUCCH 2/2a/2b and PUCCH 1/1a/1b with FDD cell 1, due to FDD cell 2 away from It is nearest from the centre frequency of the uplink band, therefore distribute and be used for transmission between PUCCH2/2a/2b and PUCCH 1/1a/1b The frequency resource of the RB of PUCCH 1/1a/1b and PUCCH 2/2a/2b mixing.
Same inventive concept is based in the specific embodiment of the invention, it is also proposed that a kind of base station can be applied to same uplink In the LTE network that frequency range is matched from different band downlinks.Referring to fig. 4, Fig. 4 is to be applied to above-mentioned skill in the specific embodiment of the invention The structural schematic diagram of the base station of art.The base station includes: configuration unit 401 and allocation unit 402.
Configuration unit 401 matches clock synchronization with N number of band downlink for configuring any uplink band, the uplink band Resource is shared by the corresponding N number of FDD cell of N number of band downlink.
Allocation unit 402, for since the both ends for the uplink band that configuration unit 401 configures, for N number of FDD cell It is sequentially allocated frequency resource, is transmitted for PUCCH 2/2a/2b and PUCCH 1/1a/1b, and remaining frequency resource is used for PUSCH transmission, wherein be the PUCCH 2/2a/2b and PUCCH1/1a/1b of each FDD cell distribution at the both ends of the uplink band It is symmetrical.
Preferably,
Allocation unit 402 is further used for distributing PUCCH2/2a/2b in the FDD cell for last dividing frequency resource Between PUCCH 1/1a/1b, RB transmission of the dividing frequency resource for PUCCH 1/1a/1b and PUCCH 2/2a/2b mixing.
The unit of above-described embodiment can integrate in one, can also be deployed separately;It can be merged into a unit, it can also To be further split into multiple subelements.
In conclusion base station is since the both ends for the uplink band that each FDD cell shares in the specific embodiment of the invention N number of FDD cell is sequentially allocated frequency resource, transmits for PUCCH 2/2a/2b and PUCCH1/1a/1b, and by remaining frequency Rate resource is used for PUSCH transmission.The upload control resource of each cell of the uplink control channel is shared by distinguishing, it is each to distinguish The uplink control channel of cell can be avoided collision problem of multiple FDD cells when using same uplink control channel.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention Within the scope of.

Claims (4)

1. a kind of physical uplink control channel PUCCH resource distribution method is applied to same uplink band and different downlinks On base station in the long term evolution LTE network of frequency range pairing, which is characterized in that when any uplink band is the same as N number of downlink frequency Section matches clock synchronization, and the resource of the uplink band is shared by the corresponding N number of Frequency Division Duplex FDD cell of N number of band downlink, comprising:
Since the both ends of the uplink band, be sequentially allocated frequency resource for N number of FDD cell, for PUCCH2/2a/2b and PUCCH 1/1a/1b transmission, and remaining frequency resource is used for Physical Uplink Shared Channel PUSCH transmission, wherein it is each PUCCH 2/2a/2b and the PUCCH 1/1a/1b of FDD cell distribution are symmetrical at the both ends of the uplink band.
2. the method according to claim 1, wherein the method further includes:
In the cell for last dividing frequency resource, distribute between PUCCH 2/2a/2b and PUCCH 1/1a/1b, dividing frequency Resource block RB transmission of the resource for PUCCH 1/1a/1b and PUCCH 2/2a/2b mixing.
3. a kind of base station can be applied in the long term evolution LTE network that same uplink band is matched from different band downlinks, special Sign is that the base station includes: configuration unit and allocation unit;
The configuration unit, for configuring any uplink band with N number of band downlink with clock synchronization, the resource of the uplink band It is shared by the corresponding N number of Frequency Division Duplex FDD cell of N number of band downlink;
The allocation unit, for since the both ends of the uplink band of the configuration of described dispensing unit, for N number of FDD cell according to Sub-distribution frequency resource is transmitted for physical uplink control channel PUCCH 2/2a/2b and PUCCH 1/1a/1b, and will Remaining frequency resource is used for Physical Uplink Shared Channel PUSCH transmission, wherein for the PUCCH 2/2a/ of each FDD cell distribution 2b and PUCCH 1/1a/1b is symmetrical at the both ends of the uplink band.
4. base station according to claim 3, which is characterized in that
The allocation unit, is further used in the FDD cell for last dividing frequency resource, distribute PUCCH2/2a/2b and Between PUCCH 1/1a/1b, RB transmission of the dividing frequency resource for PUCCH 1/1a/1b and PUCCH 2/2a/2b mixing.
CN201310054136.6A 2013-02-20 2013-02-20 A kind of physical uplink control channel resource allocation methods and base station Active CN103997789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310054136.6A CN103997789B (en) 2013-02-20 2013-02-20 A kind of physical uplink control channel resource allocation methods and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310054136.6A CN103997789B (en) 2013-02-20 2013-02-20 A kind of physical uplink control channel resource allocation methods and base station

Publications (2)

Publication Number Publication Date
CN103997789A CN103997789A (en) 2014-08-20
CN103997789B true CN103997789B (en) 2019-02-05

Family

ID=51311760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310054136.6A Active CN103997789B (en) 2013-02-20 2013-02-20 A kind of physical uplink control channel resource allocation methods and base station

Country Status (1)

Country Link
CN (1) CN103997789B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101729125A (en) * 2008-10-31 2010-06-09 大唐移动通信设备有限公司 Method and device for transmitting signal
CN102083211A (en) * 2010-03-29 2011-06-01 大唐移动通信设备有限公司 Determining method and equipment of uplink control channel resources
CN102439891A (en) * 2009-05-12 2012-05-02 翔跃通信公司 Dual mode radio for frequency division duplexing and time division duplexing communication modes
CN102905270A (en) * 2012-10-24 2013-01-30 中国联合网络通信集团有限公司 Communication method and device for frequency division duplexing (FDD) system and base station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101729125A (en) * 2008-10-31 2010-06-09 大唐移动通信设备有限公司 Method and device for transmitting signal
CN102439891A (en) * 2009-05-12 2012-05-02 翔跃通信公司 Dual mode radio for frequency division duplexing and time division duplexing communication modes
CN102083211A (en) * 2010-03-29 2011-06-01 大唐移动通信设备有限公司 Determining method and equipment of uplink control channel resources
CN102905270A (en) * 2012-10-24 2013-01-30 中国联合网络通信集团有限公司 Communication method and device for frequency division duplexing (FDD) system and base station

Also Published As

Publication number Publication date
CN103997789A (en) 2014-08-20

Similar Documents

Publication Publication Date Title
US20220078627A1 (en) Systems and methods for concurrent spectrum usage within actively used spectrum
US20210359799A1 (en) System and Method for a Long-Term Evolution (LTE)-Compatible Subframe Structure for Wideband LTE
JP6896653B2 (en) Subframe operation and channel information transmission method and equipment for interference control in communication systems
CN102113254B (en) Method and device for allocating resources in multiple frequency band system
EP2975900B1 (en) Carrier aggregation scheduling apparatus and base station
CN109600212A (en) The device and method for sending and receiving the HARQ ACK/NACK information of new radio
WO2018230604A1 (en) Communication system
CN108513730A (en) Transmission in new radio system under multiple systematic parameters
KR102197238B1 (en) Method and apparatus for transmitting channel state information in wireless communication system
US8345582B2 (en) Mobile communications system, base station apparatus, user apparatus and method
US20160374069A1 (en) Network Node, Wireless Device and Methods Therein for Controlling a Radio Communication using Carrier Aggregation
CN110199558A (en) The system and method coexisted for low time delay and time delay tolerant of communication resource
CN101741710A (en) Uplink-downlink configuration and receiving methods of TDD system carrier aggregation
JP2022008908A (en) Resource allocation signaling
CN101527886B (en) Mixed duplex realization method based on separated service and control as well as data transmission method
US9236937B2 (en) Radio base station and communication control method including downlink radio resource allocation
CN102843180A (en) Method of data transmission in channel
CN105309020B (en) Sending device, reception device, sending method and method of reseptance
CN102457972A (en) Same-frequency networking method and device for different time slot allocations
CN103997789B (en) A kind of physical uplink control channel resource allocation methods and base station
EP2854301B1 (en) A method of operating a wireless communications system, a corresponding antenna controller, and radio access node
KR102114949B1 (en) Apparatus and method of PUCCH resource allocation for new radio
US20170331568A1 (en) Apparatus and method for interference alignment in cellular communication network
CN117812737A (en) Communication method and communication device
WO2024211003A1 (en) Scheduling during slots with sub-band full-duplex resources

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: ZHANXUN COMMUNICATION (SHANGHAI) CO. LTD.

Effective date: 20141016

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20141016

Address after: 100045 Beijing city Xicheng District Yuetan Nan Street 11

Applicant after: Research Institute of Telecommunications Transmission, Ministry of Industry and Information Technology

Applicant after: Zhanxun Communication (Shanghai) Co., Ltd.

Address before: 100045 Beijing city Xicheng District Yuetan Nan Street 11

Applicant before: Research Institute of Telecommunications Transmission, Ministry of Industry and Information Technology

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant