Tilke et al., 2010 - Google Patents
Optimizing Well Placement Planning in the Presence of Subsurface Uncertainty and Operational Risk ToleranceTilke et al., 2010
- Document ID
- 2500556280693795758
- Author
- Tilke P
- Banerjee R
- Halabe V
- Balci B
- Thambynayagam R
- Publication year
- Publication venue
- ECMOR XII-12th European Conference on the Mathematics of Oil Recovery
External Links
Snippet
This paper presents an automated workflow to accelerate the well placement planning process in the presence of subsurface uncertainty and operational risk. The system allows the user to screen and rank development options in minutes. This automated field …
- 238000005457 optimization 0 abstract description 36
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B2041/0028—Fuzzy logic, artificial intelligence, neural networks, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8005658B2 (en) | Automated field development planning of well and drainage locations | |
US8793111B2 (en) | Automated field development planning | |
US10480289B2 (en) | Fracturability index maps for fracture placement and design of shale reservoirs | |
EP3559401B1 (en) | Method and system for stable and efficient reservoir simulation using stability proxies | |
Guyaguler et al. | Optimization of well placement in a Gulf of Mexico waterflooding project | |
EP2948618B1 (en) | Constrained optimization for well placement planning | |
Nasrabadi et al. | Well placement optimization: A survey with special focus on application for gas/gas-condensate reservoirs | |
US20120130696A1 (en) | Optimizing Well Management Policy | |
Litvak et al. | Field development optimization with subsurface uncertainties | |
Tilke et al. | Automated field development planning in the presence of subsurface uncertainty and operational risk tolerance | |
Mirzaei-Paiaman et al. | Iterative sequential robust optimization of quantity and location of wells in field development under subsurface, operational and economic uncertainty | |
Hohendorff Filho et al. | Effect of reservoir and production system integration on field production strategy selection | |
Al-Rubiay et al. | A Survey of Infill Well Location Optimization Techniques | |
Volz et al. | Field development optimization of Siberian giant oil field under uncertainties | |
Mogollón et al. | New trends in waterflooding project optimization | |
Tilke et al. | Optimizing Well Placement Planning in the Presence of Subsurface Uncertainty and Operational Risk Tolerance | |
Martin et al. | Application of a well slot optimization process to drilling large numbers of wells in clusters on artificial islands | |
Schulze-Riegert et al. | Well path design optimization under geological uncertainty: Application to a complex north sea field | |
Rosland et al. | Collaborative Well Planning and Optimization of Well Placement: A Case Study From Mangala Field Development, Rajasthan India | |
Kennedy et al. | Recommended practices for evaluation and development of shale gas/oil reservoirs over the asset life cycle: data-driven solutions | |
Johnson et al. | Improving Gas Storage Development Planning Through Simulation-Optimization | |
Al Marzouqi et al. | The Added Value of Piloting Maximum Reservoir Contact Wells Prior to Large Scale Application to a Giant Offshore Carbonate Field | |
Tyree | Predicting Frac Hits Using Artificial Intelligence; Application in Marcellus Shale | |
Yousefzadeh et al. | Application of fast marching method and quality map to well trajectory optimization with a novel well parametrization | |
Tran* XD et al. | Practical Reservoir Simulation for Small Development Teams-Customizing Stimulation Designs by Landing Zone in the Midland Basin |