Lamand et al., 2019 - Google Patents
DSSI-MTS-01 Tunnels in Doha (Qatar)–a showcase of construction techniques for tunnels, shafts, galleries and junctions between themLamand et al., 2019
- Document ID
- 18063596533529531465
- Author
- Lamand R
- Penot C
- Perrin X
- Lockhart T
- Publication year
- Publication venue
- Tunnels and Underground Cities. Engineering and Innovation Meet Archaeology, Architecture and Art
External Links
Snippet
The DSSI-MTS1 project, located in Doha (Qatar), consists of 16.4 km of sewer tunnels, 11 shafts, 9 mined galleries and connections between these elements, awarded to the Bouygues-UCC JV. The tunnels have been excavated by 2 EBP TBMs, operated jointly by …
- 238000010276 construction 0 title abstract description 12
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
- E21D11/083—Methods or devices for joining adjacent concrete segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D13/00—Large underground chambers; Methods or apparatus for making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bieniawski et al. | Critical assessment of RMR-based tunnel design practices: A practical engineer’s approach | |
CN107091101A (en) | Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site | |
Harris | 11 Protective measures | |
Wang | Tunnelling and technological progress in tunnelling in China | |
Lamand et al. | DSSI-MTS-01 Tunnels in Doha (Qatar)–a showcase of construction techniques for tunnels, shafts, galleries and junctions between them | |
CN116756940A (en) | Push pipe engineering design and construction method based on stress performances of different geological environments | |
Singh | Design and analysis of a micro tunnel boring machines (TBM) | |
CN103154434A (en) | closed trench tunnel | |
Nymann et al. | Construction of the Copenhagen metro | |
Burgess et al. | Channel tunnel rail link section 2: Thames tunnel | |
Holzhäuser et al. | Global Experience with Soft Ground and Weak Rock Tunneling under Very High Groundwater Heads | |
Winterberg et al. | Santoña–Laredo general interceptor collector–challenges and solutions | |
Ardeshana et al. | Tunnels and Tunneling Operations: Introduction To Old and New Era | |
Malouf et al. | Design of Orange Line project in Austin, Texas | |
Giacomin et al. | Excavating through hard rock formations with TBM: Technical challenges of the Follo Line Project | |
Lei | Research on shield separate launching technology in limited space | |
Trussoni et al. | Istanbul Airport Express Line: Design and built of the new strategic mass transit underground connection system | |
Kumar | Tunnelling Methods–Kolkata Under Ground Metro, India–Case Study | |
Giacomin et al. | The central interceptor project: A complex sewage tunnel network in the city of Auckland | |
Mok et al. | A perspective of pipejacking works by tunnel boring machines in Hong Kong: part II–applications, problems encountered, cost and prospects | |
Vicente | Arroyo Vega flood relief tunnel design | |
Uchiumi et al. | Construction of bifurcations of underground urban expressway | |
Fugeman et al. | MAJOR UNDERGROUND STRUCTURES. | |
Ujlayan et al. | Tunnelling Experiences on Jammu-Udhampur Rail Link | |
Flint et al. | COLLECTION SYSTEM: TUNNELS. |