Nicol, 1977 - Google Patents
Study of underground power cable installation methods. Final reportNicol, 1977
View PDF- Document ID
- 1668130042569261483
- Author
- Nicol J
- Publication year
External Links
Snippet
It has been determined by the utility industry that the costs of installing under ground high voltage transmission cable can be 50% of the total circuit in service cost. This study was directed towards underground cable systems in service and those types that can be …
- 238000009434 installation 0 title abstract description 170
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/28—Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
- E02F5/285—Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways with drag buckets or scraper plates
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/10—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F7/00—Equipment for conveying or separating excavated material
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Iseley | Trenchless installation of conduits beneath roadways | |
AU2021201302A1 (en) | Process for exposing underground utilities | |
Onsarigo et al. | Feasibility of state transportation agencies acquiring trenchless technologies: A comparison of open cut and horizontal auger boring | |
Ariaratnam et al. | Suggested practices for installations using horizontal directional drilling | |
Bayer | HDD practice handbook | |
Nicol | Study of underground power cable installation methods. Final report | |
Burden et al. | Synthesis of trenchless technologies. | |
Usamaa et al. | Comparative Analysis of Underground & Underwater Tunnel | |
Najafi et al. | Preparation of construction specifications, contract documents, field testing, educational materials, and course offerings for trenchless construction | |
Morgan | The technical and economic case for the use of three dimensional mapping for the installation of electric power cables | |
Ezeokonkwo et al. | Review of Trenchless Technologies’ Successes and their Dependence on Precise Geotechnical Investigation | |
UNDERGROUND et al. | PROCEEDINGS OF A DEPARTMENT OF ENERGY WORKSHOP | |
AU2014101360B4 (en) | Process for exposing underground utilities | |
Onsarigo | Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations | |
Pan et al. | Construction of Underground Roads and Tunnels Beneath Sensitive Infrastructures in Singapore | |
Muindi et al. | Ingredients for successfully installing pipe using trenchless methods | |
Manzano et al. | Onshore Pipeline Construction | |
Read et al. | Factors affecting choice of technique | |
Grantz et al. | Planning the third harbour tunnel in Boston, Massachusetts, USA | |
Adamtey et al. | State Transportation Agencies Acquiring Trenchless Technologies for Their In-House Operations: A Case Study of ODOT Acquiring HAB Machine | |
Iseley | Automated methods for the trenchless placement of underground utility systems | |
Zhussupbekov et al. | Recommendation for the Use of Micropiles to Ensure the Reliability of the Railway Track | |
Atalah et al. | Development of a Standard Specification for Horizontal Directional Drilling | |
Lanergan et al. | 10 Years of Learning—The East Boston Branch Sewer Project from Design through Construction | |
Conway | An investigation of trenchless technologies and their interaction with native Iowa soils |