Nicol, 1977 - Google Patents

Study of underground power cable installation methods. Final report

Nicol, 1977

View PDF
Document ID
1668130042569261483
Author
Nicol J
Publication year

External Links

Snippet

It has been determined by the utility industry that the costs of installing under ground high voltage transmission cable can be 50% of the total circuit in service cost. This study was directed towards underground cable systems in service and those types that can be …
Continue reading at www.osti.gov (PDF) (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • E02F5/285Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways with drag buckets or scraper plates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/10Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material

Similar Documents

Publication Publication Date Title
Iseley Trenchless installation of conduits beneath roadways
AU2021201302A1 (en) Process for exposing underground utilities
Onsarigo et al. Feasibility of state transportation agencies acquiring trenchless technologies: A comparison of open cut and horizontal auger boring
Ariaratnam et al. Suggested practices for installations using horizontal directional drilling
Bayer HDD practice handbook
Nicol Study of underground power cable installation methods. Final report
Burden et al. Synthesis of trenchless technologies.
Usamaa et al. Comparative Analysis of Underground & Underwater Tunnel
Najafi et al. Preparation of construction specifications, contract documents, field testing, educational materials, and course offerings for trenchless construction
Morgan The technical and economic case for the use of three dimensional mapping for the installation of electric power cables
Ezeokonkwo et al. Review of Trenchless Technologies’ Successes and their Dependence on Precise Geotechnical Investigation
UNDERGROUND et al. PROCEEDINGS OF A DEPARTMENT OF ENERGY WORKSHOP
AU2014101360B4 (en) Process for exposing underground utilities
Onsarigo Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations
Pan et al. Construction of Underground Roads and Tunnels Beneath Sensitive Infrastructures in Singapore
Muindi et al. Ingredients for successfully installing pipe using trenchless methods
Manzano et al. Onshore Pipeline Construction
Read et al. Factors affecting choice of technique
Grantz et al. Planning the third harbour tunnel in Boston, Massachusetts, USA
Adamtey et al. State Transportation Agencies Acquiring Trenchless Technologies for Their In-House Operations: A Case Study of ODOT Acquiring HAB Machine
Iseley Automated methods for the trenchless placement of underground utility systems
Zhussupbekov et al. Recommendation for the Use of Micropiles to Ensure the Reliability of the Railway Track
Atalah et al. Development of a Standard Specification for Horizontal Directional Drilling
Lanergan et al. 10 Years of Learning—The East Boston Branch Sewer Project from Design through Construction
Conway An investigation of trenchless technologies and their interaction with native Iowa soils