JAMALUDIN, 2017 - Google Patents
FATIGUE ANALYSIS OF CATENARY OFFSET BUOYANTJAMALUDIN, 2017
View PDF- Document ID
- 15412427529625512776
- Author
- JAMALUDIN F
- Publication year
External Links
Snippet
ABSTRACT Steel Catenary Riser is the preferred solution to riser system in offshore oil & gas production. They are more structurally reliable, technically simple and cost effective compared to other types of riser. As the offshore oil & gas production move to deep and ultra …
- 238000004458 analytical method 0 title abstract description 34
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/012—Risers with buoyancy elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/015—Non-vertical risers, e.g. articulated or catenary-type
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/08—Casing joints
- E21B17/085—Riser connections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B2043/0115—Drilling for or production of natural gas hydrate reservoirs; Drilling through or monitoring of formations containing gas hydrates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0007—Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Guo et al. | Offshore pipelines: design, installation, and maintenance | |
Amaechi et al. | Understanding the fluid–structure interaction from wave diffraction forces on CALM buoys: Numerical and analytical solutions | |
Bell et al. | State-of-the-art of ultra deepwater production technologies | |
규식박 et al. | Structural analysis of deepwater steel catenary riser using OrcaFlex | |
JAMALUDIN | FATIGUE ANALYSIS OF CATENARY OFFSET BUOYANT | |
Poll et al. | An evaluation of strength, fatigue and operational performance of dry tree semisubmersible riser tensioning equipment | |
Jamaludin et al. | Catenary offset buoyant riser assembly for Malaysian deepwater | |
RU2643392C2 (en) | Method of vacuum riser line control | |
Buberg | Design and analysis of steel catenary riser systems for deep waters | |
Taheri et al. | Effect of seabed stiffness on fatigue life of steel catenary risers due to random waves | |
Vidic-Perunovic et al. | Steel catenary riser design for cylindrical FPSO application in ultra-deep GoM | |
Orimolade | Steel lazy wave risers from turret moored FPSO | |
Dev | Preliminary Design Analysis of Deepwater Production Risers | |
Adejuwon | Ultra-Deep water High Pressure Riser Concept Offshore Brazil | |
Jayathilake | Parametrization of Steel Lazy Wave Riser Configuration for Fatigue Considerations at the Touch Down Point | |
Li | Sensitivity study of SCR fatigue at touch down point: effect of marine growth | |
Yamamoto et al. | A numerical analysis of the internal flow effect on the riser’s mechanical behavior | |
Imani Bidgoli | The Effect of FPSO’s Mooring System on Dynamic Response and Fatigue Life of Riser | |
Yamamoto et al. | Simulation of a Free Standing Riser Model and Validation With Experimental Results | |
Swamidas et al. | Offshore Platforms | |
Junaidi et al. | Review on Design of Oil Subsea Pipeline in Kikeh Field, Malaysia | |
Head et al. | Riser Concepts for High Motion Vessels in Ultradeep Water | |
Yubenraj | A Review Study of Oil and Gas Production Facility for Semi-Submersible Platform | |
Morooka et al. | Evaluation of alternatives for offshore petroleum production system in deep and ultradeep water depth | |
Koto | Review on Deep Water Flow lines of Gumusut–Kakap, Malaysia |