Stevens et al., 1995 - Google Patents

Taurus-Small launch vehicle technologies development

Stevens et al., 1995

Document ID
11089050812018195517
Author
Stevens T
Lockwood P
McInerney J
Publication year
Publication venue
Space Programs and Technologies Conference

External Links

Snippet

Abstract The Department of Defense's@ OD) newest small launch vehicle, Taurus, successfully launched on March 13, 1994. DoD's Advanced Research Projects Agency and the Air Force teamed to manage a very unique two and a half year research and …
Continue reading at arc.aiaa.org (other versions)

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G1/00Cosmonautic vehicles
    • B64G1/22Parts of, or equipment specially adapted for fitting in or to, cosmonautic vehicles
    • B64G1/64Systems for coupling or separating cosmonautic vehicles or parts thereof, e.g. docking arrangements
    • B64G1/646Docking or rendez-vous systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G1/00Cosmonautic vehicles
    • B64G1/22Parts of, or equipment specially adapted for fitting in or to, cosmonautic vehicles
    • B64G1/52Protection, safety or emergency devices; Survival aids
    • B64G1/58Thermal protection, e.g. heat shields
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G1/00Cosmonautic vehicles
    • B64G1/22Parts of, or equipment specially adapted for fitting in or to, cosmonautic vehicles
    • B64G1/40Arrangements or adaptations of propulsion systems
    • B64G1/402Propellant tanks; Feeding propellants
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G1/00Cosmonautic vehicles
    • B64G1/22Parts of, or equipment specially adapted for fitting in or to, cosmonautic vehicles
    • B64G1/42Arrangements or adaptations of power supply systems
    • B64G1/44Arrangements or adaptations of power supply systems using radiation, e.g. deployable solar arrays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G1/00Cosmonautic vehicles
    • B64G1/10Artificial satellites; Systems of such satellites; Interplanetary vehicles
    • B64G1/1085Swarms and constellations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G1/00Cosmonautic vehicles
    • B64G1/002Launch systems

Similar Documents

Publication Publication Date Title
Stevens et al. Taurus-Small launch vehicle technologies development
Lagier Ariane 6
Nicolini Vega Operations: Transition to Commercial Operations and New Developments
Schoneman et al. Orbital Suborbital Program (OSP)'Minotaur'space launch vehicle-Low cost space lift for small satellites using surplus Minuteman motors
Alliance Aft Bulkhead Carrier Auxiliary Payload User's Guide
Williams et al. Ares 1 First Stage Design, Development, Test, and Evaluation
Cassidy et al. The Mercury-Redstone Project
Williams et al. Crew Launch Vehicle First Stage Design, Development, Test and Evaluation
Koller Jr Glossary, Acronyms, Abbreviations: Space transportation system and associated payloads
Schoneman et al. Demonstration of a New Smallsat Launch Vehicle: The Orbital/Suborbital Program (OSP) Space Launch Vehicle Inaugural Mission Results
Crain Scheduling technique improvement study for advanced programs. Volume 4: Ground support, test, training, investment, operations, advanced space transport program
Ward et al. The launch Vehicle processing flow in the VaB
Martin STS and Cargo Glossary, acronyms, and abbreviations
Ackerman Jr et al. WORKSHOP F DESIGN ASSURANCE TECHNIQUES SESSION 3-AUTOMATED DESIGN AND ANALYSIS TECHNIQUES
Edson Shuttle Test and Operations Approach
CORDING et al. Greenland I
Peterson et al. Liquid flyback booster pre-phase: A study assessment
Schuiling et al. Launch site payload test configurations for Space Shuttle scientificpayloads
Wertz Responsive space launch with the scorpius family of low-cost, expendable launch vehicles
NASA BOEING SMALL
Erickson et al. FAULT-TOLERANT EQUIPMENT-DESIGN, TEST AND RELIABILITY
Seiler et al. Ares First Stage" Systemology"-Combining Advanced Systems Engineering and Planning Tools to Assure Mission Success
Carey The process of launching communications satellites with the Shuttle-An example using Westar VI
Portanova et al. Evolved Expendable Launch Vehicle System: A Revolutionary Approach to Launch Satellites
Nicolini et al. Vega Launch Operations and Ground Facilities