WO2021006349A1 - ショベル - Google Patents
ショベル Download PDFInfo
- Publication number
- WO2021006349A1 WO2021006349A1 PCT/JP2020/027119 JP2020027119W WO2021006349A1 WO 2021006349 A1 WO2021006349 A1 WO 2021006349A1 JP 2020027119 W JP2020027119 W JP 2020027119W WO 2021006349 A1 WO2021006349 A1 WO 2021006349A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- bucket
- weight
- calculation unit
- center
- earth
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
- E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
- E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
- E02F3/437—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
- E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
- E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/261—Surveying the work-site to be treated
- E02F9/262—Surveying the work-site to be treated with follow-up actions to control the work tool, e.g. controller
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/264—Sensors and their calibration for indicating the position of the work tool
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/264—Sensors and their calibration for indicating the position of the work tool
- E02F9/265—Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G19/00—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
- G01G19/08—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
- G01G19/10—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles having fluid weight-sensitive devices
Definitions
- This disclosure relates to excavators.
- a front attachment including a bucket and a link mechanism including a boom
- a series of operating states from excavation by the front attachment to excavation and return turning are detected, and the load acting on the bucket during this operation is measured.
- the load acting on the bucket is measured within the time from the end of excavation to the start of excavation, and the load acting on the bucket is measured again within the time from the end of excavation to the start of excavation.
- a method for calculating the amount of operating soil of a hydraulic excavator is known, which is characterized in that the amount of operating soil during excavation work is calculated by obtaining the difference between these two loads (see Patent Document 1).
- the earth and sand weight is estimated based on the pressure of the boom cylinder, but during the boom raising operation, the waveform of the estimated earth and sand weight vibrates at the start and end of the operation. May make it difficult to detect the weight of earth and sand.
- an attachment attached to an upper swing body, a first actuator and a second actuator for driving the attachment, and a control device are provided, and the control device comprises.
- the first weight calculation unit that calculates the weight of the load loaded on the attachment as the first weight based on the first actuator, and the weight of the load as the second weight based on the second actuator. It has a second weight calculation unit for calculating.
- FIG. 1 is a side view of the excavator 100 as an excavator according to the present embodiment.
- the excavator 100 is located on a horizontal plane facing the uphill slope ES to be constructed, and is an uphill slope BS (that is, after construction on the uphill slope ES) which is an example of a target construction surface to be described later. Slope shape) is also described.
- the uphill slope ES to be constructed is provided with a cylindrical body (not shown) indicating the normal direction of the uphill slope BS, which is the target construction surface.
- the excavator 100 includes a lower traveling body 1, an upper swivel body 3 mounted on the lower traveling body 1 so as to be swivelable via a swivel mechanism 2, a boom 4 and an arm constituting an attachment (working machine). It includes 5, a bucket 6, and a cabin 10.
- the lower traveling body 1 travels the excavator 100 by hydraulically driving a pair of left and right crawlers by the traveling hydraulic motors 1L and 1R (see FIG. 2 described later), respectively. That is, the pair of traveling hydraulic motors 1L and 1R (an example of the traveling motor) drive the lower traveling body 1 (crawler) as the driven portion.
- the upper swing body 3 turns with respect to the lower traveling body 1 by being driven by the swing hydraulic motor 2A (see FIG. 2 described later). That is, the swivel hydraulic motor 2A is a swivel drive unit that drives the upper swivel body 3 as a driven unit, and can change the direction of the upper swivel body 3.
- the upper swivel body 3 may be electrically driven by an electric motor (hereinafter, "swivel motor”) instead of the swivel hydraulic motor 2A. That is, the swivel motor is a swivel drive unit that drives the upper swivel body 3 as a non-drive unit, like the swivel hydraulic motor 2A, and can change the direction of the upper swivel body 3.
- swivel motor is a swivel drive unit that drives the upper swivel body 3 as a non-drive unit, like the swivel hydraulic motor 2A, and can change the direction of the upper swivel body 3.
- the boom 4 is pivotally attached to the center of the front portion of the upper swivel body 3 so as to be vertically movable, an arm 5 is pivotally attached to the tip of the boom 4 so as to be vertically rotatable, and an end attachment is attached to the tip of the arm 5.
- the bucket 6 is pivotally attached so as to be vertically rotatable.
- the boom 4, arm 5, and bucket 6 are hydraulically driven by the boom cylinder 7, arm cylinder 8, and bucket cylinder 9 as hydraulic actuators, respectively.
- the bucket 6 is an example of an end attachment, and the tip of the arm 5 has another end attachment, for example, a slope bucket, a dredging bucket, or a breaker, instead of the bucket 6 depending on the work content or the like. Etc. may be attached.
- the cabin 10 is a driver's cab on which the operator boarded, and is mounted on the front left side of the upper swivel body 3.
- FIG. 2 is a diagram schematically showing an example of the configuration of the excavator 100 according to the present embodiment.
- FIG. 2 the mechanical power system, the hydraulic oil line, the pilot line, and the electric control system are shown by double lines, solid lines, broken lines, and dotted lines, respectively.
- the drive system of the excavator 100 includes an engine 11, a regulator 13, a main pump 14, and a control valve 17. Further, as described above, the hydraulic drive system of the excavator 100 according to the present embodiment is the traveling hydraulic motors 1L, 1R that hydraulically drive each of the lower traveling body 1, the upper rotating body 3, the boom 4, the arm 5, and the bucket 6. , Swirling hydraulic motor 2A, boom cylinder 7, arm cylinder 8, bucket cylinder 9, and other hydraulic actuators.
- the engine 11 is the main power source in the hydraulic drive system, and is mounted on the rear part of the upper swing body 3, for example. Specifically, the engine 11 rotates constantly at a preset target rotation speed under direct or indirect control by a controller 30, which will be described later, to drive the main pump 14 and the pilot pump 15.
- the engine 11 is, for example, a diesel engine that uses light oil as fuel.
- the regulator 13 controls the discharge amount of the main pump 14. For example, the regulator 13 adjusts the angle (tilt angle) of the swash plate of the main pump 14 in response to a control command from the controller 30.
- the regulator 13 includes regulators 13L and 13R, for example, as described later.
- the main pump 14 is mounted on the rear part of the upper swing body 3 like the engine 11, and supplies hydraulic oil to the control valve 17 through the high-pressure hydraulic line.
- the main pump 14 is driven by the engine 11 as described above.
- the main pump 14 is, for example, a variable displacement hydraulic pump, and as described above, the stroke length of the piston is adjusted by adjusting the tilt angle of the swash plate by the regulator 13 under the control of the controller 30, and the pump is discharged.
- the flow rate (discharge pressure) is controlled.
- the main pump 14 includes, for example, the main pumps 14L and 14R as described later.
- the control valve 17 is, for example, a hydraulic control device mounted in the central portion of the upper swing body 3 and controlling the hydraulic drive system according to the operation of the operating device 26 by the operator. As described above, the control valve 17 is connected to the main pump 14 via the high-pressure hydraulic line, and the hydraulic oil supplied from the main pump 14 is supplied to the hydraulic actuator (running hydraulic motor 1L) according to the operating state of the operating device 26. , 1R, swing hydraulic motor 2A, boom cylinder 7, arm cylinder 8, and bucket cylinder 9) are selectively supplied. Specifically, the control valve 17 includes control valves 171 to 176 that control the flow rate and flow direction of the hydraulic oil supplied from the main pump 14 to each of the hydraulic actuators.
- control valve 171 corresponds to the traveling hydraulic motor 1L
- control valve 172 corresponds to the traveling hydraulic motor 1R
- control valve 173 corresponds to the swing hydraulic motor 2A
- control valve 174 corresponds to the bucket cylinder 9
- control valve 175 corresponds to the boom cylinder 7
- the control valve 176 corresponds to the arm cylinder 8.
- control valve 175 includes, for example, control valves 175L and 175R as described later
- control valve 176 includes, for example, control valves 176L and 176R as described later. Details of the control valves 171 to 176 will be described later.
- the operation system of the excavator 100 includes the pilot pump 15 and the operation device 26. Further, the operation system of the excavator 100 includes a shuttle valve 32 as a configuration related to a machine control function by the controller 30, which will be described later.
- the pilot pump 15 is mounted on the rear part of the upper swing body 3, for example, and supplies the pilot pressure to the operating device 26 via the pilot line.
- the pilot pump 15 is, for example, a fixed-capacity hydraulic pump, and is driven by the engine 11 as described above.
- the operation device 26 is provided near the driver's seat of the cabin 10, and is an operation input means for the operator to operate various operation elements (lower traveling body 1, upper turning body 3, boom 4, arm 5, bucket 6, etc.). Is. In other words, the operating device 26 operates the hydraulic actuators (that is, traveling hydraulic motors 1L, 1R, swivel hydraulic motor 2A, boom cylinder 7, arm cylinder 8, bucket cylinder 9, etc.) in which the operator drives each operating element. It is an operation input means for performing.
- the operating device 26 is connected to the control valve 17 directly through the pilot line on the secondary side thereof or indirectly via the shuttle valve 32 described later provided on the pilot line on the secondary side.
- the operating device 26 includes, for example, a lever device for operating the arm 5 (arm cylinder 8). Further, the operating device 26 includes, for example, lever devices 26A to 26C for operating each of the boom 4 (boom cylinder 7), the bucket 6 (bucket cylinder 9), and the upper swing body 3 (swing hydraulic motor 2A) (FIG. 4A). See ⁇ 4C). Further, the operating device 26 includes, for example, a lever device and a pedal device for operating each of a pair of left and right crawlers (running hydraulic motors 1L, 1R) of the lower traveling body 1.
- the shuttle valve 32 has two inlet ports and one outlet port, and outputs hydraulic oil having the higher pilot pressure of the pilot pressures input to the two inlet ports to the outlet port.
- one of the two inlet ports is connected to the operating device 26 and the other is connected to the proportional valve 31.
- the outlet port of the shuttle valve 32 is connected through the pilot line to the pilot port of the corresponding control valve in the control valve 17 (see FIGS. 4A-4C for details). Therefore, the shuttle valve 32 can make the higher of the pilot pressure generated by the operating device 26 and the pilot pressure generated by the proportional valve 31 act on the pilot port of the corresponding control valve.
- the controller 30, which will be described later, outputs a pilot pressure higher than the pilot pressure on the secondary side output from the operating device 26 from the proportional valve 31, so that the corresponding control is performed regardless of the operation of the operating device 26 by the operator. It is possible to control the valve and control the operation of various operating elements.
- the shuttle valve 32 includes, for example, shuttle valves 32AL, 32AR, 32BL, 32BR, 32CL, 32CR as described later.
- the operating device 26 (left operating lever, right operating lever, left traveling lever, and right traveling lever) may be an electric type that outputs an electric signal instead of a hydraulic pilot type that outputs a pilot pressure.
- the electric signal from the operating device 26 is input to the controller 30, and the controller 30 controls each of the control valves 171 to 176 in the control valve 17 according to the input electric signal.
- the operation of various hydraulic actuators is realized according to the operation content with respect to 26.
- the control valves 171 to 176 in the control valve 17 may be electromagnetic solenoid type spool valves driven by a command from the controller 30.
- an electromagnetic valve that operates in response to an electric signal from the controller 30 may be arranged between the pilot pump 15 and the pilot ports of the control valves 171 to 176.
- the controller 30 controls the solenoid valve by an electric signal corresponding to the operation amount (for example, the lever operation amount) to increase or decrease the pilot pressure.
- the operation amount for example, the lever operation amount
- the control system of the excavator 100 includes a controller 30, a discharge pressure sensor 28, an operating pressure sensor 29, a proportional valve 31, a display device 40, an input device 42, an audio output device 43, and storage.
- the device 47, a boom angle sensor S1, an arm angle sensor S2, a bucket angle sensor S3, a machine body tilt sensor S4, a turning state sensor S5, an image pickup device S6, a positioning device P0, and a communication device T1 are included.
- the controller 30 (an example of a control device) is provided in the cabin 10, for example, and controls the drive of the excavator 100.
- the function of the controller 30 may be realized by any hardware, software, or a combination thereof.
- the controller 30 is centered on a microcomputer including a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), a non-volatile auxiliary storage device, and various input / output interfaces. It is composed.
- the controller 30 realizes various functions by executing various programs stored in a ROM or a non-volatile auxiliary storage device on the CPU, for example.
- the controller 30 sets a target rotation speed based on a work mode or the like preset by a predetermined operation of an operator or the like, and performs drive control for rotating the engine 11 at a constant speed.
- controller 30 outputs a control command to the regulator 13 as needed to change the discharge amount of the main pump 14.
- the controller 30 controls the machine guidance function for guiding the manual operation of the excavator 100 through the operating device 26 by the operator, for example. Further, the controller 30 controls, for example, a machine control function that automatically supports the manual operation of the excavator 100 through the operating device 26 by the operator. That is, the controller 30 includes the machine guidance unit 50 as a functional unit related to the machine guidance function and the machine control function. Further, the controller 30 includes a sediment load processing unit 60, which will be described later.
- controller 30 may be realized by another controller (control device). That is, the function of the controller 30 may be realized in a manner distributed by a plurality of controllers.
- the machine guidance function and the machine control function may be realized by a dedicated controller (control device).
- the discharge pressure sensor 28 detects the discharge pressure of the main pump 14.
- the detection signal corresponding to the discharge pressure detected by the discharge pressure sensor 28 is taken into the controller 30.
- the discharge pressure sensor 28 includes, for example, discharge pressure sensors 28L and 28R as described later.
- the operating pressure sensor 29 determines the pilot pressure on the secondary side of the operating device 26, that is, the operating state (for example, the operating direction, the operating amount, etc.) related to each operating element (that is, the hydraulic actuator) in the operating device 26.
- the pilot pressure corresponding to the operation content) is detected.
- the pilot pressure detection signal corresponding to the operating state of the lower traveling body 1, the upper swinging body 3, the boom 4, the arm 5, the bucket 6 and the like in the operating device 26 by the operating pressure sensor 29 is taken into the controller 30.
- the operating pressure sensor 29 includes, for example, operating pressure sensors 29A to 29C as described later.
- the operating pressure sensor 29 it is possible to detect the operating amount (tilting amount) and tilting direction of other sensors capable of detecting the operating state of each operating element in the operating device 26, for example, the lever devices 26A to 26C.
- An encoder, a potentiometer, or the like may be provided.
- the proportional valve 31 is provided in the pilot line connecting the pilot pump 15 and the shuttle valve 32, and is configured so that the flow path area (cross-sectional area through which hydraulic oil can flow) can be changed.
- the proportional valve 31 operates in response to a control command input from the controller 30.
- the controller 30 can supply the hydraulic oil discharged from the pilot pump 15 to the proportional valve 31 and the proportional valve 31 even when the operating devices 26 (specifically, the lever devices 26A to 26C) are not operated by the operator. It can be supplied to the pilot port of the corresponding control valve in the control valve 17 via the shuttle valve 32.
- the proportional valve 31 includes, for example, proportional valves 31AL, 31AR, 31BL, 31BR, 31CL, 31CR as described later.
- the display device 40 is provided in a place in the cabin 10 that is easily visible to the seated operator, and displays various information images under the control of the controller 30.
- the display device 40 may be connected to the controller 30 via an in-vehicle communication network such as CAN (Controller Area Network), or may be connected to the controller 30 via a one-to-one dedicated line.
- CAN Controller Area Network
- the input device 42 is provided within reach of the seated operator in the cabin 10, receives various operation inputs by the operator, and outputs a signal corresponding to the operation input to the controller 30.
- the input device 42 includes a touch panel mounted on a display of a display device that displays various information images, a knob switch provided at the tip of a lever portion of lever devices 26A to 26C, a button switch installed around the display device 40, and a lever. , Toggle, rotary dial, etc.
- the signal corresponding to the operation content for the input device 42 is taken into the controller 30.
- the voice output device 43 is provided in the cabin 10, for example, is connected to the controller 30, and outputs voice under the control of the controller 30.
- the audio output device 43 is, for example, a speaker, a buzzer, or the like.
- the voice output device 43 outputs various information by voice in response to a voice output command from the controller 30.
- the storage device 47 is provided in the cabin 10, for example, and stores various information under the control of the controller 30.
- the storage device 47 is a non-volatile storage medium such as a semiconductor memory.
- the storage device 47 may store information output by various devices during the operation of the excavator 100, or may store information acquired through the various devices before the operation of the excavator 100 is started.
- the storage device 47 may store data regarding the target construction surface acquired via the communication device T1 or the like or set through the input device 42 or the like, for example.
- the target construction surface may be set (saved) by the operator of the excavator 100, or may be set by the construction manager or the like.
- the boom angle sensor S1 is attached to the boom 4, and the depression / elevation angle of the boom 4 with respect to the upper swing body 3 (hereinafter, “boom angle”), for example, in a side view, the boom 4 has a swing plane of the upper swing body 3. Detects the angle formed by the straight line connecting the fulcrums at both ends.
- the boom angle sensor S1 may include, for example, a rotary encoder, an acceleration sensor, a 6-axis sensor, an IMU (Inertial Measurement Unit), and the like.
- the boom angle sensor S1 may include a potentiometer using a variable resistor, a cylinder sensor for detecting the stroke amount of the hydraulic cylinder (boom cylinder 7) corresponding to the boom angle, and the like.
- the detection signal corresponding to the boom angle by the boom angle sensor S1 is taken into the controller 30.
- the arm angle sensor S2 is attached to the arm 5, and the rotation angle of the arm 5 with respect to the boom 4 (hereinafter, “arm angle”), for example, the arm 5 with respect to a straight line connecting the fulcrums at both ends of the boom 4 in a side view. Detects the angle formed by the straight line connecting the fulcrums at both ends of. The detection signal corresponding to the arm angle by the arm angle sensor S2 is taken into the controller 30.
- the bucket angle sensor S3 is attached to the bucket 6, and the rotation angle of the bucket 6 with respect to the arm 5 (hereinafter, “bucket angle”), for example, the bucket 6 with respect to a straight line connecting the fulcrums at both ends of the arm 5 in a side view. Detects the angle formed by the straight line connecting the fulcrum and the tip (blade edge). The detection signal corresponding to the bucket angle by the bucket angle sensor S3 is taken into the controller 30.
- the airframe tilt sensor S4 detects the tilted state of the airframe (upper swivel body 3 or lower traveling body 1) with respect to the horizontal plane.
- the machine body tilt sensor S4 is attached to, for example, the upper swivel body 3 and has a tilt angle around two axes in the front-rear direction and the left-right direction of the shovel 100 (that is, the upper swivel body 3) (hereinafter, “front-rear tilt angle” and “left-right” Tilt angle ”) is detected.
- the airframe tilt sensor S4 may include, for example, a rotary encoder, an acceleration sensor, a 6-axis sensor, an IMU, and the like.
- the detection signal corresponding to the tilt angle (front-back tilt angle and left-right tilt angle) by the aircraft tilt sensor S4 is taken into the controller 30.
- the swivel state sensor S5 outputs detection information regarding the swivel state of the upper swivel body 3.
- the turning state sensor S5 detects, for example, the turning angular velocity and the turning angle of the upper turning body 3.
- the swivel state sensor S5 may include, for example, a gyro sensor, a resolver, a rotary encoder, and the like.
- the detection signal corresponding to the turning angle and the turning angular velocity of the upper turning body 3 by the turning state sensor S5 is taken into the controller 30.
- the imaging device S6 as a space recognition device images the periphery of the excavator 100.
- the image pickup apparatus S6 includes a camera S6F that images the front of the excavator 100, a camera S6L that images the left side of the excavator 100, a camera S6R that images the right side of the excavator 100, and a camera S6B that images the rear of the excavator 100. ..
- the camera S6F is mounted on the ceiling of the cabin 10, that is, inside the cabin 10, for example. Further, the camera S6F may be attached to the outside of the cabin 10, such as the roof of the cabin 10 and the side surface of the boom 4.
- the camera S6L is attached to the left end of the upper surface of the upper swivel body 3
- the camera S6R is attached to the right end of the upper surface of the upper swivel body 3
- the camera S6B is attached to the rear end of the upper surface of the upper swivel body 3.
- the image pickup apparatus S6 (cameras S6F, S6B, S6L, S6R) is, for example, a monocular wide-angle camera having a very wide angle of view. Further, the image pickup device S6 may be a stereo camera, a distance image camera, or the like. The image captured by the image pickup device S6 is captured by the controller 30 via the display device 40.
- the image pickup device S6 as a space recognition device may function as an object detection device.
- the image pickup apparatus S6 may detect an object existing around the excavator 100.
- the object to be detected may include, for example, a person, an animal, a vehicle, a construction machine, a building, a hole, or the like. Further, the image pickup device S6 may calculate the distance from the image pickup device S6 or the excavator 100 to the recognized object.
- the image pickup device S6 as an object detection device may include, for example, a stereo camera, a distance image sensor, and the like.
- the space recognition device is, for example, a monocular camera having an image sensor such as a CCD or CMOS, and outputs the captured image to the display device 40.
- the space recognition device may be configured to calculate the distance from the space recognition device or the excavator 100 to the recognized object.
- other object detection devices such as an ultrasonic sensor, a millimeter wave radar, a LIDAR, and an infrared sensor may be provided as the space recognition device.
- a millimeter-wave radar, an ultrasonic sensor, a laser radar, or the like is used as the space recognition device 80, a large number of signals (laser light, etc.) are transmitted to an object, and the reflected signal is received from the reflected signal. The distance and direction of the object may be detected.
- the image pickup apparatus S6 may be directly connected to the controller 30 so as to be able to communicate with the controller 30.
- a boom rod pressure sensor S7R and a boom bottom pressure sensor S7B are attached to the boom cylinder 7.
- An arm rod pressure sensor S8R and an arm bottom pressure sensor S8B are attached to the arm cylinder 8.
- a bucket rod pressure sensor S9R and a bucket bottom pressure sensor S9B are attached to the bucket cylinder 9.
- the boom rod pressure sensor S7R, boom bottom pressure sensor S7B, arm rod pressure sensor S8R, arm bottom pressure sensor S8B, bucket rod pressure sensor S9R and bucket bottom pressure sensor S9B are also collectively referred to as "cylinder pressure sensor”.
- the boom rod pressure sensor S7R detects the pressure in the rod side oil chamber of the boom cylinder 7 (hereinafter referred to as “boom rod pressure”), and the boom bottom pressure sensor S7B detects the pressure in the bottom side oil chamber of the boom cylinder 7 (hereinafter referred to as “boom rod pressure”). , “Boom bottom pressure”) is detected.
- the arm rod pressure sensor S8R detects the pressure in the rod side oil chamber of the arm cylinder 8 (hereinafter referred to as “arm rod pressure”), and the arm bottom pressure sensor S8B detects the pressure in the bottom side oil chamber of the arm cylinder 8 (hereinafter referred to as “arm rod pressure”). , "Arm bottom pressure”) is detected.
- the bucket rod pressure sensor S9R detects the pressure in the rod side oil chamber of the bucket cylinder 9 (hereinafter referred to as “bucket rod pressure”), and the bucket bottom pressure sensor S9B detects the pressure in the bottom side oil chamber of the bucket cylinder 9 (hereinafter referred to as “bucket rod pressure”). , “Bucket bottom pressure”) is detected.
- the positioning device P0 measures the position and orientation of the upper swivel body 3.
- the positioning device P0 is, for example, a GNSS (Global Navigation Satellite System) compass, detects the position and orientation of the upper swivel body 3, and captures the detection signal corresponding to the position and orientation of the upper swivel body 3 into the controller 30. .. Further, among the functions of the positioning device P0, the function of detecting the orientation of the upper swivel body 3 may be replaced by the directional sensor attached to the upper swivel body 3.
- GNSS Global Navigation Satellite System
- the communication device T1 communicates with an external device through a predetermined network including a mobile communication network having a base station as a terminal, a satellite communication network, an Internet network, and the like.
- the communication device T1 is, for example, a mobile communication module corresponding to mobile communication standards such as LTE (LongTermEvolution), 4G (4thGeneration), and 5G (5thGeneration), and satellite communication for connecting to a satellite communication network. Modules, etc.
- the machine guidance unit 50 executes control of the excavator 100 regarding the machine guidance function, for example.
- the machine guidance unit 50 conveys work information such as the distance between the target construction surface and the tip of the attachment, specifically, the work part of the end attachment, to the operator through the display device 40, the voice output device 43, or the like. ..
- the data regarding the target construction surface is stored in advance in the storage device 47, for example, as described above.
- the data regarding the target construction surface is represented by, for example, a reference coordinate system.
- the reference coordinate system is, for example, the world geodetic system.
- the world geodetic system has a three-dimensional orthogonality with the origin at the center of gravity of the earth, the X-axis in the direction of the intersection of the Greenwich meridian and the equator, the Y-axis in the direction of 90 degrees east longitude, and the Z-axis in the direction of the North Pole. It is an XYZ coordinate system.
- the operator may set an arbitrary point on the construction site as a reference point and set a target construction surface through the input device 42 according to the relative positional relationship with the reference point.
- the working part of the bucket 6 is, for example, the toe of the bucket 6, the back surface of the bucket 6, and the like.
- the tip portion of the breaker corresponds to the work part.
- the machine guidance unit 50 notifies the operator of work information through the display device 40, the voice output device 43, and the like, and guides the operator to operate the excavator 100 through the operation device 26.
- the machine guidance unit 50 executes control of the excavator 100 regarding the machine control function, for example.
- the machine guidance unit 50 is, for example, at least one of the boom 4, the arm 5, and the bucket 6 so that the target construction surface and the tip position of the bucket 6 are aligned when the operator is manually performing the excavation operation. One may be operated automatically.
- the machine guidance unit 50 receives information from the boom angle sensor S1, the arm angle sensor S2, the bucket angle sensor S3, the body tilt sensor S4, the turning state sensor S5, the image pickup device S6, the positioning device P0, the communication device T1, the input device 42, and the like. get. Then, the machine guidance unit 50 calculates the distance between the bucket 6 and the target construction surface based on, for example, the acquired information, and the bucket is based on the sound from the sound output device 43 and the image displayed on the display device 40. Notify the operator of the degree of distance between 6 and the target construction surface, and make sure that the tip of the attachment (specifically, the work part such as the tip or back of the bucket 6) matches the target construction surface. Automatically control the operation of attachments.
- the machine guidance unit 50 has a position calculation unit 51, a distance calculation unit 52, an information transmission unit 53, an automatic control unit 54, and a turning angle calculation unit 55 as detailed functional configurations related to the machine guidance function and the machine control function. And the relative angle calculation unit 56.
- the position calculation unit 51 calculates the position of a predetermined positioning target. For example, the position calculation unit 51 calculates the coordinate points in the reference coordinate system of the tip portion of the attachment, specifically, the work portion such as the toe or the back surface of the bucket 6. Specifically, the position calculation unit 51 calculates the coordinate points of the working portion of the bucket 6 from the elevation angles (boom angle, arm angle, and bucket angle) of the boom 4, the arm 5, and the bucket 6.
- the elevation angles boost angle, arm angle, and bucket angle
- the distance calculation unit 52 calculates the distance between two positioning targets. For example, the distance calculation unit 52 calculates the distance between the tip of the attachment, specifically, the work site such as the tip of the bucket 6 or the back surface, and the target construction surface. Further, the distance calculation unit 52 may calculate an angle (relative angle) between the back surface of the bucket 6 as a work portion and the target construction surface.
- the information transmission unit 53 transmits (notifies) various information to the operator of the excavator 100 through a predetermined notification means such as the display device 40 and the voice output device 43.
- the information transmission unit 53 notifies the operator of the excavator 100 of the magnitude (degree) of various distances and the like calculated by the distance calculation unit 52. For example, using at least one of the visual information from the display device 40 and the auditory information from the audio output device 43, the distance (magnitude) between the tip end portion of the bucket 6 and the target construction surface is transmitted to the operator.
- the information transmission unit 53 uses at least one of the visual information by the display device 40 and the auditory information by the audio output device 43, and the relative angle (large) between the back surface of the bucket 6 as a work part and the target construction surface. You may tell the operator.
- the information transmission unit 53 informs the operator of the magnitude of the distance (for example, the vertical distance) between the work part of the bucket 6 and the target construction surface by using the intermittent sound generated by the voice output device 43.
- the information transmission unit 53 may shorten the interval of the intermittent sound as the vertical distance becomes smaller, and lengthen the sensation of the intermittent sound as the vertical distance increases.
- the information transmission unit 53 may use continuous sound, and may express the difference in the magnitude of the vertical distance while changing the pitch, strength, etc. of the sound.
- the information transmission unit 53 may issue an alarm through the voice output device 43 when the tip end portion of the bucket 6 is at a position lower than the target construction surface, that is, when the target construction surface is exceeded.
- the alarm is, for example, a continuous sound that is significantly louder than the intermittent sound.
- the information transmission unit 53 is the tip portion of the attachment, specifically, the size of the distance between the work part of the bucket 6 and the target construction surface, and the relative angle between the back surface of the bucket 6 and the target construction surface.
- the size and the like may be displayed on the display device 40 as work information.
- the display device 40 displays, for example, the work information received from the information transmission unit 53 together with the image data received from the image pickup device S6.
- the information transmission unit 53 may transmit the magnitude of the vertical distance to the operator by using, for example, an image of an analog meter or an image of a bar graph indicator.
- the automatic control unit 54 automatically supports the manual operation of the excavator 100 through the operating device 26 by the operator by automatically operating the actuator.
- the automatic control unit 54 is a control valve (specifically, specifically, a swivel hydraulic motor 2A, a boom cylinder 7, and a bucket cylinder 9) corresponding to a plurality of hydraulic actuators (specifically, a swing hydraulic motor 2A, a boom cylinder 7, and a bucket cylinder 9) as described later.
- the pilot pressure acting on the control valve 173, the control valves 175L, 175R, and the control valve 174) can be adjusted individually and automatically. As a result, the automatic control unit 54 can automatically operate each of the hydraulic actuators.
- the control related to the machine control function by the automatic control unit 54 may be executed, for example, when a predetermined switch included in the input device 42 is pressed.
- the predetermined switch is, for example, a machine control switch (hereinafter, “MC (Machine Control) switch”), and is a grip portion by an operator of an operating device 26 (for example, a lever device corresponding to the operation of the arm 5) as a knob switch. It may be arranged at the tip of.
- MC Machine Control
- the automatic control unit 54 automatically switches at least one of the boom cylinder 7 and the bucket cylinder 9 in accordance with the operation of the arm cylinder 8 in order to support the excavation work and the shaping work. Expand and contract.
- the automatic control unit 54 when the operator manually closes the arm 5 (hereinafter, “arm closing operation”), the target construction surface and the work part such as the toe or the back surface of the bucket 6 At least one of the boom cylinder 7 and the bucket cylinder 9 is automatically expanded and contracted so as to match the position of. In this case, for example, the operator can close the arm 5 while aligning the toes of the bucket 6 with the target construction surface by simply operating the lever device corresponding to the operation of the arm 5.
- the automatic control unit 54 may automatically rotate the swing hydraulic motor 2A (an example of an actuator) in order to make the upper swing body 3 face the target construction surface when the MC switch or the like is pressed. ..
- the control by the controller 30 (automatic control unit 54) to make the upper swing body 3 face the target construction surface is referred to as "face-to-face control".
- the operator or the like can target the upper swivel body 3 by simply pressing a predetermined switch, or by operating the lever device 26C described later corresponding to the swivel operation while the switch is pressed. It can be made to face the face. Further, the operator can make the upper swivel body 3 face the target construction surface and start the machine control function related to the excavation work of the target construction surface described above by simply pressing the MC switch.
- the tip of the attachment (for example, the tip of the toe or the back surface of the bucket 6 as a work part) is set to the target construction surface (for example, according to the operation of the attachment). It is in a state where it can be moved along the inclination direction of the ascending slope BS).
- the operating surface of the attachment (attachment operating surface) vertical to the swivel plane of the excavator 100 corresponds to the target construction surface. It is a state including the normal of the surface (in other words, a state along the normal).
- the automatic control unit 54 can make the upper swivel body 3 face each other by automatically rotating the swivel hydraulic motor 2A. As a result, the excavator 100 can appropriately construct the target construction surface.
- the automatic control unit 54 determines, for example, the leftmost vertical distance between the leftmost coordinate point of the toe of the bucket 6 and the target construction surface (hereinafter, simply “leftmost vertical distance") and the toe of the bucket 6.
- the rightmost vertical distance between the rightmost coordinate point and the target construction surface hereinafter, simply “rightmost vertical distance” becomes equal, it is judged that the excavator faces the target construction surface.
- the automatic control unit 54 is not when the leftmost vertical distance and the rightmost vertical distance are equal (that is, when the difference between the leftmost vertical distance and the rightmost vertical distance becomes zero), but the difference is equal to or less than a predetermined value. When becomes, it may be determined that the excavator 100 faces the target construction surface.
- the automatic control unit 54 may operate the swing hydraulic motor 2A based on, for example, the difference between the leftmost vertical distance and the rightmost vertical distance in the face-to-face control. Specifically, when the lever device 26C corresponding to the turning operation is operated while a predetermined switch such as the MC switch is pressed, the lever device 26C moves in the direction in which the upper turning body 3 faces the target construction surface. Determine if it has been manipulated. For example, when the lever device 26C is operated in the direction in which the vertical distance between the toe of the bucket 6 and the target construction surface (uphill slope BS) increases, the automatic control unit 54 does not execute the facing control.
- a predetermined switch such as the MC switch
- the automatic control unit 54 executes the facing control.
- the automatic control unit 54 can operate the swing hydraulic motor 2A so that the difference between the leftmost vertical distance and the rightmost vertical distance becomes small.
- the automatic control unit 54 stops the swing hydraulic motor 2A.
- the automatic control unit 54 sets a turning angle at which the difference is equal to or less than a predetermined value or becomes zero as a target angle, and is based on the target angle and the current turning angle (specifically, the detection signal of the turning state sensor S5).
- the operation of the swing hydraulic motor 2A may be controlled so that the angle difference from the detected value) becomes zero.
- the turning angle is, for example, the angle of the front-rear axis of the upper turning body 3 with respect to the reference direction.
- the automatic control unit 54 performs face-to-face control with the swivel motor (an example of an actuator) as a control target. ..
- the turning angle calculation unit 55 calculates the turning angle of the upper turning body 3. As a result, the controller 30 can specify the current orientation of the upper swing body 3.
- the turning angle calculation unit 55 calculates, for example, the angle of the front-rear axis of the upper turning body 3 with respect to the reference direction as the turning angle based on the output signal of the GNSS compass included in the positioning device P0. Further, the turning angle calculation unit 55 may calculate the turning angle based on the detection signal of the turning state sensor S5. Further, when the reference point is set at the construction site, the turning angle calculation unit 55 may use the direction in which the reference point is viewed from the turning axis as the reference direction.
- the turning angle indicates the direction in which the attachment operating surface extends with respect to the reference direction.
- the attachment operating surface is, for example, a virtual plane that vertically traverses the attachment, and is arranged so as to be perpendicular to the turning plane.
- the swivel plane is, for example, a virtual plane including the bottom surface of the swivel frame perpendicular to the swivel axis.
- the relative angle calculation unit 56 calculates the turning angle (relative angle) required for the upper swivel body 3 to face the target construction surface.
- the relative angle is formed between, for example, the direction of the front-rear axis of the upper swivel body 3 when the upper swivel body 3 faces the target construction surface and the current direction of the front-rear axis of the upper swivel body 3. Relative angle.
- the relative angle calculation unit 56 calculates the relative angle based on, for example, the data on the target construction surface stored in the storage device 47 and the turning angle calculated by the turning angle calculation unit 55.
- the automatic control unit 54 When the lever device 26C corresponding to the turning operation is operated while a predetermined switch such as the MC switch is pressed, the automatic control unit 54 is turned in the direction in which the upper turning body 3 faces the target construction surface. Judge whether or not. When the automatic control unit 54 determines that the upper swivel body 3 has been swiveled in the direction facing the target construction surface, the automatic control unit 54 sets the relative angle calculated by the relative angle calculation unit 56 as the target angle. Then, when the change in the turning angle after the lever device 26C is operated reaches the target angle, the automatic control unit 54 determines that the upper turning body 3 faces the target construction surface, and determines that the turning hydraulic motor 2A You may stop the movement.
- the automatic control unit 54 can make the upper swivel body 3 face the target construction surface on the premise of the configuration shown in FIG.
- face-to-face control an example of face-to-face control with respect to the target construction surface is shown, but the present invention is not limited to this.
- a target excavation track corresponding to the target volume is generated, and a turning operation is performed so that the attachment faces the target excavation track.
- the target excavation track is changed each time the scooping operation is performed. Therefore, after the soil is discharged to the dump truck DT, it is directly controlled against the newly changed target excavation track.
- the swing hydraulic motor 2A has a first port 2A1 and a second port 2A2.
- the hydraulic sensor 21 detects the pressure of the hydraulic oil in the first port 2A1 of the swivel hydraulic motor 2A.
- the hydraulic sensor 22 detects the pressure of the hydraulic oil in the second port 2A2 of the swivel hydraulic motor 2A.
- the detection signal corresponding to the discharge pressure detected by the oil pressure sensors 21 and 22 is taken into the controller 30.
- first port 2A1 is connected to the hydraulic oil tank via the relief valve 23.
- the relief valve 23 opens when the pressure on the first port 2A1 side reaches a predetermined relief pressure, and discharges the hydraulic oil on the first port 2A1 side to the hydraulic oil tank.
- the second port 2A2 is connected to the hydraulic oil tank via the relief valve 24.
- the relief valve 24 opens when the pressure on the second port 2A2 side reaches a predetermined relief pressure, and discharges the hydraulic oil on the second port 2A2 side to the hydraulic oil tank.
- FIG. 3 is a diagram schematically showing an example of the configuration of the hydraulic system of the excavator 100 according to the present embodiment.
- the flood control system realized by the hydraulic circuit circulates hydraulic oil from the main pumps 14L and 14R driven by the engine 11 to the hydraulic oil tank via the center bypass oil passages C1L and C1R and the parallel oil passages C2L and C2R, respectively. Let me.
- the center bypass oil passage C1L starts from the main pump 14L, passes through the control valves 171, 173, 175L, and 176L arranged in the control valve 17 in order, and reaches the hydraulic oil tank.
- the center bypass oil passage C1R starts from the main pump 14R, passes through the control valves 172, 174, 175R, and 176R arranged in the control valve 17 in order, and reaches the hydraulic oil tank.
- the control valve 171 is a spool valve that supplies the hydraulic oil discharged from the main pump 14L to the traveling hydraulic motor 1L and discharges the hydraulic oil discharged from the traveling hydraulic motor 1L to the hydraulic oil tank.
- the control valve 172 is a spool valve that supplies the hydraulic oil discharged from the main pump 14R to the traveling hydraulic motor 1R and discharges the hydraulic oil discharged from the traveling hydraulic motor 1R to the hydraulic oil tank.
- the control valve 173 is a spool valve that supplies the hydraulic oil discharged from the main pump 14L to the swing hydraulic motor 2A and discharges the hydraulic oil discharged by the swing hydraulic motor 2A to the hydraulic oil tank.
- the control valve 174 is a spool valve that supplies the hydraulic oil discharged from the main pump 14R to the bucket cylinder 9 and discharges the hydraulic oil in the bucket cylinder 9 to the hydraulic oil tank.
- the control valves 175L and 175R are spool valves that supply the hydraulic oil discharged by the main pumps 14L and 14R to the boom cylinder 7 and discharge the hydraulic oil in the boom cylinder 7 to the hydraulic oil tank, respectively.
- the control valves 176L and 176R supply the hydraulic oil discharged by the main pumps 14L and 14R to the arm cylinder 8 and discharge the hydraulic oil in the arm cylinder 8 to the hydraulic oil tank.
- the control valves 171, 172, 173, 174, 175L, 175R, 176L, and 176R adjust the flow rate of the hydraulic oil supplied to and discharged from the hydraulic actuator according to the pilot pressure acting on the pilot port, and the flow direction, respectively. To switch.
- the parallel oil passage C2L supplies the hydraulic oil of the main pump 14L to the control valves 171, 173, 175L, and 176L in parallel with the center bypass oil passage C1L.
- the parallel oil passage C2L branches from the center bypass oil passage C1L on the upstream side of the control valve 171 and supplies the hydraulic oil of the main pump 14L in parallel with the control valves 171, 173, 175L, and 176R, respectively. It is configured to be possible.
- the parallel oil passage C2L supplies the hydraulic oil to the control valve further downstream when the flow of the hydraulic oil through the center bypass oil passage C1L is restricted or blocked by any of the control valves 171, 173, and 175L. it can.
- the parallel oil passage C2R supplies the hydraulic oil of the main pump 14R to the control valves 172, 174, 175R and 176R in parallel with the center bypass oil passage C1R.
- the parallel oil passage C2R branches from the center bypass oil passage C1R on the upstream side of the control valve 172, and supplies hydraulic oil for the main pump 14R in parallel with the control valves 172, 174, 175R, and 176R, respectively. It is configured to be possible.
- the parallel oil passage C2R can supply the hydraulic oil to the control valve further downstream when the flow of the hydraulic oil through the center bypass oil passage C1R is restricted or blocked by any of the control valves 172, 174, and 175R.
- the regulators 13L and 13R adjust the discharge amounts of the main pumps 14L and 14R by adjusting the tilt angle of the swash plate of the main pumps 14L and 14R, respectively, under the control of the controller 30.
- the discharge pressure sensor 28L detects the discharge pressure of the main pump 14L, and the detection signal corresponding to the detected discharge pressure is taken into the controller 30. The same applies to the discharge pressure sensor 28R. As a result, the controller 30 can control the regulators 13L and 13R according to the discharge pressures of the main pumps 14L and 14R.
- Negative control throttles (hereinafter, “negative control throttles”) 18L and 18R are provided between the most downstream control valves 176L and 176R and the hydraulic oil tank in the center bypass oil passages C1L and C1R. As a result, the flow of hydraulic oil discharged by the main pumps 14L and 14R is restricted by the negative control throttles 18L and 18R. Then, the negative control diaphragms 18L and 18R generate a control pressure (hereinafter, “negative control pressure”) for controlling the regulators 13L and 13R.
- negative control pressure hereinafter, “negative control pressure”
- the negative control pressure sensors 19L and 19R detect the negative control pressure, and the detection signal corresponding to the detected negative control pressure is taken into the controller 30.
- the controller 30 may control the regulators 13L and 13R according to the discharge pressures of the main pumps 14L and 14R detected by the discharge pressure sensors 28L and 28R, and adjust the discharge amount of the main pumps 14L and 14R. For example, the controller 30 may reduce the discharge amount by controlling the regulator 13L in response to the increase in the discharge pressure of the main pump 14L and adjusting the swash plate tilt angle of the main pump 14L. The same applies to the regulator 13R. As a result, the controller 30 controls the total horsepower of the main pumps 14L and 14R so that the absorbed horsepower of the main pumps 14L and 14R, which is represented by the product of the discharge pressure and the discharge amount, does not exceed the output horsepower of the engine 11. be able to.
- the controller 30 may adjust the discharge amount of the main pumps 14L and 14R by controlling the regulators 13L and 13R according to the negative control pressure detected by the negative control pressure sensors 19L and 19R. For example, the controller 30 reduces the discharge amount of the main pumps 14L and 14R as the negative control pressure increases, and increases the discharge amount of the main pumps 14L and 14R as the negative control pressure decreases.
- the hydraulic oil discharged from the main pumps 14L and 14R passes through the center bypass oil passages C1L and C1R. Through it, it reaches the negative control aperture 18L, 18R. Then, the flow of the hydraulic oil discharged from the main pumps 14L and 14R increases the negative control pressure generated upstream of the negative control throttles 18L and 18R. As a result, the controller 30 reduces the discharge amount of the main pumps 14L and 14R to the allowable minimum discharge amount, and suppresses the pressure loss (pumping loss) when the discharged hydraulic oil passes through the center bypass oil passages C1L and C1R. ..
- the hydraulic oil discharged from the main pumps 14L and 14R is sent to the operation target hydraulic actuator via the control valve corresponding to the operation target hydraulic actuator. It flows in. Then, the flow of hydraulic oil discharged from the main pumps 14L and 14R reduces or eliminates the amount reaching the negative control diaphragms 18L and 18R, and lowers the negative control pressure generated upstream of the negative control throttles 18L and 18R. As a result, the controller 30 can increase the discharge amount of the main pumps 14L and 14R, circulate sufficient hydraulic oil to the operation target hydraulic actuator, and reliably drive the operation target hydraulic actuator.
- FIG. 4A to 4C are diagrams schematically showing an example of a component related to an operation system in the hydraulic system of the excavator 100 according to the present embodiment.
- FIG. 4A is a diagram showing an example of a pilot circuit in which a pilot pressure is applied to the control valves 175L and 175R that hydraulically control the boom cylinder 7.
- FIG. 4B is a diagram showing an example of a pilot circuit in which a pilot pressure is applied to a control valve 174 that hydraulically controls the bucket cylinder 9.
- FIG. 4C is a diagram showing an example of a pilot circuit in which a pilot pressure is applied to a control valve 173 that hydraulically controls the swing hydraulic motor 2A.
- the lever device 26A is used by an operator or the like to operate the boom cylinder 7 corresponding to the boom 4.
- the lever device 26A uses the hydraulic oil discharged from the pilot pump 15 to output the pilot pressure according to the operation content to the secondary side.
- the two inlet ports are the pilot line on the secondary side of the lever device 26A corresponding to the operation in the raising direction of the boom 4 (hereinafter, "boom raising operation"), and the secondary of the proportional valve 31AL.
- the outlet port is connected to the pilot port on the right side of the control valve 175L and the pilot port on the left side of the control valve 175R.
- the two inlet ports are the pilot line on the secondary side of the lever device 26A corresponding to the operation in the lowering direction of the boom 4 (hereinafter, “boom lowering operation”), and the secondary of the proportional valve 31AR. It is connected to the pilot line on the side and the outlet port is connected to the pilot port on the right side of the control valve 175R.
- the lever device 26A applies a pilot pressure according to the operation content (for example, the operation direction and the operation amount) to the pilot ports of the control valves 175L and 175R via the shuttle valves 32AL and 32AR. Specifically, the lever device 26A outputs a pilot pressure according to the amount of operation to one inlet port of the shuttle valve 32AL when the boom is raised, and the right side of the control valve 175L via the shuttle valve 32AL. It acts on the pilot port of the above and the pilot port on the left side of the control valve 175R.
- the operation content for example, the operation direction and the operation amount
- the lever device 26A when the boom lowering operation is performed, the lever device 26A outputs the pilot pressure according to the operation amount to one inlet port of the shuttle valve 32AR, and the pilot port on the right side of the control valve 175R via the shuttle valve 32AR. To act on.
- the proportional valve 31AL operates according to the control current input from the controller 30. Specifically, the proportional valve 31AL uses the hydraulic oil discharged from the pilot pump 15 to output a pilot pressure corresponding to the control current input from the controller 30 to the other inlet port of the shuttle valve 32AL. Thereby, the proportional valve 31AL can adjust the pilot pressure acting on the pilot port on the right side of the control valve 175L and the pilot port on the left side of the control valve 175R via the shuttle valve 32AL.
- the proportional valve 31AR operates according to the control current input from the controller 30. Specifically, the proportional valve 31AR uses the hydraulic oil discharged from the pilot pump 15 to output a pilot pressure corresponding to the control current input from the controller 30 to the other inlet port of the shuttle valve 32AR. Thereby, the proportional valve 31AR can adjust the pilot pressure acting on the pilot port on the right side of the control valve 175R via the shuttle valve 32AR.
- the proportional valves 31AL and 31AR can adjust the pilot pressure output to the secondary side so that the control valves 175L and 175R can be stopped at an arbitrary valve position regardless of the operating state of the lever device 26A.
- the proportional valve 33AL functions as a machine control control valve in the same manner as the proportional valve 31AL.
- the proportional valve 33AL is arranged in a pipeline connecting the operating device 26 and the shuttle valve 32AL, and is configured so that the flow path area of the pipeline can be changed.
- the proportional valve 33AL operates in response to a control command output from the controller 30. Therefore, the controller 30 reduces the pressure of the hydraulic oil discharged by the operating device 26 regardless of the operation of the operating device 26 by the operator, and then passes the shuttle valve 32AL to the corresponding control valve in the control valve 17. Can be supplied to the pilot port of.
- the proportional valve 33AR functions as a control valve for machine control.
- the proportional valve 33AR is arranged in a pipeline connecting the operating device 26 and the shuttle valve 32AR, and is configured so that the flow path area of the pipeline can be changed.
- the proportional valve 33AR operates in response to a control command output from the controller 30. Therefore, the controller 30 reduces the pressure of the hydraulic oil discharged by the operating device 26 regardless of the operation of the operating device 26 by the operator, and then passes the corresponding control valve in the control valve 17 via the shuttle valve 32AR. Can be supplied to the pilot port of.
- the operating pressure sensor 29A detects the operation content of the lever device 26A by the operator in the form of pressure (operating pressure), and the detection signal corresponding to the detected pressure is taken into the controller 30. As a result, the controller 30 can grasp the operation content for the lever device 26A.
- the controller 30 controls the hydraulic oil discharged from the pilot pump 15 to the pilot port on the right side of the control valve 175L via the proportional valve 31AL and the shuttle valve 32AL, regardless of the boom raising operation on the lever device 26A by the operator. It can be supplied to the pilot port on the left side of the valve 175R. Further, the controller 30 supplies the hydraulic oil discharged from the pilot pump 15 to the pilot port on the right side of the control valve 175R via the proportional valve 31AR and the shuttle valve 32AR regardless of the boom lowering operation of the lever device 26A by the operator. Can be supplied to. That is, the controller 30 can automatically control the raising and lowering operation of the boom 4. Further, the controller 30 can forcibly stop the operation of the hydraulic actuator corresponding to the specific operating device 26 even when the operation for the specific operating device 26 is being performed.
- the proportional valve 33AL operates in response to a control command (current command) output by the controller 30. Then, the pilot pressure due to the hydraulic oil introduced from the pilot pump 15 to the right side pilot port of the control valve 175L and the left side pilot port of the control valve 175R is reduced via the lever device 26A, the proportional valve 33AL, and the shuttle valve 32AL.
- the proportional valve 33AR operates in response to a control command (current command) output by the controller 30. Then, the pilot pressure due to the hydraulic oil introduced from the pilot pump 15 to the right pilot port of the control valve 175R via the lever device 26A, the proportional valve 33AR, and the shuttle valve 32AR is reduced.
- the proportional valves 33AL and 33AR can adjust the pilot pressure so that the control valves 175L and 175R can be stopped at any valve position.
- the controller 30 can use the pilot port on the raising side of the control valve 175 (the left side pilot port of the control valve 175L and the control valve, if necessary, even when the boom raising operation is performed by the operator.
- the pilot pressure acting on the right pilot port of the 175R) can be reduced to forcibly stop the closing operation of the boom 4. The same applies to the case where the lowering operation of the boom 4 is forcibly stopped while the boom lowering operation is being performed by the operator.
- the controller 30 controls the proportional valve 31AR as necessary even when the boom raising operation is performed by the operator, and is on the opposite side of the pilot port on the raising side of the control valve 175.
- the controller 30 controls the proportional valve 31AR as necessary even when the boom raising operation is performed by the operator, and is on the opposite side of the pilot port on the raising side of the control valve 175.
- the lever device 26B is used by an operator or the like to operate the bucket cylinder 9 corresponding to the bucket 6.
- the lever device 26B uses the hydraulic oil discharged from the pilot pump 15 to output the pilot pressure according to the operation content to the secondary side.
- the two inlet ports are the pilot line on the secondary side of the lever device 26B corresponding to the operation in the closing direction of the bucket 6 (hereinafter, “bucket closing operation”), and the secondary of the proportional valve 31BL. It is connected to the pilot line on the side and the outlet port is connected to the pilot port on the left side of the control valve 174.
- the two inlet ports are the pilot line on the secondary side of the lever device 26B corresponding to the operation in the opening direction of the bucket 6 (hereinafter, “bucket opening operation”), and the secondary of the proportional valve 31BR. It is connected to the pilot line on the side and the outlet port is connected to the pilot port on the right side of the control valve 174.
- the lever device 26B applies a pilot pressure according to the operation content to the pilot port of the control valve 174 via the shuttle valves 32BL and 32BR. Specifically, when the bucket is closed, the lever device 26B outputs a pilot pressure according to the amount of operation to one inlet port of the shuttle valve 32BL, and via the shuttle valve 32BL, the left side of the control valve 174. Act on the pilot port of. Further, when the bucket opening operation is performed, the lever device 26B outputs the pilot pressure according to the operation amount to one inlet port of the shuttle valve 32BR, and via the shuttle valve 32BR, the pilot port on the right side of the control valve 174. To act on.
- the proportional valve 31BL operates according to the control current input from the controller 30. Specifically, the proportional valve 31BL uses the hydraulic oil discharged from the pilot pump 15 to output a pilot pressure corresponding to the control current input from the controller 30 to the other pilot port of the shuttle valve 32BL. Thereby, the proportional valve 31BL can adjust the pilot pressure acting on the pilot port on the left side of the control valve 174 via the shuttle valve 32BL.
- the proportional valve 31BR operates according to the control current output by the controller 30. Specifically, the proportional valve 31BR uses the hydraulic oil discharged from the pilot pump 15 to output a pilot pressure corresponding to the control current input from the controller 30 to the other pilot port of the shuttle valve 32BR. Thereby, the proportional valve 31BR can adjust the pilot pressure acting on the pilot port on the right side of the control valve 174 via the shuttle valve 32BR.
- the proportional valves 31BL and 31BR can adjust the pilot pressure output to the secondary side so that the control valve 174 can be stopped at an arbitrary valve position regardless of the operating state of the lever device 26B.
- the proportional valve 33BL functions as a machine control control valve in the same manner as the proportional valve 31BL.
- the proportional valve 33BL is arranged in a pipeline connecting the operating device 26 and the shuttle valve 32BL, and is configured so that the flow path area of the pipeline can be changed.
- the proportional valve 33BL operates in response to a control command output from the controller 30. Therefore, the controller 30 reduces the pressure of the hydraulic oil discharged by the operating device 26 regardless of the operation of the operating device 26 by the operator, and then passes the shuttle valve 32BL to the corresponding control valve in the control valve 17. Can be supplied to the pilot port of.
- the proportional valve 33BR functions as a control valve for machine control.
- the proportional valve 33BR is arranged in a pipeline connecting the operating device 26 and the shuttle valve 32BR, and is configured so that the flow path area of the pipeline can be changed.
- the proportional valve 33BR operates in response to a control command output from the controller 30. Therefore, the controller 30 reduces the pressure of the hydraulic oil discharged by the operating device 26 regardless of the operation of the operating device 26 by the operator, and then passes the corresponding control valve in the control valve 17 via the shuttle valve 32BR. Can be supplied to the pilot port of.
- the operating pressure sensor 29B detects the operation content of the lever device 26B by the operator in the form of pressure (operating pressure), and the detection signal corresponding to the detected pressure is taken into the controller 30. As a result, the controller 30 can grasp the operation content of the lever device 26B.
- the controller 30 supplies the hydraulic oil discharged from the pilot pump 15 to the pilot port on the left side of the control valve 174 via the proportional valve 31BL and the shuttle valve 32BL, regardless of the bucket closing operation on the lever device 26B by the operator. Can be made to. Further, the controller 30 supplies the hydraulic oil discharged from the pilot pump 15 to the pilot port on the right side of the control valve 174 via the proportional valve 31BR and the shuttle valve 32BR regardless of the bucket opening operation for the lever device 26B by the operator. Can be supplied to. That is, the controller 30 can automatically control the opening / closing operation of the bucket 6. Further, the controller 30 can forcibly stop the operation of the hydraulic actuator corresponding to the specific operating device 26 even when the operation for the specific operating device 26 is being performed.
- the operation of the proportional valves 33BL and 33BR for forcibly stopping the operation of the bucket 6 when the bucket closing operation or the bucket opening operation is performed by the operator is performed by the operator as a boom raising operation or a boom lowering operation. This is the same as the operation of the proportional valves 33AL and 33AR for forcibly stopping the operation of the boom 4 when the boom 4 is broken, and a duplicate description will be omitted.
- the lever device 26C is used by an operator or the like to operate the swing hydraulic motor 2A corresponding to the upper swing body 3 (swing mechanism 2).
- the lever device 26C uses the hydraulic oil discharged from the pilot pump 15 to output the pilot pressure according to the operation content to the secondary side.
- the two inlet ports are the pilot line on the secondary side of the lever device 26C corresponding to the left turning operation of the upper turning body 3 (hereinafter, “left turning operation”), and the proportional valve 31CL.
- the outlet port is connected to the pilot port on the left side of the control valve 173.
- the two inlet ports are the pilot line on the secondary side of the lever device 26C corresponding to the rightward turning operation of the upper turning body 3 (hereinafter, "right turning operation"), and the proportional valve. It is connected to the pilot line on the secondary side of the 31CR, and the outlet port is connected to the pilot port on the right side of the control valve 173.
- the lever device 26C applies a pilot pressure according to the operation content in the left-right direction to the pilot port of the control valve 173 via the shuttle valves 32CL and 32CR. Specifically, when the lever device 26C is turned left, the pilot pressure corresponding to the amount of operation is output to one inlet port of the shuttle valve 32CL, and the left side of the control valve 173 is output via the shuttle valve 32CL. Act on the pilot port of. Further, when the lever device 26C is turned to the right, the pilot pressure according to the operation amount is output to one inlet port of the shuttle valve 32CR, and the pilot on the right side of the control valve 173 via the shuttle valve 32CR. Act on the port.
- the proportional valve 31CL operates according to the control current input from the controller 30. Specifically, the proportional valve 31CL uses the hydraulic oil discharged from the pilot pump 15 to output a pilot pressure corresponding to the control current input from the controller 30 to the other pilot port of the shuttle valve 32CL. As a result, the proportional valve 31CL can adjust the pilot pressure acting on the pilot port on the left side of the control valve 173 via the shuttle valve 32CL.
- the proportional valve 31CR operates according to the control current output by the controller 30. Specifically, the proportional valve 31CR uses the hydraulic oil discharged from the pilot pump 15 to output a pilot pressure corresponding to the control current input from the controller 30 to the other pilot port of the shuttle valve 32CR. Thereby, the proportional valve 31CR can adjust the pilot pressure acting on the pilot port on the right side of the control valve 173 via the shuttle valve 32CR.
- the proportional valves 31CL and 31CR can adjust the pilot pressure output to the secondary side so that the control valve 173 can be stopped at an arbitrary valve position regardless of the operating state of the lever device 26C.
- the proportional valve 33CL functions as a machine control control valve in the same manner as the proportional valve 31CL.
- the proportional valve 33CL is arranged in a pipeline connecting the operating device 26 and the shuttle valve 32CL, and is configured so that the flow path area of the pipeline can be changed.
- the proportional valve 33CL operates in response to a control command output from the controller 30. Therefore, the controller 30 reduces the pressure of the hydraulic oil discharged by the operating device 26 regardless of the operation of the operating device 26 by the operator, and then passes the shuttle valve 32CL to the corresponding control valve in the control valve 17. Can be supplied to the pilot port of.
- the proportional valve 33CR functions as a control valve for machine control.
- the proportional valve 33CR is arranged in a pipeline connecting the operating device 26 and the shuttle valve 32CR, and is configured so that the flow path area of the pipeline can be changed.
- the proportional valve 33CR operates in response to a control command output from the controller 30. Therefore, the controller 30 reduces the pressure of the hydraulic oil discharged by the operating device 26 regardless of the operation of the operating device 26 by the operator, and then passes the corresponding control valve in the control valve 17 via the shuttle valve 32CR. Can be supplied to the pilot port of.
- the operating pressure sensor 29C detects the operating state of the lever device 26C by the operator as a pressure, and the detection signal corresponding to the detected pressure is taken into the controller 30. As a result, the controller 30 can grasp the operation content in the left-right direction with respect to the lever device 26C.
- the controller 30 supplies the hydraulic oil discharged from the pilot pump 15 to the pilot port on the left side of the control valve 173 via the proportional valve 31CL and the shuttle valve 32CL regardless of the left turning operation of the lever device 26C by the operator. Can be made to. Further, the controller 30 transfers the hydraulic oil discharged from the pilot pump 15 to the pilot on the right side of the control valve 173 via the proportional valve 31CR and the shuttle valve 32CR regardless of the right turning operation of the lever device 26C by the operator. It can be supplied to the port. That is, the controller 30 can automatically control the turning operation of the upper turning body 3 in the left-right direction. Further, the controller 30 can forcibly stop the operation of the hydraulic actuator corresponding to the specific operating device 26 even when the operation for the specific operating device 26 is being performed.
- the operation of the proportional valves 33CL and 33CR for forcibly stopping the operation of the upper swivel body 3 when the swivel operation is performed by the operator is a boom raising operation or a boom lowering operation by the operator.
- the operation is the same as the operation of the proportional valves 33AL and 33AR for forcibly stopping the operation of the boom 4, and duplicate description will be omitted.
- the excavator 100 may further include a configuration in which the arm 5 is automatically opened and closed, and a configuration in which the lower traveling body 1 is automatically moved forward and backward.
- the components related to the operation system of the arm cylinder 8 are the components related to the operation system of the traveling hydraulic motor 1L, and the components related to the operation of the traveling hydraulic motor 1R are the components related to the operation system of the boom cylinder 7. It may be configured in the same manner as the parts and the like (FIGS. 4A to 4C).
- FIG. 5 is a diagram schematically showing an example of a component related to a sediment load detecting function in the excavator 100 according to the present embodiment.
- the controller 30 includes the earth and sand load processing unit 60 as a functional unit related to the function of detecting the load of the earth and sand excavated by the bucket 6.
- the earth and sand load processing unit 60 includes a load weight calculation unit 61, a maximum load capacity detection unit 62, an additional load capacity calculation unit 63, a remaining load capacity calculation unit 64, and a load center of gravity calculation unit 65.
- the excavator 100 controls the attachment at the excavation position and excavates the earth and sand by the bucket 6 (excavation operation).
- the excavator 100 swivels the upper swivel body 3 and moves the bucket 6 from the excavation position to the earth discharge position (swivel operation).
- the loading platform of the dump truck DT is arranged below the release position.
- the excavator 100 loads the earth and sand in the bucket 6 onto the loading platform of the dump truck DT by controlling the attachment at the earth discharge position and discharging the earth and sand in the bucket 6 (excavator operation).
- the excavator 100 swivels the upper swivel body 3 and moves the bucket 6 from the earth discharge position to the excavation position (swivel operation). By repeating these operations, the excavator 100 loads the excavated earth and sand onto the loading platform of the dump truck DT.
- the load weight calculation unit 61 calculates the weight of the earth and sand (load) in the bucket 6.
- the load weight calculation unit 61 has a first weight calculation unit 611, a second weight calculation unit 612, and a switching determination unit 613.
- the first weight calculation unit 611 calculates the earth and sand weight based on the thrust of the boom cylinder 7.
- the second weight calculation unit 612 calculates the earth and sand weight based on the thrust of the bucket cylinder 9. The method of calculating the earth and sand weight in the first weight calculation unit 611 and the second weight calculation unit 612 will be described later.
- the switching determination unit 613 determines whether the earth and sand weight output by the load weight calculation unit 61 is the earth and sand weight calculated by the first weight calculation unit 611 or the earth and sand weight calculated by the second weight calculation unit 612. Judge and switch.
- both the first weight calculation unit 611 and the second weight calculation unit 612 calculate the earth and sand weight, respectively, and of the two calculated earth and sand weights in the switching determination unit 613.
- the configuration may be such that it is determined which is the sediment weight output by the load weight calculation unit 61 and switched.
- the load weight calculation unit 61 switches the weight calculation unit for calculating the earth and sand weight by the switching determination unit 613, that is, the weight calculation unit of one of the first weight calculation unit 611 and the second weight calculation unit 612.
- the process may be configured to function and stop the process of the other weight calculation unit.
- the first weight calculation unit 611 constantly calculates the earth and sand weight without the judgment of the switching determination unit 613, and the second weight calculation unit 612 calculates the earth and sand weight only when it is selected by the switching determination unit 613. It may be configured to be.
- the switching determination unit 613 switches between the first weight calculation unit 611 and the second weight calculation unit 612 according to the state of the boom cylinder 7 that drives the boom 4. For example, the switching determination unit 613 switches to the calculation of the earth and sand weight by the second weight calculation unit 612 when the predetermined condition is satisfied based on the calculation of the earth and sand weight by the first weight calculation unit 611. Further, when the switching determination unit 613 does not satisfy the predetermined condition, the switching determination unit 613 again switches to the calculation of the earth and sand weight by the first weight calculation unit 611.
- the predetermined condition may be, for example, at the start of the boom 4 raising operation or at the end of the operation.
- the switching determination unit 613 determines whether or not the operation of raising the boom 4 is at the start or end of the operation based on the detection value of the boom angle sensor S1 (posture sensor). When the operation of raising the boom 4 is started or ended, the switching determination unit 613 selects the second weight calculation unit 612. When the operation of raising the boom 4 is not at the start of the operation and at the end of the operation, the switching determination unit 613 selects the first weight calculation unit 611.
- the method of detecting whether or not the operation of raising the boom 4 is at the start or end of the operation is not limited to this, and is performed by a sensor (not shown) that detects the input of the operating device 26. It may be made by a sensor (not shown) that detects the pilot pressure, and is not limited thereto. Further, the predetermined condition is not limited to the start or end of the boom 4 raising operation. For example, there is a case where vibration occurs in the value of the earth and sand weight calculated by the first weight calculation unit 611 with respect to time.
- the first weight calculation unit 611 calculates the earth and sand weight based on the thrust of the boom cylinder 7. For example, the first weight calculation unit 611 determines the thrust of the boom cylinder 7, the distance from the pin connecting the upper swing body 3 and the boom 4, to the center of gravity of the earth and sand, and the pin circumference connecting the upper swing body 3 and the boom 4. Calculate the sediment weight based on the equation of the moment of. Further, the second weight calculation unit 612 calculates the earth and sand weight based on the thrust of the bucket cylinder 9.
- the second weight calculation unit 612 is an equation of the thrust of the bucket cylinder 9, the distance from the pin connecting the arm 5 and the bucket 6 to the center of gravity of the earth and sand, and the moment around the pin connecting the arm 5 and the bucket 6. And, the sediment weight is calculated based on.
- the distance from the pin connecting the upper swing body 3 and the boom 4 to the center of gravity of the earth and sand is longer than the distance from the pin connecting the arm 5 and the bucket 6 to the center of gravity of the earth and sand. Therefore, for example, the distance from the pin connecting the upper swivel body 3 and the boom 4 to the center of gravity of the earth and sand is larger than the distance between the estimated position of the center of gravity of the earth and sand and the actual position of the center of gravity of the earth and sand. The effect of misalignment is smaller than the distance from the pin connecting the bucket 6 and the center of gravity of the earth and sand. Therefore, the first weight calculation unit 611 can calculate the earth and sand weight more accurately than the second weight calculation unit 612.
- the switching determination unit 613 switches the calculation of the earth and sand weight to the second weight calculation unit 612. As a result, the sediment weight can be calculated with high accuracy even at the start of the boom 4 raising operation and at the end of the boom 4 raising operation.
- the second weight calculation unit 612 may calculate the earth and sand weight based on the thrust of the arm cylinder 8.
- the second weight calculation unit 612 is an equation of the thrust of the arm cylinder 8, the distance from the pin connecting the boom 4 and the arm 5 to the center of gravity of the earth and sand, and the moment around the pin connecting the boom 4 and the arm 5.
- the sediment weight may be calculated based on.
- the switching determination unit 613 sets the earth and sand weight output by the load weight calculation unit 61 as the earth and sand weight calculated by the first weight calculation unit 611, or is calculated by the second weight calculation unit 612.
- the load weight calculation unit 61 may calculate the earth and sand weight based on the thrust of the bucket cylinder 9 using only the second weight calculation unit 612.
- parameters such as the weight of the attachment must be taken into consideration, which may reduce the accuracy.
- the parameters to be considered can be reduced and the calculation accuracy of the sediment weight can be improved. ..
- the maximum load capacity detection unit 62 detects the maximum load capacity of the dump truck DT to be loaded with earth and sand. For example, the maximum load capacity detection unit 62 identifies the dump truck DT to be loaded with earth and sand based on the image captured by the image pickup device S6. Next, the maximum load capacity detection unit 62 detects the maximum load capacity of the dump truck DT based on the image of the specified dump truck DT. For example, the maximum load capacity detection unit 62 determines the vehicle type (size, etc.) of the dump truck DT based on the image of the specified dump truck DT.
- the maximum load capacity detection unit 62 has a table in which the vehicle type and the maximum load capacity are associated with each other, and obtains the maximum load capacity of the dump truck DT based on the vehicle type and the table determined from the image.
- the maximum load capacity of the dump truck DT, the vehicle type, etc. are input by the input device 42, and the maximum load capacity detection unit 62 may obtain the maximum load capacity of the dump truck DT based on the input information of the input device 42. ..
- the additional load capacity calculation unit 63 calculates the weight of earth and sand loaded on the dump truck DT. That is, each time the earth and sand in the bucket 6 is discharged to the loading platform of the dump truck DT, the additional load capacity calculation unit 63 adds the earth and sand weight in the bucket 6 calculated by the load weight calculation unit 61.
- the additional load capacity (total weight) which is the total weight of the earth and sand loaded on the loading platform of the dump truck DT, is calculated. If the dump truck DT to be loaded with earth and sand becomes a new dump truck DT, the additional load capacity is reset.
- the remaining load capacity calculation unit 64 calculates the difference between the maximum load capacity of the dump truck DT detected by the maximum load capacity detection unit 62 and the current additional load capacity calculated by the additional load capacity calculation unit 63 as the remaining load capacity. ..
- the remaining load capacity is the remaining weight of earth and sand that can be loaded on the dump truck DT.
- the load center of gravity calculation unit 65 calculates the center of gravity of the earth and sand (load) in the bucket 6. The method of calculating the center of gravity of earth and sand will be described later.
- the display device 40 is calculated by the sediment weight in the bucket 6 calculated by the load weight calculation unit 61, the maximum load capacity of the dump truck DT detected by the maximum load capacity detection unit 62, and the additional load capacity calculation unit 63.
- the additional load capacity of the dump truck DT total weight of sediment loaded on the loading platform
- the remaining load capacity of the dump truck DT calculated by the remaining load capacity calculation unit 64 (remaining weight of sediment that can be loaded) are displayed. You may.
- the display device 40 may be configured to warn when the additional load capacity exceeds the maximum load capacity. Further, when the calculated earth and sand weight in the bucket 6 exceeds the remaining load capacity, the display device 40 may be configured to warn.
- the warning is not limited to the case where it is displayed on the display device 40, and may be a voice output by the voice output device 43. As a result, it is possible to prevent the earth and sand from being loaded in excess of the maximum load capacity of the dump truck DT.
- FIG. 6A to 6B are schematic views for explaining the parameters related to the calculation of the earth and sand weight in the attachment of the excavator 100.
- FIG. 6A shows the excavator 100
- FIG. 6B shows the vicinity of the bucket 6.
- the pin P1 the bucket center of gravity G3, and the earth and sand center of gravity Gs, which will be described later, are arranged on the horizontal line L1.
- the pin connecting the upper swing body 3 and the boom 4 is referred to as P1.
- the pin connecting the upper swing body 3 and the boom cylinder 7 is P2.
- the pin connecting the boom 4 and the boom cylinder 7 is P3.
- the pin connecting the boom 4 and the arm cylinder 8 is P4.
- the pin connecting the arm 5 and the arm cylinder 8 is referred to as P5.
- the pin connecting the boom 4 and the arm 5 is P6.
- the pin connecting the arm 5 and the bucket 6 is P7.
- the center of gravity of the boom 4 is G1.
- the center of gravity of the arm 5 is G2.
- the center of gravity of the bucket 6 is G3. Let Gs be the center of gravity of the earth and sand (load) loaded on the bucket 6.
- the reference line L2 passes through the pin P7 and is parallel to the opening surface of the bucket 6. Further, the distance between the pin P1 and the center of gravity G4 of the boom 4 is D1. Let D2 be the distance between the pin P1 and the center of gravity G5 of the arm 5. The distance between the pin P1 and the center of gravity G6 of the bucket 6 is D3. Let Ds be the distance between the pin P1 and the center of gravity Gs of the earth and sand. Let Dc be the distance between the straight line connecting the pin P2 and the pin P3 and the pin P1. Further, the detected value of the cylinder pressure of the boom cylinder 7 is set to Fb.
- the vertical component in the direction perpendicular to the straight line connecting the pin P1 and the boom center of gravity G1 is W1a.
- the vertical component in the direction perpendicular to the straight line connecting the pin P1 and the center of gravity G2 of the arm is W2a.
- the weight of the bucket 6 is W6, and the weight of the earth and sand (load) loaded on the bucket 6 is Ws.
- the position of the pin P7 is calculated from the boom angle and the arm angle. That is, the position of the pin P7 can be calculated based on the detected values of the boom angle sensor S1 and the arm angle sensor S2.
- the positional relationship between the pin P7 and the bucket center of gravity G3 (the angle ⁇ 4 between the reference line L2 of the bucket 6 and the straight line connecting the pin P7 and the bucket center of gravity G3.
- the pin P7 and the bucket center of gravity G3 The distance D4.) Is a specified value.
- the positional relationship between the pin P7 and the center of gravity Gs (the angle ⁇ 5 between the reference line L2 of the bucket 6 and the straight line connecting the pin P7 and the center of gravity Gs; the distance D5 between the pin P7 and the center of gravity Gs) is, for example.
- Experimentally obtained in advance and stored in the controller 30 That is, the earth and sand center of gravity Gs and the bucket center of gravity G3 can be estimated based on the bucket angle sensor S3.
- the load center of gravity calculation unit 65 can estimate the earth and sand center of gravity Gs based on the detected values of the boom angle sensor S1, the arm angle sensor S2, and the bucket angle sensor S3.
- WsDs + W1aD1 + W2aD2 + W3D3 FbDc ...
- Ws (FbDc- (W1aD1 + W2aD2 + W3D3)) / Ds ... (A2)
- the detected value Fb of the cylinder pressure of the boom cylinder 7 is calculated by the boom rod pressure sensor S7R and the boom bottom pressure sensor S7B.
- the distance Dc and the weight W1a of the vertical component are calculated by the boom angle sensor S1.
- the weight W2a and the distance D2 of the vertical component are calculated by the boom angle sensor S1 and the arm angle sensor S2.
- the distance D1 and the weight W3 are known values. Further, the distance Ds and the distance D3 are also estimated by estimating the center of gravity Gs of the earth and sand and the center of gravity G3 of the bucket.
- the earth and sand weight Ws is the cylinder pressure detection value of the boom cylinder 7 (detection value of boom rod pressure sensor S7R, boom bottom pressure sensor S7B), boom angle (detection value of boom angle sensor S1), and arm angle (arm angle). It can be calculated based on the detection value of the sensor S2).
- the load weight calculation unit 61 can calculate the sediment weight Ws based on the sediment center of gravity Gs estimated by the load center of gravity calculation unit 65.
- Whether or not the excavator 100 is in the specified operation can be determined by estimating the posture of the attachment based on the detection value of the pilot of the bucket cylinder 9.
- the posture of the bucket 6 during the specified operation is assumed to be horizontal, the center of gravity of the earth and sand is estimated, and the weight of the earth and sand is calculated, but the description is not limited to this.
- the bucket 6 may be imaged by the camera S6F that images the front, and the posture of the bucket 6 may be estimated based on the image. Further, when the bucket 6 is imaged by the camera S6F and it is determined that the posture of the bucket 6 is horizontal based on the image, the center of gravity of the earth and sand may be estimated and the earth and sand load may be calculated.
- FIG. 7A-7B are partially enlarged views illustrating the relationship between the forces acting on the bucket 6. Further, FIG. 7A shows a case where the shape of the earth and sand in the bucket 6 is the first shape (reference shape). FIG. 7B shows a case where the shape of the earth and sand in the bucket 6 is the second shape (an example of the shape at the time of measuring the weight of the earth and sand).
- the rear end side of the bucket cylinder 9 is connected to the vicinity of the rear end of the arm 5 by a connecting pin 9a.
- the tip end side of the bucket cylinder 9 is connected to one end of the two links 91 and 92 by a connecting pin 9b.
- One end of the link 91 is connected to the tip end side of the bucket cylinder 9 by a connecting pin 9b, and the other end side is connected to the vicinity of the tip end side of the arm 5 by a connecting pin 9c.
- One end of the link 92 is connected to the tip end side of the bucket cylinder 9 by a connecting pin 9b, and the other end side is connected to the vicinity of the base end of the bucket 6 by a connecting pin 9d.
- L1 is a horizontal distance between the center of gravity Ge of the bucket 6 and the center of the bucket support shaft 6b.
- L2 is the horizontal distance between the center of gravity Gl of the earth and sand L in the bucket 6 and the center of the bucket support shaft 6b.
- L3 is the distance between the center of the connecting pin 9a and the center of the connecting pin 9b (the central axis of the bucket cylinder 9) and the center of the connecting pin 9c.
- L4 is the distance between the center of the connecting pin 9b, the line segment passing through the center of the connecting pin 9d (the central axis of the link 92), and the center of the connecting pin 9c.
- L5 is the distance between the center of the connecting pin 9b and the center of the connecting pin 9d (the central axis of the link 92) and the center of the bucket support shaft 6b.
- the link 91 and the link 92 are rotatably connected at the center of the connecting pin 9b, and if the reaction force acting in the direction from the connecting pin 9b of the link 92 to the connecting pin 9d is fbd, it is around the center of the connecting pin 9c. From the balance with the moment mc, it can be expressed by the following equation (2-2).
- the positions of the connecting pins 9a to 9d with respect to the position of the bucket support shaft 6b are determined by posture sensors (for example, boom angle sensor S1, arm angle sensor S2, bucket angle sensor). It can be uniquely obtained by S3, the body tilt sensor S4, and the turning state sensor S5), and the distances L3, L4, and L5 can be obtained.
- posture sensors for example, boom angle sensor S1, arm angle sensor S2, bucket angle sensor. It can be uniquely obtained by S3, the body tilt sensor S4, and the turning state sensor S5), and the distances L3, L4, and L5 can be obtained.
- the moment due to the reaction force F of the bucket cylinder 9 can be obtained by the equations (2) and (3) based on the detected values of the attitude sensor and the pressure sensor of the bucket cylinder 9.
- the moment Me due to the weight We of the bucket 6 can be expressed by the following equation (4). Further, the moment Ml due to the weight Wl of the earth and sand L can be expressed by the following equation (5).
- the distance L1 can be obtained by the posture sensor.
- the distance L2 is, for example, experimentally obtained in advance and stored in the controller 30. Further, the distance L2 may be obtained based on the center of gravity of the earth and sand calculated by the load center of gravity calculation unit 65, which will be described later.
- the weight Wl of the earth and sand L can be obtained from the equations (1) to (5) based on the detected values of the attitude sensor and the pressure sensor of the bucket cylinder 9.
- the weight Wl of the earth and sand L may be obtained based on the detected values of the posture sensor and the pressure sensor of the boom cylinder 7.
- the weight Wl of the earth and sand L may be obtained based on the detected values of the posture sensor and the pressure sensor of the arm cylinder 8.
- the relational expressions in these cases may be obtained in the same manner, and the description thereof will be omitted.
- the shape of the earth and sand L in the bucket 6 is not limited to the case where the bucket 6 is evenly loaded inside as in the reference shape shown in FIG. 7A.
- the shape of the earth and sand La in the bucket 6 may be offset toward the bucket tip 6a, which may be different from the reference shape.
- the position of the center of gravity Gla of the earth and sand La in the bucket 6 may be different from the position of the center of gravity Gla of the earth and sand L having the reference shape shown in FIG. 7A.
- the load center of gravity calculation unit 65 has a function of calculating the position of the center of gravity of the earth and sand loaded on the bucket 6.
- the load center of gravity calculation unit 65 calculates the position of the center of gravity of the earth and sand by using, for example, any of the first to fourth center of gravity calculation methods.
- the first method of calculating the center of gravity by the load center of gravity calculation unit 65 will be described.
- the image pickup device S6 images the shape of the earth and sand loaded on the bucket 6.
- the load center of gravity calculation unit 65 acquires an image captured by the image pickup device S6.
- the load center of gravity calculation unit 65 calculates the position of the center of gravity of the earth and sand based on the shape of the earth and sand imaged by the image pickup apparatus S6.
- the load center of gravity calculation unit 65 has shape information on the inner surface of the bucket 6.
- the load center of gravity calculation unit 65 estimates the overall shape of the earth and sand loaded on the bucket 6 based on the shape of the earth and sand imaged by the image pickup apparatus S6 and the shape information of the inner surface of the bucket 6 registered in advance.
- the load center of gravity calculation unit 65 calculates the position of the center of gravity of the earth and sand based on the estimated overall shape of the earth and sand. For example, the load center of gravity calculation unit 65 calculates the position of the center of gravity of the earth and sand based on the estimated overall shape of the earth and sand, assuming that the density distribution of the earth and sand is uniform.
- the camera S6F for capturing the front of the excavator 100 may be used.
- the boom 4 and the arm 5 may be provided with a camera (not shown) for capturing the shape of earth and sand.
- these cameras may be, for example, stereo cameras.
- a second method of calculating the center of gravity by the load center of gravity calculation unit 65 will be described.
- the operator operates the input device 42 to select parameters before starting the excavation operation of the excavator 100.
- parameters for example, the type of earth and sand to be excavated (for example, soil, sand, gravel, etc.) and the state of earth and sand (for example, wet state, dry state, etc.) are input.
- the load center of gravity calculation unit 65 calculates the position of the center of gravity of the earth and sand based on at least one of the input types and states of the earth and sand.
- the angle of repose differs depending on the type and condition of the earth and sand. Therefore, when the earth and sand are excavated by the bucket 6 and the attitude of the bucket 6 is set to the attitude of estimating the earth and sand weight (load holding attitude), the shape of the upper surface of the earth and sand loaded on the bucket 6 is the type, state and parameters of the earth and sand. It can be estimated using (earth and sand characteristic information) and the like.
- the load center of gravity calculation unit 65 estimates the overall shape of the earth and sand loaded on the bucket 6 based on the estimated shape of the upper surface of the earth and sand and the shape information of the inner surface of the bucket 6. Further, the load center of gravity calculation unit 65 calculates the position of the center of gravity of the earth and sand based on the estimated overall shape of the earth and sand.
- a table in which the parameters of the earth and sand (earth and sand characteristic information: type, state, etc.) and the position of the center of gravity of the earth and sand loaded on the bucket 6 are associated with each other may be stored in the load center of gravity calculation unit 65. ..
- the load center of gravity calculation unit 65 can calculate the position of the center of gravity of the earth and sand based on the input parameters and the table.
- the table may be obtained by experiments, simulations, or the like.
- FIG. 8 is a schematic diagram illustrating a third method of calculating the center of gravity by the load center of gravity calculation unit 65.
- the load center of gravity calculation unit 65 determines the sediment pressure based on the cylinder pressure of the bucket cylinder 9 when the bucket 6 is in the first state and the cylinder pressure of the bucket cylinder 9 when the bucket 6 is in the second state. Calculate the position of the center of gravity.
- the controller 30 sets the bucket 6 in the first state (shown by a solid line in FIG. 8).
- the posture is such that the opening surface of the bucket 6 is horizontal.
- the center of gravity of the bucket 6 in the first state is Ge1
- the center of gravity of the earth and sand in the first state is Gl1.
- L be the horizontal distance from the bucket support shaft 6b to the center of gravity Ge1
- L + ⁇ L be the horizontal distance from the bucket support shaft 6b to the center of gravity Gl1.
- the weight of earth and sand is W.
- the torque ⁇ 1 due to the weight of the earth and sand on the bucket support shaft 6b can be expressed by the following equation (6).
- the controller 30 sets the bucket 6 in the second state (indicated by the alternate long and short dash line in FIG. 8).
- the bucket angle is opened by ⁇ from the first state.
- the center of gravity of the bucket 6 in the second state is Ge2
- the center of gravity of the earth and sand in the second state is Gl2.
- the horizontal distance from the bucket support shaft 6b to the center of gravity Ge2 is Lsin ⁇
- the horizontal distance from the bucket support shaft 6b to the center of gravity Gl2 is Lsin ⁇ + ⁇ Lsin ⁇ .
- the torque ⁇ 1 and the torque ⁇ 2 can be obtained by the cylinder pressure and attitude sensor (bucket angle sensor S3) of the bucket cylinder 9 (bucket rod pressure sensor S9R, bucket bottom pressure sensor S9B). Further, the angle ⁇ can be obtained by the bucket angle sensor S3. Further, the center of gravity Ge2 of the bucket 6 is obtained in advance, and the distance L is also a known value.
- the load center of gravity calculation unit 65 can calculate the position of the center of gravity of the earth and sand based on these values and the formula (8).
- FIG. 9 is a schematic diagram illustrating a fourth method of calculating the center of gravity by the load center of gravity calculation unit 65.
- the load center of gravity calculation unit 65 calculates the position of the center of gravity of the earth and sand based on at least two of the pressure of the boom cylinder 7, the pressure of the arm cylinder 8, and the pressure of the bucket cylinder 9.
- the controller 30 puts the attachment in a predetermined state.
- the posture is such that the opening surface of the bucket 6 is horizontal.
- Gl be the center of gravity of the reference-shaped earth and sand L
- Gla be the center of gravity of the actual earth and sand La.
- the horizontal distance from the boom support shaft connecting the upper swing body 3 and the boom 4 to the center of gravity Gl is L3
- the horizontal distance from the arm support shaft connecting the boom 4 and the arm 5 to the center of gravity Gl is L4
- the center of gravity Gl and the center of gravity Gl Let ⁇ L be the horizontal distance of Gla. Further, the weight of earth and sand is W.
- the torque ⁇ 3 due to the weight of the earth and sand on the boom support shaft can be expressed by the following equation (9).
- the torque ⁇ 4 due to the weight of the earth and sand on the arm support shaft can be expressed by the following equation (10).
- ⁇ 3 W (L3- ⁇ L)... (9)
- ⁇ 4 W (L4- ⁇ L)... (10)
- the torque ⁇ 3 can be obtained by the cylinder pressure of the boom cylinder 7 (boom rod pressure sensor S7R, boom bottom pressure sensor S7B) and the attitude sensor (boom angle sensor S1, arm angle sensor S2, bucket angle sensor S3). ..
- the torque ⁇ 4 can be obtained by the cylinder pressure of the arm cylinder 8 (arm rod pressure sensor S8R, arm bottom pressure sensor S8B) and the attitude sensor (boom angle sensor S1, arm angle sensor S2, bucket angle sensor S3).
- the center of gravity Gl is a preset value
- the distances L3 and L4 can be obtained by the posture sensors (boom angle sensor S1, arm angle sensor S2, bucket angle sensor S3).
- the load center of gravity calculation unit 65 can calculate the distance ⁇ L based on these values and the equation (11). That is, the load center of gravity calculation unit 65 can calculate the position of the center of gravity Lla of the earth and sand La.
- the present invention is not limited to this.
- the position of the center of gravity of the earth and sand may be calculated based on the pressure of the boom cylinder 7 and the pressure of the bucket cylinder 9.
- the position of the center of gravity of the earth and sand may be calculated based on the pressure of the arm cylinder 8 and the pressure of the bucket cylinder 9.
- the relational expressions in these cases may be obtained in the same manner, and the description thereof will be omitted.
- the weight of excavated earth and sand can be detected. Further, according to the excavator 100 according to the present embodiment, the center of gravity of the earth and sand can be calculated by the load center of gravity calculation unit 65, and the weight of the earth and sand can be calculated based on the calculated center of gravity of the earth and sand. As a result, for example, even when the earth and sand loaded in the bucket 6 is biased, the earth and sand weight can be calculated based on the center of gravity of the earth and sand, and the detection accuracy of the earth and sand weight can be improved. it can.
- the weight of earth and sand loaded on the dump truck DT can be calculated. This makes it possible to prevent the dump truck DT from being overloaded.
- the load capacity of the dump truck DT is checked by a truck scale or the like before going out from the work site to the public road. If the load capacity exceeds the maximum load capacity, the dump truck DT needs to return to the position of the excavator 100 to reduce the load of earth and sand. Therefore, the operational efficiency of the dump truck DT is lowered. Insufficient loading of the dump truck DT increases the total number of dump truck DTs that carry earth and sand, and reduces the operational efficiency of the dump truck DT.
- the earth and sand can be loaded on the dump truck DT while preventing overloading, so that the operational efficiency of the dump truck DT can be improved.
- the display device 40 displays the sediment weight in the bucket 6, the maximum load capacity of the dump truck DT, the additional load capacity, and the remaining load capacity. As a result, the perator boarding the excavator 100 can load the dump truck DT with earth and sand by performing the work while referring to these displays.
- the load weight calculation unit 61 has been described as calculating the weight of earth and sand based on the pressure of the bucket cylinder 9 (boom cylinder 7, arm cylinder 8), but the method of calculating the earth and sand weight is not limited to this. ..
- the load weight calculation unit 61 may calculate the weight of the earth and sand based on the turning torque when turning the upper swivel body 3.
- the load weight calculation unit 61 calculates the weight of earth and sand based on the turning torque when turning the upper swivel body 3 will be described.
- the equation of motion of the turning torque ⁇ when turning the upper turning body 3 can be expressed by the following equation (12).
- the attachment angle ⁇ includes a boom angle, an arm angle, and a bucket angle.
- equation of motion of the turning torque ⁇ 0 when turning the upper swivel body 3 when there is no earth and sand in the bucket 6 can be expressed by the following equation (13).
- equation of motion of the turning torque ⁇ w when turning the upper turning body 3 when there is earth and sand in the bucket 6 can be expressed by the following equation (14).
- the load weight M can be calculated.
- the load weight calculation unit 61 acquires the turning driving force of the upper turning body 3 in the turning operation of the upper turning body 3.
- the swivel driving force of the upper swivel body 3 is obtained from the pressure difference between one port and the other port of the swivel hydraulic motor 2A, that is, the difference in flood pressure detected by the hydraulic sensors 21 and 22.
- the load weight calculation unit 61 acquires the posture of the attachment by the posture sensor.
- the attachment angle (boom angle, arm angle, bucket angle) is acquired by the boom angle sensor S1, the arm angle sensor S2, and the bucket angle sensor S3.
- the tilt angle of the fuselage may be acquired by the fuselage tilt sensor S4.
- the load weight calculation unit 61 acquires the turning angular velocity and the turning angle of the upper turning body 3 by the turning state sensor S5.
- the load weight calculation unit 61 has a table in advance.
- the load weight M is associated with the table according to the posture of the attachment and the turning driving force.
- the load weight calculation unit 61 can calculate the load weight M based on the turning driving force, the information of the attitude sensor, and the table.
- the load weight calculation unit 61 may obtain the turning inertia by the turning driving force and calculate the load weight M based on the obtained turning inertia.
- the turning inertia when there is no earth and sand in the bucket 6 can be obtained from the posture of the attachment and known information (position of the center of gravity of each part, weight, etc.). Further, the turning inertia when the bucket 6 has earth and sand can be calculated from the turning torque.
- the load weight M can be calculated by comparing the swirling inertia when there is no earth and sand with the swirling inertia when there is earth and sand. In other words, the load weight M can be calculated based on the difference between these turning inertias.
- the position of the center of gravity of the earth and sand is included in the terms of Jw and hp in the equation (14).
- the turning driving force includes the effects of the moment of inertia and the turning centrifugal force. Therefore, the method of calculating the sediment weight in the load weight calculation unit 61 does not require complicated compensation when calculating the weight of the load, and the load weight M can be directly obtained.
- the present invention is not limited to this.
- the load weight M may be obtained in consideration of the speed of the attachment.
- the load weight M may be obtained in consideration of this.
- the main screen 41V has a date / time display area 41a, a running mode display area 41b, an attachment display area 41c, a fuel consumption display area 41d, an engine control status display area 41e, an engine operating time display area 41f, a cooling water temperature display area 41g, and a fuel remaining amount display.
- the area 41s and the target weight display area 41t are included.
- the traveling mode display area 41b, the attachment display area 41c, the engine control state display area 41e, and the rotation speed mode display area 41i are areas for displaying the setting state information which is the information related to the setting state of the excavator 100.
- Fuel consumption display area 41d, engine operating time display area 41f, cooling water temperature display area 41g, fuel remaining amount display area 41h, urea water remaining amount display area 41j, hydraulic oil temperature display area 41k, current weight display area 41p and cumulative weight display area 41q is an area for displaying operating state information, which is information related to the operating state of the excavator 100.
- the date and time display area 41a is an area for displaying the current date and time.
- the travel mode display area 41b is an area for displaying the current travel mode.
- the attachment display area 41c is an area for displaying an image representing the currently mounted end attachment.
- FIG. 10 shows a state in which an image representing the bucket 6 is displayed.
- the fuel consumption display area 41d is an area for displaying fuel consumption information calculated by the controller 30.
- the fuel consumption display area 41d includes an average fuel consumption display area 41d1 for displaying the lifetime average fuel consumption or the section average fuel consumption, and an instantaneous fuel consumption display area 41d2 for displaying the instantaneous fuel consumption.
- the engine control status display area 41e is an area for displaying the control status of the engine 11.
- the engine operating time display area 41f is an area for displaying the cumulative operating time of the engine 11.
- the cooling water temperature display area 41g is an area for displaying the current temperature state of the engine cooling water.
- the fuel remaining amount display area 41h is an area for displaying the remaining amount state of the fuel stored in the fuel tank.
- the rotation speed mode display area 41i is an area for displaying the current rotation speed mode set by the engine rotation speed adjustment dial 75.
- the urea water remaining amount display area 41j is an area for displaying the remaining amount state of the urea water stored in the urea water tank.
- the hydraulic oil temperature display area 41k is an area for displaying the temperature state of the hydraulic oil in the hydraulic oil tank.
- the camera image display area 41m is an area for displaying an image captured by the image pickup device S6.
- the camera image display area 41 m displays the back camera image captured by the back camera 80B.
- the back camera image is a rear image that reflects the space behind the excavator 100, and includes a counterweight image 3a.
- the current weight display area 41p is an area for displaying the weight (current weight) of the object actually lifted by the bucket 6.
- FIG. 10 shows that the current weight is 550 kg.
- the controller 30 calculates the current weight based on, for example, the posture of the work attachment, the boom bottom pressure, and the specifications (weight, center of gravity position, etc.) of the work attachment registered in advance. Specifically, the controller 30 calculates the current weight based on the outputs of information acquisition devices such as the boom angle sensor S1, the arm angle sensor S2, and the boom bottom pressure sensor S6b.
- the cumulative weight display area 41q is an area for displaying an integrated value (hereinafter, referred to as “cumulative weight”) of the weight of an object lifted by the bucket 6 in a predetermined period.
- FIG. 10 shows that the cumulative weight is 9500 kg.
- the predetermined period is, for example, a period that starts when the reset button 41r is pressed. For example, when the operator performs the work of loading earth and sand on the loading platform of the dump truck DT, the operator presses the reset button 41r every time the dump truck DT to be loaded is replaced to reset the cumulative weight. This is so that the total weight of the earth and sand loaded on each dump truck DT can be easily grasped.
- the excavator 100 can prevent earth and sand from being loaded on the loading platform of the dump truck DT beyond the maximum load weight of the dump truck DT.
- the driver of the dump truck DT returns to the loading yard and unloads a part of the earth and sand loaded on the loading platform. Work needs to be done.
- the excavator 100 can prevent the occurrence of such load weight adjustment work.
- the predetermined period may be, for example, a period from the time when the work of the day starts to the time when the work of the day ends. This is so that the operator or the manager can easily recognize the total weight of the earth and sand carried by the work in one day.
- the reset button 41r is a software button for resetting the cumulative weight.
- the reset button 41r may be a hardware button arranged on the input device 42, the left operating lever 26L, the right operating lever 26R, or the like.
- the controller 30 may be configured to automatically recognize the replacement of the dump truck DT and automatically reset the cumulative weight. In this case, the controller 30 may recognize the replacement of the dump truck DT by using the image captured by the imaging device S6, or may recognize the replacement of the dump truck DT by using the communication device.
- the controller 30 is configured to integrate the current weight after recognizing that the earth and sand lifted by the bucket 6 is loaded on the loading platform of the dump truck DT based on the image captured by the image pickup device S6. May be good. This is to prevent the earth and sand transferred to a place other than the loading platform of the dump truck DT from being accumulated as the earth and sand loaded on the dump truck DT.
- the controller 30 may determine whether or not the earth and sand lifted by the bucket 6 has been loaded onto the loading platform of the dump truck DT based on the posture of the work attachment. Specifically, in the controller 30, for example, when the height of the bucket 6 exceeds a predetermined value (for example, the height of the loading platform of the dump truck DT) and the release button 65C is pressed, the earth and sand are removed from the dump truck DT. It may be determined that the truck has been loaded on the loading platform.
- a predetermined value for example, the height of the loading platform of the dump truck DT
- the controller 30 may be configured to output an alarm when it is determined that the current weight exceeds a predetermined value.
- the predetermined value is, for example, a value based on the rated lifting weight.
- the alarm may be a visual alarm, an auditory alarm or a tactile alarm. With this configuration, the controller 30 can inform the operator that the current weight exceeds or is likely to exceed a predetermined value.
- the remaining weight display area 41s is an area for displaying the remaining weight.
- FIG. 10 shows that the cumulative weight is 9500 kg and the remaining weight is 500 kg. That is, it shows that the maximum load capacity is 10,000 kg.
- the display device 40 may display the maximum load capacity without displaying the remaining weight, or may display the maximum load capacity separately from the remaining weight.
- the target weight display area 41t is an area for displaying the target weight of the object adsorbed by the bucket 6.
- the target weight is set at a value that does not exceed the remaining weight.
- the target weight is set to 500 kg.
- the current weight is 550 kg. Therefore, the controller 30 controls to reduce the current of the bucket 6 until the current weight reaches 500 kg (target weight). This makes it possible to prevent the dump truck DT from being overloaded.
- the weight (current weight) of the object lifted by the bucket 6 can be set as the target weight.
- the weight of the object lifted by the bucket 6 is calculated by having a table in which the target weight and the target current command are associated with each other and generating the target current command of the current supplied to the bucket 6 based on the target weight.
- a configuration that approaches the target weight can be considered.
- the object adsorbed by the bucket 6 is, for example, an object having uneven density such as earth and sand or steel frame, even if a current value corresponding to the target weight is applied, the object actually adsorbed by the bucket 6 It is assumed that the weight deviates from the target weight.
- the weight of the object lifted by the bucket 6 can be set as the target weight.
- a message is displayed in the message display area 41m1. For example, when the current weight exceeds the target weight, a message to that effect is displayed. As a result, it is possible to prevent the loading operation from being performed before the weight adjustment is completed. A message may also be displayed when the cumulative weight exceeds the maximum load capacity. As a result, the operator can be encouraged to carry out the loading / unloading work, and the dump truck DT can be prevented from being overloaded.
- FIG. 11 is a diagram showing a configuration example of the loading support system SYS.
- the loading support system SYS includes a shovel 100, a mobile body 200 having a support device 210 provided on the dump truck DT, a management device 300, and a support device 400, and can communicate via a communication network 900. It may be configured.
- the support device 210 is a mobile terminal device, for example, a computer such as a notebook PC, a tablet PC, or a smartphone installed in a dump truck DT.
- the management device 300 is a fixed terminal device, for example, a computer installed in a management center or the like outside the work site.
- the management device 300 may be a portable computer (for example, a portable terminal device such as a notebook PC, a tablet PC, or a smartphone).
- the support device 400 is a mobile terminal device, for example, a computer such as a notebook PC, a tablet PC, or a smartphone carried by a worker or the like at a work site.
- the controller 30 of the excavator 100 may transmit the calculated earth and sand weight and the like to the management device 300 via the communication device T1 and the communication network 900.
- the management device 300 can manage the weight of the load such as earth and sand loaded on the dump truck DT by the excavator 100.
- the controller 30 of the excavator 100 may transmit to the support device 210 provided on the dump truck DT via the communication device T1 and the communication network 900.
- the excavator 100 may be remotely controlled via the communication network 900.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Operation Control Of Excavators (AREA)
- Component Parts Of Construction Machinery (AREA)
Abstract
精度よく積載物の重量を算出するショベルを提供する。 上部旋回体に取り付けられるアタッチメントと、前記アタッチメントを駆動する第1アクチュエータ及び第2アクチュエータと、制御装置と、を備え、前記制御装置は、前記第1アクチュエータに基づいて、前記アタッチメントに積載された積載物の重量を第1重量として算出する第1重量算出部と、前記第2アクチュエータに基づいて、前記積載物の重量を第2重量として算出する第2重量算出部と、を有する、ショベル。
Description
本開示は、ショベルに関する。
例えば、バケットおよびブームを含むリンク機構からなるフロントアタッチメントと、このフロントアタッチメントによる掘削から放土して戻り旋回に至る一連の動作状態を検出し、この動作中の前記バケットに作用する荷重を測定するコントローラユニットとを備え、掘削終了から放土開始までの時間内で前記バケットに作用する荷重を測定すると共に、放土終了から掘削開始までの時間内で前記バケットに作用する荷重を再び測定し、これら両荷重の差を求めて掘削作業時の操作土量を算出するようにしたことを特徴とする油圧ショベルの操作土量算出方法が知られている(特許文献1参照)。
しかしながら、特許文献1に開示された方法では、ブームシリンダの圧力に基づいて土砂重量を推定しているが、ブーム上げ動作時には、動作開始時と動作終了時に、推定された土砂重量の波形に振動が発生し、土砂重量の検出が困難となるおそれがある。
そこで、上記課題に鑑み、精度よく積載物の重量を算出するショベルを提供することを目的とする。
上記目的を達成するため、本発明の一実施形態では、上部旋回体に取り付けられるアタッチメントと、前記アタッチメントを駆動する第1アクチュエータ及び第2アクチュエータと、制御装置と、を備え、前記制御装置は、前記第1アクチュエータに基づいて、記アタッチメントに積載された積載物の重量を第1重量として算出する第1重量算出部と、前記第2アクチュエータに基づいて、前記積載物の重量を第2重量として算出する第2重量算出部と、を有する。
上述の実施形態によれば、精度よく積載物の重量を算出するショベルを提供することができる。
以下、図面を参照して発明を実施するための形態について説明する。
[ショベルの概要]
最初に、図1を参照して、本実施形態に係るショベル100の概要について説明する。
最初に、図1を参照して、本実施形態に係るショベル100の概要について説明する。
図1は、本実施形態に係る掘削機としてのショベル100の側面図である。
尚、図1では、ショベル100は、施工対象の上り傾斜面ESに面する水平面に位置すると共に、後述する目標施工面の一例である上り法面BS(つまり、上り傾斜面ESに対する施工後の法面形状)が併せて記載されている。なお、施工対象の上り傾斜面ESには、目標施工面である上り法面BSの法線方向を示す円筒体(図示せず)が設けられている。
本実施形態に係るショベル100は、下部走行体1と、旋回機構2を介して旋回自在に下部走行体1に搭載される上部旋回体3と、アタッチメント(作業機)を構成するブーム4、アーム5、及び、バケット6と、キャビン10を備える。
下部走行体1は、左右一対のクローラが走行油圧モータ1L,1R(後述する図2参照)でそれぞれ油圧駆動されることにより、ショベル100を走行させる。つまり、一対の走行油圧モータ1L,1R(走行モータの一例)は、被駆動部としての下部走行体1(クローラ)を駆動する。
上部旋回体3は、旋回油圧モータ2A(後述する図2参照)で駆動されることにより、下部走行体1に対して旋回する。つまり、旋回油圧モータ2Aは、被駆動部としての上部旋回体3を駆動する旋回駆動部であり、上部旋回体3の向きを変化させることができる。
尚、上部旋回体3は、旋回油圧モータ2Aの代わりに、電動機(以下、「旋回用電動機」)により電気駆動されてもよい。つまり、旋回用電動機は、旋回油圧モータ2Aと同様、非駆動部としての上部旋回体3を駆動する旋回駆動部であり、上部旋回体3の向きを変化させることができる。
ブーム4は、上部旋回体3の前部中央に俯仰可能に枢着され、ブーム4の先端には、アーム5が上下回動可能に枢着され、アーム5の先端には、エンドアタッチメントとしてのバケット6が上下回動可能に枢着される。ブーム4、アーム5、及びバケット6は、それぞれ、油圧アクチュエータとしてのブームシリンダ7、アームシリンダ8、及びバケットシリンダ9によりそれぞれ油圧駆動される。
尚、バケット6は、エンドアタッチメントの一例であり、アーム5の先端には、作業内容等に応じて、バケット6の代わりに、他のエンドアタッチメント、例えば、法面用バケット、浚渫用バケット、ブレーカ等が取り付けられてもよい。
キャビン10は、オペレータが搭乗する運転室であり、上部旋回体3の前部左側に搭載される。
[ショベルの構成]
次に、図1に加えて、図2を参照して、本実施形態に係るショベル100の具体的な構成について説明する。
次に、図1に加えて、図2を参照して、本実施形態に係るショベル100の具体的な構成について説明する。
図2は、本実施形態に係るショベル100の構成の一例を概略的に示す図である。
尚、図2において、機械的動力系、作動油ライン、パイロットライン、及び電気制御系は、それぞれ、二重線、実線、破線、及び点線で示されている。
本実施形態に係るショベル100の駆動系は、エンジン11と、レギュレータ13と、メインポンプ14と、コントロールバルブ17を含む。また、本実施形態に係るショベル100の油圧駆動系は、上述の如く、下部走行体1、上部旋回体3、ブーム4、アーム5、及びバケット6のそれぞれを油圧駆動する走行油圧モータ1L,1R、旋回油圧モータ2A、ブームシリンダ7、アームシリンダ8、及びバケットシリンダ9等の油圧アクチュエータを含む。
エンジン11は、油圧駆動系におけるメイン動力源であり、例えば、上部旋回体3の後部に搭載される。具体的には、エンジン11は、後述するコントローラ30による直接或いは間接的な制御下で、予め設定される目標回転数で一定回転し、メインポンプ14及びパイロットポンプ15を駆動する。エンジン11は、例えば、軽油を燃料とするディーゼルエンジンである。
レギュレータ13は、メインポンプ14の吐出量を制御する。例えば、レギュレータ13は、コントローラ30からの制御指令に応じて、メインポンプ14の斜板の角度(傾転角)を調節する。レギュレータ13は、例えば、後述の如く、レギュレータ13L,13Rを含む。
メインポンプ14は、例えば、エンジン11と同様、上部旋回体3の後部に搭載され、高圧油圧ラインを通じてコントロールバルブ17に作動油を供給する。メインポンプ14は、上述の如く、エンジン11により駆動される。メインポンプ14は、例えば、可変容量式油圧ポンプであり、上述の如く、コントローラ30による制御下で、レギュレータ13により斜板の傾転角が調節されることでピストンのストローク長が調整され、吐出流量(吐出圧)が制御される。メインポンプ14は、例えば、後述の如く、メインポンプ14L,14Rを含む。
コントロールバルブ17は、例えば、上部旋回体3の中央部に搭載され、オペレータによる操作装置26に対する操作に応じて、油圧駆動系の制御を行う油圧制御装置である。コントロールバルブ17は、上述の如く、高圧油圧ラインを介してメインポンプ14と接続され、メインポンプ14から供給される作動油を、操作装置26の操作状態に応じて、油圧アクチュエータ(走行油圧モータ1L,1R、旋回油圧モータ2A、ブームシリンダ7、アームシリンダ8、及びバケットシリンダ9)に選択的に供給する。具体的には、コントロールバルブ17は、メインポンプ14から油圧アクチュエータのそれぞれに供給される作動油の流量と流れる方向を制御する制御弁171~176を含む。より具体的には、制御弁171は、走行油圧モータ1Lに対応し、制御弁172は、走行油圧モータ1Rに対応し、制御弁173は、旋回油圧モータ2Aに対応する。また、制御弁174は、バケットシリンダ9に対応し、制御弁175は、ブームシリンダ7に対応し、制御弁176は、アームシリンダ8に対応する。また、制御弁175は、例えば、後述の如く、制御弁175L,175Rを含み、制御弁176は、例えば、後述の如く、制御弁176L,176Rを含む。制御弁171~176の詳細は、後述する。
本実施形態に係るショベル100の操作系は、パイロットポンプ15と、操作装置26を含む。また、ショベル100の操作系は、後述するコントローラ30によるマシンコントロール機能に関する構成として、シャトル弁32を含む。
パイロットポンプ15は、例えば、上部旋回体3の後部に搭載され、パイロットラインを介して操作装置26にパイロット圧を供給する。パイロットポンプ15は、例えば、固定容量式油圧ポンプであり、上述の如く、エンジン11により駆動される。
操作装置26は、キャビン10の操縦席付近に設けられ、オペレータが各種動作要素(下部走行体1、上部旋回体3、ブーム4、アーム5、バケット6等)の操作を行うための操作入力手段である。換言すれば、操作装置26は、オペレータがそれぞれの動作要素を駆動する油圧アクチュエータ(即ち、走行油圧モータ1L,1R、旋回油圧モータ2A、ブームシリンダ7、アームシリンダ8、バケットシリンダ9等)の操作を行うための操作入力手段である。操作装置26は、その二次側のパイロットラインを通じて直接的に、或いは、二次側のパイロットラインに設けられる後述のシャトル弁32を介して間接的に、コントロールバルブ17にそれぞれ接続される。これにより、コントロールバルブ17には、操作装置26における下部走行体1、上部旋回体3、ブーム4、アーム5、及びバケット6等の操作状態に応じたパイロット圧が入力されうる。そのため、コントロールバルブ17は、操作装置26における操作状態に応じて、それぞれの油圧アクチュエータを駆動することができる。操作装置26は、例えば、アーム5(アームシリンダ8)を操作するレバー装置を含む。また、操作装置26は、例えば、ブーム4(ブームシリンダ7)、バケット6(バケットシリンダ9)、上部旋回体3(旋回油圧モータ2A)のそれぞれを操作するレバー装置26A~26Cを含む(図4A~4C参照)。また、操作装置26は、例えば、下部走行体1の左右一対のクローラ(走行油圧モータ1L,1R)のそれぞれを操作するレバー装置やペダル装置を含む。
シャトル弁32は、2つの入口ポートと1つの出口ポートを有し、2つの入口ポートに入力されたパイロット圧のうちの高い方のパイロット圧を有する作動油を出口ポートに出力させる。シャトル弁32は、2つの入口ポートのうちの一方が操作装置26に接続され、他方が比例弁31に接続される。シャトル弁32の出口ポートは、パイロットラインを通じて、コントロールバルブ17内の対応する制御弁のパイロットポートに接続されている(詳細は、図4A~4C参照)。そのため、シャトル弁32は、操作装置26が生成するパイロット圧と比例弁31が生成するパイロット圧のうちの高い方を、対応する制御弁のパイロットポートに作用させることができる。つまり、後述するコントローラ30は、操作装置26から出力される二次側のパイロット圧よりも高いパイロット圧を比例弁31から出力させることにより、オペレータによる操作装置26の操作に依らず、対応する制御弁を制御し、各種動作要素の動作を制御することができる。シャトル弁32は、例えば、後述の如く、シャトル弁32AL,32AR,32BL,32BR,32CL,32CRを含む。
尚、操作装置26(左操作レバー、右操作レバー、左走行レバー、及び右走行レバー)は、パイロット圧を出力する油圧パイロット式ではなく、電気信号を出力する電気式であってもよい。この場合、操作装置26からの電気信号は、コントローラ30に入力され、コントローラ30は、入力される電気信号に応じて、コントロールバルブ17内の各制御弁171~176を制御することにより、操作装置26に対する操作内容に応じた、各種油圧アクチュエータの動作を実現する。例えば、コントロールバルブ17内の制御弁171~176は、コントローラ30からの指令により駆動する電磁ソレノイド式スプール弁であってよい。また、例えば、パイロットポンプ15と各制御弁171~176のパイロットポートとの間には、コントローラ30からの電気信号に応じて動作する電磁弁が配置されてもよい。この場合、電気式の操作装置26を用いた手動操作が行われると、コントローラ30は、その操作量(例えば、レバー操作量)に対応する電気信号によって、当該電磁弁を制御しパイロット圧を増減させることで、操作装置26に対する操作内容に合わせて、各制御弁171~176を動作させることができる。
本実施形態に係るショベル100の制御系は、コントローラ30と、吐出圧センサ28と、操作圧センサ29と、比例弁31と、表示装置40と、入力装置42と、音声出力装置43と、記憶装置47と、ブーム角度センサS1と、アーム角度センサS2と、バケット角度センサS3と、機体傾斜センサS4と、旋回状態センサS5と、撮像装置S6と、測位装置P0と、通信装置T1を含む。
コントローラ30(制御装置の一例)は、例えば、キャビン10内に設けられ、ショベル100の駆動制御を行う。コントローラ30は、その機能が任意のハードウェア、ソフトウェア、或いは、その組み合わせにより実現されてよい。例えば、コントローラ30は、CPU(Central Processing Unit)と、ROM(Read Only Memory)と、RAM(Random Access Memory)と、不揮発性の補助記憶装置と、各種入出力インターフェース等を含むマイクロコンピュータを中心に構成される。コントローラ30は、例えば、ROMや不揮発性の補助記憶装置に格納される各種プログラムをCPU上で実行することにより各種機能を実現する。
例えば、コントローラ30は、オペレータ等の所定操作により予め設定される作業モード等に基づき、目標回転数を設定し、エンジン11を一定回転させる駆動制御を行う。
また、例えば、コントローラ30は、必要に応じてレギュレータ13に対して制御指令を出力し、メインポンプ14の吐出量を変化させる。
また、例えば、コントローラ30は、例えば、オペレータによる操作装置26を通じたショベル100の手動操作をガイド(案内)するマシンガイダンス機能に関する制御を行う。また、コントローラ30は、例えば、オペレータによる操作装置26を通じたショベル100の手動操作を自動的に支援するマシンコントロール機能に関する制御を行う。つまり、コントローラ30は、マシンガイダンス機能及びマシンコントロール機能に関する機能部として、マシンガイダンス部50を含む。また、コントローラ30は、後述する土砂荷重処理部60を含む。
尚、コントローラ30の機能の一部は、他のコントローラ(制御装置)により実現されてもよい。即ち、コントローラ30の機能は、複数のコントローラにより分散される態様で実現されてもよい。例えば、マシンガイダンス機能及びマシンコントロール機能は、専用のコントローラ(制御装置)により実現されてもよい。
吐出圧センサ28は、メインポンプ14の吐出圧を検出する。吐出圧センサ28により検出された吐出圧に対応する検出信号は、コントローラ30に取り込まれる。吐出圧センサ28は、例えば、後述の如く、吐出圧センサ28L,28Rを含む。
操作圧センサ29は、上述の如く、操作装置26の二次側のパイロット圧、即ち、操作装置26におけるそれぞれの動作要素(即ち、油圧アクチュエータ)に関する操作状態(例えば、操作方向や操作量等の操作内容)に対応するパイロット圧を検出する。操作圧センサ29による操作装置26における下部走行体1、上部旋回体3、ブーム4、アーム5、及びバケット6等の操作状態に対応するパイロット圧の検出信号は、コントローラ30に取り込まれる。操作圧センサ29は、例えば、後述の如く、操作圧センサ29A~29Cを含む。
尚、操作圧センサ29の代わりに、操作装置26におけるそれぞれの動作要素に関する操作状態を検出可能な他のセンサ、例えば、レバー装置26A~26C等の操作量(傾倒量)や傾倒方向を検出可能なエンコーダやポテンショメータ等が設けられてもよい。
比例弁31は、パイロットポンプ15とシャトル弁32とを接続するパイロットラインに設けられ、その流路面積(作動油が通流可能な断面積)を変更できるように構成される。比例弁31は、コントローラ30から入力される制御指令に応じて動作する。これにより、コントローラ30は、オペレータにより操作装置26(具体的には、レバー装置26A~26C)が操作されていない場合であっても、パイロットポンプ15から吐出される作動油を、比例弁31及びシャトル弁32を介し、コントロールバルブ17内の対応する制御弁のパイロットポートに供給できる。比例弁31は、例えば、後述の如く、比例弁31AL,31AR,31BL,31BR,31CL,31CRを含む。
表示装置40は、キャビン10内の着座したオペレータから視認し易い場所に設けられ、コントローラ30による制御下で、各種情報画像を表示する。表示装置40は、CAN(Controller Area Network)等の車載通信ネットワークを介してコントローラ30に接続されていてもよいし、一対一の専用線を介してコントローラ30に接続されていてもよい。
入力装置42は、キャビン10内の着座したオペレータから手が届く範囲に設けられ、オペレータによる各種操作入力を受け付け、操作入力に応じた信号をコントローラ30に出力する。入力装置42は、各種情報画像を表示する表示装置のディスプレイに実装されるタッチパネル、レバー装置26A~26Cのレバー部の先端に設けられるノブスイッチ、表示装置40の周囲に設置されるボタンスイッチ、レバー、トグル、回転ダイヤル等を含む。入力装置42に対する操作内容に対応する信号は、コントローラ30に取り込まれる。
音声出力装置43は、例えば、キャビン10内に設けられ、コントローラ30と接続され、コントローラ30による制御下で、音声を出力する。音声出力装置43は、例えば、スピーカやブザー等である。音声出力装置43は、コントローラ30からの音声出力指令に応じて各種情報を音声出力する。
記憶装置47は、例えば、キャビン10内に設けられ、コントローラ30による制御下で、各種情報を記憶する。記憶装置47は、例えば、半導体メモリ等の不揮発性記憶媒体である。記憶装置47は、ショベル100の動作中に各種機器が出力する情報を記憶してもよく、ショベル100の動作が開始される前に各種機器を介して取得する情報を記憶してもよい。記憶装置47は、例えば、通信装置T1等を介して取得される、或いは、入力装置42等を通じて設定される目標施工面に関するデータを記憶していてもよい。当該目標施工面は、ショベル100のオペレータにより設定(保存)されてもよいし、施工管理者等により設定されてもよい。
ブーム角度センサS1は、ブーム4に取り付けられ、ブーム4の上部旋回体3に対する俯仰角度(以下、「ブーム角度」)、例えば、側面視において、上部旋回体3の旋回平面に対してブーム4の両端の支点を結ぶ直線が成す角度を検出する。ブーム角度センサS1は、例えば、ロータリエンコーダ、加速度センサ、6軸センサ、IMU(Inertial Measurement Unit:慣性計測装置)等を含んでよい。また、ブーム角度センサS1は、可変抵抗器を利用したポテンショメータ、ブーム角度に対応する油圧シリンダ(ブームシリンダ7)のストローク量を検出するシリンダセンサ等を含んでもよい。以下、アーム角度センサS2、バケット角度センサS3についても同様である。ブーム角度センサS1によるブーム角度に対応する検出信号は、コントローラ30に取り込まれる。
アーム角度センサS2は、アーム5に取り付けられ、アーム5のブーム4に対する回動角度(以下、「アーム角度」)、例えば、側面視において、ブーム4の両端の支点を結ぶ直線に対してアーム5の両端の支点を結ぶ直線が成す角度を検出する。アーム角度センサS2によるアーム角度に対応する検出信号は、コントローラ30に取り込まれる。
バケット角度センサS3は、バケット6に取り付けられ、バケット6のアーム5に対する回動角度(以下、「バケット角度」)、例えば、側面視において、アーム5の両端の支点を結ぶ直線に対してバケット6の支点と先端(刃先)とを結ぶ直線が成す角度を検出する。バケット角度センサS3によるバケット角度に対応する検出信号は、コントローラ30に取り込まれる。
機体傾斜センサS4は、水平面に対する機体(上部旋回体3或いは下部走行体1)の傾斜状態を検出する。機体傾斜センサS4は、例えば、上部旋回体3に取り付けられ、ショベル100(即ち、上部旋回体3)の前後方向及び左右方向の2軸回りの傾斜角度(以下、「前後傾斜角」及び「左右傾斜角」)を検出する。機体傾斜センサS4は、例えば、ロータリエンコーダ、加速度センサ、6軸センサ、IMU等を含んでよい。機体傾斜センサS4による傾斜角度(前後傾斜角及び左右傾斜角)に対応する検出信号は、コントローラ30に取り込まれる。
旋回状態センサS5は、上部旋回体3の旋回状態に関する検出情報を出力する。旋回状態センサS5は、例えば、上部旋回体3の旋回角速度及び旋回角度を検出する。旋回状態センサS5は、例えば、ジャイロセンサ、レゾルバ、ロータリエンコーダ等を含んでよい。旋回状態センサS5による上部旋回体3の旋回角度や旋回角速度に対応する検出信号は、コントローラ30に取り込まれる。
空間認識装置としての撮像装置S6は、ショベル100の周辺を撮像する。撮像装置S6は、ショベル100の前方を撮像するカメラS6F、ショベル100の左方を撮像するカメラS6L、ショベル100の右方を撮像するカメラS6R、及び、ショベル100の後方を撮像するカメラS6Bを含む。
カメラS6Fは、例えば、キャビン10の天井、即ち、キャビン10の内部に取り付けられている。また、カメラS6Fは、キャビン10の屋根、ブーム4の側面等、キャビン10の外部に取り付けられていてもよい。カメラS6Lは、上部旋回体3の上面左端に取り付けられ、カメラS6Rは、上部旋回体3の上面右端に取り付けられ、カメラS6Bは、上部旋回体3の上面後端に取り付けられている。
撮像装置S6(カメラS6F,S6B,S6L,S6R)は、それぞれ、例えば、非常に広い画角を有する単眼の広角カメラである。また、撮像装置S6は、ステレオカメラや距離画像カメラ等であってもよい。撮像装置S6による撮像画像は、表示装置40を介してコントローラ30に取り込まれる。
空間認識装置としての撮像装置S6は、物体検知装置として機能してもよい。この場合、撮像装置S6は、ショベル100の周囲に存在する物体を検知してよい。検知対象の物体には、例えば、人、動物、車両、建設機械、建造物、穴等が含まれうる。また、撮像装置S6は、撮像装置S6又はショベル100から認識された物体までの距離を算出してもよい。物体検知装置としての撮像装置S6には、例えば、ステレオカメラ、距離画像センサ等が含まれうる。そして、空間認識装置は、例えば、CCDやCMOS等の撮像素子を有する単眼カメラであり、撮像した画像を表示装置40に出力する。また、空間認識装置は、空間認識装置又はショベル100から認識された物体までの距離を算出するように構成されていてもよい。また、撮像装置S6に加えて、空間認識装置として、例えば、超音波センサ、ミリ波レーダ、LIDAR、赤外線センサ等の他の物体検知装置が設けられてもよい。空間認識装置80としてミリ波レーダ、超音波センサ、又はレーザレーダ等を利用する場合には、多数の信号(レーザ光等)を物体に発信し、その反射信号を受信することで、反射信号から物体の距離及び方向を検出してもよい。
尚、撮像装置S6は、直接、コントローラ30と通信可能に接続されてもよい。
ブームシリンダ7にはブームロッド圧センサS7R及びブームボトム圧センサS7Bが取り付けられている。アームシリンダ8にはアームロッド圧センサS8R及びアームボトム圧センサS8Bが取り付けられている。バケットシリンダ9にはバケットロッド圧センサS9R及びバケットボトム圧センサS9Bが取り付けられている。ブームロッド圧センサS7R、ブームボトム圧センサS7B、アームロッド圧センサS8R、アームボトム圧センサS8B、バケットロッド圧センサS9R及びバケットボトム圧センサS9Bは、集合的に「シリンダ圧センサ」とも称される。
ブームロッド圧センサS7Rはブームシリンダ7のロッド側油室の圧力(以下、「ブームロッド圧」とする。)を検出し、ブームボトム圧センサS7Bはブームシリンダ7のボトム側油室の圧力(以下、「ブームボトム圧」とする。)を検出する。アームロッド圧センサS8Rはアームシリンダ8のロッド側油室の圧力(以下、「アームロッド圧」とする。)を検出し、アームボトム圧センサS8Bはアームシリンダ8のボトム側油室の圧力(以下、「アームボトム圧」とする。)を検出する。バケットロッド圧センサS9Rはバケットシリンダ9のロッド側油室の圧力(以下、「バケットロッド圧」とする。)を検出し、バケットボトム圧センサS9Bはバケットシリンダ9のボトム側油室の圧力(以下、「バケットボトム圧」とする。)を検出する。
測位装置P0は、上部旋回体3の位置及び向きを測定する。測位装置P0は、例えば、GNSS(Global Navigation Satellite System)コンパスであり、上部旋回体3の位置及び向きを検出し、上部旋回体3の位置及び向きに対応する検出信号は、コントローラ30に取り込まれる。また、測位装置P0の機能のうちの上部旋回体3の向きを検出する機能は、上部旋回体3に取り付けられた方位センサにより代替されてもよい。
通信装置T1は、基地局を末端とする移動体通信網、衛星通信網、インターネット網等を含む所定のネットワークを通じて外部機器と通信を行う。通信装置T1は、例えば、LTE(Long Term Evolution)、4G(4th Generation)、5G(5th Generation)等の移動体通信規格に対応する移動体通信モジュールや、衛星通信網に接続するための衛星通信モジュール等である。
マシンガイダンス部50は、例えば、マシンガイダンス機能に関するショベル100の制御を実行する。マシンガイダンス部50は、例えば、目標施工面とアタッチメントの先端部、具体的には、エンドアタッチメントの作業部位との距離等の作業情報を、表示装置40や音声出力装置43等を通じて、オペレータに伝える。目標施工面に関するデータは、例えば、上述の如く、記憶装置47に予め記憶されている。目標施工面に関するデータは、例えば、基準座標系で表現されている。基準座標系は、例えば、世界測地系である。世界測地系は、地球の重心に原点をおき、X軸をグリニッジ子午線と赤道との交点の方向に、Y軸を東経90度の方向に、そして、Z軸を北極の方向にとる三次元直交XYZ座標系である。オペレータは、施工現場の任意の点を基準点と定め、入力装置42を通じて、基準点との相対的な位置関係により目標施工面を設定してよい。バケット6の作業部位は、例えば、バケット6の爪先、バケット6の背面等である。また、エンドアタッチメントとして、バケット6の代わりに、例えば、ブレーカが採用される場合、ブレーカの先端部が作業部位に相当する。マシンガイダンス部50は、表示装置40、音声出力装置43等を通じて、作業情報をオペレータに通知し、オペレータによる操作装置26を通じたショベル100の操作をガイドする。
また、マシンガイダンス部50は、例えば、マシンコントロール機能に関するショベル100の制御を実行する。マシンガイダンス部50は、例えば、オペレータが手動で掘削操作を行っているときに、目標施工面とバケット6の先端位置とが一致するように、ブーム4、アーム5、及び、バケット6の少なくとも一つを自動的に動作させてもよい。
マシンガイダンス部50は、ブーム角度センサS1、アーム角度センサS2、バケット角度センサS3、機体傾斜センサS4、旋回状態センサS5、撮像装置S6、測位装置P0、通信装置T1及び入力装置42等から情報を取得する。そして、マシンガイダンス部50は、例えば、取得した情報に基づき、バケット6と目標施工面との間の距離を算出し、音声出力装置43からの音声及び表示装置40に表示される画像により、バケット6と目標施工面との間の距離の程度をオペレータに通知したり、アタッチメントの先端部(具体的には、バケット6の爪先や背面等の作業部位)が目標施工面に一致するように、アタッチメントの動作を自動的に制御したりする。マシンガイダンス部50は、当該マシンガイダンス機能及びマシンコントロール機能に関する詳細な機能構成として、位置算出部51と、距離算出部52と、情報伝達部53と、自動制御部54と、旋回角度算出部55と、相対角度算出部56と、を含む。
位置算出部51は、所定の測位対象の位置を算出する。例えば、位置算出部51は、アタッチメントの先端部、具体的には、バケット6の爪先や背面等の作業部位の基準座標系における座標点を算出する。具体的には、位置算出部51は、ブーム4、アーム5、及びバケット6のそれぞれの俯仰角度(ブーム角度、アーム角度、及びバケット角度)からバケット6の作業部位の座標点を算出する。
距離算出部52は、2つの測位対象間の距離を算出する。例えば、距離算出部52は、アタッチメントの先端部、具体的には、バケット6爪先や背面等の作業部位と目標施工面との間の距離を算出する。また、距離算出部52は、バケット6の作業部位としての背面と目標施工面との間の角度(相対角度)を算出してもよい。
情報伝達部53は、表示装置40や音声出力装置43等の所定の通知手段を通じて、各種情報をショベル100のオペレータに伝達(通知)する。情報伝達部53は、距離算出部52により算出された各種距離等の大きさ(程度)をショベル100のオペレータに通知する。例えば、表示装置40による視覚情報及び音声出力装置43による聴覚情報の少なくとも一方を用いて、バケット6の先端部と目標施工面との間の距離(の大きさ)をオペレータに伝える。また、情報伝達部53は、表示装置40による視覚情報及び音声出力装置43による聴覚情報の少なくとも一方を用いて、バケット6の作業部位としての背面と目標施工面との間の相対角度(の大きさ)をオペレータに伝えてもよい。
具体的には、情報伝達部53は、音声出力装置43による断続音を用いて、バケット6の作業部位と目標施工面との間の距離(例えば、鉛直距離)の大きさをオペレータに伝える。この場合、情報伝達部53は、鉛直距離が小さくなるほど、断続音の間隔を短くし、鉛直距離が大きくなるほど、断続音の感覚を長くしてよい。また、情報伝達部53は、連続音を用いてもよく、音の高低、強弱等を変化させながら、鉛直距離の大きさの違いを表すようにしてもよい。また、情報伝達部53は、バケット6の先端部が目標施工面よりも低い位置になった、つまり、目標施工面を超えてしまった場合、音声出力装置43を通じて警報を発してもよい。当該警報は、例えば、断続音より顕著に大きい連続音である。
また、情報伝達部53は、アタッチメントの先端部、具体的には、バケット6の作業部位と目標施工面との間の距離の大きさやバケット6の背面と目標施工面との間の相対角度の大きさ等を作業情報として表示装置40に表示させてもよい。表示装置40は、コントローラ30による制御下で、例えば、撮像装置S6から受信した画像データと共に、情報伝達部53から受信した作業情報を表示する。情報伝達部53は、例えば、アナログメータの画像やバーグラフインジケータの画像等を用いて、鉛直距離の大きさをオペレータに伝えるようにしてもよい。
自動制御部54は、アクチュエータを自動的に動作させることでオペレータによる操作装置26を通じたショベル100の手動操作を自動的に支援する。具体的には、自動制御部54は、後述の如く、複数の油圧アクチュエータ(具体的には、旋回油圧モータ2A、ブームシリンダ7、及びバケットシリンダ9)に対応する制御弁(具体的には、制御弁173、制御弁175L,175R、及び制御弁174)に作用するパイロット圧を個別に且つ自動的に調整することができる。これにより、自動制御部54は、それぞれの油圧アクチュエータを自動的に動作させることができる。自動制御部54によるマシンコントロール機能に関する制御は、例えば、入力装置42に含まれる所定のスイッチが押下された場合に実行されてよい。当該所定のスイッチは、例えば、マシンコントロールスイッチ(以下、「MC(Machine Control)スイッチ」)であり、ノブスイッチとして操作装置26(例えば、アーム5の操作に対応するレバー装置)のオペレータによる把持部の先端に配置されていてもよい。以下、MCスイッチが押下されている場合に、マシンコントロール機能が有効である前提で説明を進める。
例えば、自動制御部54は、MCスイッチ等が押下されている場合、掘削作業や整形作業を支援するために、アームシリンダ8の動作に合わせて、ブームシリンダ7及びバケットシリンダ9の少なくとも一方を自動的に伸縮させる。具体的には、自動制御部54は、オペレータが手動でアーム5の閉じ操作(以下、「アーム閉じ操作」)を行っている場合に、目標施工面とバケット6の爪先や背面等の作業部位の位置とが一致するようにブームシリンダ7及びバケットシリンダ9の少なくとも一方を自動的に伸縮させる。この場合、オペレータは、例えば、アーム5の操作に対応するレバー装置をアーム閉じ操作するだけで、バケット6の爪先等を目標施工面に一致させながら、アーム5を閉じることができる。
また、自動制御部54は、MCスイッチ等が押下されている場合、上部旋回体3を目標施工面に正対させるために旋回油圧モータ2A(アクチュエータの一例)を自動的に回転させてもよい。以下、コントローラ30(自動制御部54)による上部旋回体3を目標施工面に正対させる制御を「正対制御」と称する。これにより、オペレータ等は、所定のスイッチを押下するだけで、或いは、当該スイッチが押下された状態で、旋回操作に対応する後述のレバー装置26Cを操作するだけで、上部旋回体3を目標施工面に正対させることができる。また、オペレータは、MCスイッチを押下するだけで、上部旋回体3を目標施工面に正対させ且つ上述の目標施工面の掘削作業等に関するマシンコントロール機能を開始させることができる。
例えば、ショベル100の上部旋回体3が目標施工面に正対している状態は、アタッチメントの動作に従い、アタッチメントの先端部(例えば、バケット6の作業部位としての爪先や背面等)を目標施工面(上り法面BS)の傾斜方向に沿って移動させることが可能な状態である。具体的には、ショベル100の上部旋回体3が目標施工面に正対している状態は、ショベル100の旋回平面に鉛直なアタッチメントの稼動面(アタッチメント稼動面)が、円筒体に対応する目標施工面の法線を含む状態(換言すれば、当該法線に沿う状態)である。
ショベル100のアタッチメント稼動面が円筒体に対応する目標施工面の法線を含む状態にない場合、アタッチメントの先端部は、目標施工面を傾斜方向に移動させることができない。そのため、結果として、ショベル100は、目標施工面を適切に施工できない。これに対して、自動制御部54は、自動的に旋回油圧モータ2Aを回転させることで、上部旋回体3を正対させることができる。これにより、ショベル100は、目標施工面を適切に施工することができる。
自動制御部54は、正対制御において、例えば、バケット6の爪先の左端の座標点と目標施工面との間の左端鉛直距離(以下、単に「左端鉛直距離」)と、バケット6の爪先の右端の座標点と目標施工面との間の右端鉛直距離(以下、単に「右端鉛直距離」)とが等しくなった場合に、ショベルが目標施工面に正対していると判断する。また、自動制御部54は、左端鉛直距離と右端鉛直距離とが等しくなった場合(即ち、左端鉛直距離と右端鉛直距離との差がゼロになった場合)ではなく、その差が所定値以下になった場合に、ショベル100が目標施工面に正対していると判断してもよい。
また、自動制御部54は、正対制御において、例えば、左端鉛直距離と右端鉛直距離との差に基づき、旋回油圧モータ2Aを動作させてもよい。具体的には、MCスイッチ等の所定のスイッチが押下された状態で旋回操作に対応するレバー装置26Cが操作されると、上部旋回体3を目標施工面に正対させる方向にレバー装置26Cが操作されたか否かを判断する。例えば、バケット6の爪先と目標施工面(上り法面BS)との間の鉛直距離が大きくなる方向にレバー装置26Cが操作された場合、自動制御部54は、正対制御を実行しない。一方で、バケット6の爪先と目標施工面(上り法面BS)との間の鉛直距離が小さくなる方向に旋回操作レバーが操作された場合、自動制御部54は、正対制御を実行する。その結果、自動制御部54は、左端鉛直距離と右端鉛直距離との差が小さくなるように旋回油圧モータ2Aを動作させることができる。その後、自動制御部54は、その差が所定値以下或いはゼロになると、旋回油圧モータ2Aを停止させる。また、自動制御部54は、その差が所定値以下或いはゼロとなる旋回角度を目標角度として設定し、その目標角度と現在の旋回角度(具体的には、旋回状態センサS5の検出信号に基づく検出値)との角度差がゼロになるように、旋回油圧モータ2Aの動作制御を行ってもよい。この場合、旋回角度は、例えば、基準方向に対する上部旋回体3の前後軸の角度である。
尚、上述の如く、旋回油圧モータ2Aの代わりに、旋回用電動機がショベル100に搭載される場合、自動制御部54は、旋回用電動機(アクチュエータの一例)を制御対象として、正対制御を行う。
旋回角度算出部55は、上部旋回体3の旋回角度を算出する。これにより、コントローラ30は、上部旋回体3の現在の向きを特定することができる。旋回角度算出部55は、例えば、測位装置P0に含まれるGNSSコンパスの出力信号に基づき、基準方向に対する上部旋回体3の前後軸の角度を旋回角度として算出する。また、旋回角度算出部55は、旋回状態センサS5の検出信号に基づき、旋回角度を算出してもよい。また、施工現場に基準点が設定されている場合、旋回角度算出部55は、旋回軸から基準点を見た方向を基準方向としてもよい。
旋回角度は、基準方向に対するアタッチメント稼動面が延びる方向を示す。アタッチメント稼動面は、例えば、アタッチメントを縦断する仮想平面であり、旋回平面に垂直となるように配置される。旋回平面は、例えば、旋回軸に垂直な旋回フレームの底面を含む仮想平面である。コントローラ30(マシンガイダンス部50)は、例えば、アタッチメント稼動面が目標施工面の法線を含んでいると判断した場合に、上部旋回体3が目標施工面に正対していると判断する。
相対角度算出部56は、上部旋回体3を目標施工面に正対させるために必要な旋回角度(相対角度)を算出する。相対角度は、例えば、上部旋回体3を目標施工面に正対させたときの上部旋回体3の前後軸の方向と、上部旋回体3の前後軸の現在の方向との間に形成される相対的な角度である。相対角度算出部56は、例えば、記憶装置47に記憶されている目標施工面に関するデータと、旋回角度算出部55により算出された旋回角度とに基づき、相対角度を算出する。
自動制御部54は、MCスイッチ等の所定のスイッチが押下された状態で旋回操作に対応するレバー装置26Cが操作されると、上部旋回体3を目標施工面に正対させる方向に旋回操作されたか否かを判断する。自動制御部54は、上部旋回体3を目標施工面に正対させる方向に旋回操作されたと判断した場合、相対角度算出部56により算出された相対角度を目標角度として設定する。そして、自動制御部54は、レバー装置26Cが操作された後の旋回角度の変化が目標角度に達した場合、上部旋回体3が目標施工面に正対したと判断し、旋回油圧モータ2Aの動きを停止させてよい。これにより、自動制御部54は、図2に示す構成を前提として、上部旋回体3を目標施工面に正対させることができる。上記正対制御の実施例では目標施工面に対する正対制御の事例を示したが、これに限られることはない。例えば、仮置きの土砂をダンプトラックDT(図11参照)に積み込む際の掬い取り動作においても、目標体積に相当する目標掘削軌道を生成し、目標掘削軌道に対してアタッチメントが向かい合うように旋回動作の正対制御をおこなってもよい。この場合、掬い取り動作の都度、目標掘削軌道は変更される。このため、ダンプトラックDTへの排土後は、新たに変更された目標掘削軌道に対して正対制御される。
また、旋回油圧モータ2Aは、第1ポート2A1及び第2ポート2A2を有している。油圧センサ21は、旋回油圧モータ2Aの第1ポート2A1の作動油の圧力を検出する。油圧センサ22は、旋回油圧モータ2Aの第2ポート2A2の作動油の圧力を検出する。油圧センサ21,22により検出された吐出圧に対応する検出信号は、コントローラ30に取り込まれる。
また、第1ポート2A1は、リリーフ弁23を介して作動油タンクと接続される。リリーフ弁23は、第1ポート2A1側の圧力が所定のリリーフ圧に達した場合に開き、第1ポート2A1側の作動油を作動油タンクに排出する。同様に、第2ポート2A2は、リリーフ弁24を介して作動油タンクと接続される。リリーフ弁24は、第2ポート2A2側の圧力が所定のリリーフ圧に達した場合に開き、第2ポート2A2側の作動油を作動油タンクに排出する。
[ショベルの油圧システム]
次に、図3を参照して、本実施形態に係るショベル100の油圧システムについて説明する。
次に、図3を参照して、本実施形態に係るショベル100の油圧システムについて説明する。
図3は、本実施形態に係るショベル100の油圧システムの構成の一例を概略的に示す図である。
尚、図3において、機械的動力系、作動油ライン、パイロットライン、及び電気制御系は、図2等の場合と同様、それぞれ、二重線、実線、破線、及び点線で示されている。
当該油圧回路により実現される油圧システムは、エンジン11により駆動されるメインポンプ14L,14Rのそれぞれから、センタバイパス油路C1L,C1R、パラレル油路C2L,C2Rを経て作動油タンクまで作動油を循環させる。
センタバイパス油路C1Lは、メインポンプ14Lを起点として、コントロールバルブ17内に配置される制御弁171,173,175L,176Lを順に通過し、作動油タンクに至る。
センタバイパス油路C1Rは、メインポンプ14Rを起点として、コントロールバルブ17内に配置される制御弁172,174,175R,176Rを順に通過し、作動油タンクに至る。
制御弁171は、メインポンプ14Lから吐出される作動油を走行油圧モータ1Lへ供給し、且つ、走行油圧モータ1Lが吐出する作動油を作動油タンクに排出させるスプール弁である。
制御弁172は、メインポンプ14Rから吐出される作動油を走行油圧モータ1Rへ供給し、且つ、走行油圧モータ1Rが吐出する作動油を作動油タンクへ排出させるスプール弁である。
制御弁173は、メインポンプ14Lから吐出される作動油を旋回油圧モータ2Aへ供給し、且つ、旋回油圧モータ2Aが吐出する作動油を作動油タンクへ排出させるスプール弁である。
制御弁174は、メインポンプ14Rから吐出される作動油をバケットシリンダ9へ供給し、且つ、バケットシリンダ9内の作動油を作動油タンクへ排出させるスプール弁である。
制御弁175L,175Rは、それぞれ、メインポンプ14L,14Rが吐出する作動油をブームシリンダ7へ供給し、且つ、ブームシリンダ7内の作動油を作動油タンクへ排出させるスプール弁である。
制御弁176L,176Rは、メインポンプ14L,14Rが吐出する作動油をアームシリンダ8へ供給し、且つ、アームシリンダ8内の作動油を作動油タンクへ排出させる。
制御弁171,172,173,174,175L,175R,176L,176Rは、それぞれ、パイロットポートに作用するパイロット圧に応じて、油圧アクチュエータに給排される作動油の流量を調整したり、流れる方向を切り換えたりする。
パラレル油路C2Lは、センタバイパス油路C1Lと並列的に、制御弁171,173,175L,176Lにメインポンプ14Lの作動油を供給する。具体的には、パラレル油路C2Lは、制御弁171の上流側でセンタバイパス油路C1Lから分岐し、制御弁171,173,175L,176Rのそれぞれに並列してメインポンプ14Lの作動油を供給可能に構成される。これにより、パラレル油路C2Lは、制御弁171,173,175Lの何れかによってセンタバイパス油路C1Lを通る作動油の流れが制限或いは遮断された場合に、より下流の制御弁に作動油を供給できる。
パラレル油路C2Rは、センタバイパス油路C1Rと並列的に、制御弁172,174,175R,176Rにメインポンプ14Rの作動油を供給する。具体的には、パラレル油路C2Rは、制御弁172の上流側でセンタバイパス油路C1Rから分岐し、制御弁172,174,175R,176Rのそれぞれに並列してメインポンプ14Rの作動油を供給可能に構成される。パラレル油路C2Rは、制御弁172,174,175Rの何れかによってセンタバイパス油路C1Rを通る作動油の流れが制限或いは遮断された場合に、より下流の制御弁に作動油を供給できる。
レギュレータ13L,13Rは、それぞれ、コントローラ30による制御下で、メインポンプ14L,14Rの斜板の傾転角を調節することによって、メインポンプ14L,14Rの吐出量を調節する。
吐出圧センサ28Lは、メインポンプ14Lの吐出圧を検出し、検出された吐出圧に対応する検出信号は、コントローラ30に取り込まれる。吐出圧センサ28Rについても同様である。これにより、コントローラ30は、メインポンプ14L,14Rの吐出圧に応じて、レギュレータ13L,13Rを制御することができる。
センタバイパス油路C1L,C1Rには、最も下流にある制御弁176L,176Rのそれぞれと作動油タンクとの間には、ネガティブコントロール絞り(以下、「ネガコン絞り」)18L,18Rが設けられる。これにより、メインポンプ14L,14Rにより吐出された作動油の流れは、ネガコン絞り18L,18Rで制限される。そして、ネガコン絞り18L,18Rは、レギュレータ13L,13Rを制御するための制御圧(以下、「ネガコン圧」)を発生させる。
ネガコン圧センサ19L,19Rは、ネガコン圧を検出し、検出されたネガコン圧に対応する検出信号は、コントローラ30に取り込まれる。
コントローラ30は、吐出圧センサ28L,28Rにより検出されるメインポンプ14L,14Rの吐出圧に応じて、レギュレータ13L,13Rを制御し、メインポンプ14L,14Rの吐出量を調節してよい。例えば、コントローラ30は、メインポンプ14Lの吐出圧の増大に応じて、レギュレータ13Lを制御し、メインポンプ14Lの斜板傾転角を調節することにより、吐出量を減少させてよい。レギュレータ13Rについても同様である。これにより、コントローラ30は、吐出圧と吐出量との積で表されるメインポンプ14L,14Rの吸収馬力がエンジン11の出力馬力を超えないように、メインポンプ14L,14Rの全馬力制御を行うことができる。
また、コントローラ30は、ネガコン圧センサ19L,19Rにより検出されるネガコン圧に応じて、レギュレータ13L,13Rを制御することにより、メインポンプ14L,14Rの吐出量を調節してよい。例えば、コントローラ30は、ネガコン圧が大きいほどメインポンプ14L,14Rの吐出量を減少させ、ネガコン圧が小さいほどメインポンプ14L,14Rの吐出量を増大させる。
具体的には、ショベル100における油圧アクチュエータが何れも操作されていない待機状態(図3に示す状態)の場合、メインポンプ14L,14Rから吐出される作動油は、センタバイパス油路C1L,C1Rを通ってネガコン絞り18L,18Rに至る。そして、メインポンプ14L,14Rから吐出される作動油の流れは、ネガコン絞り18L,18Rの上流で発生するネガコン圧を増大させる。その結果、コントローラ30は、メインポンプ14L,14Rの吐出量を許容最小吐出量まで減少させ、吐出した作動油がセンタバイパス油路C1L,C1Rを通過する際の圧力損失(ポンピングロス)を抑制する。
一方、何れかの油圧アクチュエータが操作装置26を通じて操作された場合、メインポンプ14L,14Rから吐出される作動油は、操作対象の油圧アクチュエータに対応する制御弁を介して、操作対象の油圧アクチュエータに流れ込む。そして、メインポンプ14L,14Rから吐出される作動油の流れは、ネガコン絞り18L,18Rに至る量を減少或いは消失させ、ネガコン絞り18L,18Rの上流で発生するネガコン圧を低下させる。その結果、コントローラ30は、メインポンプ14L,14Rの吐出量を増大させ、操作対象の油圧アクチュエータに十分な作動油を循環させ、操作対象の油圧アクチュエータを確実に駆動させることができる。
[ショベルのマシンコントロール機能に関する構成の詳細]
次に、図4A~4Cを参照して、ショベル100のマシンコントロール機能に関する構成の詳細について説明する。
次に、図4A~4Cを参照して、ショベル100のマシンコントロール機能に関する構成の詳細について説明する。
図4A~4Cは、本実施形態に係るショベル100の油圧システムのうちの操作系に関する構成部分の一例を概略的に示す図である。具体的には、図4Aは、ブームシリンダ7を油圧制御する制御弁175L,175Rにパイロット圧を作用させるパイロット回路の一例を示す図である。また、図4Bは、バケットシリンダ9を油圧制御する制御弁174にパイロット圧を作用させるパイロット回路の一例を示す図である。また、図4Cは、旋回油圧モータ2Aを油圧制御する制御弁173にパイロット圧を作用させるパイロット回路の一例を示す図である。
また、例えば、図4Aに示すように、レバー装置26Aは、オペレータ等がブーム4に対応するブームシリンダ7を操作するために用いられる。レバー装置26Aは、パイロットポンプ15から吐出される作動油を利用して、その操作内容に応じたパイロット圧を二次側に出力する。
シャトル弁32ALは、二つの入口ポートが、それぞれ、ブーム4の上げ方向の操作(以下、「ブーム上げ操作」)に対応するレバー装置26Aの二次側のパイロットラインと、比例弁31ALの二次側のパイロットラインとに接続され、出口ポートが、制御弁175Lの右側のパイロットポート及び制御弁175Rの左側のパイロットポートに接続される。
シャトル弁32ARは、二つの入口ポートが、それぞれ、ブーム4の下げ方向の操作(以下、「ブーム下げ操作」)に対応するレバー装置26Aの二次側のパイロットラインと、比例弁31ARの二次側のパイロットラインとに接続され、出口ポートが、制御弁175Rの右側のパイロットポートに接続される。
つまり、レバー装置26Aは、シャトル弁32AL,32ARを介して、操作内容(例えば、操作方向及び操作量)に応じたパイロット圧を制御弁175L,175Rのパイロットポートに作用させる。具体的には、レバー装置26Aは、ブーム上げ操作された場合に、操作量に応じたパイロット圧をシャトル弁32ALの一方の入口ポートに出力し、シャトル弁32ALを介して、制御弁175Lの右側のパイロットポートと制御弁175Rの左側のパイロットポートに作用させる。また、レバー装置26Aは、ブーム下げ操作された場合に、操作量に応じたパイロット圧をシャトル弁32ARの一方の入口ポートに出力し、シャトル弁32ARを介して、制御弁175Rの右側のパイロットポートに作用させる。
比例弁31ALは、コントローラ30から入力される制御電流に応じて動作する。具体的には、比例弁31ALは、パイロットポンプ15から吐出される作動油を利用して、コントローラ30から入力される制御電流に応じたパイロット圧をシャトル弁32ALの他方の入口ポートに出力する。これにより、比例弁31ALは、シャトル弁32ALを介して、制御弁175Lの右側のパイロットポート及び制御弁175Rの左側のパイロットポートに作用するパイロット圧を調整することができる。
比例弁31ARは、コントローラ30から入力される制御電流に応じて動作する。具体的には、比例弁31ARは、パイロットポンプ15から吐出される作動油を利用して、コントローラ30から入力される制御電流に応じたパイロット圧をシャトル弁32ARの他方の入口ポートに出力する。これにより、比例弁31ARは、シャトル弁32ARを介して、制御弁175Rの右側のパイロットポートに作用するパイロット圧を調整することができる。
つまり、比例弁31AL,31ARは、レバー装置26Aの操作状態に依らず、制御弁175L、175Rを任意の弁位置で停止できるように、二次側に出力するパイロット圧を調整することができる。
比例弁33ALは、比例弁31ALと同様に、マシンコントロール用制御弁として機能する。比例弁33ALは、操作装置26とシャトル弁32ALとを接続する管路に配置され、その管路の流路面積を変更できるように構成されている。本実施形態では、比例弁33ALは、コントローラ30が出力する制御指令に応じて動作する。そのため、コントローラ30は、操作者による操作装置26の操作とは無関係に、操作装置26が吐出する作動油の圧力を減圧した上で、シャトル弁32ALを介し、コントロールバルブ17内の対応する制御弁のパイロットポートに供給できる。
同様に、比例弁33ARは、マシンコントロール用制御弁として機能する。比例弁33ARは、操作装置26とシャトル弁32ARとを接続する管路に配置され、その管路の流路面積を変更できるように構成されている。本実施形態では、比例弁33ARは、コントローラ30が出力する制御指令に応じて動作する。そのため、コントローラ30は、操作者による操作装置26の操作とは無関係に、操作装置26が吐出する作動油の圧力を減圧した上で、シャトル弁32ARを介し、コントロールバルブ17内の対応する制御弁のパイロットポートに供給できる。
操作圧センサ29Aは、オペレータによるレバー装置26Aに対する操作内容を圧力(操作圧)の形で検出し、検出された圧力に対応する検出信号は、コントローラ30に取り込まれる。これにより、コントローラ30は、レバー装置26Aに対する操作内容を把握できる。
コントローラ30は、オペレータによるレバー装置26Aに対するブーム上げ操作とは無関係に、パイロットポンプ15から吐出される作動油を、比例弁31AL及びシャトル弁32ALを介して、制御弁175Lの右側のパイロットポート及び制御弁175Rの左側のパイロットポートに供給させることができる。また、コントローラ30は、オペレータによるレバー装置26Aに対するブーム下げ操作とは無関係に、パイロットポンプ15から吐出される作動油を、比例弁31AR及びシャトル弁32ARを介して、制御弁175Rの右側のパイロットポートに供給できる。即ち、コントローラ30は、ブーム4の上げ下げの動作を自動制御することができる。また、コントローラ30は、特定の操作装置26に対する操作が行われている場合であっても、その特定の操作装置26に対応する油圧アクチュエータの動作を強制的に停止させることができる。
比例弁33ALは、コントローラ30が出力する制御指令(電流指令)に応じて動作する。そして、パイロットポンプ15からレバー装置26A、比例弁33AL、及びシャトル弁32ALを介して制御弁175Lの右側パイロットポート及び制御弁175Rの左側パイロットポートに導入される作動油によるパイロット圧を減圧する。比例弁33ARは、コントローラ30が出力する制御指令(電流指令)に応じて動作する。そして、パイロットポンプ15からレバー装置26A、比例弁33AR、及びシャトル弁32ARを介して制御弁175Rの右側パイロットポートに導入される作動油によるパイロット圧を減圧する。比例弁33AL、33ARは、制御弁175L、175Rを任意の弁位置で停止できるようにパイロット圧を調整可能である。
この構成により、コントローラ30は、操作者によるブーム上げ操作が行われている場合であっても、必要に応じて、制御弁175の上げ側のパイロットポート(制御弁175Lの左側パイロットポート及び制御弁175Rの右側パイロットポート)に作用するパイロット圧を減圧し、ブーム4の閉じ動作を強制的に停止させることができる。操作者によるブーム下げ操作が行われているときにブーム4の下げ動作を強制的に停止させる場合についても同様である。
或いは、コントローラ30は、操作者によるブーム上げ操作が行われている場合であっても、必要に応じて、比例弁31ARを制御し、制御弁175の上げ側のパイロットポートの反対側にある、制御弁175の下げ側のパイロットポート(制御弁175Rの右側パイロットポート)に作用するパイロット圧を増大させ、制御弁175を強制的に中立位置に戻すことで、ブーム4の上げ動作を強制的に停止させてもよい。この場合、比例弁33ALは省略されてもよい。操作者によるブーム下げ操作が行われている場合にブーム4の下げ動作を強制的に停止させる場合についても同様である。
図4Bに示すように、レバー装置26Bは、オペレータ等がバケット6に対応するバケットシリンダ9を操作するために用いられる。レバー装置26Bは、パイロットポンプ15から吐出される作動油を利用して、その操作内容に応じたパイロット圧を二次側に出力する。
シャトル弁32BLは、二つの入口ポートが、それぞれ、バケット6の閉じ方向の操作(以下、「バケット閉じ操作」)に対応するレバー装置26Bの二次側のパイロットラインと、比例弁31BLの二次側のパイロットラインとに接続され、出口ポートが、制御弁174の左側のパイロットポートに接続される。
シャトル弁32BRは、二つの入口ポートが、それぞれ、バケット6の開き方向の操作(以下、「バケット開き操作」)に対応するレバー装置26Bの二次側のパイロットラインと、比例弁31BRの二次側のパイロットラインとに接続され、出口ポートが、制御弁174の右側のパイロットポートに接続される。
つまり、レバー装置26Bは、シャトル弁32BL,32BRを介して、操作内容に応じたパイロット圧を制御弁174のパイロットポートに作用させる。具体的には、レバー装置26Bは、バケット閉じ操作された場合に、操作量に応じたパイロット圧をシャトル弁32BLの一方の入口ポートに出力し、シャトル弁32BLを介して、制御弁174の左側のパイロットポートに作用させる。また、レバー装置26Bは、バケット開き操作された場合に、操作量に応じたパイロット圧をシャトル弁32BRの一方の入口ポートに出力し、シャトル弁32BRを介して、制御弁174の右側のパイロットポートに作用させる。
比例弁31BLは、コントローラ30から入力される制御電流に応じて動作する。具体的には、比例弁31BLは、パイロットポンプ15から吐出される作動油を利用して、コントローラ30から入力される制御電流に応じたパイロット圧をシャトル弁32BLの他方のパイロットポートに出力する。これにより、比例弁31BLは、シャトル弁32BLを介して、制御弁174の左側のパイロットポートに作用するパイロット圧を調整することができる。
比例弁31BRは、コントローラ30が出力する制御電流に応じて動作する。具体的には、比例弁31BRは、パイロットポンプ15から吐出される作動油を利用して、コントローラ30から入力される制御電流に応じたパイロット圧をシャトル弁32BRの他方のパイロットポートに出力する。これにより、比例弁31BRは、シャトル弁32BRを介して、制御弁174の右側のパイロットポートに作用するパイロット圧を調整することができる。
つまり、比例弁31BL,31BRは、レバー装置26Bの操作状態に依らず、制御弁174を任意の弁位置で停止できるように、二次側に出力するパイロット圧を調整することができる。
比例弁33BLは、比例弁31BLと同様に、マシンコントロール用制御弁として機能する。比例弁33BLは、操作装置26とシャトル弁32BLとを接続する管路に配置され、その管路の流路面積を変更できるように構成されている。本実施形態では、比例弁33BLは、コントローラ30が出力する制御指令に応じて動作する。そのため、コントローラ30は、操作者による操作装置26の操作とは無関係に、操作装置26が吐出する作動油の圧力を減圧した上で、シャトル弁32BLを介し、コントロールバルブ17内の対応する制御弁のパイロットポートに供給できる。
同様に、比例弁33BRは、マシンコントロール用制御弁として機能する。比例弁33BRは、操作装置26とシャトル弁32BRとを接続する管路に配置され、その管路の流路面積を変更できるように構成されている。本実施形態では、比例弁33BRは、コントローラ30が出力する制御指令に応じて動作する。そのため、コントローラ30は、操作者による操作装置26の操作とは無関係に、操作装置26が吐出する作動油の圧力を減圧した上で、シャトル弁32BRを介し、コントロールバルブ17内の対応する制御弁のパイロットポートに供給できる。
操作圧センサ29Bは、オペレータによるレバー装置26Bに対する操作内容を圧力(操作圧)の形で検出し、検出された圧力に対応する検出信号は、コントローラ30に取り込まれる。これにより、コントローラ30は、レバー装置26Bの操作内容を把握できる。
コントローラ30は、オペレータによるレバー装置26Bに対するバケット閉じ操作とは無関係に、パイロットポンプ15から吐出される作動油を、比例弁31BL及びシャトル弁32BLを介して、制御弁174の左側のパイロットポートに供給させることができる。また、コントローラ30は、オペレータによるレバー装置26Bに対するバケット開き操作とは無関係に、パイロットポンプ15から吐出される作動油を、比例弁31BR及びシャトル弁32BRを介して、制御弁174の右側のパイロットポートに供給させることができる。即ち、コントローラ30は、バケット6の開閉動作を自動制御することができる。また、コントローラ30は、特定の操作装置26に対する操作が行われている場合であっても、その特定の操作装置26に対応する油圧アクチュエータの動作を強制的に停止させることができる。
なお、操作者によるバケット閉じ操作又はバケット開き操作が行われている場合にバケット6の動作を強制的に停止させる比例弁33BL,33BRの操作は、操作者によるブーム上げ操作又はブーム下げ操作が行われている場合にブーム4の動作を強制的に停止させる比例弁33AL,33ARの操作と同様であり、重複する説明を省略する。
また、例えば、図4Cに示すように、レバー装置26Cは、オペレータ等が上部旋回体3(旋回機構2)に対応する旋回油圧モータ2Aを操作するために用いられる。レバー装置26Cは、パイロットポンプ15から吐出される作動油を利用して、その操作内容に応じたパイロット圧を二次側に出力する。
シャトル弁32CLは、二つの入口ポートが、それぞれ、上部旋回体3の左方向の旋回操作(以下、「左旋回操作」)に対応するレバー装置26Cの二次側のパイロットラインと、比例弁31CLの二次側のパイロットラインとに接続され、出口ポートが、制御弁173の左側のパイロットポートに接続される。
シャトル弁32CRは、二つの入口ポートが、それぞれ、上部旋回体3の右方向の旋回操作(以下、「右旋回操作」)に対応するレバー装置26Cの二次側のパイロットラインと、比例弁31CRの二次側のパイロットラインとに接続され、出口ポートが、制御弁173の右側のパイロットポートに接続される。
つまり、レバー装置26Cは、シャトル弁32CL,32CRを介して、左右方向への操作内容に応じたパイロット圧を制御弁173のパイロットポートに作用させる。具体的には、レバー装置26Cは、左旋回操作された場合に、操作量に応じたパイロット圧をシャトル弁32CLの一方の入口ポートに出力し、シャトル弁32CLを介して、制御弁173の左側のパイロットポートに作用させる。また、レバー装置26Cは、右旋回操作された場合に、操作量に応じたパイロット圧をシャトル弁32CRの一方の入口ポートに出力し、シャトル弁32CRを介して、制御弁173の右側のパイロットポートに作用させる。
比例弁31CLは、コントローラ30から入力される制御電流に応じて動作する。具体的には、比例弁31CLは、パイロットポンプ15から吐出される作動油を利用して、コントローラ30から入力される制御電流に応じたパイロット圧をシャトル弁32CLの他方のパイロットポートに出力する。これにより、比例弁31CLは、シャトル弁32CLを介して、制御弁173の左側のパイロットポートに作用するパイロット圧を調整することができる。
比例弁31CRは、コントローラ30が出力する制御電流に応じて動作する。具体的には、比例弁31CRは、パイロットポンプ15から吐出される作動油を利用して、コントローラ30から入力される制御電流に応じたパイロット圧をシャトル弁32CRの他方のパイロットポートに出力する。これにより、比例弁31CRは、シャトル弁32CRを介して、制御弁173の右側のパイロットポートに作用するパイロット圧を調整することができる。
つまり、比例弁31CL,31CRは、レバー装置26Cの操作状態に依らず、制御弁173を任意の弁位置で停止できるように、二次側に出力するパイロット圧を調整することができる。
比例弁33CLは、比例弁31CLと同様に、マシンコントロール用制御弁として機能する。比例弁33CLは、操作装置26とシャトル弁32CLとを接続する管路に配置され、その管路の流路面積を変更できるように構成されている。本実施形態では、比例弁33CLは、コントローラ30が出力する制御指令に応じて動作する。そのため、コントローラ30は、操作者による操作装置26の操作とは無関係に、操作装置26が吐出する作動油の圧力を減圧した上で、シャトル弁32CLを介し、コントロールバルブ17内の対応する制御弁のパイロットポートに供給できる。
同様に、比例弁33CRは、マシンコントロール用制御弁として機能する。比例弁33CRは、操作装置26とシャトル弁32CRとを接続する管路に配置され、その管路の流路面積を変更できるように構成されている。本実施形態では、比例弁33CRは、コントローラ30が出力する制御指令に応じて動作する。そのため、コントローラ30は、操作者による操作装置26の操作とは無関係に、操作装置26が吐出する作動油の圧力を減圧した上で、シャトル弁32CRを介し、コントロールバルブ17内の対応する制御弁のパイロットポートに供給できる。
操作圧センサ29Cは、オペレータによるレバー装置26Cに対する操作状態を圧力として検出し、検出された圧力に対応する検出信号は、コントローラ30に取り込まれる。これにより、コントローラ30は、レバー装置26Cに対する左右方向への操作内容を把握できる。
コントローラ30は、オペレータによるレバー装置26Cに対する左旋回操作とは無関係に、パイロットポンプ15から吐出される作動油を、比例弁31CL及びシャトル弁32CLを介して、制御弁173の左側のパイロットポートに供給させることができる。また、コントローラ30は、オペレータによるレバー装置26Cに対する右旋回操作とは無関係に、パイロットポンプ15から吐出される作動油を、比例弁31CR及びシャトル弁32CRを介して、制御弁173の右側のパイロットポートに供給させることができる。即ち、コントローラ30は、上部旋回体3の左右方向への旋回動作を自動制御することができる。また、コントローラ30は、特定の操作装置26に対する操作が行われている場合であっても、その特定の操作装置26に対応する油圧アクチュエータの動作を強制的に停止させることができる。
なお、操作者による旋回操作が行われている場合に上部旋回体3の動作を強制的に停止させる比例弁33CL,33CRの操作は、操作者によるブーム上げ操作又はブーム下げ操作が行われている場合にブーム4の動作を強制的に停止させる比例弁33AL,33ARの操作と同様であり、重複する説明を省略する。
尚、ショベル100は、更に、アーム5を自動的に開閉させる構成、及び、下部走行体1を自動的に前進・後進させる構成を備えていてもよい。この場合、油圧システムのうち、アームシリンダ8の操作系に関する構成部分、走行油圧モータ1Lの操作系に関する構成部分、及び、走行油圧モータ1Rの操作に関する構成部分は、ブームシリンダ7の操作系に関する構成部分等(図4A~4C)と同様に構成されてよい。
[ショベルの土砂荷重検出機能に関する構成の詳細]
次に、図5を参照して、本実施形態に係るショベル100の土砂荷重検出機能に関する構成の詳細について説明する。図5は、本実施形態に係るショベル100のうちの土砂荷重検出機能に関する構成部分の一例を概略的に示す図である。
次に、図5を参照して、本実施形態に係るショベル100の土砂荷重検出機能に関する構成の詳細について説明する。図5は、本実施形態に係るショベル100のうちの土砂荷重検出機能に関する構成部分の一例を概略的に示す図である。
図3で前述したように、コントローラ30は、バケット6で掘削した土砂の荷重を検出する機能に関する機能部として、土砂荷重処理部60を含む。
土砂荷重処理部60は、積載物重量算出部61と、最大積載量検出部62と、加算積載量算出部63と、残積載量算出部64と、積載物重心算出部65と、を有する。
ここで、本実施形態に係るショベル100によるダンプトラックDTへの土砂(積載物)の積み込み作業の動作の一例について説明する。
まず、ショベル100は、掘削位置において、アタッチメントを制御してバケット6により土砂を掘削する(掘削動作)。次に、ショベル100は、上部旋回体3を旋回させ、バケット6を掘削位置から放土位置へと移動する(旋回動作)。放土位置の下方には、ダンプトラックDTの荷台が配置されている。次に、ショベル100は、放土位置において、アタッチメントを制御してバケット6内の土砂を放土することにより、バケット6内の土砂をダンプトラックDTの荷台へと積み込む(放土動作)。次に、ショベル100は、上部旋回体3を旋回させ、バケット6を放土位置から掘削位置へと移動する(旋回動作)。これらの動作を繰り返すことにより、ショベル100は、掘削した土砂をダンプトラックDTの荷台へと積み込む。
積載物重量算出部61は、バケット6内の土砂(積載物)の重量を算出する。積載物重量算出部61は、第1重量算出部611と、第2重量算出部612と、切替判断部613と、を有している。
第1重量算出部611は、ブームシリンダ7の推力に基づいて、土砂重量を算出する。第2重量算出部612は、バケットシリンダ9の推力に基づいて、土砂重量を算出する。なお、第1重量算出部611及び第2重量算出部612における土砂重量の算出方法は、後述する。
切替判断部613は、積載物重量算出部61が出力する土砂重量を、第1重量算出部611で算出された土砂重量とするか、第2重量算出部612で算出された土砂重量とするか、を判断して切り替える。
なお、積載物重量算出部61は、第1重量算出部611及び第2重量算出部612の両方が、それぞれ土砂重量の算出を行っており、切替判断部613において2つの算出した土砂重量のうちどちらを積載物重量算出部61が出力する土砂重量とするかを判断して切り替える構成であってもよい。
また、積載物重量算出部61は、切替判断部613によって、土砂重量を算出する重量算出部を切り替える、即ち、第1重量算出部611及び第2重量算出部612のうち、一方の重量算出部の処理を機能させるとともに、他方の重量算出部の処理を停止させる構成であってもよい。また、第1重量算出部611は切替判断部613の判断によらずに常時土砂重量の算出を行っており、第2重量算出部612は切替判断部613において選択された時のみ土砂重量を算出する構成であってもよい。
切替判断部613は、ブーム4を駆動するブームシリンダ7の状態に応じて、第1重量算出部611と第2重量算出部612とを切り替える。例えば、切替判断部613は、第1重量算出部611での土砂重量の算出を基本とし、所定の条件を満たした場合に、第2重量算出部612での土砂重量の算出に切り替える。また、切替判断部613は、所定の条件を満たさなくなると、再び、第1重量算出部611での土砂重量の算出に切り替える。
ここで、所定の条件とは、例えば、ブーム4上げ動作の動作開始時または動作終了時としてもよい。例えば、切替判断部613は、ブーム角度センサS1(姿勢センサ)の検出値に基づいて、ブーム4を上げる動作の動作開始時または動作終了時であるか否かを判定する。ブーム4を上げる動作の動作開始時または動作終了時である場合、切替判断部613は、第2重量算出部612を選択する。ブーム4を上げる動作の動作開始時及び動作終了時でない場合、切替判断部613は、第1重量算出部611を選択する。なお、ブーム4を上げる動作の動作開始時または動作終了時であるか否かを検知する方法は、これに限られるものではなく、操作装置26の入力を検知するセンサ(図示せず)によってなされてもよく、パイロット圧を検知するセンサ(図示せず)によってなされてもよく、限定するものではない。また、所定の条件とは、ブーム4上げ動作の動作開始時または動作終了時に限られるものではない。例えば、時間に対して、第1重量算出部611で算出した土砂重量の値に振動が発生する場合である。
第1重量算出部611は、ブームシリンダ7の推力に基づいて土砂重量を算出する。例えば、第1重量算出部611は、ブームシリンダ7の推力と、上部旋回体3とブーム4とを連結するピンから土砂重心までの距離と、上部旋回体3とブーム4とを連結するピン回りのモーメントの式と、に基づいて土砂重量を算出する。また、第2重量算出部612は、バケットシリンダ9の推力に基づいて土砂重量を算出する。例えば、第2重量算出部612は、バケットシリンダ9の推力と、アーム5とバケット6とを連結するピンから土砂重心までの距離と、アーム5とバケット6とを連結するピン回りのモーメントの式と、に基づいて土砂重量を算出する。
ここで、上部旋回体3とブーム4とを連結するピンから土砂重心までの距離の方が、アーム5とバケット6とを連結するピンから土砂重心までの距離よりも長くなっている。このため、例えば、推定した土砂重心の位置と実際の土砂重心の位置との位置ずれに対して、上部旋回体3とブーム4とを連結するピンから土砂重心までの距離の方が、アーム5とバケット6とを連結するピンから土砂重心までの距離よりも、位置ずれによる影響が小さくなる。よって、第1重量算出部611の方が、第2重量算出部612よりも精度よく土砂重量を算出することができる。
しかしながら、例えば、ブーム4上げ動作の開始時及びブーム4上げ動作の終了時において、ブームシリンダ7の推力に振動が発生し、第1重量算出部611で算出される土砂重量にも振動が発生する。このため、第1重量算出部611では、精度よく土砂重量を検出することが困難となる。この場合、切替判断部613は、土砂重量の算出を第2重量算出部612へと切り替える。これにより、ブーム4上げ動作の開始時及びブーム4上げ動作の終了時においても、精度を保って土砂重量を算出することができる。
なお、第2重量算出部612は、バケットシリンダ9の推力に基づいて土砂重量を算出するものとして説明したが、これに限られるものではない。第2重量算出部612は、アームシリンダ8の推力に基づいて土砂重量を算出してもよい。例えば、第2重量算出部612は、アームシリンダ8の推力と、ブーム4とアーム5とを連結するピンから土砂重心までの距離と、ブーム4とアーム5とを連結するピン回りのモーメントの式と、に基づいて土砂重量を算出してもよい。
なお、本実施形態において、切替判断部613は、積載物重量算出部61が出力する土砂重量を、第1重量算出部611で算出された土砂重量とするか、第2重量算出部612で算出された土砂重量とするか、を判断して切り替える事例を説明したが、これに限られるものではない。積載物重量算出部61は、第2重量算出部612のみを用いてバケットシリンダ9の推力に基づいて土砂重量を算出してもよい。第1重量算出部611を用いてブームシリンダ7の推力に基づいて土砂重量を算出する場合には、アタッチメントの重量等のパラメータを考慮しなければならず、精度が低下するおそれがある。これに対し、第2重量算出部612を用いてバケットシリンダ9の推力に基づいて土砂重量を算出することにより、考慮するパラメータを低減することができ、土砂重量の算出精度を向上させることができる。
最大積載量検出部62は、土砂を積載する対象のダンプトラックDTの最大積載量を検出する。例えば、最大積載量検出部62は、撮像装置S6で撮像された画像に基づいて、土砂を積載する対象のダンプトラックDTを特定する。次に、最大積載量検出部62は、特定されたダンプトラックDTの画像に基づいて、ダンプトラックDTの最大積載量を検出する。例えば、最大積載量検出部62は、特定されたダンプトラックDTの画像に基づいて、ダンプトラックDTの車種(サイズ等)を判定する。最大積載量検出部62は、車種と最大積載量とを対応付けしたテーブルを有しており、画像から判定した車種及びテーブルに基づいて、ダンプトラックDTの最大積載量を求める。なお、入力装置42によってダンプトラックDTの最大積載量、車種等が入力され、最大積載量検出部62は、入力装置42の入力情報に基づいて、ダンプトラックDTの最大積載量を求めてもよい。
加算積載量算出部63は、ダンプトラックDTに積載された土砂重量を算出する。即ち、バケット6内の土砂がダンプトラックDTの荷台に放土されるごとに、加算積載量算出部63は、積載物重量算出部61で算出されたバケット6内の土砂重量を加算して、ダンプトラックDTの荷台に積載された土砂重量の合計である加算積載量(合計重量)を算出する。なお、土砂を積載する対象のダンプトラックDTが新しいダンプトラックDTとなった場合には、加算積載量はリセットされる。
残積載量算出部64は、最大積載量検出部62で検出したダンプトラックDTの最大積載量と、加算積載量算出部63で算出した現在の加算積載量との差を残積載量として算出する。残積載量とは、ダンプトラックDTに積載可能な土砂の残りの重量である。
積載物重心算出部65は、バケット6内の土砂(積載物)の重心を算出する。なお、土砂の重心の算出方法については、後述する。
表示装置40には、積載物重量算出部61で算出されたバケット6内の土砂重量、最大積載量検出部62で検出されたダンプトラックDTの最大積載量、加算積載量算出部63で算出されたダンプトラックDTの加算積載量(荷台に積載された土砂重量の合計)、残積載量算出部64で算出されたダンプトラックDTの残積載量(積載可能な土砂の残りの重量)が表示されてもよい。
なお、加算積載量が最大積載量を超えた場合、表示装置40に警告が出るように構成されていてもよい。また、算出されたバケット6内の土砂重量が残積載量を超える場合、表示装置40に警告が出るように構成されていてもよい。なお、警告は、表示装置40に表示される場合に限られず、音声出力装置43による音声出力であってもよい。これにより、ダンプトラックDTの最大積載量を超えて土砂が積載されることを防止することができる。
[第1重量算出部611における土砂重量算出方法]
次に、図5を参照しつつ、図6A~6Bを用いて、本実施形態に係るショベル100の第1重量算出部611におけるバケット6内の土砂(積載物)の重量を算出する方法について説明する。
次に、図5を参照しつつ、図6A~6Bを用いて、本実施形態に係るショベル100の第1重量算出部611におけるバケット6内の土砂(積載物)の重量を算出する方法について説明する。
図6A~6Bは、ショベル100のアタッチメントにおける土砂重量の算出に関するパラメータを説明する模式図である。図6Aはショベル100を示し、図6Bはバケット6付近を示す。なお、以下の説明において、後述するピンP1とバケット重心G3及び土砂重心Gsが水平線L1上に配置されているものとして説明する。
ここで、上部旋回体3とブーム4を連結するピンをP1とする。上部旋回体3とブームシリンダ7を連結するピンをP2とする。ブーム4とブームシリンダ7を連結するピンをP3とする。ブーム4とアームシリンダ8を連結するピンをP4とする。アーム5とアームシリンダ8を連結するピンをP5とする。ブーム4とアーム5を連結するピンをP6とする。アーム5とバケット6を連結するピンをP7とする。また、ブーム4の重心をG1とする。アーム5の重心をG2とする。バケット6の重心をG3とする。バケット6に積載された土砂(積載物)の重心をGsとする。基準線L2は、ピンP7を通りバケット6の開口面と平行な線とする。また、ピンP1とブーム4の重心G4との距離をD1とする。ピンP1とアーム5の重心G5との距離をD2とする。ピンP1とバケット6の重心G6との距離をD3とする。ピンP1と土砂の重心Gsとの距離をDsとする。ピンP2とピンP3を結ぶ直線と、ピンP1との距離をDcとする。また、ブームシリンダ7のシリンダ圧の検出値をFbとする。また、ブーム重量のうち、ピンP1とブーム重心G1を結ぶ直線に対して垂直方向の垂直成分をW1aとする。アーム重量のうち、ピンP1とアーム重心G2を結ぶ直線に対して垂直方向の垂直成分をW2aとする。バケット6の重量をW6とし、バケット6に積載された土砂(積載物)の重量をWsとする。
図6Aに示すように、ピンP7の位置は、ブーム角度及びアーム角度により算出される。即ち、ピンP7の位置は、ブーム角度センサS1及びアーム角度センサS2の検出値に基づいて算出することができる。
また、図6Bに示すように、ピンP7とバケット重心G3との位置関係(バケット6の基準線L2と、ピンP7とバケット重心G3を結ぶ直線との角度θ4。ピンP7とバケット重心G3との距離D4。)は、規定値である。また、ピンP7と土砂重心Gsとの位置関係(バケット6の基準線L2と、ピンP7と土砂重心Gsを結ぶ直線との角度θ5。ピンP7と土砂重心Gsとの距離D5。)は、例えば、実験的に予め求めてコントローラ30に記憶させておく。即ち、バケット角度センサS3に基づいて、土砂重心Gsとバケット重心G3を推定することができる。
即ち、積載物重心算出部65は、ブーム角度センサS1、アーム角度センサS2及びバケット角度センサS3の検出値に基づいて、土砂重心Gsを推定することができる。
次に、ピンP1回りの各モーメントとブームシリンダ7との釣り合いの式は、以下の式(A1)で表すことができる。
WsDs+W1aD1+W2aD2+W3D3=FbDc ・・・(A1)
式(1)を土砂重量Wsについて展開すると、以下の式(A2)で表すことができる。
Ws=(FbDc-(W1aD1+W2aD2+W3D3))/Ds ・・・(A2)
ここで、ブームシリンダ7のシリンダ圧の検出値Fbは、ブームロッド圧センサS7R、ブームボトム圧センサS7Bにより算出される。距離Dc、垂直成分の重量W1aは、ブーム角度センサS1により算出される。垂直成分の重量W2a、距離D2は、ブーム角度センサS1及びアーム角度センサS2により算出される。距離D1、重量W3は既知の値である。また、土砂重心Gsとバケット重心G3を推定したことにより、距離Ds、距離D3も推定される。
よって、土砂重量Wsは、ブームシリンダ7のシリンダ圧の検出値(ブームロッド圧センサS7R、ブームボトム圧センサS7Bの検出値)、ブーム角度(ブーム角度センサS1の検出値)及びアーム角度(アーム角度センサS2の検出値)に基づいて算出することができる。これにより、積載物重量算出部61は、積載物重心算出部65で推定した土砂重心Gsに基づいて土砂重量Wsを算出することができる。
なお、ショベル100が規定動作時であるか否かは、バケットシリンダ9のパイロットの検出値に基づいて、アタッチメントの姿勢を推定し、判定することができる。
なお、規定動作時におけるバケット6の姿勢は水平であるものとみなして、土砂重心を推定し、土砂重量を算出するものとして説明したが、これに限られるものではない。例えば、前方を撮像するカメラS6Fでバケット6を撮像し、その画像に基づいて、バケット6の姿勢を推定してもよい。また、カメラS6Fでバケット6を撮像し、その画像に基づいて、バケット6の姿勢が水平であると判定した場合に土砂重心の推定、土砂荷重の算出を行ってもよい。
[第2重量算出部612における土砂重量算出方法]
次に、図5を参照しつつ、図7A~7Bを用いて、本実施形態に係るショベル100の第2重量算出部612におけるバケット6内の土砂(積載物)の重量を算出する方法について説明する。
次に、図5を参照しつつ、図7A~7Bを用いて、本実施形態に係るショベル100の第2重量算出部612におけるバケット6内の土砂(積載物)の重量を算出する方法について説明する。
図7A~7Bは、バケット6に作用する力の関係を説明する部分拡大図である。また、図7Aは、バケット6内の土砂の形状が第1の形状(基準形状)である場合を示す。図7Bは、バケット6内の土砂の形状が第2の形状(土砂重量測定時の形状の一例)である場合を示す。
図7Aに示すように、バケットシリンダ9の後端側は、連結ピン9aによりアーム5の後端付近と連結されている。バケットシリンダ9の先端側は、連結ピン9bにより2つのリンク91,92の一端同士と連結されている。リンク91は、一端側が連結ピン9bによりバケットシリンダ9の先端側と連結され、他端側が連結ピン9cによりアーム5の先端付近と連結されている。リンク92は、一端側が連結ピン9bによりバケットシリンダ9の先端側と連結され、他端側が連結ピン9dによりバケット6の基端付近と連結されている。
また、図7Aに示すように、L1は、バケット6の重心Geと、バケット支持軸6bの中心との水平距離とする。L2は、バケット6内の土砂Lの重心Glと、バケット支持軸6bの中心との水平距離とする。L3は、連結ピン9aの中心及び連結ピン9bの中心を通る線分(バケットシリンダ9の中心軸)と、連結ピン9cの中心と、の距離とする。L4は、連結ピン9bの中心及び連結ピン9dの中心を通る線分(リンク92の中心軸)と、連結ピン9cの中心と、の距離とする。L5は、連結ピン9bの中心及び連結ピン9dの中心を通る線分(リンク92の中心軸)と、バケット支持軸6bの中心と、の距離とする。
ショベル100のバケット6を、アーム5の傾斜角によらず所定の積荷保持姿勢、例えば、バケット先端6aがバケット支持軸6bと同じ高さになるような所定の水平姿勢に維持した場合、バケット支持軸6bの回りには、バケット6側の重量によるモーメントMと、バケット6を積荷保持姿勢に維持するバケットシリンダ9の反力Fによるモーメントとが働く。バケット6はこの状態で釣合っているから、釣合い条件により、両モーメントは向きが反対で大きさが等しくなる。
バケット6側の重量によるモーメントMは、バケット6の自重WeによるモーメントMeと、土砂Lの重量WlによるモーメントMlと、に分けられるから、以下の式(1)で表すことができる。
M=Me+Ml …(1)
次に、バケット6を積荷保持姿勢に維持するバケットシリンダ9の反力Fによるモーメントについて説明する。まず、バケットシリンダ9の反力Fがリンク91の連結ピン9cの中心回りに与えるモーメントをmcとすると、以下の式(2-1)で表すことができる。
mc=F・L3 …(2-1)
一方、リンク91とリンク92は連結ピン9bの中心で回転自在に連結されており、リンク92の連結ピン9bから連結ピン9dの向きに働く反力をfbdとすると、連結ピン9cの中心回りのモーメントmcとの釣り合いから、以下の式(2-2)で表すことができる。
fbd・L4=mc …(2-2)
更に、バケット支持軸6bの中心回りでは、連結ピン9dの中心に働く反力fcdとバケット6のモーメントMが釣り合うので、以下の式(2-3)で表すことができる。
fcd・L5=M …(2-3)
式(2-1)から式(2-3)を整理すると、釣合の式は、以下の式(2)で表すことができる。
F・L3・L5/L4=M …(2)
ここで、バケット6を所定の積荷保持姿勢に保った場合、バケット支持軸6bの位置に対する連結ピン9a~9dの位置は、姿勢センサ(例えば、ブーム角度センサS1、アーム角度センサS2、バケット角度センサS3、機体傾斜センサS4、旋回状態センサS5)により一意的に求めることができ、距離L3,L4,L5を求めることができる。
また、バケットシリンダ9の圧力センサ(例えば、バケットロッド圧センサS9R、バケットボトム圧センサS9)に基づいて検出した負荷圧をPとし、バケットシリンダ9のピストンの受圧面積をSとすると、バケットシリンダ9の反力Fは、以下の式(3)で表すことができる。
F=P×S …(3)
以上の様に、姿勢センサ及びバケットシリンダ9の圧力センサの検出値に基づいて、式(2),(3)により、バケットシリンダ9の反力Fによるモーメントを求めることができる。
一方、バケット6の自重WeによるモーメントMeは、以下の式(4)で表すことができる。また、土砂Lの重量WlによるモーメントMlは、以下の式(5)で表すことができる。
Me=We×L1 …(4)
Ml=Wl×L2 …(5)
Ml=Wl×L2 …(5)
なお、バケット6を所定の積荷保持姿勢に保った場合、姿勢センサにより距離L1を求めることができる。なお、距離L2は、例えば、実験的に予め求めてコントローラ30に記憶させておく。また、後述する積載物重心算出部65で算出される土砂の重心に基づいて距離L2を求めてもよい。
以上の様に、姿勢センサ及びバケットシリンダ9の圧力センサの検出値に基づいて、式(1)から(5)により、土砂Lの重量Wlを求めることができる。なお、バケットシリンダ9の圧力に基づいて土砂重量を求める場合を例に説明したが、これに限られるものではない。例えば、姿勢センサ及びブームシリンダ7の圧力センサの検出値に基づいて、土砂Lの重量Wlを求めてもよい。また、姿勢センサ及びアームシリンダ8の圧力センサの検出値に基づいて、土砂Lの重量Wlを求めてもよい。なお、これらの場合の関係式は同様に求めればよく、説明を省略する。
ここで、ショベル100の掘削動作の際、バケット先端6aから土砂がバケット6内に入る。オペレータの技量によっては、バケット6内の土砂Lの形状は、図7Aに示す基準形状の様にバケット6を内に均等に積載される場合に限られない。例えば、図7Bに示すように、バケット6内の土砂Laの形状がバケット先端6aの側に片寄り、基準形状と異なる場合がある。この場合、バケット6内の土砂Laの重心Glaの位置は、図7Aに示す基準形状の土砂Lの重心Glの位置と異なる場合がある。
図5に戻り、積載物重心算出部65は、バケット6に積載された土砂の重心の位置を算出する機能を有している。積載物重心算出部65は、例えば、第1から第4の重心算出方法のいずれかを用いて土砂の重心の位置を算出する。
(第1の重心算出方法)
積載物重心算出部65による第1の重心算出方法について説明する。撮像装置S6は、バケット6に積載された土砂の形状を撮像する。積載物重心算出部65は、撮像装置S6で撮像された画像を取得する。積載物重心算出部65は、撮像装置S6で撮像された土砂の形状に基づいて、土砂の重心の位置を算出する。
積載物重心算出部65による第1の重心算出方法について説明する。撮像装置S6は、バケット6に積載された土砂の形状を撮像する。積載物重心算出部65は、撮像装置S6で撮像された画像を取得する。積載物重心算出部65は、撮像装置S6で撮像された土砂の形状に基づいて、土砂の重心の位置を算出する。
ここで、積載物重心算出部65は、バケット6内面の形状情報を有している。積載物重心算出部65は、撮像装置S6で撮像された土砂の形状と予め登録されているバケット6内面の形状情報に基づいて、バケット6に積載された土砂の全体の形状を推定する。積載物重心算出部65は、推定された土砂の全体の形状に基づいて、土砂の重心の位置を算出する。例えば、積載物重心算出部65は、土砂の密度分布が一様であるものとして、推定された土砂の全体の形状に基づいて、土砂の重心の位置を算出する。
なお、バケット6に積載された土砂の形状を撮像する撮像装置S6は、例えば、ショベル100の前方を撮像するカメラS6Fを用いてもよい。また、ブーム4やアーム5に土砂の形状を撮像するカメラ(図示せず)を設けてもよい。ブーム4やアーム5に撮像装置を設けることにより、土砂の上方から撮像することができるので、より精度よく土砂の形状を推定することができる。また、これらのカメラは、例えばステレオカメラであってもよい。
(第2の重心算出方法)
積載物重心算出部65による第2の重心算出方法について説明する。オペレータは、ショベル100の掘削動作を開始する前に、入力装置42を操作してパラメータを選択する。パラメータ(土砂特性情報)としては、例えば、掘削対象の土砂の種類(例えば、土、砂、砂利等)、土砂の状態(例えば、ウェット状態、ドライ状態等)を入力する。積載物重心算出部65は、入力された土砂の種類及び状態の少なくともいずれか一方に基づいて、土砂の重心の位置を算出する。
積載物重心算出部65による第2の重心算出方法について説明する。オペレータは、ショベル100の掘削動作を開始する前に、入力装置42を操作してパラメータを選択する。パラメータ(土砂特性情報)としては、例えば、掘削対象の土砂の種類(例えば、土、砂、砂利等)、土砂の状態(例えば、ウェット状態、ドライ状態等)を入力する。積載物重心算出部65は、入力された土砂の種類及び状態の少なくともいずれか一方に基づいて、土砂の重心の位置を算出する。
ここで、土砂の種類や状態によって安息角が異なる。このため、バケット6により土砂を掘削し、バケット6の姿勢を土砂重量を推定する姿勢(積荷保持姿勢)とした場合、バケット6に積載された土砂の上面の形状は土砂の種類や状態やパラメータ(土砂特性情報)等を用いて推定することができる。積載物重心算出部65は、推定された土砂の上面の形状とバケット6内面の形状情報に基づいて、バケット6に積載された土砂の全体の形状を推定する。また、積載物重心算出部65は、推定された土砂の全体の形状に基づいて、土砂の重心の位置を算出する。
なお、土砂のパラメータ(土砂特性情報:種類、状態等)と、バケット6に積載された土砂の重心の位置と、を対応付けしたテーブルを積載物重心算出部65に記憶しておいてもよい。この場合、積載物重心算出部65は、入力されたパラメータとテーブルとに基づいて、土砂の重心の位置を算出することができる。なお、テーブルは、実験、シミュレーション等により求めてもよい。
(第3の重心算出方法)
積載物重心算出部65による第3の重心算出方法について図8を用いて説明する。図8は、積載物重心算出部65による第3の重心算出方法を説明する模式図である。
積載物重心算出部65による第3の重心算出方法について図8を用いて説明する。図8は、積載物重心算出部65による第3の重心算出方法を説明する模式図である。
積載物重心算出部65は、バケット6を第1状態とした際のバケットシリンダ9のシリンダ圧と、バケット6を第2状態とした際のバケットシリンダ9のシリンダ圧と、に基づいて、土砂の重心の位置を算出する。
まず、コントローラ30は、バケット6を第1の状態(図8において実線で示す)とする。図8に示す例では、バケット6の開口面が水平となるような姿勢とする。ここで、第1の状態におけるバケット6の重心をGe1とし、第1の状態における土砂の重心をGl1とする。バケット支持軸6bから重心Ge1までの水平距離をLとし、バケット支持軸6bから重心Gl1までの水平距離をL+ΔLとする。また、土砂の重量をWとする。
第1の状態であって、バケット支持軸6bにおける土砂の自重によるトルクτ1は、以下の式(6)で表すことができる。
τ1=W(L+ΔL) …(6)
次に、コントローラ30は、バケット6を第2の状態(図8において二点鎖線で示す)とする。図8に示す例では、第1の状態からバケット角度をθだけ開いた姿勢とする。ここで、第2の状態におけるバケット6の重心をGe2とし、第2の状態における土砂の重心をGl2とする。この場合、バケット支持軸6bから重心Ge2までの水平距離はLsinθとなり、バケット支持軸6bから重心Gl2までの水平距離はLsinθ+ΔLsinθとなる。
第2の状態であって、バケット支持軸6bにおける土砂の自重によるトルクτ2は、以下の式(7)で表すことができる。
τ2=W(Lsinθ+ΔLsinθ) …(7)
式(6)及び式(7)において、土砂重量Wは一致するので、以下の式(8)を導く。
τ1/(L+ΔL)=τ2/(Lsinθ+ΔLsinθ) …(8)
ここで、トルクτ1及びトルクτ2は、バケットシリンダ9(バケットロッド圧センサS9R、バケットボトム圧センサS9B)のシリンダ圧、姿勢センサ(バケット角度センサS3)により求めることができる。また、角度θは、バケット角度センサS3により求めることができる。また、バケット6の重心Ge2は予め求められており、距離Lも既知の値である。積載物重心算出部65は、これらの値及び式(8)に基づいて、土砂の重心の位置を算出することができる。
(第4の重心算出方法)
積載物重心算出部65による第4の重心算出方法について図9を用いて説明する。図9は、積載物重心算出部65による第4の重心算出方法を説明する模式図である。
積載物重心算出部65による第4の重心算出方法について図9を用いて説明する。図9は、積載物重心算出部65による第4の重心算出方法を説明する模式図である。
積載物重心算出部65は、ブームシリンダ7の圧力、アームシリンダ8の圧力、バケットシリンダ9の圧力のうち少なくとも2つに基づいて、土砂の重心の位置を算出する。
まず、コントローラ30は、アタッチメントを所定の状態とする。図9に示す例では、バケット6の開口面が水平となるような姿勢とする。ここで、基準形状の土砂Lの重心をGlとし、実際の土砂Laの重心をGlaとする。上部旋回体3とブーム4を連結するブーム支持軸から重心Glまでの水平距離をL3とし、ブーム4とアーム5を連結するアーム支持軸から重心Glまでの水平距離をL4とし、重心Glと重心Glaの水平距離をΔLとする。また、土砂の重量をWとする。
ブーム支持軸における土砂の自重によるトルクτ3は、以下の式(9)で表すことができる。アーム支持軸における土砂の自重によるトルクτ4は、以下の式(10)で表すことができる。
τ3=W(L3-ΔL) …(9)
τ4=W(L4-ΔL) …(10)
τ4=W(L4-ΔL) …(10)
式(9)及び式(10)において、土砂重量Wは一致するので、以下の式(11)を導く。
τ3/(L3-ΔL)=τ4/(L4-ΔL) …(11)
ここで、トルクτ3は、ブームシリンダ7(ブームロッド圧センサS7R、ブームボトム圧センサS7B)のシリンダ圧、姿勢センサ(ブーム角度センサS1、アーム角度センサS2、バケット角度センサS3)により求めることができる。トルクτ4は、アームシリンダ8(アームロッド圧センサS8R、アームボトム圧センサS8B)のシリンダ圧、姿勢センサ(ブーム角度センサS1、アーム角度センサS2、バケット角度センサS3)により求めることができる。重心Glは予め設定された値であり、距離L3,L4は、姿勢センサ(ブーム角度センサS1、アーム角度センサS2、バケット角度センサS3)により求めることができる。積載物重心算出部65は、これらの値及び式(11)に基づいて、距離ΔLを算出することができる。即ち、積載物重心算出部65は、土砂Laの重心Llaの位置を算出することができる。
なお、ブームシリンダ7の圧力及びアームシリンダ8の圧力に基づいて、土砂の重心の位置を算出する場合を例に説明したが、これに限られるものではない。例えば、ブームシリンダ7の圧力及びバケットシリンダ9の圧力に基づいて、土砂の重心の位置を算出してもよい。また、アームシリンダ8の圧力及びバケットシリンダ9の圧力に基づいて、土砂の重心の位置を算出してもよい。なお、これらの場合の関係式は同様に求めればよく、説明を省略する。
以上、本実施形態に係るショベル100によれば、掘削された土砂重量を検出することができる。また、本実施形態に係るショベル100によれば、積載物重心算出部65により土砂の重心を算出し、算出した土砂の重心に基づいて土砂重量を算出することができる。これにより、例えば、バケット6に積載された土砂の片寄りが生じるような場合であっても、土砂の重心に基づいて土砂重量を算出することができ、土砂重量の検出精度を向上させることができる。
また、ダンプトラックDTに積載された土砂重量を算出することができる。これにより、ダンプトラックDTの過積載を防止することができる。例えば、作業現場から公道へ出る前にトラックスケール等によりダンプトラックDTの積載量がチェックされる。積載量が最大積載量を超えている場合、ダンプトラックDTはショベル100の位置まで戻り、積載している土砂を減らす作業が必要である。このため、ダンプトラックDTの運用効率が低下する。また、ダンプトラックDTの積載不足は、土砂を運搬するダンプトラックDTの延べ台数を増加させ、ダンプトラックDTの運用効率が低下する。これに対し、本実施形態に係るショベル100によれば、過積載を防止しつつ、土砂をダンプトラックDTに積載することができるので、ダンプトラックDTの運用効率を向上させることができる。
また、表示装置40には、バケット6内の土砂重量、ダンプトラックDTの最大積載量、加算積載量、残積載量が表示される。これにより、ショベル100に搭乗するペレータは、これらの表示を参照しながら作業を行うことにより、ダンプトラックDTに土砂を積載することができる。
以上、ショベル100の実施形態等について説明したが、本発明は上記実施形態等に限定されるものではなく、特許請求の範囲に記載された本発明の要旨の範囲内において、種々の変形、改良が可能である。
積載物重量算出部61は、バケットシリンダ9(ブームシリンダ7、アームシリンダ8)の圧力に基づいて、土砂の重量を算出するものとして説明したが土砂重量の算出方法はこれに限られるものではない。積載物重量算出部61は、上部旋回体3を旋回させる際の旋回トルクに基づいて土砂の重量を算出してもよい。
積載物重量算出部61が上部旋回体3を旋回させる際の旋回トルクに基づいて土砂の重量を算出する場合について説明する。上部旋回体3を旋回させる際の旋回トルクτの運動方程式は、以下の式(12)で表すことができる。なお、アタッチメント角θは、ブーム角度、アーム角度、バケット角度を含む。
また、バケット6内に土砂がない場合(空荷の場合)における上部旋回体3を旋回させる際の旋回トルクτ0の運動方程式は、以下の式(13)で表すことができる。
また、バケット6内に土砂がある場合における上部旋回体3を旋回させる際の旋回トルクτwの運動方程式は、以下の式(14)で表すことができる。
ここで、式(13)及び式(14)より、土砂がある場合の旋回トルクτwと土砂がない場合の旋回トルクτ0との差Δτは、以下の式(15)で表すことができる。
ここで、式(15)における積載物重量M以外のパラメータは、既知あるいは計測可能であるため、積載物重量Mを算出することが可能である。
即ち、積載物重量算出部61は、上部旋回体3の旋回動作において、上部旋回体3の旋回駆動力を取得する。ここで、上部旋回体3の旋回駆動力は、旋回油圧モータ2Aの一方のポートと他方のポートとの圧力差、即ち、油圧センサ21,22で検出した油圧の差から得られる。
また、積載物重量算出部61は、姿勢センサによりアタッチメントの姿勢を取得する。例えば、ブーム角度センサS1、アーム角度センサS2、バケット角度センサS3により、アタッチメント角(ブーム角度、アーム角度、バケット角度)を取得する。また、機体傾斜センサS4により、機体の傾斜角度を取得してもよい。また、積載物重量算出部61は、旋回状態センサS5により、上部旋回体3の旋回角速度及び旋回角度を取得する。
また、積載物重量算出部61は、事前にテーブルを有している。テーブルには、アタッチメントの姿勢と、旋回駆動力と、に対応して、積載物重量Mが対応付けされている。
これにより、積載物重量算出部61は、旋回駆動力、姿勢センサの情報、テーブルに基づいて、積載物重量Mを算出することができる。
また、積載物重量算出部61は、旋回駆動力により旋回イナーシャを求め、求めた旋回イナーシャに基づいて、積載物重量Mを算出してもよい。
ここで、バケット6内に土砂がない場合の旋回イナーシャは、アタッチメントの姿勢及び既知の情報(各部の重心位置、重量等)により求めることができる。また、バケット6内に土砂を有する場合の旋回イナーシャは、旋回トルクから計算することができる。
土砂がない場合の旋回イナーシャから土砂がある場合の旋回イナーシャへの増加量は、バケット6内の土砂重量に基づくものである。よって、土砂がない場合の旋回イナーシャと土砂を有する場合の旋回イナーシャへとを対比して、積載物重量Mを算出することができる。換言すれば、これらの旋回イナーシャの差分に基づいて、積載物重量Mを算出することができる。
ここで、土砂の重心位置は、式(14)におけるJw及びhwの項に含まれる。積載物重心算出部65が土砂の重心位置を算出することにより、上部旋回体3の旋回トルクを用いて積載物重量Mを算出する場合にも、算出精度を向上させることができる。
また、旋回駆動力には、慣性モーメント、旋回遠心力の影響が含まれている。このため、積載物重量算出部61における土砂重量の算出方法は、積載物の重量を計算する際に複雑な補償を必要とせず、積載物重量Mを直接求めることができる。
なお、ショベル100が上部旋回体3が旋回する場合を例に説明したが、これに限られるものではない。例えば、上部旋回体3が旋回するとともに、アタッチメントが旋回方向以外の方向に速度成分を持つ場合、アタッチメントの速度を考慮して積載物重量Mを求めてもよい。例えば、バケット6が上部旋回体3の回転軸よりも遠ざかるまたは近づく方向に移動する、バケット6が上部旋回体3の回転軸に沿った上方向または下方向に移動する場合、バケット6の速度を考慮して積載物重量Mを求めてもよい。
[メイン画面の構成例]
次に、図10を参照し、表示装置40に表示されるメイン画面41Vの構成例について説明する。図10のメイン画面41Vは、画像表示部41に表示される。
次に、図10を参照し、表示装置40に表示されるメイン画面41Vの構成例について説明する。図10のメイン画面41Vは、画像表示部41に表示される。
メイン画面41Vは、日時表示領域41a、走行モード表示領域41b、アタッチメント表示領域41c、燃費表示領域41d、エンジン制御状態表示領域41e、エンジン稼働時間表示領域41f、冷却水温表示領域41g、燃料残量表示領域41h、回転数モード表示領域41i、尿素水残量表示領域41j、作動油温表示領域41k、カメラ画像表示領域41m、現重量表示領域41p、累積重量表示領域41q、リセットボタン41r、残重量表示領域41s及び目標重量表示領域41tを含む。
走行モード表示領域41b、アタッチメント表示領域41c、エンジン制御状態表示領域41e及び回転数モード表示領域41iは、ショベル100の設定状態に関する情報である設定状態情報を表示する領域である。燃費表示領域41d、エンジン稼働時間表示領域41f、冷却水温表示領域41g、燃料残量表示領域41h、尿素水残量表示領域41j、作動油温表示領域41k、現重量表示領域41p及び累積重量表示領域41qは、ショベル100の稼動状態に関する情報である稼動状態情報を表示する領域である。
具体的には、日時表示領域41aは、現在の日時を表示する領域である。走行モード表示領域41bは、現在の走行モードを表示する領域である。アタッチメント表示領域41cは、現在装着されているエンドアタッチメントを表す画像を表示する領域である。図10は、バケット6を表す画像が表示された状態を示している。
燃費表示領域41dは、コントローラ30によって算出された燃費情報を表示する領域である。燃費表示領域41dは、生涯平均燃費又は区間平均燃費を表示する平均燃費表示領域41d1、瞬間燃費を表示する瞬間燃費表示領域41d2を含む。
エンジン制御状態表示領域41eは、エンジン11の制御状態を表示する領域である。エンジン稼働時間表示領域41fは、エンジン11の累積稼働時間を表示する領域である。冷却水温表示領域41gは、現在のエンジン冷却水の温度状態を表示する領域である。燃料残量表示領域41hは、燃料タンクに貯蔵されている燃料の残量状態を表示する領域である。回転数モード表示領域41iは、エンジン回転数調節ダイヤル75によって設定された現在の回転数モードを表示する領域である。尿素水残量表示領域41jは、尿素水タンクに貯蔵されている尿素水の残量状態を表示する領域である。作動油温表示領域41kは、作動油タンク内の作動油の温度状態を表示する領域である。
カメラ画像表示領域41mは、撮像装置S6が撮像した画像を表示する領域である。図10の例では、カメラ画像表示領域41mは、バックカメラ80Bが撮像したバックカメラ画像を表示している。バックカメラ画像は、ショベル100の後方の空間を映し出す後方画像であり、カウンタウェイトの画像3aを含む。
現重量表示領域41pは、バケット6が現に持ち上げている物体の重量(現重量)を表示する領域である。図10は、現重量が550kgであることを示している。
コントローラ30は、例えば、作業アタッチメントの姿勢とブームボトム圧と予め登録されている作業アタッチメントの仕様(重量及び重心位置等)とに基づいて現重量を算出する。具体的には、コントローラ30は、ブーム角度センサS1、アーム角度センサS2及びブームボトム圧センサS6b等の情報取得装置の出力に基づいて現重量を算出する。
累積重量表示領域41qは、所定の期間においてバケット6が持ち上げた物体の重量の積算値(以下、「累積重量」とする。)を表示する領域である。図10は、累積重量が9500kgであることを示している。
所定の期間は、例えば、リセットボタン41rが押されたときに始まる期間である。操作者は、例えば、ダンプトラックDTの荷台に土砂を積み込む作業を行う場合、積み込み対象のダンプトラックDTが入れ替わる度にリセットボタン41rを押して累積重量をリセットする。各ダンプトラックDTに積み込んだ土砂の総重量を容易に把握できるようにするためである。
この構成により、ショベル100は、ダンプトラックDTの最大積載重量を超えて、ダンプトラックDTの荷台に土砂が積み込まれてしまうのを防止できる。最大積載重量を超えて土砂が積み込まれていることが台貫での重量測定によって検知されると、ダンプトラックDTの運転者は、積み込みヤードに戻り、荷台に積み込まれた土砂の一部を下ろす作業を行う必要がある。ショベル100は、このような積載重量の調整作業の発生を防止できる。
所定の期間は、例えば、1日の作業を開始する時刻から1日の作業を終了する時刻までの期間であってもよい。1日の作業によって運搬された土砂の総重量を操作者又は管理者が容易に認識できるようにするためである。
リセットボタン41rは、累積重量をリセットするためのソフトウェアボタンである。リセットボタン41rは、入力装置42、左操作レバー26L又は右操作レバー26R等に配置されるハードウェアボタンであってもよい。
コントローラ30は、ダンプトラックDTの入れ替わりを自動的に認識して累積重量を自動的にリセットするように構成されていてもよい。この場合、コントローラ30は、撮像装置S6が撮像した画像を利用してダンプトラックDTの入れ替わりを認識してもよく、通信装置を利用してダンプトラックDTの入れ替わりを認識してもよい。
また、コントローラ30は、撮像装置S6が撮像した画像に基づき、バケット6で持ち上げた土砂がダンプトラックDTの荷台に積み込まれたことを認識した上で、現重量を積算するように構成されていてもよい。ダンプトラックDTの荷台以外の場所に移された土砂がダンプトラックDTに積み込まれた土砂として積算されてしまうのを防止するためである。
コントローラ30は、作業アタッチメントの姿勢に基づき、バケット6で持ち上げた土砂がダンプトラックDTの荷台に積み込まれたか否かを判定してもよい。具体的には、コントローラ30は、例えば、バケット6の高さが所定値(例えば、ダンプトラックDTの荷台の高さ)を超え且つ釈放ボタン65Cが押された場合に、土砂がダンプトラックDTの荷台に積み込まれたと判定してもよい。
コントローラ30は、現重量が所定値を超えていると判定した場合に警報を出力するように構成されていてもよい。所定値は、例えば、定格持ち上げ重量に基づく値である。警報は、視覚的警報、聴覚的警報又は触覚的警報であってもよい。この構成により、コントローラ30は、現重量が所定値を超えていること或いはそのおそれがあることを操作者に伝えることができる。
残重量表示領域41sは、残重量を表示する領域である。図10は、累積重量が9500kgで、且つ、残重量が500kgであることを示している。すなわち、最大積載量が10000kgであることを示している。但し、表示装置40は、残重量を表示させずに最大積載量を表示させてもよいし、残重量とは別に最大積載量を表示させてもよい。
目標重量表示領域41tは、バケット6で吸着する物体の目標重量を表示する領域である。なお、目標重量は、残重量を超えない値で設定される。
図10に示す例では、残重量が500kgであることから、目標重量は500kgと設定されている。これに対し、現重量は、550kgである。このため、コントローラ30は、現重量が500kg(目標重量)となるまでバケット6の電流を減少させる制御を行う。これにより、ダンプトラックDTの過積載を防止することができる。
以上、本実施形態に係るショベル100によれば、バケット6によって持ち上げられた物体の重量(現重量)を目標重量とすることができる。
なお、目標重量と目標電流指令とを対応付けしたテーブルを有し、目標重量に基づいて、バケット6に供給する電流の目標電流指令を生成することにより、バケット6によって持ち上げられた物体の重量を目標重量に近づけるという構成が考えられる。しかしながら、バケット6で吸着する物体は、例えば、土砂や鉄骨等の粗密のバラツキがある物体である場合、目標重量に対応した電流値を印加しても、実際にバケット6に吸着された物体の重量が目標重量とずれることが想定される。これに対し、本実施形態に係るショベル100によれば、バケット6によって持ち上げられた物体の重量を目標重量とすることができる。
また、メッセージ表示領域41m1には、メッセージが表示される。例えば、現重量が目標重量を超過している際には、その旨のメッセージが表示される。これにより、重量調整が完了する前に積み込み動作を行うことを防止することができる。また、累積重量が最大積載量を超過した場合にもメッセージを表示してもよい。これにより、オペレータに積み降ろし作業を促すことができ、ダンプトラックDTの過積載を防止することができる。
[積込支援システム]
次に、積込支援システムSYSについて、図11を用いて説明する。図11は、積込支援システムSYSの構成例を示す図である。積込支援システムSYSは、ショベル100と、ダンプトラックDTに設けられた支援装置210を有する移動体200と、管理装置300と、支援装置400と、を備え、通信網900を介して通信可能に構成されていてもよい。
次に、積込支援システムSYSについて、図11を用いて説明する。図11は、積込支援システムSYSの構成例を示す図である。積込支援システムSYSは、ショベル100と、ダンプトラックDTに設けられた支援装置210を有する移動体200と、管理装置300と、支援装置400と、を備え、通信網900を介して通信可能に構成されていてもよい。
支援装置210は、携帯端末装置であり、例えば、ダンプトラックDTに備え付けられるノートPC、タブレットPC、スマートフォン等のコンピュータである。
管理装置300は、固定端末装置であり、例えば、作業現場外の管理センタ等に設置されるコンピュータである。なお、管理装置300は、可搬性のコンピュータ(例えば、ノートPC、タブレットPC、スマートフォン等の携帯端末装置)であってもよい。
支援装置400は、携帯端末装置であり、例えば、作業現場にいる作業者等が携帯するノートPC、タブレットPC、スマートフォン等のコンピュータである。
ショベル100のコントローラ30は、算出した土砂重量等を通信装置T1及び通信網900を介して管理装置300に送信してもよい。これにより、管理装置300は、ショベル100がダンプトラックDTに積載した土砂等の積載物の重量を管理することができる。また、ショベル100のコントローラ30は、通信装置T1及び通信網900を介してダンプトラックDTに設けられた支援装置210に送信してもよい。
また、ショベル100は、通信網900を介して遠隔操作されてもよい。
以上、ショベル100の実施形態等について説明したが、本発明は上記実施形態等に限定されるものではなく、特許請求の範囲に記載された本発明の要旨の範囲内において、種々の変形、改良が可能である。
本願は、2019年7月11日に出願した日本国特許出願2019-129524号に基づく優先権を主張するものであり、この日本国特許出願の全内容を本願に参照により援用する。
100 ショベル
1 下部走行体
2 旋回機構
2A 旋回油圧モータ
2A1 第1ポート
2A2 第2ポート
3 上部旋回体
4 ブーム(アタッチメント)
5 アーム(アタッチメント)
6 バケット(アタッチメント)
7 ブームシリンダ(第1アクチュエータ)
8 アームシリンダ(第2アクチュエータ)
9 バケットシリンダ(第2アクチュエータ)
21,22 油圧センサ
30 コントローラ(制御装置)
40 表示装置
42 入力装置
43 音声出力装置
47 記憶装置
60 土砂荷重処理部
61 積載物重量算出部(重量算出部)
62 最大積載量検出部
63 加算積載量算出部
64 残積載量算出部
65 積載物重心算出部(重心算出部)
611 第1重量算出部
612 第2重量算出部
613 切替判断部(切替部)
S1 ブーム角度センサ
S2 アーム角度センサ
S3 バケット角度センサ
S4 機体傾斜センサ
S5 旋回状態センサ
S6 撮像装置
S7R ブームロッド圧センサ
S7B ブームボトム圧センサ
S8R アームロッド圧センサ
S8B アームボトム圧センサ
S9R バケットロッド圧センサ
S9B バケットボトム圧センサ
DT ダンプトラック
1 下部走行体
2 旋回機構
2A 旋回油圧モータ
2A1 第1ポート
2A2 第2ポート
3 上部旋回体
4 ブーム(アタッチメント)
5 アーム(アタッチメント)
6 バケット(アタッチメント)
7 ブームシリンダ(第1アクチュエータ)
8 アームシリンダ(第2アクチュエータ)
9 バケットシリンダ(第2アクチュエータ)
21,22 油圧センサ
30 コントローラ(制御装置)
40 表示装置
42 入力装置
43 音声出力装置
47 記憶装置
60 土砂荷重処理部
61 積載物重量算出部(重量算出部)
62 最大積載量検出部
63 加算積載量算出部
64 残積載量算出部
65 積載物重心算出部(重心算出部)
611 第1重量算出部
612 第2重量算出部
613 切替判断部(切替部)
S1 ブーム角度センサ
S2 アーム角度センサ
S3 バケット角度センサ
S4 機体傾斜センサ
S5 旋回状態センサ
S6 撮像装置
S7R ブームロッド圧センサ
S7B ブームボトム圧センサ
S8R アームロッド圧センサ
S8B アームボトム圧センサ
S9R バケットロッド圧センサ
S9B バケットボトム圧センサ
DT ダンプトラック
Claims (13)
- 上部旋回体に取り付けられるアタッチメントと、
前記アタッチメントを駆動する第1アクチュエータ及び第2アクチュエータと、
制御装置と、を備え、
前記制御装置は、
前記第1アクチュエータに基づいて、前記アタッチメントに積載された積載物の重量を第1重量として算出する第1重量算出部と、
前記第2アクチュエータに基づいて、前記積載物の重量を第2重量として算出する第2重量算出部と、を有する、ショベル。 - 前記制御装置は、
前記第1アクチュエータの状態に基づいて、前記第1重量算出部と前記第2重量算出部とを切り替える切替部を更に有する、
請求項1に記載のショベル。 - 前記切替部は、
前記第1重量算出部で算出された前記第1重量及び前記第2重量算出部で算出された前記第2重量のうち、選択する重量を切り替える、
請求項2に記載のショベル。 - 前記切替部は、
前記第1重量算出部及び前記第2重量算出部のうち、前記積載物の重量の算出処理を機能させる重量算出部を切り替える、
請求項2に記載のショベル。 - 前記アタッチメントは、ブーム、アーム、バケットを備え、
前記第1アクチュエータは、前記ブームを駆動し、
前記第2アクチュエータは、前記バケットまたは前記アームを駆動する、
請求項2に記載のショベル。 - 前記切替部は、
前記第1アクチュエータが前記ブームを上げ動作する際、前記積載物の重量を前記第2重量として切り替える、
請求項5に記載のショベル。 - 前記制御装置は、
前記積載物の重心を算出する重心算出部を更に有する、
請求項1に記載のショベル。 - 上部旋回体に取り付けられ、バケットを含むアタッチメントと、
前記バケットを駆動するバケットシリンダと、
制御装置と、を備え、
前記制御装置は、
前記バケットシリンダに基づいて、前記バケットに積載された積載物の重量を算出する重量算出部を有する、ショベル。 - 前記制御装置は、
前記バケットに積載された積載物の重心を算出する重心算出部を更に有する、
請求項8に記載のショベル。 - 前記積載物を撮像する撮像装置を備え、
前記重心算出部は、
前記撮像装置で撮像された前記積載物の形状に基づいて、前記積載物の重心を算出する、
請求項9に記載のショベル。 - 前記重心算出部は、
前記積載物の種類及び状態の少なくともいずれか一方に基づいて、前記積載物の重心を算出する、
請求項9に記載のショベル。 - 前記重心算出部は、
前記バケットを第1状態とした際の前記バケットシリンダの圧力と、前記バケットを第1状態とはバケット角が異なる第2状態とした際の前記バケットシリンダの圧力と、に基づいて、前記積載物の重心を算出する、
請求項9に記載のショベル。 - 前記アタッチメントは、ブーム及びアームを更に含み、
前記ブームを駆動するブームシリンダと、
前記アームを駆動するアームシリンダと、を備え、
前記重心算出部は、
前記ブームシリンダの圧力、前記アームシリンダの圧力、前記バケットシリンダの圧力のうち少なくとも2つに基づいて、前記積載物の重心を算出する、
請求項9に記載のショベル。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202080047445.9A CN114026293A (zh) | 2019-07-11 | 2020-07-10 | 挖土机 |
JP2021530744A JPWO2021006349A1 (ja) | 2019-07-11 | 2020-07-10 | |
US17/647,222 US20220127817A1 (en) | 2019-07-11 | 2022-01-06 | Excavator |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019129524 | 2019-07-11 | ||
JP2019-129524 | 2019-07-11 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/647,222 Continuation US20220127817A1 (en) | 2019-07-11 | 2022-01-06 | Excavator |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2021006349A1 true WO2021006349A1 (ja) | 2021-01-14 |
Family
ID=74114529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2020/027119 WO2021006349A1 (ja) | 2019-07-11 | 2020-07-10 | ショベル |
Country Status (4)
Country | Link |
---|---|
US (1) | US20220127817A1 (ja) |
JP (1) | JPWO2021006349A1 (ja) |
CN (1) | CN114026293A (ja) |
WO (1) | WO2021006349A1 (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022215413A1 (ja) * | 2021-04-06 | 2022-10-13 | コベルコ建機株式会社 | 作業機械 |
WO2024189757A1 (ja) * | 2023-03-14 | 2024-09-19 | 株式会社Earthbrain | ショベルのバケット内の土量をブーム及びアームの角度から推定する情報処理装置、ショベル、方法及びプログラム |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7088691B2 (ja) * | 2018-02-28 | 2022-06-21 | 株式会社小松製作所 | 積込機械の制御装置、制御方法および遠隔操作システム |
USD977031S1 (en) * | 2018-12-12 | 2023-01-31 | Bruder Spielwaren Gmbh + Co. Kg | Toy |
JP7252762B2 (ja) * | 2019-01-08 | 2023-04-05 | 日立建機株式会社 | 作業機械 |
US11788258B2 (en) * | 2020-03-20 | 2023-10-17 | Caterpillar Inc. | Systems and methods for determining a locational value of a load associated with an implement |
US20230243129A1 (en) * | 2022-02-01 | 2023-08-03 | Caterpillar Inc. | System and method for measuring material swell |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4499960A (en) * | 1981-08-05 | 1985-02-19 | Mannesmann Aktiengesellschaft | Method for measuring the weight of bulk goods loaded by a hydraulic excavator |
JPS62189222A (ja) * | 1986-02-14 | 1987-08-19 | Komatsu Ltd | パワ−シヨベルにおける作業機制御方法および装置 |
JPH11230821A (ja) * | 1998-02-17 | 1999-08-27 | Shin Caterpillar Mitsubishi Ltd | ショベルクレーンの吊荷重検出装置 |
JP2000291078A (ja) * | 1999-04-12 | 2000-10-17 | Hitachi Constr Mach Co Ltd | 自動運転ショベル |
JP2002004337A (ja) * | 2000-06-15 | 2002-01-09 | Hitachi Constr Mach Co Ltd | 油圧ショベルの操作土量算出方法 |
JP2007178362A (ja) * | 2005-12-28 | 2007-07-12 | Shin Caterpillar Mitsubishi Ltd | 作業機械におけるアタッチメントデータ補正方法および作業機械 |
JP2009243157A (ja) * | 2008-03-31 | 2009-10-22 | Hitachi Constr Mach Co Ltd | 掘削作業機械の掘削制御装置 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0610378A (ja) * | 1992-06-26 | 1994-01-18 | Komatsu Ltd | 掘削積込機の作業量検出装置 |
DE102005039251A1 (de) * | 2005-08-19 | 2007-02-22 | Deere & Company, Moline | Ladegerät |
US9464403B2 (en) * | 2014-06-09 | 2016-10-11 | Caterpillar Inc. | Method and system for estimating payload weight with tilt position compensation |
KR102479557B1 (ko) * | 2015-11-09 | 2022-12-20 | 현대두산인프라코어(주) | 휠로더의 적재 중량 측정 방법 및 측정 시스템 |
DE112017004563T5 (de) * | 2016-12-28 | 2019-05-23 | Komatsu Ltd. | Arbeitsfahrzeug, server-vorrichtung, system zur verwaltung von ladungsgewicht sowie verfahren zur verwaltung von ladungsgewicht |
JP6749878B2 (ja) * | 2017-09-29 | 2020-09-02 | 日立建機株式会社 | ホイールローダおよびバケット積載荷重演算方法 |
CN109680738B (zh) * | 2019-02-12 | 2024-02-27 | 徐州徐工挖掘机械有限公司 | 一种液压挖掘机物料在线称重装置及方法 |
-
2020
- 2020-07-10 JP JP2021530744A patent/JPWO2021006349A1/ja active Pending
- 2020-07-10 WO PCT/JP2020/027119 patent/WO2021006349A1/ja active Application Filing
- 2020-07-10 CN CN202080047445.9A patent/CN114026293A/zh active Pending
-
2022
- 2022-01-06 US US17/647,222 patent/US20220127817A1/en not_active Abandoned
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4499960A (en) * | 1981-08-05 | 1985-02-19 | Mannesmann Aktiengesellschaft | Method for measuring the weight of bulk goods loaded by a hydraulic excavator |
JPS62189222A (ja) * | 1986-02-14 | 1987-08-19 | Komatsu Ltd | パワ−シヨベルにおける作業機制御方法および装置 |
JPH11230821A (ja) * | 1998-02-17 | 1999-08-27 | Shin Caterpillar Mitsubishi Ltd | ショベルクレーンの吊荷重検出装置 |
JP2000291078A (ja) * | 1999-04-12 | 2000-10-17 | Hitachi Constr Mach Co Ltd | 自動運転ショベル |
JP2002004337A (ja) * | 2000-06-15 | 2002-01-09 | Hitachi Constr Mach Co Ltd | 油圧ショベルの操作土量算出方法 |
JP2007178362A (ja) * | 2005-12-28 | 2007-07-12 | Shin Caterpillar Mitsubishi Ltd | 作業機械におけるアタッチメントデータ補正方法および作業機械 |
JP2009243157A (ja) * | 2008-03-31 | 2009-10-22 | Hitachi Constr Mach Co Ltd | 掘削作業機械の掘削制御装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022215413A1 (ja) * | 2021-04-06 | 2022-10-13 | コベルコ建機株式会社 | 作業機械 |
WO2024189757A1 (ja) * | 2023-03-14 | 2024-09-19 | 株式会社Earthbrain | ショベルのバケット内の土量をブーム及びアームの角度から推定する情報処理装置、ショベル、方法及びプログラム |
Also Published As
Publication number | Publication date |
---|---|
US20220127817A1 (en) | 2022-04-28 |
CN114026293A (zh) | 2022-02-08 |
JPWO2021006349A1 (ja) | 2021-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021006349A1 (ja) | ショベル | |
US12104353B2 (en) | Excavator and control apparatus for excavator | |
JP7242387B2 (ja) | ショベル | |
WO2020203851A1 (ja) | ショベル | |
WO2022124319A1 (ja) | 作業機械及び作業機械用の制御装置 | |
WO2021241526A1 (ja) | ショベル及びショベル用のシステム | |
CN112411662B (zh) | 挖土机 | |
JP7289701B2 (ja) | ショベル | |
US20240175243A1 (en) | Shovel control device and shovel | |
JP7285679B2 (ja) | ショベル | |
US20240018750A1 (en) | Display device for shovel, shovel, and assist device for shovel | |
JP2021156080A (ja) | 施工支援システム及び施工支援装置 | |
JP2021156078A (ja) | ショベル | |
JP7420618B2 (ja) | ショベル | |
JP7420619B2 (ja) | ショベル | |
JP2020165256A (ja) | ショベル | |
JP2021188260A (ja) | ショベル | |
JP7395403B2 (ja) | 検出装置及びショベル | |
JP2021156081A (ja) | 作業機械 | |
US20230408322A1 (en) | Work machine and work machine support system | |
JP2021025198A (ja) | ショベル | |
JP2021188432A (ja) | ショベル |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20836533 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2021530744 Country of ref document: JP Kind code of ref document: A |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20836533 Country of ref document: EP Kind code of ref document: A1 |