WO2017116132A1 - 비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 신호를 송수신하는 방법 및 이를 지원하는 장치 - Google Patents
비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 신호를 송수신하는 방법 및 이를 지원하는 장치 Download PDFInfo
- Publication number
- WO2017116132A1 WO2017116132A1 PCT/KR2016/015381 KR2016015381W WO2017116132A1 WO 2017116132 A1 WO2017116132 A1 WO 2017116132A1 KR 2016015381 W KR2016015381 W KR 2016015381W WO 2017116132 A1 WO2017116132 A1 WO 2017116132A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- control information
- downlink control
- scheduling
- subframes
- transmission
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 167
- 238000004891 communication Methods 0.000 title claims description 34
- 230000008054 signal transmission Effects 0.000 claims abstract description 35
- 230000005540 biological transmission Effects 0.000 claims description 367
- 230000008569 process Effects 0.000 description 83
- 238000010586 diagram Methods 0.000 description 37
- 210000004027 cell Anatomy 0.000 description 29
- 238000013468 resource allocation Methods 0.000 description 28
- 230000011664 signaling Effects 0.000 description 28
- 230000006870 function Effects 0.000 description 22
- 238000005259 measurement Methods 0.000 description 16
- 238000012545 processing Methods 0.000 description 16
- 238000002360 preparation method Methods 0.000 description 15
- 239000000872 buffer Substances 0.000 description 14
- 238000012544 monitoring process Methods 0.000 description 10
- 208000037918 transfusion-transmitted disease Diseases 0.000 description 9
- 101000741965 Homo sapiens Inactive tyrosine-protein kinase PRAG1 Proteins 0.000 description 8
- 102100038659 Inactive tyrosine-protein kinase PRAG1 Human genes 0.000 description 8
- 230000001960 triggered effect Effects 0.000 description 7
- 238000001514 detection method Methods 0.000 description 6
- 230000007423 decrease Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000010295 mobile communication Methods 0.000 description 4
- 230000004044 response Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000015654 memory Effects 0.000 description 3
- 230000001174 ascending effect Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000000737 periodic effect Effects 0.000 description 2
- 238000005070 sampling Methods 0.000 description 2
- 201000000913 Duane retraction syndrome Diseases 0.000 description 1
- 241000760358 Enodes Species 0.000 description 1
- 241000402754 Erythranthe moschata Species 0.000 description 1
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 210000000678 band cell Anatomy 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000009849 deactivation Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000000162 direct recoil spectroscopy Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 210000004457 myocytus nodalis Anatomy 0.000 description 1
- 230000001151 other effect Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/14—Spectrum sharing arrangements between different networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0446—Resources in time domain, e.g. slots or frames
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W74/00—Wireless channel access
- H04W74/08—Non-scheduled access, e.g. ALOHA
- H04W74/0808—Non-scheduled access, e.g. ALOHA using carrier sensing, e.g. carrier sense multiple access [CSMA]
Definitions
- the following description relates to a wireless communication system supporting an unlicensed band, and more particularly, to a method for transmitting and receiving an uplink signal between a terminal and a base station in a wireless communication system supporting an unlicensed band and devices supporting the same.
- Wireless access systems are widely deployed to provide various kinds of communication services such as voice and data.
- a wireless access system is a multiple access system capable of supporting communication with multiple users by sharing available system resources (bandwidth, transmission power, etc.).
- multiple access systems include code division multiple access (CDMA) systems, frequency division multiple access (FDMA) systems, time division multiple access (TDMA) systems, orthogonal frequency division multiple access (OFDMA) systems, and single carrier frequency (SC-FDMA). division multiple access) system.
- CDMA code division multiple access
- FDMA frequency division multiple access
- TDMA time division multiple access
- OFDMA orthogonal frequency division multiple access
- SC-FDMA single carrier frequency division multiple access
- An object of the present invention is to provide a method for transmitting / receiving an uplink signal to a base station by a base station or a terminal when performing a List-Before-Talk (LBT) based signal transmission.
- LBT List-Before-Talk
- the present invention provides a method and apparatus for transmitting / receiving an uplink signal between a terminal and a base station in an unlicensed band in a wireless communication system.
- a method for transmitting an uplink signal from a base station to a base station in a wireless communication system supporting an unlicensed band is a type of scheduling uplink signal transmission for one or more subframes from the base station. Or receiving first downlink control information indicating whether the scheduling is a second type, and receiving the first downlink control information when the first downlink control information indicates the scheduling of the first type.
- first downlink control information indicates whether the scheduling is a second type
- the first downlink control information indicates the scheduling of the first type.
- the uplink for the one or more subframes is transmitted from the base station.
- Receiving second downlink control information indicating signal transmission, and receiving the second downlink In at least one subframe, which is set based on the reception point of the control information and transmits the uplink signal.
- a method for receiving an uplink signal from a terminal by a base station in a wireless communication system supporting an unlicensed band the type of scheduling uplink signal transmission for one or more subframes is the first type of scheduling or When the first downlink control information indicating whether the second type of scheduling is transmitted to the terminal, and the first downlink control information indicates the scheduling of the first type, the first downlink control information of the When an uplink signal is received in one or more subframes set based on a transmission time point, and the first downlink control information indicates scheduling of the second type, uplink signal transmission for the one or more subframes. Transmitting second downlink control information indicating a to the terminal and transmitting the second downlink control information; In at least one subframe, which is set based on the transmission time point and receives the uplink signal.
- a terminal for transmitting an uplink signal to a base station in a wireless communication system supporting an unlicensed band includes a receiving unit; A transmitter; And a processor operating in connection with the receiver and the transmitter.
- the processor receives, from the base station, first downlink control information indicating whether a type of scheduling uplink signal transmission for one or more subframes is scheduling of a first type or scheduling of a second type, and When the first downlink control information indicates the first type of scheduling, an uplink signal is transmitted in one or more subframes set based on a reception time of the first downlink control information, and the first downlink control information is transmitted.
- the link control information indicates the second type of scheduling
- the second downlink control information indicating the uplink signal transmission for the one or more subframes is received from the base station, and the second downlink control information is received.
- the uplink signal is transmitted in one or more subframes set based on a reception time of Can be configured to send.
- a base station for receiving an uplink signal from a terminal in a wireless communication system supporting an unlicensed band includes a receiver; A transmitter; And a processor operating in connection with the receiver and the transmitter.
- the processor transmits first downlink control information indicating whether the type of scheduling uplink signal transmission for one or more subframes is a first type scheduling or a second type scheduling, to the terminal, and
- the first downlink control information indicates the first type of scheduling
- an uplink signal is received in one or more subframes set based on a transmission time of the first downlink control information, and the first downlink control information is received.
- the second downlink control information indicating the uplink signal transmission for the one or more subframes is transmitted to the terminal, and the second downlink control information.
- the first downlink control information may indicate a type of scheduling uplink signal transmission for the one or more subframes using an indicator of 1 bit size.
- the first type of scheduling may correspond to normal scheduling
- the second type of scheduling may correspond to triggering scheduling
- the uplink signal is transmitted and received in one or more subframes after four subframes from the time point of receiving the first downlink control information. Can be.
- the uplink signal may be transmitted and received in one or more subframes after the reception point of the second downlink control information from the base station. have.
- the second downlink control information is received only when the second downlink control information is received within a predetermined time period from the time point of receiving the first downlink control information.
- the uplink signal may be transmitted and received in one or more subframes after the reception time of the second downlink control information.
- uplink transmission and reception between a terminal and a base station may be possible according to a scheduling scheme different from that of an existing LTE system in a wireless access system supporting an unlicensed band.
- 1 is a diagram illustrating a physical channel and a signal transmission method using the same.
- FIG. 2 is a diagram illustrating an example of a structure of a radio frame.
- 3 is a diagram illustrating a resource grid for a downlink slot.
- FIG. 4 is a diagram illustrating an example of a structure of an uplink subframe.
- 5 is a diagram illustrating an example of a structure of a downlink subframe.
- FIG. 6 is a diagram illustrating an example of a CA environment supported by the LTE-U system.
- FIG. 7 is a diagram illustrating an example of an FBE operation that is one of LBT processes.
- FIG. 8 is a block diagram illustrating an FBE operation.
- FIG. 9 is a diagram illustrating an example of an LBE operation that is one of LBT processes.
- FIG. 10 is a diagram for explaining DRS transmission methods supported by a LAA system.
- FIG. 11 is a diagram for explaining a CAP and a CWA.
- FIG. 12 is a diagram illustrating a PUSCH transmission operation of a terminal in a LAA system.
- FIG. 13 is a diagram illustrating an operation of a terminal performing continuous uplink transmission through multi-subframe scheduling.
- FIG. 14 is a diagram illustrating an operation when a COT of an uplink transmission burst is 5 TTIs.
- FIG. 15 illustrates an operation of indicating PUSCH transmission in a plurality of subframes according to fast uplink timing through a single uplink grant.
- FIG. 16 illustrates an operation in which a single uplink grant indicates PUSCH transmission in subframes other than the second subframe among four consecutive subframes.
- FIG. 17 is a diagram illustrating an operation of pre-scheduling some subframes through an uplink grant.
- FIG. 18 illustrates an operation in which PUSCH transmission is indicated by a triggering DCI received in an nth subframe when a time gap is set.
- FIG. 19 illustrates a configuration based on MCS or resource allocation (MCS) or resource allocation (RA) information configured in semi-persistent scheduling (SPS) or PUCS transmission according to multiple subframe scheduling according to MCS or RA information configured in an uplink grant Drawing.
- MCS resource allocation
- RA resource allocation
- FIG. 20 is a diagram illustrating whether or not previously prescheduled data is transmitted through an uplink grant, future scheduling, and scheduling operation for data to be actually transmitted.
- 21 to 23 are diagrams illustrating an operation according to multi-subframe scheduling proposed by the present invention.
- 24 is a diagram illustrating an operation of setting HARQ process numbers of a plurality of PUSCHs identically according to multi-subframe scheduling.
- 25 is a diagram illustrating an operation when time windows for different PUSCHs overlap.
- FIG. 26 is a diagram illustrating a configuration of a terminal and a base station in which proposed embodiments can be implemented.
- each component or feature may be considered to be optional unless otherwise stated.
- Each component or feature may be embodied in a form that is not combined with other components or features.
- some of the components and / or features may be combined to form an embodiment of the present invention.
- the order of the operations described in the embodiments of the present invention may be changed. Some components or features of one embodiment may be included in another embodiment, or may be replaced with corresponding components or features of another embodiment.
- the base station is meant as a terminal node of a network that directly communicates with a mobile station.
- the specific operation described as performed by the base station in this document may be performed by an upper node of the base station in some cases.
- various operations performed for communication with a mobile station in a network consisting of a plurality of network nodes including a base station may be performed by the base station or network nodes other than the base station.
- the 'base station' may be replaced by terms such as a fixed station, a Node B, an eNode B (eNB), an advanced base station (ABS), or an access point.
- a terminal may be a user equipment (UE), a mobile station (MS), a subscriber station (SS), or a mobile subscriber station (MSS). It may be replaced with terms such as a mobile terminal or an advanced mobile station (AMS).
- UE user equipment
- MS mobile station
- SS subscriber station
- MSS mobile subscriber station
- AMS advanced mobile station
- the transmitting end refers to a fixed and / or mobile node that provides a data service or a voice service
- the receiving end refers to a fixed and / or mobile node that receives a data service or a voice service. Therefore, in uplink, a mobile station may be a transmitting end and a base station may be a receiving end. Similarly, in downlink, a mobile station may be a receiving end and a base station may be a transmitting end.
- Embodiments of the present invention may be supported by standard documents disclosed in at least one of the IEEE 802.xx system, the 3rd Generation Partnership Project (3GPP) system, the 3GPP LTE system, and the 3GPP2 system, which are wireless access systems, and in particular, the present invention.
- Embodiments of the may be supported by 3GPP TS 36.211, 3GPP TS 36.212, 3GPP TS 36.213, 3GPP TS 36.321 and 3GPP TS 36.331 documents. That is, obvious steps or portions not described among the embodiments of the present invention may be described with reference to the above documents.
- all terms disclosed in the present document can be described by the above standard document.
- Transmission Opportunity Period may be used in the same meaning as the term transmission period, transmission burst (Tx burst) or RRP (Reserved Resource Period).
- LBT process may be performed for the same purpose as a carrier sensing process, a clear channel access (CCA), and a channel access procedure (CAP) for determining whether a channel state is idle.
- CCA clear channel access
- CAP channel access procedure
- 3GPP LTE / LTE-A system will be described as an example of a wireless access system in which embodiments of the present invention can be used.
- CDMA code division multiple access
- FDMA frequency division multiple access
- TDMA time division multiple access
- OFDMA orthogonal frequency division multiple access
- SC-FDMA single carrier frequency division multiple access
- CDMA may be implemented with a radio technology such as Universal Terrestrial Radio Access (UTRA) or CDMA2000.
- TDMA may be implemented with wireless technologies such as Global System for Mobile communications (GSM) / General Packet Radio Service (GPRS) / Enhanced Data Rates for GSM Evolution (EDGE).
- GSM Global System for Mobile communications
- GPRS General Packet Radio Service
- EDGE Enhanced Data Rates for GSM Evolution
- OFDMA may be implemented in a wireless technology such as IEEE 802.11 (Wi-Fi), IEEE 802.16 (WiMAX), IEEE 802-20, Evolved UTRA (E-UTRA).
- UTRA is part of the Universal Mobile Telecommunications System (UMTS).
- 3GPP Long Term Evolution (LTE) is part of an Evolved UMTS (E-UMTS) using E-UTRA, and employs OFDMA in downlink and SC-FDMA in uplink.
- LTE-A (Advanced) system is an improved system of the 3GPP LTE system.
- embodiments of the present invention will be described based on the 3GPP LTE / LTE-A system, but can also be applied to IEEE 802.16e / m system and the like.
- a terminal receives information from a base station through downlink (DL) and transmits information to the base station through uplink (UL).
- the information transmitted and received by the base station and the terminal includes general data information and various control information, and various physical channels exist according to the type / use of the information they transmit and receive.
- FIG. 1 is a diagram for explaining physical channels that can be used in embodiments of the present invention and a signal transmission method using the same.
- the initial cell search operation such as synchronizing with the base station is performed in step S11.
- the UE receives a Primary Synchronization Channel (P-SCH) and a Secondary Synchronization Channel (S-SCH) from the base station, synchronizes with the base station, and obtains information such as a cell ID.
- P-SCH Primary Synchronization Channel
- S-SCH Secondary Synchronization Channel
- the terminal may receive a physical broadcast channel (PBCH) signal from the base station to obtain broadcast information in a cell.
- PBCH physical broadcast channel
- the terminal may receive a downlink reference signal (DL RS) in the initial cell search step to confirm the downlink channel state.
- DL RS downlink reference signal
- the UE After completing the initial cell search, the UE receives a physical downlink control channel (PDCCH) and a physical downlink control channel (PDSCH) according to the physical downlink control channel information in step S12. Specific system information can be obtained.
- PDCCH physical downlink control channel
- PDSCH physical downlink control channel
- the terminal may perform a random access procedure as in steps S13 to S16 to complete the access to the base station.
- the UE transmits a preamble through a physical random access channel (PRACH) (S13), a response message to the preamble through a physical downlink control channel and a corresponding physical downlink shared channel. Can be received (S14).
- PRACH physical random access channel
- the UE may perform contention resolution such as transmitting an additional physical random access channel signal (S15) and receiving a physical downlink control channel signal and a corresponding physical downlink shared channel signal (S16). Procedure).
- the UE After performing the above-described procedure, the UE subsequently receives a physical downlink control channel signal and / or a physical downlink shared channel signal (S17) and a physical uplink shared channel (PUSCH) as a general uplink / downlink signal transmission procedure.
- a transmission (Uplink Shared Channel) signal and / or a Physical Uplink Control Channel (PUCCH) signal may be transmitted (S18).
- UCI uplink control information
- HARQ-ACK / NACK Hybrid Automatic Repeat and reQuest Acknowledgement / Negative-ACK
- SR Scheduling Request
- CQI Channel Quality Indication
- PMI Precoding Matrix Indication
- RI Rank Indication
- UCI is generally transmitted periodically through the PUCCH, but may be transmitted through the PUSCH when control information and traffic data should be transmitted at the same time.
- the UCI may be aperiodically transmitted through the PUSCH by the request / instruction of the network.
- FIG. 2 shows a structure of a radio frame used in embodiments of the present invention.
- the type 1 frame structure can be applied to both full duplex Frequency Division Duplex (FDD) systems and half duplex FDD systems.
- FDD Frequency Division Duplex
- One subframe is defined as two consecutive slots, and the i-th subframe includes slots corresponding to 2i and 2i + 1. That is, a radio frame consists of 10 subframes.
- the time taken to transmit one subframe is called a transmission time interval (TTI).
- the slot includes a plurality of OFDM symbols or SC-FDMA symbols in the time domain and a plurality of resource blocks in the frequency domain.
- One slot includes a plurality of orthogonal frequency division multiplexing (OFDM) symbols in the time domain. Since 3GPP LTE uses OFDMA in downlink, the OFDM symbol is for representing one symbol period. The OFDM symbol may be referred to as one SC-FDMA symbol or symbol period.
- a resource block is a resource allocation unit and includes a plurality of consecutive subcarriers in one slot.
- 10 subframes may be used simultaneously for downlink transmission and uplink transmission during each 10ms period. At this time, uplink and downlink transmission are separated in the frequency domain.
- the terminal cannot transmit and receive at the same time.
- the structure of the radio frame described above is just one example, and the number of subframes included in the radio frame, the number of slots included in the subframe, and the number of OFDM symbols included in the slot may be variously changed.
- Type 2 frame structure is applied to the TDD system.
- the type 2 frame includes a special subframe consisting of three fields: a downlink pilot time slot (DwPTS), a guard period (GP), and an uplink pilot time slot (UpPTS).
- DwPTS downlink pilot time slot
- GP guard period
- UpPTS uplink pilot time slot
- the DwPTS is used for initial cell search, synchronization or channel estimation in the terminal.
- UpPTS is used for channel estimation at the base station and synchronization of uplink transmission of the terminal.
- the guard period is a period for removing interference generated in the uplink due to the multipath delay of the downlink signal between the uplink and the downlink.
- Table 1 below shows the structure of the special frame (length of DwPTS / GP / UpPTS).
- FIG. 3 is a diagram illustrating a resource grid for a downlink slot that can be used in embodiments of the present invention.
- one downlink slot includes a plurality of OFDM symbols in the time domain.
- one downlink slot includes seven OFDM symbols, and one resource block includes 12 subcarriers in a frequency domain, but is not limited thereto.
- Each element on the resource grid is a resource element, and one resource block includes 12 ⁇ 7 resource elements.
- the number NDL of resource blocks included in the downlink slot depends on the downlink transmission bandwidth.
- the structure of the uplink slot may be the same as the structure of the downlink slot.
- FIG. 4 shows a structure of an uplink subframe that can be used in embodiments of the present invention.
- an uplink subframe may be divided into a control region and a data region in the frequency domain.
- the control region is allocated a PUCCH carrying uplink control information.
- a PUSCH carrying user data is allocated.
- one UE does not simultaneously transmit a PUCCH and a PUSCH.
- the PUCCH for one UE is allocated an RB pair in a subframe. RBs belonging to the RB pair occupy different subcarriers in each of the two slots.
- the RB pair assigned to this PUCCH is said to be frequency hopping at the slot boundary.
- FIG. 5 shows a structure of a downlink subframe that can be used in embodiments of the present invention.
- up to three OFDM symbols from the OFDM symbol index 0 in the first slot in the subframe are control regions to which control channels are allocated, and the remaining OFDM symbols are data regions to which the PDSCH is allocated. to be.
- a downlink control channel used in 3GPP LTE includes a Physical Control Format Indicator Channel (PCFICH), a PDCCH, and a Physical Hybrid-ARQ Indicator Channel (PHICH).
- PCFICH Physical Control Format Indicator Channel
- PDCCH Physical Hybrid-ARQ Indicator Channel
- PHICH Physical Hybrid-ARQ Indicator Channel
- the PCFICH is transmitted in the first OFDM symbol of a subframe and carries information about the number of OFDM symbols (ie, the size of the control region) used for transmission of control channels within the subframe.
- the PHICH is a response channel for the uplink and carries an ACK (Acknowledgement) / NACK (Negative-Acknowledgement) signal for a hybrid automatic repeat request (HARQ).
- Control information transmitted through the PDCCH is called downlink control information (DCI).
- the downlink control information includes uplink resource allocation information, downlink resource allocation information or an uplink transmission (Tx) power control command for a certain terminal group.
- the LTE-U system refers to an LTE system supporting CA conditions of the licensed and unlicensed bands.
- the unlicensed band may be a Wi-Fi band or a Bluetooth (BT) band.
- the LTE-A system operating in the unlicensed band is referred to as Licensed Assisted Access (LAA), and the LAA may also mean a method of performing data transmission and reception in the unlicensed band in combination with a licensed band.
- LAA Licensed Assisted Access
- FIG. 6 is a diagram illustrating an example of a CA environment supported by the LTE-U system.
- CCs component carriers
- a licensed CC (LCC: Licensed CC) is a major carrier (can be referred to as a primary CC (PCC or PCell)), and an unlicensed carrier (Unlicensed CC: UCC) is a sub-carrier ( Secondary CC: can be called SCC or S cell).
- LCC Licensed CC
- PCC or PCell primary CC
- UCC unlicensed carrier
- Secondary CC can be called SCC or S cell
- embodiments of the present invention may be extended to a situation in which a plurality of licensed bands and a plurality of unlicensed bands are used in a carrier combining method.
- the proposed schemes of the present invention can be extended to not only 3GPP LTE system but also other system.
- FIG. 6 shows a case in which one base station supports both a licensed band and an unlicensed band. That is, the terminal can transmit and receive control information and data through a PCC, which is a licensed band, and can also transmit and receive control information and data through an SCC, which is an unlicensed band.
- PCC which is a licensed band
- SCC which is an unlicensed band
- the terminal may configure a P-cell and a macro base station (M-eNB: Macro eNB) and a small cell (S-eNB: Small eNB) and an S cell.
- M-eNB Macro eNB
- S-eNB Small eNB
- the macro base station and the small base station may be connected through a backhaul network.
- the unlicensed band may be operated in a contention-based random access scheme.
- the eNB supporting the unlicensed band may first perform a carrier sensing (CS) process before data transmission and reception.
- the CS process is a process of determining whether the corresponding band is occupied by another entity.
- the eNB of the SCell checks whether the current channel is busy or idle. If the corresponding band is determined to be in an idle state, the base station transmits a scheduling grant to the UE through the (E) PDCCH of the Pcell in the case of the cross-carrier scheduling or the PDCCH of the Scell in the case of the self-scheduling scheme. Resource allocation and data transmission and reception.
- the base station may set a transmission opportunity (TxOP) section consisting of M consecutive subframes.
- TxOP transmission opportunity
- the base station may inform the UE of the M value and the use of the M subframes in advance through a higher layer signal, a physical control channel, or a physical data channel through a Pcell.
- a TxOP period consisting of M subframes may be called a reserved resource period (RRP).
- the CS process may be referred to as a clear channel assessment (CCA) process or a channel access procedure, and a corresponding channel is busy based on a CCA threshold set through a preset or higher layer signal. It may be determined to be busy or idle. For example, if an energy higher than the CCA threshold is detected in an S cell that is an unlicensed band, it may be determined to be busy or idle. At this time, if the channel state is determined to be idle, the base station may start signal transmission in the SCell. This series of processes may be called List-Before-Talk (LBT).
- LBT List-Before-Talk
- FIG. 7 is a diagram illustrating an example of an FBE operation that is one of LBT processes.
- the European ETSI regulation (EN 301 893 V1.7.1) illustrates two LBT operations, called Frame Based Equipment (FBE) and Load Based Equipment (LBE).
- FBE is equivalent to Channel Occupancy Time (eg, 1 to 10ms) and at least 5% of the channel occupancy time, which is the length of time that a communication node can continue transmitting when it succeeds in channel access.
- the idle period which constitutes one fixed frame constitutes one fixed frame
- CCA is defined as an operation of observing a channel during a CCA slot (at least 20us) at the end of the idle period.
- the communication node periodically performs CCA on a fixed frame basis. If the channel is in the Unoccupied state, the communication node transmits data during the channel occupancy time. If the channel is in the occupied state, the communication node suspends transmission and waits until the next cycle of the CCA slot.
- FIG. 8 is a block diagram illustrating an FBE operation.
- a communication node ie, a base station managing an SCell performs a CCA process during a CCA slot. If the channel is in the idle state, the communication node performs data transmission (Tx). If the channel is in the busy state, the communication node waits as long as the CCA slot is subtracted from the fixed frame period and then performs the CCA process again.
- Tx data transmission
- the communication node performs data transmission during the channel occupancy time, and after the data transmission is completed, waits for the time obtained by subtracting the CCA slot from the idle period and then performs the CCA process again. If the channel is idle or there is no data to be transmitted, the communication node waits for the time obtained by subtracting the CCA slot from the fixed frame period and then performs the CCA process again.
- FIG. 9 is a diagram illustrating an example of an LBE operation that is one of LBT processes.
- the communication node first performs q ⁇ 4, 5,... To perform the LBE operation. , 32 ⁇ and CCA for one CCA slot.
- FIG. 9 (b) is a block diagram of the LBE operation. The LBE operation will be described with reference to FIG. 9 (b).
- the communication node may perform a CCA process in the CCA slot. If the channel is not occupied in the first CCA slot, the communication node may transmit data by securing a maximum (13/32) q ms length of time.
- the communication node randomly selects (ie, randomly) N ⁇ ⁇ 1, 2, ..., q ⁇ to set and store the counter value as an initial value Afterwards, if the channel is not occupied in a specific CCA slot while sensing the channel state in units of CCA slots, the previously set counter value is decreased by one. When the counter value reaches zero, the communication node can transmit data with a maximum length of (13/32) q ms.
- Discontinuous transmission on an unlicensed carrier with a limited maximum transmission interval may affect some functions required for operation of the LTE system. Some of these functions may be supported by one or more signals transmitted at the beginning of discontinuous LAA downlink transmission. Functions supported by these signals include functions such as AGC setting, channel reservation, and the like.
- channel reservation means transmitting signals on the acquired channels to transmit signals to other nodes after channel connection through successful LBT operation.
- Functions supported by one or more signals for LAA operation including discontinuous downlink transmission include detection of LAA downlink transmission by the terminal and time and frequency synchronization of the terminals. At this time, the requirement of these functions does not mean to exclude other possible functions, and these functions may be supported by other methods.
- the recommended design goal for the LAA system is to support the UE in acquiring time and frequency synchronization through each or a combination of discovery signals for RRM (Radio Resource Management) measurement and reference signals included in DL transmission bursts.
- the discovery signal for RRM measurement transmitted in the serving cell is used to obtain at least coarse time or frequency synchronization.
- subframe boundary coordination may follow a CA timing relationship between serving cells coupled by a CA defined in an LTE-A system (Rel-12 or lower). However, this does not mean that the base station starts DL transmission only at the subframe boundary. According to the result of the LBT process, the LAA system may support PDSCH transmission even when all OFDM symbols are not available in one subframe. At this time, transmission of necessary control information for PDSCH transmission should be supported.
- the LTE-A system may transmit a discovery signal at a start time for supporting an RRM function including cell detection.
- the discovery signal may be referred to as a discovery reference signal (DRS).
- DRS discovery reference signal
- the discovery signal and the transmission / reception functions of the discovery signal of the LTE-A system may be changed and applied.
- the DRS of the LTE-A system is designed to support small cell on / off operation. At this time, the small cells that are off means most of the functions are turned off except for periodic DRS transmission. DRSs are sent at DRS transmission opportunity with a period of 40, 80 or 160 ms.
- Discovery Measurement Timing Configuration refers to a time interval in which the UE can expect to receive the DRS. The DRS transmission opportunity may occur anywhere in the DMTC, and the UE may anticipate that the DRS is continuously transmitted with a corresponding period from the allocated cell.
- DRS transmission may be a target of LBT.
- LBT LBT is applied to DRS transmission, it may not be transmitted in a periodic manner as in the case of DRS transmission of the LTE-A system. Therefore, the following two ways can be considered for DRS transmissions for LAA system.
- the DRS is transmitted only at a fixed time position within the configured DMTC.
- transmission of the DRS is allowed at least one or more other time locations within the configured DMTC.
- the number of time positions may be limited to one time position in one subframe. If more advantageous, DRS transmission outside the configured DMTC may be allowed in addition to the transmission of DRS within the DMTC.
- FIG. 10 is a diagram for explaining DRS transmission methods supported by a LAA system.
- the upper part of FIG. 10 shows the first DRS transmission method described above, and the lower part shows the second DRS transmission method. That is, in the first scheme, the terminal may receive the DRS only at a predetermined position within the DMTC interval, but in the second scheme, the terminal may receive the DRS at an arbitrary position within the DMTC interval.
- the terminal When the terminal performs the RRM measurement based on the DRS transmission in the LTE-A system, the terminal may perform one RRM measurement based on a plurality of DRS opportunities.
- DRS is used in the LAA system, due to constraints by the LBT, it cannot be guaranteed that the DRS is transmitted at a specific location. If the terminal assumes that the DRS exists when the DRS is not transmitted from the actual base station, the quality of the RRM measurement result reported by the terminal may be degraded. Therefore, the LAA DRS design should allow detecting the presence of the DRS in one DRS opportunity, which can ensure that the UE can combine the RRM measurement to perform only successfully detected DRS opportunities.
- Signals containing DRS do not guarantee contiguous DRS transmissions in time. That is, if there is no data transmission in subframes accompanying DRS, there may be OFDM symbols for which no physical signal is transmitted. While operating in the unlicensed band, other nodes may sense that the channel is idle in this silent period between DRS transmissions. To avoid this problem, it is desirable to ensure that transmission bursts containing a DRS signal consist of adjacent OFDM symbols on which some signals are transmitted.
- CAP channel access procedure
- CWA contention window adjustment
- FIG. 11 is a diagram for explaining a CAP and a CWA.
- an LTE transmitting node eg, a base station
- CAP channel access procedure
- the base station may arbitrarily select a backoff counter N within the contention window CW.
- the N value is set to an initial value Ninit (S1120).
- Ninit is selected from any value between 0 and CW p .
- the base station terminates the CAP procedure and performs Tx burst transmission including the PDSCH (S1124).
- the base station decreases the backoff counter value by 1 (S1130).
- the base station checks whether the channel of the LAA S cell (s) is in the idle state (S1140), and if the channel is in the idle state, checks whether the backoff counter value is 0 (S1150). The base station decreases the backoff counter value by 1 and repeatedly checks whether the channel is idle until the backoff counter value becomes zero.
- the base station determines whether the corresponding channel is idle for a defer duration T d (25usec or more) longer than the slot time (eg, 9usec). Check (S1142). If the channel is idle in the reservation period, the base station may resume the CAP process again (S1144). For example, if the backoff counter value Ninit is 10 and the backoff counter value is reduced to 5 and the channel is determined to be busy, the base station senses the channel during the reservation period and determines whether the channel is idle.
- T d 25usec or more
- the base station may resume the CAP process again (S1144). For example, if the backoff counter value Ninit is 10 and the backoff counter value is reduced to 5 and the channel is determined to be busy, the base station senses the channel during the reservation period and determines whether the channel is idle.
- the base station may perform the CAP process again from the backoff counter value 5 (or after decrementing the backoff counter value by 1) instead of setting the backoff counter value Ninit. have.
- the base station re-performs step S1142 to check again whether the channel is idle during the new reservation period.
- the base station determines whether the backoff counter value N becomes 0 (S1150), and when the backoff counter value reaches 0, terminates the CAP process and performs Tx burst transmission including the PDSCH. Can be done (S1160).
- the base station may receive HARQ-ACK information on the Tx burst from the terminal (S1170).
- the base station may adjust the content window size (CWS) based on the received HARQ-ACK information (S1180).
- CWS content window size
- the base station may adjust the CWS based on HARQ-ACK information on the first subframe of the most recently transmitted Tx burst (that is, the start subframe of the Tx burst).
- the base station may set an initial CW for each priority class before performing the CWP. Then, when the probability that the HARQ-ACK values corresponding to the PDSCH transmitted in the reference subframe is determined to be NACK is at least 80%, the base station increases the CW values set for each priority class to the next higher priority respectively. Let's do it.
- the PDSCH may be allocated in a self-carrier scheduling or a cross-carrier scheduling scheme.
- the base station counts the DTX, NACK / DTX, or ANY status of the feedback HARQ-ACK information as NACK. If the PDSCH is allocated by the cross carrier scheduling method, the base station counts NACK / DTX and ANY as NACK and does not count the DTX state as NACK among the feedback HARQ-ACK information.
- the base station may consider M HARQ-ACK responses to the bundled HARQ-ACK information.
- the bundled M subframes preferably include a reference subframe.
- the present invention provides a transmission time interval (TTI) (or subframe SF) of uplink transmission data transmitted by a terminal to a base station when the base station or the terminal performs LBT-based signal transmission in a wireless communication system including a base station and a terminal.
- TTI transmission time interval
- subframe SF subframe SF
- the basic uplink transmission structure of the LAA system may follow the uplink transmission structure in the existing LTE system.
- the base station transmits downlink control information (or UL grant) indicating uplink data transmission in the nth subframe
- the terminal n + L eg, according to the downlink control information
- PUSCH physical uplink shared channel
- the base station and the terminal may perform LBT to transmit and receive the control information and the PUSCH.
- the base station if the base station succeeds in performing downlink LBT before the nth subframe, the base station transmits an uplink grant indicating PUSCH transmission in the n + 4th subframe to the UE in the nth subframe. .
- the UE receives the uplink grant, the UE attempts an uplink LBT before the n + 4th subframe, and performs a PUSCH transmission in the n + 4th subframe when the channel access is successful through the uplink LBT. can do.
- the terminal may not always perform the PUSCH transmission in the corresponding subframe corresponding to the uplink grant received from the base station.
- the base station transmits an uplink grant in the n + 2th subframe after successfully performing channel access after performing the downlink LBT operation, the UE uplink before the n + 6th subframe. If the channel access is not successful according to the LBT, the UE may not perform the PUSCH transmission corresponding to the uplink grant.
- the unlicensed band of the LAA system is a band in which several nodes of the heterogeneous system as well as the LAA system compete through LBT operation for channel access, the time between the uplink grant transmitted in a specific subframe and the PUSCH transmission becomes longer. The more likely the channel is occupied by another node, the lower the probability of performing PUSCH transmission corresponding to the uplink grant.
- an uplink signal that can be continuously transmitted within a maximum COT (hereinafter referred to as MCOT (maximum channel occupancy time)) in an unlicensed band is referred to as an uplink transmission burst (UL TX Burst).
- the base station may be configured to transmit a continuous uplink grant to the terminal so that the terminal may perform uplink transmission in the continuous subframe or transmit an uplink transmission burst.
- the continuous uplink grant transmission of the base station and the continuous PUSCH transmission of the terminal corresponding thereto are possible only when both the downlink LBT of the base station and the uplink LBT of the terminal are successful, which is not preferable in terms of implementation. Can be.
- multi-subframe scheduling (ie, scheduling a plurality of subframes through a single uplink grant) may be considered as an advantageous form for transmitting an uplink transmission burst.
- FIG. 13 is a diagram illustrating an operation of a terminal performing continuous uplink transmission through multi-subframe scheduling.
- an uplink transmission having an uplink grant and a partial TTI is transmitted in one subframe (eg, n + 4 th and n + 8 th subframes) or transmission of a separate uplink grant.
- Uplink transmission with an intact TTI can be transmitted in one subframe (eg, n + 12 th subframe).
- FIG. 13 there are subframes (eg, n + 1 th, n + 2 th, n + 3 th) without a separate signal transmission before the most recent uplink transmission burst.
- Channel occupancy can be deprived of heterogeneous system nodes.
- the operation of performing uplink transmission in the remaining subframes other than the subframe in which the uplink grant is transmitted may be difficult to apply when the COT of the uplink transmission burst is 4 TTI (or 4 subframes) or more. .
- the case of FIG. 14 will be described.
- FIG. 14 is a diagram illustrating an operation when a COT of an uplink transmission burst is 5 TTIs.
- the timing interval at which the PUSCH corresponding to the uplink grant is transmitted from the time point at which a specific uplink grant is received is 4 TTIs (or 4 subframes), while the maximum length of the uplink transmission burst is If it is set to 5 TTIs (or 5 subframes), continuous PUSCH transmission is impossible as shown in FIG. 13, and thus the maximum length of an uplink transmission burst may be limited.
- the present invention solves the above problems and proposes a method for supporting a terminal to perform uplink transmission as continuously as possible.
- the base station transmits an uplink grant to the user equipment in the nth subframe, and attempts to transmit the PUSCH in the n + N 0th subframe that is the terminal that receives the uplink grant.
- An operation is defined as an operation based on a reference uplink timing (or legacy uplink timing).
- the N 0 value may be a value previously set between the base station and the terminal or set to a radio resource control (RRC) signal.
- RRC radio resource control
- the uplink grant may be transmitted in the form of downlink control information.
- the base station determines whether the PUSCH is transmitted for each subframe in consecutive L subframes (L ⁇ 1) to the UE through a single uplink grant, and a number of subframes to which reference uplink timing is applied among the L subframes is applied. (E.g., I 0th ).
- the UE applies a time offset with respect to the transmission time by K * (I 0 -I 1 ) TTIs (or subframes) for the remaining I 1 subframes.
- the L and K values may be promised in advance between the base station and the terminal, or the base station may be set to the terminal as an upper layer signal such as an RRC.
- the base station may transmit the L and M values to the terminal through a dynamic control signal.
- the LTE system proposes a scheme for scheduling PUSCH transmission for two uplink subframes in one downlink subframe.
- the base station includes a 2-bit uplink index (UL index) in the uplink grant, and may schedule PUSCH transmission for the two uplink subframes according to the value of the uplink index. For example, if the subframe index is '00', two uplink subframes are not transmitted. If '10', the first uplink subframe is transmitted. If the subframe index is '01', the second uplink subframe is '01'. If the transmission for the frame, '11' can indicate the transmission for the two uplink subframes.
- the base station can inform whether PUSCH is transmitted for each subframe for consecutive L subframes through a single uplink grant.
- the base station when the UE processing delay (UE processing delay) is expected to be small, the base station to indicate the PUSCH transmission in the subframe that follows the uplink timing (aka Fast UL timing) that is earlier than the reference uplink timing transmission time It may be. More specifically, when the base station satisfies the following conditions, the base station may instruct the UE to transmit PUSCH according to fast UL timing.
- a terminal whose TA (Timing Advance) is equal to or less than a specific value may report the uplink TA value to the base station.
- the specific terminal may ignore an uplink grant indicating a fast uplink timing.
- PUSCH corresponding to a PDCCH based uplink grant may not be applied to the EPDCCH (enhanced Physical Control CHannel) proposed in the LTE-A system, and may be applied differently from the PDCCH case.
- EPDCCH enhanced Physical Control CHannel
- SPS Semi-Persistent Scheduling
- the base station may provide the user equipment with fast uplink timing corresponding to a specific uplink grant in various ways. For example, the base station may directly indicate a subframe in which the PUSCH is transmitted according to the fast uplink timing, and indicate a subframe following the reference uplink timing so that the UE indirectly transmits the PUSCH according to the fast uplink timing. You can see the frame.
- the fast uplink timing applied to the terminal may be different depending on the TA value of the terminal. For example, a UE having a TA value close to 0 may apply 3 ms (typically k TTIs) at a fast uplink timing, and otherwise 4 msec (typically k TTIs + ceil (max_TA / TTI duration)).
- ceil (K) means the minimum value of an integer greater than or equal to K value.
- FIG. 15 illustrates an operation of indicating PUSCH transmission in a plurality of subframes according to fast uplink timing through a single uplink grant.
- the base station may transmit an uplink grant to the terminal in the nth subframe and the n + 4th subframe.
- the base station indicates PUSCH transmission for the n + 3, n + 5, n + 6th subframes and corresponds to the uplink grant transmitted in the nth subframe, and performs PUSCH transmission for the n + 4th subframe. You may not instruct.
- the base station may indicate USCH transmission for the n + 7, n + 8, n + 9, and n + 10th subframes in response to the uplink grant transmitted in the n + 4th subframe. Accordingly, as shown in FIG. 15, the base station may support continuous uplink transmission of the terminal.
- Whether the fast uplink timing is applied may be indicated through RRC configuration. If the fast uplink timing is not applied, the bit field may be omitted from the uplink grant.
- the bit field may be omitted from the uplink grant.
- multiple subframes in the multi-subframe scheduling indicated by the base station Transmission of subframes following the fast uplink timing in a frame may be omitted.
- the terminal may omit the corresponding uplink transmission.
- the base station determines whether the PUSCH is transmitted for each subframe in L (L ⁇ 1) subframes, and the uplink timing applied to the first subframe of the L subframes is determined from the reference uplink timing. It can be informed whether it has a time offset.
- the uplink transmission time in the remaining subframes may be set to increase linearly with respect to the transmission time of the first subframe.
- the base station and the terminal may recognize the maximum TA value differently according to the TTI length in an additional operation.
- the base station or the terminal may also set the maximum TA value to be small.
- the maximum TA value may be set to be proportional to the TTI length.
- each terminal takes into account an uplink channel of each terminal ahead of a downlink TTI (eg, subframe) boundary in consideration of a TA command. send.
- a downlink TTI eg, subframe
- the time interval between (E) PDCCH / PDSDCH and PUCCH / PUSCH is used for timing adjustment and decoding / encoding process of the physical channel. In other words, as the radius of the target cell increases, the time difference in which the PUSCH is transmitted from the HARQ process delay or the uplink grant increases unless the processing time decreases.
- the terminal assumes that the maximum TA value is proportional to the TTI length may be considered.
- the maximum TA value may be 0.33 ms (corresponding to 50 km of cell radius) when 1 TTI corresponds to 7 symbols, and 0.16 ms (cell corresponding to 3 or 4 symbols) when 1 TTI corresponds to 3 or 4 symbols. Radius of 24 km), or 0.093 ms if one TTI corresponds to two symbols, or 0.047 ms if one TTI corresponds to one symbol. (Corresponding to a cell radius of 7 km).
- the 5% -tile UPT (User Packet Throughput) characteristic e.g., data yield of cell boundary terminal (or user)
- the maximum TA value for short TTI may be set to be proportional to the TTI length, thereby shortening the overall processing time for the short TTI.
- the base station determines the number M of subframes in which PUSCH transmission is not performed among the L subframes (L ⁇ 1) consecutively transmitted to the UE and location information of subframes in which the PUSCH transmission is not performed. , L C M ).
- the L and M values may be promised in advance between the terminal and the base station or the base station may inform the user through a higher layer signal such as an RRC.
- the base station may transmit the L and M values to the terminal through a dynamic control signal.
- a method of notifying whether PUSCH is transmitted for each subframe for L consecutive subframes is most flexible, but has a disadvantage of high control signaling overhead.
- an 8-bit bit field may be included in an uplink grant.
- Such a configuration may be matched to a configuration in which the number of subframes that do not perform PUSCH transmission is limited because the LAA system preferably transmits a UL transmission burst unit.
- FIG. 16 illustrates an operation in which a single uplink grant indicates PUSCH transmission in subframes other than the second subframe among five consecutive subframes.
- the base station may indicate PUSCH transmission for the n + 4th, n + 6th, n + 7th, and n + 8th subframes through an uplink grant transmitted in the nth subframe. Can be. Subsequently, the base station may indicate PUSCH transmission for the n + 9th, n + 11th, n + 12th, n + 13th, and n + 14th subframes in the n + 5th subframe. Through such an operation, the UE may continuously perform PUSCH transmission.
- the case where the first subframe is included in the subframe without the PUSCH transmission may be excluded, and a specific state indicated by the bit field indicating the position information of the subframes on which the PUSCH transmission is not performed may include a plurality of subframes. It may mean that there is no subframe in which the PUSCH transmission is not performed among the subframes. In other words, the specific state may mean that PUSCH transmission is performed in all of the plurality of subframes.
- the UE may perform monitoring on downlink control signaling for subframes without PUSCH transmission indicated by the base station. In this case, it may be determined whether a partial subframe is applied to an adjacent uplink subframe based on the monitoring target subframe of the downlink control signaling indicated by the base station. For example, an ending partial subframe may be applied to an uplink subframe immediately before the target subframe of downlink control signaling.
- the UE monitors downlink control signaling to receive a new uplink grant, and performs a PUSCH transmission on an uplink subframe in which the received uplink grant is already scheduled. If not instructed, the UE may determine whether to transmit the PUSCH in the corresponding subframe and the content according to the content indicated by the uplink grant most recently or later received.
- the base station sets subframes for the UE to monitor the downlink signal in advance, and instructs the UE to transmit the PUSCH for L consecutive (L ⁇ 1) subframes through a single uplink grant.
- the terminal may interpret the operation as follows and perform an operation corresponding thereto.
- the UE may interpret the uplink grant as scheduling information for L subframes consecutive from the first uplink transmission time indicated by the uplink grant. However, when the subframes for monitoring the downlink signal are included in the L subframes, the UE may omit PUSCH transmission for the corresponding subframe.
- the UE may interpret the scheduling information for L subframes excluding subframes for monitoring the downlink signal from the first uplink transmission time indicated by the uplink grant.
- the base station has a terminal in advance of n, n + 5, n + 10, n + 15,...
- the downlink control signaling may be configured to be monitored in the first subframe.
- the base station performs multi-subframe scheduling for five subframes through an uplink grant in the nth subframe, n + 4, n + 5, n + 6, n + based on an uplink grant reception time
- the UE can expect PUSCH transmission for the 7, n + 8th subframes.
- the PUSCH transmission scheduled in the corresponding subframe may be omitted.
- the base station sets subframes to monitor the downlink signal through an upper layer signal in advance, and activates the subframes to monitor the downlink signal through common signaling (eg, common downlink control information (DCI)) or It may indicate deactivation or may indicate one of a plurality of settings for subframes for monitoring the downlink signal.
- common signaling eg, common downlink control information (DCI)
- DCI downlink control information
- the base station may inform downlink subframes to which an uplink grant is transmitted. For the purpose, it may indicate that subframes for monitoring the downlink signal have been activated. That is, the base station may configure a subframe for monitoring the downlink signal with a period and an offset, and may inform whether the setting is currently applied with a common DCI or the like.
- the base station may set a plurality of settings (that is, different periods and offsets) for the subframes to monitor the downlink signal, and indicate one of the plurality of settings with a common DCI.
- the base station may indicate a subframe for monitoring the future downlink signal through common signaling (eg, common DCI).
- common signaling eg, common DCI
- This method is a very dynamic scheme, and the base station can inform the terminal of the location where the next downlink signal will be transmitted through the common DCI. More specifically, the base station may inform the terminal of the position of the next subframe in which the downlink signal is to be transmitted, based on the current subframe, in the form of a time offset.
- the transmission gap may be applied to the rear part of the immediately preceding subframe of the link subframe.
- a transmission gap for the downlink LBT operation should be set. Therefore, when the base station configures a subframe for monitoring the downlink signal, even if there is no signal, the UE sets the transmission gap to the front part of the downlink subframe (for example, part or all of the first slot) or the downlink subframe. It may be set in the rear part (eg, part or all of the second slot) of the immediately preceding subframe.
- each subframe is used as information on a transmission time of each subframe with the uplink grant. Indicates a transmission time offset value compared to the previous subframe. However, the base station may indicate the transmission time for the first subframe of the L subframes to the terminal through the uplink grant.
- a time interval for transmitting an uplink grant in L subframes is set as shown in FIG. 16. Can be.
- M subframes in which actual PUSCH transmission is not performed among the L subframes may be indicated, or alternatively, a transmission time offset value between each subframe may be indicated.
- a bit field specific to an uplink grant may indicate a time axis offset value with respect to a transmission time of a t-1 th subframe with respect to any t (t> 1) th subframe among the L subframes.
- the offset value may be set in subframe units.
- the base station to follow the transmission time indicated by the uplink grant for the first subframe, +0 subframe compared to the previous subframe for each of the remaining three subframes, It can be indicated through a 1-bit indicator to have a transmission time offset value of the +1 subframe.
- a location in which (blank) frames (or blank time durations) are inserted may be indicated as an uplink grant.
- the UE may expect downlink reception (or at least uplink grant reception) for the blank subframe.
- a space for uplink grant transmission between L subframes may be set as shown in FIG. 16.
- the base station may support a space for transmitting an uplink grant in the form of inserting one empty subframe in the L subframes.
- a method of inserting the one blank subframe after the corresponding subframe may be applied.
- two or more positions may be inserted into the empty subframe.
- the base station may instruct to insert one empty subframe after the first subframe and the second subframe through the uplink grant.
- the UE may expect downlink reception for the empty subframe.
- the configuration of the base station may indicate to the user equipment through the uplink grant that K empty subframes, each consisting of K, are inserted into M positions among the L subframes.
- the M and K values may be set as higher layer signals, indicated as dynamic control signals, or may be values previously promised.
- the uplink grant indicates whether scheduling for the L subframes is prescheduling or not. Indicates whether it is general scheduling.
- the uplink grant may be transmitted in the form of downlink control information (DCI).
- DCI downlink control information
- an indicator of 1 bit size may be applied to indicate a scheduling scheme for the L subframes, and 'pre-scheduling' or 'general scheduling' may be indicated according to the value of the indicator.
- the 'prescheduling' scheme may be interpreted as the same meaning as 'triggered scheduling'.
- specific M subframes among the total L subframes may be presented through a predetermined scheme or a bit filter in an RRC signaling or an uplink grant.
- the subframes to be prescheduled may be applied to subframes in which a transmission time is set earlier than the reference uplink timing.
- the base station may set whether or not the terminal interprets the pre-scheduling target for a specific subframe set through an upper layer signal such as RRC or may indicate through bit filters in the uplink grant.
- the meaning of 'pre-scheduling' in the present invention means that the terminal suspends the transmission of data for a recent uplink grant, but is pre-scheduled through a separate instruction (for example, an uplink grant transmitted later).
- a separate instruction for example, an uplink grant transmitted later.
- the data transmission may mean a series of operations of preparing to transmit data according to a fast uplink timing from the corresponding indication time.
- pre-scheduling may refer to an operation of notifying the UE of (part) scheduling information for generating data during PUSCH transmission, but not indicating a transmission time point of the PUSCH. Accordingly, the terminal that has been instructed to pre-schedule generates a PUSCH to be transmitted in advance, and may later suspend the PUSCH transmission until a transmission instruction time of the base station.
- the triggering DCI may refer to a DCI indicating actual transmission (at a specific time point) of the prescheduled PUSCH.
- the base station instructs transmission for the n + 1, n + 2, n + 3, and n + 4th subframes for the uplink grant transmitted in the nth subframe, and the terminal transmits the reference uplink timing. It is assumed that subframes having a fast starting point are set to be interpreted as a prescheduling target. In this case, as shown in FIG. 17, the terminal may prepare a transmission block by generating a transmission block (TB) in advance without performing actual transmission for the n + 1, n + 2, n + 3th subframe.
- TB transmission block
- the base station may indicate a scheduling type for all L or specific M subframes out of L.
- the base station when the base station only informs the pre-scheduling information through the uplink grant, the base station for the uplink grant to indicate whether the uplink grant is used for pre-scheduling or actual PUSCH transmission for the uplink grant It can be included within a link grant.
- separate HARQ processes for prescheduling may be allocated, and the terminal may identify whether the corresponding uplink grant is for actual PUSCH transmission or for prescheduling PUSCH transmission through the HARQ process index in the uplink grant.
- the base station transmits the uplink grant in the nth subframe.
- the uplink grant indicates a general scheduling use (or non-pre-scheduling use) for N subframes
- the UE may have a predetermined time after receiving the uplink grant (eg, n + 4).
- Th subframe An uplink signal (eg, PUSCH) corresponding to the uplink grant is transmitted to the base station.
- the terminal when the uplink grant indicates a prescheduling purpose for N subframes, the terminal then receives an uplink grant (eg, triggering DCI) for triggering transmission of a prescheduled uplink signal, and The uplink signal corresponding to the received uplink grant is transmitted to the base station.
- an uplink grant eg, triggering DCI
- the base station simultaneously directs initial transmission preparation and retransmission preparation for specific uplink data through a single uplink grant, and then the base station instructs whether to actually transmit the retransmission data pre-prepared by the terminal as a separate triggering DCI. can do.
- the transmission time point of the pre-prepared retransmission data applies a fixed uplink timing (or an uplink timing at which the base station is set to a higher layer signal) based on a triggering DCI reception time (or an uplink grant reception time or an initial transmission time). Can be determined.
- the redundancy version (RV) for the retransmission data may be determined by applying a fixed offset (or an offset set by the base station as a higher layer signal) to the RV indicated in the initial transmission.
- the base station may instruct the terminal to prepare for retransmission for the corresponding data while instructing the terminal to initially transmit the specific transmission of the specific uplink data through a single uplink grant.
- the base station informs the terminal in advance.
- the prepared retransmission may be instructed to transmit at a faster uplink timing.
- the base station may instruct to transmit the retransmission data prepared in advance by the terminal in the n + 6th subframe by transmitting the triggering DCI in the n + 5th subframe.
- a UL scheduling delay corresponding to four subframes is considered for initial transmission, but a smaller uplink scheduling delay corresponding to one subframe may be considered since the UL scheduling delay corresponding to four subframes is prepared in advance. have.
- the base station interprets the single uplink grant transmitted to the terminal to perform both data transmission according to scheduling and preparation for non-adaptive retransmission for the data. Can be set (via higher layer signal, etc.).
- the UE may receive the uplink timing faster than the normal uplink timing (eg, received in the nth subframe and transmitted in the n + 4th subframe) from the PHICH reception time point of the base station (eg, n). Received in the first subframe and transmitted in the n + 2th subframe).
- the base station directs initial transmission of specific uplink data to one uplink grant among a plurality of uplink grants (for the same UE) in the same subframe, and transmits the uplink data to the other uplink grant (s) for the uplink data.
- the base station After instructing the retransmission preparation in advance, whether or not the actual transmission for the retransmission data prepared in advance by the terminal can be indicated by a separate triggering DCI.
- the transmission time of the pre-prepared retransmission data is fixed uplink timing (or the base station is set to a higher layer signal based on a triggering DCI reception time (or an uplink grant reception time or initial transmission time point indicating retransmission preparation) Uplink timing).
- the uplink signal may be transmitted according to a timing set after the triggering DCI reception time.
- a method of distinguishing and transmitting an uplink grant indicating initial transmission and a separate uplink grant for retransmission preparation in order to increase the degree of freedom in scheduling a base station is provided.
- the base station transmits an uplink grant for initial transmission and an uplink grant indicating retransmission preparation in the same subframe, and the terminal can expect to receive the uplink grant for the two purposes in one subframe.
- the base station may be configured for each of the initial transmission and retransmission preparations indicated at the same time for the specific L HARQ processes to the terminal. Instructing the data to be buffered separately, the base station may reduce the total number of HARQ processes to M to configure the terminal.
- the soft buffer size for the L HARQ processes may be determined by giving a weight twice the weight.
- the UE may divide the soft buffer evenly for the N HARQ processes.
- the soft buffer may support an operation of buffering previously transmitted data for a specific HARQ process and then combining the retransmitted data.
- the terminal soft buffers both data for initial transmission and data for retransmission preparation. Should be stored in Therefore, when the base station sets the UE to perform an operation for simultaneously instructing the initial transmission and the retransmission preparation for the L HARQ process out of the N HARQ process, the terminal sets the soft buffer size for the L HARQ process to another initial It should be set at least twice as large as the soft buffer size for HARQ processes that perform only one of transmission and retransmission.
- the base station reduces the total number of HARQ processes to M because the soft buffer of the terminal may be insufficient, and the soft buffer size is given by doubling weights for the L HARQ processes capable of simultaneously indicating initial transmission and retransmission preparation. Can be distributed.
- the base station may inform a specific HARQ process number to be weighted as an upper layer signal along with corresponding weight information. Or if the base station informs the terminal when the total number of HARQ processes (M), the terminal, the soft buffer size for the NM HARQ processes in ascending or descending order of the HARQ process index compared to the maximum number of HARQ processes (N) set to itself Can be doubled. Alternatively, the base station informs the terminal of the number of HARQ processes to increase the soft buffer size, the terminal may double the soft buffer size for the HARQ process corresponding to the number in the ascending or descending order of the HARQ process index.
- M total number of HARQ processes
- N maximum number of HARQ processes
- the base station may reduce the total number of HARQ processes to ensure fast uplink processing time for the L HARQ processes. .
- the base station may reduce the total number of HARQ processes to N-L, and inform the terminal of the corresponding information.
- the terminal may ignore scheduling for a specific HARQ process index (eg, M M + 1,..., N) corresponding to the excluded HARQ process.
- a specific HARQ process index eg, M M + 1,..., N
- the base station transmits and retransmits an uplink grant (first uplink grant) for initial transmission and an uplink grant (second uplink grant) for a preliminary purpose or a general uplink grant (first uplink grant) and initial transmission and retransmission.
- the uplink grant (second uplink grant) indicating at the same time can be classified and transmitted in the following manner.
- RNTI Radio Network Temporary Identifiers
- different RNTIs are applied to a hashing function and a CRC mask that determine the search region of the DCI.
- different RNTIs are applied to the CRC mask. At this time, the search region of the DCI may be the same.
- the search space for the second uplink grant may be continuously located in the search space for the first uplink grant.
- the two types of uplink grants may be transmitted in the same subframe, and the UE may expect detection of the two types of uplink grants in the same subframe.
- whether to actually transmit the retransmission data prepared in advance by the terminal may be indicated by a separate triggering DCI.
- the uplink grants for the two purposes are indicated by the indicator in the DCI in the same DCI format.
- the RNTI used as a CRC mask may be distinguished from one another by being distinguished. Alternatively, they may have different DCI formats. For example, an uplink grant for retransmission preliminary purpose may have a smaller DCI size.
- the base station instructs the mobile station to pre-schedule some subframes (set S 0 ) among consecutive L (L ⁇ 1) subframes through a single uplink grant and then instructs transmission of the prescheduled data.
- the base station In case of transmitting dynamic signaling, the base station notifies some of the scheduling information for uplink data transmission as prescheduling information, and transmits some of the scheduling information in dynamic signaling.
- the uplink timing is set to 4 TTI (or 4 ms). This is because control channel monitoring latency, control channel decoding delay, UL encoding latency, power setup latency, etc. ) And TA.
- the UE does not need to set the uplink timing to 4TTI (or 4ms) like the LTE system by performing the above-described processing.
- the terminal may reduce the UE encoding latency by performing TB generation and encoding based on the prescheduling information.
- the scheduling signal for the relatively small processing delay of the terminal is included in the triggering signal to support more flexible scheduling. It may be an operation.
- the base station informs information such as TB size, new data indicator (NDI) and redundancy version (RV) as prescheduling information, and transmits information such as resource allocation (RA) and HARQ process index in a triggering signal.
- the base station instructs the UE in advance scheduling for PUSCH transmission in N ( ⁇ 1) subframes through an uplink grant, and then instructs transmission of PUSCHs prescheduled in the uplink grant through a triggering DCI
- the UE does not receive the triggering DCI within a predetermined time (or within a time interval) from a time point of receiving the uplink grant (prearranged or set by the base station)
- the terminal may invalidate the indication of the uplink grant.
- the uplink grant may be in the form of dynamic signaling (eg, DCI).
- DCI dynamic signaling
- the base station transmits an uplink grant to the DCI to indicate prescheduling for PUSCH transmission in a series of M subframes, and the PUSCH in the M subframes is then indicated through a triggering DCI.
- M subframes may be sequentially transmitted from a start time point.
- the scheduling information in the uplink grant is transmitted at the time when the transmission information is transmitted to the triggering DCI according to channel aging. It may not be useful because it does not fit the channel information.
- the uplink grant may set a valid time interval and transmit PUSCHs pre-scheduled to the corresponding uplink grant only when a triggering DCI is received within the time interval.
- the time interval may be a value previously set or a value set by the base station as a higher layer signal such as RRC.
- the terminal when the terminal receives the uplink grant and receives the normal uplink grant (which indicates both scheduling information for PUSCH generation and transmission time) before receiving the triggering DCI, the UE may determine that the uplink grant is invalidated and may perform PUSCH transmission according to a normal uplink grant.
- the base station instructs the UE to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes with a higher layer signal such as RRC, and then instructs transmission of the prescheduled PUSCHs through a triggering DCI.
- the base station may inform the terminal of the HARQ process ID information by the triggering DCI.
- the base station instructs the UE to pre-schedule the PUSCH transmission in a series of M subframes through RRC signaling similarly to the SPS operation, and the PUSCH in the M subframes is then triggered through a triggering DCI.
- M subframes may be sequentially transmitted from the indicated transmission start time point.
- the present invention proposes a method of indicating HARQ process ID information for M PUSCHs prescheduled in triggering DCI when instructing prescheduling by RRC.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through the uplink grant, and then instructs transmission of the PUSCHs prescheduled to the uplink grant through the triggering DCI.
- the base station may indicate the following time interval from the time point of receiving the triggering DCI through the triggering DCI. Alternatively, the reception time of the triggering DCI may imply the following time interval.
- the UE may transmit PUSCHs pre-scheduled to uplink grant (s) satisfying the following conditions within the indicated time interval according to a transmission time indicated by the triggering DCI.
- the uplink grant may be in the form of dynamic signaling (eg, DCI).
- DCI dynamic signaling
- the terminal may misinterpret an uplink grant indicated by a specific triggering DCI.
- the terminal when the terminal does not receive the uplink grant (P 1 ), and receives only the triggering DCI (D 1 ) corresponding to P 1 , the terminal is the terminal is received triggering DCI (D 1 ) which uplink can not determine whether to indicate a grant, if If before the base station sends (that are independent of the triggering DCI (D 1)) UL grant (P 2) existing in the UE transmission of the D 1 is P 2 You can misunderstand that. Accordingly, the present invention proposes a method of informing a triggering DCI of a time interval in which an uplink grant indicated by the corresponding triggering DCI exists. If the UE does not receive the uplink grant within the time interval indicated by the triggering DCI, it may be determined that the triggering DCI is invalidated and may not follow the transmission instruction.
- the base station may accurately indicate when (or subframe) the corresponding uplink grant (s) exist through the triggering DCI. That is, when the uplink grant (s) are transmitted N subframes before the reception time of the triggering DCI, the N value (or the subframe position where the uplink grant is transmitted) may be indicated by the triggering DCI. If the UE does not receive an uplink grant at the time indicated by the triggering DCI, the UE determines that the triggering DCI is invalidated and may not follow the transmission instruction.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in the N (N ⁇ 1) subframe through the uplink grant, and then instructs the transmission of the PUSCH prescheduled to the uplink grant through the triggering DCI
- the base station assigns a unique ID for the uplink grant as a function of (upon or in part) scheduling information of the uplink grant and the transmitted subframe index, and ID of an uplink grant to indicate transmission through a triggering DCI. Can be indicated.
- the uplink grant may be in the form of dynamic signaling (eg, DCI).
- DCI dynamic signaling
- the base station When the base station instructs the pre-scheduling for the specific PUSCH transmission to the uplink grant and then the actual transmission for the pre-scheduled PUSCH through the triggering DCI, in order to ensure that there is no inconsistency between the base station and the terminal exactly what is triggered through It should be able to indicate whether pre-scheduling for uplink grant should be transmitted.
- the base station transmits the corresponding uplink grant as a function of the scheduling information of the uplink grant (in whole or in part) and the transmitted subframe index to identify the uplink grant to which the triggering DCI is directed.
- a method of assigning a unique ID to and indicating an ID of an uplink grant to indicate transmission through a triggering DCI may be considered.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through an uplink grant (or RRC signaling), and then instructs transmission of the prescheduled PUSCHs through a triggering DCI.
- the UE may report UE capability for the number of PUSCH transmission subframes (or the number of TBs) capable of performing prescheduling to the base station.
- the uplink grant may be in the form of dynamic signaling (eg, DCI).
- DCI dynamic signaling
- the terminal When the base station instructs the terminal to pre-schedule the N subframes, the terminal must generate TBs corresponding to the N subframes in advance. In this case, considering the buffer capacity that the terminal can generate and store TB in advance, the maximum number of TBs that the terminal can generate for pre-scheduling may be limited according to the capability of the terminal.
- the present invention proposes a method of defining the number of PUSCH transmission subframes (or the number of TBs) in which a UE can perform prescheduling as UE capability and reporting UE capability information on prescheduling to a base station. .
- the base station may instruct the pre-scheduling appropriately for each terminal based on the reported terminal capability. If a specific UE receives prescheduling that is not supported by its UE capability (e.g., when a UE receives a prescheduling indication exceeding the maximum number of PUSCH transmission subframes (or TBs) that can be generated in advance), The prescheduling instructions may not be followed.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through the uplink grant, and then instructs transmission of the PUSCHs prescheduled to the uplink grant through the triggering DCI.
- the terminal may perform one of the following operations.
- the uplink grant may be in the form of dynamic signaling (eg, DCI).
- DCI dynamic signaling
- the present invention defines an operation when the terminal receives another uplink grant after receiving the uplink grant but before the corresponding triggering DCI. Specifically, it should be able to determine whether the UE can ignore the previously received uplink grant or should prepare for transmission for all the received uplink grants.
- the terminal may be expected to operate according to a prescheduling instruction instructed by the base station to the terminal with the latest uplink grant. That is, when the terminal receives a plurality of uplink grants before the triggering DCI reception, the UE may prepare for PUSCH transmission with prescheduling information corresponding to the most recent uplink grant.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through an uplink grant (or RRC signaling), and then instructs the transmission of the prescheduled PUSCHs through a triggering DCI.
- the operation may be applied only when the uplink transmission in the LAA SCell indicates self-carrier scheduling. In other words, it may be applied only when an uplink grant is transmitted in a LAA SCell to perform PUSCH transmission.
- the base station may configure whether the base station applies the uplink grant and the triggering DCI-based PUSCH transmission operation to the terminal as an upper layer signal.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through the uplink grant, and then instructs transmission of the PUSCHs prescheduled to the uplink grant through the triggering DCI.
- the UE may assume that the (prescheduled) PUSCHs for which a specific triggering DCI indicates transmission are PUSCHs prescheduled with uplink grant (s) transmitted before the time gap from a corresponding triggering DCI reception time point.
- the UE When the UE receives the pre-scheduled uplink grant and is instructed to transmit the pre-scheduled PUSCH through the triggering DCI, if the time between the triggering DCI and the PUSCH transmission is not sufficient, the UE cannot complete preparation for the PUSCH transmission. Can be.
- the PUSCH transmission power may be determined after the actual transmission location is indicated by the triggering DCI.
- the UE needs a minimum time to calculate the PUSCH transmission power, and may need a time gap between the triggering DCI and the PUSCH (instructed to be transmitted to the triggering DCI) according to the purpose.
- the time gap may be a fixed value or may be a value determined according to the terminal capability with respect to the processing time of the terminal.
- the UE may assume that a PUSCH transmission indicating that a specific triggering DCI indicates transmission targets PUSCHs pre-scheduled to an uplink grant received before the time gap from the triggering DCI reception time point.
- FIG. 18 illustrates that when a time gap is set to 2 subframes (or 2ms), when a subframe in which a UE receives a triggering DCI is an nth subframe, the corresponding triggering DCI is received in a subframe before the n-2nd subframe.
- FIG. 4 illustrates a case of transmitting only PUSCHs corresponding to one uplink grant (s).
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through the uplink grant, and the terminal receives the triggering DCI in the time interval in which the uplink grant (set by the base station) is valid.
- the UE performs transmission of PUSCHs prescheduled to the uplink grant.
- the terminal may assume only a single uplink grant within a time interval in which the uplink grant is valid.
- the uplink grant may be excluded from the valid time interval during the time gap (predetermined) based on the uplink grant reception time.
- the terminal may assume that all uplink grants are valid as in the seventh additional embodiment described above. However, if different uplink grants (UG1, UG2) instruct different PUSCH scheduling for the same subframe in the above example, it may be ambiguous which indication the UE should follow.
- the present invention proposes a method of assuming that a new uplink grant does not come during the valid time of the uplink grant when the UE receives a specific uplink grant in order to prevent the above problem situation. That is, even if a new uplink grant is received during the valid time period, the terminal may ignore the uplink grant as invalid.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through the uplink grant, and the terminal receives the triggering DCI in the time interval in which the uplink grant (set by the base station) is valid.
- the UE performs transmission of PUSCHs prescheduled to the uplink grant.
- a valid time period of the uplink grant indicated by the base station includes a DMRS (DRS measurement timing configuration) section (or a measurement gap) section (or a measurement gap) section (or a measurement gap) section (or a measurement gap) section (or a measurement gap) section (or a measurement gap) section (or a measurement gap)
- the terminal may interpret it as one of the following.
- the UE when a DMTC interval (or a measurement gap) is included in a valid time interval for an uplink grant, the UE measures a frequency band other than its own frequency band during the DMTC interval (eg, inter-frequency measurement (inter- frequency measurement)). In this case, the UE may not perform triggering DCI detection in the DMTC interval (or the measurement gap, even if the uplink grant is a valid time interval, and thus the UE may not expect to receive the triggering DCI in the corresponding interval. In order to compensate for the amount of time that the triggering DCI could not be received, the UE may allow an operation of extending an effective time interval of an uplink grant by the length of time.
- a frequency band other than its own frequency band during the DMTC interval eg, inter-frequency measurement (inter- frequency measurement)
- the UE may not perform triggering DCI detection in the DMTC interval (or the measurement gap, even if the uplink grant is a valid time interval, and thus the UE may not expect to receive
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through an uplink grant, and the terminal receives a triggering DCI in a time interval in which an uplink grant (set by the base station) is valid.
- the UE performs transmission of PUSCHs prescheduled to the uplink grant.
- the terminal may operate as one of the following.
- the triggering DCI is not expected for the OFF time included in the valid time interval of the uplink grant.
- the ON time in the DRX cycle includes not only the ON period but also the DRX inactivity time, and the remaining time except the ON time in the DRX cycle is called an OFF time.
- a valid time interval of an uplink grant indicated by the base station means a valid length of time on the ON time.
- the LTE system supports the DRX operation for the purpose of reducing battery consumption of the terminal.
- the UE receives an ON interval for detecting a PDCCH within a recurring predetermined time unit, which is named DRX cycle.
- DRX cycle a recurring predetermined time unit
- the PDCCH may be detected by maintaining the ON state for the DRX inactivity time set by the base station.
- the terminal prioritizes the DRX operation and may perform the OFF operation for PDCCH detection without expecting a triggering DCI even in a valid time interval of an uplink grant for the OFF time.
- the UE may assume that the OFF time included in the valid time interval of the uplink grant is not applied because the terminal gives more priority to the valid time interval of the uplink grant. In other words, the UE can always recognize at least the valid time interval of the uplink grant as the ON time.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through the first uplink grant, and the terminal is within a valid time interval of the first uplink grant (set by the base station).
- the UE When receiving a second uplink grant (eg, triggering DCI), the UE performs transmission of PUSCHs prescheduled to the first uplink grant. In this case, the terminal may not expect to receive a new first uplink grant for the following time interval.
- the UE When the UE expects that the second uplink grant for the first uplink grant received in the nth subframe is to be received after the n + k-1th subframe, the UE receives the first uplink grant Time interval from subframe (nth subframe) to ⁇ n + valid? H time interval-k ⁇ th subframe
- the UE may expect to receive the second uplink grant up to the n + Lth subframe.
- k may be a value corresponding to a minimum uplink timing for UE processing from receiving a first uplink grant to transmitting a second uplink grant.
- the terminal when the terminal expects that the second uplink grant corresponding to the first uplink grant received in the nth subframe is to be received after the n + k-1th subframe, the terminal receives the n + kth subframe. It can be expected to receive the second uplink grant from the frame to the subframe where the valid time interval ends. For example, if the valid time interval corresponds to L subframes, the valid time interval for the first uplink grant received by the terminal becomes ⁇ n + 1th subframe to n + Lth subframe ⁇ . .
- the second uplink grant corresponding to the new first uplink grant is n + L th It can be expected to be received after a subframe. That is, in the period in which the second uplink grant corresponding to the new first uplink grant is expected to be received, the second uplink grant corresponding to the first uplink grant previously received by the terminal is expected to be received. It does not overlap with ⁇ n + 2th subframe to n + Lth subframe ⁇ which is a period.
- the UE may not expect to receive a new first uplink grant from the subframe in which the first uplink grant is received to the n + L-2 th subframe. Alternatively, when a new first uplink grant in the corresponding section is received, this may be ignored.
- the base station instructs the terminal to pre-schedule the PUSCH transmission in N (N ⁇ 1) subframes through the first uplink grant, and the terminal instructs a second uplink grant (eg, triggering DCI) in the nth subframe.
- the UE Upon receipt of the UE, the UE performs prescheduled PUSCH transmission in the n + L th subframe.
- L + k is a certain length ( For example, it may be determined that PUSCH transmission is valid only when 4 ms) or more.
- the terminal when the terminal receives a pre-scheduling and then receives a second uplink grant (eg, triggering DCI) for the pre-scheduling in the nth subframe, the terminal receives the second uplink in the n + Lth subframe.
- a second uplink grant eg, triggering DCI
- the terminal receives the second uplink in the n + Lth subframe.
- PUSCH transmission according to a link grant can be performed.
- the second uplink grant corresponding to the first uplink grant received by the terminal in the mth subframe will be received after the m + kth subframe.
- the PUSCH transmission corresponding to the first uplink grant received in the mth subframe may be performed after the at least m + k + Lth subframes.
- the k + L may correspond to the uplink timing, the value may be set to be at least equal to or greater than the uplink timing according to the normal uplink grant. Therefore, the terminal may determine that the PUSCH transmission corresponding to the first uplink grant is valid only when k + L is greater than or equal to a predetermined length, and may omit the PUSCH transmission because it is determined to be invalid otherwise.
- the terminal may advance in one of the following ways: Generate TB according to scheduling.
- the MCS or RA information for the set S 0 in the uplink grant may follow scheduling information for subframes (or MCS or RA information commonly applied to the L subframes) rather than prescheduling.
- a method of mitigating control signaling overhead may use a semi-persistent scheduling (SPS) method of the LTE system.
- SPS semi-persistent scheduling
- the MCS and RA or TB size may be set to an upper layer signal such as RRC in advance, and in the uplink grant, only 1 bit information may indicate whether to perform prescheduling for the set S 0 .
- the base station when the base station configures the MCS or RA in the SPS operation and instructs the UE to transmit PUSCH for L subframes (L ⁇ 1) through a single uplink grant, one of the following L For the subframe selected by the method, the UE may perform PUSCH transmission according to the MCS or RA set to SPS.
- FIG. 19 is a diagram illustrating a configuration according to MCS or RA information configured in semi-persistent scheduling (SPS) or MCS or RA information configured in an uplink grant during PUSCH transmission according to multiple subframe scheduling.
- SPS semi-persistent scheduling
- MCS or RA information configured in an uplink grant during PUSCH transmission according to multiple subframe scheduling.
- the base station performs multi-subframe scheduling for four subframes
- the terminal receives an uplink grant in the nth subframe
- the subframes before the n + 4th subframe For PUSCH transmission according to the MCS or RA information configured in the SPS, PUSCH transmission may be performed according to the MCS or RA information configured in the uplink grant for the n + 4th subframe and subsequent subframes.
- the base station determines MCS or RA configured as a higher layer signal and other scheduling information (eg, CIF (carrier indication field) for subframes having uplink timing earlier than the reference uplink timing among L subframes. , diff0-1A, resource allocation (uplink hopping), TBS (Transmission Block Size, uplink index, uplink DAI, CSI reporting, SRS request, RA type, TPMI / layer (DCI4), padding, HARQ process ID, cross Multi-subframe information, MCS index, modulation order, coding rate, number of coded symbols (or resource allocation), HARQ process index, NDI (new data indicator), redundancy version (RTV), transmission power control (TPC) , PUSCH transmission may be performed by using a DM-RS cyclic shift (CS), an orthogonal cover code (OCC), a frequency hopping (FH), and an aperiodic CSI request).
- CIF carrier indication field
- the base station instructs the UE whether to transmit PUSCH for consecutive L subframes (L ⁇ 1) through a single uplink grant, one of the following is used as an ID for the uplink grant.
- the terminal may pre-configure uplink data scheduled in advance in the uplink grant corresponding to the uplink grant ID. It can be transmitted or retransmitted according to uplink timing.
- the base station uses a bit field indicating transmission of prescheduled data in an uplink grant in which a single uplink grant is transmitted at a previous time point, scheduling information about actual data to be transmitted, and future transmission. It may be configured to include prescheduling information for the data. For example, a single uplink grant received in the nth subframe may or may not transmit previously prescheduled data in the n + 1, n + 2 and n + 3th subframes, and prescheduled transmission in the future, and n + The fourth and subsequent time points may include scheduling for data to be actually transmitted.
- FIG. 20 is a diagram illustrating a scheduling operation for data to be transmitted previously, prescheduled to be transmitted in future, and data to be actually transmitted through an uplink grant.
- a specific subframe among the M subframes to be prescheduled may correspond to a specific subframe among the L subframes in the uplink grant, and is compared with a triggering time point for the M subframes to be prescheduled.
- the transmission time point may follow the transmission time point of the uplink grant of the subframe corresponding to the one of the transmission time points of the uplink grant with respect to the L subframes in the uplink grant.
- the transmission time of the three pre-scheduled subframes in FIG. 20 are +1, +2, and +3 TTIs, respectively, compared to the uplink grant. It can be transmitted at the time of transmission of +2 and +3 TTI.
- the base station instructs transmission of prescheduled data in the operation
- a discrepancy between the base station and the terminal may occur as to which uplink grant in the past should be applied to the prescheduling indicated.
- the base station transmits the first uplink grant and the second uplink grant in order, and the terminal does not receive the second uplink grant.
- the base station transmits a 1-bit on / off indication to the terminal to transmit the pre-scheduled data
- the base station expects the transmission of the data pre-scheduled by the most recently transmitted second uplink grant
- the terminal may transmit data prescheduled by the first uplink grant received by the terminal, thereby causing a mismatch between the base station and the terminal.
- the present invention proposes a scheme for indicating an uplink grant corresponding to data pre-scheduled by the counter value, including a counter that cyclically increases in an uplink grant, similarly to the DAI concept of the LTE system.
- a time offset from a current uplink grant may be indicated in addition to the counter value to indicate an uplink grant corresponding to prescheduled data.
- the terminal when receiving an indication of an uplink grant that the terminal has not received through the above method, the terminal may omit the corresponding prescheduled data transmission.
- a PHICH resource eg, a combination of a PHICH group and an orthogonal sequence
- a PHICH resource eg, a combination of a PHICH group and an orthogonal sequence
- the UE may perform or cancel fast uplink timing based (re) transmission for the PUSCH (or uplink grant) corresponding to the PHICH resource in a specific subframe according to the PHICH transmission time according to the PHICH value. Can be.
- the UE that receives the uplink grant transmitted from the nth subframe by the base station performs uplink data transmission in the n + 4th subframe but fails to transmit the uplink data due to the failure of the uplink LBT operation. If there is no downlink data to be transmitted separately by the base station, the base station can expect the terminal to retransmit fast for the uplink grant that failed to transmit.
- the base station may utilize a PHICH resource with less control signaling overhead and detection complexity relative to DCI and PDCCH in order to indicate fast retransmission of the terminal. For example, when a terminal receiving an uplink grant transmitted in an nth subframe performs uplink data transmission in an n + 4th subframe, the terminal may operate as follows.
- the UE detects the PHICH resource in the n + 5th subframe, and if the value indicated by the PHICH is '1', (fast uplink timing for PUSCH transmission corresponding to the PHICH resource in the n + 4th subframe If the transmission is performed and '0', it may be recognized as canceling (eg, cell-specific).
- the base station may provide the UE with information such as HARQ process number, NDI or RV by utilizing a plurality of PHICH resources or by changing a coding method of PHICH resources.
- the UE expects that the PHICH resource (eg, PHICH group and orthogonal sequence combination) implies one of the following values.
- the PHICH resource eg, PHICH group and orthogonal sequence combination
- the UE may perform or cancel fast uplink timing based (re) transmission for all (or specific) PUSCHs (or uplink grants) corresponding to corresponding transmission points according to the PHICH value.
- the present invention is a modified example of the seventh embodiment and may imply information on the PUSCH resource (or uplink grant) resource to which the PHICH resource is a retransmission target. Accordingly, the following operation can be considered.
- the combination of the PHICH group and the orthogonal sequence of the PHICH resource indicates a time offset value, and when the UE receives the PHICH resource, all uplink transmitted in the subframe to which the time offset (corresponding to the PHICH resource) is applied from the current subframe
- the link grant is recognized as PUSCH transmission or cancellation according to fast uplink timing according to the value of PHICH resource.
- the combination of the PHICH group and the orthogonal sequence of the PHICH resource indicates a time offset, a PUSCH RB index, a DM-RS sequence, and the like, and when the UE receives the PHICH resource, a time offset (corresponding to the PHICH resource) from the current subframe
- the PUSCH transmitted in the applied subframe and has a PUSCH RB index or a DM-RS sequence (corresponding to the PHICH resource) is recognized as a PUSCH transmission or cancellation according to fast uplink timing according to the value of the PHICH resource (eg, Cell specific)
- the base station may inform the UE of information such as HARQ process number, NDI or RV by utilizing a plurality of PHICH resources or by changing a coding method of PHICH resources.
- the UE When the UE transmits the PUSCH according to a fast uplink timing having a faster transmission time point than the reference uplink timing, if the uplink transmission power of a predetermined level or more is not guaranteed at the time of the PUSCH transmission, the UE may be one of the followings. It works in the way.
- the UE may require a process for adjusting uplink transmission power, that is, a minimum time for uplink transmission control.
- a process for adjusting uplink transmission power that is, a minimum time for uplink transmission control.
- an uplink transmission power remaining for the PUSCH transmission may be too small.
- the base station schedules the first PUSCH based on the reference uplink timing in the nth subframe and the terminal allocates uplink transmission power as required by the first PUSCH before the n + 3th subframe. . Then, when the base station instructs the second PUSCH transmission based on fast musk link timing in the n + 3th subframe, the terminal lacks time to adjust the uplink transmission power control for the first PUSCH within 1 ms. As for the PUSCH, only some remaining power of the entire uplink transmission power may be allocated.
- the UE may be disadvantageous in competition with other nodes in the uplink LBT process, so the UE abandons the transmission of the second PUSCH or transmits the second PUSCH based on the reference uplink timing. Uplink transmission power may be allocated.
- an aperiodic CSI request field is applied to an uplink grant indicating the PUSCH transmission. I never do that.
- a time point for performing CSI calculation and uplink timing for the purpose of reporting channel state information (CSI) is referred to in the CSI calculation based on an uplink grant reception time (that is, a CSI reference resource). Set)).
- CSI channel state information
- the UE calculates a CSI corresponding to the subframe in which the aperiodic CSI request is indicated. do. This is because the UE is expected to perform CSI reporting in the n + 4th subframe based on the nth subframe in which the aperiodic CSI request is indicated.
- an aperiodic CSI request field may not be applied to an uplink grant indicating the PUSCH transmission.
- the base station may set uplink timing to be applied to the PUSCH according to the prescheduling information or the aperiodic CSI request field value in the uplink grant (for the prescheduled data) as follows.
- the UE may apply the reference uplink timing or the legacy uplink timing when transmitting the PUSCH.
- the UE may apply fast uplink timing when transmitting the PUSCH.
- the UE If there is an aperiodic CSI request field in a control signal (or an uplink grant) that triggers prescheduled data transmission, and the aperiodic CSI report is triggered, the UE transmits a reference uplink timing or legacy uplink timing during PUSCH transmission. Can be applied. On the other hand, if there is an aperiodic CSI request field in a control signal (or an uplink grant) that triggers prescheduled data transmission but the aperiodic CSI report is not triggered, the UE may apply fast uplink timing in PUSCH transmission. .
- the base station When the base station instructs the UE to multi-subframe scheduling (or whether PUSCH is transmitted) for L uplink subframes, the base station determines a time difference between a PUSCH transmission time from an uplink grant reception time according to the L value. UL grant-to-PUSCH timing can be changed. Alternatively, the base station may determine the maximum number of multi-subframes that can be scheduled according to the time difference between the UL grant reception time and the PUSCH transmission time.
- a PUSCH transmission time point may be defined based on a subframe of a specific position among the multi-subframes.
- the first subframe of the multi-subframe may be defined as a reference.
- the base station When the base station performs multi-subframe scheduling for four uplink subframes according to the reference uplink timing or the legacy uplink timing of the LTE system in the LAA system, the time between successive uplink subframes as shown in FIG. 21.
- the use of downlink subframes can be minimized.
- the base station expects the UE to receive the downlink transmission in the next subframe after the PUSCH transmission according to the multi-subframe scheduling is terminated or the bit field in the uplink grant indicating the multi-subframe scheduling Through downlink reception in a specific subframe can be indicated.
- the downlink signal may be received in the next subframe of the l th subframe of the multi-subframe scheduling for the L uplink subframes.
- a UL grant-to-PUSCH timing is given as 4 ms from a UL grant reception time and multi-subframe scheduling of a base station is performed for 5 uplink subframes, FIG. 21 and FIG. As shown in FIG. 22, the uplink subframes are difficult to be compact, and a PUSCH may be transmitted.
- the uplink sub-frame is more advantageous to the LBT operation as shown in FIG. 22.
- the frames can be transmitted in a compact manner.
- the present invention proposes a method of changing a UL grant-to-PUSCH timing from an uplink grant reception time in proportion to the number of target uplink subframes to be actually transmitted through multi-subframe scheduling. do.
- the base station sets the first subframe scheduled for multi-subframe to the UE to follow the transmission time point to which the time offset is additionally applied to the reference uplink timing, and the information on the time offset in the RRC or uplink grant bit field Can be informed via
- the proposed methods of the present invention may be selectively applied depending on whether cross-carrier scheduling or self-carrier scheduling is performed.
- the terminal When the base station performs multi-subframe scheduling for N (N ⁇ 1) subframes, the terminal designates the same HARQ process number for N subframes in the DCI for the multi-subframe scheduling. A single subframe transmission is attempted for the HARQ process within a time window (consisting of N subframes) defined based on a reception time of the DCI.
- a base station when a base station performs multi-subframe scheduling, new data may be transmitted for each subframe, but more transmission opportunities may be provided for the same data.
- a method for recycling a DCI in which a base station indicates multi-subframe scheduling may be a more efficient signaling method.
- 24 is a diagram illustrating an operation of setting HARQ process numbers of a plurality of PUSCHs identically according to multi-subframe scheduling.
- the base station when a base station can indicate PUSCH transmission in four subframes, the base station may set the same HARQ process number (eg, 0) of a PUSCH to be transmitted in four subframes. Then, the UE may interpret the PUSCH transmission for the HARQ process 0 indicated by the DCI in four subframes in which the DCI indicates the multi-subframe transmission.
- the HARQ process number eg, 0
- a base station When a base station indicates a time window (eg, TW1, TW2) based transmission for different PUSCHs (eg, a first PUSCH, a second PUSCH), a certain PUSCH (eg, a first PUSCH) is assigned to a specific uplink sub If transmission in the frame is successful and the next uplink subframe of the specific uplink subframe is included in the time window of the remaining PUSCH (for example, the second PUSCH), the UE does not perform a separate LBT operation. send.
- a time window eg, TW1, TW2
- the UE may continuously transmit the second PUSCH to the first PUSCH under conditions that do not violate the MCOT (maximum channel occupancy time).
- a base station can indicate transmission in a time window for a specific PUSCH according to the twelfth embodiment or another method described above, a case may occur where time windows for different PUSCHs overlap.
- 25 is a diagram illustrating an operation when time windows for different PUSCHs overlap.
- a base station transmits an uplink grant to a specific user equipment in an nth subframe and thus has a time window of four subframe lengths for PUSCH1 (eg, n + 4th, n + 5th, n +). 6th, n + 7th subframe), and the uplink grant is transmitted to the same user equipment in the n + 1th subframe to transmit a time window of four subframe lengths (eg, n + 5th) for the second PUSCH. , n + 6th, n + 7th, n + 8th subframes).
- the base station When the base station sets a subframe set capable of transmitting an uplink grant in advance and informs the terminal (or other base station in the network) and transmits an uplink grant (or only an uplink grant), the base station transmits a frequency reuse factor (FR). In order to achieve 1, one of the following uplink LBT operations is performed.
- a back-off counter uplink LBT without a reservation signal is performed before an uplink grant transmission subframe.
- the uplink transmission between two different terminals is not detected in the CCA process due to the distance between the terminals, but the downlink transmission transmitted to any one terminal is performed in the CCA process of the other terminal. Can be detected. In consideration of such a situation, even when only the uplink traffic exists when the base station is self-scheduling, when the uplink grant is transmitted through the unlicensed band, it may occur when the UL transmission of the terminal serviced by another base station is blocked.
- the uplink grant transmission may be limited to a case where only an uplink grant is transmitted without data transmission.
- the downlink LBT operation for the uplink grant transmission is operated independently of the PDSCH and performs the following LBT operation.
- the base station when the base station performs the LBT operation to transmit the uplink grant (eg, DCI), it is applied to the LBT operation based on whether the PUSCH corresponding to the previously transmitted uplink grant is transmitted.
- the LAA system proposes an LBT scheme named Category 4 (Cat. 4) as a downlink LBT operation.
- the LBT parameters for the Category 4 downlink LBT include Defer period length, CWS (contention window size) value for each class, for a total of four Channel Access Priority Classes as shown in Table 2 below.
- the MCOT maximum channel occupancy time
- the base station may perform random back-off using LBT parameters determined according to the channel access priority class, and may perform signal transmission within the MCOT when the channel is accessed after the random back-off is completed.
- the MCOT value is set to 2/3/8/8 ms, and MCOT in an environment without other radio access technology (RAT) such as Wi-Fi.
- RAT radio access technology
- Cat. 4 may be designed to utilize HARQ-ACK information on the PDSCH in the CWS adjustment process, but when only an uplink grant is transmitted, it may be difficult to adjust the CWS because there is no corresponding HARQ-ACK information.
- CWS where CWS value can be set irrespective of PDSCH transmission value
- the base station may consider that collision has occurred and increase the CWS for the uplink grant.
- the CWS may be initialized to a minimum value (or a specific value).
- the configuration is performed when the base station operates in self-carrier scheduling and transmits an uplink grant with an LBT operation in an unlicensed band, and when the base station operates in cross-carrier scheduling and performs an LBT operation on an uplink grant. All can be applied.
- FIG. 26 is a diagram illustrating a configuration of a terminal and a base station in which the proposed embodiment can be implemented.
- the terminal and the base station illustrated in FIG. 26 operate to implement the above-described embodiments of the method for transmitting and receiving uplink signals between the terminal and the base station.
- a UE may operate as a transmitting end in uplink and a receiving end in downlink.
- an e-Node B eNB
- eNB e-Node B
- the terminal and the base station may include transmitters 2640 and 2650 and receivers 2660 and 2670, respectively, in order to control transmission and reception of information, data and / or messages. Or it may include an antenna (2600, 2610) for transmitting and receiving a message.
- the terminal and the base station may each include a processor 2620 and 2630 for performing the above-described embodiments of the present invention, and memories 2680 and 2690 that can temporarily or continuously store the processing of the processor. Can be.
- the terminal configured as described above includes first downlink control information indicating whether the type of scheduling uplink signal transmission for one or more subframes from the base station through the processor 2620 is scheduling of a first type or scheduling of a second type. If the first downlink control information indicates the scheduling of the first type, and transmits an uplink signal in one or more subframes set based on the reception time of the first downlink control information; When the first downlink control information indicates the second type of scheduling, the second downlink control information indicating uplink signal transmission for the one or more subframes is received from the base station, and the first downlink control information is received. 2 In one or more subframes set based on a reception time of downlink control information It can be configured to transmit the uplink signal group.
- the base station configured as described above may indicate, via the processor 2630, first downlink control information indicating whether the type of scheduling uplink signal transmission for one or more subframes is scheduling of a first type or scheduling of a second type. Is transmitted to a terminal, and when the first downlink control information indicates scheduling of the first type, an uplink signal is transmitted in one or more subframes set based on a transmission time of the first downlink control information.
- the first downlink control information indicates the second type of scheduling, and transmits the second downlink control information indicating the uplink signal transmission for the one or more subframes to the terminal.
- the uplink in one or more subframes set based on a transmission time point of the second downlink control information. It may be configured to receive a greater signal.
- the transmitter and the receiver included in the terminal and the base station include a packet modulation and demodulation function, a high speed packet channel coding function, an orthogonal frequency division multiple access (OFDMA) packet scheduling, and a time division duplex (TDD) for data transmission. Packet scheduling and / or channel multiplexing may be performed.
- the terminal and base station of FIG. 26 may further include a low power radio frequency (RF) / intermediate frequency (IF) unit.
- RF radio frequency
- IF intermediate frequency
- the terminal is a personal digital assistant (PDA), a cellular phone, a personal communication service (PCS) phone, a GSM (Global System for Mobile) phone, a WCDMA (Wideband CDMA) phone, an MBS.
- PDA personal digital assistant
- PCS personal communication service
- GSM Global System for Mobile
- WCDMA Wideband CDMA
- MBS Multi Mode-Multi Band
- a smart phone is a terminal that combines the advantages of a mobile communication terminal and a personal portable terminal, and may mean a terminal incorporating data communication functions such as schedule management, fax transmission and reception, which are functions of a personal mobile terminal, in a mobile communication terminal.
- a multimode multiband terminal can be equipped with a multi-modem chip to operate in both portable Internet systems and other mobile communication systems (e.g., code division multiple access (CDMA) 2000 systems, wideband CDMA (WCDMA) systems, etc.). Speak the terminal.
- CDMA code division multiple access
- WCDMA wideband CDMA
- Embodiments of the invention may be implemented through various means.
- embodiments of the present invention may be implemented by hardware, firmware, software, or a combination thereof.
- a method according to embodiments of the present invention may include one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), Field programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors and the like can be implemented.
- ASICs application specific integrated circuits
- DSPs digital signal processors
- DSPDs digital signal processing devices
- PLDs programmable logic devices
- FPGAs Field programmable gate arrays
- processors controllers, microcontrollers, microprocessors and the like can be implemented.
- the method according to the embodiments of the present invention may be implemented in the form of a module, procedure, or function that performs the functions or operations described above.
- software code may be stored in the memory units 2680 and 2690 and driven by the processors 2620 and 2630.
- the memory unit may be located inside or outside the processor, and may exchange data with the processor by various known means.
- Embodiments of the present invention can be applied to various wireless access systems.
- various radio access systems include 3rd Generation Partnership Project (3GPP) or 3GPP2 systems.
- 3GPP 3rd Generation Partnership Project
- Embodiments of the present invention can be applied not only to the various wireless access systems, but also to all technical fields to which the various wireless access systems are applied.
- the proposed method can be applied to mmWave communication system using ultra high frequency band.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
본 발명에서는 기지국 또는 단말이 LBT (Listen-Before-Talk) 기반의 신호 전송을 수행하는 LAA(Licensed Assisted Access) 시스템에서, 기지국과 단말간 상향링크 신호를 송수신하는 방법 및 이를 지원하는 장치를 개시한다. 구체적으로, 본 발명에서는 기지국이 단말에게 지시하는 스케줄링 타입에 따라 상기 기지국 및 단말이 상향링크 신호를 송신 하는 방법 및 이를 지원하는 장치를 개시한다.
Description
이하의 설명은 비면허 대역을 지원하는 무선 통신 시스템에 대한 것으로, 구체적으로는 비면허 대역을 지원하는 무선 통신 시스템에서 단말과 기지국 간 상향링크 신호를 송수신하는 방법 및 이를 지원하는 장치들에 대한 것이다.
무선 접속 시스템이 음성이나 데이터 등과 같은 다양한 종류의 통신 서비스를 제공하기 위해 광범위하게 전개되고 있다. 일반적으로 무선 접속 시스템은 가용한 시스템 자원(대역폭, 전송 파워 등)을 공유하여 다중 사용자와의 통신을 지원할 수 있는 다중 접속(multiple access) 시스템이다. 다중 접속 시스템의 예들로는 CDMA(code division multiple access) 시스템, FDMA(frequency division multiple access) 시스템, TDMA(time division multiple access) 시스템, OFDMA(orthogonal frequency division multiple access) 시스템, SC-FDMA(single carrier frequency division multiple access) 시스템 등이 있다.
본 발명의 목적은 기지국 또는 단말이 LBT (Listen-Before-Talk) 기반의 신호 전송을 수행할 때, 상기 단말이 기지국으로의 상향링크 신호를 송수신하는 방법을 제공하는 것이다.
특히, 본 발명의 목적은 다수의 노드들이 이용 가능한 비면허 대역에서 특정 단말이 상향링크 신호를 효율적으로 기지국으로 송수신하는 방법을 제공하는 것이다.
본 발명에서 이루고자 하는 기술적 목적들은 이상에서 언급한 사항들로 제한되지 않으며, 언급하지 않은 또 다른 기술적 과제들은 이하 설명할 본 발명의 실시 예들로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 고려될 수 있다.
본 발명은 비면허 대역을 무선 통신 시스템에서 단말과 기지국 간 상향링크 신호를 송수신하는 방법 및 장치들을 제공한다.
본 발명의 일 양태로서, 비면허 대역을 지원하는 무선 통신 시스템에서 단말이 기지국으로 상향링크 신호를 전송하는 방법은 기지국으로부터 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 수신하고, 상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 전송하고, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 기지국으로부터 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 수신하고, 상기 제2 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송한다.
본 발명의 다른 양태로서, 비면허 대역을 지원하는 무선 통신 시스템에서 기지국이 단말로부터 상향링크 신호를 수신하는 방법은, 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 단말로 전송하고, 상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 수신하고, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 상기 단말로 전송하고, 상기 제2 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신한다.
본 발명의 또 다른 양태로서, 비면허 대역을 지원하는 무선 통신 시스템에서 기지국으로 상향링크 신호를 전송하는 단말은 수신부; 송신부; 및 상기 수신부 및 송신부와 연결되어 동작하는 프로세서를 포함한다. 이때, 상기 프로세서는, 기지국으로부터 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 수신하고, 상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 전송하고, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 기지국으로부터 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 수신하고, 상기 제2 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송하도록 구성될 수 있다.
본 발명의 또 다른 양태로서, 비면허 대역을 지원하는 무선 통신 시스템에서 단말로부터 상향링크 신호를 수신하는 기지국은 수신부; 송신부; 및 상기 수신부 및 송신부와 연결되어 동작하는 프로세서를 포함한다. 이때, 상기 프로세서는, 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 단말로 전송하고, 상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 수신하고, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 상기 단말로 전송하고, 상기 제2 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신하도록 구성될 수 있다.
이때, 상기 제1 하향링크 제어 정보는 1 비트 크기의 지시자를 이용하여 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입을 지시할 수 있다.
이때, 상기 제1 타입의 스케줄링은 정상 스케줄링에 대응하고, 상기 제2 타입의 스케줄링은 트리거링 스케줄링에 대응할 수 있다.
이때, 상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점으로부터 4개 서브프레임 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호가 송수신될 수 있다.
또한, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 기지국으로부터 상기 제2 하향링크 제어 정보의 수신 시점 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호가 송수신될 수 있다.
또한, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점으로부터 일정 시간 구간 이내에 상기 제2 하향링크 제어 정보가 수신된 경우에만 상기 제2 하향링크 제어 정보의 수신 시점 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호가 송수신될 수 있다.
상술한 본 발명의 양태들은 본 발명의 바람직한 실시예들 중 일부에 불과하며, 본원 발명의 기술적 특징들이 반영된 다양한 실시예들이 당해 기술분야의 통상적인 지식을 가진 자에 의해 이하 상술할 본 발명의 상세한 설명을 기반으로 도출되고 이해될 수 있다.
본 발명의 실시 예들에 따르면 다음과 같은 효과가 있다.
첫째, 본 발명에 따르면, 비면허 대역을 지원하는 무선 접속 시스템에서 기존 LTE 시스템과 상이한 스케줄링 방식에 따라 단말과 기지국 간 상향링크 송수신이 가능할 수 있다.
둘째, 단말이 비면허 대역을 통해 신호를 송수신하는 경우, 다른 노드들에 의해 상기 비면허 대역이 점유되어 스케줄링된 시점에서 상향링크 신호의 전송을 실패하는 경우를 최소화할 수 있다.
본 발명의 실시 예들에서 얻을 수 있는 효과는 이상에서 언급한 효과들로 제한되지 않으며, 언급하지 않은 또 다른 효과들은 이하의 본 발명의 실시 예들에 대한 기재로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 도출되고 이해될 수 있다. 즉, 본 발명을 실시함에 따른 의도하지 않은 효과들 역시 본 발명의 실시 예들로부터 당해 기술분야의 통상의 지식을 가진 자에 의해 도출될 수 있다.
이하에 첨부되는 도면들은 본 발명에 관한 이해를 돕기 위한 것으로, 상세한 설명과 함께 본 발명에 대한 실시 예들을 제공한다. 다만, 본 발명의 기술적 특징이 특정 도면에 한정되는 것은 아니며, 각 도면에서 개시하는 특징들은 서로 조합되어 새로운 실시 예로 구성될 수 있다. 각 도면에서의 참조 번호(reference numerals)들은 구조적 구성요소(structural elements)를 의미한다.
도 1은 물리 채널들 및 이들을 이용한 신호 전송 방법을 설명하기 위한 도면이다.
도 2는 무선 프레임의 구조의 일례를 나타내는 도면이다.
도 3는 하향링크 슬롯에 대한 자원 그리드(resource grid)를 예시한 도면이다.
도 4는 상향링크 서브 프레임의 구조의 일례를 나타내는 도면이다.
도 5는 하향링크 서브 프레임의 구조의 일례를 나타내는 도면이다.
도 6은 LTE-U 시스템에서 지원하는 CA 환경의 일례를 나타내는 도면이다.
도 7은 LBT 과정 중 하나인 FBE 동작의 일례를 나타내는 도면이다.
도 8은 FBE 동작을 블록 다이어그램으로 나타낸 도면이다.
도 9는 LBT 과정 중 하나인 LBE 동작의 일례를 나타내는 도면이다.
도 10은 LAA 시스템에서 지원하는 DRS 전송 방법들을 설명하기 위한 도면이다.
도 11은 CAP 및 CWA를 설명하기 위한 도면이다.
도 12는 LAA 시스템에서의 단말의 PUSCH 전송 동작을 나타낸 도면이다.
도 13은 다중-서브프레임 스케줄링을 통해 단말이 연속된 상향링크 전송을 수행하는 동작을 나타낸 도면이다.
도 14는 상향링크 전송 버스트의 COT가 5 TTI인 경우의 동작을 나타낸 도면이다.
도 15는 단일의 상향링크 그랜트를 통해 빠른 상향링크 타이밍에 따라 복수의 서브프레임에서의 PUSCH 전송을 지시하는 동작을 나타낸 도면이다.
도 16은 단일의 상향링크 그랜트가 4개의 연속하는 서브프레임 중 2번째 서브프레임을 제외한 서브프레임들에서 PUSCH 전송을 지시하는 동작을 나타낸 도면이다.
도 17은 상향링크 그랜트를 통해 일부 서브프레임에 대한 사전 스케줄링을 수행하는 동작을 나타낸 도면이다.
도 18은 시간 갭(Time gap)이 설정된 경우 n번째 서브프레임에서 수신되는 트리거링 DCI에 의해 PUSCH 전송이 지시되는 동작을 나타낸 도면이다.
도 19는 다중 서브프레임 스케줄링에 따라 PUSCH 전송시 SPS(semi-persistent scheduling)에서 설정된 MCS (modulation and coding scheme) 또는 RA (resource allocation) 정보 또는 상향링크 그랜트에서 설정된 MCS 또는 RA 정보에 따르는 구성을 나타낸 도면이다.
도 20은 상향링크 그랜트를 통해 이전에 사전 스케줄링된 데이터의 전송 여부, 미래 전송할 사전 스케줄링 및 실저 전송할 데이터에 대한 스케줄링 동작을 나타낸 도면이다.
도 21 내지 도 23은 본 발명에서 제안하는 다중-서브프레임 스케줄링에 따른 동작을 나타낸 도면이다.
도 24는 다중-서브프레임 스케줄링에 따라 복수 개의 PUSCH의 HARQ 프로세스 번호를 동일하게 설정하는 동작을 나타낸 도면이다.
도 25는 서로 다른 PUSCH에 대한 시간 윈도우가 중첩되는 경우의 동작을 나타낸 도면이다.
도 26은 제안하는 실시 예들이 구현될 수 있는 단말 및 기지국의 구성을 도시하는 도면이다.
이하의 실시 예들은 본 발명의 구성요소들과 특징들을 소정 형태로 결합한 것들이다. 각 구성요소 또는 특징은 별도의 명시적 언급이 없는 한 선택적인 것으로 고려될 수 있다. 각 구성요소 또는 특징은 다른 구성요소나 특징과 결합되지 않은 형태로 실시될 수 있다. 또한, 일부 구성요소들 및/또는 특징들을 결합하여 본 발명의 실시 예를 구성할 수도 있다. 본 발명의 실시 예들에서 설명되는 동작들의 순서는 변경될 수 있다. 어느 실시 예의 일부 구성이나 특징은 다른 실시 예에 포함될 수 있고, 또는 다른 실시 예의 대응하는 구성 또는 특징과 교체될 수 있다.
도면에 대한 설명에서, 본 발명의 요지를 흐릴 수 있는 절차 또는 단계 등은 기술하지 않았으며, 당업자의 수준에서 이해할 수 있을 정도의 절차 또는 단계는 또한 기술하지 아니하였다.
명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함(comprising 또는 including)"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 또한, 명세서에 기재된 "...부", "...기", "모듈" 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며, 이는 하드웨어나 소프트웨어 또는 하드웨어 및 소프트웨어의 결합으로 구현될 수 있다. 또한, "일(a 또는 an)", "하나(one)", "그(the)" 및 유사 관련어는 본 발명을 기술하는 문맥에 있어서(특히, 이하의 청구항의 문맥에서) 본 명세서에 달리 지시되거나 문맥에 의해 분명하게 반박되지 않는 한, 단수 및 복수 모두를 포함하는 의미로 사용될 수 있다.
본 명세서에서 본 발명의 실시예들은 기지국과 이동국 간의 데이터 송수신 관계를 중심으로 설명되었다. 여기서, 기지국은 이동국과 직접적으로 통신을 수행하는 네트워크의 종단 노드(terminal node)로서의 의미가 있다. 본 문서에서 기지국에 의해 수행되는 것으로 설명된 특정 동작은 경우에 따라서는 기지국의 상위 노드(upper node)에 의해 수행될 수도 있다.
즉, 기지국을 포함하는 다수의 네트워크 노드들(network nodes)로 이루어지는 네트워크에서 이동국과의 통신을 위해 수행되는 다양한 동작들은 기지국 또는 기지국 이외의 다른 네트워크 노드들에 의해 수행될 수 있다. 이때, '기지국'은 고정국(fixed station), Node B, eNode B(eNB), 발전된 기지국(ABS: Advanced Base Station) 또는 억세스 포인트(access point) 등의 용어에 의해 대체될 수 있다.
또한, 본 발명의 실시예들에서 단말(Terminal)은 사용자 기기(UE: User Equipment), 이동국(MS: Mobile Station), 가입자 단말(SS: Subscriber Station), 이동 가입자 단말(MSS: Mobile Subscriber Station), 이동 단말(Mobile Terminal) 또는 발전된 이동단말(AMS: Advanced Mobile Station) 등의 용어로 대체될 수 있다.
또한, 송신단은 데이터 서비스 또는 음성 서비스를 제공하는 고정 및/또는 이동 노드를 말하고, 수신단은 데이터 서비스 또는 음성 서비스를 수신하는 고정 및/또는 이동 노드를 의미한다. 따라서, 상향링크에서는 이동국이 송신단이 되고, 기지국이 수신단이 될 수 있다. 마찬가지로, 하향링크에서는 이동국이 수신단이 되고, 기지국이 송신단이 될 수 있다.
본 발명의 실시예들은 무선 접속 시스템들인 IEEE 802.xx 시스템, 3GPP(3rd Generation Partnership Project) 시스템, 3GPP LTE 시스템 및 3GPP2 시스템 중 적어도 하나에 개시된 표준 문서들에 의해 뒷받침될 수 있으며, 특히, 본 발명의 실시예들은 3GPP TS 36.211, 3GPP TS 36.212, 3GPP TS 36.213, 3GPP TS 36.321 및 3GPP TS 36.331 문서들에 의해 뒷받침 될 수 있다. 즉, 본 발명의 실시예들 중 설명하지 않은 자명한 단계들 또는 부분들은 상기 문서들을 참조하여 설명될 수 있다. 또한, 본 문서에서 개시하고 있는 모든 용어들은 상기 표준 문서에 의해 설명될 수 있다.
이하, 본 발명에 따른 바람직한 실시 형태를 첨부된 도면을 참조하여 상세하게 설명한다. 첨부된 도면과 함께 이하에 개시될 상세한 설명은 본 발명의 예시적인 실시형태를 설명하고자 하는 것이며, 본 발명이 실시될 수 있는 유일한 실시형태를 나타내고자 하는 것이 아니다.
또한, 본 발명의 실시예들에서 사용되는 특정(特定) 용어들은 본 발명의 이해를 돕기 위해서 제공된 것이며, 이러한 특정 용어의 사용은 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다른 형태로 변경될 수 있다.
예를 들어, 전송기회구간(TxOP: Transmission Opportunity Period)라는 용어는 전송구간, 전송 버스트(Tx burst) 또는 RRP(Reserved Resource Period)라는 용어와 동일한 의미로 사용될 수 있다. 또한, LBT(Listen Before Talk) 과정은 채널 상태가 유휴인지 여부를 판단하기 위한 캐리어 센싱 과정, CCA(Clear Channel Accessment), 채널 접속 과정(CAP: Channel Access Procedure)과 동일한 목적으로 수행될 수 있다.
이하에서는 본 발명의 실시예들이 사용될 수 있는 무선 접속 시스템의 일례로 3GPP LTE/LTE-A 시스템에 대해서 설명한다.
이하의 기술은 CDMA(code division multiple access), FDMA(frequency division multiple access), TDMA(time division multiple access), OFDMA(orthogonal frequency division multiple access), SC-FDMA(single carrier frequency division multiple access) 등과 같은 다양한 무선 접속 시스템에 적용될 수 있다.
CDMA는 UTRA(Universal Terrestrial Radio Access)나 CDMA2000과 같은 무선 기술(radio technology)로 구현될 수 있다. TDMA는 GSM(Global System for Mobile communications)/GPRS(General Packet Radio Service)/EDGE(Enhanced Data Rates for GSM Evolution)와 같은 무선 기술로 구현될 수 있다. OFDMA는 IEEE 802.11 (Wi-Fi), IEEE 802.16 (WiMAX), IEEE 802-20, E-UTRA(Evolved UTRA) 등과 같은 무선 기술로 구현될 수 있다.
UTRA는 UMTS(Universal Mobile Telecommunications System)의 일부이다. 3GPP LTE(Long Term Evolution)은 E-UTRA를 사용하는 E-UMTS(Evolved UMTS)의 일부로써, 하향링크에서 OFDMA를 채용하고 상향링크에서 SC-FDMA를 채용한다. LTE-A(Advanced) 시스템은 3GPP LTE 시스템이 개량된 시스템이다. 본 발명의 기술적 특징에 대한 설명을 명확하게 하기 위해, 본 발명의 실시예들을 3GPP LTE/LTE-A 시스템을 위주로 기술하지만 IEEE 802.16e/m 시스템 등에도 적용될 수 있다.
1. 3GPP LTE/LTE_A 시스템
무선 접속 시스템에서 단말은 하향링크(DL: Downlink)를 통해 기지국으로부터 정보를 수신하고, 상향링크(UL: Uplink)를 통해 기지국으로 정보를 전송한다. 기지국과 단말이 송수신하는 정보는 일반 데이터 정보 및 다양한 제어 정보를 포함하고, 이들이 송수신 하는 정보의 종류/용도에 따라 다양한 물리 채널이 존재한다.
도 1은 본 발명의 실시예들에서 사용될 수 있는 물리 채널들 및 이들을 이용한 신호 전송 방법을 설명하기 위한 도면이다.
전원이 꺼진 상태에서 다시 전원이 켜지거나, 새로이 셀에 진입한 단말은 S11 단계에서 기지국과 동기를 맞추는 등의 초기 셀 탐색 (Initial cell search) 작업을 수행한다. 이를 위해 단말은 기지국으로부터 주동기 채널 (P-SCH: Primary Synchronization Channel) 및 부동기 채널 (S-SCH: Secondary Synchronization Channel)을 수신하여 기지국과 동기를 맞추고, 셀 ID 등의 정보를 획득한다.
그 후, 단말은 기지국으로부터 물리방송채널 (PBCH: Physical Broadcast Channel) 신호를 수신하여 셀 내 방송 정보를 획득할 수 있다.
한편, 단말은 초기 셀 탐색 단계에서 하향링크 참조 신호 (DL RS: Downlink Reference Signal)를 수신하여 하향링크 채널 상태를 확인할 수 있다.
초기 셀 탐색을 마친 단말은 S12 단계에서 물리하향링크제어채널 (PDCCH: Physical Downlink Control Channel) 및 물리하향링크제어채널 정보에 따른 물리하향링크공유 채널 (PDSCH: Physical Downlink Control Channel)을 수신하여 조금 더 구체적인 시스템 정보를 획득할 수 있다.
이후, 단말은 기지국에 접속을 완료하기 위해 이후 단계 S13 내지 단계 S16과 같은 임의 접속 과정 (Random Access Procedure)을 수행할 수 있다. 이를 위해 단말은 물리임의접속채널 (PRACH: Physical Random Access Channel)을 통해 프리앰블 (preamble)을 전송하고(S13), 물리하향링크제어채널 및 이에 대응하는 물리하향링크공유 채널을 통해 프리앰블에 대한 응답 메시지를 수신할 수 있다(S14). 경쟁 기반 임의 접속의 경우, 단말은 추가적인 물리임의접속채널 신호의 전송(S15) 및 물리하향링크제어채널 신호 및 이에 대응하는 물리하향링크공유 채널 신호의 수신(S16)과 같은 충돌해결절차 (Contention Resolution Procedure)를 수행할 수 있다.
상술한 바와 같은 절차를 수행한 단말은 이후 일반적인 상/하향링크 신호 전송 절차로서 물리하향링크제어채널 신호 및/또는 물리하향링크공유채널 신호의 수신(S17) 및 물리상향링크공유채널 (PUSCH: Physical Uplink Shared Channel) 신호 및/또는 물리상향링크제어채널 (PUCCH: Physical Uplink Control Channel) 신호의 전송(S18)을 수행할 수 있다.
단말이 기지국으로 전송하는 제어정보를 통칭하여 상향링크 제어정보(UCI: Uplink Control Information)라고 지칭한다. UCI는 HARQ-ACK/NACK (Hybrid Automatic Repeat and reQuest Acknowledgement/Negative-ACK), SR (Scheduling Request), CQI (Channel Quality Indication), PMI (Precoding Matrix Indication), RI (Rank Indication) 정보 등을 포함한다.
LTE 시스템에서 UCI는 일반적으로 PUCCH를 통해 주기적으로 전송되지만, 제어정보와 트래픽 데이터가 동시에 전송되어야 할 경우 PUSCH를 통해 전송될 수 있다. 또한, 네트워크의 요청/지시에 의해 PUSCH를 통해 UCI를 비주기적으로 전송할 수 있다.
도 2는 본 발명의 실시예들에서 사용되는 무선 프레임의 구조를 나타낸다.
도 2(a)는 타입 1 프레임 구조(frame structure type 1)를 나타낸다. 타입 1 프레임 구조는 전이중(full duplex) FDD(Frequency Division Duplex) 시스템과 반이중(half duplex) FDD 시스템 모두에 적용될 수 있다.
하나의 무선 프레임(radio frame)은 Tf = 307200*Ts = 10ms의 길이를 가지고, Tslot = 15360*Ts = 0.5ms의 균등한 길이를 가지며 0부터 19의 인덱스가 부여된 20개의 슬롯으로 구성된다. 하나의 서브프레임은 2개의 연속된 슬롯으로 정의되며, i 번째 서브프레임은 2i 와 2i+1에 해당하는 슬롯으로 구성된다. 즉, 무선 프레임(radio frame)은 10개의 서브프레임(subframe)으로 구성된다. 하나의 서브프레임을 전송하는 데 걸리는 시간을 TTI(transmission time interval)이라 한다. 여기서, Ts 는 샘플링 시간을 나타내고, Ts=1/(15kHz×2048)=3.2552×10-8(약 33ns)로 표시된다. 슬롯은 시간 영역에서 복수의 OFDM 심볼 또는 SC-FDMA 심볼을 포함하고, 주파수 영역에서 복수의 자원블록(Resource Block)을 포함한다.
하나의 슬롯은 시간 영역에서 복수의 OFDM(orthogonal frequency division multiplexing) 심볼을 포함한다. 3GPP LTE는 하향링크에서 OFDMA를 사용하므로 OFDM 심볼은 하나의 심볼 구간(symbol period)을 표현하기 위한 것이다. OFDM 심볼은 하나의 SC-FDMA 심볼 또는 심볼 구간이라고 할 수 있다. 자원 블록(resource block)은 자원 할당 단위이고, 하나의 슬롯에서 복수의 연속적인 부반송파(subcarrier)를 포함한다.
전이중 FDD 시스템에서는 각 10ms 구간 동안 10개의 서브프레임은 하향링크 전송과 상향링크 전송을 위해 동시에 이용될 수 있다. 이때, 상향링크와 하향링크 전송은 주파수 영역에서 분리된다. 반면, 반이중 FDD 시스템의 경우 단말은 전송과 수신을 동시에 할 수 없다.
상술한 무선 프레임의 구조는 하나의 예시에 불과하며, 무선 프레임에 포함되는 서브 프레임의 수 또는 서브 프레임에 포함되는 슬롯의 수, 슬롯에 포함되는 OFDM 심볼의 수는 다양하게 변경될 수 있다.
도 2(b)는 타입 2 프레임 구조(frame structure type 2)를 나타낸다. 타입 2 프레임 구조는 TDD 시스템에 적용된다. 하나의 무선 프레임(radio frame)은 Tf = 307200*Ts = 10ms의 길이를 가지며, 153600*Ts = 5ms 길이를 가지는 2개의 하프프레임(half-frame)으로 구성된다. 각 하프프레임은 30720*Ts = 1ms의 길이를 가지는 5개의 서브프레임으로 구성된다. i 번째 서브프레임은 2i 와 2i+1에 해당하는 각 Tslot = 15360*Ts = 0.5ms의 길이를 가지는 2개의 슬롯으로 구성된다. 여기에서, Ts 는 샘플링 시간을 나타내고, Ts=1/(15kHz×2048)=3.2552×10-8(약 33ns)로 표시된다.
타입 2 프레임에는 DwPTS(Downlink Pilot Time Slot), 보호구간(GP: Guard Period), UpPTS(Uplink Pilot Time Slot)인 3가지의 필드로 구성되는 특별 서브프레임을 포함한다. 여기서, DwPTS는 단말에서의 초기 셀 탐색, 동기화 또는 채널 추정에 사용된다. UpPTS는 기지국에서의 채널 추정과 단말의 상향 전송 동기를 맞추는 데 사용된다. 보호구간은 상향링크와 하향링크 사이에 하향링크 신호의 다중경로 지연으로 인해 상향링크에서 생기는 간섭을 제거하기 위한 구간이다.
다음 표 1는 특별 프레임의 구성(DwPTS/GP/UpPTS의 길이)을 나타낸다.
도 3은 본 발명의 실시예들에서 사용될 수 있는 하향링크 슬롯에 대한 자원 그리드(resource grid)를 예시한 도면이다.
도 3을 참조하면, 하나의 하향링크 슬롯은 시간 영역에서 복수의 OFDM 심볼을 포함한다. 여기서, 하나의 하향링크 슬롯은 7개의 OFDM 심볼을 포함하고, 하나의 자원 블록은 주파수 영역에서 12개의 부 반송파를 포함하는 것을 예시적으로 기술하나, 이에 한정되는 것은 아니다.
자원 그리드 상에서 각 요소(element)를 자원 요소(resource element)하고, 하나의 자원 블록은 12 × 7 개의 자원 요소를 포함한다. 하향링크 슬롯에 포함되는 자원 블록들의 수 NDL은 하향링크 전송 대역폭(bandwidth)에 종속한다. 상향링크 슬롯의 구조는 하향링크 슬롯의 구조와 동일할 수 있다.
도 4는 본 발명의 실시예들에서 사용될 수 있는 상향링크 서브 프레임의 구조를 나타낸다.
도 4를 참조하면, 상향링크 서브 프레임은 주파수 영역에서 제어 영역과 데이터 영역으로 나눌 수 있다. 제어 영역에는 상향링크 제어 정보를 나르는 PUCCH가 할당된다. 데이터 영역은 사용자 데이터를 나르는 PUSCH가 할당된다. 단일 반송파 특성을 유지하기 위해 하나의 단말은 PUCCH와 PUSCH를 동시에 전송하지 않는다. 하나의 단말에 대한 PUCCH에는 서브 프레임 내에 RB 쌍이 할당된다. RB 쌍에 속하는 RB들은 2개의 슬롯들의 각각에서 서로 다른 부 반송파를 차지한다. 이러한 PUCCH에 할당된 RB 쌍은 슬롯 경계(slot boundary)에서 주파수 도약(frequency hopping)된다고 한다.
도 5는 본 발명의 실시예들에서 사용될 수 있는 하향링크 서브 프레임의 구조를 나타낸다.
도 5를 참조하면, 서브 프레임내의 첫번째 슬롯에서 OFDM 심볼 인덱스 0부터 최대 3개의 OFDM 심볼들이 제어 채널들이 할당되는 제어 영역(control region)이고, 나머지 OFDM 심볼들은 PDSCH이 할당되는 데이터 영역(data region)이다. 3GPP LTE에서 사용되는 하향링크 제어 채널의 일례로 PCFICH(Physical Control Format Indicator Channel), PDCCH, PHICH(Physical Hybrid-ARQ Indicator Channel) 등이 있다.
PCFICH는 서브 프레임의 첫 번째 OFDM 심볼에서 전송되고, 서브 프레임 내에 제어 채널들의 전송을 위하여 사용되는 OFDM 심볼들의 수(즉, 제어 영역의 크기)에 관한 정보를 나른다. PHICH는 상향 링크에 대한 응답 채널이고, HARQ(Hybrid Automatic Repeat Request)에 대한 ACK(Acknowledgement)/NACK(Negative-Acknowledgement) 신호를 나른다. PDCCH를 통해 전송되는 제어 정보를 하향링크 제어정보(DCI: downlink control information)라고 한다. 하향링크 제어정보는 상향링크 자원 할당 정보, 하향링크 자원 할당 정보 또는 임의의 단말 그룹에 대한 상향링크 전송(Tx) 파워 제어 명령을 포함한다.
2.
LTE
-U 시스템
2.1
LTE
-U 시스템 구성
이하에서는 면허 대역(Licensed Band)인 LTE-A 대역과 비면허 대역(Unlicensed Band)의 반송파 결합 환경에서 데이터를 송수신하는 방법들에 대해서 설명한다. 본 발명의 실시 예들에서 LTE-U 시스템은 이러한 면허 대역과 비면허 대역의 CA 상황을 지원하는 LTE 시스템을 의미한다. 비면허 대역은 와이파이(WiFi) 대역 또는 블루투스(BT) 대역 등이 이용될 수 있다. 비면허 대역에서 동작하는 LTE-A 시스템을 LAA(Licensed Assisted Access)라 하며, LAA는 또는 면허 대역과의 조합으로 비면허 대역에서 데이터 송수신을 수행하는 방식을 의미할 수도 있다.
도 6은 LTE-U 시스템에서 지원하는 CA 환경의 일례를 나타내는 도면이다.
이하에서는 설명의 편의를 위해서, UE가 두 개의 요소 반송파(CC: Component Carrier)를 이용하여 면허 대역과 비면허 대역 각각에서 무선 통신을 수행 하도록 설정된 상황을 가정한다. 물론, UE에 세 개 이상의 CC들이 구성된 경우에도 이하 설명하는 방법들이 적용될 수 있다.
본 발명의 실시 예들에서, 면허 대역의 반송파(LCC: Licensed CC)는 주요소 반송파(Primary CC: PCC 또는 P셀로 부를 수 있음)이고, 비 면허 대역의 반송파(Unlicensed CC: UCC)는 부요소 반송파(Secondary CC: SCC 또는 S셀로 부를 수 있음)인 경우를 가정한다. 다만, 본 발명의 실시 예들은 다수 개의 면허 대역과 다수 개의 비면허 대역들이 캐리어 결합 방식으로 이용되는 상황에도 확장 적용될 수 있다. 또한, 본 발명의 제안 방식들은 3GPP LTE 시스템뿐만 아니라 다른 특성의 시스템 상에서도 확장 적용이 가능하다.
도 6에서는 하나의 기지국에서 면허 대역과 비면허 대역을 모두 지원하는 경우를 나타내었다. 즉, 단말은 면허 대역인 PCC를 통해 제어 정보 및 데이터를 송수신할 수 있고, 또한 비면허 대역인 SCC를 통해 제어 정보 및 데이터를 송수신할 수 있다. 그러나, 도 6에 도시된 상황은 하나의 일례이며, 하나의 단말이 다수 개의 기지국과 접속하는 CA 환경에도 본 발명의 실시 예들이 적용될 수 있다.
예를 들어, 단말은 매크로 기지국(M-eNB: Macro eNB)과 P셀을 구성하고, 스몰 기지국(S-eNB: Small eNB)과 S셀을 구성할 수 있다. 이때, 매크로 기지국과 스몰 기지국은 백홀 망을 통해 연결되어 있을 수 있다.
본 발명의 실시 예들에서, 비면허 대역은 경쟁 기반의 임의 접속 방식으로 동작될 수 있다. 이때, 비면허 대역을 지원하는 eNB는 데이터 송수신 전에 먼저 케리어 센싱(CS: Carrier Sensing) 과정을 수행할 수 있다. CS 과정은 해당 대역이 다른 개체에 의해 점유되어 있는지 여부를 판단하는 과정이다.
예를 들어, S셀의 기지국(eNB)은 현재 채널이 사용중인 비지(busy) 상태인지 또는 사용하지 않는 유휴(idle) 상태인지를 체크한다. 만약, 해당 대역이 유휴 상태라고 판단되면, 기지국은 크로스 캐리어 스케줄링 방식인 경우 P셀의 (E)PDCCH를 통해 또는 셀프 스케줄링 방식인 경우 S셀의 PDCCH를 통해 스케줄링 그랜트(scheduling grant)를 단말에 전송하여 자원을 할당하고, 데이터 송수신을 시도할 수 있다.
이때, 기지국은 M개의 연속된 서브프레임으로 구성된 전송 기회(TxOP: Transmission OPportunity) 구간을 설정할 수 있다. 여기서, M값 및 M개의 서브프레임의 용도를 사전에 기지국이 단말에게 P셀을 통해 상위 계층 시그널이나 물리 제어채널 또는 물리 데이터 채널을 통해 알려줄 수 있다. M개의 서브프레임으로 구성된 TxOP 구간은 예약된 자원 구간(RRP: Reserved Resource Period)으로 불릴 수 있다.
2.2
캐리어
센싱
과정
본 발명의 실시 예들에서 CS 과정은 CCA(Clear Channel Assessment) 과정 또는 채널 접속 과정(Channel Access Procedure)이라 불릴 수 있으며, 기설정된 또는 상위 계층 신호를 통해 설정된 CCA 임계값을 기준으로 해당 채널이 비지(busy) 또는 유휴(idle) 상태로 판단될 수 있다. 예를 들어, 비면허대역인 S셀에서 CCA 임계값보다 높은 에너지가 검출되면 비지 아니면 유휴라고 판단될 수 있다. 이때, 채널 상태가 유휴로 판단되면, 기지국은 S셀에서 신호 전송을 시작할 수 있다. 이러한 일련의 과정은 LBT(Listen-Before-Talk)이라고 명명될 수 있다.
도 7은 LBT 과정 중 하나인 FBE 동작의 일례를 나타내는 도면이다.
유럽의 ETSI 규정(regulation; EN 301 893 V1.7.1)에서는 FBE(Frame Based Equipment)와 LBE(Load Based Equipment)로 명명되는 2가지의 LBT 동작을 예시하고 있다. FBE는 통신 노드가 채널 접속(channel access)에 에 성공했을 때 송신을 지속할 수 있는 시간을 의미하는 채널 점유 시간(Channel Occupancy Time; e.g., 1~10ms)과 채널 점유 시간의 최소 5%에 해당되는 유휴 기간(Idle Period)이 하나의 고정 프레임(Fixed Frame)을 구성하며, CCA는 유휴 기간 내 끝 부분에 CCA 슬롯(최소 20us) 동안 채널을 관측하는 동작으로 정의된다.
이때, 통신 노드는 고정 프레임 단위로 주기적으로 CCA를 수행한다. 만약, 채널이 비점유(Unoccupied) 상태인 경우에 통신 노드는 채널 점유 시간 동안 데이터를 송신하고, 채널이 점유 상태인 경우에는 전송을 보류하고 다음 주기의 CCA 슬롯까지 기다린다.
도 8은 FBE 동작을 블록 다이어그램으로 나타낸 도면이다.
도 8을 참조하면, S셀을 관리하는 통신노드(즉, 기지국)는 CCA 슬롯 동안 CCA 과정을 수행한다. 만약, 채널이 유휴 상태이면 통신 노드는 데이터 전송(Tx)을 수행하고, 채널이 비지 상태이면 고정 프레임 기간에서 CCA 슬롯을 뺀 시간 만큼 대기한 후 다시 CCA 과정을 수행한다.
통신 노드는 채널 점유 시간동안 데이터 전송을 수행하고, 데이터 전송이 끝나면, 유휴 기간에서 CCA 슬롯을 뺀 시간만큼 대기한 후 다시 CCA 과정을 수행한다. 만약, 통신 노드가 채널이 유휴 상태이나 전송할 데이터가 없는 경우에는 고정 프레임 기간에서 CCA 슬롯을 뺀 시간만큼 대기한 후 다시 CCA 과정을 수행한다.
도 9는 LBT 과정 중 하나인 LBE 동작의 일례를 나타내는 도면이다.
도 9(a)를 참조하면 통신 노드는 LBE 동작을 수행하기 위해 먼저 q{4, 5, …, 32}의 값을 설정한 후 1개 CCA 슬롯에 대한 CCA를 수행한다.
도 9(b)는 LBE 동작을 블록 다이어그램으로 나타낸 도면이다. 도 9(b)를 참조하여 LBE 동작에 대해서 설명한다.
통신 노드는 CCA 슬롯에서 CCA 과정을 수행할 수 있다. 만약, 첫 번째 CCA 슬롯에서 채널이 비점유 상태이면, 통신 노드는 최대 (13/32)q ms 길이의 시간을 확보하여 데이터를 송신할 수 있다.
그러나, 첫 번째 CCA 슬롯에서 채널이 점유 상태이면, 통신 노드는 임의로 (i.e., randomly) N∈{1, 2, ..., q}의 값을 골라 카운터 값을 초기값으로 설정 및 저장하고, 이후 CCA 슬롯 단위로 채널 상태를 센싱하면서 특정 CCA 슬롯에서 채널이 비점유 상태이면 앞서 설정한 카운터 값을 1개씩 줄여나간다. 카운터 값이 0이 되면, 통신 노드는 최대 (13/32)q ms 길이의 시간을 확보하여 데이터를 송신할 수 있다.
2.3 하향링크에서 불연속 전송
제한된 최대 전송 구간을 갖는 비면허 캐리어 상에서 불연속 전송은 LTE 시스템의 동작에 필요한 몇몇 기능들에 영향을 줄 수 있다. 이러한 몇몇 기능들은 불연속 LAA 하향링크 전송의 시작 부분에서 전송되는 하나 이상의 신호들에 의해 지원될 수 있다. 이러한 신호들에 의해 지원되는 기능들은 AGC 설정, 채널 예약 등의 기능을 포함한다.
LAA 노드에 의한 신호 전송에 있어서 채널 예약은 성공적인 LBT 동작을 통한 채널 접속 후에 다른 노드들에 신호를 전송하기 위해 획득된 채널들을 통해 신호들을 전송하는 것을 의미한다.
불연속 하향링크 전송을 포함하는 LAA 동작을 위한 하나 이상의 신호들에 의해 지원되는 기능들은 단말에 의한 LAA 하향링크 전송의 검출 및 단말들의 시간 및 주파수 동기화 기능을 포함한다. 이때, 이러한 기능들의 요구가 다른 가능한 기능들을 제외하는 것을 의미하는 것은 아니며, 이러한 기능들은 다른 방법들에 의해 지원될 수 있다.
2.3.
1 시간
및 주파수 동기
LAA 시스템에 대해 추천되는 설계 목표는 RRM(Radio Resource Management) 측정을 위한 디스커버리 신호 및 DL 전송 버스트들에 내포된 참조신호들 각각 또는 이들의 조합을 통해 단말이 시간 및 주파수 동기를 획득하는 것을 지원하는 것이다. 서빙셀에서 전송되는 RRM 측정을 위한 디스커버리 신호는 적어도 대략적인(coarse) 시간 또는 주파수 동기를 획득하기 위해 사용된다.
2.3.2 하향링크 전송 타이밍
DL LAA 설계에 있어서, 서브프레임 경계 조정은 LTE-A 시스템(Rel-12 이하)에서 정의하는 CA에 의해 결합되는 서빙셀 간의 CA 타이밍 관계를 따를 수 있다. 다만, 이는 기지국이 오직 서브프레임 경계에서만 DL 전송을 시작하는 것을 의미하지는 않는다. LAA 시스템은 LBT 과정의 결과에 따라 하나의 서브프레임 내에서 모든 OFDM 심볼들이 가용하지 않은 경우에도 PDSCH 전송을 지원할 수 있다. 이때, PDSCH 전송을 위한 필요한 제어 정보의 전송은 지원되어야 한다.
2.4
RRM
측정 및 보고
LTE-A 시스템은 셀 검출을 포함하는 RRM 기능을 지원하기 위한 시작 시점에서 디스커버리 신호(Discovery Signal)를 전송할 수 있다. 이때, 디스커버리 신호는 디스커버리 참조 신호(DRS: Discovery Reference Signal)로 불릴 수 있다. LAA를 위한 RRM 기능들을 지원하기 위해 LTE-A 시스템의 디스커버리 신호와 디스커버리 신호의 송수신 기능들은 변경되어 적용될 수 있다.
2.4.1 디스커버리 참조 신호(
DRS
)
LTE-A 시스템의 DRS는 스몰셀 온오프 동작을 지원하기 위해 설계되었다. 이때, 오프된 스몰셀들은 주기적인 DRS의 전송을 제외한 대부분의 기능들이 꺼진 상태를 의미한다. DRS들은 40, 80 또는 160ms의 주기를 가지고 DRS 전송 기회(occasion)에서 전송된다. 디스커버리 측정 타이밍 구성(DMTC: Discovery Measurement Timing Configuration)은 단말이 DRS를 수신할 것을 예상할 수 있는 시간 구간을 의미한다. DRS 전송 기회는 DMTC 내 어디에서도 발생할 수 있으며, 단말은 할당 받은 셀로부터 해당 주기를 갖고 연속적으로 DRS가 전송되는 것을 예상할 수 있다.
LTE-A 시스템의 DRS를 LAA 시스템에서 사용하는 것은 새로운 제한 사항들을 가져올 수 있다. 예를 들어, 몇몇 지역에서 LBT 없는 매우 짧은 제어 전송과 같이 DRS의 전송을 허용할 수 있지만, LBT 없는 짧은 제어 전송은 다른 몇몇 지역에서는 허용하지 않는다. 따라서, LAA 시스템에서 DRS 전송은 LBT의 대상이 될 수 있다.
만약, DRS 전송에 있어서 LBT가 적용된다면, LTE-A 시스템의 DRS 전송의 경우와 같이 주기적인 방식으로 전송되지 않을 수 있다. 따라서, 다음과 같은 두 가지 방식들이 LAA 시스템을 위한 DRS 전송들을 위해 고려될 수 있다.
첫 번째는, LBT를 조건으로, 구성된 DMTC 내에서 고정된 시간 위치에서만 DRS가 전송되는 것이다.
두 번째는, LBT를 조건으로, 구성된 DMTC 내에서 적어도 하나 이상의 다른 시간 위치에서 DRS의 전송이 허용되는 것이다.
두 번째 방식의 다른 측면으로서, 시간 위치들의 개수는 하나의 서브프레임 내에서 하나의 시간 위치로 제한될 수 있다. 만약 더 유익하다면 DMTC 내에서 DRS의 전송 이외에 구성된 DMTC 밖에서의 DRS 전송이 허용될 수 있다.
도 10은 LAA 시스템에서 지원하는 DRS 전송 방법들을 설명하기 위한 도면이다.
도 10을 참조하면, 도 10의 윗부분은 상술한 첫 번째 DRS 전송 방법을 나타내고, 아래 부분은 두 번째 DRS 전송 방법을 나타내는 도면이다. 즉, 첫 번째 방식의 경우 단말은 DMTC 구간 내에서 정해진 위치에서만 DRS를 수신할 수 있으나, 두 번째 방식의 경우 단말은 DMTC 구간 내에서 임의의 위치에서 DRS를 수신할 수 있다.
LTE-A 시스템에서 단말이 DRS 전송에 기반한 RRM 측정을 수행하는 경우에, 단말은 다수의 DRS 기회들을 기반으로 하나의 RRM 측정을 수행할 수 있다. LAA 시스템에서 DRS가 사용되는 경우에, LBT에 의한 제약으로 인해 DRS가 특정 위치에서 전송되는 것이 보장될 수 없다. 만약, 단말이 DRS가 실제 기지국으로부터 전송되지 않는 경우에 DRS가 존재하는 것으로 가정한다면, 단말에 의해 보고되는 RRM 측정 결과에 대한 품질이 저하될 수 있다. 그러므로, LAA DRS 설계는 하나의 DRS 기회에서 DRS의 존재를 검출할 수 있도록 허용해야 하고, 이는 UE에게 오직 성공적으로 검출된 DRS 기회들을 수행하는 RRM 측정에 결합할 수 있도록 보장할 수 있다.
DRS를 포함하는 신호들은 시간 상에서 인접한 DRS 전송들을 보장하지 않는다. 즉, DRS를 수반하는 서브프레임들에서 데이터 전송이 없다면 물리 신호가 전송되지 않는 OFDM 심볼들이 있을 수 있다. 비면허 대역에서 동작하는 동안, 다른 노드들은 DRS 전송들 간의 이러한 침묵 구간에서 해당 채널이 유휴 상태인 것으로 센싱할 수 있다. 이러한 문제를 피하기 위해, DRS 신호를 포함하는 전송 버스트들은 몇몇 신호들이 전송되는 인접한 OFDM 심볼들로 구성되는 것을 보장하는 것이 바람직하다.
2.5 채널 접속 과정 및 경쟁
윈도우
조정 과정
이하에서는 상술한 채널 접속 과정(CAP: Channel Access Procedure) 및 경쟁 윈도우 조정 과정(CWA: Contention Window Adjustment)에 대해서 송신노드의 관점에서 설명한다.
도 11은 CAP 및 CWA를 설명하기 위한 도면이다.
하향링크 전송에 대해서 LTE 전송 노드(예를 들어, 기지국)가 비면허 대역 셀인 LAA S셀(들)에서 동작하기 위해 채널 접속 과정(CAP)을 개시할 수 있다 (S1110).
기지국은 경쟁 윈도우(CW) 내에서 백오프 카운터 N을 임의로 선택할 수 있다. 이때, N 값은 초기 값 Ninit으로 설정된다 (S1120). Ninit 은 0 내지 CWp 사이의 값 중 임의의 값으로 선택된다.
이어서, 백오프 카운터 값(N)이 0이라면 (S1122), 기지국은 CAP 과정을 종료하고 PDSCH를 포함하는 Tx 버스트 전송을 수행한다 (S1124). 반면에, 백오프 카운터 값이 0 이 아니라면, 기지국은 백오프 카운터 값을 1만큼 줄인다 (S1130).
기지국은 LAA S셀(들)의 채널이 유휴 상태인지 여부를 확인하고 (S1140), 채널이 유휴 상태이면 백오프 카운터 값이 0 인지 확인한다 (S1150). 기지국은 백오프 카운터 값을 1씩 줄여가면서, 백오프 카운터 값이 0이 될때까지 채널이 유휴 상태인지 여부를 반복하여 확인한다.
S1140 단계에서 채널이 유휴 상태가 아니면 즉, 채널이 비지 상태이면, 기지국은 슬롯 시간(예를 들어, 9usec)보다 긴 유보 기간(defer duration Td; 25usec 이상) 동안 해당 채널이 유휴 상태인지 여부를 확인한다 (S1142). 유보 기간에 채널이 유휴 상태이면 기지국은 다시 CAP 과정을 재개할 수 있다 (S1144). 예를 들어, 백오프 카운터 값 Ninit가 10이고, 백오프 카운터 값이 5까지 감소된 후 채널이 비지 상태로 판단되면 기지국은 유보 기간 동안 채널을 센싱하여 유휴 상태인지 여부를 판단한다. 이때, 유보 기간 동안 채널이 유휴 상태면 기지국은 백오프 카운터 값 Ninit을 설정하는 것이 아니라 백오프 카운터 값 5부터(또는, 백오프 카운터 값을 1 감소시킨 후 4부터) 다시 CAP 과정을 수행할 수 있다. 반면에, 유보 기간 동안 채널이 비지 상태이면, 기지국은 S1142 단계를 재수행하여 새로운 유보 기간 동안 채널이 유휴 상태인지 여부를 다시 확인한다.
다시 도 11을 참조하면, 기지국은 백오프 카운터 값(N)이 0이 되는지 여부를 판단하고 (S1150), 백오프 카운터 값이 0이 되면 CAP 과정을 종료하고 PDSCH를 포함하는 Tx 버스트 전송을 수행할 수 있다 (S1160).
기지국은 단말로부터 Tx 버스트에 대한 HARQ-ACK 정보를 수신할 수 있다 (S1170). 기지국은 수신한 HARQ-ACK 정보를 기반으로 CWS(Contention Window Size)를 조정할 수 있다 (S1180).
S1180 단계에서 CWS를 조정하는 방법으로서 기지국은 가장 최근에 전송한 Tx 버스트의 첫 번째 서브프레임(즉, Tx 버스트의 시작 서브프레임)에 대한 HARQ-ACK 정보를 기반으로 CWS를 조정할 수 있다.
이때, 기지국은 CWP를 수행하기 전에, 각 우선순위 클래스에 대해서 초기 CW를 설정할 수 있다. 이후, 참조 서브프레임에서 전송된 PDSCH에 대응되는 HARQ-ACK 값들이 NACK으로 결정되는 확률이 적어도 80%인 경우에는, 기지국은 각 우선순위 클래스에 대해서 설정된 CW 값들을 각각 허용된 다음 윗순위로 증가시킨다.
S1160 단계에서, PDSCH는 셀프 캐리어 스케줄링 또는 크로스 캐리어 스케줄링 방식으로 할당될 수 있다. 셀프 캐리어 스케줄링 방식으로 PDSCH가 할당된 경우에, 기지국은 피드백 받은 HARQ-ACK 정보의 DTX, NACK/DTX 또는 ANY 상태를 NACK으로 카운트한다. 만약, 크로스 캐리어 스케줄링 방식으로 PDSCH가 할당된 경우, 기지국은 피드백 받은 HARQ-ACK 정보 중 NACK/DTX 및 ANY는 NACK으로 카운트하고 DTX 상태는 NACK으로 카운트하지 않는다.
만약, M 서브프레임(M>=2)에 걸쳐 번들링되고, 번들된 HARQ-ACK 정보가 수신되는 경우, 기지국은 해당 번들된 HARQ-ACK 정보에 대해서 M 개의 HARQ-ACK 응답으로 간주할 수 있다. 이때, 번들된 M개의 서브프레임에는 참조 서브프레임이 포함되는 것이 바람직하다.
3. 제안하는
실시예
본 발명은 기지국과 단말로 구성된 무선 통신 시스템에서 기지국 또는 단말이 LBT 기반의 신호 전송을 수행할 때, 단말이 기지국으로 전송하는 상향링크 전송 데이터의 TTI(transmission time interval) (또는 서브프레임(SF))마다 전송 시점을 다르게 설정하여 가능한 연속적인 상향링크 전송을 지원하는 방안을 제안한다.
본 발명에 따른 LAA 시스템의 기본적인 상향링크 전송 구조는 기존 LTE 시스템에서의 상향링크 전송 구조를 따를 수 있다. 일 예로, 기지국이 n번째 서브프레임에서 상향링크 데이터 전송을 지시하는 하향링크 제어 정보 (또는 상향링크 그랜트(UL grant))를 전송하면, 단말은 상기 하향링크 제어 정보에 따라 n+L (예: L=4) 번째 서브프레임에서 PUSCH (physical uplink shared channel) 전송을 시도할 수 있다. 이때, LAA 시스템의 특성상, 상기 제어 정보 및 PUSCH의 송수신을 위해 기지국 및 단말은 각각 LBT를 수행할 수 있다.
도 12는 LAA 시스템에서의 L=4일 때 단말의 PUSCH 전송 동작을 나타낸 도면이다.
도 12에 도시된 바와 같이, 기지국은 n번째 서브프레임 이전에 하향링크 LBT 수행을 성공하면, n+4 번째 서브프레임에서의 PUSCH 전송을 지시하는 상향링크 그랜트를 n번째 서브프레임에서 단말에게 전송한다. 단말이 상기 상향링크 그랜트를 수신하면, 상기 단말은 n+4 번째 서브프레임 이전에 상향링크 LBT를 시도하고, 상기 상향링크 LBT를 통해 채널 접속에 성공하면 n+4번째 서브프레임에서 PUSCH 전송을 수행할 수 있다.
반면, LAA 시스템의 특성상, 단말은 기지국으로부터 수신하는 상향링크 그랜트에 대응하여 항상 대응하는 서브프레임에서 PUSCH 전송을 수행할 수 있는 것은 아니다. 도 12에 도시된 바와 같이, 비록 기지국이 하향링크 LBT 동작을 수행한 후 채널 접속에 성공하여 n+2번째 서브프레임에서 상향링크 그랜트를 전송하더라도, 단말이 n+6 번째 서브프레임 이전에 상향링크 LBT에 따른 채널 접속에 성공하지 못하면 상기 단말은 상기 상향링크 그랜트에 대응되는 PUSCH 전송을 수행하지 못할 수 있다.
왜냐하면, LAA 시스템의 비면허 대역은 LAA 시스템뿐만 아니라 이종 시스템의 여러 노드들이 채널 접속을 위해 LBT 동작을 통해 경쟁하는 대역으로써, 특정 서브프레임에서 전송된 상향링크 그랜트 이후 PUSCH 전송까지의 사이 시간이 길어 질수록 다른 노드에 의해 채널이 점유될 확률이 높아지고, 이에 따라 상기 상향링크 그랜트에 대응되는 PUSCH 전송을 수행하는 확률이 낮아질 수 있다.
따라서 LBT 동작을 통해 채널 접속에 성공하는 경우, 연속적인 상향링크 신호를 전송하여 해당 대역으로의 채널 접속을 최대한 유지하는 것이 바람직한 동작일 수 있다. 이하에서는 설명의 편의상 단말이 비면허 대역에서 최대 COT (이하 MCOT (maximum channel occupancy time)) 이내로 연속하여 전송 가능한 상향링크 신호를 상향링크 전송 버스트 (UL TX Burst)로 명명한다.
본 발명에 적용 가능한 일 예로, 기지국이 단말에게 연속된 상향링크 그랜트를 전송함으로써 단말로 하여금 연속된 서브프레임에서 상향링크 전송을 수행할 수 있도록 또는 상향링크 전송 버스트를 전송할 수 있도록 구성될 수 있다. 그러나, 상기 예에서 기지국의 연속된 상향링크 그랜트 전송 및 이에 대응한 단말의 연속된 PUSCH 전송은 각각 기지국의 하향링크 LBT 및 단말의 상향링크 LBT를 모두 성공해야만 가능한 것으로, 실시적 측면에서는 바람직하지 않을 수 있다.
이에, 상향링크 전송 버스트를 전송하기 유리한 형태로써 다중-서브프레임 스케줄링(즉, 단일의 상향링크 그랜트를 통해 복수의 서브프레임을 스케줄링)을 고려할 수 있다. 도 13은 다중-서브프레임 스케줄링을 통해 단말이 연속된 상향링크 전송을 수행하는 동작을 나타낸 도면이다.
도 13에 도시된 바와 같이, 상향링크 그랜트와 부분적 TTI를 갖는 상향링크 전송이 하나의 서브프레임 (예: n+4 번째, n+8 번째 서브프레임)에서 전송되거나, 별도의 상향링크 그랜트의 전송 없이 온전한 TTI를 갖는 상향링크 전송이 하나의 서브프레임 (예: n+12 번째 서브프레임)에서 전송될 수 있다.
다만, 도 13에 있어서 가장 앞선 상향링크 전송 버스트의 이전에는 별도의 신호 전송이 없는 서브프레임들(예: n+1번째, n+2번째, n+3번째)이 존재하는 바, Wi-Fi 등의 이종 시스템 노드들에게 채널 점유를 빼앗길 수 있다. 또한 도 13과 같이 상향링크 그랜트가 전송되는 서브프레임을 제외한 나머지 서브프레임에서 상향링크 전송을 수행하는 동작은 상향링크 전송 버스트의 COT가 4 TTI (또는 4 서브프레임) 이상인 경우에는 적용되기 어려울 수 있다. 일 예로, 도 14의 경우를 살펴본다.
도 14는 상향링크 전송 버스트의 COT가 5 TTI인 경우의 동작을 나타낸 도면이다.
도 14에 도시된 바와 같이, 특정 상향링크 그랜트를 수신한 시점으로부터 상기 상향링크 그랜트에 대응되는 PUSCH가 전송되는 타이밍 간격이 4 TTI (또는 4 서브프레임)인 반면, 상향링크 전송 버스트의 최대 길이가 5 TTI (또는 5 서브프레임)로 설정되게 되면, 도 13과 같이 연속적인 PUSCH 전송이 불가하여 상향링크 전송 버스트의 최대 길이가 제한되는 경우가 발생할 수 있다.
이에 본 발명에서는 상기와 같은 문제점을 해결하며 단말로 하여금 가능한 연속적으로 상향링크 전송을 수행하도록 지원하는 방안을 제안한다.
이하, 본 발명의 동작에 대한 설명의 편의상, 기지국이 단말에게 n 번째 서브프레임에서 상향링크 그랜트를 전송하고, 상기 상향링크 그랜트를 수신한 단말인 n+N0번째 서브프레임에서 PUSCH 전송을 시도하는 동작을 기준 상향링크 타이밍 (또는 레거시 상향링크 타이밍)에 기반한 동작이라 정의한다. 이때, N0 값은 기지국과 단말 간 사전에 약속되거나 또는 radio resource control (RRC) 신호 등으로 설정되는 값일 수 있다.
이때, 상향링크 그랜트는 하향링크 제어 정보의 형태로 전송될 수 있다.
이하, 본 발명에 대한 다양한 변형예들을 제시하며, 양립 불가한 사항들을 제외한 모든 변형예들은 함께 적용될 수 있다.
3.1 제1
실시예
기지국은 단일의 상향링크 그랜트를 통해 단말에게 연속된 L개 (L≥1) 서브프레임들 내 각 서브프레임 별 PUSCH 전송 여부와 상기 L개 서브프레임 중 기준 상향링크 타이밍이 적용되는 서브프레임이 몇 번째(예: I0번째) 서브프레임인지를 전달한다. 단말은 나머지 I1번째 서브프레임에 대해 K*(I0-I1)개 TTI (또는 서브프레임)만큼 전송 시점에 대한 시간 오프셋을 적용한다.
이때, 상기 L과 K 값은 기지국과 단말 간 사전에 약속되거나, 기지국이 RRC 등의 상위 계층 신호로 단말에게 설정해 줄 수 있다. 또는, 상기 기지국은 상기 L과 M 값을 동적인 제어 신호를 통해 단말에게 전달할 수도 있다.
LTE 시스템에서 TDD 설정 0이 설정되면, 3개 상향링크 서브프레임에 대응하는 하향링크 서브프레임이 2개만 존재하는 경우가 발생한다. 이에, 상기 LTE 시스템에서는 하나의 하향링크 서브프레임에서 2개 상향링크 서브프레임에 대한 PUSCH 전송을 스케줄링 하는 방안을 제안한다. 구체적으로, 기지국은 상향링크 그랜트 내에 2비트 길이의 상향링크 인덱스(UL index)를 포함하고, 상기 상향링크 인덱스의 값에 따라 상기 2개 상향링크 서브프레임에 대한 PUSCH 전송을 스케줄링할 수 있다. 일 예로, 상기 서브프레임 인덱스가 '00'이면 2개 상향링크 서브프레임에 대한 전송을 수행하지 않고, '10'이면 첫 번째 상향링크 서브프레임에 대한 전송을, '01'이면 두 번째 상향링크 서브프레임에 대한 전송을, '11'이면 두 상향링크 서브프레임에 대한 전송을 지시할 수 있다.
상기 구성을 다중-서브프레임 스케줄링으로 확장하면, 기지국은 단일 상향링크 그랜트를 통해 연속된 L개 서브프레임에 대해 각 서브프레임마다의 PUSCH 전송 여부를 알려줄 수 있다. 이때, 단말의 처리 지연(UE processing delay)이 작을 것으로 기대되는 경우, 기지국은 기준 상향링크 타이밍보다 전송 시점이 빠른 상향링크 타이밍 (일명, Fast UL timing)을 따르는 서브프레임에서의 PUSCH 전송을 지시할 수도 있다. 보다 구체적으로, 기지국은 아래와 같은 조건을 만족하는 경우 단말에게 빠른 상향링크 타이밍(Fast UL timing)을 따르는 PUSCH 전송을 지시할 수 있다.
(1) TA(Timing Advance)가 특정 값 이하인 단말. 이를 위해, 단말은 기지국에게 상향링크 TA 값을 보고할 수 있다. 또한, 특정 단말의 TA가 특정 값 이상인 경우, 상기 특정 단말은 빠른 상향링크 타이밍을 지시한 상향링크 그랜트는 무시할 수 있다.
(2) 단말 처리 능력(UE processing capability)에서 빠른 상향링크 타이밍을 지원 가능한 단말
(3) 전송 블록(TB) 크기가 특정 값 이하인 PUSCH
(4) PDCCH 기반 상향링크 그랜트에 대응되는 PUSCH. 추가적으로, LTE-A 시스템에서 제안된 EPDCCH(enhanced Physical Control CHannel)에는 적용하지 않을 수도 있으며, PDCCH 경우와 차별화하여 적용할 수도 있다.
(5) 재전송을 위한 PUSCH
(6) SPS (Semi-Persistent Scheduling) 기반 PUSCH
기지국은 특정 상향링크 그랜트에 대응한 빠른 상향링크 타이밍을 다양한 방법으로 단말에게 제공할 수 있다. 일 예로, 기지국은 빠른 상향링크 타이밍에 따라 PUSCH가 전송되는 서브프레임을 직접 지시할 수도 있으며, 기준 상향링크 타이밍을 따르는 서브프레임을 지시하여 단말이 간접적으로 빠른 상향링크 타이밍에 따라 PUSCH가 전송되는 서브프레임을 알 수 있도록 할 수 있다.
단말에게 적용되는 빠른 상향링크 타이밍은 상기 단말의 TA 값에 따라 다른 값이 적용될 수 있다. 일 예로, TA 값이 0에 근접한 단말은 빠른 상향링크 타이밍으로 3ms (일반적으로 k TTIs), 그렇지 않은 경우는 4 msec (일반적으로 k TTIs + ceil (max_TA/TTI duration))을 적용할 수 있다. 여기서, ceil (K)는 K 값보다 크거나 같은 정수의 최소값을 의미한다.
도 15는 단일의 상향링크 그랜트를 통해 빠른 상향링크 타이밍에 따라 복수의 서브프레임에서의 PUSCH 전송을 지시하는 동작을 나타낸 도면이다.
도 15에 도시된 바와 같이, 기지국은 n 번째 서브프레임 및 n+4 번째 서브프레임에서 단말에게 상향링크 그랜트를 전송할 수 있다. 이때, 기지국은 n번째 서브프레임에서 전송된 상향링크 그랜트에 대응하여 n+3, n+5, n+6번째 서브프레임에 대한 PUSCH 전송을 지시하고, n+4번째 서브프레임에 대해서는 PUSCH 전송을 지시하지 않을 수 있다. 또한, 기지국은 n+4번째 서브프레임에서 전송된 상향링크 그랜트에 대응하여 n+7, n+8, n+9, n+10번째 서브프레임에 대한 USCH 전송을 지시할 수 있다. 이에 따라, 도 15와 같이 기지국은 단말의 연속적인 상향링크 전송을 지원할 수 있다.
이와 같은 빠른 상향링크 타이밍의 적용 여부는 RRC 설정을 통해 지시할 수 있으며, 만약 빠른 상향링크 타이밍이 적용되지 않도록 설정된 경우에는 기준 상향링크 타이밍을 비트 필드가 상향링크 그랜트에서 생략될 수 있다. 또한 빠른 상향링크 타이밍을 지원할 수 없는 단말, 예를 들어, TA 값이 일정 값 이상이거나 또는 단말 처리 능력에서 빠른 상향링크 타이밍이 지원되지 않는 단말의 경우에는 기지국이 지시한 다중 서브프레임 스케줄링 내 복수 서브프레임 중 상기 빠른 상향링크 타이밍을 따르는 서브프레임들에 대한 전송을 생략할 수 있다.
또한, 기지국이 빠른 상향링트 타이밍에서 지원 불가한 PUSCH 전송을 지시하는 경우, 단말은 대응되는 상향링크 전송을 생략할 수 있다.
추가적인 변형예로, 기지국은 L개 (L≥1) 서브프레임들 내 각 서브프레임별 PUSCH 전송 여부와 상기 L개 서브프레임들 중 첫 번째 서브프레임에 적용되는 상향링크 타이밍이 기준 상향링크 타이밍으로부터 얼마만큼 시간 오프셋을 갖는지의 정보를 알려줄 수 있다. 이때, 나머지 서브프레임들에서의 상향링크 전송 시점은 상기 첫 번째 서브프레임의 전송 시점 대비 선형적으로 증가하도록 설정될 수 있다.
추가적으로, 상기 기지국이 단말 별 TA 값에 따라 상향링크 타이밍을 다르게 적용하는 경우, 추가적인 동작으로 기지국과 단말은 TTI 길이에 따라서 최대 TA 값을 다르게 인지할 수 있다. 일례로, TTI 길이가 짧은 경우, 기지국 또는 단말은 최대 TA 값 또한 작게 설정할 수 있다. 구체적으로 최대 TA 값은 TTI 길이에 비례하도록 설정될 수 있다.
보다 구체적으로, 동일한 서빙 셀과 관련된 복수의 단말들 간 상향링크 동기를 맞추기 위해, 각 단말은 TA 명령을 고려하여 하향링크 TTI (예: 서브프레임) 경계로부터 일정 시간 앞서 각 단말의 상향링크 채널을 전송한다. 예를 들어, 단말과 상기 서빙 셀 간 거리가 100km라면, 상기 단말을 위한 TA 값은 약 0.67ms(=2*100km/(3*108m/s))가 된다. (E)PDCCH/PDSDCH 및 PUCCH/PUSCH 사이의 시간 구간은 타이밍 조정(timing adjustment) 및 물리 채널의 디코딩/인코딩 프로세스에 사용된다. 다시 말해, 타겟 셀의 반경이 증가할수록 프로세싱 시간이 감소하지 않는 한 HARQ 프로세스 딜레이 또는 상향링크 그랜트부터 PUSCH가 전송되는 시간 차는 증가하게 된다.
특히, 짧은 TTI는 HARQ 프로세스 딜레이 및 RTT(Round Trip Time) 감소에 이득이 있는 바, 타이밍 조절 및/또는 프로세싱을 위한 시간을 감소시키는 것이 선호될 수 있다. 이에, 단말이 최대 TA 값이 TTI 길이에 비례한다고 가정하는 방안이 고려될 수 있다. 일 예로, 최대 TA 값은 1 TTI가 7 개 심볼에 대응되는 경우에는 0.33ms(셀 반경 50km에 대응됨)이 될 수 있으며, 1 TTI가 3 또는 4개 심볼에 대응되는 경우에는 0.16ms(셀 반경 24km에 대응됨)이 될 수 있으며, 1 TTI가 2 개 심볼에 대응되는 경우에는 0.093ms(셀 반경 14km에 대응됨)이 될 수 있으며, 1 TTI가 1 개 심볼에 대응되는 경우에는 0.047ms(셀 반경 7km에 대응됨)이 될 수 있다.
5%-tile UPT (User Packet Throughput) 특성(예: 셀 경계 단말(또는 사용자)의 데이터 수율)은 TTI 길이가 감소함에 따라 감소되므로, 짧은 TTI를 위해 최대 TA 값을 감소시키는 것이 적절하다고 볼 수 있다. TA를 업데이트하는 동안, 주어진 TTI 길이에 대해 축적된 TA 값은 최대 TA 값보다 커질 수 있다. 이 경우, 단말은 상향링크/하향링크 전송을 위해 상향링크 채널 전송을 포기하거나 TTI 길이를 변경할 수 있다. 이에, 본 발명에서는 최대 TA 값이 TTI 길이에 비례하도록 설정되어 짧은 TTI를 위한 전체 프로세싱 시간을 단축시킬 수 있다.
3.2 제2
실시예
기지국은 단일 상향링크 그랜트를 단말에게 연속된 L개 (L≥1) 서브프레임들 중 PUSCH 전송이 수행되지 않는 서브프레임의 개수(M)과 상기 PUSCH 전송이 수행되지 않는 서브프레임들의 위치 정보 (e.g., LCM)에 대한 정보를 제공한다.
이때, 상기 L과 M 값은 단말과 기지국 간 사전에 약속하거나 또는 기지국이 RRC 등의 상위 계층 신호를 통해 알려줄 수 있다. 또는, 기지국이 동적인 제어 신호를 통해 상기 L과 M 값을 단말에게 전달할 수 있다.
앞서 설명한 제1 실시예와 같이 L개의 연속된 서브프레임들에 대해 각 서브프레임별 PUSCH 전송 여부를 알려주는 방안은 가장 유연한 동작이 가능하지만, 제어 시그널링 오버헤드(Control signaling overhead)가 높다는 단점이 있다. LAA 시스템에서 COT가 8 서브프레임이라고 가정하면, 제1 실시예에 따르면 8 비트 크기의 비트 필드가 상향링크 그랜트 내에 포함되어야 할 수 있다.
따라서, 제2 실시예에서는 제어 시그널링 오버헤드를 줄이는 방안으로 8개(즉, L=8) 서브프레임들 중 PUSCH 전송이 수행되지 않는 서브프레임의 수가 1이라고 가정하면(즉, M=1), 기지국은 3 (=log2(8)) 비트로 PUSCH 전송이 수행되지 않는 서브프레임의 위치 정보를 단말에게 알려줄 수 있다. 이와 같은 구성은 LAA 시스템에서 상향링크 전송 버스트 단위로 전송하는 것이 바람직하므로 PUSCH 전송을 수행하지 않는 서브프레임의 수를 작게 제한하는 구성에 부합될 수 있다.
일 예로, L=4, M=1으로 설정되고, 상향링크 그랜트 내 2 비트 길이의 비트 필드는 PUSCH 전송이 수행되지 않는 서브프레임을 4개 서브프레임들 중 2번째 서브프레임으로 지시한다고 가정한다. 이때, 앞서 제안한 구성을 활용하면, 도 15와 같이 단말의 연속된 상향링크 전송을 지원할 수 있다.
도 16은 단일의 상향링크 그랜트가 5개의 연속하는 서브프레임 중 2번째 서브프레임을 제외한 서브프레임들에서 PUSCH 전송을 지시하는 동작을 나타낸 도면이다.
도 16에 도시된 바와 같이, 기지국이 n번째 서브프레임에서 전송한 상향링크 그랜트를 통해 n+4번째, n+6번째, n+7번째, n+8번째 서브프레임에 대한 PUSCH 전송을 지시할 수 있다. 이어, 기지국은 n+5번째 서브프레임에서 n+9번째, n+11번째, n+12번째, n+13번째, n+14번째 서브프레임에 대한 PUSCH 전송을 지시할 수 있다. 이와 같은 동작을 통해, 단말은 연속적으로 PUSCH 전송을 수행할 수 있다.
이때, PUSCH 전송이 없는 서브프레임에 첫 번째 서브프레임이 포함되는 경우는 제외할 수 있으며, PUSCH 전송이 수행되지 않는 서브프레임들의 위치 정보를 알려주는 비트 필드가 지시하는 특정 상태(State)는 복수 개의 서브프레임들 중 PUSCH 전송이 수행되지 않는 서브프레임이 없음을 의미할 수 있다. 다시 말해, 상기 특정 상태는 복수 개의 서브프레임들 모두에서 PUSCH 전송이 수행됨을 의미할 수 있다.
단말은 기지국이 지시한 PUSCH 전송이 없는 서브프레임들에 대해 하향링크 제어 시그널링에 대한 모니터링을 수행할 수 있다. 이때, 상기 기지국이 지시한 하향링크 제어 시그널링의 모니터링 대상 서브프레임을 기준으로 인접 상향링크 서브프레임에서의 부분적 서브프레임(Partial subframe) 적용 여부가 결정될 수 있다. 일 예로, 하향링크 제어 시그널링의 대상 서브프레임의 직전 상향링크 서브프레임에서는 종료 부분적 서브프레임(Ending Partial SF)이 적용될 수 있다.
추가적으로, 상기 PUSCH 전송이 수행되지 않는 서브프레임들에서는 단말이 하향링크 제어 시그널링을 모니터링하여 새로운 상향링크 그랜트를 수신하고, 상기 수신된 상향링크 그랜트가 이미 스케줄링된 상향링크 서브프레임에 대해 PUSCH 전송을 수행하지 않도록 지시하는 경우, 단말은 가장 최근에 또는 나중에 수신한 상향링크 그랜트가 지시하는 내용에 따라 해당 서브프레임에서의 PUSCH 전송 여부 및 전송 내용을 결정할 수 있다.
3.2.1 제1 추가
실시예
기지국은 사전에 단말이 하향링크 신호를 모니터링할 서브프레임들을 설정하고, 단말에게 단일 상향링크 그랜트를 통해 연속된 L개 (L≥1) 서브프레임들에 대한 PUSCH 전송을 지시한다. 이때, 단말은 상기 동작을 아래와 같이 해석하고 이에 대응하는 동작을 수행할 수 있다.
(1) 단말은 상기 상향링크 그랜트를 상기 상향링크 그랜트가 지시한 첫 번째 상향링크 전송 시점으로부터 연속된 L개 서브프레임들에 대한 스케줄링 정보로 해석할 수 있다. 단, 상기 L개 서브프레임들에 하향링크 신호를 모니터링 할 서브프레임이 포함되는 경우 단말은 해당 서브프레임에 대한 PUSCH 전송을 생략할 수 있다.
(2) 단말은 상기 상향링크 그랜트가 지시한 첫 번째 상향링크 전송 시점으로부터 상기 하향링크 신호를 모니터링 할 서브프레임들을 제외한 L개 서브프레임들에 대한 스케줄링 정보로 해석할 수 있다.
예를 들어, 도 16에서 기지국은 사전에 단말이 n, n+5, n+10, n+15, … 번째 서브프레임에서 하향링크 제어 시그널링을 모니터링 하도록 설정할 수 있다. 상기 기지국이 n번째 서브프레임에서 상향링크 그랜트를 통해 5개 서브프레임에 대한 다중-서브프레임 스케줄링을 수행하면, 상향링크 그랜트 수신 시점을 기준으로 n+4, n+5, n+6, n+7, n+8번째 서브프레임에 대한 단말의 PUSCH 전송을 기대할 수 있다. 이때, 단말은 n+5번째 서브프레임에 대해서는 이미 하향링크 제어 시그널링을 모니터링 하도록 설정되었기 때문에 해당 서브프레임에서 스케줄링된 PUSCH 전송은 생략할 수 있다.
3.2.2 제2 추가
실시예
기지국은 사전에 상위 계층 신호를 통해 하향링크 신호를 모니터링 할 서브프레임들을 설정하고, 공통 시그널링(예: 공통 하향링크 제어 정보(DCI))으로 상기 하향링크 신호를 모니터링 할 서브프레임들에 대한 활성화 또는 비활성화를 지시하거나 상기 하향링크 신호를 모니터링 할 서브프레임들에 대한 복수의 설정 중 하나를 지시할 수 있다.
일 예로, 트래픽 부하(Traffic Load)가 적고 상향링크 트래픽만 존재하는 환경에서 기지국이 셀프 캐리어 스케줄링(Self-carrier scheduling)을 수행할 때, 상기 기지국은 상향링크 그랜트가 전송될 하향링크 서브프레임들을 알려줄 목적으로 상기 하향링크 신호를 모니터링 할 서브프레임들이 활성화되었음을 지시할 수 있다. 즉, 기지국은 주기와 오프셋으로 하향링크 신호를 모니터링 할 서브프레임에 대해 설정하고, 공통 DCI 등으로 상기 설정이 현재 적용되는지 여부를 알려줄 수 있다.
추가적으로, 기지국은 상기 하향링크 신호를 모니터링 할 서브프레임에 대한 복수의 설정(즉, 서로 다른 주기 및 오프 셋)을 설정하고, 공통 DCI 등으로 상기 복수의 설정들 중 하나를 지시할 수도 있다.
3.2.3. 제3 추가
실시예
기지국은 공통 시그널링(예: 공통 DCI)로 미래 하향링크 신호를 모니터링 할 서브프레임을 지시할 수 있다.
상기 방법은 매우 동적인 방안으로써 기지국은 공통 DCI를 통해 다음 번 하향링크 신호가 전송될 예정 위치를 단말에게 알려줄 수 있다. 보다 구체적으로 기지국은 현재 서브프레임을 기준으로 다음 번 하향링크 신호가 전송될 서브프레임의 위치를 시간 오프셋 형태로 단말에게 알려줄 수 있다.
3.2.4. 제4 추가
실시예
기지국이 앞서 설명한 추가 실시예 중 하나의 동작을 통해 하향링크 신호를 모니터링 할 서브프레임들을 설정하였을 때, 기지국 또는 단말이 하향링크 서브프레임 (하향링크 신호를 모니터링 할 서브프레임)의 앞 부분 또는 상기 하향링크 서브프레임의 직전 서브프레임의 뒷 부분에 전송 갭을 적용할 수 있다.
상기 하향링크 신호를 모니터링 할 서브프레임에서 PDCCH 등이 하향링크 LBT 동작에 따라 전송된다면 상기 하향링크 LBT 동작을 위한 전송 갭이 설정되어야 한다. 따라서 단말은 기지국이 하향링크 신호를 모니터링 할 서브프레임을 설정하면 별도의 신호가 없더라도 전송 갭을 상기 하향링크 서브프레임의 앞 부분(예: 제1 슬롯의 일부 또는 전부) 또는 상기 하향링크 서브프레임의 직전 서브프레임의 뒷 부분(예: 제2 슬롯의 일부 또는 전부)에 설정할 수 있다.
3.2.5 제5 추가
실시예
기지국이 단일 상향링크 그랜트를 통해 단말에게 L개 (L≥1) 서브프레임들에 대한 다중-서브프레임 스케줄링을 지시할 때, 상기 상향링크 그랜트로 각 서브프레임 별 전송 시점에 대한 정보로써 각 서브프레임 별 이전 서브프레임 대비 전송 시점 오프셋 값을 지시한다. 단, 기지국은 상기 L개 서브프레임들 중 첫 번째 서브프레임에 대한 전송 시점은 상기 상향링크 그랜트를 통해 단말로 지시할 수 있다.
일 예로, 기지국이 단말에게 단일 상향링크 그랜트를 통해 4개 서브프레임에 대한 다중-서브프레임 스케줄링을 지시할 때, 도 16과 같이 L개 서브프레임들 내 상향링크 그랜트를 전송할 수 있는 시간 구간을 설정할 수 있다.
이를 위한 한 가지 방안으로 앞서 설명한 제2 실시예와 같이 L개 서브프레임들 중 실제 PUSCH 전송이 수행되지 않는 M개 서브프레임을 지시할 수도 있고, 다른 방안으로 각 서브프레임 간 전송 시점 오프셋 값을 지시하여 이를 구현할 수도 있다. 즉, 상향링크 그랜트에 특정 비트 필드는 상기 L개 서브프레임 중 임의의 t (t>1)번째 서브프레임에 대해 t-1번째 서브프레임의 전송 시점 대비 시간 축 오프셋 값을 지시할 수 있다.
일 예로, 상기 오프셋 값은 서브프레임 단위로 설정될 수 있다. 상기 4개 서브프레임의 예시에서, 기지국은 첫 번째 서브프레임에 대해서는 상향링크 그랜트로 지시한 전송 시점을 따르도록 하고, 나머지 3개 서브프레임에 대해서는 각 서브프레임별로 이전 서브프레임 대비 +0 서브프레임, +1 서브프레임의 전송 시점 오프셋 값을 갖도록 1 비트 지시자를 통해 지시할 수 있다.
3.2.6 제6 추가
실시예
기지국은 단일 상향링크 그랜트를 통해 단말에게 L개 (L≥1) 서브프레임들에 대한 다중-서브프레임 스케줄링을 지시할 때, 사전에 약속된 (또는 상위 계층 신호로 설정된) 길이를 갖는 빈 서브프레임(Blank subframe)들 (또는 빈 시간 구간(Blank time duration))이 삽입되는 위치를 상향링크 그랜트로 지시할 수 있다.
단, 단말은 상기 빈 서브프레임(Blank subframe)에 대해서 하향링크 수신 (또는 최소한 상향링크 그랜트 수신)을 기대할 수 있다.
일 예로, 기지국이 단말에게 단일 상향링크 그랜트를 통해 4개 서브프레임에 대한 다중-서브프레임 스케줄링을 지시할 때, 도 16과 같이 L개 서브프레임들 사이에 상향링크 그랜트 전송을 위한 공간을 설정할 수 있다. 이때, 기지국은 상기 L개 서브프레임들 내 1개의 빈 서브프레임을 삽입하는 형태로 상향링크 그랜트가 전송될 공간을 지원할 수 있다.
보다 구체적으로 1개 서브프레임으로 정의되는 빈 서브프레임을 설정하고, 상기 L개 서브프레임들 중 한 서브프레임을 지시하면 해당 서브프레임 이후로 상기 1개 빈 서브프레임을 삽입하는 방식이 적용될 수 있다.
이때, 상기 빈 서브프레임이 삽입되는 위치는 2개 이상일 수 있다. 일 예로, 4개 서브프레임을 스케줄링 할 때, 기지국은 상향링크 그랜트를 통해 첫 번째 서브프레임과 2번째 서브프레임 이후에 각 1개 빈 서브프레임을 삽입하도록 지시할 수 있다. 단말은 상기 빈 서브프레임에 대해서 하향링크 수신을 기대할 수 있다.
상기 구성을 일반적으로 설명하면, 기지국은 L개 서브프레임들 중 M개 위치에 대해 각각 K개로 구성된 빈 서브프레임들이 삽입됨을 상향링크 그랜트를 통해 단말에게 지시할 수 있다. 이때, M, K 값은 상위 계층 신호로 설정되거나 동적 제어 신호로 지시되거나 사전에 약속된 값일 수 있다.
3.3 제3
실시예
기지국이 단일 상향링크 그랜트를 통해 단말에게 연속된 L개 (L≥1) 서브프레임들에 대한 PUSCH 전송 여부를 지시할 때, 상기 상향링크 그랜트는 상기 L개 서브프레임에 대한 스케줄링이 사전 스케줄링인지 아니면 일반적인 스케줄링 인지를 지시한다.
앞서 설명한 바와 같이, 상기 상향링크 그랜트는 하향링크 제어 정보(downlink control information, DCI)의 형태로 전송될 수 있다.
구체적으로, 상기 L개 서브프레임들에 대한 스케줄링 방식을 지시하기 위해 1비트 크기의 지시자가 적용될 수 있으며, 상기 지시자의 값에 따라 '사전 스케줄링' 또는 '일반적인 스케줄링'이 지시될 수 있다. 여기서, '사전 스케줄링' 방식은 '트리거링된 스케줄링'과 동일한 의미로 해석될 수 있다.
또는, 전체 L개 서브프레임들 중 특정 M개 서브프레임을 사전에 약속된 방식 또는 RRC 시그널링 또는 상향링크 그랜트 내 비트 필트를 통해 제시할 수도 있다.
여기서, 사전 스케줄링 대상 서브프레임들은 기준 상향링크 타이밍보다 전송 시점이 빠르게 설정된 서브프레임들이 적용될 수 있다. 기지국은 특정 서브프레임 세트에 대해 단말이 사전 스케줄링 대상으로 해석할 지의 여부를 RRC 등의 상위 계층 신호를 통해 설정하거나 또는 상기 상향링크 그랜트 내 비트 필트를 통해 지시할 수 있다.
이하, 본 발명에서 제시하는 '사전 스케줄링'의 의미는 최근 상향링크 그랜트에 대해 단말이 데이터를 전송하는 것을 보류하되, 이후 별도의 지시(예: 이후에 전송되는 상향링크 그랜트)를 통해 사전 스케줄링된 데이터의 전송을 지시 받으면 해당 지시 시점으로부터 빠른 상향링크 타이밍에 따라 전송할 수 있도록 준비하는 일련의 동작을 의미할 수 있다.
다시 말해, 본 발명에서 사전 스케줄링은 PUSCH 전송 시 데이터 생성을 위한 (일부) 스케줄링 정보를 단말에게 알려주되, 상기 PUSCH의 전송 시점은 지시하지 않는 동작을 의미할 수 있다. 이에 따라, 사전 스케줄링을 지시받은 단말은 전송할 PUSCH를 미리 생성하되 추후 기지국의 전송 지시 시점까지 PUSCH 전송을 보류할 수 있다. 이떄, 트리거링 DCI는 상기 사전 스케줄링 된 PUSCH의 (특정 시점에서의) 실제 전송을 지시하는 DCI를 의미할 수 있다.
예를 들어, 기지국이 n번째 서브프레임에서 전송된 상향링크 그랜트에 대해 n+1, n+2, n+3, n+4번째 서브프레임에 대해 전송을 지시하고 단말이 기준 상향링크 타이밍 보다 전송 시점이 빠르게 설정된 서브프레임들에 대해서는 사전 스케줄링 대상으로 해석하도록 설정하였다고 가정한다. 이때, 단말은 도 17과 같이 n+1, n+2, n+3번째 서브프레임에 대한 실제 전송은 수행하지 않고 미리 전송 블록(TB)을 생성하여 전송 준비를 할 수 있다.
상기 특징을 일반적으로 정리하면, 기지국은 다중 서브프레임 스케줄링 대상이 L개 서브프레임일 때, L개 전체 또는 L개 중 특정 M개 서브프레임에 대한 스케줄링 타입을 지시할 수 있다. 추가적으로, 기지국이 상향링크 그랜트를 통해 사전 스케줄링 정보만을 알려주는 경우, 기지국은 임의의 상향링크 그랜트에 대해 해당 상향링크 그랜트가 사전 스케줄링 용도인지 실제 PUSCH 전송을 지시하는 용도인지를 알려주는 지시자를 상기 상향링크 그랜트 내에 포함할 수 있다. 또는 사전 스케줄링을 위한 별도의 HARQ 프로세스들을 할당하고 단말은 상향링크 그랜트 내 HARQ 프로세스 인덱스를 통해 해당 상향링크 그랜트가 실제 PUSCH 전송 목적인지 또는 미래의 PUSCH 전송을 위한 사전 스케줄링 목적인지 구분할 수 있다.
일 예로, 기지국이 상기 상향링크 그랜트가 n 번째 서브프레임에서 전송한다고 가정한다. 이때, 상기 상향링크 그랜트가 N개 서브프레임에 대한 일반 스케줄링 용도 (또는 비-사전 스케줄링 용도)를 지시하는 경우, 단말은 상기 상향링크 그랜트를 수신한 시점으로부터 일정 시간 이후에(예: n+4번째 서브프레임) 상기 상향링크 그랜트에 대응하는 상향링크 신호(예: PUSCH)를 기지국으로 전송한다.
또는, 상기 상향링크 그랜트가 N개 서브프레임에 대한 사전 스케줄링 용도를 지시하는 경우, 상기 단말은 이후 사전 스케줄링된 상향링크 신호의 전송을 트리거링하는 상향링크 그랜트(예: 트리거링 DCI)를 수신하고, 상기 수신된 상향링크 그랜트에 대응하는 상향링크 신호를 기지국으로 전송한다.
이하, 본 발명에 대한 추가 실시예에 대해 상세히 설명한다.
3.3.1 제1 추가
실시예
기지국이 단일 상향링크 그랜트를 통해 특정 상향링크 데이터에 대한 초기 전송 준비와 재전송의 사전 준비를 동시에 지시하고, 이후 상기 기지국은 상기 단말이 사전 준비한 재전송 데이터에 대한 실제 전송 여부를 별도의 트리거링 DCI로 지시할 수 있다.
단, 상기 사전 준비한 재전송 데이터의 전송 시점은 트리거링 DCI 수신 시점 (또는 상향링크 그랜트 수신 시점 또는 초기 전송 시점)을 기준으로 고정된 상향링크 타이밍 (또는 기지국이 상위 계층 신호로 설정된 상향링크 타이밍)을 적용하여 결정될 수 있다.
단, 재전송 데이터에 대한 RV (redundancy version)은 상기 초기 전송에 지시된 RV에 고정된 오프셋 (또는 기지국이 상위 계층 신호로 설정한 오프셋)을 적용하여 결정될 수 있다.
보다 구체적으로, 기지국은 단일 상향링크 그랜트를 통해 단말에게 특정 상향링크 데이터에 대한 초기 전송을 스케줄링 지시를 하는 동시에 해당 데이터에 대한 재전송 준비를 하도록 단말에게 지시할 수 있다. 이때, 기지국이 n번째 서브프레임에서 상향링크 그랜트를 전송하여 n+4번째 서브프레임에서 단말이 초기 전송을 수행하였는데 상기 기지국이 상기 단말이 전송한 데이터의 복조에 실패한 경우, 상기 기지국은 단말에게 미리 준비시킨 재전송을 보다 빠른 상향링크 타이밍으로 전송하도록 지시할 수 있다.
일 예로, 기지국은 n+5번째 서브프레임에서 트리거링 DCI를 전송하여 n+6번째 서브프레임에서 단말이 미리 준비한 재전송 데이터를 전송하도록 지시할 수 있다. 이때, 초기 전송에 대해서는 4개 서브프레임에 대응한 상향링크 스케줄링 지연(UL scheduling delay)이 고려되나, 재전송에 대해서는 미리 준비된 상태이므로 1개 서브프레임에 대응하는 보다 작은 상향링크 스케줄링 지연이 고려될 수 있다.
또는 동기식 HARQ(Synchronous HARQ)인 경우, 기지국은 단말에게 전송하는 단일 상향링크 그랜트가 스케줄링에 따른 데이터 전송과 상기 데이터에 대한 비-적응적(Non-adaptive) 재전송 준비를 모두 수행하는 의미로 해석하도록 (상위 계층 신호 등을 통해) 설정할 수 있다. 이때, 단말은 기지국의 PHICH 수신 시점으로부터 상기 비-적응적 재전송 데이터를 일반 상향링크 타이밍 (예: n번째 서브프레임에서 수신하여 n+4번째 서브프레임에서 전송)보다 빠른 상향링크 타이밍 (예: n번째 서브프레임에서 수신하여 n+2번째 서브프레임에서 전송)을 적용하여 전송할 수 있다.
3.3.2 제2 추가
실시예
기지국은 동일 서브프레임 내 (동일 단말에 대한) 복수 개의 상향링크 그랜트 중 하나의 상향링크 그랜트로 특정 상향링크 데이터에 대한 초기 전송을 지시하고, 다른 상향링크 그랜트(들)로 상기 상향링크 데이터에 대한 재전송 사전 준비를 지시한 뒤, 이후 상기 단말이 사전 준비한 재전송 데이터에 대한 실제 전송 여부는 별도의 트리거링 DCI로 지시할 수 있다.
단, 상기 사전 준비한 재전송 데이터의 전송 시점은 트리거링 DCI 수신 시점 (또는 재전송 사전 준비를 지시한 상향링크 그랜트 수신 시점 또는 초기 전송 시점)을 기준으로 고정된 상향링크 타이밍(또는 기지국이 상위 계층 신호로 설정된 상향링크 타이밍)을 적용하여 결정될 수 있다. 또는, 상기 트리거링 DCI 수신 시점 이후에 설정되는 타이밍에 따라 상향링크 신호를 전송할 수 있다.
상기 제1 추가 실시예에서는 동일 상향링크 그랜트로 초기 전송과 재전송에 대한 준비를 지시하는 경우, 단일 스케줄링 정보가 적용되기 때문에 재전송 스케줄링에 대한 자유도가 떨어지는 문제가 있을 수 있다. 따라서 제2 추가 실시예에서는 보다 기지국 스케줄링의 자유도를 높이기 위해 초기 전송을 지시하는 상향링크 그랜트와 재전송 준비를 위한 별도의 상향링크 그랜트를 구분하여 전송하는 방법을 제시한다.
단, 기지국이 단말의 초기 전송 실패 시 빠른 재전송을 지시하기 위해서는 상기 초기 전송을 지시하는 동시에 재전송 준비를 시킬 수 있어야 한다. 이를 위해 기지국은 상기 초기 전송을 위한 상향링크 그랜트와 재전송 준비를 지시하는 상향링크 그랜트는 동일 서브프레임에서 전송하고, 단말은 한 서브프레임 내에서 상기 두 가지 목적의 상향링크 그랜트 수신을 기대할 수 있다.
3.3.3 제3 추가
실시예
단말이 최대 N개 HARQ 프로세스에 대한 전송 (또는 버퍼링 동작)을 수행할 수 있는 경우, 기지국이 상기 단말에게 특정 L개 HARQ 프로세스들에 대해서는 동일 시점에 지시된 초기 전송과 재전송 사전 준비에 대한 각각의 데이터를 따로 버퍼링할 수 있도록 지시하고, 기지국은 전체 HARQ 프로세스 수를 M개로 감소시켜서 단말에게 설정할 수 있다.
단, 단말은 상기 감소된 M개 HARQ 프로세스들에 대해 HARQ 프로세스별 소프트 버퍼(Soft buffer)의 크기를 설정할 때, 상기 L개 HARQ 프로세스에 대한 소프트 버퍼 크기는 2배의 가중치를 주어 결정할 수 있다.
만약 단말이 최대 N개 HARQ 프로세스에 대한 상향링크 전송을 수행할 수 있는 경우, 단말은 상기 N개 HARQ 프로세스에 대해 균등하게 소프트 버퍼를 나눌 수 있다. 상기 소프트 버퍼는 특정 HARQ 프로세스에 대해 이전에 전송된 데이터를 버퍼링하였다가 이후 재전송 된 데이터와 결합하는 동작을 지원할 수 있다.
이때, 제1 추가 실시예 또는 제2 추가 실시예와 같이 기지국이 동일 HARQ 프로세스에 대해 초기 전송과 재전송 준비를 모두 지시하는 경우, 단말은 초기 전송을 위한 데이터와 재전송 준비를 위한 데이터를 모두 소프트 버퍼에 저장해야 한다. 따라서 전체 N개 HARQ 프로세스 중 L개 HARQ 프로세스에 대해 초기 전송과 재전송 준비를 동시에 지시하는 동작을 수행할 수 있도록 기지국이 단말에게 설정하면, 단말은 상기 L개 HARQ 프로세스에 대한 소프트 버퍼 크기를 다른 초기 전송과 재전송 중 하나만 수행하는 HARQ 프로세스에 대한 소프트 버퍼 크기에 비해 적어도 2배 이상으로 설정해야 한다.
여기서, 기지국은 단말의 소프트 버퍼가 부족할 수 있으므로 전체 HARQ 프로세스 수를 M개로 줄이고, 이 중 초기 전송과 재전송 준비를 동시에 지시할 수 있는 상기 L개의 HARQ 프로세스에 대해서는 2배 가중치를 주어 소프트 버퍼 크기를 분배할 수 있다.
상기 HARQ 프로세스별 소프트 버퍼를 나눌 때, 기지국은 가중치를 부여할 특정 HARQ 프로세스 번호를 해당 가중치 정보와 함께 상위 계층 신호로 알려줄 수 있다. 또는 기지국이 전체 HARQ 프로세스 수(M)를 알려주면 단말에게 알려주면, 단말은 자신에게 설정된 최대 HARQ 프로세스 수(N)와 비교하여 HARQ 프로세스 인덱스의 오름차순 또는 내림차순으로 N-M개 HARQ 프로세스에 대해 소프트 버퍼 크기를 2배로 늘려줄 수 있다. 또는 기지국이 소프트 버퍼 크기를 증가시킬 HARQ 프로세스 수를 단말에게 알려주고, 단말은 상기 HARQ 프로세스 인덱스의 오름차순 또는 내림차순으로 상기 수에 대응하는 HARQ 프로세스에 대해 소프트 버퍼 크기를 2배로 늘려줄 수 있다.
또는 기지국이 단말에게 전체 N개 HARQ 프로세스 중 L개 HARQ 프로세스에 대한 빠른 상향링크 프로세싱을 설정하는 경우, 상기 L개 HARQ 프로세스에 대한 빠른 상향링크 처리 시간을 확보하기 위해 전체 HARQ 프로세스 수를 줄일 수 있다. 일 예로, 기지국은 전체 HARQ 프로세스 수를 N-L개로 감소시키고, 해당 정보를 단말에게 알려줄 수 있다.
단, 단말은 전체 HARQ 프로세스가 줄어들었을 때 (예: M개), 상기 제외된 HARQ 프로세스에 대응되는 특정 HARQ 프로세스 인덱스 (예: M M+1, …, N)에 대한 스케줄링을 무시할 수 있다.
3.3.3 제4 추가
실시예
기지국은 초기 전송 목적의 상향링크 그랜트 (제1 상향링크 그랜트)와 재전송 사전 준비 목적의 상향링크 그랜트 (제2 상향링크 그랜트), 또는 일반 상향링크 그랜트 (제1 상향링크 그랜트)와 초기 전송 및 재전송을 동시에 지시하는 상향링크 그랜트 (제2 상향링크 그랜트)를 아래와 같은 방법으로 구분하여 전송할 수 있다.
(1) 서로 다른 RNTI(Radio Network Temporary Identifier)를 적용한다. 특히, 서로 다른 RNTI를 DCI의 탐색 영역을 결정하는 해쉬 기능(Hashing function) 및 CRC 마스크에 적용한다. 또는, 서로 다른 RNTI를 CRC 마스크에 적용한다. 이때, DCI의 탐색 영역은 동일할 수 있다.
(2) 서로 다른 DCI 포맷 (또는 DCI 크기)를 적용한다.
(3) 서로 다른 탐색 공간(Search space)으로 전송한다. 이때, 제2 상향링크 그랜트에 대한 탐색 공간은 제1 상향링크 그랜트에 대한 탐색 공간에 연속적으로 위치할 수 있다.
단, 상기 두 종류의 상향링크 그랜트는 동일 서브프레임에서 전송될 수 있고, 단말은 상기 두 종류의 상향링크 그랜트에 대한 검출을 동일 서브프레임에서 기대할 수 있다.
단, 상기 단말이 사전 준비한 재전송 데이터에 대한 실제 전송 여부는 별도의 트리거링 DCI로 지시할 수 있다.
앞서 설명한 제2 추가 실시예와 같이 기지국이 초기 전송을 위한 상향링크 그랜트와 재전송 사전준비를 위한 상향링크 그랜트를 구분하여 전송할 때, 상기 두 가지 목적의 상향링크 그랜트는 동일 DCI 포맷에서 DCI 내 지시자로 구분될 수도 있고, 또는 CRC 마스크로 활용되는 RNTI를 달리하여 구분할 수도 있다. 또는 서로 다른 DCI 포맷을 가질 수도 있다. 일 예로, 재전송 사전준비 목적의 상향링크 그랜트는 보다 작은 DCI 크기를 가질 수 있다.
3.4 제4
실시예
기지국이 단일 상향링크 그랜트를 통해 단말에게 연속된 L개 (L≥1) 서브프레임들 중 일부 서브프레임들 (세트 S0)에 대한 사전 스케줄링을 지시하고 이후 상기 사전 스케줄링 된 데이터의 전송을 지시하는 동적인 시그널링을 전송하는 경우, 상기 기지국은 상향링크 데이터 전송을 위한 스케줄링 정보 중 일부는 사전 스케줄링 정보로 알려주고 일부는 동적인 시그널링에 포함하여 전송한다.
LTE 시스템에서 상향링크 타이밍은 4 TTI (또는 4 ms)로 설정된다. 왜냐하면, 단말에서 수행하는 처리 지연의 요소로써 제어 채널 모니터링 지연(control channel monitoring latency), 제어 채널 복호 지연(control channel decoding latency), 상향링크 인코딩 지연(UL encoding latency), 전력 설정 지연(power setup latency) 및 TA 등을 고려했기 때문이다.
그러나, 본 발명의 제3 실시예에서 제시하는 사전 스케줄링에 따르면, 단말이 앞서 고려된 처리 과정을 수행하도록 함으로써 LTE 시스템과 같이 상향링크 타이밍을 4TTI (또는 4ms)로 설정하지 않아도 된다. 일 예로, 단말은 사전 스케줄링 정보를 기반으로 미리 TB 생성 및 인코딩을 수행하여 단말 인코딩 지연(UE encoding latency)을 줄일 수 있다.
이때, 기지국이 사전 스케줄링 된 데이터의 전송을 트리거링하는 별도의 동적인 시그널링을 전송한다면, 비교적 단말의 처리 지연(Processing delay)이 작은 스케줄링 정보들에 대해서는 상기 트리거링 신호에 포함하는 것이 보다 유연한 스케줄링을 지원하는 동작일 수 있다. 일 예로, 기지국은 사전 스케줄링 정보로 TB 크기, NDI (new data indicator), RV (redundancy version) 등의 정보를 알려주고, RA (resource allocation), HARQ 프로세스 인덱스 등의 정보는 트리거링 신호에 포함하여 전송할 수 있다.
3.4.1 제1 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 지시하는 경우, 단말은 상기 상향링크 그랜트를 수신한 시점으로부터 (사전에 약속된 또는 기지국이 설정한) 일정 시간 이내 (또는 시간 구간 이내)에 트리거링 DCI를 수신하지 못하면 상기 상향링크 그랜트의 지시를 무효화할 수 있다.
단, 상기 상향링크 그랜트는 동적인 시그널링 (예: DCI)의 형태일 수 있다.
일 예로, 기지국은 DCI로 상향링크 그랜트를 전송하여 일련의 M개 서브프레임들에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 상기 M개 서브프레임들에서의 PUSCH은 이후 트리거링 DCI를 통해 지시된 전송 시작 시점부터 순차적으로 M개 서브프레임들에 대해 전송할 수 있다. 이때, 상기 상향링크 그랜트의 수신 시점으로부터 지나치게 긴 시간 이후에 트리거링 DCI를 전송하는 동작을 허용한다면 채널 노화(Channel aging)에 따라 상기 상향링크 그랜트 내 스케줄링 정보가 트리거링 DCI로 전송이 지시된 시점에서의 채널 정보에 맞지 않아 유용하지 않을 수 있다.
따라서 바람직하게는 상기 상향링크 그랜트가 유효한 시간 구간을 설정하고, 상기 시간 구간 내에서 트리거링 DCI를 수신한 경우에만 해당 상향링크 그랜트로 사전 스케줄링 된 PUSCH들을 전송할 수 있다. 이때, 상기 시간 구간은 사전에 약속된 값 또는 기지국이 RRC 등의 상위 계층 신호로 설정한 값일 수 있다.
3.4.2 제2 추가
실시예
상기 제1 추가 실시예의 변형예로, 단말이 상향링크 그랜트를 수신하고 트리거링 DCI를 수신하기 이전에 (PUSCH 생성과 전송 시점에 대한 스케줄링 정보를 모두 지시하는) 정상 상향링크 그랜트를 수신한 경우, 상기 단말은 상기 상향링크 그랜트가 무효화되었다고 판단하고 정상 상향링크 그랜트에 따른 PUSCH 전송을 수행할 수 있다.
3.4.3. 제3 추가
실시예
기지국이 RRC 등의 상위 계층 신호로 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 사전 스케줄링 된 PUSCH들의 전송을 지시할 때, 상기 기지국은 트리거링 DCI로 HARQ 프로세스 ID 정보를 단말에게 알려줄 수 있다.
일 예로, 기지국은 SPS 동작과 유사하게 RRC 시그널링을 통해 단말에게 일련의 M개 서브프레임들에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 상기 M개 서브프레임들에서의 PUSCH은 이후 트리거링 DCI를 통해 지시된 전송 시작 시점부터 순차적으로 M개 서브프레임들에 대해 전송할 수 있다.
그러나 이때, LAA 시스템 상의 상향링크에서 비동기식 HARQ(Asynchronous HARQ)가 도입됨에 따라 HARQ 프로세스 ID에 대한 정보가 주어져야 하고, 시간에 따라 사용 가능한 HARQ 프로세스들이 변경되기 때문에 상기 HARQ 프로세스 ID 정보를 RRC 시그널링으로 전달할 수 있다. 따라서 본 발명에서는 RRC로 사전 스케줄링을 지시하는 경우, 트리거링 DCI에서 사전 스케줄링 된 M개 PUSCH들에 대한 HARQ 프로세스 ID 정보를 지시하는 방안을 제안한다.
3.4.4 제4 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 지시하는 경우, 상기 기지국은 트리거링 DCI를 통해 트리거링 DCI의 수신 시점으로부터 다음과 같은 시간 구간을 지시할 수 있다. 또는 트리거링 DCI의 수신 시점이 아래와 같은 시간 구간을 암시할 수 있다.
- 트리거링 DCI 수신 시점으로부터 T1 이전 시점부터 T2 이전 시점까지 (단, T1>T2≥0)
이때, 단말은 상기 지시된 시간 구간 내에서 아래 조건을 만족하는 상향링크 그랜트(들)로 사전 스케줄링 된 PUSCH들을 트리거링 DCI가 지시하는 전송 시점에 따라 전송할 수 있다.
(1) (상기 트리거링 DCI가 지시하는 시간 구간 내) 모든 상향링크 그랜트(들)
(2) (상기 트리거링 DCI가 지시하는 시간 구간 내) 상향링크 그랜트가 존재하는 가장 최신 서브프레임 내 모든 상향링크 그랜트(들)
(3) (상기 트리거링 DCI가 지시하는 시간 구간 내) 각 단말별 최신 상향링크 그랜트
단, 상기 상향링크 그랜트는 동적인 시그널링 (예: DCI)의 형태일 수 있다.
기지국이 상기 상향링크 그랜트로 PUSCH들에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI로 사전 스케줄링 된 PUSCH들의 실제 전송을 지시하는 경우, 단말은 특정 트리거링 DCI가 지시하는 상향링크 그랜트를 잘못 해석할 수 있다.
일 예로, 단말이 상향링크 그랜트 (P1)를 수신하지 못하고, P1에 대응되는 트리거링 DCI (D1)만 수신한 경우, 상기 단말은 단말은 수신된 트리거링 DCI (D1)가 어떤 상향링크 그랜트를 지시하는 지 판단할 수 없으며, 만약 이전에 기지국이 전송한 (상기 트리거링 DCI (D1)와 무관한) 상향링크 그랜트 (P2)가 존재하였다면 단말은 상기 D1이 P2의 전송을 지시한다고 오인할 수 있다. 따라서 본 발명에서는 트리거링 DCI로 해당 트리거링 DCI가 지시하는 상향링크 그랜트가 존재하는 시간 구간을 알려주는 방안을 제안한다. 만약 단말이 상기 트리거링 DCI가 지시한 시간 구간 내에서 상향링크 그랜트를 수신하지 못한 경우에는 트리거링 DCI가 무효화되었다고 판단하고 전송 지시를 따르지 않을 수 있다.
추가적으로, 기지국은 트리거링 DCI를 통해 대응되는 상향링크 그랜트(들)이 존재하는 시점 (또는 서브프레임)을 정확하게 지시할 수 있다. 즉, 트리거링 DCI의 수신 시점 대비 N 서브프레임 이전에서 상향링크 그랜트(들)이 전송된 경우, 트리거링 DCI로 상기 N 값 (또는 상향링크 그랜트가 전송된 서브프레임 위치)을 지시할 수 있다. 만약 단말이 상기 트리거링 DCI가 지시한 시점에서 상향링크 그랜트를 수신하지 못한 경우, 상기 단말은 트리거링 DCI가 무효화되었다고 판단하고 전송 지시를 따르지 않을 수 있다.
3.4.5 제5 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(N ≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 지시하는 경우, 상기 기지국은 상향링크 그랜트의 (전체 또는 일부) 스케줄링 정보 및 전송된 서브프레임 인덱스의 함수로 해당 상향링크 그랜트에 대한 고유의 ID를 부여하고, 트리거링 DCI를 통해 전송을 지시할 상향링크 그랜트의 ID를 지시할 수 있다.
단, 상기 상향링크 그랜트는 동적인 시그널링 (예: DCI)의 형태일 수 있다.
기지국이 상향링크 그랜트로 특정 PUSCH 전송에 대한 사전 스케줄링을 지시하고 이후 트리거링 DCI를 통해 상기 사전 스케줄링 된 PUSCH에 대한 실제 전송을 지시할 때, 기지국과 단말 간 불일치가 없도록 하기 위해서는 트리거링 DCI를 통해 정확히 어떤 상향링크 그랜트에 대한 사전 스케줄링을 전송해야 하는지 지시할 수 있어야 한다. 상기 문제를 해결하기 위한 한 가지 방안으로 기지국은 트리거링 DCI가 전송을 지시할 상향링크 그랜트를 구분하기 위해 상향링크 그랜트의 (전체 또는 일부) 스케줄링 정보 및 전송된 서브프레임 인덱스의 함수로 해당 상향링크 그랜트에 대한 고유의 ID를 부여하고, 트리거링 DCI를 통해 전송을 지시할 상향링크 그랜트의 ID를 지시하는 방안을 고려할 수 있다.
3.4.6 제6 추가
실시예
기지국이 상향링크 그랜트 (또는 RRC signaling)를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 사전 스케줄링된 PUSCH들의 전송을 지시하는 경우, 단말은 사전 스케줄링을 수행할 수 있는 PUSCH 전송 서브프레임 수 (또는 TB 수)에 대한 단말 능력(UE capability)을 기지국에게 보고할 수 있다.
단, 상기 상향링크 그랜트는 동적인 시그널링 (예: DCI)의 형태일 수 있다.
기지국이 단말에게 N개 서브프레임에 대한 사전 스케줄링을 지시하면, 단말은 상기 N개 서브프레임에 대응되는 TB들을 미리 생성해야 한다. 이때, 단말이 미리 TB를 생성한 뒤 저장할 수 있는 버퍼 용량 등을 고려할 때, 상기 단말이 사전 스케줄링을 위해 미리 생성할 수 있는 최대 TB 수는 상기 단말의 능력에 따라 제한될 수 있다.
따라서 본 발명에서는 단말이 사전 스케줄링을 수행할 수 있는 PUSCH 전송 서브프레임 수 (또는 TB 수)를 단말 능력(UE capability)으로 정의하고, 사전 스케줄링에 대한 단말 능력 정보를 기지국에게 보고하는 방안을 제안한다. 기지국은 보고받은 단말 능력을 토대로 각 단말에게 적합하게 사전 스케줄링을 지시할 수 있다. 만약 특정 단말이 자신의 단말 능력에서 지원되지 않는 사전 스케줄링을 받은 경우 (예: 단말이 미리 생성할 수 있는 최대 PUSCH 전송 서브프레임 수 (또는 TB 수)를 초과하는 사전 스케줄링 지시를 받은 경우)에는 해당 사전 스케줄링 지시를 따르지 않을 수 있다.
3.4.7 제7 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 지시하는 경우, 단말은 상향링크 그랜트를 수신한 이후 (대응되는 트리거링 DCI 수신 이전에) 다시 상향링크 그랜트를 수신하게 되면 아래 중 하나의 동작을 수행할 수 있다.
(1) 가장 최신의 상향링크 그랜트의 지시만 따름
(2) 수신한 모든 상향링크 그랜트의 지시를 따름
단, 상기 상향링크 그랜트는 동적인 시그널링 (예: DCI)의 형태일 수 있다.
본 발명에서는 단말이 상향링크 그랜트를 수신한 이후 대응되는 트리거링 DCI 수신 이전에 또 다른 상향링크 그랜트를 수신한 경우의 동작을 정의한다. 구체적으로, 단말이 이전에 수신한 상향링크 그랜트는 무시해도 되는 것인지 또는 상기 수신한 모든 상향링크 그랜트에 대한 전송 준비를 해야 하는 것인지 결정할 수 있어야 한다.
단말의 사전 스케줄링 역량이 한정될 수 있음을 고려할 때, 바람직하게는 기지국이 단말에게 가장 최신의 상향링크 그랜트로 지시한 사전 스케줄링 지시에 따라 상기 단말이 동작하는 것을 기대할 수 있다. 즉, 단말이 트리거링 DCI 수신 이전에 복수의 상향링크 그랜트를 수신한 경우, 가장 최신의 상향링크 그랜트에 대응되는 사전 스케줄링 정보로 PUSCH 전송을 준비할 수 있다.
상기 기지국이 상향링크 그랜트(또는 RRC 시그널링)를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 사전 스케줄링 된 PUSCH들의 전송을 지시하는 동작은 LAA SCell에서의 상향링크 전송을 셀프 캐리어 스케줄링으로 지시하는 경우에만 적용될 수 있다. 다시 말해, 상향링크 그랜트가 PUSCH 전송을 수행할 LAA SCell에서 전송되는 경우에만 적용될 수 있다. 또는 기지국이 상기 상향링크 그랜트와 트리거링 DCI 기반의 PUSCH 전송 동작을 적용할 지 여부를 상위 계층 신호로 단말에게 설정할 수 있다.
3.4.8 제8 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 이후 트리거링 DCI를 통해 상기 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 지시하는 경우, 아래와 같이 시간 갭(Time gap)을 설정할 수 있다.
(1) 사전에 약속된 시간 갭 길이 설정
(2) 단말 능력(UE capability)에 따른 시간 갭 길이 설정
단말은 특정 트리거링 DCI가 전송을 지시하는 (사전 스케줄링 된) PUSCH들은 해당 트리거링 DCI 수신 시점으로부터 상기 시간 갭 이전에 전송된 상향링크 그랜트(들)로 사전 스케줄링 된 PUSCH들로 가정할 수 있다.
단말이 상향링크 그랜트로 사전 스케줄링을 받은 후 트리거링 DCI를 통해 상기 사전 스케줄링 된 PUSCH에 대한 전송을 지시 받았을 때, 트리거링 DCI와 PUSCH 전송 간의 시간이 충분하지 않으면 단말이 PUSCH 전송을 위한 준비를 완료하지 못할 수 있다. 일 예로, 전송할 데이터에 대한 인코딩 등은 상향링크 그랜트를 통해 수행하더라도, PUSCH 전송 전력은 트리거링 DCI로 실제 전송 위치를 지시 받은 이후에 결정할 수 있다. 이때, 단말은 PUSCH 전송 전력을 계산하기 위해 최소한의 시간이 필요하며, 상기 목적에 따른 트리거링 DCI와 (상기 트리거링 DCI로 전송 지시된) PUSCH 간의 시간 갭이 필요할 수 있다. 상기 시간 갭은 고정된 값일 수도 있고, 또는 단말의 처리 시간에 대한 단말 능력에 따라 결정되는 값일 수 있다.
상기 시간 갭이 정의되었을 때, 단말은 특정 트리거링 DCI가 전송을 지시하는 PUSCH 전송은 상기 트리거링 DCI 수신 시점으로부터 시간 갭 이전에 수신된 상향링크 그랜트로 사전 스케줄링 된 PUSCH들을 대상으로 한다고 가정할 수 있다.
도 18은 시간 갭이 2 서브프레임 (또는 2ms)으로 설정된 경우, 단말이 트리거링 DCI를 수신한 서브프레임이 n번째 서브프레임일 때, 해당 트리거링 DCI가 n-2번째 서브프레임 이전의 서브프레임에서 수신한 상향링크 그랜트(들)에 대응하는 PUSCH들만 전송하는 경우를 나타낸 도면이다.
3.4.9 제9 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 단말은 (기지국이 설정한) 상향링크 그랜트가 유효한 시간 구간 내 트리거링 DCI를 수신하면 상기 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 수행한다. 이때, 상기 단말은 상기 상향링크 그랜트가 유효한 시간 구간 내에는 단일의 상향링크 그랜트만 가정할 수 있다.
단, 상기 상향링크 그랜트 수신 시점을 기준으로 (사전에 약속된) 시간 갭 동안은 해당 상향링크 그랜트가 유효한 시간 구간에서 제외될 수 있다.
일 예로, 단말이 상향링크 그랜트 (UG1)을 수신한 이후 상기 UG1이 유효한 시간 구간 내 새로운 상향링크 그랜트 (UG2)를 수신하였다고 가정한다. 이때, 단말은 앞서 설명한 제7 추가 실시예와 같이 모든 상향링크 그랜트가 유효하다고 가정할 수 있다. 그러나 만약 상기 예시에서 서로 다른 상향링크 그랜트 (UG1, UG2)가 동일 서브프레임에 대한 서로 다른 PUSCH 스케줄링을 지시한다면, 단말이 어떤 지시를 따라야 하는지 모호해질 수 있다.
이에 본 발명에서는 상기와 같은 문제 상황을 방지하기 위해 단말이 특정 상향링크 그랜트를 수신하면 해당 상향링크 그랜트의 유효 시간 동안은 새로운 상향링크 그랜트가 오지 않는다고 가정하는 방안을 제안한다. 즉, 단말은 상기 유효 시간 동안 새로운 상향링크 그랜트가 수신되더라도 해당 상향링크 그랜트는 유효하지 않은 것으로 보고 무시할 수 있다.
3.4.10 제10 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 단말은 (기지국이 설정한) 상향링크 그랜트가 유효한 시간 구간 내 트리거링 DCI를 수신하면 상기 상향링크 그랜트로 사전 스케줄링된 PUSCH들의 전송을 수행한다. 이때, 상기 기지국이 지시한 상향링크 그랜트의 유효한 시간 구간에 DMTC (DRS measurement timing configuration) 구간 (또는 측정 갭(Measurement gap))이 포함되면 상기 단말은 이를 다음 중 하나와 같이 해석할 수 있다.
(1) 상기 상향링크 그랜트의 유효한 시간 구간에 포함되는 DMTC 구간 (또는 측정 갭)에 대해서는 트리거링 DCI 수신을 기대하지 않음
(2) 상기 상향링크 그랜트의 유효한 시간 구간에 포함되는 DMTC 구간 (또는 측정 갭)에 대해서는 트리거링 DCI 수신을 기대하지 않고, 상기 DMTC 구간 (또는 측정 갭)만큼 유효한 시간 구간의 길이를 연장
일 예로, 상향링크 그랜트가 유효한 시간 구간 내 DMTC 구간 (또는 측정 갭)이 포함된 경우, 단말은 상기 DMTC 구간 동안에 자신의 주파수 대역이 아닌 다른 주파수 대역에 대한 측정(예: 주파수 간 측정 (inter-frequency measurement))을 수행해야 할 수 있다. 이 경우, 단말은 상향링크 그랜트가 유효한 시간 구간이더라도 DMTC 구간 (또는 측정 갭에서 트리거링 DCI 검출을 수행하지 못할 수 있으며, 따라서 단말이 해당 구간에서는 트리거링 DCI 수신을 기대하지 않을 수 있다. 이때, 단말이 트리거링 DCI를 수신할 수 없었던 시간만큼을 보상하기 위해 단말이 상기 시간 길이만큼 상향링크 그랜트의 유효한 시간 구간을 연장하는 동작을 허용할 수 있다.
3.4.11 제11 추가
실시예
기지국이 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 단말이 (기지국이 설정한) 상향링크 그랜트가 유효한 시간 구간 내 트리거링 DCI를 수신하면 상기 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 수행한다. 이때, 상기 기지국이 지시한 상향링크 그랜트의 유효한 시간 구간에 DRX (discontinuous reception) 동작에 따른 OFF 시간이 포함되면 단말은 다음 중 하나와 같이 동작할 수 있다.
(1) 상기 상향링크 그랜트의 유효한 시간 구간에 포함되는 OFF 시간에 대해서는 트리거링 DCI를 기대하지 않음
(1) 상기 상향링크 그랜트의 유효한 시간 구간에 포함되는 OFF 시간은 적용되지 않는다고 가정 (즉, DRX 주기 내 상향링크 그랜트의 유효한 시간 구간은 항상 ON 시간으로 인지)
단, 제11 추가 실시예에서 DRX 주기 내 ON 시간은 ON 구간 뿐만 아니라 DRX 비활동 시간(Inactivity time)을 포함하며, DRX 주기 내 상기 ON 시간을 제외한 나머지 시간은 OFF 시간으로 명명한다.
단, 제11 추가 실시예에서 제안하는 동작 (1)의 경우, 기지국이 지시한 상향링크 그랜트의 유효한 시간 구간이 ON 시간 상에서의 유효한 시간 길이를 의미하는 것으로 가정할 수도 있다.
본 발명의 실시 예에 따른 LTE 시스템에서는 단말의 배터리 소모를 줄이기 위한 목적으로 DRX 동작을 지원하고 있다. 단말은 DRX 주기로 명명되는 반복되는 일정 시간 단위 내 PDCCH를 검출할 수 있는 ON 구간을 설정 받는다. 이때, 상기 ON 구간 내 PDCCH가 검출되면 기지국이 설정한 DRX 비활동 시간(Inactivity time) 동안 ON 상태를 유지하여 PDCCH 검출을 수행할 수 있다.
이때, 기지국이 지시한 상향링크 그랜트의 유효한 시간 구간에 DRX 동작에 따른 OFF 시간이 포함되는 경우, 단말 동작이 정의될 필요가 있다. 간단하게는 단말이 DRX 동작을 우선시 하여 상기 OFF 시간에 대해서는 상향링크 그랜트의 유효한 시간 구간이더라도 트리거링 DCI를 기대하지 않고 PDCCH 검출에 대한 OFF 동작을 수행할 수 있다.
또는 비면허 대역에서 전송 기회를 높일 목적으로, 상기 단말은 상향링크 그랜트의 유효한 시간 구간에 좀 더 우선 순위를 두어 상향링크 그랜트의 유효한 시간 구간에 포함되는 OFF 시간은 적용되지 않는다고 가정할 수 있다. 다시 말해, 단말은 적어도 상향링크 그랜트의 유효한 시간 구간은 항상 ON 시간으로 인지할 수 있다.
3.4.12 제12 추가
실시예
기지국이 제1 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 단말이 (기지국이 설정한) 제1 상향링크 그랜트의 유효한 시간 구간 내 제2 상향링크 그랜트(예: 트리거링 DCI) 를 수신하는 경우, 단말은 상기 제1 상향링크 그랜트로 사전 스케줄링 된 PUSCH들의 전송을 수행한다. 이때, 단말은 아래 시간 구간에 대해 새로운 제1 상향링크 그랜트의 수신을 기대하지 않을 수 있다.
(1) 단말이 n번째 서브프레임에서 수신한 제1 상향링크 그랜트에 대한 제2 상향링크 그랜트가 n+k-1번째 서브프레임 이후에 수신될 것으로 기대하는 경우, 제1 상향링크 그랜트를 수신한 서브프레임(n번째 서브프레임) 이후부터 {n + 유효?h 시간 구간 - k} 번째 서브프레임까지의 시간 구간
단, n번째 서브프레임에서 제1 상향링크 그랜트를 수신하고 유효한 시간 구간이 L이면, 단말은 n+L번째 서브프레임까지 제2 상향링크 그랜트에 대한 수신을 기대할 수 있다.
단, 상기 k는 제1 상향링크 그랜트 수신 이후 제2 상향링크 그랜트 전송까지의 단말 처리(UE processing)를 위한 최소 상향링크 타이밍에 대응되는 값이 적용될 수 있다.
구체적으로, 단말이 n번째 서브프레임에서 수신한 제1 상향링크 그랜트에 대응하는 제2 상향링크 그랜트가 n+k-1번째 서브프레임 이후에 수신될 것으로 기대하는 경우, 단말은 n+k번째 서브프레임 이후부터 유효한 시간 구간이 끝나는 서브프레임까지 제2 상향링크 그랜트 수신을 기대할 수 있다. 예를 들어, 유효한 시간 구간이 L개 서브프레임에 대응되면, 상기 단말이 수신한 제1 상향링크 그랜트에 대한 유효한 시간 구간은 {n+1번째 서브프레임부터 n+L번째 서브프레임까지}가 된다. 이때, k=2인 경우, 적어도 n+L-2번째 서브프레임 이후 단말이 새로운 제1 상향링크 그랜트를 수신하게 되면 상기 새로운 제1 상향링크 그랜트에 대응되는 제2 상향링크 그랜트는 n+L번째 서브프레임 이후에 수신될 것으로 기대될 수 있다. 즉, 상기 새로운 제1 상향링크 그랜트에 대응되는 제2 상향링크 그랜트가 수신될 것으로 기대되는 구간은 상기 단말이 이전에 수신한 제1 상향링크 그랜트에 대응하는 제2 상향링크 그랜트가 수신될 것으로 기대되는 구간인 {n+2번째 서브프레임으부터 n+L번째 서브프레임까지}와 중복되지 않는다.
따라서 단말은 제1 상향링크 그랜트가 수신된 서브프레임 이후부터 n+L-2번째 서브프레임까지는 새로운 제1 상향링크 그랜트가 수신될 것을 기대하지 않을 수 있다. 또는, 해당 구간 내 새로운 제1 상향링크 그랜트가 수신될 경우 이를 무시할 수 있다.
3.4.13 제13 추가
실시예
기지국이 제1 상향링크 그랜트를 통해 단말에게 N(N≥1)개 서브프레임에서의 PUSCH 전송에 대한 사전 스케줄링을 지시하고, 단말이 n번째 서브프레임에서 제2 상향링크 그랜트(예: 트리거링 DCI)를 수신하면 상기 단말은 n+L번째 서브프레임에서 사전 스케줄링 된 PUSCH 전송을 수행한다. 이때, 단말이 m번째 서브프레임에서 수신한 제1 상향링크 그랜트에 대응하는 제2 상향링크 그랜트는 m+k번째 서브프레임 이후에 수신될 것으로 기대할 때, 상기 단말은 상기 L+k이 일정 길이 (예: 4ms) 이상인 경우에만 PUSCH 전송이 유효하다고 판단할 수 있다.
일 예로, 단말이 사전 스케줄링을 받고 나서 해당 사전 스케줄링에 대한 제2 상향링크 그랜트(예: 트리거링 DCI)를 n번째 서브프레임에서 수신한 경우, 상기 단말이 n+L번째 서브프레임에서 상기 제2 상향링크 그랜트에 따른 PUSCH 전송을 수행할 수 있다고 가정한다. 이때, 단말이 m번째 서브프레임에서 수신한 제1 상향링크 그랜트에 대응하는 제2 상향링크 그랜트는 m+k번째 서브프레임 이후에 수신될 것으로 기대할 수 있다. 그러면 m번째 서브프레임에서 수신한 제1 상향링크 그랜트에 대응하는 PUSCH 전송은 최소 m+k+L번째 서브프레임 이후에 수행될 수 있다. 이때, 상기 k+L은 상향링크 타이밍에 대응될 수 있고, 상기 값은 정상 상향링크 그랜트에 따른 상향링크 타이밍과 적어도 같거나 크도록 설정될 수 있다. 라서 상기 k+L이 일정 길이 이상인 경우에만 단말은 제1 상향링크 그랜트에 대응하는 PUSCH 전송이 유효하다고 판단하고, 그 밖의 경우에는 유효하지 않다고 판단하여 PUSCH 전송을 생략할 수 있다.
3.5 제5
실시예
기지국이 단일 상향링크 그랜트를 통해 단말에게 연속된 L개 (L≥1) 서브프레임들 중 일부 서브프레임들(세트 S0)에 대한 사전 스케줄링을 지시하는 경우, 단말은 다음 중 하나의 방법으로 사전 스케줄링에 따른 TB를 생성한다.
(1) 상기 상향링크 그랜트 내 세트 S0에 대한 MCS 및 RA (또는 할당할 RB 수) 또는 TB 크기 기반으로 TB를 생성
(2) RRC 등 상위 계층 신호로 설정된 MCS 및 RA (또는 할당할 RB 수) 또는 TB 크기 기반으로 TB를 생성
(3) 상기 상향링크 그랜트 내 세트 S0에 대한 MCS 와 RRC로 설정된 RA (또는 할당할 RB 수) 기반으로 TB를 생성
(4) 상기 상향링크 그랜트 내 세트 S0에 대한 RA (또는 할당할 RB 수)와 RRC로 설정된 MCS 기반으로 TB를 생성
단, 상기 상향링크 그랜트 내 세트 S0에 대한 MCS 또는 RA 정보는 사전 스케줄링이 아닌 서브프레임들에 대한 스케줄링 정보 (또는 상기 L개 서브프레임에 공통적으로 적용되는 MCS 또는 RA 정보)를 따를 수 있다.
앞서 설명한 제4 실시예와 같이 기지국이 상향링크 그랜트 내 상향링크 그랜트 내 TB 생성을 위한 사전 스케줄링 정보를 포함하여 단말에게 알려주는 경우, 상기 상향링크 그랜트 내 MCS 및 RA 정보가 항상 포함되는 경우 상향링크 그랜트의 제어 시그널링 오버헤드를 증가시킬 수 있다.
이에, 제어 시그널링 오버헤드를 완화하는 방안으로 LTE 시스템의 SPS (semi-persistent scheduling) 방식을 활용할 수 있다. 간단하게는, MCS 및 RA 또는 TB 크기를 사전에 RRC 등의 상위 계층 신호로 설정하고, 상향링크 그랜트에서는 세트 S0에 대한 사전 스케줄링의 수행 여부만 1 비트 정보로 지시할 수 있다.
추가적인 실시예로, 기지국이 SPS 동작으로 MCS 또는 RA를 설정하고 단일 상향링크 그랜트를 통해 단말에게 L개 (L≥1) 서브프레임들에 대한 PUSCH 전송을 지시하는 경우, 상기 L개 중 다음 중 하나의 방법으로 선택된 서브프레임에 대해 단말은 SPS로 설정된 MCS 또는 RA를 따라 PUSCH 전송을 수행할 수 있다.
1) L개 서브프레임들 중 상위 계층 신호로 설정한 M개 서브프레임들
2) L개 서브프레임들 중 기준 상향링크 타이밍보다 빠른 상향링크 타이밍을 갖는 서브프레임들
도 19는 다중 서브프레임 스케줄링에 따라 PUSCH 전송시 SPS(semi-persistent scheduling)에서 설정된 MCS 또는 RA 정보 또는 상향링크 그랜트에서 설정된 MCS 또는 RA 정보에 따르는 구성을 나타낸 도면이다. 도 19에 도시된 바와 같이, 기지국이 4개 서브프레임들에 대한 다중-서브프레임 스케줄링을 수행하는 경우, 단말이 n번째 서브프레임에서 상향링크 그랜트를 수신하면 n+4번째 서브프레임 이전 서브프레임들에 대해서는 SPS에서 설정된 MCS 또는 RA 정보에 따라 PUSCH 전송을 수행하고, n+4번째 서브프레임 및 그 이후 서브프레임들에 대해서는 상향링크 그랜트에서 설정된 MCS 또는 RA 정보에 따라 PUSCH 전송을 수행할 수 있다.
보다 일반적으로 기지국은 L개 서브프레임들 중 기준 상향링크 타이밍보다 빠른 상향링크 타이밍을 갖는 서브프레임들에 대해서는 상위 계층 신호로 설정된 MCS 또는 RA 그리고 그 밖의 스케줄링 정보들(예: CIF (carrier indication field), diff0-1A, 자원 할당(상향링크 호핑), TBS (Transmission Block Size, 상향링크 인덱스, 상향링크 DAI, CSI 보고, SRS 요청, RA 타입, TPMI/계층 (DCI4), 패딩, HARQ 프로세스 ID, 크로스/멀티-서브프레임 정보, MCS 인덱스, 변조 차수, 코딩 레이트, 코딩된 심볼의 수 (또는 자원 할당), HARQ 프로세스 인덱스, NDI (new data indicator), RV (redundancy version), TPC (transmission power control), DM-RS CS (cyclic shift), OCC (orthogonal cover code), FH (frequency hopping), 비주기적 CSI 요청)을 활용하여 PUSCH 전송을 수행할 수 있다.
3.6 제6
실시예
기지국이 단일 상향링크 그랜트를 통해 단말에게 연속된 L개 (L≥1) 서브프레임들에 대한 PUSCH 전송 여부를 지시하는 경우, 상기 상향링크 그랜트에 대한 ID로 아래 중 하나를 활용한다.
(1) 상향링크 그랜트 내 순환적으로 증가하는 카운터 설정
(2) 상향링크 그랜트가 전송된 시점 (또는 서브프레임 인덱스)
이때, 기지국이 상향링크 그랜트 또는 별도의 동적인 시그널링을 활용하여 특정 상향링크 그랜트 ID를 지시하면 단말은 상기 상향링크 그랜트 ID에 대응되는 상향링크 그랜트에서 (사전) 스케줄링 된 상향링크 데이터를 미리 설정된 빠른 상향링크 타이밍에 따라 전송 또는 재전송할 수 있다.
앞서 설명한 제3 실시예를 활용하는 한 방안으로 기지국은 단일 상향링크 그랜트가 이전 시점에 전송된 상향링크 그랜트에서 사전 스케줄링된 데이터의 전송을 지시하는 비트 필드, 실제 전송할 데이터에 대한 스케줄링 정보, 미래 전송할 데이터에 대한 사전 스케줄링 정보를 포함하도록 구성할 수 있다. 예를 들어, n번째 서브프레임에서 수신된 단일 상향링크 그랜트는 n+1, n+2, n+3번째 서브프레임에서 과거에 사전 스케줄링된 데이터를 전송할 지의 여부와 미래 전송할 사전 스케줄링, 그리고 n+4 번째 및 그 이후 시점에서 실제 전송할 데이터에 대한 스케줄링을 포함할 수 있다.
도 20은 상기 예시에 따라 상향링크 그랜트를 통해 이전에 사전 스케줄링된 데이터의 전송 여부, 미래 전송할 사전 스케줄링 및 실저 전송할 데이터에 대한 스케줄링 동작을 나타낸 도면이다.
도 20에 있어, 사전 스케줄링 대상 M개 서브프레임들 중 특정 서브프레임은 상향링크 그랜트 내 L개 서브프레임들 중 특정 서브프레임에 대응될 수 있으며, 사전 스케줄링 대상 M개 서브프레임들에 대한 트리거링 시점 대비 전송 시점은 상향링크 그랜트 내 L개 서브프레임들에 대한 상향링크 그랜트 대비 전송 시점 중 자신에 대응되는 서브프레임의 상향링크 그랜트 대비 전송 시점을 따를 수 있다. 예를 들어, 도 20에서 사전 스케줄링된 3개 서브프레임의 전송 시점이 각각 상향링크 그랜트 대비 +1, +2, +3 TTI 이고, 따라서 단말은 추후 사전 스케줄링 데이터를 전송하는 트리거링 시점 대비 +1, +2, +3 TTI의 전송 시점으로 전송할 수 있다.
단, 상기 동작에서 기지국이 사전 스케줄링된 데이터에 대한 전송을 지시할 때, 과거의 어떤 상향링크 그랜트에서 지시된 사전 스케줄링을 적용해야 하는지에 대해 기지국과 단말 간 불일치가 발생할 수 있다. 일 예로, 기지국이 제1 상향링크 그랜트와 제2 상향링크 그랜트를 순서대로 전송하고, 단말이 제2 상향링크 그랜트를 수신하지 못하였다고 가정한다. 이후 기지국이 사전 스케줄링된 데이터를 전송하라는 1 비트 크기의 On/Off 지시를 단말에게 전달하는 경우, 기지국은 가장 최신에 전송된 제2 상향링크 그랜트에 의해 사전 스케줄링된 데이터의 전송을 기대하는 반면, 단말은 자신이 수신한 제1 상향링크 그랜트에 의해 사전 스케줄링된 데이터를 전송하게 되어 기지국 및 단말간 불일치가 발생할 수 있다.
따라서 본 발명에서는 LTE 시스템의 DAI 개념과 유사하게 상향링크 그랜트 내에 순환적으로 증가하는 카운터를 포함하고 상기 카운터 값으로 사전 스케줄링된 데이터에 대응되는 상향링크 그랜트를 지시하는 방안을 제안한다. 또는 상기 카운터 값 외에 현재 상향링크 그랜트로부터의 시간 오프셋을 지시하여 사전 스케줄링된 데이터에 대응되는 상향링크 그랜트를 지시할 수 있다. 이때, 상기와 같은 방법을 통해 단말이 수신하지 못한 상향링크 그랜트에 대한 지시를 수신하는 경우, 상기 단말은 해당 사전 스케줄링된 데이터 전송을 생략할 수 있다.
3.7 제7
실시예
단말은 PHICH 자원 (예: PHICH 그룹 및 직교 시퀀스(orthogonal sequence) 조합)은 아래 중 하나의 값을 암시한다고 기대한다.
(1) PUSCH 자원의 (최소) RB 인덱스, DM-RS 시퀀스 정보
(2) 상향링크 그랜트의 (최소) CCE (Control Channel Element) 인덱스 정보
이때, 단말은 상기 PHICH 자원을 수신하면 PHICH 값에 따라 PHICH 전송 시점 대비 특정 서브프레임에서 PHICH 자원에 대응되는 PUSCH (또는 상향링크 그랜트)에 대한 빠른 상향링크 타이밍 기반 (재)전송을 수행하거나 취소할 수 있다.
기지국이 n번째 서브프레임에서 전송한 상향링크 그랜트를 수신한 단말이 n+4번째 서브프레임에서 상향링크 데이터 전송을 수행하였으나, 상향링크 LBT 동작의 실패로 상항링크 데이터 전송을 하지 못하였다고 가정한다. 만약 기지국이 따로 전송할 하향링크 데이터가 없다면 기지국은 상기 전송에 실패한 상향링크 그랜트에 대해 단말이 빠른 재전송을 하기를 기대할 수 있다. 상기 기지국은 단말의 빠른 재전송을 지시할 목적으로 DCI, PDCCH에 비해 상대적으로 제어 시그널링 오버헤드와 검출 복잡도가 적은 PHICH 자원을 활용할 수 있다. 일례로 기지국이 n번째 서브프레임에서 전송한 상향링크 그랜트를 수신한 단말이 n+4번째 서브프레임에서 상향링크 데이터 전송을 수행하는 경우, 상기 단말은 다음과 같이 동작 할 수 있다.
1) 단말은 PHICH 자원을 n+5번째 서브프레임에서 검출하고, 상기 PHICH가 지시하는 값이 '1'이면 n+4번째 서브프레임에서의 PHICH 자원에 대응되는 PUSCH 전송에 대한 (빠른 상향링크 타이밍에 따른) 전송을 수행하고 '0'이면 취소(Cancelling)로 인식(예: 셀 특이적(cell-specific))할 수 있다.
추가적으로, 기지국은 복수의 PHICH 자원을 활용하거나 또는 PHICH 자원의 코딩 방법을 변경하여 단말에게 HARQ 프로세스 번호, NDI 또는 RV 등의 정보를 제공할 수 있다.
3.8 제8
실시예
단말은 PHICH 자원 (예: PHICH 그룹 및 직교 시퀀스 조합)은 아래 중 하나의 값을 암시한다고 기대한다.
(1) PHICH 전송 시점 대비 특정 서브프레임
(2) PHICH 전송 시점 대비 특정 서브프레임 및 PUSCH 자원의 (최소) RB 인덱스, DM-RS 시퀀스 정보
(3) PHICH 전송 시점 대비 특정 서브프레임 및 상향링크 그랜트의 (최소) CCE 인덱스 정보
단말은 상기 PHICH 자원을 수신하면 PHICH 값에 따라 해당 전송 시점에 대응되는 모든 (또는 특정) PUSCH (또는 상향링크 그랜트)에 대한 빠른 상향링크 타이밍 기반 (재)전송을 수행하거나 취소할 수 있다.
본 발명은 제7 실시예의 변형예로써 PHICH 자원이 재전송 대상이 되는 PUSCH 자원 (또는 상향링크 그랜트) 자원에 대한 정보를 암시할 수 있다. 이에 따라, 다음과 같은 동작을 고려할 수 있다.
1) PHICH 자원의 PHICH 그룹 및 직교 시퀀스의 조합은 시간 오프셋 값을 지시하고, 단말은 PHICH 자원을 수신하면 현재 서브프레임으로부터 (상기 PHICH 자원에 대응되는) 시간 오프셋이 적용된 서브프레임에서 전송된 모든 상향링크 그랜트에 대해 PHICH 자원의 값에 따라 빠른 상향링크 타이밍에 따른 PUSCH 전송 또는 취소로 인식한다. (예: 셀 특이적)
2) PHICH 자원의 PHICH 그룹 및 직교 시퀀스의 조합은 시간 오프셋, PUSCH RB 인덱스, DM-RS 시퀀스 등을 지시하고, 단말은 PHICH 자원을 수신하면 현재 서브프레임으로부터 (상기 PHICH 자원에 대응되는) 시간 오프셋이 적용된 서브프레임에서 전송되고 (상기 PHICH 자원에 대응되는) PUSCH RB 인덱스 또는 DM-RS 시퀀스를 갖는 PUSCH에 대해 PHICH 자원의 값에 따라 빠른 상향링크 타이밍에 따른 PUSCH 전송 또는 취소로 인식한다 (예: 셀 특이적)
추가적으로, 기지국은 복수의 PHICH 자원을 활용하거나 또는 PHICH 자원의 코딩 방법을 변경하여 HARQ 프로세스 번호, NDI 또는 RV 등의 정보를 단말에게 알려줄 수도 있다.
3.9 제9
실시예
단말이 기준 상향링크 타이밍에 비해 빠른 전송 시점을 가지는 빠른 상향링크 타이밍에 따라 PUSCH를 전송하는 경우, 상기 PUSCH 전송 시점에 일정 수준(Level) 이상의 상향링크 전송 전력이 보장되지 않으면 상기 단말은 다음 중 하나의 방법으로 동작한다.
(1) 해당 PUSCH 전송을 생략. 단, 이 경우 상기 전송 생략된 PUSCH에 상응하는 LBT 동작도 생략될 수 있다.
(2) 해당 PUSCH 전송에 대해 기준 상향링크 타이밍을 적용
구현 상 단말은 상향링크 전송 전력을 조절하는 과정 즉, 상향링크 전송 제어를 위한 최소의 시간이 필요할 수 있다. 그러나 단말의 빠른 상향링크 타이밍에 기반하여 PUSCH를 전송하는 경우, 상기 PUSCH 전송을 위해 남아있는 상향링크 전송 전력이 지나치게 작은 경우가 발생할 수 있다.
예를 들어, 기지국이 n번째 서브프레임에서 기준 상향링크 타이밍에 기반한 제1 PUSCH를 스케줄링하고 단말이 n+3번째 서브프레임 이전에 상향링크 전송 전력을 상기 제1 PUSCH에서 요구하는 만큼 할당하였다고 가정한다. 이후 기지국이 빠른 사향링크 타이밍에 기반한 제2 PUSCH 전송을 n+3번째 서브프레임에서 지시할 경우, 단말은 상기 제1 PUSCH에 대한 상향링크 전송 전력 제어를 1ms 안에 조절하기에는 시간적 여유가 부족하므로 제2 PUSCH에 대해서는 전체 상향링크 전송 전력 중 일부 남은 전력만큼만 할당할 수 있다. 이때, 상기 남은 전력이 지나치게 작은 경우, 상향링크 LBT 과정에서 다른 노드들과의 경쟁에서 불리할 수 있으므로 단말은 제2 PUSCH의 전송을 포기하거나 기준 상향링크 타이밍에 기반하여 제2 PUSCH를 전송하고 다시 상향링크 전송 전력을 할당할 수 있다.
3.10 제10
실시예
단말이 기준 상향링크 타이밍에 비해 빠른 전송 시점을 가지는 빠른 상향링크 타이밍에 기반하여 PUSCH를 전송하는 경우, 상기 PUSCH 전송을 지시하는 상향링크 그랜트에 대해서는 비주기적 CSI 요청 필드(Aperiodic CSI request field)를 적용하지 않는다.
LTE 시스템에서는 CSI (channel state information) 보고를 목적으로 CSI 계산을 수행하는 시간과 상향링크 타이밍을 상향링크 그랜트 수신 시점을 기준으로 상기 CSI 계산에서 참조할 대상 시점 (즉, CSI 기준 자원(CSI reference resource))을 설정한다. 다시 말해, LTE 시스템에서는 참조 시점에 준하는 CSI를 계산하는 방법을 설정한다.
일 예로, FDD 시스템에서 n번째 서브프레임에서 수신된 상향링크 그랜트 내 비주기적 CSI 요청 필드에서 비주기적 CSI 보고가 지시된 경우, 단말은 해당 비주기적 CSI 요청이 지시된 서브프레임에 대응되는 CSI를 계산한다. 이는 단말이 상기 비주기적 CSI 요청이 지시된 n번째 서브프레임을 기준으로 n+4번째 서브프레임에서 CSI 보고를 수행할 것으로 기대되기 때문이다.
그러나 빠른 상향링크 타이밍이 적용될 경우, 단말은 CSI 계산을 위해 주어졌던 기존 4ms 보다 짧은 시간 내에 CSI 계산을 수행해야 하는 문제가 발생한다. 상기 문제를 해결하는 한 방안으로 빠른 상향링크 타이밍에 따라 PUSCH를 전송할 때, 상기 PUSCH 전송을 지시하는 상향링크 그랜트에 대해서는 비주기적 CSI 요청 필드를 적용하지 않을 수 있다.
추가적으로, 기지국은 사전 스케줄링 정보 또는 (사전 스케줄링 데이터에 대한) 상향링크 그랜트 내 비주기적 CSI 요청 필드 값에 따라 PUSCH에 적용할 상향링크 타이밍을 다음과 같이 설정할 수 있다.
(1) 사전 스케줄링 정보에 비주기적 CSI 요청 필드가 존재하고, 비주기적 CSI 보고가 트리거링되었으면 단말은 PUSCH 전송 시 기준 상향링크 타이밍 또는 레거시 상향링크 타이밍을 적용할 수 있다. 반면, 사전 스케줄링 정보에 비주기적 CSI 요청 필드가 존재하나 비주기적 CSI 보고가 트리거링되지 않았으면 단말은 PUSCH 전송 시 빠른 상향링크 타이밍을 적용할 수 있다.
(2) 사전 스케줄링 된 데이터 전송을 트리거링하는 제어 신호 (또는 상향링크 그랜트)에 비주기적 CSI 요청 필드가 존재하고, 비주기적 CSI 보고가 트리거링 되었으면 단말은 PUSCH 전송 시 기준 상향링크 타이밍 또는 레거시 상향링크타이밍을 적용할 수 있다. 반면, 사전 스케줄링 된 데이터 전송을 트리거링하는 제어 신호 (또는 상향링크 그랜트)에 비주기적 CSI 요청 필드가 존재하나 비주기적 CSI 보고가 트리거링되지 않았으면 단말은 PUSCH 전송 시 빠른 상향링크 타이밍을 적용할 수 있다.
3.11 제11
실시예
기지국이 단말에게 L개 상향링크 서브프레임들에 대한 다중-서브프레임 스케줄링 (또는 PUSCH 전송 여부)을 지시하는 경우, 상기 기지국은 상기 L 값에 따라 상향링크 그랜트 수신 시점으로부터 PUSCH 전송 시점 간 시간 차이 (UL grant-to-PUSCH timing)를 변경할 수 있다. 또는 반대로 상기 기지국이 최대 스케줄 가능한 다중-서브프레임 수를 상향링크 그랜트 수신 시점으로부터 PUSCH 전송 시점 간 시간 차이에 따라 결정할 수도 있다.
단, 다중-서브프레임 스케줄링의 경우 PUSCH 전송 시점은 다중-서브프레임 중 특정 위치의 서브프레임을 기준으로 정의될 수 있다. 예를 들어, 다중-서브프레임의 첫번째 서브프레임이 기준으로 정의될 수 있다.
LAA 시스템에서 LTE 시스템의 기준 상향링크 타이밍 또는 레거시 상향링크 타이밍을 따를 때, 기지국이 4개 상향링크 서브프레임에 대한 다중-서브프레임 스케줄링을 수행하면 도 21과 같이 연속된 상향링크 서브프레임들 사이 시간에 하향링크 서브프레임의 사용을 최소화할 수 있다.
이때, 기지국은 다중-서브프레임 스케줄링에 따른 PUSCH 전송이 종료된 서브프레임의 다음 서브프레임에서 단말이 하향링크 전송을 수신할 것으로 기대하거나 또는 다중-서브프레임 스케줄링을 지시하는 상향링크 그랜트 내의 비트 필드를 통해 특정 서브프레임에서의 하향링크 수신 여부를 지시할 수 있다. 예를 들어, L개 상향링크 서브프레임에 대한 다중-서브프레임 스케줄링의 l번째 서브프레임의 다음 서브프레임에서는 하향링크 신호를 수신할 수 있다.
만약 상향링크 그랜트 수신 시점으로부터 PUSCH 전송 시점 간 시간 차이 (UL grant-to-PUSCH timing)가 4ms로 주어지고 기지국의 다중-서브프레임 스케줄링이 5개 상향링크 서브프레임에 대해 수행되는 경우, 도 21과 같이 상향링크 서브프레임들을 밀집하기 어렵고 도 22와 같이 PUSCH가 전송될 수 있다.
이때, 상기 다중-서브프레임 스케줄링 수에 비례하게 상향링크 그랜트 수신 시점으로부터 PUSCH 전송 시점 간 시간 차이(UL grant-to-PUSCH timing)를 증가시키면 도 22와 같이 LBT 동작에 보다 유리한 구조로 상향링크 서브프레임들을 밀집하여 전송할 수 있다.
따라서 본 발명에서는 다중-서브프레임 스케줄링을 통해 실제 전송될 대상 상향링크 서브프레임 수에 비례하여 상향링크 그랜트 수신 시점으로부터 PUSCH 전송 시점 간 시간 차이(UL grant-to-PUSCH timing)를 변경하는 방안을 제안한다. 또는 기지국은 단말에게 다중-서브프레임 스케줄링 된 첫 번째 서브프레임이 기준 상향링크 타이밍에 추가적으로 적용되는 시간 오프셋이 적용된 전송 시점을 따르도록 설정하고, 상기 시간 오프셋에 대한 정보 RRC 또는 상향링크 그랜트 내 비트 필드를 통해 알려줄 수 있다.
특징적으로 상기 본 발명의 제안 방안들은 크로스-캐리어 스케줄링(Cross-carrier scheduling) 또는 셀프-캐리어 스케줄링(Self-carrier scheduling)의 여부에 따라 선택적으로 적용될 수 있다.
3.12 제12
실시예
기지국이 N개 (N≥1) 서브프레임에 대한 다중-서브프레임 스케줄링을 수행하는 경우, 기지국이 상기 다중-서브프레임 스케줄링을 위한 DCI 내 N개 서브프레임에 대해 동일 HARQ 프로세스 번호를 지정하면 단말은 상기 DCI의 수신 시점을 기준으로 정의되는 (N개 서브프레임으로 구성된) 시간 윈도우 내에서 상기 HARQ 프로세스에 대한 단일의 서브프레임 전송을 시도한다.
본 발명의 실시 예에 따른 LAA 시스템에서 기지국이 다중-서브프레임 스케줄링을 수행할 때, 각 서브프레임 별로 새로운 데이터를 전송할 수도 있지만 동일한 데이터에 보다 많은 전송 기회를 주고자 할 수 있다. 상기 동작을 위한 별도의 DCI를 새롭게 정의하기 보다 기지국이 다중-서브프레임 스케줄링을 지시하는 DCI를 재활용하는 방안이 보다 효율적인 시그널링 방안일 수 있다.
도 24는 다중-서브프레임 스케줄링에 따라 복수 개의 PUSCH의 HARQ 프로세스 번호를 동일하게 설정하는 동작을 나타낸 도면이다.
도 24에 도시된 바와 같이, 기지국이 4개 서브프레임에서의 PUSCH 전송을 지시가능한 경우, 상기 기지국은 4개 서브프레임에서 전송할 PUSCH의 HARQ 프로세스 번호(예: 0)를 동일하게 설정할 수 있다. 그러면 단말은 DCI에서 지시한 0번 HARQ 프로세스에 대한 PUSCH 전송을 DCI가 다중-서브프레임 전송을 지시한 4개 서브프레임에서 시도하라는 의미로 해석할 수 있다.
3.13 제13
실시예
기지국이 서로 다른 PUSCH (예: 제1 PUSCH, 제2 PUSCH) 에 대해 시간 윈도우 (예: TW1, TW2) 기반 전송을 지시하는 경우, 어떤 하나의 PUSCH (예: 제1 PUSCH)가 특정 상향링크 서브프레임에서의 전송에 성공하고, 상기 특정 상향링크 서브프레임의 다음 상향링크 서브프레임이 나머지 PUSCH (예: 제2 PUSCH)의 시간 윈도우에 포함되면, 상기 단말은 상기 제2 PUSCH를 별도의 LBT 동작 없이 전송한다.
단, 단말은 상기 제2 PUSCH를 MCOT (maximum channel occupancy time)을 위배하지 않는 조건에서 제1 PUSCH에 연속하여 전송할 수 있다.
기지국이 앞서 설명한 제12 실시예 또는 다른 방법에 따라 특정 PUSCH에 대한 시간 윈도우 내 전송을 지시할 수 있을 때, 서로 다른 PUSCH에 대한 시간 윈도우가 중첩되는 경우가 발생할 수 있다.
도 25는 서로 다른 PUSCH에 대한 시간 윈도우가 중첩되는 경우의 동작을 나타낸 도면이다.
도 25에 도시된 바와 같이, 기지국이 특정 단말에게 n번째 서브프레임에서 상향링크 그랜트를 전송하여 PUSCH1에 대한 4개 서브프레임 길이의 시간 윈도우 (예: n+4번째, n+5 번째, n+6 번째, n+7 번째 서브프레임)을 지시하고, 동일 단말에게 n+1번째 서브프레임에서 상향링크 그랜트를 전송하여 제2 PUSCH에 대한 4개 서브프레임 길이의 시간 윈도우 (예: n+5 번째, n+6 번째, n+7 번째, n+8번째 서브프레임)을 지시할 수 있다. 이때, 만약 상기 단말이 제1 PUSCH 전송을 n+5번째 서브프레임에서 성공하고 MCOT가 2개 서브프레임 길이 이상이면, 자연스럽게 제2 PUSCH 전송을 n+6번째 서브프레임에서 수행하는 동작을 고려할 수 있다.
3.14 제14
실시예
기지국이 상향링크 그랜트를 전송 가능한 서브프레임 집합을 사전에 설정하여 단말 (또는 네트워크 내 다른 기지국)에게 알려주고, 상향링크 그랜트 (또는 상향링크 그랜트만) 전송하는 경우, 상기 기지국은 FR (frequency reuse factor) 1을 달성하기 위해 다음 중 하나의 상향링크 LBT 동작을 수행한다.
(1) 상향링크 그랜트 전송 서브프레임 이전에 예약 신호(Reservation signal)가 없는 백-오프 카운터 상향링크 LBT를 수행한다.
(2) 상향링크 그랜트 전송 서브프레임 이전에 단일의 CCA 슬롯에 대한 CCA 기반 상햐링크 LBT를 수행한다.
본 발명의 실시 예에 따른 LAA 시스템에서 서로 다른 두 단말 간 상향링크 전송은 각 단말간 거리로 인해 CCA 과정에서 검출되지 않지만, 어느 하나의 단말에게 전송되는 하향링크 전송은 다른 쪽 단말의 CCA 과정에서 검출될 수 있다. 이러한 상황을 고려하면 기지국이 셀프-스케줄링하는 경우 상향링크 트래픽만 존재하더라도 상향링크 그랜트를 비면허 대역을 통해 전송할 때 다른 기지국으로부터 서비스 받는 단말의 UL 전송을 차단하는 경우가 발생할 수 있다.
따라서 본 발명에서는 기지국들 간에 상향링크 그랜트 전송 시점을 조절하고, FR을 지원하도록 상향링크 LBT를 설계함으로써 적어도 각 기지국이 상향링크 전송을 수행하는 경우 기지국이 상향링크 전송을 차단하는 경우를 가급적 완화하는 방안을 제안한다. 이때, 상기 상향링크 그랜트 전송은 데이터 전송 없이 상향링크 그랜트만 전송되는 경우로 한정될 수 있다.
3.15 제15
실시예
기지국이 하향링크 데이터 없이 상향링크 그랜트만 전송하는 경우, 상기 상향링크 그랜트 전송을 위한 하향링크 LBT 동작을 PDSCH와 독립적으로 운용하고 아래와 같은 LBT 동작을 수행한다.
(1) Cat. 4이고 CWS 값을 고정하는 LBT 방식
(2) Cat. 4이고 전송된 상향링크 그랜트에 대응되는 PUSCH의 전송 여부를 기준으로 CWS 값을 조정하는 방식
즉, 본 발명에서는 기지국이 상향링크 그랜트 (예: DCI)를 전송하기 위해 LBT 동작을 수행하는 경우, 이전에 전송된 상향링크 그랜트에 대응되는 PUSCH가 전송되었는지 여부를 기준으로 상기 LBT 동작에 적용되는 경쟁 윈도우 크기 파라미터 값을 조절하는 방안을 제안한다.
본 발명의 실시 예에 따른 LAA 시스템에서는 하향링크 LBT 동작으로 카테고리 4 (Cat. 4)로 명명되는 LBT 방식을 제안한다. 상기 카테고리 4 하향링크 LBT를 위한 LBT 파라미터는 아래 표 2와 같이 총 4 개의 채널 접근 우선 클래스(Channel Access Priority Class)에 대해 각 클래스 별로 지연 구간(Defer period) 길이, CWS (contention window size) 값, MCOT (maximum channel occupancy time) 값 등이 설정된다. 따라서 기지국은 채널 접근 우선 클래스에 따라 정해진 LBT 파라미터들을 활용하여 랜덤 백-오프를 수행하고, 랜덤 백-오프를 마친 후 채널에 접속하게 되면 MCOT 이내로 신호 전송을 수행할 수 있다.
일 예로, 채널 접근 우선 클래스 1/2/3/4의 경우, MCOT 값은 2/3/8/8 ms으로 설정되고, 만약 Wi-Fi와 같은 다른 RAT (radio access technology)이 없는 환경 에서는 MCOT 값이 2/3/10/10 ms로 정해진다.
추가적으로, LAA 시스템에서 상향링크 전송이 지원되면, 기지국이 하향링크 데이터 없이 상향링크 그랜트를 전송할 경우에도 상기 동작이 하향링크 전송의 일종이기 때문에 하향링크 LBT로 정의된 Cat. 4를 적용하는 동작을 고려할 수 있다. 이때, 하향링크 LBT의 Cat. 4 CWS 조정 과정에서 PDSCH에 대한 HARQ-ACK 정보를 활용하도록 설계될 수 있나, 상향링크 그랜트만 전송되는 경우에는 대응되는 HARQ-ACK 정보가 없으므로 CWS를 조정하기 어려울 수 있다.
따라서 본 발명에서는 상향링크 그랜트만 전송되는 경우에도 Cat. 4를 적용하되 CWS (단, CWS 값은 PDSCH 전송을 위한 값과 무관하게 설정될 수 있음)를 고정하여 사용하는 방안을 제안한다. 또는 기지국이 상향링크 그랜트를 전송한 후 상기 상향링크 그랜트에 대응되는 PUSCH 전송에 실패한 경우 충돌(Collision)이 발생하였다고 간주하고 상향링크 그랜트에 대한 CWS를 증가시킬 수 있다. 이때, 상기 상향링크 그랜트에 대응되는 PUSCH 전송에 성공한 경우에는 CWS를 최소값 (또는 특정 값)으로 초기화 시킬 수 있다.
상기 구성은 기지국이 셀프-캐리어 스케줄링으로 동작하고 상향링크 그랜트를 비면허 대역에서 LBT 동작과 함께 전송하는 경우와, 상기 기지국이 크로스-캐리어 스케줄링으로 동작하고 상향링크 그랜트에 대한 LBT 동작을 수행하는 경우에 모두 적용될 수 있다.
4. 장치 구성
도 26은 제안하는 실시 예가 구현될 수 있는 단말 및 기지국의 구성을 도시하는 도면이다. 도 26에 도시된 단말 및 기지국은 앞서 설명한 단말과 기지국 간 상향링크 신호 송수신 방법의 실시 예들을 구현하기 위해 동작한다.
단말(UE: User Equipment)은 상향링크에서는 송신단으로 동작하고, 하향링크에서는 수신단으로 동작할 수 있다. 또한, 기지국(eNB: e-Node B)은 상향링크에서는 수신단으로 동작하고, 하향링크에서는 송신단으로 동작할 수 있다.
즉, 단말 및 기지국은 정보, 데이터 및/또는 메시지의 전송 및 수신을 제어하기 위해 각각 송신기(Transmitter: 2640, 2650) 및 수신기(Receiver: 2660, 2670)를 포함할 수 있으며, 정보, 데이터 및/또는 메시지를 송수신하기 위한 안테나(2600, 2610) 등을 포함할 수 있다.
또한, 단말 및 기지국은 각각 상술한 본 발명의 실시 예들을 수행하기 위한 프로세서(Processor: 2620, 2630)와 프로세서의 처리 과정을 임시적으로 또는 지속적으로 저장할 수 있는 메모리(2680, 2690)를 각각 포함할 수 있다.
이와 같이 구성된 단말은 프로세서(2620)를 통해 기지국으로부터 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 수신하고, 상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 전송하고, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 기지국으로부터 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 수신하고, 상기 제2 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송하도록 구성될 수 있다.
또한, 이와 같이 구성된 기지국은 프로세서(2630)를 통해 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 단말로 전송하고, 상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 수신하고, 상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 상기 단말로 전송하고, 상기 제2 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신하도록 구성될 수 있다.
단말 및 기지국에 포함된 송신기 및 수신기는 데이터 전송을 위한 패킷 변복조 기능, 고속 패킷 채널 코딩 기능, 직교주파수분할다중접속(OFDMA: Orthogonal Frequency Division Multiple Access) 패킷 스케줄링, 시분할듀플렉스(TDD: Time Division Duplex) 패킷 스케줄링 및/또는 채널 다중화 기능을 수행할 수 있다. 또한, 도 26의 단말 및 기지국은 저전력 RF(Radio Frequency)/IF(Intermediate Frequency) 유닛을 더 포함할 수 있다.
한편, 본 발명에서 단말로 개인휴대단말기(PDA: Personal Digital Assistant), 셀룰러폰, 개인통신서비스(PCS: Personal Communication Service) 폰, GSM(Global System for Mobile) 폰, WCDMA(Wideband CDMA) 폰, MBS(Mobile Broadband System) 폰, 핸드헬드 PC(Hand-Held PC), 노트북 PC, 스마트(Smart) 폰 또는 멀티모드 멀티밴드(MM-MB: Multi Mode-Multi Band) 단말기 등이 이용될 수 있다.
여기서, 스마트 폰이란 이동통신 단말기와 개인 휴대 단말기의 장점을 혼합한 단말기로서, 이동통신 단말기에 개인 휴대 단말기의 기능인 일정 관리, 팩스 송수신 및 인터넷 접속 등의 데이터 통신 기능을 통합한 단말기를 의미할 수 있다. 또한, 멀티모드 멀티밴드 단말기란 멀티 모뎀칩을 내장하여 휴대 인터넷시스템 및 다른 이동통신 시스템(예를 들어, CDMA(Code Division Multiple Access) 2000 시스템, WCDMA(Wideband CDMA) 시스템 등)에서 모두 작동할 수 있는 단말기를 말한다.
본 발명의 실시 예들은 다양한 수단을 통해 구현될 수 있다. 예를 들어, 본 발명의 실시 예들은 하드웨어, 펌웨어(firmware), 소프트웨어 또는 그것들의 결합 등에 의해 구현될 수 있다.
하드웨어에 의한 구현의 경우, 본 발명의 실시 예들에 따른 방법은 하나 또는 그 이상의 ASICs(application specific integrated circuits), DSPs(digital signal processors), DSPDs(digital signal processing devices), PLDs(programmable logic devices), FPGAs(field programmable gate arrays), 프로세서, 콘트롤러, 마이크로 콘트롤러, 마이크로 프로세서 등에 의해 구현될 수 있다.
펌웨어나 소프트웨어에 의한 구현의 경우, 본 발명의 실시 예들에 따른 방법은 이상에서 설명된 기능 또는 동작들을 수행하는 모듈, 절차 또는 함수 등의 형태로 구현될 수 있다. 예를 들어, 소프트웨어 코드는 메모리 유닛(2680, 2690)에 저장되어 프로세서(2620, 2630)에 의해 구동될 수 있다. 상기 메모리 유닛은 상기 프로세서 내부 또는 외부에 위치할 수 있으며, 이미 공지된 다양한 수단에 의해 상기 프로세서와 데이터를 주고 받을 수 있다.
본 발명은 본 발명의 기술적 아이디어 및 필수적 특징을 벗어나지 않는 범위에서 다른 특정한 형태로 구체화될 수 있다. 따라서, 상기의 상세한 설명은 모든 면에서 제한적으로 해석되어서는 아니되고 예시적인 것으로 고려되어야 한다. 본 발명의 범위는 첨부된 청구항의 합리적 해석에 의해 결정되어야 하고, 본 발명의 등가적 범위 내에서의 모든 변경은 본 발명의 범위에 포함된다. 또한, 특허청구범위에서 명시적인 인용 관계가 있지 않은 청구항들을 결합하여 실시 예를 구성하거나 출원 후의 보정에 의해 새로운 청구항으로 포함할 수 있다.
본 발명의 실시 예들은 다양한 무선접속 시스템에 적용될 수 있다. 다양한 무선접속 시스템들의 일례로서, 3GPP(3rd Generation Partnership Project) 또는 3GPP2 시스템 등이 있다. 본 발명의 실시 예들은 상기 다양한 무선접속 시스템뿐 아니라, 상기 다양한 무선접속 시스템을 응용한 모든 기술 분야에 적용될 수 있다. 나아가, 제안한 방법은 초고주파 대역을 이용하는 mmWave 통신 시스템에도 적용될 수 있다.
Claims (15)
- 비면허 대역을 지원하는 무선 통신 시스템에서 단말이 기지국으로 상향링크 신호를 전송하는 방법에 있어서,기지국으로부터 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 수신하고,상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 전송하고,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 기지국으로부터 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 수신하고, 상기 제2 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송하는, 상향링크 신호 전송 방법.
- 제 1항에 있어서,상기 제1 하향링크 제어 정보는 1 비트 크기의 지시자를 이용하여 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입을 지시하는, 상향링크 신호 전송 방법.
- 제 1항에 있어서,상기 제1 타입의 스케줄링은 정상 스케줄링에 대응하고,상기 제2 타입의 스케줄링은 트리거링 스케줄링에 대응하는, 상향링크 신호 전송 방법.
- 제 1항에 있어서,상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점으로부터 4개 서브프레임 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송하는, 상향링크 신호 전송 방법.
- 제 1항에 있어서,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 기지국으로부터 상기 제2 하향링크 제어 정보의 수신 시점 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송하는, 상향링크 신호 전송 방법.
- 제 1항에 있어서,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점으로부터 일정 시간 구간 이내에 상기 제2 하향링크 제어 정보가 수신된 경우에만 상기 제2 하향링크 제어 정보의 수신 시점 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송하는, 상향링크 신호 전송 방법.
- 비면허 대역을 지원하는 무선 통신 시스템에서 기지국이 단말로부터 상향링크 신호를 수신하는 방법에 있어서,하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 단말로 전송하고,상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 수신하고,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 상기 단말로 전송하고, 상기 제2 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신하는, 상향링크 신호 수신 방법.
- 제 7항에 있어서,상기 제1 하향링크 제어 정보는 1 비트 크기의 지시자를 이용하여 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입을 지시하는, 상향링크 신호 수신 방법.
- 제 7항에 있어서,상기 제1 타입의 스케줄링은 정상 스케줄링에 대응하고,상기 제2 타입의 스케줄링은 트리거링 스케줄링에 대응하는, 상향링크 신호 수신 방법.
- 제 7항에 있어서,상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점으로부터 4개 서브프레임 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신하는, 상향링크 신호 수신 방법.
- 제 7항에 있어서,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 제2 하향링크 제어 정보의 전송 시점 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신하는, 상향링크 신호 수신 방법.
- 제 7항에 있어서,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 전송 시점으로부터 일정 시간 구간 이내에 상기 제2 하향링크 제어 정보가 전송된 경우에만 상기 제2 하향링크 제어 정보의 전송 시점 이후의 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신하는, 상향링크 신호 수신 방법.
- 제 7항에 있어서,상기 기지국이 상기 제1 하향링크 제어 정보 또는 상기 제2 하향링크 제어 정보를 송신하기 위해 LBT (Listen-Before-Talk) 동작을 수행하되,상기 LBT 동작에 적용되는 경쟁 윈도우 크기 파라미터는 상기 제1 하향링크 제어 정보 또는 상기 제2 하향링크 제어 정보 이전의 하향링크 제어 정보에 대응되는 상향링크 신호의 수신 여부에 기반하여 조정되는, 상향링크 신호 수신 방법.
- 비면허 대역을 지원하는 무선 통신 시스템에서 기지국으로 상향링크 신호를 전송하는 단말에 있어서,수신부;송신부; 및상기 수신부 및 송신부와 연결되어 동작하는 프로세서를 포함하되,상기 프로세서는,기지국으로부터 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 수신하고,상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 전송하고,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 기지국으로부터 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 수신하고, 상기 제2 하향링크 제어 정보의 수신 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 전송하도록 구성되는, 단말.
- 비면허 대역을 지원하는 무선 통신 시스템에서 단말로부터 상향링크 신호를 수신하는 기지국에 있어서,수신부;송신부; 및상기 수신부 및 송신부와 연결되어 동작하는 프로세서를 포함하되,상기 프로세서는,하나 이상의 서브프레임에 대한 상향링크 신호 전송을 스케줄링하는 타입이 제1 타입의 스케줄링 또는 제2 타입의 스케줄링인지 여부를 지시하는 제1 하향링크 제어 정보를 단말로 전송하고,상기 제1 하향링크 제어 정보가 상기 제1 타입의 스케줄링을 지시하는 경우에는, 상기 제1 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상향링크 신호를 수신하고,상기 제1 하향링크 제어 정보가 상기 제2 타입의 스케줄링을 지시하는 경우에는, 상기 하나 이상의 서브프레임에 대한 상향링크 신호 전송을 지시하는 제2 하향링크 제어 정보를 상기 단말로 전송하고, 상기 제2 하향링크 제어 정보의 전송 시점을 기준으로 설정되는 하나 이상의 서브프레임에서 상기 상향링크 신호를 수신하도록 구성되는, 기지국.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP16882084.3A EP3399822B1 (en) | 2015-12-31 | 2016-12-28 | Method for transmitting and receiving uplink signal in wireless communication system supporting unlicensed band and apparatus for supporting same |
US15/780,604 US10687345B2 (en) | 2015-12-31 | 2016-12-28 | Method for transmitting and receiving uplink signal in wireless communication system supporting unlicensed band and apparatus for supporting same |
CN201680072392.XA CN108370582B (zh) | 2015-12-31 | 2016-12-28 | 在支持免授权频带的无线通信系统中发送和接收上行链路信号的方法以及支持该方法的设备 |
Applications Claiming Priority (18)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201562273444P | 2015-12-31 | 2015-12-31 | |
US62/273,444 | 2015-12-31 | ||
US201662275238P | 2016-01-06 | 2016-01-06 | |
US62/275,238 | 2016-01-06 | ||
US201662289880P | 2016-02-01 | 2016-02-01 | |
US62/289,880 | 2016-02-01 | ||
US201662316537P | 2016-03-31 | 2016-03-31 | |
US62/316,537 | 2016-03-31 | ||
US201662322200P | 2016-04-13 | 2016-04-13 | |
US62/322,200 | 2016-04-13 | ||
US201662340016P | 2016-05-23 | 2016-05-23 | |
US62/340,016 | 2016-05-23 | ||
US201662341061P | 2016-05-24 | 2016-05-24 | |
US62/341,061 | 2016-05-24 | ||
US201662384731P | 2016-09-08 | 2016-09-08 | |
US62/384,731 | 2016-09-08 | ||
US201662404771P | 2016-10-06 | 2016-10-06 | |
US62/404,771 | 2016-10-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017116132A1 true WO2017116132A1 (ko) | 2017-07-06 |
Family
ID=59225201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2016/015381 WO2017116132A1 (ko) | 2015-12-31 | 2016-12-28 | 비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 신호를 송수신하는 방법 및 이를 지원하는 장치 |
Country Status (4)
Country | Link |
---|---|
US (1) | US10687345B2 (ko) |
EP (1) | EP3399822B1 (ko) |
CN (1) | CN108370582B (ko) |
WO (1) | WO2017116132A1 (ko) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018058056A1 (en) * | 2016-09-24 | 2018-03-29 | Ofinno Technologies, Llc | Discontinuous reception in a wireless device and wireless network |
WO2019101155A1 (zh) * | 2017-11-25 | 2019-05-31 | 华为技术有限公司 | 一种非授权频谱中确定参考子帧的方法及装置 |
WO2019200593A1 (en) * | 2018-04-19 | 2019-10-24 | Nokia Shanghai Bell Co., Ltd. | Methods, devices and computer readable medium for data transmission without rrc connections |
WO2020032678A1 (ko) * | 2018-08-09 | 2020-02-13 | 엘지전자 주식회사 | 비면허 대역에서 단말의 데이터 전송 방법 및 상기 방법을 이용하는 장치 |
WO2020091565A1 (ko) * | 2018-11-02 | 2020-05-07 | 엘지전자 주식회사 | 비면허 대역에서 단말의 상향링크 신호 전송 방법 및 상기 방법을 이용하는 장치 |
WO2020125121A1 (en) * | 2018-12-21 | 2020-06-25 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and device operating in unlicensed spectrum |
CN112788779A (zh) * | 2019-11-06 | 2021-05-11 | 华硕电脑股份有限公司 | 无线通信系统中用于上行链路准予覆盖的方法和设备 |
US11337207B2 (en) | 2016-09-24 | 2022-05-17 | Honda Motor Co., Ltd. | Uplink transmission based on a hybrid retransmission request (HARQ) process and a new data indicator (NDI) |
Families Citing this family (45)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2795981A1 (en) * | 2011-12-22 | 2014-10-29 | Interdigital Patent Holdings, Inc. | Control signaling in lte carrier aggregation |
KR102574506B1 (ko) * | 2016-01-29 | 2023-09-05 | 한국전자통신연구원 | 비면허대역 통신 시스템에서 신호를 전송하는 방법 및 장치, 상향링크 스케줄링 방법 및 장치, 그리고 채널 상태 측정 구간에 관한 정보를 전송하는 방법 및 장치 |
EP3860292A1 (en) * | 2016-02-04 | 2021-08-04 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method and device for transmitting uplink information on unlicensed carrier |
BR112018015780A2 (pt) * | 2016-02-04 | 2019-01-02 | Huawei Tech Co Ltd | método e aparelho para determinação de informação de janela de contenção |
US10575297B2 (en) * | 2016-02-05 | 2020-02-25 | Panasonic Intellectual Property Corporation Of America | Base station, terminal, and communication method |
US10827471B2 (en) | 2016-02-16 | 2020-11-03 | Qualcomm Incorporated | Uplink procedures on a wireless communication medium |
US11051311B2 (en) * | 2016-02-29 | 2021-06-29 | Telefonaktiebolaget Lm Ericsson (Publ) | Technique for accessing a wireless channel in coexistence scnarios |
JP6904969B2 (ja) * | 2016-03-31 | 2021-07-21 | 華為技術有限公司Huawei Technologies Co.,Ltd. | 無線通信方法、基地局、及び端末 |
WO2017171604A1 (en) * | 2016-03-31 | 2017-10-05 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and device for timing correction in a channel access using a listen-before-talk protocol |
US10681663B2 (en) * | 2016-03-31 | 2020-06-09 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods for adjusting uplink transmission timing |
CN108781375B (zh) * | 2016-04-01 | 2020-10-09 | 华为技术有限公司 | 上行数据传输的方法和设备 |
CN107294577A (zh) * | 2016-04-01 | 2017-10-24 | 索尼公司 | 无线通信系统中的电子设备和无线通信方法 |
JP6404256B2 (ja) * | 2016-04-14 | 2018-10-10 | 株式会社Nttドコモ | ユーザ端末及び無線通信方法 |
US10334624B2 (en) * | 2016-04-29 | 2019-06-25 | Ofinno, Llc | Allocation of licensed assisted access resources in a wireless device |
CN107666721B (zh) * | 2016-07-29 | 2020-11-03 | 中兴通讯股份有限公司 | 数据传输方法及装置 |
KR102123233B1 (ko) * | 2016-09-01 | 2020-06-17 | 주식회사 케이티 | 차세대 무선 액세스 망에서 데이터를 송수신하는 방법 및 그 장치 |
EP3510712B1 (en) * | 2016-09-13 | 2021-11-10 | Huawei Technologies Co., Ltd. | Uplink control channel transmission in unlicensed communication spectrum |
US10455570B2 (en) | 2016-09-26 | 2019-10-22 | Ofinno, Llc | Selection of DCI based upon TTI |
WO2018082059A1 (zh) * | 2016-11-04 | 2018-05-11 | 华为技术有限公司 | Harq-ack反馈信息的传输方法及相关装置 |
EP3545713A1 (en) * | 2016-11-28 | 2019-10-02 | Telefonaktiebolaget LM Ericsson (publ) | Ta dependent harq feedback/ul grant timing determination |
US10925047B2 (en) * | 2018-02-07 | 2021-02-16 | Huawei Technologies Co., Ltd. | Systems and methods for scheduling wireless communications |
CN108496390B (zh) * | 2018-04-11 | 2022-09-09 | 北京小米移动软件有限公司 | 非授权小区中的数据传输方法及装置、基站和用户设备 |
CN111684840B (zh) * | 2018-05-11 | 2022-09-27 | Oppo广东移动通信有限公司 | 中继系统同步方法、装置、计算机设备及存储介质 |
US11658789B2 (en) * | 2018-08-09 | 2023-05-23 | Lg Electronics Inc. | Method for transmitting physical uplink shared channel of terminal in unlicensed band and device using same method |
WO2020032706A1 (ko) * | 2018-08-09 | 2020-02-13 | 엘지전자 주식회사 | 무선 통신 시스템에서 비면허 대역 내에서 lbt 타입에 따른 동작을 수행하는 방법 및 상기 방법을 이용하는 단말 |
WO2020029199A1 (zh) | 2018-08-09 | 2020-02-13 | Oppo广东移动通信有限公司 | 传输信息的方法、终端设备和网络设备 |
US11696284B2 (en) * | 2018-09-10 | 2023-07-04 | Qualcomm Incorporated | Interference detection, signaling, and mitigation techniques for low latency transmissions |
WO2020056554A1 (zh) * | 2018-09-17 | 2020-03-26 | Oppo广东移动通信有限公司 | 一种反馈时序的确定方法、终端设备及网络设备 |
CN110944396B (zh) * | 2018-09-25 | 2023-04-25 | 维沃移动通信有限公司 | 竞争窗口大小调节方法和网络设备 |
WO2020098718A1 (en) * | 2018-11-12 | 2020-05-22 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Apparatus and method for discontinuous reception of same |
CN111294176B (zh) * | 2019-01-11 | 2022-09-16 | 北京紫光展锐通信技术有限公司 | 信道触发方法及装置 |
CN111278123B (zh) * | 2019-02-02 | 2022-08-19 | 维沃移动通信有限公司 | 非授权频段的信息传输方法、终端及网络设备 |
US20200313806A1 (en) * | 2019-03-29 | 2020-10-01 | Qualcomm Incorporated | Dynamically configurable acknowledgement procedures |
CN111615147B (zh) * | 2019-06-28 | 2022-05-03 | 维沃移动通信有限公司 | 配置方法及终端设备 |
US20220272583A1 (en) * | 2019-08-15 | 2022-08-25 | Telefonaktiebolaget Lm Ericsson (Publ) | Long term evolution-m resource reservation using bitmap |
KR20220038086A (ko) * | 2019-08-16 | 2022-03-25 | 엘지전자 주식회사 | 사물 인터넷을 지원하는 무선 통신 시스템에서 하향링크 정보를 송수신하는 방법 및 이를 위한 장치 |
US11863331B2 (en) * | 2019-10-03 | 2024-01-02 | Qualcomm Incorporated | Determining priorities for a plurality of transport blocks for transmission |
US11792848B2 (en) | 2019-10-04 | 2023-10-17 | Huawei Technologies Co., Ltd. | Methods and apparatuses for cot sharing in unlicensed spectrum |
CN114642071A (zh) * | 2019-11-07 | 2022-06-17 | Lg 电子株式会社 | 无线通信系统中发送和接收上行链路信道的方法及其设备 |
CN111092692A (zh) * | 2019-11-08 | 2020-05-01 | 中兴通讯股份有限公司 | 一种控制信息指示方法、通信节点及计算机可读存储介质 |
EP4070576B1 (en) * | 2019-12-06 | 2024-01-31 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Methods for channel occupancy time sharing, user equipment and base station |
EP4111805A4 (en) * | 2020-02-28 | 2023-11-01 | Qualcomm Incorporated | PSA VALIDATION FOR FRAME-BASED DEVICES |
CN114071739A (zh) * | 2020-08-06 | 2022-02-18 | 维沃移动通信有限公司 | 免授权频谱的信道接入方法、终端及网络侧设备 |
US20230111781A1 (en) * | 2021-10-11 | 2023-04-13 | Qualcomm Incorporated | Techniques for identifying control channel candidates based on reference signal sequences |
WO2023247985A1 (en) * | 2022-06-24 | 2023-12-28 | Orope France Sarl | Apparatus and method of wireless communication |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012150823A2 (ko) * | 2011-05-05 | 2012-11-08 | 엘지전자 주식회사 | 하향링크 신호 수신방법 및 사용자기기와, 하향링크 신호 전송방법 및 기지국 |
WO2014198023A1 (zh) * | 2013-06-09 | 2014-12-18 | 华为技术有限公司 | 一种调度方法及基站 |
EP2882249A1 (en) * | 2013-12-06 | 2015-06-10 | Telefonaktiebolaget L M Ericsson (publ) | Controlling predictive scheduling |
WO2015131730A1 (zh) * | 2014-08-22 | 2015-09-11 | 中兴通讯股份有限公司 | 一种实现数据处理的方法、基站及用户设备 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011063244A2 (en) * | 2009-11-19 | 2011-05-26 | Interdigital Patent Holdings, Inc. | Component carrier activation/deactivation in multi-carrier systems |
RU2527753C2 (ru) * | 2010-03-22 | 2014-09-10 | Самсунг Электроникс Ко., Лтд. | Мультиплексирование управляющей информации и информации данных от пользовательского оборудования в физическом канале данных |
CN102202408B (zh) * | 2010-03-22 | 2014-01-01 | 华为技术有限公司 | 多子帧调度方法、系统和设备 |
EP3657715B1 (en) * | 2011-03-14 | 2021-08-11 | LG Electronics Inc. | Method and device for transmitting ack/nack in wireless communication system |
-
2016
- 2016-12-28 EP EP16882084.3A patent/EP3399822B1/en active Active
- 2016-12-28 CN CN201680072392.XA patent/CN108370582B/zh active Active
- 2016-12-28 WO PCT/KR2016/015381 patent/WO2017116132A1/ko active Application Filing
- 2016-12-28 US US15/780,604 patent/US10687345B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012150823A2 (ko) * | 2011-05-05 | 2012-11-08 | 엘지전자 주식회사 | 하향링크 신호 수신방법 및 사용자기기와, 하향링크 신호 전송방법 및 기지국 |
WO2014198023A1 (zh) * | 2013-06-09 | 2014-12-18 | 华为技术有限公司 | 一种调度方法及基站 |
EP2882249A1 (en) * | 2013-12-06 | 2015-06-10 | Telefonaktiebolaget L M Ericsson (publ) | Controlling predictive scheduling |
WO2015131730A1 (zh) * | 2014-08-22 | 2015-09-11 | 中兴通讯股份有限公司 | 一种实现数据处理的方法、基站及用户设备 |
Non-Patent Citations (2)
Title |
---|
"Scheduling Request Based on Prescheduling Transmission", R2-156244, 3GPP TSG-RAN WG2 MEETING #92, 6 November 2015 (2015-11-06), Anaheim , USA, XP051024479 * |
See also references of EP3399822A4 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11700620B2 (en) | 2016-09-24 | 2023-07-11 | Honda Motor Co., Ltd. | Uplink transmission based on a hybrid retransmission request (HARQ) process and a new data indicator (NDI) |
US11337207B2 (en) | 2016-09-24 | 2022-05-17 | Honda Motor Co., Ltd. | Uplink transmission based on a hybrid retransmission request (HARQ) process and a new data indicator (NDI) |
WO2018058056A1 (en) * | 2016-09-24 | 2018-03-29 | Ofinno Technologies, Llc | Discontinuous reception in a wireless device and wireless network |
EP3565359A1 (en) | 2016-09-24 | 2019-11-06 | Ofinno, LLC | Power headroom reporting with two-stage uplink dci grants |
US10420165B2 (en) | 2016-09-24 | 2019-09-17 | Ofinno, Llc | Discontinuous reception in a wireless device and wireless network |
WO2019101155A1 (zh) * | 2017-11-25 | 2019-05-31 | 华为技术有限公司 | 一种非授权频谱中确定参考子帧的方法及装置 |
WO2019200593A1 (en) * | 2018-04-19 | 2019-10-24 | Nokia Shanghai Bell Co., Ltd. | Methods, devices and computer readable medium for data transmission without rrc connections |
WO2020032678A1 (ko) * | 2018-08-09 | 2020-02-13 | 엘지전자 주식회사 | 비면허 대역에서 단말의 데이터 전송 방법 및 상기 방법을 이용하는 장치 |
US11516828B2 (en) | 2018-08-09 | 2022-11-29 | Lg Electronics Inc. | Method by which terminal transmits data in unlicensed band, and apparatus using method |
CN112586072A (zh) * | 2018-08-09 | 2021-03-30 | Lg 电子株式会社 | 终端在免执照频带中发送数据的方法和使用该方法的装置 |
CN112586072B (zh) * | 2018-08-09 | 2023-09-01 | Lg 电子株式会社 | 终端在免执照频带中发送数据的方法和使用该方法的装置 |
US11792789B2 (en) | 2018-08-09 | 2023-10-17 | Lg Electronics Inc. | Method by which terminal transmits data in unlicensed band, and apparatus using method |
WO2020091565A1 (ko) * | 2018-11-02 | 2020-05-07 | 엘지전자 주식회사 | 비면허 대역에서 단말의 상향링크 신호 전송 방법 및 상기 방법을 이용하는 장치 |
WO2020125121A1 (en) * | 2018-12-21 | 2020-06-25 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and device operating in unlicensed spectrum |
US12082253B2 (en) | 2018-12-21 | 2024-09-03 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and device operating in unlicensed spectrum |
CN112788779A (zh) * | 2019-11-06 | 2021-05-11 | 华硕电脑股份有限公司 | 无线通信系统中用于上行链路准予覆盖的方法和设备 |
CN112788779B (zh) * | 2019-11-06 | 2023-10-31 | 华硕电脑股份有限公司 | 无线通信系统中用于上行链路准予覆盖的方法和设备 |
Also Published As
Publication number | Publication date |
---|---|
CN108370582A (zh) | 2018-08-03 |
US20180359772A1 (en) | 2018-12-13 |
EP3399822A4 (en) | 2019-07-03 |
US10687345B2 (en) | 2020-06-16 |
EP3399822A1 (en) | 2018-11-07 |
CN108370582B (zh) | 2021-08-31 |
EP3399822B1 (en) | 2021-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017116132A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 신호를 송수신하는 방법 및 이를 지원하는 장치 | |
WO2017126935A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 신호를 전송하는 방법 및 이를 지원하는 장치 | |
WO2018143749A1 (ko) | 무선 통신 시스템에서 무선 신호 송수신 방법 및 장치 | |
WO2018174653A1 (ko) | 무선 통신 시스템에서 신호를 송신 또는 수신하는 방법 및 이를 위한 장치 | |
WO2018174550A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 단말의 상향링크 신호 전송 방법 및 이를 지원하는 장치 | |
WO2018169347A1 (ko) | 무선 통신 시스템에서 단말과 기지국의 동작 방법 및 이를 지원하는 장치 | |
WO2018026182A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 신호 송수신 방법 및 이를 지원하는 장치 | |
WO2021020955A1 (ko) | 무선 통신 시스템에서 상향링크 공유 채널(physical uplink shared channel: pusch)를 송수신하는 방법, 장치 및 시스템 | |
WO2017171422A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 하향링크 제어 정보를 수신하는 방법 및 이를 지원하는 장치 | |
WO2017217799A1 (ko) | 무선 통신 시스템에서 물리 상향링크 제어 채널 송수신 방법 및 이를 지원하는 장치 | |
WO2016182366A1 (ko) | 비면허 대역을 지원하는 무선접속시스템에서 harq-ack 정보를 기반으로 경쟁 윈도우 크기를 조정하는 방법 및 이를 지원하는 장치 | |
WO2016182355A1 (ko) | 비면허 대역을 지원하는 무선접속시스템에서 경쟁 윈도우 크기를 조정하는 방법 및 이를 지원하는 장치 | |
WO2018143689A1 (ko) | 선점된 자원 정보를 지시하는 방법 및 이를 위한 장치 | |
WO2018021821A1 (ko) | 무선 통신 시스템에서 단말의 상향링크 제어 정보 전송 방법 및 이를 지원하는 장치 | |
WO2019194652A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 신호를 송수신하는 방법 및 이를 지원하는 장치 | |
WO2017155305A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 신호를 송수신하는 방법 및 이를 지원하는 장치 | |
WO2017131476A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 하향링크 lbt 파라미터를 조절하는 방법 및 이를 지원하는 장치 | |
WO2017171347A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 제어 정보를 전송하는 방법 및 이를 지원하는 장치 | |
WO2018151539A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 기지국과 단말 간 신호 송수신 방법 및 이를 지원하는 장치 | |
WO2017010764A1 (ko) | 비면허 대역 및 캐리어 결합을 지원하는 무선접속시스템에서 데이터 버스트 전송 방법 및 장치 | |
WO2016182356A1 (ko) | 비면허 대역을 지원하는 무선접속시스템에서 서로 다른 타입의 신호를 전송하기 위한 채널 접속 과정을 수행하는 방법 및 장치 | |
WO2018164553A2 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 단말의 임의 접속 절차 수행 방법 및 이를 수행하는 단말 | |
WO2017010773A1 (ko) | 비면허 대역을 지원하는 무선접속시스템에서 디스커버리 참조 신호를 전송하는 방법 및 장치 | |
WO2019027297A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 단말이 상향링크 신호를 전송하는 방법 및 이를 지원하는 장치 | |
WO2018048172A1 (ko) | 비면허 대역을 지원하는 무선 통신 시스템에서 상향링크 데이터 전송 방법 및 이를 지원하는 장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16882084 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2016882084 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2016882084 Country of ref document: EP Effective date: 20180731 |