US3847219A - Producing oil from tar sand - Google Patents
Producing oil from tar sand Download PDFInfo
- Publication number
- US3847219A US3847219A US00402930A US40293073A US3847219A US 3847219 A US3847219 A US 3847219A US 00402930 A US00402930 A US 00402930A US 40293073 A US40293073 A US 40293073A US 3847219 A US3847219 A US 3847219A
- Authority
- US
- United States
- Prior art keywords
- steam
- injection
- well
- production
- zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011275 tar sand Substances 0.000 title abstract description 21
- 239000012530 fluid Substances 0.000 claims abstract description 87
- 238000004519 manufacturing process Methods 0.000 claims abstract description 86
- 238000002347 injection Methods 0.000 claims abstract description 71
- 239000007924 injection Substances 0.000 claims abstract description 71
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 67
- 238000010793 Steam injection (oil industry) Methods 0.000 claims abstract description 12
- 230000003247 decreasing effect Effects 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 74
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 30
- 239000004576 sand Substances 0.000 claims description 13
- 229920006395 saturated elastomer Polymers 0.000 claims description 3
- 239000011269 tar Substances 0.000 abstract description 59
- 239000010426 asphalt Substances 0.000 abstract description 6
- 238000005755 formation reaction Methods 0.000 description 57
- 238000004891 communication Methods 0.000 description 13
- 238000010438 heat treatment Methods 0.000 description 9
- 239000007789 gas Substances 0.000 description 7
- 230000035699 permeability Effects 0.000 description 7
- 238000012423 maintenance Methods 0.000 description 6
- 239000011148 porous material Substances 0.000 description 5
- 238000011084 recovery Methods 0.000 description 5
- 238000011065 in-situ storage Methods 0.000 description 4
- 241001443588 Cottus gobio Species 0.000 description 3
- YXFVVABEGXRONW-UHFFFAOYSA-N Toluene Chemical compound CC1=CC=CC=C1 YXFVVABEGXRONW-UHFFFAOYSA-N 0.000 description 3
- 238000013459 approach Methods 0.000 description 3
- 238000002485 combustion reaction Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 3
- 229930195733 hydrocarbon Natural products 0.000 description 3
- 150000002430 hydrocarbons Chemical class 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 2
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 239000003546 flue gas Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 239000008186 active pharmaceutical agent Substances 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 229910010272 inorganic material Inorganic materials 0.000 description 1
- 239000011147 inorganic material Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 210000003141 lower extremity Anatomy 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 229920000136 polysorbate Polymers 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000009834 vaporization Methods 0.000 description 1
- 230000008016 vaporization Effects 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/18—Repressuring or vacuum methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
Definitions
- AppL-NO 402930 In a tar sand formation in which a relatively water- I impermeable zone overlies a water-permeable zone, [52] US. Cl. 166/263, 166/272 tar is recovered y injecting steam into the permeable [51] Int.
- bituminous fluidbearing formation characterized by having a relatively water-impermeable zone lying above and adjacent a water-permeable zone
- steam is injected into the permeable zone and maintained there at a high temperature and pressure, to decrease the viscosity of the bituminous fluid, in both zones
- the bituminous fluid can later be produced by reducing the pressure in the permeable zone by increasing the flow of fluids through a production well and oil can then be recovered from these fluids.
- oil recovery can be as much as percent of the oil in place in the formation so treated.
- This invention is a process for recovering bituminous fluid from a bituminous sand formation which contains at least one water-permeable zone and at least one adjacent, preferably overlying, water-impermeable zone and which has been penetrated by at least one injection well and at least one production well both of which communicate with a water-permeable zone.
- the process comprises a. injecting a hot aqueous fluid, preferably steam, into the permeable zone to establish a hot, waterpermeable channel between the injection and production wells, preferably so that the bituminous fluid in the channel has a mobility of at least 15 millidarcies/centipoise;
- Preferably steam is initially injected into a production well at very high injection rates while at the same time water is produced from an injection well and the injection well backpressure is maintained as low as possible to promote a high rate of steam zone advance.
- injection of steam is initiated through the injection well to the steam-permeable zone to establish the hot channel between the two wells. Once the hot channel is established the production of fluid is substantially restricted, i.e., the production well is throttled back to minimize inefficient production of steam.
- FIG. 1 depicts a vertical cross-section through a tar sand formation comprising an upper relatively waterimpermeable zone and a lower water-permeable zone and illustrates an arrangement of wells for carrying out one embodiment of the process of this invention.
- FIG. 2 is an overview of an idealized single 7-spot producing pattern.
- FIG. 3 is a graph presenting production-injection performance data for an experiment using the process of this invention on a laboratory scale.
- Tar sands are generally, but not always, characterized as being unconsolidated or friable structures which are either of a fluent nature, or they are held together by a bituminous material such that if this material is extracted at the surface, for instance, with toluene, the sands collapse.
- the bituminous fluid present in the tar sands frequently has an API gravity of between about l5, and is present to an extent in the tar sand formation of about 5-15 percent by weight.
- the bituminous fluid recovered by the process of this invention is the substantially hydrocarbon material which is associated with the inorganic material of the formation and can be referred to as bitumen, oil, tar, etc. For brevity this bituminous fluid will hereafter be referred to as tar.
- the tar sand formations in which the process of this invention is particularly useful have a relatively waterimpermeable zone lying adjacent, and preferably above, a relatively water permeable zone toward the bottom of the tar sand formation.
- Water in this context includes both liquid water and steam.
- these zones will be referred to simply as impermeable and permeable zones.
- Most of the remaining pore volume is taken up by water, referred to as inplace water.
- the naturally occurring tar in the tar sand formation generally exhibits a very low mobility (permeability divided by viscosity). For instance, in
- the initial mobility of the tar in much of the reservoir is about 7 X 10 millidarcies per centipoise (md/cp).
- md/cp millidarcies per centipoise
- the impermeable zone can be considered a relatively tar-rich zone while the permeable zone can be considered as a relatively tar-deficient zone. Both zones generally will be tar bearing.
- a fluid such as steam
- the tar-bearing sand interval in such formations will lie below the surface of the earth and will generally be covered by an overburden of from about feet to more than 1,000 feet. For the purposes of the process of this invention, it is preferred that the overburden be about 1,000 feet or more.
- the tar-bearing sand interval itself is generally at least 20 feet thick. Within such interval the permeable zone will be about 4 feet thick, with the impermeable zone making up the remainder of the interval. It is not unusual to find tar sand intervals 100 feet or more thick, wherein the impermeable zone is 50-90 feet thick.
- the process of this invention is carried out in a tar sand formation 10 which has been penetrated by at least one injection borehole 11 and at least one production borehole 12 both of which communicate with the permeable zone 13.
- the production borehole is the one through which substantially all of the tar is ultimately produced, although as explained below, steam may be injected into this borehole.
- the permeable zone 13 will lie below the relatively impermeable zone 14, the boreholes pass through the over-burden l5 and the impermeable zone 14 to communicate with the underlying, steampermeable zone 13.
- the injection and production boreholes are established using methods known in the art so that communication can be properly established and maintained between the surface of the earth l6 and the bottom of the formation. Alternatively, one borehole may be drilled in which both production and injection facilities are positioned.
- the process of this invention preferably requires that at least one production and one injection well are in communication with the permeable zone
- the number of wells used for production of large quantitles of bituminous fluid using the process of this invention can be much greater, for example, anywhere from a totalof 2 to 1,000 or more wells can be used.
- the wells are drilled using any of the known patterns, such as a S-spot, 7-spot, 9-spot, 13-spot, etc., patterns, over an area of l to 10 or more acres per pattern.
- FIG. 2 depicts a 7-spot pattern and is discussed below in Embodiment l.
- the first step of the process involves injecting a heat carrying fluid, i.e., hot aqueous fluid, into the permeable zone to establish a hot, water-permeable channel between the injection and production wells, thus establishing hot fluid communication between the wells and increasing the temperature of the formation.
- the hot, permeable channel is formed, i.e., hot fluid communication is established, when the temperature of the produced fluids approaches that of the injected fluid and- /or, in case of steam, when the bottom hole pressure of the production well approaches that of the injection well, i.e., there is a small. difference in bottom hole pressures between the two wells.
- the hot aqueous fluid injected may be hot water, steam or mixtures thereof.
- the steam which is used in this process can be generally high or low quality steam and can be mixed with other fluids, preferably non-condensable gases such as air or flue gas.
- the steam is produced at the surface by using methods known in the art and can be superheated or wet, but it is preferred that the steam which enters the permeable zone be at least 50 percent quality and more preferably about 7090 percent.
- the steam is injected into the water-permeable zone of the formation at the highest practical rates, i.e., sufficient to establish a hot, water-permeable channel which exhibits a tar mobility of at least md/cp in the shortest possible period of time.
- a substantial portion of the pore volume of the permeable zone formerly occupied by in-place, relatively low temperature water and tar is replaced by steam or hot water (condensed from steam or in-place water heated by the injected steam), and hot tar having a mobility of at least about 15 md/cp.
- the hot, water-permeable channel can be visualized as a passageway permeated by hot, aqueous fluids.
- the heat from the hot, aqueous fluids is transferred to the remaining tar occupying the permeable zone-and adjacent impermeable zone to increase the tars mobility within the formation.
- the injection rate will depend on the permeability thickness product of the permeable zone and the difference between the bottom hole injection pressure and the formation pressure. In some cases it is preferred to first fracture the formation to achieve the desired injection rates and speed the heating of the formation.
- injection rates may typically be about 0.05 to 0.15 pore volume (PV) over a period of about I to 4 months (where 1 PV corresponds to about 1,320,000 Bbl'for 7.0 acre per pattern spacing.
- the steam is injected at a high rate originally through the production well 12 (indicated by arrows 18) to maximize the length of time the zone 13 around the production well 12 is heated; and, at the same time, in-place water is produced through the injection well 11.
- injection into each producer may be staggered. When using a staggering technique, producers into which steam has already been injected are shut in to avoid inefficient production of steam and loss of heat, but otherwise fluids can be produced from them.
- the steam injection pressure at the production well 12 is higher than the formation pressure so that a front 17 of steam moves through the permeable zone while at the same time heating'the permeable zone 13, which is being filled by the steam and hot water and forcing the in-place water out of the other well 11 (indicated by arrows 19).
- Injection of steam through the producer can be continued until steam communication is established between the production and injection wells, but it is generally preferred that prior to the time that thesteam front reaches the injection well, that is, after measurements indicate that the steam front has traversed from 50-90 percent (and preferably about percent of the distance between the production well and the injection well, steam is then injected through the injection well to the permeable zone in order to establish the hot, water-permeable channel between the injection and production wells, thus minimizing the heat loss via produced fluids and the possibility of plugging due to a cooling tarbank. Generally this is accomplished by, stopping water production from the injection well and switching steam injection from the production to the injection well no later than when the bottom hole temperature and pressure of the produced water approach those of saturated steam.
- the period necessary to establish hot fluid communication will be primarily dependent upon achievable injection'rate and floodable reservoirivolume per pattern and may range from a month or more to several years, e.g. 3, but the most attractive times are less than about a year and preferably about 6 months.
- steam may continue to be injected through the injection well at substantially the same rates or slightly less (e.g. 10-40 percent less) while at the same time the production well is throttled back, i.e., production of fluids is substantially restricted, so that the hot, waterpermeable channel is established and expanded to the maximum possible size while minimizing inefficient production of steam from the production well.
- the high rate of injection is continued no longer than that time needed to obtain the desired mobility level of the tar in and near the channel, i.e., in a substantial portion of the permeable zone.
- the production well generally is throttled back shortly after hot fluid communication is established, not only to minimize loss of thermal energy through steam production, but also to reduce the period of time over which a high steam injection rate is to be maintained before desired steam temperature and pressure levels are attained throughout the permeable zone. It has been found that, since the heating of theoverlying, water-impermeable zone occurs predominantly by conduction and not convection, the tar viscosity in the impermeable zone is efficiently reduced by raising the temperature (and thus the pressure) of the steam in the permeable zone to relatively high values.
- the injection rate is decreased to a rate which is at least sufficient to maintain the mobility of the tar in said channel at the desired level; that'is, enough steam is added to make up for the heat losses to the base rock, the overlying tar-rich zone, and the slight losses out the production well.
- This rate will generally be about onetenth of the high rates used to establish a hot, waterpermeable channel and is sufficient to increase the tar mobility in the bulk of the formation to at least about md/cp.
- the bulk of the formation includes not only a substantial majority of the tar in the hot, .waterpermeable channel and permeable zone generally, but also a substantial portion of the adjacent impermeable zone, preferably at least a majority of the tar in the latter zone.
- the desired temperature and pressure are also established and the injection rate of steam is decreased nearly immediately thereafter to desired maintenance rate.
- a high backpressure is maintained at the production wells to minimize the inefficient escape of steam and to assist in maintaining the high pressure level.
- the underlying permeable zone is .typically maintained at high temperature and pressure for about 6 months to about 3 years, preferably about 2 years or less, to heat the overlying tar-rich section.
- the temperature and pressure of the formation are increased to a level at which the tar of the impermeable zone becomes mobile, i.e., will flow relatively easily either by gravity or to an area of reduced pressure.
- the pressure level at which the formation is to be maintained is larger than reservoir pressure, preferably about 500 to 2,500 pounds per square inch (psi) and even more preferably about l,200l ,500 psi, while i the temperature is maintained at corresponding satuthe minimum temperature is about 300F.
- a noncondensable gas such as air or flue gas under non-combustion conditions
- air is preferred.
- the noncondensable gas can be added in a ratio of about 50 to 150 cubic feet of gas per barrel of steam.
- a blowdown period is initiated wherein formation pressure is gradually reduced from the level at which it was being maintained (i.e., about 1,200-1 ,500 psi) to about l.00500 psi (preferably about 100-200 psi and most preferably about 100 psi) over a period of about 2 to 5 years.
- formation pressure is gradually reduced from the level at which it was being maintained (i.e., about 1,200-1 ,500 psi) to about l.00500 psi (preferably about 100-200 psi and most preferably about 100 psi) over a period of about 2 to 5 years.
- the tar is forced out of the formation by a combination of the expansion of the highpressure steam present in the reservoir and the gases generated by the vaporization of the hot waterand hydrocarbons as the reservoir pressure is reduced.
- the steam injection continues but still at a very low rate, that is, enough to keep the temtion to flow through the production well and thereafter,
- the permeability of the upper layer was 345 millidarcies (ind) which was less permeable than the lower layers permeability of 1,665 md, while the porosity of each of the layers was 0.27 (ratio of volume of the interstices to volume of the overall mass).
- the tar saturation of the available pore space in the upper. layer was about 0.80 while the tar saturation in the lower zone was 0.65.
- the model was further set up so that all wells has fractures with radii equal to 17.5 percent of the interwell distance (60 feet for the 7 acre, 7- spot pattern).
- FIG. 2 shows the double element of symmetry and one 7-spot well layout represented by the physical model.
- Numbers 12 and 12 represent wells through which the bitumen is ultimately produced, thus are referred to as production wells, while 11 represents the well into which steam is injected during bituminous fluid production.
- the crosshatched area in FIG. 2 is the area studied in the physical model.
- FIG. 3 shows the results from employing the process of this invention in the physical model. Results show that an oil recovery of 0.49 PV is obtained over about a 7 year period with a total steam injection of 2.22 PV and an oil/steam ratio in Bbl/Bbl of 0.22.
- steam was injected into production well 12 for a period of about 1 month, followed thereafter by steam injection into production 12' for a month, then the cycle was repeated. (See the upper left hand corner of FIG. 3).
- a low back pressure was maintained at injection well 11 to promote a high rate of steam advance.
- steam was injected into well 11 while the back pressure of production wells 12 and 12' was kept at a low value to promote a high rate of steam advance.
- the mobility of the tar towards the early part of production was about 20 md/cp, while towards the end of producing the mobility increased to about 100 md/cp, probably due. i.e., to the extensive heating which the lutcr-produccd tar underwent in the formation.
- BDW percent Quality indicates the number of barrels per day water injected as steam and the per cent quality of the steam injected.
- 3,965 BDW/90percent indicates 90percent quality steam was injected at a rate of 3,965 barrels water per day.
- Equivalent steam is the amount of water (at standard conditions) injected assuming all of it was converted to 1,150 btu/lb steam.
- a process for recovering bituminous fluid from a bituminous sand formation which contains at least one water-permeable zone and at least one adjacent, waterimpermeable zone and which has been penetrated by at least one injection well and at least one production well, both of which communicate with said waterperrneable zone, said process comprising:
- step (a) the rate of steam injection is maintained at substantially the same rate as step (a) until mobility value of at least millidarcieslcentipoise for said bituminous fluid in said permeable zone is attained, then the rate of injection is decreased to a rate sufficient to maintain said mobility value for the tar in said permeable zone and increase the mobility of thetar in the bulk of the formation to 15 millidarcies/centipoise.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Abstract
In a tar sand formation in which a relatively water-impermeable zone overlies a water-permeable zone, tar is recovered by injecting steam into the permeable zone to establish a hot, water-permeable channel between at least one production and at least one injection well, said channel preferably having a tar mobility of at least 15 md/cp; continuing steam injection at a rate sufficient to maintain mobility of the tar in the channel at 15 md/cp and increase the tar mobility in the bulk of the formation to about 15 md/cp, preferably while at about the same time restricting production of fluids from the production well; decreasing the pressure in the formation by increasing production from the production well; and recovering the bitumen from the fluids produced.
Description
United States Patent 1191 Wang et al. 51 Nov. 12, 1974 [54] PRODUCING OIL FROM TAR SAND 3,771,598 ll/l973 McBean lob/272 Inventors: Kuo H g; Michael Prats: Don 3,796,262 3/1974 Allen et al. l66/272 A. Campbell, all of Houston, Tex. Primary Exammer-Frank L. Abbott [73] Ass1gnees: Shell Canada Llmlted, Toronto, Assismm Examiner |ack Ebe| Canada; Exphrer Limited, Attorney, Agent, or Firm-Fredrik Marlowe Houston, Tex.
[21] AppL-NO: 402930 In a tar sand formation in which a relatively water- I impermeable zone overlies a water-permeable zone, [52] US. Cl. 166/263, 166/272 tar is recovered y injecting steam into the permeable [51] Int. Cl E2111 43/00, E2lb 43/24 Zone to establish a hot, water-permeable channel [58] Field of Search 166/263, 272, 303 tween at ast one pr du t n and at least one injection well, said channel preferably having a tar mobility [56] Referen es Cit d of at least 15 md/cp; continuing steam injection at a UNITED STATES PATENTS rate suificient to /maintain mobility hof the .tal;J an the channe at 15 md cp and increase t e tar mo iity in 35331333 1311322 EJ222111gz'gijii'ifi 122/323 tho book of too fooooooo oo ooooo 15 o o oiofooo- 3,324,946 6/1967 Belknap........,,....: .1: 166/272 while at about the Same time resmctmg Produc' 3,367,419 2/1968 Van Lookeren 166/272 of fluids from the Production decreasing the 3,396,791 8/1968 Van Meursetal. 166/303 pressure in the formation y increasing production 3,439,742 4/1969 Durie 166/272 from the production well; and recovering the bitumen 3,455,384 7/1969 Gilchrist et a1. 166/272 from the fluids produced. 3,483,924 l2/l969 Bleuins et al. l66/272 3,682,244 8/1972 Bowman et al. 166/272 20 Claims, 3 Drawing Figures PATENTEDRUY 12 97'- SHEEI 10F 2 FIG] PRODUCING OIL FROM TAR SAND BACKGROUND OF THE INVENTION 1. Field of the Invention This invention relates to a process for producing bituminous fluid from bituminous sand formations.
2. Prior Art In view of the increasing rate of energy usage in the world today, it is becoming clear that methods must be found to recover energy values from all available fossil sourcesof fuel, especially those heretofore relatively undeveloped unconventional sources such as tar sands. It has been known for many years that large deposits of tar sands exist in the world, such as those in the Edna and Sisquoc regions in California, regions in Venezuela, and regions in Alberta, Canada, especially along the Athabasca and Peace Rivers. In the Athabasca River area alone anywhere from 200 to 1,500 billion barrels of oil may be present. However, only a small percentage of the oil is economically recoverable by the now operable Great Canadian Oil Sands process, wherein the tar sands are surface mined and the tar separated from the tar sands so mined. It is clear that, if the energy values are to be recovered from the vast majority of the tar sand deposits, they must be recovered in situ. The process of this invention provides a new and particularly effective means of obtaining energy values from tar sands, particularly the tar sands in the Peace River area.
It has been proposed to mine the tar sand and to recover oil from the mined sands by various operations requiring mechanical preparation followed by washing and heating. Such a process is described in U.S. Pat. No. 3,401,110 to P. H. Floyd et al. The cost of these operations on a commercial scale is excessive both in terms of capital investment and operating expenses, especially for deep deposits. And, as pointed out before, if the majority of the energy values are to be recovered from the tar sands, the values will have to be recovered using in situ methods.
Many attempts have been made in the past to apply secondary and tertiary oil recovery methods to recover tar from tar sand formations. Although these recovery methods are of interest, the technology is not always economically applicable to the treatment of tar sands. Various attempts have been made using soaks, drives, in situ combustion, and combinations thereof, but to date there has yet to be commercial production. Examples of some of the in situ methods used in attempting to recover hydrocarbons from tar sand and viscous oilbearing formations include the following:,U.S. Pat. No. 2,825,408 to Watson; U.S. Pat. No. 3,040,809 to Helser; U.S. Pat. No. 2,881,838 to Morris; U.S. Pat. No. 3,221,813 to Closmann; U.S. Pat. No. 3,396,791 to Van Meurs et a1; U.S. Pat. No. 3,091,292 to Kerr; Canadian Pat. No. 679,222 to Muskat; and Venezuelan patents 631/72 and 632/72.
Another method is discussed in U.S. Pat. No. 3,439,742 to Durie which is useful in a formation wherein the permeability of the tar sand varies from being relatively water impermeable in the upper zone of the tar sand formation but relatively water permeable in the lower regions of the formation. In that process, a passageway is established between injection and production wells in the lower regions of the formation by injecting a fluid such as water or steam into the formation through the injection well to the production well, then a fluid, e.g., steam, is passed through the passageway from the injection well to the production well, thus entraining bituminous fluids with which the hot flowing fluid comes in contact. The mixture of bituminous fluids and hot fluids is then produced from the production well and the bituminous fluids are recovered therefrom.
In still another patent (U.S. Pat. No. 3,554,285 to Meldau) a process is described which is also useful in a formation comprising less water permeable oilbearing sand overlying a more water permeable oil bearing sand zone. This process is very similar to the Durie process, above, except that after communication is established between the injection and production wells in the more permeable zone, the formation is heated to more than 550F by injecting steam or an oxygen containing gas to establsih a combustion front, then heating is terminated to allow oil of decreased viscosity to flow into the permeable zone. This oil is then displaced towards the production well by again injecting the oxygen containing gas or steam, then the oil is pumped up from the well.
It has now been found that in a bituminous fluidbearing formation characterized by having a relatively water-impermeable zone lying above and adjacent a water-permeable zone, if steam is injected into the permeable zone and maintained there at a high temperature and pressure, to decrease the viscosity of the bituminous fluid, in both zones, the bituminous fluid can later be produced by reducing the pressure in the permeable zone by increasing the flow of fluids through a production well and oil can then be recovered from these fluids. By this method oil recovery can be as much as percent of the oil in place in the formation so treated.
SUMMARY OF THE INVENTION This invention is a process for recovering bituminous fluid from a bituminous sand formation which contains at least one water-permeable zone and at least one adjacent, preferably overlying, water-impermeable zone and which has been penetrated by at least one injection well and at least one production well both of which communicate with a water-permeable zone. The process comprises a. injecting a hot aqueous fluid, preferably steam, into the permeable zone to establish a hot, waterpermeable channel between the injection and production wells, preferably so that the bituminous fluid in the channel has a mobility of at least 15 millidarcies/centipoise;
b. continuing the injection of said hot aqueous fluid at a rate sufficient to maintain the desired mobility level of the bituminous fluid in the channel and sufficient to increase the mobility of the bituminous fluid in the bulk of the formation to at least 15 millidarcies per centipoise;
c. reducing the pressure in said formation by increasing the production of fluids at the production well, and
d. recovering bituminous fluids from the fluids produced.
Preferably steam is initially injected into a production well at very high injection rates while at the same time water is produced from an injection well and the injection well backpressure is maintained as low as possible to promote a high rate of steam zone advance. Before the steam front from the production well reaches the injection well, injection of steam is initiated through the injection well to the steam-permeable zone to establish the hot channel between the two wells. Once the hot channel is established the production of fluid is substantially restricted, i.e., the production well is throttled back to minimize inefficient production of steam.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 depicts a vertical cross-section through a tar sand formation comprising an upper relatively waterimpermeable zone and a lower water-permeable zone and illustrates an arrangement of wells for carrying out one embodiment of the process of this invention.
FIG. 2 is an overview of an idealized single 7-spot producing pattern.
FIG. 3 is a graph presenting production-injection performance data for an experiment using the process of this invention on a laboratory scale.
DETAILED DESCRIPTION OF THE INVENTION In general, although the process of this invention is described as-being particularly applicable to recovery of bituminous fluids from tar sand formations, but it is understood that the process is applicable to other bituminous sand formations such as high viscosity oilbearing sand formations which exhibit similar permeability properties, whether naturally occurring or manmade.
Tar sands are generally, but not always, characterized as being unconsolidated or friable structures which are either of a fluent nature, or they are held together by a bituminous material such that if this material is extracted at the surface, for instance, with toluene, the sands collapse. The bituminous fluid present in the tar sands frequently has an API gravity of between about l5, and is present to an extent in the tar sand formation of about 5-15 percent by weight. The bituminous fluid recovered by the process of this invention is the substantially hydrocarbon material which is associated with the inorganic material of the formation and can be referred to as bitumen, oil, tar, etc. For brevity this bituminous fluid will hereafter be referred to as tar.
The tar sand formations in which the process of this invention is particularly useful have a relatively waterimpermeable zone lying adjacent, and preferably above, a relatively water permeable zone toward the bottom of the tar sand formation. Water in this context includes both liquid water and steam. For brevity these zones will be referred to simply as impermeable and permeable zones. Generally, there is no clean-cut division between the two zones which clearly identifies one from the other, but usually the top of the tar-bearing interval will, exhibit a saturation which is typically 0.60-0.85 (i.e., 60-85 percent of the pore volume is filled with tar) while the lower extremities of the interval will range from about 0.0 to about 0.70. Most of the remaining pore volume is taken up by water, referred to as inplace water. The naturally occurring tar in the tar sand formation generally exhibits a very low mobility (permeability divided by viscosity). For instance, in
' the Upper Bullhead Formation of the Peace River Area in Alberta, Canada, the initial mobility of the tar in much of the reservoir is about 7 X 10 millidarcies per centipoise (md/cp). It will be apparent that the impermeable zone can be considered a relatively tar-rich zone while the permeable zone can be considered as a relatively tar-deficient zone. Both zones generally will be tar bearing. Thus when a fluid, such as steam, is injected into the formation the tendency of the steam is to preferentially enter the lower zone instead of the less permeable upper zone and steam communication will be preferentially established between wells through the permeable Zone. Generally this type of formation is found in the-Peace River area in Alberta, Canada, but such a formation may also be found in other areas where tar sands or viscous oil sands are located. The tar-bearing sand interval in such formations will lie below the surface of the earth and will generally be covered by an overburden of from about feet to more than 1,000 feet. For the purposes of the process of this invention, it is preferred that the overburden be about 1,000 feet or more. The tar-bearing sand interval itself is generally at least 20 feet thick. Within such interval the permeable zone will be about 4 feet thick, with the impermeable zone making up the remainder of the interval. It is not unusual to find tar sand intervals 100 feet or more thick, wherein the impermeable zone is 50-90 feet thick.
The process of this invention can be more clearly described by reference to FIG. 1, but it is to be understood that the following description is illustrative only and is not to be interpreted as limiting the scope of the invention.
Preferably the process of this invention is carried out in a tar sand formation 10 which has been penetrated by at least one injection borehole 11 and at least one production borehole 12 both of which communicate with the permeable zone 13. (The production borehole is the one through which substantially all of the tar is ultimately produced, although as explained below, steam may be injected into this borehole.) Since, generally, the permeable zone 13 will lie below the relatively impermeable zone 14, the boreholes pass through the over-burden l5 and the impermeable zone 14 to communicate with the underlying, steampermeable zone 13. The injection and production boreholes are established using methods known in the art so that communication can be properly established and maintained between the surface of the earth l6 and the bottom of the formation. Alternatively, one borehole may be drilled in which both production and injection facilities are positioned.
While the process of this invention preferably requires that at least one production and one injection well are in communication with the permeable zone, the number of wells used for production of large quantitles of bituminous fluid using the process of this invention can be much greater, for example, anywhere from a totalof 2 to 1,000 or more wells can be used. The wells are drilled using any of the known patterns, such as a S-spot, 7-spot, 9-spot, 13-spot, etc., patterns, over an area of l to 10 or more acres per pattern. FIG. 2 depicts a 7-spot pattern and is discussed below in Embodiment l.
The first step of the process involves injecting a heat carrying fluid, i.e., hot aqueous fluid, into the permeable zone to establish a hot, water-permeable channel between the injection and production wells, thus establishing hot fluid communication between the wells and increasing the temperature of the formation. The hot, permeable channel is formed, i.e., hot fluid communication is established, when the temperature of the produced fluids approaches that of the injected fluid and- /or, in case of steam, when the bottom hole pressure of the production well approaches that of the injection well, i.e., there is a small. difference in bottom hole pressures between the two wells. The hot aqueous fluid injected may be hot water, steam or mixtures thereof. Generally it is preferred to use steam but occasionally hot water is used to avoid plugging problems. The steam which is used in this process can be generally high or low quality steam and can be mixed with other fluids, preferably non-condensable gases such as air or flue gas. The steam is produced at the surface by using methods known in the art and can be superheated or wet, but it is preferred that the steam which enters the permeable zone be at least 50 percent quality and more preferably about 7090 percent.
The steam is injected into the water-permeable zone of the formation at the highest practical rates, i.e., sufficient to establish a hot, water-permeable channel which exhibits a tar mobility of at least md/cp in the shortest possible period of time. When the hot, waterpermeable channel is established, a substantial portion of the pore volume of the permeable zone formerly occupied by in-place, relatively low temperature water and tar, is replaced by steam or hot water (condensed from steam or in-place water heated by the injected steam), and hot tar having a mobility of at least about 15 md/cp. Thus at this point the hot, water-permeable channel can be visualized as a passageway permeated by hot, aqueous fluids. The heat from the hot, aqueous fluids is transferred to the remaining tar occupying the permeable zone-and adjacent impermeable zone to increase the tars mobility within the formation. The injection rate will depend on the permeability thickness product of the permeable zone and the difference between the bottom hole injection pressure and the formation pressure. In some cases it is preferred to first fracture the formation to achieve the desired injection rates and speed the heating of the formation.
Generally steam is injected at rates varying from a few hundred, e.g., 200 barrels (Bbl) of water (as 1,150 Btu/lb steam) to several thousand, e.g. 5,000, bbl. per day. Under conditions existing in the upper Bullhead Formation of the Peace River Area, injection rates may typically be about 0.05 to 0.15 pore volume (PV) over a period of about I to 4 months (where 1 PV corresponds to about 1,320,000 Bbl'for 7.0 acre per pattern spacing.
While steam is being injected at the highest practical rates through one well, the back pressure of the well from which fluids (predominently in-place water) are produced is kept as low as practical to promote a high rate of steam advance through the permeable zone. Preferably the steam is injected at a high rate originally through the production well 12 (indicated by arrows 18) to maximize the length of time the zone 13 around the production well 12 is heated; and, at the same time, in-place water is produced through the injection well 11. If more than one production well is used, injection into each producer may be staggered. When using a staggering technique, producers into which steam has already been injected are shut in to avoid inefficient production of steam and loss of heat, but otherwise fluids can be produced from them.
- During the period that steam communication is being established between the production well 12 and injection well 11, the steam injection pressure at the production well 12 is higher than the formation pressure so that a front 17 of steam moves through the permeable zone while at the same time heating'the permeable zone 13, which is being filled by the steam and hot water and forcing the in-place water out of the other well 11 (indicated by arrows 19). Injection of steam through the producer can be continued until steam communication is established between the production and injection wells, but it is generally preferred that prior to the time that thesteam front reaches the injection well, that is, after measurements indicate that the steam front has traversed from 50-90 percent (and preferably about percent of the distance between the production well and the injection well, steam is then injected through the injection well to the permeable zone in order to establish the hot, water-permeable channel between the injection and production wells, thus minimizing the heat loss via produced fluids and the possibility of plugging due to a cooling tarbank. Generally this is accomplished by, stopping water production from the injection well and switching steam injection from the production to the injection well no later than when the bottom hole temperature and pressure of the produced water approach those of saturated steam. The period necessary to establish hot fluid communication will be primarily dependent upon achievable injection'rate and floodable reservoirivolume per pattern and may range from a month or more to several years, e.g. 3, but the most attractive times are less than about a year and preferably about 6 months.
Once hot fluid communication is established, i.e., the hot, water-permeable channel in which the tar has a mobility of at least about l5 md/cp is formed, steam may continue to be injected through the injection well at substantially the same rates or slightly less (e.g. 10-40 percent less) while at the same time the production well is throttled back, i.e., production of fluids is substantially restricted, so that the hot, waterpermeable channel is established and expanded to the maximum possible size while minimizing inefficient production of steam from the production well. The high rate of injection is continued no longer than that time needed to obtain the desired mobility level of the tar in and near the channel, i.e., in a substantial portion of the permeable zone. The production well generally is throttled back shortly after hot fluid communication is established, not only to minimize loss of thermal energy through steam production, but also to reduce the period of time over which a high steam injection rate is to be maintained before desired steam temperature and pressure levels are attained throughout the permeable zone. It has been found that, since the heating of theoverlying, water-impermeable zone occurs predominantly by conduction and not convection, the tar viscosity in the impermeable zone is efficiently reduced by raising the temperature (and thus the pressure) of the steam in the permeable zone to relatively high values.
After establishing the hot, water-permeable channel, the injection rate is decreased to a rate which is at least sufficient to maintain the mobility of the tar in said channel at the desired level; that'is, enough steam is added to make up for the heat losses to the base rock, the overlying tar-rich zone, and the slight losses out the production well. This rate will generally be about onetenth of the high rates used to establish a hot, waterpermeable channel and is sufficient to increase the tar mobility in the bulk of the formation to at least about md/cp. The bulk of the formation includes not only a substantial majority of the tar in the hot, .waterpermeable channel and permeable zone generally, but also a substantial portion of the adjacent impermeable zone, preferably at least a majority of the tar in the latter zone. Preferably, once the channel between wells is established, the desired temperature and pressure are also established and the injection rate of steam is decreased nearly immediately thereafter to desired maintenance rate. Throughout this temperature and pressure maintenance period, a high backpressure is maintained at the production wells to minimize the inefficient escape of steam and to assist in maintaining the high pressure level. The underlying permeable zone is .typically maintained at high temperature and pressure for about 6 months to about 3 years, preferably about 2 years or less, to heat the overlying tar-rich section.
' The heating by conduction of the overlying tar-rich the reservoir. In turn, this improved flow of steam is thought to accelerate the heating of the upper part to cause some drainage of tar (primarily by gravity forces) from the impermeable to the permeable zone. The length of maintenance of the relatively high pressure and temperature will depend in part upon the size of the overlying section, and generally increases as the vertical dimensions of the section increases. .Thus for an impermeable zone of about 60 feet in thickness, the high-temperature/pressure-maintenance period will be about 1 to 2 years. An overlying tar-rich zone which is less than that thickness will, of course, require less time, while a thicker tar-rich zone will require a greater period of time.
Generally the temperature and pressure of the formation are increased to a level at which the tar of the impermeable zone becomes mobile, i.e., will flow relatively easily either by gravity or to an area of reduced pressure. The pressure level at which the formation is to be maintained is larger than reservoir pressure, preferably about 500 to 2,500 pounds per square inch (psi) and even more preferably about l,200l ,500 psi, while i the temperature is maintained at corresponding satuthe minimum temperature is about 300F.
it has been found that it is preferable to include, along with the steam preferably during the maintenance period, i.e., after hot fluid communication has been established, a noncondensable gas, such as air or flue gas under non-combustion conditions, as a means for accelerating oil production during the throttled production period. Because of its availability air is preferred. The noncondensable gas can be added in a ratio of about 50 to 150 cubic feet of gas per barrel of steam.
After the high temperature/pressure period has been maintained for a sufficient periodof time, i.e., about 6 months to about 3 years and preferably about 2 years, a blowdown period is initiated wherein formation pressure is gradually reduced from the level at which it was being maintained (i.e., about 1,200-1 ,500 psi) to about l.00500 psi (preferably about 100-200 psi and most preferably about 100 psi) over a period of about 2 to 5 years. It is thought that the tar is forced out of the formation by a combination of the expansion of the highpressure steam present in the reservoir and the gases generated by the vaporization of the hot waterand hydrocarbons as the reservoir pressure is reduced. During the blowdown period the steam injection continues but still at a very low rate, that is, enough to keep the temtion to flow through the production well and thereafter,
of course, recovering the oil or bituminous fluid from the fluids produced from the well.
Generally, the best results have been observed using the above sequence of steps, but certain improvements not depleted during the first short blowdown. This particular method is useful where the overlying tar-rich zone is thicker than the usual 50-90 foot-size impermeable zone. Flowing the' steam for the second time into this upper portion would result in more rapid heating than by conduction alone from the underlying steam channel, but such a multiple pressurization is generally not needed for a 60-foot reservoir. Instead of having a lengthy second pressurization period as described above, it is also possible to use a series of shortduration blowdown pulses, during the initial pressure maintenance phase, that is, reducing the pressure in the permeable zone over a short period of time, for example a week to two months, then immediately thereafter gradually returning the steam zone to the high pressure condition. It is thought that by developing 'a high pressure difference, the downward flow of the hot tar is accelerated during the blowdown pulses, and the upward steam flow into the depleted regions during the subsequent repressurization is improved. Again, this particular variation in the method is of more importance where the upper zone is thicker than about 50 to feet.
This invention will be further explained in detail with reference to the following specific embodiments which are given by way of illustration only and not by way of limitation.
EMBODIMENT l A physical model which simulated natural conditions in the Upper Bullhead Formation of the Peace River area tar sand accumulation was developed in the laboratory which was characterized by having a high permeability sand layer at the bottom of the simulated tar sand formation. The model represented a doubleelement of symmetry for a single 7-spot well pattern corresponding to 7.0 acres per pattern, i.e., one injection well and two production wells about 340 feet apart. The properties of the model were such that the thickness of the upper relatively bitumen-rich steamimpermeable layer corresponded to about 60 feet while the lower steam-permeable layer corresponded to about 30 feet. The permeability of the upper layer was 345 millidarcies (ind) which was less permeable than the lower layers permeability of 1,665 md, while the porosity of each of the layers was 0.27 (ratio of volume of the interstices to volume of the overall mass). The tar saturation of the available pore space in the upper. layer was about 0.80 while the tar saturation in the lower zone was 0.65. The model was further set up so that all wells has fractures with radii equal to 17.5 percent of the interwell distance (60 feet for the 7 acre, 7- spot pattern).
FIG. 2 shows the double element of symmetry and one 7-spot well layout represented by the physical model. Numbers 12 and 12 represent wells through which the bitumen is ultimately produced, thus are referred to as production wells, while 11 represents the well into which steam is injected during bituminous fluid production. The crosshatched area in FIG. 2 is the area studied in the physical model.
FIG. 3 shows the results from employing the process of this invention in the physical model. Results show that an oil recovery of 0.49 PV is obtained over about a 7 year period with a total steam injection of 2.22 PV and an oil/steam ratio in Bbl/Bbl of 0.22. In this experiment steam was injected into production well 12 for a period of about 1 month, followed thereafter by steam injection into production 12' for a month, then the cycle was repeated. (See the upper left hand corner of FIG. 3). During this time a low back pressure was maintained at injection well 11 to promote a high rate of steam advance. Thereafter, steam was injected into well 11 while the back pressure of production wells 12 and 12' was kept at a low value to promote a high rate of steam advance. Then wells 12 and 12' were throttled back so that the pressure and temperature of the steam zone would be maintained at a high level. While the steam is being injected into the injection well it is difficult to maintain the exact same pressure in the steam zone as indicated by the fluctuation in the pressure curve labeled P in FIG. 3. However, the pressure is maintained at about l,2001,700 psi before the final blowdown period begins. It should be noted that although the production wells are throttled for a period of about 2 years, there is a small amount of fluid produced during this period due to the need to insure steam communication between wells, and some bitumen is included therein, but it is clear from the results that the majority of the production occurs during the blowdown phase. The mobility of the tar towards the early part of production was about 20 md/cp, while towards the end of producing the mobility increased to about 100 md/cp, probably due. i.e., to the extensive heating which the lutcr-produccd tar underwent in the formation.
In FIG. 3 BDW percent Quality indicates the number of barrels per day water injected as steam and the per cent quality of the steam injected. Thus 3,965 BDW/90percent indicates 90percent quality steam was injected at a rate of 3,965 barrels water per day. Equivalent steam is the amount of water (at standard conditions) injected assuming all of it was converted to 1,150 btu/lb steam.
We claim as our invention:
1. A process for recovering bituminous fluid from a bituminous sand formation which contains at least one water-permeable zone and at least one adjacent, waterimpermeable zone and which has been penetrated by at least one injection well and at least one production well, both of which communicate with said waterperrneable zone, said process comprising:
a. injecting a hot aqueous fluid into said formation through at least one well while producing fluids at at least one other well to establish a hot, waterpermeable channel extending between the injection and production wells;
b. continuing the injection of said hot aqueous fluid at a rate at least sufficient to maintain said bituminous fluid mobility within said channel and to increase the mobility of the bituminous fluid in the bulk of the bituminous sand formation surrounding said path to at least 15 millidarcies per centipoise;
c. reducing the pressure in said formation by increasingthe production of fluids at the production well; and
d. recovering bituminous fluid from the fluids pro duced.
2. The process of claim 1 wherein the highest practical injection rates are maintained until said hot, waterpermeable channel is established.
3. The process of claim 2 wherein the rate of production of fluids at the production well is substantially restricted after said hot channel has been established between said injection and production wells.
4. The process of claim 2 wherein before said hot channel is established the back pressure of the well through which fluids are being produced is maintained at a low value to promote a high rate of growth of said channel in the permeable zone.
5. The process of claim 1 wherein said waterimpermeable zone lies above said water-permeable zone.
6. The process of claim 1 wherein said hot aqueous fluid is steam. I
7. The process of claim 6 wherein the highest practical injection rates are maintained until said channel is established.
8. The process of claim 7 wherein before said channel is established, the back pressure of the well through which fluids are being produced is maintained at a low value to promote a high rate of steam advance in the permeable zone.
9. The process of claim 7 wherein steam is first injected through the production well to establish said hot channel.
10. The process of claim 9 wherein a steam front moves through the permeable zone to force the inplace water from the formation out the injection well, and, before said steam front reaches the injection well. water production from the injection well is stopped and steam is then injected through the injection well to saidpermeable zone.
11. The process of claim wherein steam is injected through said injection well when said steam front has advanced about 50 to 90 per cent of the distance between said production well and said injection well.
12. The process of claim 8 wherein the rate of production of fluids from the well from which fluids are being produced is substantially restricted shortly after said channel is established.
13. The process of claim 12 wherein the rate of steam injection is maintained at substantially the same rate as step (a) until mobility value of at least millidarcieslcentipoise for said bituminous fluid in said permeable zone is attained, then the rate of injection is decreased to a rate sufficient to maintain said mobility value for the tar in said permeable zone and increase the mobility of thetar in the bulk of the formation to 15 millidarcies/centipoise.
14. The process of claim 13 wherein the decreased rate of steam injection is maintained for about six months to about three years.
15. The process of claim 14 wherein the pressure of the heated formation is maintained at a higher value than the initial reservoir pressure and the temperature is maintained at the corresponding saturated steam temperature.
16. The process of claim 15 wherein the pressure of said permeable zone is gradually reduced to about to 200 pounds per square inch over about 2 to 5 years.
non-
non-
Claims (20)
1. A PROCESS FOR RECOVERING BITUMINOUS FLUID FROM A BITUMINOUS SAND FORMATION WHICH CONTAINS AT LEAST ONE WATERPERMEABLE ZONE AND AT LEAST ONE ADJACENT, WATER-IMPERMEABLE ZONE AND WHICH HAS BEEN PENETRATED BY AT LEAST ONE INJECTION WELL AND AT LEAST ONE PRODUCTION WELL, BOTH OF WHICH COMMUNICATE WITH SAID WATER-PERMEABLE ZONE, SAID PROCESS COMPRISING: A. INJECTING A HOT AQUEOUS FLUID INTO SAID FORMATION THROUGH AT LEAST ONE WELL WHILE PRODUCING FLUIDS AT AT LEAST ONE OTHER WELL TO ESTABLISH A HOT, WATER-PERMEABLE CHANNEL EXTENDING BETWEEN THE INJECTION AND PRODUCTION WELLS; B. CONTINUING THE INJECTION OF SAID HOT AQUEOUS FLUID AT A RATE AT LEAST SUFFICIENT TO MAINTAIN SAID BITUMINOUS FLUID MOBILITY WITHIN SAID CHANNEL AND TO INCREASE THE MOBILITY OF THE BITUMINOUS FLUID IN THE BULK OF THE BITUMINOUS SAND FORMATION SURROUNDING SAID PATH TO AT LEAST 15 MILLIDARCIES PER CENTIPOISE; C. REDUCING THE PRESSURE IN SAID FORMATION BY INCREASING THE PRODUCTION OF FLUIDS AT THE PRODUCTION WELL; AND D. RECOVERING BITUMINOUS FLUID FROM THE FLUIDS PRODUCED.
2. The process of claim 1 wherein the highest practical injection rates are maintained until said hot, water-permeable channel is established.
3. The process of claim 2 wherein the rate of production of fluids at the production well is substantially restricted after said hot channel has been established between said injection and production wells.
4. The process of claim 2 wherein before said hot channel is established the back pressure of the well through which fluids are being produced is maintained at a low value to promote a high rate of growth of said channel in the permeable zone.
5. The process of claim 1 wherein said water-impermeable zone lies above said water-permeable zone.
6. The process of claim 1 wherein said hot aqueous fluid is steam.
7. The process of claim 6 wherein the highest practical injection rates are maintained until said channel is established.
8. The process of claim 7 wherein before said channel is established, the back pressure of the well through which fluids are being produced is maintained at a low value to promote a high rate of steam advance in the permeable zone.
9. The process of claim 7 wherein steam is first injected through the production well to establish said hot channel.
10. The process of claim 9 wherein a steam front moves through the permeable zone to force the in-place water From the formation out the injection well, and, before said steam front reaches the injection well, water production from the injection well is stopped and steam is then injected through the injection well to said permeable zone.
11. The process of claim 10 wherein steam is injected through said injection well when said steam front has advanced about 50 to 90 per cent of the distance between said production well and said injection well.
12. The process of claim 8 wherein the rate of production of fluids from the well from which fluids are being produced is substantially restricted shortly after said channel is established.
13. The process of claim 12 wherein the rate of steam injection is maintained at substantially the same rate as step (a) until mobility value of at least 15 millidarcies/centipoise for said bituminous fluid in said permeable zone is attained, then the rate of injection is decreased to a rate sufficient to maintain said mobility value for the tar in said permeable zone and increase the mobility of the tar in the bulk of the formation to 15 millidarcies/centipoise.
14. The process of claim 13 wherein the decreased rate of steam injection is maintained for about six months to about three years.
15. The process of claim 14 wherein the pressure of the heated formation is maintained at a higher value than the initial reservoir pressure and the temperature is maintained at the corresponding saturated steam temperature.
16. The process of claim 15 wherein the pressure of said permeable zone is gradually reduced to about 100 to 200 pounds per square inch over about 2 to 5 years.
17. The process of claim 1 wherein a non-condensable gas is injected into the permeable zone along with the hot aqueous fluid.
18. The process of claim 17 wherein the non-condensable gas is air.
19. The process of claim 6, wherein a non-condensable gas is injected into the permeable zone along with said steam.
20. The process of claim 19, wherein the non-condensable gas is air.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US00402930A US3847219A (en) | 1973-10-03 | 1973-10-03 | Producing oil from tar sand |
CA204,393A CA1004593A (en) | 1973-10-03 | 1974-07-09 | Producing oil from tar sands |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US00402930A US3847219A (en) | 1973-10-03 | 1973-10-03 | Producing oil from tar sand |
Publications (1)
Publication Number | Publication Date |
---|---|
US3847219A true US3847219A (en) | 1974-11-12 |
Family
ID=23593848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US00402930A Expired - Lifetime US3847219A (en) | 1973-10-03 | 1973-10-03 | Producing oil from tar sand |
Country Status (2)
Country | Link |
---|---|
US (1) | US3847219A (en) |
CA (1) | CA1004593A (en) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3938590A (en) * | 1974-06-26 | 1976-02-17 | Texaco Exploration Canada Ltd. | Method for recovering viscous asphaltic or bituminous petroleum |
US4020901A (en) * | 1976-01-19 | 1977-05-03 | Chevron Research Company | Arrangement for recovering viscous petroleum from thick tar sand |
US4022280A (en) * | 1976-05-17 | 1977-05-10 | Stoddard Xerxes T | Thermal recovery of hydrocarbons by washing an underground sand |
US4064942A (en) * | 1976-07-21 | 1977-12-27 | Shell Canada Limited | Aquifer-plugging steam soak for layered reservoir |
US4086964A (en) * | 1977-05-27 | 1978-05-02 | Shell Oil Company | Steam-channel-expanding steam foam drive |
US4121661A (en) * | 1977-09-28 | 1978-10-24 | Texas Exploration Canada, Ltd. | Viscous oil recovery method |
US4127170A (en) * | 1977-09-28 | 1978-11-28 | Texaco Exploration Canada Ltd. | Viscous oil recovery method |
US4223730A (en) * | 1976-01-23 | 1980-09-23 | Wintershall Aktiengesellschaft | Method for the tertiary recovery of petroleum by flooding with hot water and an aqueous alkaline solution |
DE3025750A1 (en) * | 1979-07-10 | 1981-01-29 | Exxon Production Research Co | METHOD FOR OBTAINING OIL FROM TEAR SANDS |
US4610304A (en) * | 1982-01-25 | 1986-09-09 | Doscher Todd M | Heavy oil recovery by high velocity non-condensible gas injection |
US4718489A (en) * | 1986-09-17 | 1988-01-12 | Alberta Oil Sands Technology And Research Authority | Pressure-up/blowdown combustion - a channelled reservoir recovery process |
US4874043A (en) * | 1988-09-19 | 1989-10-17 | Amoco Corporation | Method of producing viscous oil from subterranean formations |
US4957164A (en) * | 1989-04-17 | 1990-09-18 | Iit Research Institute | Enhanced oil recovery using flash-driven steamflooding |
US5318124A (en) * | 1991-11-14 | 1994-06-07 | Pecten International Company | Recovering hydrocarbons from tar sand or heavy oil reservoirs |
US20100108317A1 (en) * | 2008-11-03 | 2010-05-06 | Laricina Energy Ltd. | Passive Heating Assisted Recovery Methods |
US7980312B1 (en) * | 2005-06-20 | 2011-07-19 | Hill Gilman A | Integrated in situ retorting and refining of oil shale |
US9309756B1 (en) | 2011-10-25 | 2016-04-12 | Joseph A Affholter | In situ retorting of hydrocarbons |
US9429004B2 (en) | 2006-06-19 | 2016-08-30 | Joseph A. Affholter | In situ retorting and refining of hygrocarbons |
US9845668B2 (en) | 2012-06-14 | 2017-12-19 | Conocophillips Company | Side-well injection and gravity thermal recovery processes |
US10487636B2 (en) | 2017-07-27 | 2019-11-26 | Exxonmobil Upstream Research Company | Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes |
US11002123B2 (en) | 2017-08-31 | 2021-05-11 | Exxonmobil Upstream Research Company | Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation |
US11142681B2 (en) | 2017-06-29 | 2021-10-12 | Exxonmobil Upstream Research Company | Chasing solvent for enhanced recovery processes |
US11261725B2 (en) | 2017-10-24 | 2022-03-01 | Exxonmobil Upstream Research Company | Systems and methods for estimating and controlling liquid level using periodic shut-ins |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5803171A (en) * | 1995-09-29 | 1998-09-08 | Amoco Corporation | Modified continuous drive drainage process |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3259186A (en) * | 1963-08-05 | 1966-07-05 | Shell Oil Co | Secondary recovery process |
US3280909A (en) * | 1964-01-20 | 1966-10-25 | Shell Oil Co | Method of producing an oil bearing formation |
US3324946A (en) * | 1964-11-12 | 1967-06-13 | Phillips Petroleum Co | Prevention of water invasion into a heavy crude reservoir |
US3367419A (en) * | 1964-09-28 | 1968-02-06 | Shell Oil Co | Oil recovery by steam injection and pressure reduction |
US3396791A (en) * | 1966-09-09 | 1968-08-13 | Shell Oil Co | Steam drive for incompetent tar sands |
US3439742A (en) * | 1966-01-17 | 1969-04-22 | Shell Oil Co | Method of producing hydrocarbons from an underground formation |
US3455384A (en) * | 1966-07-14 | 1969-07-15 | Phillips Petroleum Co | Method of controlling steam injection into a reservoir in the production of hydrocarbons |
US3483924A (en) * | 1968-01-26 | 1969-12-16 | Chevron Res | Method of assisting the recovery of hydrocarbons using a steam drive |
US3682244A (en) * | 1971-03-05 | 1972-08-08 | Shell Oil Co | Control of a steam zone |
US3771598A (en) * | 1972-05-19 | 1973-11-13 | Tennco Oil Co | Method of secondary recovery of hydrocarbons |
US3796262A (en) * | 1971-12-09 | 1974-03-12 | Texaco Inc | Method for recovering oil from subterranean reservoirs |
-
1973
- 1973-10-03 US US00402930A patent/US3847219A/en not_active Expired - Lifetime
-
1974
- 1974-07-09 CA CA204,393A patent/CA1004593A/en not_active Expired
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3259186A (en) * | 1963-08-05 | 1966-07-05 | Shell Oil Co | Secondary recovery process |
US3280909A (en) * | 1964-01-20 | 1966-10-25 | Shell Oil Co | Method of producing an oil bearing formation |
US3367419A (en) * | 1964-09-28 | 1968-02-06 | Shell Oil Co | Oil recovery by steam injection and pressure reduction |
US3324946A (en) * | 1964-11-12 | 1967-06-13 | Phillips Petroleum Co | Prevention of water invasion into a heavy crude reservoir |
US3439742A (en) * | 1966-01-17 | 1969-04-22 | Shell Oil Co | Method of producing hydrocarbons from an underground formation |
US3455384A (en) * | 1966-07-14 | 1969-07-15 | Phillips Petroleum Co | Method of controlling steam injection into a reservoir in the production of hydrocarbons |
US3396791A (en) * | 1966-09-09 | 1968-08-13 | Shell Oil Co | Steam drive for incompetent tar sands |
US3483924A (en) * | 1968-01-26 | 1969-12-16 | Chevron Res | Method of assisting the recovery of hydrocarbons using a steam drive |
US3682244A (en) * | 1971-03-05 | 1972-08-08 | Shell Oil Co | Control of a steam zone |
US3796262A (en) * | 1971-12-09 | 1974-03-12 | Texaco Inc | Method for recovering oil from subterranean reservoirs |
US3771598A (en) * | 1972-05-19 | 1973-11-13 | Tennco Oil Co | Method of secondary recovery of hydrocarbons |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3938590A (en) * | 1974-06-26 | 1976-02-17 | Texaco Exploration Canada Ltd. | Method for recovering viscous asphaltic or bituminous petroleum |
US4020901A (en) * | 1976-01-19 | 1977-05-03 | Chevron Research Company | Arrangement for recovering viscous petroleum from thick tar sand |
US4223730A (en) * | 1976-01-23 | 1980-09-23 | Wintershall Aktiengesellschaft | Method for the tertiary recovery of petroleum by flooding with hot water and an aqueous alkaline solution |
US4022280A (en) * | 1976-05-17 | 1977-05-10 | Stoddard Xerxes T | Thermal recovery of hydrocarbons by washing an underground sand |
US4064942A (en) * | 1976-07-21 | 1977-12-27 | Shell Canada Limited | Aquifer-plugging steam soak for layered reservoir |
US4086964A (en) * | 1977-05-27 | 1978-05-02 | Shell Oil Company | Steam-channel-expanding steam foam drive |
US4121661A (en) * | 1977-09-28 | 1978-10-24 | Texas Exploration Canada, Ltd. | Viscous oil recovery method |
US4127170A (en) * | 1977-09-28 | 1978-11-28 | Texaco Exploration Canada Ltd. | Viscous oil recovery method |
DE3025750A1 (en) * | 1979-07-10 | 1981-01-29 | Exxon Production Research Co | METHOD FOR OBTAINING OIL FROM TEAR SANDS |
US4344485A (en) * | 1979-07-10 | 1982-08-17 | Exxon Production Research Company | Method for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids |
US4610304A (en) * | 1982-01-25 | 1986-09-09 | Doscher Todd M | Heavy oil recovery by high velocity non-condensible gas injection |
US4718489A (en) * | 1986-09-17 | 1988-01-12 | Alberta Oil Sands Technology And Research Authority | Pressure-up/blowdown combustion - a channelled reservoir recovery process |
US4874043A (en) * | 1988-09-19 | 1989-10-17 | Amoco Corporation | Method of producing viscous oil from subterranean formations |
US4957164A (en) * | 1989-04-17 | 1990-09-18 | Iit Research Institute | Enhanced oil recovery using flash-driven steamflooding |
US5318124A (en) * | 1991-11-14 | 1994-06-07 | Pecten International Company | Recovering hydrocarbons from tar sand or heavy oil reservoirs |
US9085972B1 (en) | 2005-06-20 | 2015-07-21 | Gilman A. Hill | Integrated in situ retorting and refining of heavy-oil and tar sand deposits |
US7980312B1 (en) * | 2005-06-20 | 2011-07-19 | Hill Gilman A | Integrated in situ retorting and refining of oil shale |
US8235117B1 (en) * | 2005-06-20 | 2012-08-07 | Hill Gilman A | Integrated in situ retorting and refining of heavy-oil and tar sand deposits |
US9429004B2 (en) | 2006-06-19 | 2016-08-30 | Joseph A. Affholter | In situ retorting and refining of hygrocarbons |
US7934549B2 (en) * | 2008-11-03 | 2011-05-03 | Laricina Energy Ltd. | Passive heating assisted recovery methods |
US20100108317A1 (en) * | 2008-11-03 | 2010-05-06 | Laricina Energy Ltd. | Passive Heating Assisted Recovery Methods |
US9309756B1 (en) | 2011-10-25 | 2016-04-12 | Joseph A Affholter | In situ retorting of hydrocarbons |
US9845668B2 (en) | 2012-06-14 | 2017-12-19 | Conocophillips Company | Side-well injection and gravity thermal recovery processes |
US11142681B2 (en) | 2017-06-29 | 2021-10-12 | Exxonmobil Upstream Research Company | Chasing solvent for enhanced recovery processes |
US10487636B2 (en) | 2017-07-27 | 2019-11-26 | Exxonmobil Upstream Research Company | Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes |
US11002123B2 (en) | 2017-08-31 | 2021-05-11 | Exxonmobil Upstream Research Company | Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation |
US11261725B2 (en) | 2017-10-24 | 2022-03-01 | Exxonmobil Upstream Research Company | Systems and methods for estimating and controlling liquid level using periodic shut-ins |
Also Published As
Publication number | Publication date |
---|---|
CA1004593A (en) | 1977-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3847219A (en) | Producing oil from tar sand | |
US20210277757A1 (en) | Pressure assisted oil recovery | |
US4116275A (en) | Recovery of hydrocarbons by in situ thermal extraction | |
CA2046107C (en) | Laterally and vertically staggered horizontal well hydrocarbon recovery method | |
US2897894A (en) | Recovery of oil from subterranean reservoirs | |
US4727937A (en) | Steamflood process employing horizontal and vertical wells | |
US3515213A (en) | Shale oil recovery process using heated oil-miscible fluids | |
US3692111A (en) | Stair-step thermal recovery of oil | |
US3739852A (en) | Thermal process for recovering oil | |
US4327805A (en) | Method for producing viscous hydrocarbons | |
US3333637A (en) | Petroleum recovery by gas-cock thermal backflow | |
US2946382A (en) | Process for recovering hydrocarbons from underground formations | |
US4612989A (en) | Combined replacement drive process for oil recovery | |
US10550681B2 (en) | Bottom-up gravity-assisted pressure drive | |
US4121661A (en) | Viscous oil recovery method | |
CA1291944C (en) | Method of recovering oil from heavy oil reservoirs | |
CA2928278A1 (en) | Sw-sagd with between heel and toe injection | |
US3349849A (en) | Thermoaugmentation of oil production from subterranean reservoirs | |
US2876838A (en) | Secondary recovery process | |
US3439742A (en) | Method of producing hydrocarbons from an underground formation | |
US4064942A (en) | Aquifer-plugging steam soak for layered reservoir | |
US4109722A (en) | Thermal oil recovery method | |
CA2899805C (en) | Dewatering lean zones with ncg injection using production and injection wells | |
US4109723A (en) | Thermal oil recovery method | |
US4373586A (en) | Method of solvent flooding to recover viscous oils |