Impeller replacing device for molten metal stirring equipment Download PDFInfo
- Publication number
- US3814400A US3814400A US00317002A US31700272A US3814400A US 3814400 A US3814400 A US 3814400A US 00317002 A US00317002 A US 00317002A US 31700272 A US31700272 A US 31700272A US 3814400 A US3814400 A US 3814400A
- Authority
- US
- United States
- Prior art keywords
- impeller
- hood
- floor
- truck
- molten metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002184 metal Substances 0.000 title claims abstract description 14
- 238000003756 stirring Methods 0.000 title claims abstract description 14
- 230000008878 coupling Effects 0.000 claims abstract description 10
- 238000010168 coupling process Methods 0.000 claims abstract description 10
- 238000005859 coupling reaction Methods 0.000 claims abstract description 10
- 230000008439 repair process Effects 0.000 description 4
- UNPLRYRWJLTVAE-UHFFFAOYSA-N Cloperastine hydrochloride Chemical compound Cl.C1=CC(Cl)=CC=C1C(C=1C=CC=CC=1)OCCN1CCCCC1 UNPLRYRWJLTVAE-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D27/00—Stirring devices for molten material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01F—MIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
- B01F35/00—Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
- B01F35/10—Maintenance of mixers
- B01F35/12—Maintenance of mixers using mechanical means
Definitions
- the impeller replacement device comprises a Work floor provided on the hood. Openings provided through the hood and the floor through which the impeller passes, a truck movable on the floor to the openings, and a work deck arranged above the opening of the floor.
- the present invention relates to a molten metal stirring device having an easily replaceable impeller.
- FIG. 1 shows the replacement work in a conventional art.
- FIG. 2 shows one example of the present inventive device.
- FIG. 3v is a cross-sectional view along AA line in FIG. 2.
- FIG. 4 shows the replacement truck in FIG. 2.
- FIG. 5 shows a cross-sectional view along BB line in FIG. 4.
- FIG. 6 shows a cross-sectional view along C-C line in FIG. 4.
- FIG. 7 shows a front view of another example of the replacement truck of the present invention.
- FIG. 8 shows a plane view of the truck in FIG. 7.
- the replacement of the impeller is done as shown in FIG. 1.
- the replacement is done in such a manner that the impeller 4 is put on the replacement truck 1 and operators replace the impeller within the hood 3 as shown.
- the operators are exposed to very hot temperature due to the residual heat of the hood 3 and the replacement is very severe work particularly in the summer season.
- the replacement has been a dangerous work because metal slag or the like adhering on the inside of the hood 3 often falls on the operator and hurts him, and it has been usual that the replacement work takes about 2 or 3 hours.
- One object of the present invention is to eliminate the above defect and provide a device in which the replacement of the impeller can be done in a short time.
- an opening 3 through which an impeller can pass is provided in the center portion of a hood 3, and a similar opening is provided also at a corresponding portion of a work floor A above the hood 3.
- a truck 5 is moveably arranged over the opening a and a work deck B is provided on the floor A.
- the impeller 4 For the replacement of the impeller, the impeller 4 is lifted above the opening 3 of the hood 3 and the opening a of the floor A, the truck 5 is moved to a position just below the impeller, and after the impeller is put on the truck the operators get on the deck B and perform the replacement.
- the space above the hood 3 is completely cut off from the heat even during the operation so that the operator is not exposed to the heat during the replacement work and can perform the work very easily. Thus the replacement work can be done very safely and in a short time.
- FIG. 4 which shows a plane view of the truck of the present invention
- the come-in directions of the take out truck 5 for worn impellers and the take-in truck 6 for new impellers are crossed at the point E in a right angle to each other.
- These trucks travel on the rails 7 provided along the opening a of the floor A so that the center of the trucks can move to the center E of the stirring device.
- the rail 7 is provided with a slit 8 through which the brim of the wheel 12 passes.
- the rails are not always necessary to be provided within the four pillars 9 and the rail may be provided only the time of impeller replacement.
- the impeller When the impeller is worn, the impeller is lifted up through the opening 3 of the hood 3 and the opening a of the floor A. Then the take-out truck 5 is advanced up to the center E of the device as shown in FIG. 4, and the worn impeller 4 is put on the truck 5.
- refractory linings 10 on the inside surface of the take-out truck 5 as shown in FIG. 5 to protect the operator from the heat of the impeller.
- handrails 11 may be provided as shown so that the operator can take out or in the truck thereby. It is also advantageous that the trucks are driven mechanically. Then the worn impeller 4 is put on the truck 5, the operators unfold the foldable decks 14, 15 and 16 over the deck B and disengage the coupling as shown in FIG. 2. When the coupling 18 is removed, the operator grasps the handrail 11 and takes out the truck 5 carrying the impeller 4.
- the new impeller 4' shown in FIG. 4 is taken in by the take-in truck 6.
- the new impeller 4 is put on the take-in truck 6 before the beginning of the replacement work so as to. save idle time thus increasing the efficiency of the replacement work.
- the center of the new impeller 4 is aligned with the center E of the stirring device, and the operators on the foldable decks l4, l5 and 16 perform the installment of the new impeller.
- the impeller is lifted up slightly and the take-in truck 6 is taken out to complete the replacement work.
- the replacement work is very safe and easy, and can be done only in 10 to 20 minutes.
- the foldable decks 14, 15 and 16 on which the operators disengage the coupling 19 are of such a structure as shown in FIG. 3, and when they are not used they are folded and placed outside the space made by connecting the four pillars of the stirring device. When they are used, they are partially expanded inwardly by means of the hinge l7 and completely expanded by the hinge 18.
- the impeller can be taken out by lifting up one 15 of the decks, and the new impeller can be taken in by lifting up the other 16 of the decks, thus the replacement work can be done very easily.
- FIG. 7 and FIG. 8 show a modification of the truck portion of the present invention.
- the replacement truck 20 is driven by a driving device 21 and runs on rails 22 and advances into the space made by connecting the four pillars 9 of the stirring device.
- the new impeller 13 On one portion of the upper side 23 of the replacement truck, the new impeller 13 is placed and on the other portion of the upper side the worn impeller 12 is placed.
- the truck After the worn impeller 4 is disengaged, the truck is moved to a position where the center E of the stirring device coincides with the center line of the new impeller. Then after the coupling 19 is connected, the truck 20 is moved outside the space made by the four pillars to complete the replacement work.
- the present invention has advantages that the operators are protected from the high heat and dangers, that the impeller replacement can be easily done in a short time.
- the impeller replacement device comprises a work floor provided on the hood, openings provided through the hood and the floor through which the impeller passes, a truck movable on the floor to the openings, and a work deck arranged above the opening of the floor.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Treatment Of Steel In Its Molten State (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
In a molten metal stirring equipment comprising a hood, a rotary shaft extending through the hood, an impeller attached to the end of the shaft by means of coupling and a molten metal vessel which is taken in and out below the hood, the impeller replacement device comprises a work floor provided on the hood, openings provided through the hood and the floor through which the impeller passes, a truck movable on the floor to the openings, and a work deck arranged above the opening of the floor.
Description
United States Patent [191 Seki June 4, 1974 IMPELLER REPLACING DEVICE FOR MOLTEN METAL STIRRING EQUIPMENT [75] Inventor: Masahiko Seki, Kitakyushu, Japan [73] Assignee: Nippon Steel Corporation, Tokyo,
Japan [22] Filed: Dec. 20, 1972 [21] Appl. No.: 317,002
[30] Foreign Application Priority Data Dec. 22, 1971 Japan 46-121408 [521 US. Cl. 266/] R, 266/15, 266/34 A [51] Int. Cl. C2lc 7/00 [58] Field of Search 266/1 R, 15, 16, 19, 34 A [56] References Cited UNlTED STATES PATENTS 3,459,536 8/1969 Touzalin et al. 266/34 A Primary ExaminerGerald A. Dost Attorney, Agent, or FirmToren, McGeady and Stanger [57] ABSTRACT In a molten metal stirring equipment comprising a hood, a rotary shaft extending through the hood, an impeller attached to the end of the shaft by means of coupling and a molten metal vessel which is taken in and out below the hood, the impeller replacement device comprises a Work floor provided on the hood. openings provided through the hood and the floor through which the impeller passes, a truck movable on the floor to the openings, and a work deck arranged above the opening of the floor.
2 Claims, 8 Drawing Figures PATENTEDJUH 4:974 3.814.400
I saw 1 or 4 (PRIOR ART) FIG! PATENTEUJUH 4 I974 SHEET 3 BF 4 FiG.6
IMPELLER REPLACING DEVICE FOR MOLTEN METAL STIRRING EQUIPMENT The present invention relates to a molten metal stirring device having an easily replaceable impeller.
The present invention will be described in details referring to the attached drawings.
FIG. 1 shows the replacement work in a conventional art.
FIG. 2 shows one example of the present inventive device.
FIG. 3v is a cross-sectional view along AA line in FIG. 2.
FIG. 4 shows the replacement truck in FIG. 2.
FIG. 5 shows a cross-sectional view along BB line in FIG. 4.
FIG. 6 shows a cross-sectional view along C-C line in FIG. 4.
FIG. 7 shows a front view of another example of the replacement truck of the present invention and;
FIG. 8 shows a plane view of the truck in FIG. 7.
According to a conventional molten metal stirring device, the replacement of the impeller is done as shown in FIG. 1. Namely, the replacement is done in such a manner that the impeller 4 is put on the replacement truck 1 and operators replace the impeller within the hood 3 as shown. Thus the operators are exposed to very hot temperature due to the residual heat of the hood 3 and the replacement is very severe work particularly in the summer season. Also the replacement has been a dangerous work because metal slag or the like adhering on the inside of the hood 3 often falls on the operator and hurts him, and it has been usual that the replacement work takes about 2 or 3 hours.
One object of the present invention is to eliminate the above defect and provide a device in which the replacement of the impeller can be done in a short time.
In FIG. 2, an opening 3 through which an impeller can pass is provided in the center portion of a hood 3, and a similar opening is provided also at a corresponding portion of a work floor A above the hood 3. A truck 5 is moveably arranged over the opening a and a work deck B is provided on the floor A.
For the replacement of the impeller, the impeller 4 is lifted above the opening 3 of the hood 3 and the opening a of the floor A, the truck 5 is moved to a position just below the impeller, and after the impeller is put on the truck the operators get on the deck B and perform the replacement.
In this case, by arranging a foldable deck 14, 15, 16 as shown in FIG. 3 the coupling 19 can be easily engaged or disengaged.
The space above the hood 3 is completely cut off from the heat even during the operation so that the operator is not exposed to the heat during the replacement work and can perform the work very easily. Thus the replacement work can be done very safely and in a short time.
In FIG. 4 which shows a plane view of the truck of the present invention, the come-in directions of the take out truck 5 for worn impellers and the take-in truck 6 for new impellers are crossed at the point E in a right angle to each other. These trucks travel on the rails 7 provided along the opening a of the floor A so that the center of the trucks can move to the center E of the stirring device. For this purpose, the rail 7 is provided with a slit 8 through which the brim of the wheel 12 passes.
The rails are not always necessary to be provided within the four pillars 9 and the rail may be provided only the time of impeller replacement.
Next explanations will be made on the replacement work.
When the impeller is worn, the impeller is lifted up through the opening 3 of the hood 3 and the opening a of the floor A. Then the take-out truck 5 is advanced up to the center E of the device as shown in FIG. 4, and the worn impeller 4 is put on the truck 5.
It is desirable to apply refractory linings 10 on the inside surface of the take-out truck 5 as shown in FIG. 5 to protect the operator from the heat of the impeller. Also handrails 11 may be provided as shown so that the operator can take out or in the truck thereby. It is also advantageous that the trucks are driven mechanically. Then the worn impeller 4 is put on the truck 5, the operators unfold the foldable decks 14, 15 and 16 over the deck B and disengage the coupling as shown in FIG. 2. When the coupling 18 is removed, the operator grasps the handrail 11 and takes out the truck 5 carrying the impeller 4.
The new impeller 4' shown in FIG. 4 is taken in by the take-in truck 6. The new impeller 4 is put on the take-in truck 6 before the beginning of the replacement work so as to. save idle time thus increasing the efficiency of the replacement work.
By pushing forward the take-in truck 6 carrying the new impeller 4, the center of the new impeller 4 is aligned with the center E of the stirring device, and the operators on the foldable decks l4, l5 and 16 perform the installment of the new impeller. When the installment is completed, the impeller is lifted up slightly and the take-in truck 6 is taken out to complete the replacement work.
In this way, the replacement work is very safe and easy, and can be done only in 10 to 20 minutes.
The foldable decks 14, 15 and 16 on which the operators disengage the coupling 19 are of such a structure as shown in FIG. 3, and when they are not used they are folded and placed outside the space made by connecting the four pillars of the stirring device. When they are used, they are partially expanded inwardly by means of the hinge l7 and completely expanded by the hinge 18.
After the operators on the decks disengage the coupling of the worn impeller, the impeller can be taken out by lifting up one 15 of the decks, and the new impeller can be taken in by lifting up the other 16 of the decks, thus the replacement work can be done very easily.
Regarding the transfer of the worn impeller on the take-out truck to a repair shop and the transfer of the new impeller from the repair shop and its placement on the take-in truck, these works can be done by providing hoist rails 18 running over the take-in truck 6 and the worn impeller 5 to the repair shop.
In this way, the impellers put on both of the take-in and take-out trucks can be lifted up only by one hoist, and it is possible to transfer the impellers to the repair shop by a very simple mechanism.
FIG. 7 and FIG. 8 show a modification of the truck portion of the present invention.
The replacement truck 20 is driven by a driving device 21 and runs on rails 22 and advances into the space made by connecting the four pillars 9 of the stirring device.
On one portion of the upper side 23 of the replacement truck, the new impeller 13 is placed and on the other portion of the upper side the worn impeller 12 is placed.
After the worn impeller 4 is disengaged, the truck is moved to a position where the center E of the stirring device coincides with the center line of the new impeller. Then after the coupling 19 is connected, the truck 20 is moved outside the space made by the four pillars to complete the replacement work.
As understood from the above, the present invention has advantages that the operators are protected from the high heat and dangers, that the impeller replacement can be easily done in a short time.
What is claimed is:
1. In a molten metal stirring equipment comprising a hood, a rotary shaft extending through the hood, an impeller attached to the end of the shaft by means of coupling and a molten metal vessel which is taken in and out below the hood, the impeller replacement device comprises a work floor provided on the hood, openings provided through the hood and the floor through which the impeller passes, a truck movable on the floor to the openings, and a work deck arranged above the opening of the floor.
2. The impeller replacement device according to claim 1 which the deck is foldable. v a:
Claims (2)
1. In a molten metal stirring equipment comprising a hood, a rotary shaft extending through the hood, an impeller attached to the end of the shaft by means of coupling and a molten metal vessel which is taken in and out below the hood, the impeller replacement device comprises a work floor provided on the hood, openings provided through the hood and the floor through which the impeller passes, a truck movable on the floor to the openings, and a work deck arranged above the opening of the floor.
2. The impeller replacement device according to claim 1 in which the deck is foldable.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1971121408U JPS515443Y2 (en) | 1971-12-22 | 1971-12-22 |
Publications (1)
Publication Number | Publication Date |
---|---|
US3814400A true US3814400A (en) | 1974-06-04 |
Family
ID=14810424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US00317002A Expired - Lifetime US3814400A (en) | 1971-12-22 | 1972-12-20 | Impeller replacing device for molten metal stirring equipment |
Country Status (5)
Country | Link |
---|---|
US (1) | US3814400A (en) |
JP (1) | JPS515443Y2 (en) |
AU (1) | AU472486B2 (en) |
FR (1) | FR2164837B1 (en) |
NL (1) | NL166324C (en) |
Cited By (41)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4898367A (en) * | 1988-07-22 | 1990-02-06 | The Stemcor Corporation | Dispersing gas into molten metal |
US4954167A (en) * | 1988-07-22 | 1990-09-04 | Cooper Paul V | Dispersing gas into molten metal |
US5294245A (en) * | 1990-11-19 | 1994-03-15 | Gilbert Ronald E | Melting metal particles and dispersing gas with vaned impeller |
US5944496A (en) * | 1996-12-03 | 1999-08-31 | Cooper; Paul V. | Molten metal pump with a flexible coupling and cement-free metal-transfer conduit connection |
US5951243A (en) * | 1997-07-03 | 1999-09-14 | Cooper; Paul V. | Rotor bearing system for molten metal pumps |
US6027685A (en) * | 1997-10-15 | 2000-02-22 | Cooper; Paul V. | Flow-directing device for molten metal pump |
US6303074B1 (en) | 1999-05-14 | 2001-10-16 | Paul V. Cooper | Mixed flow rotor for molten metal pumping device |
US6398525B1 (en) | 1998-08-11 | 2002-06-04 | Paul V. Cooper | Monolithic rotor and rigid coupling |
US6689310B1 (en) | 2000-05-12 | 2004-02-10 | Paul V. Cooper | Molten metal degassing device and impellers therefor |
US6723276B1 (en) | 2000-08-28 | 2004-04-20 | Paul V. Cooper | Scrap melter and impeller |
US7402276B2 (en) | 2003-07-14 | 2008-07-22 | Cooper Paul V | Pump with rotating inlet |
US7470392B2 (en) | 2003-07-14 | 2008-12-30 | Cooper Paul V | Molten metal pump components |
US7507367B2 (en) | 2002-07-12 | 2009-03-24 | Cooper Paul V | Protective coatings for molten metal devices |
US7731891B2 (en) | 2002-07-12 | 2010-06-08 | Cooper Paul V | Couplings for molten metal devices |
US7906068B2 (en) | 2003-07-14 | 2011-03-15 | Cooper Paul V | Support post system for molten metal pump |
US8178037B2 (en) | 2002-07-12 | 2012-05-15 | Cooper Paul V | System for releasing gas into molten metal |
US8337746B2 (en) | 2007-06-21 | 2012-12-25 | Cooper Paul V | Transferring molten metal from one structure to another |
US8361379B2 (en) | 2002-07-12 | 2013-01-29 | Cooper Paul V | Gas transfer foot |
US8366993B2 (en) | 2007-06-21 | 2013-02-05 | Cooper Paul V | System and method for degassing molten metal |
US8444911B2 (en) | 2009-08-07 | 2013-05-21 | Paul V. Cooper | Shaft and post tensioning device |
US8449814B2 (en) | 2009-08-07 | 2013-05-28 | Paul V. Cooper | Systems and methods for melting scrap metal |
US8524146B2 (en) | 2009-08-07 | 2013-09-03 | Paul V. Cooper | Rotary degassers and components therefor |
US8535603B2 (en) | 2009-08-07 | 2013-09-17 | Paul V. Cooper | Rotary degasser and rotor therefor |
US8613884B2 (en) | 2007-06-21 | 2013-12-24 | Paul V. Cooper | Launder transfer insert and system |
US8714914B2 (en) | 2009-09-08 | 2014-05-06 | Paul V. Cooper | Molten metal pump filter |
US9011761B2 (en) | 2013-03-14 | 2015-04-21 | Paul V. Cooper | Ladle with transfer conduit |
US9108244B2 (en) | 2009-09-09 | 2015-08-18 | Paul V. Cooper | Immersion heater for molten metal |
US9156087B2 (en) | 2007-06-21 | 2015-10-13 | Molten Metal Equipment Innovations, Llc | Molten metal transfer system and rotor |
US9205490B2 (en) | 2007-06-21 | 2015-12-08 | Molten Metal Equipment Innovations, Llc | Transfer well system and method for making same |
US9410744B2 (en) | 2010-05-12 | 2016-08-09 | Molten Metal Equipment Innovations, Llc | Vessel transfer insert and system |
US9409232B2 (en) | 2007-06-21 | 2016-08-09 | Molten Metal Equipment Innovations, Llc | Molten metal transfer vessel and method of construction |
US9643247B2 (en) | 2007-06-21 | 2017-05-09 | Molten Metal Equipment Innovations, Llc | Molten metal transfer and degassing system |
US9903383B2 (en) | 2013-03-13 | 2018-02-27 | Molten Metal Equipment Innovations, Llc | Molten metal rotor with hardened top |
US10052688B2 (en) | 2013-03-15 | 2018-08-21 | Molten Metal Equipment Innovations, Llc | Transfer pump launder system |
US10138892B2 (en) | 2014-07-02 | 2018-11-27 | Molten Metal Equipment Innovations, Llc | Rotor and rotor shaft for molten metal |
US10267314B2 (en) | 2016-01-13 | 2019-04-23 | Molten Metal Equipment Innovations, Llc | Tensioned support shaft and other molten metal devices |
US10428821B2 (en) | 2009-08-07 | 2019-10-01 | Molten Metal Equipment Innovations, Llc | Quick submergence molten metal pump |
US10947980B2 (en) | 2015-02-02 | 2021-03-16 | Molten Metal Equipment Innovations, Llc | Molten metal rotor with hardened blade tips |
US11149747B2 (en) | 2017-11-17 | 2021-10-19 | Molten Metal Equipment Innovations, Llc | Tensioned support post and other molten metal devices |
US11358216B2 (en) | 2019-05-17 | 2022-06-14 | Molten Metal Equipment Innovations, Llc | System for melting solid metal |
US11873845B2 (en) | 2021-05-28 | 2024-01-16 | Molten Metal Equipment Innovations, Llc | Molten metal transfer device |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3824886A1 (en) * | 1988-07-22 | 1990-01-25 | Janke & Kunkel Kg | VERTICAL STIRRING AND / OR KNEWING MACHINE WITH ROTATING BEARING GEARBOX |
IT1225238B (en) * | 1988-09-23 | 1990-11-02 | Co Ra Di Lardieri Salvatore | MAGNETIC DRIVE AGITATION GROUP |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3459536A (en) * | 1964-11-06 | 1969-08-05 | Interlake Steel Corp | Method for mixing molten metal |
-
1971
- 1971-12-22 JP JP1971121408U patent/JPS515443Y2/ja not_active Expired
-
1972
- 1972-12-19 AU AU50253/72A patent/AU472486B2/en not_active Expired
- 1972-12-20 US US00317002A patent/US3814400A/en not_active Expired - Lifetime
- 1972-12-21 FR FR7245767A patent/FR2164837B1/fr not_active Expired
- 1972-12-22 NL NL7217535.A patent/NL166324C/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3459536A (en) * | 1964-11-06 | 1969-08-05 | Interlake Steel Corp | Method for mixing molten metal |
Cited By (112)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4898367A (en) * | 1988-07-22 | 1990-02-06 | The Stemcor Corporation | Dispersing gas into molten metal |
US4954167A (en) * | 1988-07-22 | 1990-09-04 | Cooper Paul V | Dispersing gas into molten metal |
US5294245A (en) * | 1990-11-19 | 1994-03-15 | Gilbert Ronald E | Melting metal particles and dispersing gas with vaned impeller |
US5944496A (en) * | 1996-12-03 | 1999-08-31 | Cooper; Paul V. | Molten metal pump with a flexible coupling and cement-free metal-transfer conduit connection |
US6345964B1 (en) | 1996-12-03 | 2002-02-12 | Paul V. Cooper | Molten metal pump with metal-transfer conduit molten metal pump |
US5951243A (en) * | 1997-07-03 | 1999-09-14 | Cooper; Paul V. | Rotor bearing system for molten metal pumps |
US6027685A (en) * | 1997-10-15 | 2000-02-22 | Cooper; Paul V. | Flow-directing device for molten metal pump |
US6398525B1 (en) | 1998-08-11 | 2002-06-04 | Paul V. Cooper | Monolithic rotor and rigid coupling |
US6303074B1 (en) | 1999-05-14 | 2001-10-16 | Paul V. Cooper | Mixed flow rotor for molten metal pumping device |
US6689310B1 (en) | 2000-05-12 | 2004-02-10 | Paul V. Cooper | Molten metal degassing device and impellers therefor |
US6723276B1 (en) | 2000-08-28 | 2004-04-20 | Paul V. Cooper | Scrap melter and impeller |
US9435343B2 (en) | 2002-07-12 | 2016-09-06 | Molten Meal Equipment Innovations, LLC | Gas-transfer foot |
US9034244B2 (en) | 2002-07-12 | 2015-05-19 | Paul V. Cooper | Gas-transfer foot |
US7507367B2 (en) | 2002-07-12 | 2009-03-24 | Cooper Paul V | Protective coatings for molten metal devices |
US7731891B2 (en) | 2002-07-12 | 2010-06-08 | Cooper Paul V | Couplings for molten metal devices |
US8529828B2 (en) | 2002-07-12 | 2013-09-10 | Paul V. Cooper | Molten metal pump components |
US8409495B2 (en) | 2002-07-12 | 2013-04-02 | Paul V. Cooper | Rotor with inlet perimeters |
US8110141B2 (en) | 2002-07-12 | 2012-02-07 | Cooper Paul V | Pump with rotating inlet |
US8178037B2 (en) | 2002-07-12 | 2012-05-15 | Cooper Paul V | System for releasing gas into molten metal |
US8440135B2 (en) | 2002-07-12 | 2013-05-14 | Paul V. Cooper | System for releasing gas into molten metal |
US8361379B2 (en) | 2002-07-12 | 2013-01-29 | Cooper Paul V | Gas transfer foot |
US8501084B2 (en) | 2003-07-14 | 2013-08-06 | Paul V. Cooper | Support posts for molten metal pumps |
US8075837B2 (en) | 2003-07-14 | 2011-12-13 | Cooper Paul V | Pump with rotating inlet |
US7402276B2 (en) | 2003-07-14 | 2008-07-22 | Cooper Paul V | Pump with rotating inlet |
US7470392B2 (en) | 2003-07-14 | 2008-12-30 | Cooper Paul V | Molten metal pump components |
US7906068B2 (en) | 2003-07-14 | 2011-03-15 | Cooper Paul V | Support post system for molten metal pump |
US8475708B2 (en) | 2003-07-14 | 2013-07-02 | Paul V. Cooper | Support post clamps for molten metal pumps |
US10458708B2 (en) | 2007-06-21 | 2019-10-29 | Molten Metal Equipment Innovations, Llc | Transferring molten metal from one structure to another |
US10345045B2 (en) | 2007-06-21 | 2019-07-09 | Molten Metal Equipment Innovations, Llc | Vessel transfer insert and system |
US11185916B2 (en) | 2007-06-21 | 2021-11-30 | Molten Metal Equipment Innovations, Llc | Molten metal transfer vessel with pump |
US11130173B2 (en) | 2007-06-21 | 2021-09-28 | Molten Metal Equipment Innovations, LLC. | Transfer vessel with dividing wall |
US8613884B2 (en) | 2007-06-21 | 2013-12-24 | Paul V. Cooper | Launder transfer insert and system |
US11103920B2 (en) | 2007-06-21 | 2021-08-31 | Molten Metal Equipment Innovations, Llc | Transfer structure with molten metal pump support |
US8753563B2 (en) | 2007-06-21 | 2014-06-17 | Paul V. Cooper | System and method for degassing molten metal |
US11020798B2 (en) | 2007-06-21 | 2021-06-01 | Molten Metal Equipment Innovations, Llc | Method of transferring molten metal |
US9017597B2 (en) | 2007-06-21 | 2015-04-28 | Paul V. Cooper | Transferring molten metal using non-gravity assist launder |
US11759854B2 (en) | 2007-06-21 | 2023-09-19 | Molten Metal Equipment Innovations, Llc | Molten metal transfer structure and method |
US10562097B2 (en) | 2007-06-21 | 2020-02-18 | Molten Metal Equipment Innovations, Llc | Molten metal transfer system and rotor |
US8366993B2 (en) | 2007-06-21 | 2013-02-05 | Cooper Paul V | System and method for degassing molten metal |
US9156087B2 (en) | 2007-06-21 | 2015-10-13 | Molten Metal Equipment Innovations, Llc | Molten metal transfer system and rotor |
US9205490B2 (en) | 2007-06-21 | 2015-12-08 | Molten Metal Equipment Innovations, Llc | Transfer well system and method for making same |
US10352620B2 (en) | 2007-06-21 | 2019-07-16 | Molten Metal Equipment Innovations, Llc | Transferring molten metal from one structure to another |
US11167345B2 (en) | 2007-06-21 | 2021-11-09 | Molten Metal Equipment Innovations, Llc | Transfer system with dual-flow rotor |
US10274256B2 (en) | 2007-06-21 | 2019-04-30 | Molten Metal Equipment Innovations, Llc | Vessel transfer systems and devices |
US9383140B2 (en) | 2007-06-21 | 2016-07-05 | Molten Metal Equipment Innovations, Llc | Transferring molten metal from one structure to another |
US10195664B2 (en) | 2007-06-21 | 2019-02-05 | Molten Metal Equipment Innovations, Llc | Multi-stage impeller for molten metal |
US9409232B2 (en) | 2007-06-21 | 2016-08-09 | Molten Metal Equipment Innovations, Llc | Molten metal transfer vessel and method of construction |
US10072891B2 (en) | 2007-06-21 | 2018-09-11 | Molten Metal Equipment Innovations, Llc | Transferring molten metal using non-gravity assist launder |
US8337746B2 (en) | 2007-06-21 | 2012-12-25 | Cooper Paul V | Transferring molten metal from one structure to another |
US9982945B2 (en) | 2007-06-21 | 2018-05-29 | Molten Metal Equipment Innovations, Llc | Molten metal transfer vessel and method of construction |
US9925587B2 (en) | 2007-06-21 | 2018-03-27 | Molten Metal Equipment Innovations, Llc | Method of transferring molten metal from a vessel |
US9909808B2 (en) | 2007-06-21 | 2018-03-06 | Molten Metal Equipment Innovations, Llc | System and method for degassing molten metal |
US9862026B2 (en) | 2007-06-21 | 2018-01-09 | Molten Metal Equipment Innovations, Llc | Method of forming transfer well |
US9566645B2 (en) | 2007-06-21 | 2017-02-14 | Molten Metal Equipment Innovations, Llc | Molten metal transfer system and rotor |
US9581388B2 (en) | 2007-06-21 | 2017-02-28 | Molten Metal Equipment Innovations, Llc | Vessel transfer insert and system |
US9855600B2 (en) | 2007-06-21 | 2018-01-02 | Molten Metal Equipment Innovations, Llc | Molten metal transfer system and rotor |
US9643247B2 (en) | 2007-06-21 | 2017-05-09 | Molten Metal Equipment Innovations, Llc | Molten metal transfer and degassing system |
US9657578B2 (en) | 2009-08-07 | 2017-05-23 | Molten Metal Equipment Innovations, Llc | Rotary degassers and components therefor |
US10570745B2 (en) | 2009-08-07 | 2020-02-25 | Molten Metal Equipment Innovations, Llc | Rotary degassers and components therefor |
US9506129B2 (en) | 2009-08-07 | 2016-11-29 | Molten Metal Equipment Innovations, Llc | Rotary degasser and rotor therefor |
US8449814B2 (en) | 2009-08-07 | 2013-05-28 | Paul V. Cooper | Systems and methods for melting scrap metal |
US8535603B2 (en) | 2009-08-07 | 2013-09-17 | Paul V. Cooper | Rotary degasser and rotor therefor |
US9470239B2 (en) | 2009-08-07 | 2016-10-18 | Molten Metal Equipment Innovations, Llc | Threaded tensioning device |
US9464636B2 (en) | 2009-08-07 | 2016-10-11 | Molten Metal Equipment Innovations, Llc | Tension device graphite component used in molten metal |
US9377028B2 (en) | 2009-08-07 | 2016-06-28 | Molten Metal Equipment Innovations, Llc | Tensioning device extending beyond component |
US9422942B2 (en) | 2009-08-07 | 2016-08-23 | Molten Metal Equipment Innovations, Llc | Tension device with internal passage |
US8444911B2 (en) | 2009-08-07 | 2013-05-21 | Paul V. Cooper | Shaft and post tensioning device |
US8524146B2 (en) | 2009-08-07 | 2013-09-03 | Paul V. Cooper | Rotary degassers and components therefor |
US9080577B2 (en) | 2009-08-07 | 2015-07-14 | Paul V. Cooper | Shaft and post tensioning device |
US10428821B2 (en) | 2009-08-07 | 2019-10-01 | Molten Metal Equipment Innovations, Llc | Quick submergence molten metal pump |
US9328615B2 (en) | 2009-08-07 | 2016-05-03 | Molten Metal Equipment Innovations, Llc | Rotary degassers and components therefor |
US9382599B2 (en) | 2009-08-07 | 2016-07-05 | Molten Metal Equipment Innovations, Llc | Rotary degasser and rotor therefor |
US8714914B2 (en) | 2009-09-08 | 2014-05-06 | Paul V. Cooper | Molten metal pump filter |
US10309725B2 (en) | 2009-09-09 | 2019-06-04 | Molten Metal Equipment Innovations, Llc | Immersion heater for molten metal |
US9108244B2 (en) | 2009-09-09 | 2015-08-18 | Paul V. Cooper | Immersion heater for molten metal |
US9482469B2 (en) | 2010-05-12 | 2016-11-01 | Molten Metal Equipment Innovations, Llc | Vessel transfer insert and system |
US9410744B2 (en) | 2010-05-12 | 2016-08-09 | Molten Metal Equipment Innovations, Llc | Vessel transfer insert and system |
US10641279B2 (en) | 2013-03-13 | 2020-05-05 | Molten Metal Equipment Innovations, Llc | Molten metal rotor with hardened tip |
US9903383B2 (en) | 2013-03-13 | 2018-02-27 | Molten Metal Equipment Innovations, Llc | Molten metal rotor with hardened top |
US11391293B2 (en) | 2013-03-13 | 2022-07-19 | Molten Metal Equipment Innovations, Llc | Molten metal rotor with hardened top |
US10126059B2 (en) | 2013-03-14 | 2018-11-13 | Molten Metal Equipment Innovations, Llc | Controlled molten metal flow from transfer vessel |
US10126058B2 (en) | 2013-03-14 | 2018-11-13 | Molten Metal Equipment Innovations, Llc | Molten metal transferring vessel |
US9587883B2 (en) | 2013-03-14 | 2017-03-07 | Molten Metal Equipment Innovations, Llc | Ladle with transfer conduit |
US9011761B2 (en) | 2013-03-14 | 2015-04-21 | Paul V. Cooper | Ladle with transfer conduit |
US10302361B2 (en) | 2013-03-14 | 2019-05-28 | Molten Metal Equipment Innovations, Llc | Transfer vessel for molten metal pumping device |
US10307821B2 (en) | 2013-03-15 | 2019-06-04 | Molten Metal Equipment Innovations, Llc | Transfer pump launder system |
US10052688B2 (en) | 2013-03-15 | 2018-08-21 | Molten Metal Equipment Innovations, Llc | Transfer pump launder system |
US10322451B2 (en) | 2013-03-15 | 2019-06-18 | Molten Metal Equipment Innovations, Llc | Transfer pump launder system |
US10138892B2 (en) | 2014-07-02 | 2018-11-27 | Molten Metal Equipment Innovations, Llc | Rotor and rotor shaft for molten metal |
US10465688B2 (en) | 2014-07-02 | 2019-11-05 | Molten Metal Equipment Innovations, Llc | Coupling and rotor shaft for molten metal devices |
US11939994B2 (en) | 2014-07-02 | 2024-03-26 | Molten Metal Equipment Innovations, Llc | Rotor and rotor shaft for molten metal |
US11286939B2 (en) | 2014-07-02 | 2022-03-29 | Molten Metal Equipment Innovations, Llc | Rotor and rotor shaft for molten metal |
US10947980B2 (en) | 2015-02-02 | 2021-03-16 | Molten Metal Equipment Innovations, Llc | Molten metal rotor with hardened blade tips |
US11933324B2 (en) | 2015-02-02 | 2024-03-19 | Molten Metal Equipment Innovations, Llc | Molten metal rotor with hardened blade tips |
US10641270B2 (en) | 2016-01-13 | 2020-05-05 | Molten Metal Equipment Innovations, Llc | Tensioned support shaft and other molten metal devices |
US10267314B2 (en) | 2016-01-13 | 2019-04-23 | Molten Metal Equipment Innovations, Llc | Tensioned support shaft and other molten metal devices |
US11098720B2 (en) | 2016-01-13 | 2021-08-24 | Molten Metal Equipment Innovations, Llc | Tensioned rotor shaft for molten metal |
US11519414B2 (en) | 2016-01-13 | 2022-12-06 | Molten Metal Equipment Innovations, Llc | Tensioned rotor shaft for molten metal |
US11098719B2 (en) | 2016-01-13 | 2021-08-24 | Molten Metal Equipment Innovations, Llc | Tensioned support shaft and other molten metal devices |
US12031550B2 (en) | 2017-11-17 | 2024-07-09 | Molten Metal Equipment Innovations, Llc | Tensioned support post and other molten metal devices |
US11976672B2 (en) | 2017-11-17 | 2024-05-07 | Molten Metal Equipment Innovations, Llc | Tensioned support post and other molten metal devices |
US11149747B2 (en) | 2017-11-17 | 2021-10-19 | Molten Metal Equipment Innovations, Llc | Tensioned support post and other molten metal devices |
US11358217B2 (en) | 2019-05-17 | 2022-06-14 | Molten Metal Equipment Innovations, Llc | Method for melting solid metal |
US11358216B2 (en) | 2019-05-17 | 2022-06-14 | Molten Metal Equipment Innovations, Llc | System for melting solid metal |
US11759853B2 (en) | 2019-05-17 | 2023-09-19 | Molten Metal Equipment Innovations, Llc | Melting metal on a raised surface |
US11931803B2 (en) | 2019-05-17 | 2024-03-19 | Molten Metal Equipment Innovations, Llc | Molten metal transfer system and method |
US11931802B2 (en) | 2019-05-17 | 2024-03-19 | Molten Metal Equipment Innovations, Llc | Molten metal controlled flow launder |
US11471938B2 (en) | 2019-05-17 | 2022-10-18 | Molten Metal Equipment Innovations, Llc | Smart molten metal pump |
US11858036B2 (en) | 2019-05-17 | 2024-01-02 | Molten Metal Equipment Innovations, Llc | System and method to feed mold with molten metal |
US11858037B2 (en) | 2019-05-17 | 2024-01-02 | Molten Metal Equipment Innovations, Llc | Smart molten metal pump |
US11850657B2 (en) | 2019-05-17 | 2023-12-26 | Molten Metal Equipment Innovations, Llc | System for melting solid metal |
US11873845B2 (en) | 2021-05-28 | 2024-01-16 | Molten Metal Equipment Innovations, Llc | Molten metal transfer device |
Also Published As
Publication number | Publication date |
---|---|
NL166324C (en) | 1981-07-15 |
NL7217535A (en) | 1973-06-26 |
FR2164837B1 (en) | 1976-08-27 |
AU472486B2 (en) | 1974-06-20 |
JPS4874802U (en) | 1973-09-18 |
NL166324B (en) | 1981-02-16 |
JPS515443Y2 (en) | 1976-02-16 |
AU5025372A (en) | 1974-06-20 |
FR2164837A1 (en) | 1973-08-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3814400A (en) | Impeller replacing device for molten metal stirring equipment | |
GB1024950A (en) | Working platform, particularly for the lining of converters and other metallurgical vessels and furnaces | |
FI86009B (en) | Method for repair of a furnace lining | |
GB1047963A (en) | Device for re-lining refactory lined vessels such as converters | |
US4561638A (en) | Installation with a refractorily lined metallurgical vessel | |
JPS5528354A (en) | Working method for repairing vacuum tank of degassing apparatus for molten steel | |
FR2437258B1 (en) | ||
CN206154028U (en) | Movable emery wheel milling machine | |
US4087082A (en) | Device for exchanging and/or repairing the down spout and seating brick in a steel ladle | |
KR20200075298A (en) | Cutting equipment for post-processing of castings | |
US3586305A (en) | Furnace tapping system | |
SU935445A1 (en) | Bridge crane hoisting carriage | |
CN110885086B (en) | Automatic calcium carbide pot lifting device, pot lifting system and automatic calcium carbide pot removing method | |
CN107956198A (en) | A kind of pavement cutting machine for being switched fast cutting sheet | |
KR101008054B1 (en) | An apparatus for separating a remained molten iron solidified in tundish | |
CN218656796U (en) | Accident driving device for tundish trolley | |
CN210947598U (en) | Ground ash removal machine capable of preventing foot from being accidentally injured | |
CN208254232U (en) | A kind of feeding device of melting furnace | |
CN212245902U (en) | Device is adjusted well in overhead traveling crane hook rotation | |
US3471042A (en) | Sectional retractable flux-charging chute for oxygen steel-making vessel | |
US3058412A (en) | Building for oxygen steel making | |
US3365186A (en) | Apparatus for selectively positioning a degassing vessel | |
SU1409734A1 (en) | Method of centering the load-engaging device of repair unit | |
JPS6327413B2 (en) | ||
US3055491A (en) | Wire-drawing block assembly |