US3363692A - Method for production of fluids from a well - Google Patents
Method for production of fluids from a well Download PDFInfo
- Publication number
- US3363692A US3363692A US403763A US40376364A US3363692A US 3363692 A US3363692 A US 3363692A US 403763 A US403763 A US 403763A US 40376364 A US40376364 A US 40376364A US 3363692 A US3363692 A US 3363692A
- Authority
- US
- United States
- Prior art keywords
- water
- formation
- gas
- tubing
- disposal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000012530 fluid Substances 0.000 title description 17
- 238000004519 manufacturing process Methods 0.000 title description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 145
- 230000015572 biosynthetic process Effects 0.000 claims description 119
- 238000000034 method Methods 0.000 claims description 20
- 230000002706 hydrostatic effect Effects 0.000 claims description 16
- 238000005086 pumping Methods 0.000 claims description 5
- 238000005755 formation reaction Methods 0.000 description 114
- 239000007789 gas Substances 0.000 description 54
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 10
- 150000003839 salts Chemical class 0.000 description 7
- 238000007789 sealing Methods 0.000 description 6
- 239000003345 natural gas Substances 0.000 description 5
- 238000013022 venting Methods 0.000 description 3
- 239000013505 freshwater Substances 0.000 description 2
- 239000003921 oil Substances 0.000 description 2
- 230000000135 prohibitive effect Effects 0.000 description 2
- 241000392967 Euplectes gierowii Species 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/13—Lifting well fluids specially adapted to dewatering of wells of gas producing reservoirs, e.g. methane producing coal beds
Definitions
- the invention in one of its aspects it relates to the production of gas where water is produced along with the gas.
- the invention is concerned with the production of gas and water from a natural gasand-water-bearing formation wherein the natural gas is produced at the surface and the water is disposed of or injected into a water-bearing formation in the same well bore.
- the invention in another aspect relates to apparatus for producing gas and water from a sub-surface formation wherein there is provided a tubing string, a well casing, a packer for sealing between the tubing and casu ing at a point between the said sub-surface formation and a water disposal formation, and a cross-over tool in said tubing string adapted to communicate with the said tubing string and with the annular space between said tubing and casing.
- the in- U vention relates to production of a mixture of fluids from a sub-surface formation wherein fluids other than water are produced to the surface by way of the annular space between the well casing and a well tubing and the water is disposed of in a separate but adjacent water-bearing formation utilizing the said tubing and a cross-over tool to conduct the water to said water-bearing formation, said formations being separated by a well packer.
- the invention relates to the production of gas from a gas and water-bearing formation wherein the gas and water flow into a well casing, the gas rises to the surface, the water enters a cross-over tool and rises inside a tubing string, and then under pressure sufficient to overcome the pressure of a disposal formation, the water passes through the cross-over tool, past a packer or seal and thence into a disposal formation.
- gas pressure from the annular space is applied to the column of water in the tubing to force the same into the disposal formation.
- a gas-and-water-producing formation and a separate but closely adjacent water-bearing formation are both opened to a well bore.
- the well bore is equipped with the usual casing and also with a tubing string.
- a mechanical seal such as a packer is placed between the gas-producing formation and the water-bearing formation.
- Gas is then produced from the producing formation into the annular space between the casing and tubing and thence upwardly to the surface where it is led olf by a suitable pipe to a point of utility.
- the water is produced into the tubing string Where it rises upwardly.
- the water When the water rises to a sufiicient height to overcome the hydrostatic pressure of water in the water-bearing formation, it is allowed to pass downwardly through a by-pass to enter the water-bearing formation for disposal.
- the water rises under pressure of the formation into the tubing to its maximum possible height. This is possible because the upper end of the tubing string is vented to the atmosphere.
- a time cycle controller at the surface connects the annular space between the tubing and the casing to the interior of the tubing, thus making available the pressure of the gas in this annular space which pressure in turn is added to the hydrostatic head of the water which will be sufficient to force the water out into the waterbearing formation.
- FIGURE 1 shows an embodiment of the invention where the gas-producing formation is above the waterbearing disposal formation
- FIGURE II shows an embodiment of the invention where the gas-producing zone is below the water disposa formation.
- FIGURE I there is shown generally at a well penetrating the earth to gas-producing formation 12 and a water-bearing formation 13.
- the well bore is equipped with conventional casing 1 1, which, according to customary practice, is cemented to the well bore to prevent migration of fluids from one zone to another.
- Gasand-water-producing formation 12 communicates with the well bore as does water-bearing formation 13- by means of openings or perforations in casing 11.
- Installed inside the casing is a string of tubing 14 which is sealed off with respect to the casing at the top by means of a seal 15.
- gas produced from formation 12 rises through the annular space between casing 11 and tubing 14 and is drawn off by means of a valved production pipe 16 to further use.
- Tubing 14 is provided with a packor or other mechanical seal 17 to seal off the annular space between the gas-and-water-producing formation and the water-bearing formation.
- a by-pass or cross-over tool indicated generally at 20.
- the cross-over tool 20 comprises a cylindrical member 21 which surrounds the tubing for a portion of its length and which cylindrical member is sealed at its top and at its bottom to tubing 14.
- An annular space 22 is provided between the cylindrical member 21 and tubing 14.
- Passageway 23 provides communication between annular space 19 and the interior of tubing 14.
- Annular space 22 communicates with the interior of tubing 14 as indicated by passageway 29. Below standing valve 25 and also below passageway 23, tubing 14 is sealed off as at 30.
- Annular space 22 also communicates with the tubing 14 beneath the seal 30.
- gas and water are produced from formation 12 into annulus .19 where the gas rises through the annulus to be produced by way of pipe 16.
- Water enters tubing 14 by way of passageway 23 and rises inside the tubing. After the water has risen to a height sufiicient to overcome the pressure inside formation 12, it will cease to rise further. When this occurs, no more water can enter the tubing but water will rise inside annulus 19 and this will tend to cut down or reduce flow of gas from formation 12. To operate the well, it
- a time cycle controller 35 can be set to switch the position of valve 34 so that pipe 33 communicates with pipe 16. Since pipe 16 will have a pressure within it representative of the pressure against which the well is delivering gas, this pressure now becomes available to force the column of fluid inside pipe 14- back downward into water-bearing formation 13. Standing valve 25 prevents the forcing of water from tubing 14 back into formation 12. After sufficient time has elapsed, time cycle controller 35 will switch valve 34 so that it again vents to the atmosphere.
- a valve 36 is installed near the lower end of tubing 14 to prevent upward flow of water from formation 13 in case the pressure of that formation is greater than the pressure inside tubing 14.
- the ball of valve 36 is biased upwardly by spring 37 which is supported by a stop 38.
- FIGURE II The embodiment of the invention depicted in FIGURE II is very similar to that of FIGURE I excepting that water-bearing formation 13 is above gas-and-water-producing formation 12.
- FIGURE 11 the apparatus is given numerals like those of FIGURE I wherever such apparatus is identical. The principal differences are that two packers 17a are used instead of one, and that a bottom hole pump can be used. The packers 17a are set above and below the water-bearing formation.
- the operation of this invention may be illustrated by assuming that the pressure of the gas and water entering the well bore is 300 pounds per square inch and the pressure of the water bearing formation is 450 pounds per square inch. Gas is flowing from the top of the well at a pressure of 250 p.s.i. With the upper end of tubing 14 vented to a low pressure zone or to the atmosphere via pipe 33 and three-way valve 34, water then enters tubing 14 via passageway 23 and rises upwardly until the hydrostatic head of water inside the tubing approaches the flowing bottom hole pressure of 300 psi. At this time, time cycle controller switches valve 34 so that the interior of tubing 14 communicates with pipe 16 via pipe 33 and valve 34. When this is done, the 250 p.s.i.
- gas pressure in pipe 15 is imposed on the top of the water in tubing 14 so that this pressure is added to the hydrostatic pressure of the water to give a total pressure at the bottom of tubing 14 of 550 psi. This is greater than the pressure in formation 13 and the water will be forced downwardly and out into the formation. As the water is forced down, the hydrostatic pressure will become less so that after a time, the pressure within tubing 14 is approximately equal to the pressure in formation 13 and disposal of water thereinto will cease. At this time, time cycle controller will switch back to the vent position to allow additional water to enter the tubing. Standing valve 25 prevents water from returning to the producing formation, and valve 36 prevents water from formation 13 from entering the tubing.
- water-bearing formation 13 is separated from producing formation 12 by an impermeable zone.
- This impermeable zone can be only a few feet in thick-- ness or it may be much more.
- the pump can be of the traveling barrel or of the traveling plunger type. -In the first of these, the outer barrel of the pump reciprocates with respect to the plunger which is stationary. As to the traveling plunger type pumps, the plunger moves with respect to a stationary barrel. In either instance, the traveling valve is usually associated with the moving part and the standing valve with the stationary part.
- fluids produced from the subsurface formation comprise water and oil or water, oil and gas.
- a method for the disposal of water produced along with gas in a gas well having a tubing string and a well casing therein comprising the steps of:
- a method for the disposal of water produced along with gas in a gas well having a tubing string and a well casing therein comprising the steps of (a) sealing off a portion of the well bore between a gas-and-water-producing formation and a water-bearing formation;
- a method for the disposal of water produced along with another fluid in a water-and-other-fluid-producing Well having a tubing string and a Well casing therein comprising the steps of: V
- a method for the disposal of water produced along with gas in a gas well having a well casing and a tubing string therein comprising:
- a method for the disposal of water produced from a lower gas and water producing formation into an upper disposal formation comprising mechanically pumping said water upward in a well tubing to form a column of water of sufiicient height above the level of said disposal formation to create a hydrostatic pressure at said level greater than the hydrostatic pressure of said disposal formation, and allowing said water to flow into said disposal formation.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Chemical & Material Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Processing Of Solid Wastes (AREA)
Description
Jan. 16, 1968 H. B. BISHOP 3,363,692
METHOD FOR PRODUCTION OF FLUIDS FROM A WELL Filed Oct. 14, 1964 VENT 5 30; I 200 M305 m2; 5 6 3 m mwjomk -zou H 396 msE. m H I w 4 a 3 3 AII l 4 1r 9 4 3 I 1 l u I GAS I &/ /WATER United States Patent 0 3,363,692 METHOD FOR PRODUTION 0F FLUIDS FROM A WELL Harold B. Bishop, Borger, Tex., assignor to Phillips Petroleum Company, a corporation of Delaware Filed Oct. 14, 1964, Ser. No. 403,763 11 Claims. (Cl. 166-42) This invention relates to the production of fluids from a well. In one of its aspects it relates to the production of gas where water is produced along with the gas. In still another of its aspects, the invention is concerned with the production of gas and water from a natural gasand-water-bearing formation wherein the natural gas is produced at the surface and the water is disposed of or injected into a water-bearing formation in the same well bore. In another aspect the invention relates to apparatus for producing gas and water from a sub-surface formation wherein there is provided a tubing string, a well casing, a packer for sealing between the tubing and casu ing at a point between the said sub-surface formation and a water disposal formation, and a cross-over tool in said tubing string adapted to communicate with the said tubing string and with the annular space between said tubing and casing. In still another aspect, the in- U vention relates to production of a mixture of fluids from a sub-surface formation wherein fluids other than water are produced to the surface by way of the annular space between the well casing and a well tubing and the water is disposed of in a separate but adjacent water-bearing formation utilizing the said tubing and a cross-over tool to conduct the water to said water-bearing formation, said formations being separated by a well packer. In yet another aspect, the invention relates to the production of gas from a gas and water-bearing formation wherein the gas and water flow into a well casing, the gas rises to the surface, the water enters a cross-over tool and rises inside a tubing string, and then under pressure sufficient to overcome the pressure of a disposal formation, the water passes through the cross-over tool, past a packer or seal and thence into a disposal formation. It is a further aspect of the invention as described above to utilize a disposal formation above or below the producing formation. In still a further aspect of the invention, gas pressure from the annular space is applied to the column of water in the tubing to force the same into the disposal formation.
In the production of natural gas from subsurface formations, it frequently occurs that some water is produced into the well bore along with the natural gas. When this occurs, the water must be removed from the bottom of the well bore if continued production of the gas is to be possible. If gas is produced under suflicient pressure and in sufficient volume, the water can be carried out of the well bore by the gas itself. In other instances, however, the water will accumulate at the bottom of the well bore and will ultimately build up to a height within the well bore sufficient to overcome the pressure of the gas in the formation and thus choke oflf the production of gas.
Numerous procedures have been followed in the past for the removal of Water accumulating in the bottom of a gas well. One common expedient is to install an inner string of tubing and a conventional bottom hole pump. With this type installation the natural gas is allowed to rise through the annular space between the well casing and the tubing and, is produced in normal fashion therefrom. The water is pumped up through the tubing to the surface of the earth and is disposed of from that point.
Water produced from deep formations within the earth frequently contains large amounts of natural salts. For this reason, the produced salt water cannot be disposed til of by allowing it to flow into surface streams. Instead, the preferred disposal, and, in fact, the required disposal, is to introduce the water into a subsurface formation where no damage can result. This requires that a disposal Well be provided for disposing of the produced salt water. In those areas Where producing gas wells are Widely separated, the cost of drilling disposal wells for each producing well is prohibitive. In such instances, it is necessary to lay a costly pipeline gathering network to bring all of the produced water to a central location, or alternatively, to transport the produced water by trucks or similar vehicles. Regardless of the method used for transporting the salt water from the producing well to the disposal well, the cost of such disposal can be, and often is, prohibitive.
Many subsurface formations are both porous and permeable and such formations contain fluid of some sort. If the fluid is not oil or gas, it is water. In fact, most permeable formations contain some amount of water. Any water-bearing subsurface formation which contains salt water is suitable for the disposal of produced salt water. Fresh water formations, on the other hand, must be avoided because it is desirable to protect the fresh water formations for uses other than that associated with the production of oil or gas. It is very common for a porous and permeable salt Water formation to lie closely adjacent to a producing gas formation. Such formation then can be used for a disposal of water produced with the natural gas.
Accordingly, it is an object of this invention to provide method and apparatus for the disposal of water produced with another fluid in a formation adjacent the producing formation. It is a further object of the invention to provide method and apparatus for disposing of this water using the same well bore as that used for the production of the fluids. It is a particular object to provide method and apparatus for producing gas and water from a subsurface formation wherein the gas is produced to the surface and the water is disposed of in a formation open to the same well bore.
According to the invention, a gas-and-water-producing formation and a separate but closely adjacent water-bearing formation are both opened to a well bore. The well bore is equipped with the usual casing and also with a tubing string. A mechanical seal such as a packer is placed between the gas-producing formation and the water-bearing formation. Gas is then produced from the producing formation into the annular space between the casing and tubing and thence upwardly to the surface where it is led olf by a suitable pipe to a point of utility. The water is produced into the tubing string Where it rises upwardly. When the water rises to a sufiicient height to overcome the hydrostatic pressure of water in the water-bearing formation, it is allowed to pass downwardly through a by-pass to enter the water-bearing formation for disposal. In one embodiment of the invention, the water rises under pressure of the formation into the tubing to its maximum possible height. This is possible because the upper end of the tubing string is vented to the atmosphere. When the water has so risen into the tubing string a time cycle controller at the surface connects the annular space between the tubing and the casing to the interior of the tubing, thus making available the pressure of the gas in this annular space which pressure in turn is added to the hydrostatic head of the water which will be sufficient to force the water out into the waterbearing formation.
The invention will be more fully explained in the following specification, the claims and the drawing in which:
FIGURE 1 shows an embodiment of the invention where the gas-producing formation is above the waterbearing disposal formation;
FIGURE II shows an embodiment of the invention where the gas-producing zone is below the water disposa formation.
Referring to FIGURE I there is shown generally at a well penetrating the earth to gas-producing formation 12 and a water-bearing formation 13. The well bore is equipped with conventional casing 1 1, which, according to customary practice, is cemented to the well bore to prevent migration of fluids from one zone to another. Gasand-water-producing formation 12 communicates with the well bore as does water-bearing formation 13- by means of openings or perforations in casing 11. Installed inside the casing is a string of tubing 14 which is sealed off with respect to the casing at the top by means of a seal 15. In operation, gas produced from formation 12 rises through the annular space between casing 11 and tubing 14 and is drawn off by means of a valved production pipe 16 to further use. Tubing 14 is provided with a packor or other mechanical seal 17 to seal off the annular space between the gas-and-water-producing formation and the water-bearing formation. Installed in tubing string 14 is a by-pass or cross-over tool indicated generally at 20. As shown in FIGURE 1 the cross-over tool 20 comprises a cylindrical member 21 which surrounds the tubing for a portion of its length and which cylindrical member is sealed at its top and at its bottom to tubing 14. An annular space 22 is provided between the cylindrical member 21 and tubing 14. Passageway 23 provides communication between annular space 19 and the interior of tubing 14. Annular space 22 communicates with the interior of tubing 14 as indicated by passageway 29. Below standing valve 25 and also below passageway 23, tubing 14 is sealed off as at 30.
is necessary that any gas above the column of water in the tubing be vented to the atmosphere. This is conveniently done by way of pipe 33 and three-way valve 34 which in one position vents the pipe 33 to the atmosphere.
The characteristics of the particular well will determine the length of time it takes for water to rise to any desired height within the tubing. Accordingly, a time cycle controller 35 can be set to switch the position of valve 34 so that pipe 33 communicates with pipe 16. Since pipe 16 will have a pressure within it representative of the pressure against which the well is delivering gas, this pressure now becomes available to force the column of fluid inside pipe 14- back downward into water-bearing formation 13. Standing valve 25 prevents the forcing of water from tubing 14 back into formation 12. After sufficient time has elapsed, time cycle controller 35 will switch valve 34 so that it again vents to the atmosphere.
A valve 36 is installed near the lower end of tubing 14 to prevent upward flow of water from formation 13 in case the pressure of that formation is greater than the pressure inside tubing 14. The ball of valve 36 is biased upwardly by spring 37 which is supported by a stop 38.
The embodiment of the invention depicted in FIGURE II is very similar to that of FIGURE I excepting that water-bearing formation 13 is above gas-and-water-producing formation 12. In FIGURE 11 the apparatus is given numerals like those of FIGURE I wherever such apparatus is identical. The principal differences are that two packers 17a are used instead of one, and that a bottom hole pump can be used. The packers 17a are set above and below the water-bearing formation. Gas
entering the well bore from gas-producing formation 12 rises through annular space 19 to the lower packer and thence by way of communicating tube 40 to the space above the upper packer from whence it travels to the surface and is produced through pipe 16 as before. Water enters pipe 14 by way of standing valve 25 and either rises above the level of formation 13 due to its own pressure, or is pumped up by a conventional bottom hole pump. The pump is schematically represented by plunger 26 and travelling valve 27. The plunger 26 is actuated by rod string 28 which extends to the surface and which in turn is reciprocated by a conventional beam pumping unit. Tubing 14 is provided with a conventional lubricated stuffing box assembly 18 to seal between the rod string 28 and tubing 14. The beam pumping unit forms no part of this invention and is not illustrated. After it has reached a suitable height 31 in the tubing, the water travels out through passageway 41 into water-bearing formation 13. The apparatus of FIGURE II can be operated without the bottom hole pump in the same fashion as FIGURE I. Time cycle controller 35, three way valve 34, and pipe 33 operate in the same fashion as described previously.
The operation of this invention may be illustrated by assuming that the pressure of the gas and water entering the well bore is 300 pounds per square inch and the pressure of the water bearing formation is 450 pounds per square inch. Gas is flowing from the top of the well at a pressure of 250 p.s.i. With the upper end of tubing 14 vented to a low pressure zone or to the atmosphere via pipe 33 and three-way valve 34, water then enters tubing 14 via passageway 23 and rises upwardly until the hydrostatic head of water inside the tubing approaches the flowing bottom hole pressure of 300 psi. At this time, time cycle controller switches valve 34 so that the interior of tubing 14 communicates with pipe 16 via pipe 33 and valve 34. When this is done, the 250 p.s.i. gas pressure in pipe 15 is imposed on the top of the water in tubing 14 so that this pressure is added to the hydrostatic pressure of the water to give a total pressure at the bottom of tubing 14 of 550 psi. This is greater than the pressure in formation 13 and the water will be forced downwardly and out into the formation. As the water is forced down, the hydrostatic pressure will become less so that after a time, the pressure within tubing 14 is approximately equal to the pressure in formation 13 and disposal of water thereinto will cease. At this time, time cycle controller will switch back to the vent position to allow additional water to enter the tubing. Standing valve 25 prevents water from returning to the producing formation, and valve 36 prevents water from formation 13 from entering the tubing.
Desirably, water-bearing formation 13 is separated from producing formation 12 by an impermeable zone. This impermeable zone can be only a few feet in thick-- ness or it may be much more.
It is generally unnecessary to use a bottom hole pump unless formation 13 is substantially below formation 12. It is understood, of course, that while a simple type ofpump has been illustrated in the drawing, other wellknown pumps can be used. For example, the pump can be of the traveling barrel or of the traveling plunger type. -In the first of these, the outer barrel of the pump reciprocates with respect to the plunger which is stationary. As to the traveling plunger type pumps, the plunger moves with respect to a stationary barrel. In either instance, the traveling valve is usually associated with the moving part and the standing valve with the stationary part.
It will also be apparent that the method and apparatus herein described can be used where the fluids produced from the subsurface formation comprise water and oil or water, oil and gas.
Reasonable variation of the invention as set forth in the drawing, specification and claims will be apparent to one skilled in the art, the essence of the invention being that there is provided method and apparatus for producing gas from a fiuid-and-water-bearing formation, wherein the fluid is produced to the surface and the water is raised a sufficient height inside a tubing string to permit injection and disposal of the water into an adjacent waterbearing formation.
1 claim:
1. A method for the disposal of water produced along with gas in a gas well having a tubing string and a well casing therein comprising the steps of:
(a) sealing off a portion of the well bore between a lower gas-and-water-producing formation and an upper water-bearing formation with sealing means;
(1)) producing gas from said gas-and-water-producing formation by way of an annular space between the said well bore and an inner tubing string and upwardly through a passageway in said sealing means;
(c) mechanically pumping water from said gas-andwater-producing formation upwardly in said tubing to a point such that the hydrostatic pressure created inside said tubing is greater than the hydrostatic pressure of water in said water-bearing formation;
(d) and, in a cross-over zone, passing water from said tubing to said water-bearing formation whereby said water flows into said water-bearing formation.
2. A method for the disposal of water produced along with gas in a gas well having a tubing string and a well casing therein comprising the steps of (a) sealing off a portion of the well bore between a gas-and-water-producing formation and a water-bearing formation;
(b) producing gas from said gas-and-water-producing formation by way of an annular space between the said well bore and an inner tubing string;
(0) venting to the atmosphere the upper end of said tubing string;
((1) producing water from said gas-and-water-produeing formation into said tubing string whereby said water rises in said tubing string to a point such that the hydrostatic pressure created inside said tubing is substantially equal to the flowing bottom hole pressure of said gas-and-water-bearing formation;
(e) closing off the upper end of said tubing string and communicating the same with the said annular space whereby gas pressure available in said annular space is exerted on the top of the Water inside said tubing; and
(f) utilizing the combined pressures of the hydrostatic pressure of the said water inside the said tubing string and the gas pressure communicated from the said annular space, in a cross-over zone, passing water from said tubing downwardly to said waterbearing formation whereby said water flows into said water-bearing formation and is disposed therein.
3. The method of claim 2 wherein the said gas-andwater-producing formation is above the said water-bearing formation.
4. The method according to claim 2 wherein the said gas-and-water-producing formation lies below the said water-bearing formation.
5. The method of claim 2 further comprising the step of venting the upper end of the said tubing string after the water has been disposed of in said water-bearing formation.
6. The method of claim 5 wherein the steps of closing and venting are conducted in a regular timed sequence.
7. A method for the disposal of water produced along with another fluid in a water-and-other-fluid-producing Well having a tubing string and a Well casing therein comprising the steps of: V
(a) sealing off a portion of the well bore between lower a producing formation and an upper waterbearing formation;
(b) producing said other fluid from said producing formation by way of an annular space between the said well bore and an inner tubing string;
(c) producing water from said water-and-other'fluidproducing formation upwardly in said tubing to a point such that the hydrostatic pressure created inside said tubing is greater than the hydrostatic pressure of water in said water-bearing formation; and
(d) in a cross-over zone passing water from said tubing downwardly to said water-bearing formation whereby said water flows into said water-bearing formation.
8. A method for the disposal of water produced along with gas in a gas well having a well casing and a tubing string therein, comprising:
(a) producing gas under pressure in the annulus between said tubing string and said casing;
(b) producing a column of water in said tubing string equal in height to the hydrostatic pressure of the producing formation;
(c) communicating said annulus with said tubing string at a point above said column of water; and
(d) forcing said water into a disposal formation under the combined pressure of said column of Water and said gas.
9. The method of claim 8 wherein said producing formation is above said disposal formation.
10. The method of claim 8 wherein said producing formation is below said disposal formation.
11. A method for the disposal of water produced from a lower gas and water producing formation into an upper disposal formation comprising mechanically pumping said water upward in a well tubing to form a column of water of sufiicient height above the level of said disposal formation to create a hydrostatic pressure at said level greater than the hydrostatic pressure of said disposal formation, and allowing said water to flow into said disposal formation.
References Cited UNITED STATES PATENTS 2,341,359 2/1944 Buckley 166-67 2,986,215 5/1961 Barr 166- 67 2,214,064 9/1940 Niles 1 66-42 X 2,194,616 3/1940 Schoeneck 1666 X 2,230,001 1/1941 McConnell et al. 166-9 2,551,434 5/1951 Gray et al 166101 X 3,167,125 1/1965 Bryan 166- 15 CHARLES OCONNELL, Primary Examiner.
Claims (1)
11. A METHOD FOR THE DISPOSAL OF WATER PRODUCED FROM A LOWER GAS AND WATER PRODUCING FORMATION INTO AN UPPER DISPOSAL FORMATION COMPRISING MECHANICALLY PUMPING SAID WATER UPWARD IN A WELL TUBING TO FORM A COLUMN OF WATER OF SUFFICIENT HEIGHT ABOVE THE LEVEL OF SAID DISPOSAL FORMATION TO CREATE A HYDROSTATIC PRESSURE AT SAID LEVEL GREATER THAN THE HYDROSTATIC PRESSURE OF SAID DISPOSAL FORMATION, AND ALLOWING SAID WATER TO FLOW INTO SAID DISPOSAL FORMATION.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US403763A US3363692A (en) | 1964-10-14 | 1964-10-14 | Method for production of fluids from a well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US403763A US3363692A (en) | 1964-10-14 | 1964-10-14 | Method for production of fluids from a well |
Publications (1)
Publication Number | Publication Date |
---|---|
US3363692A true US3363692A (en) | 1968-01-16 |
Family
ID=23596918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US403763A Expired - Lifetime US3363692A (en) | 1964-10-14 | 1964-10-14 | Method for production of fluids from a well |
Country Status (1)
Country | Link |
---|---|
US (1) | US3363692A (en) |
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3830305A (en) * | 1973-03-09 | 1974-08-20 | Atlantic Richfield Co | Method of well production in permafrost |
EP0022357A1 (en) * | 1979-07-06 | 1981-01-14 | Ernest H. Price | Down-hole separator for separating oil and water in a well |
US4248305A (en) * | 1979-03-12 | 1981-02-03 | Scarbrough William L | Aquifer recharge using natural energy |
US4261419A (en) * | 1979-06-14 | 1981-04-14 | Water Purification Associates | Underground recovery of natural gas from geopressured brines |
US4509599A (en) * | 1982-10-01 | 1985-04-09 | Baker Oil Tools, Inc. | Gas well liquid removal system and process |
US4632601A (en) * | 1985-11-01 | 1986-12-30 | Kuwada James T | System and method for disposal of noncondensable gases from geothermal wells |
FR2603330A1 (en) * | 1986-09-02 | 1988-03-04 | Elf Aquitaine | PROCESS FOR PUMPING HYDROCARBONS FROM A MIXTURE OF THESE HYDROCARBONS WITH AN AQUEOUS PHASE AND INSTALLATION FOR IMPLEMENTING THE PROCESS |
US4766957A (en) * | 1987-07-28 | 1988-08-30 | Mcintyre Jack W | Method and apparatus for removing excess water from subterranean wells |
US4791990A (en) * | 1986-05-27 | 1988-12-20 | Mahmood Amani | Liquid removal method system and apparatus for hydrocarbon producing |
US4901798A (en) * | 1986-05-27 | 1990-02-20 | Mahmood Amani | Apparatus and method for removal of accumulated liquids in hydrocarbon producing wells |
US5366011A (en) * | 1993-12-09 | 1994-11-22 | Mobil Oil Corporation | Method for producing high water-cut gas with in situ water-disposal |
US5425416A (en) * | 1994-01-06 | 1995-06-20 | Enviro-Tech Tools, Inc. | Formation injection tool for down-bore in-situ disposal of undesired fluids |
US5443120A (en) * | 1994-08-25 | 1995-08-22 | Mobil Oil Corporation | Method for improving productivity of a well |
US5806598A (en) * | 1996-08-06 | 1998-09-15 | Amani; Mohammad | Apparatus and method for removing fluids from underground wells |
US5816326A (en) * | 1997-02-24 | 1998-10-06 | Oxy Usa, Inc. | Uphole disposal tool for water producing gas wells |
US6092599A (en) * | 1997-08-22 | 2000-07-25 | Texaco Inc. | Downhole oil and water separation system and method |
US6092600A (en) * | 1997-08-22 | 2000-07-25 | Texaco Inc. | Dual injection and lifting system using a rod driven progressive cavity pump and an electrical submersible pump and associate a method |
US6105671A (en) * | 1997-09-23 | 2000-08-22 | Texaco Inc. | Method and apparatus for minimizing emulsion formation in a pumped oil well |
US6123149A (en) * | 1997-09-23 | 2000-09-26 | Texaco Inc. | Dual injection and lifting system using an electrical submersible progressive cavity pump and an electrical submersible pump |
US6131660A (en) * | 1997-09-23 | 2000-10-17 | Texaco Inc. | Dual injection and lifting system using rod pump and an electric submersible pump (ESP) |
US6196313B1 (en) * | 1997-02-12 | 2001-03-06 | Horst Simons | Method and apparatus for hydrocarbon production and reservoir water disposal |
WO2003091538A1 (en) * | 2002-04-24 | 2003-11-06 | Shell Internationale Research Maatschappij B.V. | Method of producing hydrocarbon gas |
WO2008153407A1 (en) * | 2007-06-11 | 2008-12-18 | Shore-Tec Consult As | A gas-driven pumping device and a method for downhole pumping of a liquid in a well |
US20090032262A1 (en) * | 2007-08-03 | 2009-02-05 | Zupanick Joseph A | Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations |
US20090211755A1 (en) * | 2008-02-27 | 2009-08-27 | Schlumberger Technology Corporation | System and method for injection into a well zone |
US20100006294A1 (en) * | 2005-04-05 | 2010-01-14 | Big Cat Energy Corporation | Well bore fluid redistribution and fluid disposal in wellbore environments |
US20100186953A1 (en) * | 2006-03-30 | 2010-07-29 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
US20100200291A1 (en) * | 2006-03-30 | 2010-08-12 | Schlumberger Technology Corporation | Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly |
US20100259266A1 (en) * | 2009-04-14 | 2010-10-14 | Chanh Cao Minh | Method for determining fluid type in reservoir |
US20100300678A1 (en) * | 2006-03-30 | 2010-12-02 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US20110079400A1 (en) * | 2009-10-07 | 2011-04-07 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
US20110192596A1 (en) * | 2010-02-07 | 2011-08-11 | Schlumberger Technology Corporation | Through tubing intelligent completion system and method with connection |
US8276673B2 (en) | 2008-03-13 | 2012-10-02 | Pine Tree Gas, Llc | Gas lift system |
US9175523B2 (en) | 2006-03-30 | 2015-11-03 | Schlumberger Technology Corporation | Aligning inductive couplers in a well |
US9175560B2 (en) | 2012-01-26 | 2015-11-03 | Schlumberger Technology Corporation | Providing coupler portions along a structure |
US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
US9644476B2 (en) | 2012-01-23 | 2017-05-09 | Schlumberger Technology Corporation | Structures having cavities containing coupler portions |
US9938823B2 (en) | 2012-02-15 | 2018-04-10 | Schlumberger Technology Corporation | Communicating power and data to a component in a well |
US10036234B2 (en) | 2012-06-08 | 2018-07-31 | Schlumberger Technology Corporation | Lateral wellbore completion apparatus and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2194616A (en) * | 1937-11-17 | 1940-03-26 | Ohio Oil Company | Means for operating oil wells |
US2214064A (en) * | 1939-09-08 | 1940-09-10 | Stanolind Oil & Gas Co | Oil production |
US2230001A (en) * | 1939-04-14 | 1941-01-28 | Shell Dev | Flooding process for recovering oils |
US2341359A (en) * | 1939-08-26 | 1944-02-08 | Standard Oil Dev Co | Apparatus for producing oil wells which make water |
US2551434A (en) * | 1949-04-05 | 1951-05-01 | Shell Dev | Subsurface pump for flooding operations |
US2986215A (en) * | 1958-09-23 | 1961-05-30 | Shell Oil Co | Salt water disposal system |
US3167125A (en) * | 1961-11-22 | 1965-01-26 | Warren P Bryan | Method for improving well production and salt water disposal |
-
1964
- 1964-10-14 US US403763A patent/US3363692A/en not_active Expired - Lifetime
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2194616A (en) * | 1937-11-17 | 1940-03-26 | Ohio Oil Company | Means for operating oil wells |
US2230001A (en) * | 1939-04-14 | 1941-01-28 | Shell Dev | Flooding process for recovering oils |
US2341359A (en) * | 1939-08-26 | 1944-02-08 | Standard Oil Dev Co | Apparatus for producing oil wells which make water |
US2214064A (en) * | 1939-09-08 | 1940-09-10 | Stanolind Oil & Gas Co | Oil production |
US2551434A (en) * | 1949-04-05 | 1951-05-01 | Shell Dev | Subsurface pump for flooding operations |
US2986215A (en) * | 1958-09-23 | 1961-05-30 | Shell Oil Co | Salt water disposal system |
US3167125A (en) * | 1961-11-22 | 1965-01-26 | Warren P Bryan | Method for improving well production and salt water disposal |
Cited By (66)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3830305A (en) * | 1973-03-09 | 1974-08-20 | Atlantic Richfield Co | Method of well production in permafrost |
US4248305A (en) * | 1979-03-12 | 1981-02-03 | Scarbrough William L | Aquifer recharge using natural energy |
US4261419A (en) * | 1979-06-14 | 1981-04-14 | Water Purification Associates | Underground recovery of natural gas from geopressured brines |
EP0022357A1 (en) * | 1979-07-06 | 1981-01-14 | Ernest H. Price | Down-hole separator for separating oil and water in a well |
US4509599A (en) * | 1982-10-01 | 1985-04-09 | Baker Oil Tools, Inc. | Gas well liquid removal system and process |
US4632601A (en) * | 1985-11-01 | 1986-12-30 | Kuwada James T | System and method for disposal of noncondensable gases from geothermal wells |
US4901798A (en) * | 1986-05-27 | 1990-02-20 | Mahmood Amani | Apparatus and method for removal of accumulated liquids in hydrocarbon producing wells |
US4791990A (en) * | 1986-05-27 | 1988-12-20 | Mahmood Amani | Liquid removal method system and apparatus for hydrocarbon producing |
FR2603330A1 (en) * | 1986-09-02 | 1988-03-04 | Elf Aquitaine | PROCESS FOR PUMPING HYDROCARBONS FROM A MIXTURE OF THESE HYDROCARBONS WITH AN AQUEOUS PHASE AND INSTALLATION FOR IMPLEMENTING THE PROCESS |
US4766957A (en) * | 1987-07-28 | 1988-08-30 | Mcintyre Jack W | Method and apparatus for removing excess water from subterranean wells |
WO1990001611A1 (en) * | 1988-07-29 | 1990-02-22 | Mahmood Amani | Removal of accumulated liquids in hydrocarbon wells |
US5366011A (en) * | 1993-12-09 | 1994-11-22 | Mobil Oil Corporation | Method for producing high water-cut gas with in situ water-disposal |
US5425416A (en) * | 1994-01-06 | 1995-06-20 | Enviro-Tech Tools, Inc. | Formation injection tool for down-bore in-situ disposal of undesired fluids |
US5443120A (en) * | 1994-08-25 | 1995-08-22 | Mobil Oil Corporation | Method for improving productivity of a well |
US5806598A (en) * | 1996-08-06 | 1998-09-15 | Amani; Mohammad | Apparatus and method for removing fluids from underground wells |
US6196313B1 (en) * | 1997-02-12 | 2001-03-06 | Horst Simons | Method and apparatus for hydrocarbon production and reservoir water disposal |
US5816326A (en) * | 1997-02-24 | 1998-10-06 | Oxy Usa, Inc. | Uphole disposal tool for water producing gas wells |
US6092599A (en) * | 1997-08-22 | 2000-07-25 | Texaco Inc. | Downhole oil and water separation system and method |
US6092600A (en) * | 1997-08-22 | 2000-07-25 | Texaco Inc. | Dual injection and lifting system using a rod driven progressive cavity pump and an electrical submersible pump and associate a method |
US6105671A (en) * | 1997-09-23 | 2000-08-22 | Texaco Inc. | Method and apparatus for minimizing emulsion formation in a pumped oil well |
US6131660A (en) * | 1997-09-23 | 2000-10-17 | Texaco Inc. | Dual injection and lifting system using rod pump and an electric submersible pump (ESP) |
US6123149A (en) * | 1997-09-23 | 2000-09-26 | Texaco Inc. | Dual injection and lifting system using an electrical submersible progressive cavity pump and an electrical submersible pump |
WO2003091538A1 (en) * | 2002-04-24 | 2003-11-06 | Shell Internationale Research Maatschappij B.V. | Method of producing hydrocarbon gas |
US20030213592A1 (en) * | 2002-04-24 | 2003-11-20 | Ligthelm Dirk Jacob | Method of producing hydrocarbon gas |
US8365819B2 (en) * | 2005-04-05 | 2013-02-05 | Big Cat Energy Corporation | Method of redistributing well bore fluid |
US8196651B2 (en) * | 2005-04-05 | 2012-06-12 | Big Cat Energy Corporation | Well bore fluid redistribution and fluid disposal in wellbore environments |
AU2006232093B2 (en) * | 2005-04-05 | 2012-02-02 | Big Cat Energy Corporation | Well bore fluid redistribution and fluid disposal |
US20110067874A1 (en) * | 2005-04-05 | 2011-03-24 | Big Cat Energy Corporation | Method of redistributing well bore fluid |
US20100006294A1 (en) * | 2005-04-05 | 2010-01-14 | Big Cat Energy Corporation | Well bore fluid redistribution and fluid disposal in wellbore environments |
US20100200291A1 (en) * | 2006-03-30 | 2010-08-12 | Schlumberger Technology Corporation | Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly |
US9175523B2 (en) | 2006-03-30 | 2015-11-03 | Schlumberger Technology Corporation | Aligning inductive couplers in a well |
US20100186953A1 (en) * | 2006-03-30 | 2010-07-29 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
US8312923B2 (en) | 2006-03-30 | 2012-11-20 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
US8235127B2 (en) | 2006-03-30 | 2012-08-07 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US20100300678A1 (en) * | 2006-03-30 | 2010-12-02 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
GB2462783A (en) * | 2007-06-11 | 2010-02-24 | Shore Tec Consult As | A gas-driven pumping device and a method for downhole pumping of a liquid in a well |
WO2008153407A1 (en) * | 2007-06-11 | 2008-12-18 | Shore-Tec Consult As | A gas-driven pumping device and a method for downhole pumping of a liquid in a well |
GB2462783B (en) * | 2007-06-11 | 2012-04-25 | Shore Tec Consult As | A gas-driven pumping device and a method for downhole pumping of a liquid in a well |
US20100284828A1 (en) * | 2007-06-11 | 2010-11-11 | Shore-Tec Consult As | Gas-Driven Pumping Device and a Method for Downhole Pumping of a Liquid in a Well |
US20090032263A1 (en) * | 2007-08-03 | 2009-02-05 | Zupanick Joseph A | Flow control system utilizing an isolation device positioned uphole of a liquid removal device |
US8528648B2 (en) | 2007-08-03 | 2013-09-10 | Pine Tree Gas, Llc | Flow control system for removing liquid from a well |
US7753115B2 (en) | 2007-08-03 | 2010-07-13 | Pine Tree Gas, Llc | Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations |
US20090050312A1 (en) * | 2007-08-03 | 2009-02-26 | Zupanick Joseph A | Flow control system having a downhole check valve selectively operable from a surface of a well |
US20100319908A1 (en) * | 2007-08-03 | 2010-12-23 | Zupanick Joseph A | Flow control system having a downhole check valve selectively operable from a surface of a well |
US7971648B2 (en) | 2007-08-03 | 2011-07-05 | Pine Tree Gas, Llc | Flow control system utilizing an isolation device positioned uphole of a liquid removal device |
US7971649B2 (en) | 2007-08-03 | 2011-07-05 | Pine Tree Gas, Llc | Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations |
US7789157B2 (en) | 2007-08-03 | 2010-09-07 | Pine Tree Gas, Llc | System and method for controlling liquid removal operations in a gas-producing well |
US8006767B2 (en) | 2007-08-03 | 2011-08-30 | Pine Tree Gas, Llc | Flow control system having a downhole rotatable valve |
US20100319905A1 (en) * | 2007-08-03 | 2010-12-23 | Zupanick Joseph A | System and method for controlling liquid removal operations in a gas-producing well |
US8162065B2 (en) | 2007-08-03 | 2012-04-24 | Pine Tree Gas, Llc | System and method for controlling liquid removal operations in a gas-producing well |
US8302694B2 (en) | 2007-08-03 | 2012-11-06 | Pine Tree Gas, Llc | Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations |
US20090032262A1 (en) * | 2007-08-03 | 2009-02-05 | Zupanick Joseph A | Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations |
US7789158B2 (en) | 2007-08-03 | 2010-09-07 | Pine Tree Gas, Llc | Flow control system having a downhole check valve selectively operable from a surface of a well |
US7896079B2 (en) * | 2008-02-27 | 2011-03-01 | Schlumberger Technology Corporation | System and method for injection into a well zone |
US20090211755A1 (en) * | 2008-02-27 | 2009-08-27 | Schlumberger Technology Corporation | System and method for injection into a well zone |
US8276673B2 (en) | 2008-03-13 | 2012-10-02 | Pine Tree Gas, Llc | Gas lift system |
US20100259266A1 (en) * | 2009-04-14 | 2010-10-14 | Chanh Cao Minh | Method for determining fluid type in reservoir |
US8378684B2 (en) * | 2009-04-14 | 2013-02-19 | Schlumberger Technology Corporation | Method for determining fluid type in reservoir |
US8839850B2 (en) | 2009-10-07 | 2014-09-23 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
US20110079400A1 (en) * | 2009-10-07 | 2011-04-07 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
US20110192596A1 (en) * | 2010-02-07 | 2011-08-11 | Schlumberger Technology Corporation | Through tubing intelligent completion system and method with connection |
US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
US9644476B2 (en) | 2012-01-23 | 2017-05-09 | Schlumberger Technology Corporation | Structures having cavities containing coupler portions |
US9175560B2 (en) | 2012-01-26 | 2015-11-03 | Schlumberger Technology Corporation | Providing coupler portions along a structure |
US9938823B2 (en) | 2012-02-15 | 2018-04-10 | Schlumberger Technology Corporation | Communicating power and data to a component in a well |
US10036234B2 (en) | 2012-06-08 | 2018-07-31 | Schlumberger Technology Corporation | Lateral wellbore completion apparatus and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3363692A (en) | Method for production of fluids from a well | |
AU753037B2 (en) | Method and apparatus for increasing fluid recovery from a subterranean formation | |
US4519456A (en) | Continuous flow perforation washing tool and method | |
US5497832A (en) | Dual action pumping system | |
US3268017A (en) | Drilling with two fluids | |
US4540348A (en) | Oilwell pump system and method | |
US4544037A (en) | Initiating production of methane from wet coal beds | |
US3675714A (en) | Retrievable density control valve | |
US4319635A (en) | Method for enhanced oil recovery by geopressured waterflood | |
US3152640A (en) | Underground storage in permeable formations | |
US20070000663A1 (en) | Enhanced liquid hydrocarbon recovery by miscible gas injection water drive | |
US2551434A (en) | Subsurface pump for flooding operations | |
US3333638A (en) | Liquid disposal | |
US6142224A (en) | Triple action pumping system with plunger valves | |
US6651742B2 (en) | Method and apparatus for enhancing oil recovery | |
US3548946A (en) | Apparatus and method for liquid introduction in oil wells | |
US2680408A (en) | Means for dually completing oil wells | |
US4623283A (en) | Method for controlling water influx into underground cavities | |
US3580336A (en) | Production of oil from a pumping well and a flowing well | |
US6209651B1 (en) | Well production apparatus and method | |
US4396230A (en) | Multiple branch well containing one producer and one injector well | |
US6234248B1 (en) | Well production apparatus | |
US6196310B1 (en) | Well production apparatus | |
US3372753A (en) | Method of preventing hydrate formation in petroleum well production strings | |
US2607426A (en) | Pumping technique to prevent excessive water coning |