US3194310A - Method of locating leaks and repairing well tubing in situ - Google Patents

Method of locating leaks and repairing well tubing in situ Download PDF

Info

Publication number
US3194310A
US3194310A US358393A US35839364A US3194310A US 3194310 A US3194310 A US 3194310A US 358393 A US358393 A US 358393A US 35839364 A US35839364 A US 35839364A US 3194310 A US3194310 A US 3194310A
Authority
US
United States
Prior art keywords
well pipe
well
pressure
leak
sealant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US358393A
Inventor
Loomis Jean Doyle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US358393A priority Critical patent/US3194310A/en
Application granted granted Critical
Publication of US3194310A publication Critical patent/US3194310A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B27/00Containers for collecting or depositing substances in boreholes or wells, e.g. bailers, baskets or buckets for collecting mud or sand; Drill bits with means for collecting substances, e.g. valve drill bits
    • E21B27/02Dump bailers, i.e. containers for depositing substances, e.g. cement or acids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/10Reconditioning of well casings, e.g. straightening
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • E21B47/117Detecting leaks, e.g. from tubing, by pressure testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/005Investigating fluid-tightness of structures using pigs or moles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • G01M3/2853Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for pipe joints or seals

Definitions

  • the present invention relates to an improved method for testing well tubing or pipe for leaks and repairing any leaks located. More specifically, the present invention relates to testing well pipe in a well to locate leaks and then repairing the well pipe in situ.
  • sealants have been made to apply sealants to leaks located in well pipe by pumping the sealant down the well pipe to the area of the leak. Since the sealants include a plastic sealant material which must be mixed with a catalyst, the mixing of the plastic sealant material with the catalyst at the surface has proved an unsatisfactory operation as the catalytic action oftentimes takes place long before the sealant reaches the point of leakage within the well. The well pipe, equipment in the wells and the like becomes clogged by such a procedure.
  • An important object of the present invention is to provide a method for locating leaks in a well pipe and repairing such leaks in situ.
  • Another object of the present invention is to provide a method of testing for leaks and repairing such leaks if located, the method contemplating positioning a sealant adjacent the area being tested and, if a leak is determined, releasing the sealant and applying the sealant under pressure to repair the leak in the well pipe.
  • Still another object of the present invention is to provide a method of testing a well pipe for leaks and if a leak is located, mixing a plastic sealant material with a catalyst at the location of the leak and applying the same to the well pipe under pressure.
  • a further object of the present invention is to provide a method for repairing leaks in well pipe utilizing a capsule filled with a batch of sealant and lowered into the well pipe to a point adjacent the leak, the capsule then being ruptured and the sealant therein applied under pressure to the leak.
  • Ancillary to the preceding it is a 3,194,310 Patented July 13, 1965 further object of the invention to utilize a capsule having separate compartments, one compartment being filled with a plastic sealant material and the other compartment being filled with a suitable catalyst, the capsule being ruptured or fractured at the location of a leak and causing mixture of the catalyst and the sealant material in the immediate area with the mixture being applied to the leak under pressure.
  • the term well pipe will be used, and it is intended to cover either a casing in a well bore or a string of flow tubing positioned within the casing.
  • casing In drilling a well, the walls of the bore or hole are supported by what is commonly referred to as casing.
  • the tubular casing which comes in long sections, is lowered into the well after the well hole has been drilled, the sections of the casing being coupled together in the usual manner by a welded or threaded joint.
  • the flow tubing is inserted within the casing after the casing has been inserted into the well bore.
  • the apparatus is used in testing flow tubing, the flow tubing remains in situ Within the casing.
  • the apparatus is used to test casings for leaks, it will be understood that the flow tubing will have been either not inserted therein or removed from the casing to permit the insertion of the apparatus into the casing.
  • the apparatus is primarily intended to test and repair well pipe while the well pipe is within the well bore, it will be appreciated that the apparatus could be utilized to test well pipe removed from the bore and positioned in the derrick.
  • the method of the invention is primarily intended for use in testing well pipe for leaks and repairing any leaks located in the well pipe while the well pipe remains in situ within the bore of a well.
  • FIGURE 1 is a vertical section partly in elevation of the apparatus being inserted down into a well pipe;
  • FIGURE 2 is a vertical sectional view similar to FIG- URE 1 but illustrating the apparatus positioned at a desired location within the well pipe, the spaced barriers of the apparatus being set by fiuid pressure and the apparatus ready for application of fluid under a measurable pressure to the space between the barriers;
  • FIGURE 3 is a view similar to FIGURE 2 but showing an additional sequence in performing the method of the present invention after the testing of a section of well pipe has been accomplished and prior to fixing or repairing a leak located in the section;
  • FIGURE 4 is a further vertical section similar to FIG- URE 3 but showing the apparatus being utilized to repair the leak located;
  • FIGURE 5 is a schematic view of the apparatus of FIGURES 1, 2, 3 and 4 and showing the apparatus sus pended in a well just prior to the repairing of a leak lo cated in the well pipe;
  • FIGURE 6 is a vertical sectional view through an apparatus similar to the apparatus of FIGURES 1 through 5 but illustrating a modified means for holding the frangible capsule filled with sealant and a modified means for fracturing such capsule;
  • FIGURE 7 is a vertical sectional view of a still further modification of the present invention. and illustrating a further modified means for fracturing the capsule having the sealant;
  • FIGURE 8 is a vertical sectional view of the apparatus of FIGURE 7 and illustrating the actuation of the means for fracturing or rupturing the capsule.
  • FIG- URES 1 through 5 apparatus of the present invention as illustrated in FIG- URES 1 through 5 is generally designated by numeral 10.
  • the apparatus is illustrated positioned in a well pipe 12 which may be casing for a well hole or flow tubing inserted within the casing.
  • the well pipe 12 is made up of a series of strands or sections 14 and 16 coupled together by a threaded collar 18.
  • the illustrative example discloses the testing of the threaded joint between the two stands, but it will be appreciated that the apparatus is also used to test the walls of the stands intermediate the collars coupling the stands together.
  • FIGURES 1 through 5 The improved method of testing the well pipe for leaks and/or repairing the well pipe for leaks in situ is best understood by referring to FIGURES 1 through 5.
  • the testing apparatus 10 is provided with an upper resilient packer element 20 and a lower resilient packer element 22 which are spaced from each other and which are adapted to be expanded into sealing engagement with the interior of the well pipe by the application of fluid under pressure.
  • testing fluid such as water or the like is flowed into the area between the spaced barriers and a measurable pressure is applied thereto.
  • a pressure gauge G (FIGURE 5), which measures the pressure on the liquid between the barriers, will determine if there is a leak in the section of pipe between the barriers. If there is an appreciable drop from the pressure as indicated by the gauge G, then there is a leak. If the test indicates a leak, the pressure on the fluid between the barriers is relieved and the barriers are released so that any liquid trapped therebetween can drop by gravity into the well.
  • the barriers are reset and a frangible capsule C having a batch of sealant therein and supported in the area of the leak is fractured and the sealant is flowed into the space between the barriers.
  • Fluid pressure is applied to the sealant to inject the same into the leaks, the fluid pressure being either water, salt water, barium impregnated mud, drilling mud, or the like.
  • the apparatus 10 of FIGURES 1 through 5 inclusive includes a pump P (FIGURE 5) suitably supported on the floor of a well derrick or the like (not shown), a source of supply S of liquid such as water, a flexible conduit 24 connecting the pump P and the source of supply S to an elongated body structure 26.
  • the elongated body structure 26 has a maximum diameter less than the inside diameter of the well pipe 12 and is adapted to support the packer elements 20 and 22.
  • Packer elements 20 and 22 are resilient and are adapted to be expanded into engagement with the well pipe 12.
  • the resilient packer elements 20 and 22 are usually made from elastomeric material such as rubber, synthetic rubber or the like and may be of the type as shown in the drawings which are compressed longitudinally so that they expand transversely into sealing engagement with the Wall of the well pipe 12 or they may be of the type which are provided with an internal cavity and can be inflated.
  • the elongated body structure 26 is provided with a cylindrical center portion 28, intermediate portions 30 of reduced diameter and upper and lower elongated end portions 32 and 34, respectively, of still further reduced diameter.
  • the lower end portion 34 is threaded as indicated at 36 and is adapted to receive a rounded nose member 38 and a packer retaining nut or back-up ring 40 which abuts against one end of the lower packer element 22.
  • a cylindrical cup-shaped piston 42 is provided on the lower end portion 34 and abuts the packer element 22 on its end opposite to the end abutting the retaining nut 40.
  • the cup-shaped piston 42 is provided with a cylindrical skirt 44 which is adapted to slide on the lower intermediate portion 30.
  • the upper packer element 20 is mounted on the upper elongated end portion 32 in a similar manner between the back-up ring or retaining nut 46 and cylindrical cupshaped piston 48. Movement of the piston 48 toward the retaining nut 46 compresses the packer element 20 and expands the same transversely into sealing engagement with the well pipe 12.
  • the upper elongated end portion 32 is provided with an open ended enlarged bore 50 which extends axially thereof and which communicates with a passage 52 extending through the body structure and opening on the surface of the center portion 28 as indicated at 54.
  • An O-ring seal 56 is provided in the shoulder bottom 58 of bore 50.
  • the body structure 26 is made in at least two parts and threaded together as indicated at 60 in order that an enlarged chamber 62 can be provided in the passage 52.
  • the chamber 62 is adapted to support the frangible capsule C which houses the batch of sealant as will be described in more detail later in the specification.
  • the elongated upper end portion 32 is provided with a passage 64 which extends therethrough and through the intermediate portions 30, center portion 28 and lower end portion 34 and opens at 66 and 68 beneath the heads of piston 48 and 42, respectively.
  • the passage 64 where it passes through the upper end portion 32 is spaced radially outwardly of the bore 50 and passage 52.
  • the passage 64 has an inlet 70 in the end of the end portion 64.
  • the flexible conduit 24 is threaded onto the end of the upper elongated end portion 32, as indicated at 72, and thus the body structure can be raised and lowered within the well tube.
  • the apparatus 10 After the apparatus 10 has been positioned in the well pipe 12 as far down as desired, it is then ready for performing a test to determine if the well pipe at that position leaks and if such a leak is determined it then can be utilized to repair such a leak.
  • FIGURE 2 the apparatus of FIG- URE 1 is shown ready to conduct a test on the section of well pipe.
  • the pump P is stopped and the liquid within the conduit 24 and in the body structure 28 will drain therefrom.
  • the conduit 24 is temporarily disconnected from the pump P in any suitable manner and a pressure responsive valve assembly 79 is dropped down the conduit and fits into the bore 50 seating against the O-ring 56.
  • the pressure responsive valve assembly 79 includes a body portion 80 having a beveled lower end or seat 82 and an elongated stem 84 extending from its upper end.
  • the stem 84 is provided with an enlarged head 86 capable of receiving suitable overshot grapples 88 (FIGURE 3).
  • a passage 90 extends through the stem 84 and body 80 and has its lower end communicating with the upper end of the passage 52.
  • a pressure responsive valve 92 housed within the body 80 is a pressure responsive valve 92 including a ball 94 urged against a seat 96 by a spring 98 and a follower 100.
  • the conduit 24 is again connected to the pump P and the pump is operated to supply liquid under pressure through the conduit 24 to the body structure 26.
  • the ball 94 closes the passage 90 and, consequently, the liquid will first flow through the inlet 74 into the passage 64 at a sufficient pressure to urge the pistons 48 and 42 in opposite directions to thereby set the packers 20 and 22 respectively.
  • the pressure in the passage 64 has caused the packer elements 20 and 22 to be set and form spaced barriers in the well pipe 12, the pressure of the liquid in the pipe 24 is increased.
  • the liquid When the pressure of the liquid has increased sufiiciently to unseat the ball 94 from its seat 96, the liquid will flow through the passage 90, passage 52 and out of the outlet 54 between the packer elements.
  • the gauge G provided adjacent the pump P can be observed as the pressure of the liquid between the packer elements 20 and 22 is built up to a predetermined amount. Once the pressure of the liquid has reached the predetermined amount, the gauge is observed for an appreciable drop in pressure and, if such a drop occurs, it will indicate that the section of well pipe being tested has a leak therein.
  • FIGURE 3 the conduit 24 is again disconnected and the overshot grapple 88 which includes the spring tongs 102 is lowered into the conduit 24 until it engages the enlarged head 86 of the pressure responsive valve assembly 79.
  • the valve assembly 79 is removed from the bore 50 and any liquid trapped in the passages 52 will flow by gravity therefrom out of the outlet 54 past the lower packer element 22. While FIG- URE 3 shows the packer elements expanded, it will be appreciated that before the pressure responsive valve assembly 79 is removed, the packer elements will have become relaxed due to the removal of pressure from the liquid in the conduit 24.
  • the tubular member 114 is provided with an enlarged bore 120 communicating with a reduced bore 122 at its lower end.
  • a lance element 124 having a piston head 126 slidable in the bore 120 is adapted to extend through the bore 122 and the passageway 52 in the body structure 26.
  • a by-pass passage 128 is provided between the bore 120 and the passage 122 so that liquid can flow past the piston head 126 through the passage 52 when the piston head is in the position shown in FIGURE 4.
  • conduit 110 When the conduit 110 with a tubular member 114 and its lance element 124 have been lowered within the conduit 24, the upper end of the conduit 110 is connected to a pipe 130 leading from a pump P suitably supported on the floor of the derrick.
  • the pump P is connected to a source of supply S which may be water, salt water, drilling mud, or barium impregnated mud.
  • the conduit 24 is reconnected to the pump P which is then started so as to flow water under pressure down the conduit 24 into the passage 64 and this actuates the pistons 48 and 42 to reset the packer elements 20 and 22 respectively.
  • the pump P is actuated to cause flow of fluid in the conduit 110.
  • the pressure of the fluid acting on the piston head 126 of the lance element 124 drives the same downwardly to a position where it penetrates the capsule C.
  • water may be flowed through the conduit 24 to clean out the passages 52, chamber 62 and the body structure 26 may then be raised so that a new capsule may be positioned in the chamber and the tests repeated at dilferent portions along the well pipe until such time as another leak is located. The testing and/ or repairing operation will then be repeated as described above.
  • the capsule C shown in FIGURES 1 to 4 is made of a frangible material such as hard vulcanized rubber, ceramic, or any molded plastics such as Bakelite. And it has compartments A and B in which a plastic sealant material and a catalyst are segregated from one another until time of use. Also, the capsule C may be constructed of a metal case with frangible ends and/or partitions to separate the plastic sealant from the catalyst. Preferably the capsule is made from a material which will shatter upon contact by the lance element 124 so that the catalyst and the plastic sealant material will quickly mix.
  • the type of plastic sealant used depends upon the existing downwell conditions such as the magnitude of the leak, well temperature and well pressure at the site of leak, type of fluid being produced through the tubing, type of fluid contained in the space around the pipe such as mud and water, or the like.
  • Plastic sealants which have been used are cellulose esters, e.g., cellulose acetate butyrate; polyurethane resins, e.g., from toluene diisocyanate and polypropylene glycol molecular weight 2025, or polyphenylene polyisocyanate (PAPI) and the polyester of adipic acid with diethylene glycol and trimethylol propane; and any of the phenolic resins such as phenolformaldehyde, cresol formaldehyde and phenol-furfural; epoxies, e.g., bisphenol A-epichlorhydrin resin; silicones, e.g., polydimethyl siloxane; and acrylates, e.g., polymerized methyl methacrylate and polymerized ethylacrylate.
  • the catalysts used depend upon the particular sealant used. With cellulose acetate butyrate and phenolics, an organic radicals, phenolic radicals, e.
  • an acid type of catalyst such as hydrochloric acid or sulfuric acid is used.
  • an amine complex catalyst e.g., boron-fluoridetriethyl amine
  • a peroxide catalyst e.g., benzoyl peroxide or cumene hydroperoxide is used with the acrylates.
  • Fillers such as wood flour, metallic powder, asbestos fiber, glass fiber, alpha cellulose, lignin, or cellophane shreds may be carried with the sealants.
  • FIGURE 6 illustrates a modified form of apparatus capable of accomplishing the method of the present invention.
  • the body structure 26 is substantially identical to the body structure 26 previously described in that it is provided with upper and lower packer elements 20 and 22 expansible by actuation of the pistons 48 and 42 respectively.
  • the body structure 26 is not provided with an enlarged chamber for housing the capsule C.
  • the pressure responsive valve assembly 79 of FIGURE 3 is removed from the bore 50 as previously described and a tubular member 200 is attached to its lower end.
  • the tubular member 200 is provided with a passageway 202 which extends into an enlarged chamber 204 that houses a piercing or lance element 206 having a piston head 210.
  • the enlarged chamber 204 also houses beneath the lance element 206 the frangible capsule C.
  • a by-pass passage 212 is provided at the lower end of the enlarged chamber 204 and extends to a reduced opening outlet 214 of the chamber 204.
  • FIGURES 7 and 8 illustrate a further modification of the present invention and, more particularly, a modification to the means for fracturing or rupturing the capsule C.
  • the body structure 26" is identical with the body structure 26 with the exception that it is provided with a vertical bore 220 which extends downwardly from the chamber 62 and out of the lower end portion 34.
  • the bore 220 has a portion of its length threaded, as indicated at 222, and is adapted to receive a threaded stem 224 of the lance element 226.
  • the portion of the stem 224 which extends outwardly of the lower end portion 34 is provided with a drag spring assembly 228 having springs 230 which frictionally engage the side walls of the well pipe 12.
  • packer elements 20 and 22 are released as shown in FIGURE 7 and the conduit 24 is disconnected from the pump. Then the conduit 24 is rotated so as to rotate the body structure 26" relative to the threaded stem 224. This will cause the threaded stem to elevate the lance element 226 so that it penetrates and fractures the capsule C. As soon as the capsule has been penetrated, the pressure responsive valve assembly 79 is again lowered into the bore 50 and the conduit 24 is again connected to the pump P and liquid is flowed through the conduit to cause initial setting of the packer elements 20 and 22, as shown in FIGURE 8.
  • the liquid pressure is increased to unseat the valve 94 so that liquid can flow through the passage 52 into the chamber 62 to force the plastic sealant material and catalyst mixture out of the opening 54 and into the leaks in the well pipe.
  • the pressure responsive valve 79 may be fished out of the conduit 24 and water may be flowed through the body structure 26" to thereby flush out the inside mechanism of the apparatus and thus prevent any sealant left therein from fouling subsequent operation.
  • a method of testing a well pipe in a well for leaks and repairing the same IILSitl1 if any leaks are determined by the test comprising the steps of: establishing spaced barriers within the well pipe on either side of a section to be tested; positioning a frangible capsule filled with a sealant within the pipe adjacent the section being tested; applying a measurabhe pressure to the section of well pipe between the spaced barriers while said capsule is being maintained in the position adjacent the section being tested, and observing for a drop i n pressure due to a leak in the pipe; releasingthe pressure between the barriers; fracturing the capsule to release the sealant if the test indicates a leak in the well pipe; and then applyingka pressure to the sealant to force the same into the 2.
  • a method of testing a well pipe in a well for leaks and repairing the same in situ if any leaks are determined by the test comprising the steps of utilizing a fluid under pressure to establish spaced barriers within the well pipe on either side of a section to be tested; positioning a frangible capsule filled with a sealant within the pipe adjacent the section being tested; flowing a liquid into the space between the barriers and applying a measurable pressure to the same while maintaining said capsule in the position adjacent the section being tested, observing fora drop in pressure due to a leak in the pipe; releasing the pressure on the liquid between the barriers and releasing barriers so that the liquid drops by gravity into the well; reestablishing the barriers if a leak has been determined and then fracturing the capsule to release the sealant between the barriers; and then applying a pressure to the sealant to force the same into the leak.
  • a method of repairing a leak in a section well pipe while the well pipe remains in situ within the well comprising the steps of: establishing spaced barriers within the well pipe on either side of the section well pipe, and at the same time positioning a frangible capsule within the well pipe adjacent the section, the frangible capsule containing a sealant; fracturing the capsule and flowing the sealant into the space between the barriers, and applying pressure on the sealant to force the same into the leak in the section of well pipe.

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Examining Or Testing Airtightness (AREA)

Description

G. L. LOOMIS July 13, 1965 METHOD OF LOCATING LEAKS AND REPAIRING WELL TUBING IN SITU 4 Sheets-Sheet 3 Original Filed July 2 1962 a @i z WM //////////l/lr/l/ fl, t
INVENTOR Gza/wv L A oa/ws BYW 09 United States Patent ice 3 194,310 METHOD OF LOCATH IG LEAKS AND REPAIRING WELL TUBING IN SITU Glenn L. Loomis, Pasadena, Tex.; Jean Doyle Loomis, independent executrix of Glenn L. Loomis, deceased, assignor to Jean Doyle Loomis, individuall Original application July 2, 1962, Ser. No. 206,631. Divided and this application Mar. 6, 1964, Ser. No. 358,393
3 Claims. (Cl. 166-4) This application is a division of my copending application, Serial No. 206,631, filed July 2, 1962, and is entitled to the filing date thereof.
The present invention relates to an improved method for testing well tubing or pipe for leaks and repairing any leaks located. More specifically, the present invention relates to testing well pipe in a well to locate leaks and then repairing the well pipe in situ.
Present day gas and oil wells are completed by a procedure of cementing the final production tubing string into the well bore. This completion practice is usually done in order to eliminate additional expense of primary strings of casing, production packers and the like.
While the practice of cementing the final production tubing into the well bore has the advantage of being more economical, there is also the disadvantage that the tubing cannot be easily pulled for repairs should leaks develop either in the threaded joints of the connecting collars or in the tubing wall. Oftentimes, leaks develop long after the intial completion of the well and while the well is in use. Uncontrollable factors such as corrosion of the tubing or vibration of the same cause such leaks and, heretofore, there has been no satisfactory way to locate and repair the leaks without pulling the tubing out of the well hole and replacing the defective well pipe and/ or threaded collars. Even in wells where the flow tubing or pipe may be easily removed to test for leaks and repair of the same, such procedure oftentimes results in further leaks developing in the joints when the string is lowered again into the well. This results in loss of operating time as the string must again be removed and repaired.
Efiorts have been made to apply sealants to leaks located in well pipe by pumping the sealant down the well pipe to the area of the leak. Since the sealants include a plastic sealant material which must be mixed with a catalyst, the mixing of the plastic sealant material with the catalyst at the surface has proved an unsatisfactory operation as the catalytic action oftentimes takes place long before the sealant reaches the point of leakage within the well. The well pipe, equipment in the wells and the like becomes clogged by such a procedure.
An important object of the present invention is to provide a method for locating leaks in a well pipe and repairing such leaks in situ.
Another object of the present invention is to provide a method of testing for leaks and repairing such leaks if located, the method contemplating positioning a sealant adjacent the area being tested and, if a leak is determined, releasing the sealant and applying the sealant under pressure to repair the leak in the well pipe.
Still another object of the present invention is to provide a method of testing a well pipe for leaks and if a leak is located, mixing a plastic sealant material with a catalyst at the location of the leak and applying the same to the well pipe under pressure.
A further object of the present invention is to provide a method for repairing leaks in well pipe utilizing a capsule filled with a batch of sealant and lowered into the well pipe to a point adjacent the leak, the capsule then being ruptured and the sealant therein applied under pressure to the leak. Ancillary to the preceding, it is a 3,194,310 Patented July 13, 1965 further object of the invention to utilize a capsule having separate compartments, one compartment being filled with a plastic sealant material and the other compartment being filled with a suitable catalyst, the capsule being ruptured or fractured at the location of a leak and causing mixture of the catalyst and the sealant material in the immediate area with the mixture being applied to the leak under pressure.
Throughout the specification, the term well pipe will be used, and it is intended to cover either a casing in a well bore or a string of flow tubing positioned within the casing. In drilling a well, the walls of the bore or hole are supported by what is commonly referred to as casing. The tubular casing, which comes in long sections, is lowered into the well after the well hole has been drilled, the sections of the casing being coupled together in the usual manner by a welded or threaded joint. The flow tubing is inserted within the casing after the casing has been inserted into the well bore. When the apparatus is used in testing flow tubing, the flow tubing remains in situ Within the casing. On the other hand, when the apparatus is used to test casings for leaks, it will be understood that the flow tubing will have been either not inserted therein or removed from the casing to permit the insertion of the apparatus into the casing.
Although the apparatus is primarily intended to test and repair well pipe while the well pipe is within the well bore, it will be appreciated that the apparatus could be utilized to test well pipe removed from the bore and positioned in the derrick. However, the method of the invention is primarily intended for use in testing well pipe for leaks and repairing any leaks located in the well pipe while the well pipe remains in situ within the bore of a well.
These and other objects and advantages of the present invention will appear more fully in the following specification, claims and drawings in which:
FIGURE 1 is a vertical section partly in elevation of the apparatus being inserted down into a well pipe;
FIGURE 2 is a vertical sectional view similar to FIG- URE 1 but illustrating the apparatus positioned at a desired location within the well pipe, the spaced barriers of the apparatus being set by fiuid pressure and the apparatus ready for application of fluid under a measurable pressure to the space between the barriers;
FIGURE 3 is a view similar to FIGURE 2 but showing an additional sequence in performing the method of the present invention after the testing of a section of well pipe has been accomplished and prior to fixing or repairing a leak located in the section;
FIGURE 4 is a further vertical section similar to FIG- URE 3 but showing the apparatus being utilized to repair the leak located;
FIGURE 5 is a schematic view of the apparatus of FIGURES 1, 2, 3 and 4 and showing the apparatus sus pended in a well just prior to the repairing of a leak lo cated in the well pipe;
FIGURE 6 is a vertical sectional view through an apparatus similar to the apparatus of FIGURES 1 through 5 but illustrating a modified means for holding the frangible capsule filled with sealant and a modified means for fracturing such capsule;
FIGURE 7 is a vertical sectional view of a still further modification of the present invention. and illustrating a further modified means for fracturing the capsule having the sealant;
FIGURE 8 is a vertical sectional view of the apparatus of FIGURE 7 and illustrating the actuation of the means for fracturing or rupturing the capsule.
Referring now to the drawings wherein like character and reference numerals represent like or similar parts, the
apparatus of the present invention as illustrated in FIG- URES 1 through 5 is generally designated by numeral 10. As shown in FIGURES 1 through 4, the apparatus is illustrated positioned in a well pipe 12 which may be casing for a well hole or flow tubing inserted within the casing. It will be understood that in the example illustrated, the well pipe 12 is made up of a series of strands or sections 14 and 16 coupled together by a threaded collar 18. The illustrative example discloses the testing of the threaded joint between the two stands, but it will be appreciated that the apparatus is also used to test the walls of the stands intermediate the collars coupling the stands together.
The improved method of testing the well pipe for leaks and/or repairing the well pipe for leaks in situ is best understood by referring to FIGURES 1 through 5. For the present, it will suiiice to say that the testing apparatus 10 is provided with an upper resilient packer element 20 and a lower resilient packer element 22 which are spaced from each other and which are adapted to be expanded into sealing engagement with the interior of the well pipe by the application of fluid under pressure.
After the packer elements 20 and 22 have been set to form spaced barriers within the well pipe 12, testing fluid such as water or the like is flowed into the area between the spaced barriers and a measurable pressure is applied thereto. Observation of a pressure gauge G (FIGURE 5), which measures the pressure on the liquid between the barriers, will determine if there is a leak in the section of pipe between the barriers. If there is an appreciable drop from the pressure as indicated by the gauge G, then there is a leak. If the test indicates a leak, the pressure on the fluid between the barriers is relieved and the barriers are released so that any liquid trapped therebetween can drop by gravity into the well. Then the barriers are reset and a frangible capsule C having a batch of sealant therein and supported in the area of the leak is fractured and the sealant is flowed into the space between the barriers. Fluid pressure is applied to the sealant to inject the same into the leaks, the fluid pressure being either water, salt water, barium impregnated mud, drilling mud, or the like. Once the sealant has been injected into the leak and has set, the barriers are released and the apparatus is moved to another position within the well pipe and the test sequence is repeated. A more detailed explanation of the method involved in the present invention will appear later in the specification together with the description of the apparatus.
The apparatus 10 of FIGURES 1 through 5 inclusive includes a pump P (FIGURE 5) suitably supported on the floor of a well derrick or the like (not shown), a source of supply S of liquid such as water, a flexible conduit 24 connecting the pump P and the source of supply S to an elongated body structure 26. The elongated body structure 26 has a maximum diameter less than the inside diameter of the well pipe 12 and is adapted to support the packer elements 20 and 22. Packer elements 20 and 22 are resilient and are adapted to be expanded into engagement with the well pipe 12. The resilient packer elements 20 and 22 are usually made from elastomeric material such as rubber, synthetic rubber or the like and may be of the type as shown in the drawings which are compressed longitudinally so that they expand transversely into sealing engagement with the Wall of the well pipe 12 or they may be of the type which are provided with an internal cavity and can be inflated.
In more detail, the elongated body structure 26 is provided with a cylindrical center portion 28, intermediate portions 30 of reduced diameter and upper and lower elongated end portions 32 and 34, respectively, of still further reduced diameter. The lower end portion 34 is threaded as indicated at 36 and is adapted to receive a rounded nose member 38 and a packer retaining nut or back-up ring 40 which abuts against one end of the lower packer element 22. A cylindrical cup-shaped piston 42 is provided on the lower end portion 34 and abuts the packer element 22 on its end opposite to the end abutting the retaining nut 40. The cup-shaped piston 42 is provided with a cylindrical skirt 44 which is adapted to slide on the lower intermediate portion 30. It will now be understood that when the piston 42 moves downwardly from the position shown in FIGURE 1 against the packer element 22, it will compress the resilient packer element against the nut or back-up ring 40 and expand the same transversely into engagement with the well pipe 12 as shown in FIGURE 2.
The upper packer element 20 is mounted on the upper elongated end portion 32 in a similar manner between the back-up ring or retaining nut 46 and cylindrical cupshaped piston 48. Movement of the piston 48 toward the retaining nut 46 compresses the packer element 20 and expands the same transversely into sealing engagement with the well pipe 12.
The construction and operation of the pistons 42 and 48 and the packer elements 22 and 20 respectively is substantially identical with that disclosed in my previously issued United States Patent 2,841,007, July 1, 1958, but it will be appreciated that the exact form of the packer elements and the use of fluid pressure to set the same may be in accordance with the teachings of my United States Patent 2,807,955, issued Octoberl, 1957.
The upper elongated end portion 32 is provided with an open ended enlarged bore 50 which extends axially thereof and which communicates with a passage 52 extending through the body structure and opening on the surface of the center portion 28 as indicated at 54. An O-ring seal 56 is provided in the shoulder bottom 58 of bore 50. Also, it will be noted that the body structure 26 is made in at least two parts and threaded together as indicated at 60 in order that an enlarged chamber 62 can be provided in the passage 52. The chamber 62 is adapted to support the frangible capsule C which houses the batch of sealant as will be described in more detail later in the specification.
The elongated upper end portion 32 is provided with a passage 64 which extends therethrough and through the intermediate portions 30, center portion 28 and lower end portion 34 and opens at 66 and 68 beneath the heads of piston 48 and 42, respectively. The passage 64 where it passes through the upper end portion 32 is spaced radially outwardly of the bore 50 and passage 52. The passage 64 has an inlet 70 in the end of the end portion 64. As clearly shown in FIGURE 1, the flexible conduit 24 is threaded onto the end of the upper elongated end portion 32, as indicated at 72, and thus the body structure can be raised and lowered within the well tube.
When liquid from the source of supply S (FIGURE 5) is supplied through the pump P into the conduit 24 and into the bore 50, the liquid will flow downwardly through the passage 52 in the body structure 26 around the capsule C in the chamber 62 and out of the outlet 54 into the well. The liquid will also flow into the inlet 70 of passage 64 but since the pressure cannot build up in this passage as passage 52 is continuously open, the pistons 48 and 42 are not actuated. When the apparatus is first lowered into the well and liquid is flowed through the conduit 24 as described above, the liquid passes from the outlet 54 into the well pipe past the packers 20 and 22 and, thus, washes away or cleans out any congealed Weighting material, mud or the like in the well pipe 12. The apparatus may then be conveniently lowered through the well pipe until it has reached a desired depth.
After the apparatus 10 has been positioned in the well pipe 12 as far down as desired, it is then ready for performing a test to determine if the well pipe at that position leaks and if such a leak is determined it then can be utilized to repair such a leak.
Referring now to FIGURE 2, the apparatus of FIG- URE 1 is shown ready to conduct a test on the section of well pipe. In more detail, after the cleansing and lowering action is accomplished as described with respect to FIGURE 1, the pump P is stopped and the liquid within the conduit 24 and in the body structure 28 will drain therefrom. The conduit 24 is temporarily disconnected from the pump P in any suitable manner and a pressure responsive valve assembly 79 is dropped down the conduit and fits into the bore 50 seating against the O-ring 56. The pressure responsive valve assembly 79 includes a body portion 80 having a beveled lower end or seat 82 and an elongated stem 84 extending from its upper end. The stem 84 is provided with an enlarged head 86 capable of receiving suitable overshot grapples 88 (FIGURE 3). A passage 90 extends through the stem 84 and body 80 and has its lower end communicating with the upper end of the passage 52. Housed within the body 80 is a pressure responsive valve 92 including a ball 94 urged against a seat 96 by a spring 98 and a follower 100.
With the pressure responsive valve assembly 79 in the position shown in FIGURE 2, the conduit 24 is again connected to the pump P and the pump is operated to supply liquid under pressure through the conduit 24 to the body structure 26. The ball 94 closes the passage 90 and, consequently, the liquid will first flow through the inlet 74 into the passage 64 at a sufficient pressure to urge the pistons 48 and 42 in opposite directions to thereby set the packers 20 and 22 respectively. Once the pressure in the passage 64 has caused the packer elements 20 and 22 to be set and form spaced barriers in the well pipe 12, the pressure of the liquid in the pipe 24 is increased. When the pressure of the liquid has increased sufiiciently to unseat the ball 94 from its seat 96, the liquid will flow through the passage 90, passage 52 and out of the outlet 54 between the packer elements. The gauge G, provided adjacent the pump P can be observed as the pressure of the liquid between the packer elements 20 and 22 is built up to a predetermined amount. Once the pressure of the liquid has reached the predetermined amount, the gauge is observed for an appreciable drop in pressure and, if such a drop occurs, it will indicate that the section of well pipe being tested has a leak therein.
If the operator notes that there is a leak, the pressure of the liquid flowing into the conduit 24 is relieved and thus the ball 94 will seat and the pistons 48 and 42 retract so that any liquid trapped between the barriers can drop by gravity down the well pipe.
Referring now to FIGURE 3, the conduit 24 is again disconnected and the overshot grapple 88 which includes the spring tongs 102 is lowered into the conduit 24 until it engages the enlarged head 86 of the pressure responsive valve assembly 79. The valve assembly 79 is removed from the bore 50 and any liquid trapped in the passages 52 will flow by gravity therefrom out of the outlet 54 past the lower packer element 22. While FIG- URE 3 shows the packer elements expanded, it will be appreciated that before the pressure responsive valve assembly 79 is removed, the packer elements will have become relaxed due to the removal of pressure from the liquid in the conduit 24. If for any reason there is fluid trapped between the packer elements which would tend to maintain the packer elements in sealing engagement, removal of the pressure responsive valve assembly 79 will cause an equalization of pressure on the fluid between the packer elements and the pressure beneath the pistons 48 and 42, thus causing an immediate full relaxing of the packer elements so that the liquid can drop into the well.
After the pressure responsive valve assembly has been removed, the apparatus will again assume the relaxed position shown in FIGURE 1. A second conduit 110 having a tubular member 114 threaded thereon, as indicated at 116, is then lowered within the conduit 24 until the lower beveled end 118 of the tubular member 114 seats against the O-ring 58 in the bottom of the bore 50.
The tubular member 114 is provided with an enlarged bore 120 communicating with a reduced bore 122 at its lower end. A lance element 124 having a piston head 126 slidable in the bore 120 is adapted to extend through the bore 122 and the passageway 52 in the body structure 26. A by-pass passage 128 is provided between the bore 120 and the passage 122 so that liquid can flow past the piston head 126 through the passage 52 when the piston head is in the position shown in FIGURE 4.
When the conduit 110 with a tubular member 114 and its lance element 124 have been lowered within the conduit 24, the upper end of the conduit 110 is connected to a pipe 130 leading from a pump P suitably supported on the floor of the derrick. The pump P is connected to a source of supply S which may be water, salt water, drilling mud, or barium impregnated mud.
With the apparatus connected as shown in FIGURE 4 but with the lance element 124 positioned vertically upwardly in the bore 120, the conduit 24 is reconnected to the pump P which is then started so as to flow water under pressure down the conduit 24 into the passage 64 and this actuates the pistons 48 and 42 to reset the packer elements 20 and 22 respectively. Once the packer elements have been reset, then the pump P is actuated to cause flow of fluid in the conduit 110. The pressure of the fluid acting on the piston head 126 of the lance element 124 drives the same downwardly to a position where it penetrates the capsule C. Continued application of pressure on the head 126 will move the head to the position shown in FIGURE 4 and then the liquid in the bore can by-pass around the head through the by-pass passage 128 into the passage 52 and thus force the sealant out of the fractured capsule C and inject the same into the leak in the well pipe. As soon as it is determined that the sealant has been injected into the leak in the well pipe, the pressure can be relieved on the packers 20 and 22 and in the conduit 110 so that the conduit 110 may be raised upwardly so as to remove the tubular member 114 from the seat 58. After the pressure has been relieved on the packers 20 and 22, water may be flowed through the conduit 24 to clean out the passages 52, chamber 62 and the body structure 26 may then be raised so that a new capsule may be positioned in the chamber and the tests repeated at dilferent portions along the well pipe until such time as another leak is located. The testing and/ or repairing operation will then be repeated as described above.
The capsule C shown in FIGURES 1 to 4 is made of a frangible material such as hard vulcanized rubber, ceramic, or any molded plastics such as Bakelite. And it has compartments A and B in which a plastic sealant material and a catalyst are segregated from one another until time of use. Also, the capsule C may be constructed of a metal case with frangible ends and/or partitions to separate the plastic sealant from the catalyst. Preferably the capsule is made from a material which will shatter upon contact by the lance element 124 so that the catalyst and the plastic sealant material will quickly mix. The type of plastic sealant used depends upon the existing downwell conditions such as the magnitude of the leak, well temperature and well pressure at the site of leak, type of fluid being produced through the tubing, type of fluid contained in the space around the pipe such as mud and water, or the like. Plastic sealants which have been used are cellulose esters, e.g., cellulose acetate butyrate; polyurethane resins, e.g., from toluene diisocyanate and polypropylene glycol molecular weight 2025, or polyphenylene polyisocyanate (PAPI) and the polyester of adipic acid with diethylene glycol and trimethylol propane; and any of the phenolic resins such as phenolformaldehyde, cresol formaldehyde and phenol-furfural; epoxies, e.g., bisphenol A-epichlorhydrin resin; silicones, e.g., polydimethyl siloxane; and acrylates, e.g., polymerized methyl methacrylate and polymerized ethylacrylate. The catalysts used depend upon the particular sealant used. With cellulose acetate butyrate and phenolics, an
acid type of catalyst such as hydrochloric acid or sulfuric acid is used. On the other hand, in addition to acid catalysts, an amine complex catalyst, e.g., boron-fluoridetriethyl amine can be used with the expoxies whereas a peroxide catalyst, e.g., benzoyl peroxide or cumene hydroperoxide is used with the acrylates. Fillers, such as wood flour, metallic powder, asbestos fiber, glass fiber, alpha cellulose, lignin, or cellophane shreds may be carried with the sealants.
FIGURE 6 illustrates a modified form of apparatus capable of accomplishing the method of the present invention. In the apparatus of FIGURE 6, the body structure 26 is substantially identical to the body structure 26 previously described in that it is provided with upper and lower packer elements 20 and 22 expansible by actuation of the pistons 48 and 42 respectively. However, the body structure 26 is not provided with an enlarged chamber for housing the capsule C. In the modification in FIGURE 6, after the test has been made on the section of well pipe and it has been determined that the same leaks, the pressure responsive valve assembly 79 of FIGURE 3 is removed from the bore 50 as previously described and a tubular member 200 is attached to its lower end. The tubular member 200 is provided with a passageway 202 which extends into an enlarged chamber 204 that houses a piercing or lance element 206 having a piston head 210. The enlarged chamber 204 also houses beneath the lance element 206 the frangible capsule C. A by-pass passage 212 is provided at the lower end of the enlarged chamber 204 and extends to a reduced opening outlet 214 of the chamber 204.
In the modification shown in FIGURE 6, it is not necessary to run a separate conduit into the conduit 24 in order to actuate the lance element 206. Once the tubular member with the lance element 204 and capsule C has been positioned as shown in FIGURE 6, the pump P is started and liquid is flowed down the conduit 24. The pressure responsive valve assembly 79 initially prevents actuation of the lance element 206 but allows the liquid to flow in the conduit 64 so as to actuate the pistons 48 and 42 to expand the packer elements 20 and 22. Upon setting of the packer elements 20 and 22, pressure builds up in the conduit 24 and eventually forces the pressure responsive valve element 94 off of its seat so that liquid can flow through the passage 202 against the head of piston 210 to force the lance element 206 downwardly where it fractures the capsule C. Continued downward movement of the piston element completely crushes the capsule and when the piston 210 passes the by-pass 212, liquid flowing in the conduit 24 can by-pass through the passage 212 out of the opening 214 to force the mixture of sealant material and catalyst through the passage 52' out of the opening 54 and inject the same under pressure in the leak in the well pipe 12. Once the leak has been repaired, the pressure responsive valve assembly 79 with the attached tubular member 200 is removed from the conduit 24 by the overshot grapple 88 and the system is then flushed with the packers relaxed, as shown in FIG- URE 1.
FIGURES 7 and 8 illustrate a further modification of the present invention and, more particularly, a modification to the means for fracturing or rupturing the capsule C. In FIGURE 7 the body structure 26" is identical with the body structure 26 with the exception that it is provided with a vertical bore 220 which extends downwardly from the chamber 62 and out of the lower end portion 34. The bore 220 has a portion of its length threaded, as indicated at 222, and is adapted to receive a threaded stem 224 of the lance element 226. The portion of the stem 224 which extends outwardly of the lower end portion 34 is provided with a drag spring assembly 228 having springs 230 which frictionally engage the side walls of the well pipe 12. After a leak has been located by operation of the apparatus 10" in a similar manner as described with respect to FIGURES 1, 2 and 3, the
packer elements 20 and 22 are released as shown in FIGURE 7 and the conduit 24 is disconnected from the pump. Then the conduit 24 is rotated so as to rotate the body structure 26" relative to the threaded stem 224. This will cause the threaded stem to elevate the lance element 226 so that it penetrates and fractures the capsule C. As soon as the capsule has been penetrated, the pressure responsive valve assembly 79 is again lowered into the bore 50 and the conduit 24 is again connected to the pump P and liquid is flowed through the conduit to cause initial setting of the packer elements 20 and 22, as shown in FIGURE 8. After setting of the packer elements 20 and 22, the liquid pressure is increased to unseat the valve 94 so that liquid can flow through the passage 52 into the chamber 62 to force the plastic sealant material and catalyst mixture out of the opening 54 and into the leaks in the well pipe. After the leak has been repaired, the pressure responsive valve 79 may be fished out of the conduit 24 and water may be flowed through the body structure 26" to thereby flush out the inside mechanism of the apparatus and thus prevent any sealant left therein from fouling subsequent operation.
While the method and the apparatus described above fully accomplish the objects and advantages of the present invention, it is, of course, within the scope of the present invention that certain changes and modifications may be made without departing from the spirit of the invention. Therefore, the terminology used in this specification is for the purpose of description and not for limitation, as the scope of the invention is defined in the claims.
What is claimed is:
1. A method of testing a well pipe in a well for leaks and repairing the same IILSitl1 if any leaks are determined by the test comprising the steps of: establishing spaced barriers within the well pipe on either side of a section to be tested; positioning a frangible capsule filled with a sealant within the pipe adjacent the section being tested; applying a measurabhe pressure to the section of well pipe between the spaced barriers while said capsule is being maintained in the position adjacent the section being tested, and observing for a drop i n pressure due to a leak in the pipe; releasingthe pressure between the barriers; fracturing the capsule to release the sealant if the test indicates a leak in the well pipe; and then applyingka pressure to the sealant to force the same into the 2. A method of testing a well pipe in a well for leaks and repairing the same in situ if any leaks are determined by the test comprising the steps of utilizing a fluid under pressure to establish spaced barriers within the well pipe on either side of a section to be tested; positioning a frangible capsule filled with a sealant within the pipe adjacent the section being tested; flowing a liquid into the space between the barriers and applying a measurable pressure to the same while maintaining said capsule in the position adjacent the section being tested, observing fora drop in pressure due to a leak in the pipe; releasing the pressure on the liquid between the barriers and releasing barriers so that the liquid drops by gravity into the well; reestablishing the barriers if a leak has been determined and then fracturing the capsule to release the sealant between the barriers; and then applying a pressure to the sealant to force the same into the leak.
3. A method of repairing a leak in a section well pipe while the well pipe remains in situ within the well comprising the steps of: establishing spaced barriers within the well pipe on either side of the section well pipe, and at the same time positioning a frangible capsule within the well pipe adjacent the section, the frangible capsule containing a sealant; fracturing the capsule and flowing the sealant into the space between the barriers, and applying pressure on the sealant to force the same into the leak in the section of well pipe.
(References on following page) References Cited by the Examiner UNITED STATES PATENTS Beecher 166-4 McLennan 166-14 X Kerman 166-14 Smith 166-14 Wrightsman 166-33 Dyer 166-32 X 1 10 Jennings 166-33 X Holland et a1. 166-33 ONeal 166-14 X Bernard 166-33 Bearden et a1. 166-29 Lebourg 166-21 CHARLES E. OCONNELL, Primary Examiner.
Davis et al 166 33 X 10 BENJAMIN HERSH, Examiner.

Claims (1)

  1. 3. A METHOD OF REPAIRING A LEAK IN A SECTION WELL PIPE WHILE THE WELL PIPE REMAINS IN SITU WITHIN THE WELL COMPRISING THE STEPS OF: ESTABLISHING SPACED BARRIERS WITHIN THE WELL PIPE ON EITHER SIDE OF THE SECTION WELL PIPE, AND AT THE SAME TIME POSITIONING A FRANGIBLE CAPSULE WITHIN THE WELL PIPE ADJACENT THE SECTION, THE FRANGIBLE CAPSULE CONTAINING A SEALANT; FRACTURING THE CAPSULE AND FLOWING THE SEALANT INTO THE SPACE BETWEEN THE BARRIERS, AND APPLYING PRESSURE ON THE SEALANT TO FORCE THE SAME INTO THE LEAK IN THE SECTION OF WELL PIPE.
US358393A 1962-07-02 1964-03-06 Method of locating leaks and repairing well tubing in situ Expired - Lifetime US3194310A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US358393A US3194310A (en) 1962-07-02 1964-03-06 Method of locating leaks and repairing well tubing in situ

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US206631A US3199598A (en) 1962-07-02 1962-07-02 Apparatus for testing and repairing well pipes
US358393A US3194310A (en) 1962-07-02 1964-03-06 Method of locating leaks and repairing well tubing in situ

Publications (1)

Publication Number Publication Date
US3194310A true US3194310A (en) 1965-07-13

Family

ID=22767252

Family Applications (2)

Application Number Title Priority Date Filing Date
US206631A Expired - Lifetime US3199598A (en) 1962-07-02 1962-07-02 Apparatus for testing and repairing well pipes
US358393A Expired - Lifetime US3194310A (en) 1962-07-02 1964-03-06 Method of locating leaks and repairing well tubing in situ

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US206631A Expired - Lifetime US3199598A (en) 1962-07-02 1962-07-02 Apparatus for testing and repairing well pipes

Country Status (1)

Country Link
US (2) US3199598A (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3364993A (en) * 1964-06-26 1968-01-23 Wilson Supply Company Method of well casing repair
US3392781A (en) * 1964-09-29 1968-07-16 Gen Electric Vaporizing heat transfer device
US3461961A (en) * 1967-03-02 1969-08-19 Clayton L Phillips Well tool combination and adapter
US3499485A (en) * 1967-03-02 1970-03-10 Clayton L Phillips Well tool combination and adapter
US3762446A (en) * 1970-12-08 1973-10-02 Minnesota Mining & Mfg Method and device for internally locating and sealing pipeline leaks
US4673652A (en) * 1982-10-12 1987-06-16 Baker Oil Tools, Inc. Method of testing and reconditioning insulating tubular conduits
US4817716A (en) * 1987-04-30 1989-04-04 Cameron Iron Works Usa, Inc. Pipe connector and method of applying same
US5154230A (en) * 1989-07-21 1992-10-13 Oryx Energy Company Method of repairing a wellbore liner for sand control
US5195588A (en) * 1992-01-02 1993-03-23 Schlumberger Technology Corporation Apparatus and method for testing and repairing in a cased borehole
US5295541A (en) * 1992-12-22 1994-03-22 Mobil Oil Corporation Casing repair using a plastic resin
US5377757A (en) * 1992-12-22 1995-01-03 Mobil Oil Corporation Low temperature epoxy system for through tubing squeeze in profile modification, remedial cementing, and casing repair
US5531272A (en) * 1992-12-22 1996-07-02 Mobil Oil Corporation Low temperature underwater epoxy system for zone isolation, remedial cementing, and casing repair
US6026675A (en) * 1995-09-02 2000-02-22 Weatherford/Lamb, Inc. Method and apparatus for testing threaded joints and threaded members
US20060152016A1 (en) * 2004-04-19 2006-07-13 Northern Power Systems, Inc. Direct Drive Wind Turbine
US20060266198A1 (en) * 2005-05-26 2006-11-30 Jeffries Walter B Snare drum accessory
US20060289159A1 (en) * 2005-06-22 2006-12-28 Davila Vicente G System and method for collecting escaping hydrocarbons from a breached well pipe
US20080277110A1 (en) * 2001-11-19 2008-11-13 Halliburton Energy Services, Inc. Hydraulic open hole packer
US20090026771A1 (en) * 2003-05-30 2009-01-29 Northern Power Systems, Inc. Wind Turbine Having a Direct-Drive Drivetrain
US7506688B2 (en) 2005-09-07 2009-03-24 Geo Estratos, S.A.De Cl.V. System and method for breach detection in petroleum wells
US20170247966A1 (en) * 2014-12-01 2017-08-31 Halliburton Energy Services, Inc. Damaged seal bore repair device
US20180100380A1 (en) * 2016-10-06 2018-04-12 Saudi Arabian Oil Company Well control using a modified liner tie-back
US10030474B2 (en) 2008-04-29 2018-07-24 Packers Plus Energy Services Inc. Downhole sub with hydraulically actuable sleeve valve
US10053957B2 (en) 2002-08-21 2018-08-21 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
CN113631904A (en) * 2019-03-25 2021-11-09 株式会社久保田 Watertight test device
US11441387B2 (en) * 2020-10-05 2022-09-13 Saudi Arabian Oil Company Method of securing a well with shallow leak in upward cross flow
US20230032805A1 (en) * 2021-07-29 2023-02-02 Zhejiang Ocean University Apparatus and method for testing dynamic sealability of fluid in the downhole minor leaks
US11773677B2 (en) 2021-12-06 2023-10-03 Saudi Arabian Oil Company Acid-integrated drill pipe bars to release stuck pipe

Families Citing this family (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3312284A (en) * 1963-10-09 1967-04-04 Aqua Ran Water Supplies Inc Apparatus for cleaning infiltration type water collector
US3468549A (en) * 1965-11-26 1969-09-23 James A Wilson Line wiper
US3503249A (en) * 1968-05-10 1970-03-31 Joseph Frank Dumond Tool for testing pipe joints
US3561490A (en) * 1969-03-03 1971-02-09 Jewel E Little Pipeline testing apparatus
DE7209732U (en) * 1971-03-24
US3700265A (en) * 1972-02-04 1972-10-24 Northern Illinois Gas Co Internal pipe sealing device
US3765484A (en) * 1972-06-02 1973-10-16 Shell Oil Co Method and apparatus for treating selected reservoir portions
US3899920A (en) * 1974-03-27 1975-08-19 Carrol J Matherne Tubing testing tool
US4170130A (en) * 1975-07-09 1979-10-09 Ball Corporation Hollow container fault detector
US3974690A (en) * 1975-10-28 1976-08-17 Stewart & Stevenson Oiltools, Inc. Method of and apparatus for measuring annulus pressure in a well
US4044798A (en) * 1975-12-15 1977-08-30 The Babcock & Wilcox Company Adhesive bonded hydrotest plug and method for using the same
US4152924A (en) * 1978-07-17 1979-05-08 Mayo John H Sub-sea equipment test and isolation tool
USRE31148E (en) * 1978-07-17 1983-02-15 Sub-sea equipment test and isolation tool
USRE31842E (en) * 1979-08-10 1985-03-05 Top Tool Company, Inc. Well washing tool and method
US4279306A (en) * 1979-08-10 1981-07-21 Top Tool Company, Inc. Well washing tool and method
US4329872A (en) * 1980-09-22 1982-05-18 Hydro-Test Inc. High pressure hydraulic testing packer
US4402213A (en) * 1980-10-14 1983-09-06 Agl Corporation Method and device for detecting and locating leaks in pipelines
US4375763A (en) * 1980-10-14 1983-03-08 Agl Corporation Device for detecting and locating leaks in pipelines
US4548069A (en) * 1983-04-26 1985-10-22 Damco Testers, Inc. Pipe testing tool
US4519238A (en) * 1983-04-28 1985-05-28 Hailey Charles D Apparatus for internally testing a plurality of interconnected pipe sections
US4557139A (en) * 1984-07-31 1985-12-10 Loomis International Inc. Leak detection method and apparatus
US4733554A (en) * 1985-02-04 1988-03-29 Richard Lazes Hydro pressure thread tester
US4718496A (en) * 1987-01-05 1988-01-12 Dresser Industries, Inc. Method and apparatus for the completion of an oil or gas well and the like
US5563336A (en) * 1995-09-13 1996-10-08 Mallet; Ronald J. Appparatus for pressure testing of tubulars
US5918271A (en) * 1998-02-11 1999-06-29 Mcguigan; James Deturck Pipe leak location detecting apparatus and repair method
OA12096A (en) * 1999-11-24 2006-05-04 Shell Int Research Device for injecting a fluid into a formation.
GB2382365B (en) * 2001-11-27 2004-04-14 Schlumberger Holdings Leak remedy through sealants in local reservoirs
NO326067B1 (en) * 2006-12-20 2008-09-08 Smart Intervention As Apparatus for leak testing and / or pressure testing of a portion of a rudder as well as the method of using the same
US8240387B2 (en) * 2008-11-11 2012-08-14 Wild Well Control, Inc. Casing annulus tester for diagnostics and testing of a wellbore
US20150068633A1 (en) * 2013-09-06 2015-03-12 Neptune Research, Inc. Testable composite systems for the reinforcement of metallic structures for containing fluids
US11247429B2 (en) * 2018-05-10 2022-02-15 Raytheon Company Bonding assembly system including timed bladder system

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1090673A (en) * 1912-10-01 1914-03-17 Titus Andrew Beecher Method for locating the place and character of a liquid coming from strata in a well.
US2187275A (en) * 1937-01-12 1940-01-16 Amos N Mclennan Means for locating and cementing off leaks in well casings
US2201096A (en) * 1937-07-07 1940-05-14 Kerman Ernest Method of locating and repairing suction strainer damages in wells
US2495352A (en) * 1945-12-12 1950-01-24 Dow Chemical Co Well repair
US2595184A (en) * 1946-10-31 1952-04-29 Standard Oil Dev Co Method for consolidating or for plugging sands
US2609880A (en) * 1948-03-04 1952-09-09 Joseph G Dyer Apparatus for sealing wells
US2842338A (en) * 1956-05-17 1958-07-08 Pan American Petroleum Corp Composition and method for plugging and consolidating
US3028915A (en) * 1958-10-27 1962-04-10 Pan American Petroleum Corp Method and apparatus for lining wells
US3097692A (en) * 1959-04-16 1963-07-16 Jersey Prod Res Co Sand consolidation method
US3111991A (en) * 1961-05-12 1963-11-26 Pan American Petroleum Corp Apparatus for repairing well casing
US3115930A (en) * 1959-10-05 1963-12-31 Pure Oil Co Process for selectively treating subterranean formations
US3126958A (en) * 1964-03-31 Cementing casing
US3153449A (en) * 1960-03-30 1964-10-20 Schlumberger Well Surv Corp Method and apparatus for completing a well

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1812945A (en) * 1929-10-12 1931-07-07 Paul H Granger Means for locating and cementing off leaks in well casings
US2248169A (en) * 1940-07-26 1941-07-08 Paul H Granger Oil well tool
US2431751A (en) * 1941-06-09 1947-12-02 Landes H Hayward Apparatus for cementing wells
US2804147A (en) * 1954-11-12 1957-08-27 Exxon Research Engineering Co Sealing leaking tubing couplings without removing the tubing from the well
US3097698A (en) * 1960-12-05 1963-07-16 Jersey Prod Res Co Wire line cementing tool
US3139931A (en) * 1961-01-19 1964-07-07 Altus L Simpson Apparatus for selectively cementing pipe casing

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3126958A (en) * 1964-03-31 Cementing casing
US1090673A (en) * 1912-10-01 1914-03-17 Titus Andrew Beecher Method for locating the place and character of a liquid coming from strata in a well.
US2187275A (en) * 1937-01-12 1940-01-16 Amos N Mclennan Means for locating and cementing off leaks in well casings
US2201096A (en) * 1937-07-07 1940-05-14 Kerman Ernest Method of locating and repairing suction strainer damages in wells
US2495352A (en) * 1945-12-12 1950-01-24 Dow Chemical Co Well repair
US2595184A (en) * 1946-10-31 1952-04-29 Standard Oil Dev Co Method for consolidating or for plugging sands
US2609880A (en) * 1948-03-04 1952-09-09 Joseph G Dyer Apparatus for sealing wells
US2842338A (en) * 1956-05-17 1958-07-08 Pan American Petroleum Corp Composition and method for plugging and consolidating
US3028915A (en) * 1958-10-27 1962-04-10 Pan American Petroleum Corp Method and apparatus for lining wells
US3097692A (en) * 1959-04-16 1963-07-16 Jersey Prod Res Co Sand consolidation method
US3115930A (en) * 1959-10-05 1963-12-31 Pure Oil Co Process for selectively treating subterranean formations
US3153449A (en) * 1960-03-30 1964-10-20 Schlumberger Well Surv Corp Method and apparatus for completing a well
US3111991A (en) * 1961-05-12 1963-11-26 Pan American Petroleum Corp Apparatus for repairing well casing

Cited By (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3364993A (en) * 1964-06-26 1968-01-23 Wilson Supply Company Method of well casing repair
US3392781A (en) * 1964-09-29 1968-07-16 Gen Electric Vaporizing heat transfer device
US3461961A (en) * 1967-03-02 1969-08-19 Clayton L Phillips Well tool combination and adapter
US3499485A (en) * 1967-03-02 1970-03-10 Clayton L Phillips Well tool combination and adapter
US3762446A (en) * 1970-12-08 1973-10-02 Minnesota Mining & Mfg Method and device for internally locating and sealing pipeline leaks
US4673652A (en) * 1982-10-12 1987-06-16 Baker Oil Tools, Inc. Method of testing and reconditioning insulating tubular conduits
US4817716A (en) * 1987-04-30 1989-04-04 Cameron Iron Works Usa, Inc. Pipe connector and method of applying same
US5154230A (en) * 1989-07-21 1992-10-13 Oryx Energy Company Method of repairing a wellbore liner for sand control
US5195588A (en) * 1992-01-02 1993-03-23 Schlumberger Technology Corporation Apparatus and method for testing and repairing in a cased borehole
US5295541A (en) * 1992-12-22 1994-03-22 Mobil Oil Corporation Casing repair using a plastic resin
US5377757A (en) * 1992-12-22 1995-01-03 Mobil Oil Corporation Low temperature epoxy system for through tubing squeeze in profile modification, remedial cementing, and casing repair
US5531272A (en) * 1992-12-22 1996-07-02 Mobil Oil Corporation Low temperature underwater epoxy system for zone isolation, remedial cementing, and casing repair
US6026675A (en) * 1995-09-02 2000-02-22 Weatherford/Lamb, Inc. Method and apparatus for testing threaded joints and threaded members
US7861774B2 (en) 2001-11-19 2011-01-04 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US9366123B2 (en) 2001-11-19 2016-06-14 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US10822936B2 (en) 2001-11-19 2020-11-03 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US10087734B2 (en) 2001-11-19 2018-10-02 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US9963962B2 (en) 2001-11-19 2018-05-08 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US20080277110A1 (en) * 2001-11-19 2008-11-13 Halliburton Energy Services, Inc. Hydraulic open hole packer
US9303501B2 (en) 2001-11-19 2016-04-05 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US8746343B2 (en) 2001-11-19 2014-06-10 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US7571765B2 (en) 2001-11-19 2009-08-11 Halliburton Energy Serv Inc Hydraulic open hole packer
US20090283280A1 (en) * 2001-11-19 2009-11-19 Halliburton Energy Services, Inc. Hydraulic open hole packer
US7832472B2 (en) 2001-11-19 2010-11-16 Halliburton Energy Services, Inc. Hydraulic open hole packer
US8397820B2 (en) 2001-11-19 2013-03-19 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US10487624B2 (en) 2002-08-21 2019-11-26 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US10053957B2 (en) 2002-08-21 2018-08-21 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US20110187121A1 (en) * 2003-05-30 2011-08-04 Northern Power Systems, Inc. Wind Turbine/Generator Set and Method of Making Same
US20090026771A1 (en) * 2003-05-30 2009-01-29 Northern Power Systems, Inc. Wind Turbine Having a Direct-Drive Drivetrain
US20110187120A1 (en) * 2003-05-30 2011-08-04 Northern Power Systems, Inc. Wind Turbine/Generator Set Having A Stator Cooling System Located Between Stator Frame and Active Coils
US20060152016A1 (en) * 2004-04-19 2006-07-13 Northern Power Systems, Inc. Direct Drive Wind Turbine
US20060152015A1 (en) * 2004-04-19 2006-07-13 Northern Power Systems, Inc. Direct Drive Wind Turbine
US20060266198A1 (en) * 2005-05-26 2006-11-30 Jeffries Walter B Snare drum accessory
US20060289159A1 (en) * 2005-06-22 2006-12-28 Davila Vicente G System and method for collecting escaping hydrocarbons from a breached well pipe
US7413012B2 (en) 2005-06-22 2008-08-19 Geo Estratos, S.A. De C.V. System and method for collecting escaping hydrocarbons from a breached well pipe
US7506688B2 (en) 2005-09-07 2009-03-24 Geo Estratos, S.A.De Cl.V. System and method for breach detection in petroleum wells
US10030474B2 (en) 2008-04-29 2018-07-24 Packers Plus Energy Services Inc. Downhole sub with hydraulically actuable sleeve valve
US10704362B2 (en) 2008-04-29 2020-07-07 Packers Plus Energy Services Inc. Downhole sub with hydraulically actuable sleeve valve
US20170247966A1 (en) * 2014-12-01 2017-08-31 Halliburton Energy Services, Inc. Damaged seal bore repair device
US10544639B2 (en) * 2014-12-01 2020-01-28 Halliburton Energy Services, Inc. Damaged seal bore repair device
US10370943B2 (en) * 2016-10-06 2019-08-06 Saudi Arabian Oil Company Well control using a modified liner tie-back
US20180100380A1 (en) * 2016-10-06 2018-04-12 Saudi Arabian Oil Company Well control using a modified liner tie-back
CN113631904A (en) * 2019-03-25 2021-11-09 株式会社久保田 Watertight test device
EP3943908A4 (en) * 2019-03-25 2022-05-18 Kubota Corporation Watertight testing device
US12000755B2 (en) 2019-03-25 2024-06-04 Kubota Corporation Watertight testing device for a pipe joint part
US11441387B2 (en) * 2020-10-05 2022-09-13 Saudi Arabian Oil Company Method of securing a well with shallow leak in upward cross flow
US20230032805A1 (en) * 2021-07-29 2023-02-02 Zhejiang Ocean University Apparatus and method for testing dynamic sealability of fluid in the downhole minor leaks
US11674887B2 (en) * 2021-07-29 2023-06-13 Zhejiang Ocean University Apparatus and method for testing dynamic sealability of fluid in the downhole minor leaks
US11773677B2 (en) 2021-12-06 2023-10-03 Saudi Arabian Oil Company Acid-integrated drill pipe bars to release stuck pipe

Also Published As

Publication number Publication date
US3199598A (en) 1965-08-10

Similar Documents

Publication Publication Date Title
US3194310A (en) Method of locating leaks and repairing well tubing in situ
US11391113B2 (en) Tandem cement retainer and bridge plug
RU2358090C2 (en) Method and device for remote intervention by means of logic valve control
EP0929731B1 (en) Method and multi-purpose apparatus for dispensing and circulating fluid in wellbore casing
US2043225A (en) Method and apparatus for testing the productivity of the formation in wells
US5004048A (en) Apparatus for injecting displacement plugs
EP2419604B1 (en) Downhole valve tool and method of use
US8327937B2 (en) Equipment for remote launching of cementing plugs
US11608707B2 (en) Removable core wiper plug
US20120090835A1 (en) Downhole material-delivery system for subterranean wells
US3044553A (en) Well packer
US20050103493A1 (en) Moled foam plugs, plug systems and methods of using same
US2308072A (en) Method of cementing oil wells
US10472925B2 (en) Well tool device with actuation device in through opening of frangible disc
US2662602A (en) Means for guiding, floating, and cementing well casing in bored holes
US3316969A (en) Method of setting hydraulic packers
US5341874A (en) Retrievable packer
SU1476108A1 (en) Casing cementing arrangement
RU2310057C2 (en) Flow string pressure-testing device