US3169604A - Scaffold - Google Patents
Scaffold Download PDFInfo
- Publication number
- US3169604A US3169604A US284036A US28403663A US3169604A US 3169604 A US3169604 A US 3169604A US 284036 A US284036 A US 284036A US 28403663 A US28403663 A US 28403663A US 3169604 A US3169604 A US 3169604A
- Authority
- US
- United States
- Prior art keywords
- carrier
- upright
- rollers
- rope
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
- E04G1/20—Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
Definitions
- This invention relates to scalfolding and more particularly to a bricklayers scaffoldingwhich provides a por able platform, which may be raised and lowered by the bricklayer while supported on such scaffolding.
- a two-level scaffolding one level arranged to support a bricklayer and a'higher level arranged to support the bricks in ready position for use by the bricklayer.
- the device is arranged with raising means on each of two simple'standards so that one person may change the scaffolding level while standing on the scaffolding.
- the device is sturdy, easily dismantled, and-is readily portable, yet is strong enough tosupporta bricklayer and a substantial quantity of bricks.
- the device also provides means for joining several scaffolding planks-by means of three or more standards, thereby increasing the efiectiveness of the scaffolding.
- ent invention is a simplified two-level scaffolding for masonry work which includes at least apair of upright tubular standardseach provided with a lifting mechanism, operable by a worker mounted on the scaffolding, to raise and lower the same as required.
- the device is provided with safety features to prevent accidents during use thereof and to provide increased strength; while retaining portability of the scaffolding members.
- Simple construction for ready assembly and disassembly provides a highly portable and quickly assembled scaffolding.
- the invention provides a two-level scaffolding in which the lower level is arranged for holding the mason and the upper layer is arranged to hold a supply of bricks for use of the mason during a bricklaying operation;
- FIG. 1 is a perspective view of atwo-level scaffolding, according to the invention, indicating attachment to other sections of scaffold planking; V V
- FIG. 2 is a side elevation of a scaflolding standard according to theinvention, illustrating in detail the mechanism thereof;
- FIG. 3 is a top plan view of a portion of the scaffolding taken along section line 33;
- FIG. 4 is an enlarged detail of a brace according to the invention.
- FIG. 5 is a rear elevation of the scaffolding of FIG. 2;
- FIG. 6 is a top plan view'of the scaffolding portion taken along section lines -G.
- a pairof scaffolding supports are arranged to be placed apart supporting upper and lower planks there between.
- a pair of upright scaffolding support members shown in general by numeral 19, support a lower plank 11 and an upper plank 12.
- the scaifolding members may be placed in series of three or more, with the ends of planks 13 and 14 placed over the planksll and 12 on the horizontal supports on the upright 10 and support on another upright similar to those shown.
- Standards are generally arranged in line along the wall under construction; however, the standards may be placed at an angle to one another so that the planks are actually at an angle.
- the planks are shown as merely resting on the supports; however, it is apparent that the planks may be secured in any convenient manner to the supports as by means of clamps, bolts, or the like.
- FIGS. 2 through 6 Each standard comprises, shown-in FIGS. 2 through 6, a central tubular member 2%) which is supported on a base 21.
- the base is removable, and it includes alateral channel member 2-2 on one side thereof and a lateral A
- the A frame as shown in FIG. 6 includeschannel members 23 and 24 secured to the member 22 by welding or other suitable means and a removable cross brace 25 resting in notches on braces 23 and 24.
- the cross brace is connected to an upper A frame member by members 26 and 271which are connectedto a-lock mechanism 28 which includes 'a hook 29for fastening into a hole in the tubular member 20.
- the handle 3i? of the lock mechanism 28 provides means for rigidly securing the base to. the tubular member 20.
- a post 31 Internally of the tubular member is removably mounted a post 31 which is welded or otherwise secured to the base member 21.
- the base member 21 is thus readily remoyable for transportation of the scaffolding member, and'when assembled with the tubing 20 is arranged to supportthe same in an essentially upright position.
- the brace'suppor ts the upright essentially perpendicular to the base member 21.
- a reciprocable carriage which includes a lower support 35 for a plank and an upper support 36 for another plank on the opposite side of the carriage.
- a pairiof conhector bars 38 and 39 which are secured by conventional means to the: support members.
- a handle 52 is mounted in,
- crank arm 51 and is arranged to slide through the opening from side to side of:the crank arm.
- the handle In one position, shown in FIG. 2, the handle is pushed through the crank arm 51 so as to rest against the upright bar 38 and form a brake for the spool, since the pull of the cable (from the weight of the carriage) tends to force the crank arm in counterclockwise position.
- the lower support 35 is a V-shaped piece of strap metal secured in position on the member 20 by means of the rollers.
- the upper support 36 is held on to the upper carriage member by means of a hook 60 over box frame 45 and an upright support bar 61 which is secured at its base to the lower support 35.
- An angle brace 62 supports the member 36 which holds the brick plank.
- the hook 60 mounts over the top frame and the bottom of the upright
- a cap 70 is mounted on the top of the upright and it includes a pair of pulleys 71 and72 forreeving a cable 75 thereover.
- the cable is connected atone end to the extension 4? by means'of a tie 76, and the cable 75 passes up over the pulley 71 down alongside the upright 26 under pulley 77 back up over the pulley 72 and then wound onto the spool 50. This reeving provides a high leverage for moving the carriage up and down the tubularv member 20.
- a chain 80 As a safety, a chain 80, provided with a key 81 at one end thereof, is attached to the cap.
- the chain passes though an opening in a boss 83 mounted on the upper part of the carriage.
- This opening has a circular portion and a notch portion connecting. therewith for temporarily locking one of the links of a chain against the boss 83, as is common in chain type locks;
- the key 81 may be placed through the link in the slot or notch and securely hold the same in the boss.
- This safety feature is an addition to the use of the handle 52 which may be pushed through the crank arm 51 to rest against the upright 29 and prevent rotation of the spool;
- the brace members through 36 are not normally used since the carriage is in lowermost position, obscuring or covering the hole through which the hook 2? is placed.
- the brace is placed in position so that the hook will pass into the hole in the upright Zil' and brace 25 rests in notches in 23 and 24, and the lever arm 23 is moved down by means of the handle to rest' against the cross bar 25 and securely hold the upright perpendicular to the base.
- a movable support 85 is provided with a bifurcated end 86 and a foot 87 at the opposite end.
- the bifurcated end may be placed in the recess adjacent the upright 69 of the support 36 and the support then braced against anyavailable support to prevent tipping of the scaffolding due to the weight of the bricks or the like carried on the plank on support 36.
- Dilterent lengths of braces may be used as the height of r the carriage changes.
- the carriage maybe slid from the upright 20 if the cap 76 is removed.
- Various heights of tubular members 20 may be provided and in one case heavy walled aluminum tubing is used for the upright to provide a simple standard for the carriage.
- a portable scaffolding support arranged to be used in pairs for supporting upper and lower bridging planks on opposite sides of upright supports comprising a tubular upright member, a base removably secured to the bottom Cl movable carrier reciprocally mounted on said upright member, said carrier including an upper outwardly extending plank support projecting laterally from one side of said carrier and a lower plank support extending outwardly-from said carrier in the direction opposite said upper plank support, an upper pair of rollers journaled in said carrier bearing against opposite sides of said up right and one of said upper rollers being mounted on the side opposite said upper plank support, a lower pair of rollers journaled in said carrier below said upper rollers and bearing against said upright, and one of said lower rollers being mounted on the side opposite said lower plank support whereby said carrier rides on said rollers on said upright, first pulley means mounted adjacent the top of said upright, second pulley means mounted on said carrier, rope means reeved around said pulleys, rope retrieve means mounted on said carrier including a
- first pulley means mounted adjacent the top of .said'upright, second pulley means mounted on said carrier, rope means reeved around said pulleys and arranged for moving said carrier up and down saidupright, rope retrieve means mounted on said car-- rier including a movable crank handle and secured to an end of said rope means, said handle being movable from of said upright supporting it in an upright position, a rean outside position for operating said rope retrieve means to an inside position temporarily locking against saidcarrier, and chain lock means cooperative between said first pulley means and said carrier for temporarily securing said carrier at predetermined heights on said upright.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Emergency Lowering Means (AREA)
Description
Feb. 16, 1965 G. H. PRANGER SCAFFOLD 2 Sheets-Sheet 1 Filed May 29, 1963 INVENTOR. Gerald H. Pranger BY f %%Wi ATTORNEYS Feb. 16, 1965 G. H. PRANGER 3,159,504
SCAFFOLD Filed May 29, 1963 2 Sheets-Sheet 2 INVENTOR.
G era/d H. Pranger ATTORNEYS United States 7 Patent 3,169,604 SCAFFOLD Gerald H. Pranger, 2475 S. Franklin St., Denver, Colo.
Filed May 29, 1963, Ser. No. 284,636 7 2 Claims. (Cl. 182-146) This invention relates to scalfolding and more particularly to a bricklayers scaffoldingwhich provides a por able platform, which may be raised and lowered by the bricklayer while supported on such scaffolding.
Scaffoldings for various types of construction work are well known throughout the construction industry, but for special purposes such as bricklaying the normal single plank scaffolding is not satisfactory for the most efiicient utilization of manpower. Commonly used scaffolding, particularly for the smaller contractor, utilizes a pair of spaced-apart sawhorses with a plank or two bridged between them. For lower work, lower sawhorses are used,
and as the height of the wall increases taller sawhorses are utilized. The extraneous movements of the bricklayer leaning down to pick up bricks for laying, and the changing of the height of the sawhorses to change the height of scaffolding, decrease theefticiency of the bricklayer and increase the amount of work necessary forlaying a brick wall. Specialized scaffolding has been proposed using bi-level platforms, buttheseihave been unwieldy and too cumbersome for a lone operator to handle.
. According to the present invention, I have provided a two-level scaffolding, one level arranged to support a bricklayer and a'higher level arranged to support the bricks in ready position for use by the bricklayer. The device is arranged with raising means on each of two simple'standards so that one person may change the scaffolding level while standing on the scaffolding. The device is sturdy, easily dismantled, and-is readily portable, yet is strong enough tosupporta bricklayer and a substantial quantity of bricks. The device also provides means for joining several scaffolding planks-by means of three or more standards, thereby increasing the efiectiveness of the scaffolding.
ent invention is a simplified two-level scaffolding for masonry work which includes at least apair of upright tubular standardseach provided with a lifting mechanism, operable by a worker mounted on the scaffolding, to raise and lower the same as required. The device is provided with safety features to prevent accidents during use thereof and to provide increased strength; while retaining portability of the scaffolding members. Simple construction for ready assembly and disassembly provides a highly portable and quickly assembled scaffolding. The invention provides a two-level scaffolding in which the lower level is arranged for holding the mason and the upper layer is arranged to hold a supply of bricks for use of the mason during a bricklaying operation;
These and other objects and advantages of the invention may be readily ascertained by referring to the fola Included amongthe objects and advantages of the preslowing description and appended illustrations in which:
FIG. 1 is a perspective view of atwo-level scaffolding, according to the invention, indicating attachment to other sections of scaffold planking; V V
FIG. 2 is a side elevation of a scaflolding standard according to theinvention, illustrating in detail the mechanism thereof;
FIG. 3 is a top plan view of a portion of the scaffolding taken along section line 33;
FIG. 4 is an enlarged detail of a brace according to the invention;
FIG. 5 is a rear elevation of the scaffolding of FIG. 2; and
FIG. 6 is a top plan view'of the scaffolding portion taken along section lines -G.
frame on the opposite side.
"ice
In the embodiment of the invention selected for illustration, a pairof scaffolding supports are arranged to be placed apart supporting upper and lower planks there between. As shown in FIG. 1, a pair of upright scaffolding support members, shown in general by numeral 19, support a lower plank 11 and an upper plank 12. The scaifolding members may be placed in series of three or more, with the ends of planks 13 and 14 placed over the planksll and 12 on the horizontal supports on the upright 10 and support on another upright similar to those shown. Standards are generally arranged in line along the wall under construction; however, the standards may be placed at an angle to one another so that the planks are actually at an angle. The planks are shown as merely resting on the supports; however, it is apparent that the planks may be secured in any convenient manner to the supports as by means of clamps, bolts, or the like.
Each standard comprises, shown-in FIGS. 2 through 6, a central tubular member 2%) which is supported on a base 21. The base is removable, and it includes alateral channel member 2-2 on one side thereof and a lateral A The A frame as shown in FIG. 6 includeschannel members 23 and 24 secured to the member 22 by welding or other suitable means and a removable cross brace 25 resting in notches on braces 23 and 24. The cross brace is connected to an upper A frame member by members 26 and 271which are connectedto a-lock mechanism 28 which includes 'a hook 29for fastening into a hole in the tubular member 20. The handle 3i? of the lock mechanism 28 provides means for rigidly securing the base to. the tubular member 20. Internally of the tubular member is removably mounted a post 31 which is welded or otherwise secured to the base member 21. The base member 21 is thus readily remoyable for transportation of the scaffolding member, and'when assembled with the tubing 20 is arranged to supportthe same in an essentially upright position. The brace'suppor ts the upright essentially perpendicular to the base member 21. a
Mounted on the tubular member 20 is a reciprocable carriage which includes a lower support 35 for a plank and an upper support 36 for another plank on the opposite side of the carriage. terconneeting the lower support 35 and the upper support 36 are a pairiof conhector bars 38 and 39 which are secured by conventional means to the: support members. On either side of the extends from the spool 50. A handle 52 is mounted in,
the crank arm 51 and is arranged to slide through the opening from side to side of:the crank arm. In one position, shown in FIG. 2, the handle is pushed through the crank arm 51 so as to rest against the upright bar 38 and form a brake for the spool, since the pull of the cable (from the weight of the carriage) tends to force the crank arm in counterclockwise position. The lower support 35 is a V-shaped piece of strap metal secured in position on the member 20 by means of the rollers.
The upper support 36 is held on to the upper carriage member by means of a hook 60 over box frame 45 and an upright support bar 61 which is secured at its base to the lower support 35. An angle brace 62 supports the member 36 which holds the brick plank. The hook 60 mounts over the top frame and the bottom of the upright A cap 70 is mounted on the top of the upright and it includes a pair of pulleys 71 and72 forreeving a cable 75 thereover. The cable is connected atone end to the extension 4? by means'of a tie 76, and the cable 75 passes up over the pulley 71 down alongside the upright 26 under pulley 77 back up over the pulley 72 and then wound onto the spool 50. This reeving provides a high leverage for moving the carriage up and down the tubularv member 20.
As a safety, a chain 80, provided with a key 81 at one end thereof, is attached to the cap. The chain passes though an opening in a boss 83 mounted on the upper part of the carriage. This opening has a circular portion and a notch portion connecting. therewith for temporarily locking one of the links of a chain against the boss 83, as is common in chain type locks; For added security, the key 81 may be placed through the link in the slot or notch and securely hold the same in the boss. This safety feature is an addition to the use of the handle 52 which may be pushed through the crank arm 51 to rest against the upright 29 and prevent rotation of the spool;
In starting to use the scaffolding, the brace members through 36 are not normally used since the carriage is in lowermost position, obscuring or covering the hole through which the hook 2? is placed. As soon as the scaffolding is raised above the point, the brace is placed in position so that the hook will pass into the hole in the upright Zil' and brace 25 rests in notches in 23 and 24, and the lever arm 23 is moved down by means of the handle to rest' against the cross bar 25 and securely hold the upright perpendicular to the base.
As the carriage is moved higher along the upright 20, an additional brace may be necessary to particularly supportthe weight of the bricks on the p lank held on the support 36. For this purpose, a movable support 85 is provided with a bifurcated end 86 and a foot 87 at the opposite end. The bifurcated end may be placed in the recess adjacent the upright 69 of the support 36 and the support then braced against anyavailable support to prevent tipping of the scaffolding due to the weight of the bricks or the like carried on the plank on support 36. Dilterent lengths of braces may be used as the height of r the carriage changes.
With the base 21 and upper support 36 removed and the carriage removed, the device is easily transported.
The carriage maybe slid from the upright 20 if the cap 76 is removed. Various heights of tubular members 20 may be provided and in one case heavy walled aluminum tubing is used for the upright to provide a simple standard for the carriage.
' While the invention has been illustrated by reference to a particular device, there isno intent to limit the spirit and scope of the invention'to the precise details set forth except as defined in the following claims.
Iclaim: V V
l. A portable scaffolding support arranged to be used in pairs for supporting upper and lower bridging planks on opposite sides of upright supports comprising a tubular upright member, a base removably secured to the bottom Cl movable carrier reciprocally mounted on said upright member, said carrier including an upper outwardly extending plank support projecting laterally from one side of said carrier and a lower plank support extending outwardly-from said carrier in the direction opposite said upper plank support, an upper pair of rollers journaled in said carrier bearing against opposite sides of said up right and one of said upper rollers being mounted on the side opposite said upper plank support, a lower pair of rollers journaled in said carrier below said upper rollers and bearing against said upright, and one of said lower rollers being mounted on the side opposite said lower plank support whereby said carrier rides on said rollers on said upright, first pulley means mounted adjacent the top of said upright, second pulley means mounted on said carrier, rope means reeved around said pulleys, rope retrieve means mounted on said carrier including a movable crank handle, one end of said rope means being ecured to said retrieve means and the other end connectedto said carrier for raising and lowering said carrier along said upright, said handle'being movable from an outside position for turning said rope retrieve means to an inside position against said carrier for preventing unwinding of the rope therefrom, a chain secured to the top of said upright, a bracket including an eye and slot mounted on said carrier for reception of said chain and support projecting laterally from one side of said carrier and a lower plank support extending outwardly from said carrier in the direction opposite said upper plank support,
there being upper and lower guide rollers journaled in said carrier bearing against said uprightmember to provide roller means for movement of said carrier up and down said upright member, first pulley means mounted adjacent the top of .said'upright, second pulley means mounted on said carrier, rope means reeved around said pulleys and arranged for moving said carrier up and down saidupright, rope retrieve means mounted on said car-- rier including a movable crank handle and secured to an end of said rope means, said handle being movable from of said upright supporting it in an upright position, a rean outside position for operating said rope retrieve means to an inside position temporarily locking against saidcarrier, and chain lock means cooperative between said first pulley means and said carrier for temporarily securing said carrier at predetermined heights on said upright.
Ericsson Feb. 8, 1927
Claims (1)
1. A PORTABLE SCAFFOLDING SUPPORT ARRANGED TO BE USED IN PAIRS FOR SUPPORTING UPPER AND LOWER BRIDGING PLANKS ON OPPOSITE SIDES OF UPRIGHT SUPPORTS COMPRISING A TUBULAR UPRIGHT MEMBER, A BASE REMOVABLY SECURED TO THE BOTTOM OF SAID UPRIGHT SUPPORTING IT IN AN UPRIGHT POSITION, A REMOVABLE CARRIER RECIPROCALLY MOUNTED ON SAID UPRIGHT MEMBER, SAID CARRIER INCLUDING AN UPPER OUTWARDLY EXTENDING PLANK SUPPORT PROJECTING LATERALLY FROM ONE SIDE OF SAID CARRIER AND A LOWER PLANK SUPPORT EXTENDING OUTWARDLY FROM SAID CARRIER IN THE DIRECTION OPPOSITE SAID UPPER PLANK SUPPORT, AN UPPER PAIR OF ROLLERS JOURNALED IN SAID CARRIER BEARING AGAINST OPPOSITE SIDES OF SAID UPRIGHT AND ONE OF SAID UPPER ROLLERS BEING MOUNTED ON THE SIDE OPPOSITE SAID UPPER PLANK SUPPORT, A LOWER PAIR OF ROLLERS JOURNALLED IN SAID CARRIER BELOW SAID UPPER ROLLERS AND BEARING AGAINST SAID UPRIGHT, AND ONE OF SAID LOWER ROLLERS BEING MOUNTED ON THE SIDE OPPOSITE SAID LOWER PLANK SUPPORT WHEREBY SAID CARRIER RIDES ON SAID ROLLERS ON SAID UPRIGHT, FIRST PULLEY MEANS MOUNTED ADJACENT THE TOP OF SAID UPRIGHT, SECOND PULLEY MEANS MOUNTED ON SAID CARRIER, ROPE MEANS REEVED AROUND SAID PULLEYS, ROPE RETRIEVE MEANS MOUNTED ON SAID CARRIER INCLUDING A MOVABLE CRANK HANDLE, ONE END OF SAID ROPE MEANS BEING SECURED TO SAID RETRIEVE MEANS AND THE OTHER END CONNECTED TO SAID CARRIER FOR RAISING AND LOWERING SAID CARRIER ALONG SAID UPRIGHT, SAID HANDLE BEING MOVABLE FROM AN OUTSIDE POSITION FOR TURNING SAID ROPE RETRIEVE MEANS TO AN INSIDE POSITION AGAINST SAID CARRIER FOR PREVENTING UNWINDING OF THE ROPE THEREFROM, A CHAIN SECURED TO THE TOP OF SAID UPRIGHT, A BRACKET INCLUDING AN EYE AND SLOT MOUNTED ON SAID CARRIER FOR RECEPTION OF SAID CHAIN AND PROVIDE TEMPORARY LOCK MEANS TO PREVENT DOWNWARD MOVEMENT OF SAID CARRIER, AND MEANS FOR LOCKING SAID CHAIN IN SAID SLOT AND EYE.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US284036A US3169604A (en) | 1963-05-29 | 1963-05-29 | Scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US284036A US3169604A (en) | 1963-05-29 | 1963-05-29 | Scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
US3169604A true US3169604A (en) | 1965-02-16 |
Family
ID=23088611
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US284036A Expired - Lifetime US3169604A (en) | 1963-05-29 | 1963-05-29 | Scaffold |
Country Status (1)
Country | Link |
---|---|
US (1) | US3169604A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3323616A (en) * | 1965-10-22 | 1967-06-06 | Frank S Best | Mason's scaffold |
US3851728A (en) * | 1973-04-11 | 1974-12-03 | Lowell A Williams | Scaffold |
US3880256A (en) * | 1973-08-02 | 1975-04-29 | Alexander Couris | Scaffolding with improved elevator mechanism |
US4002222A (en) * | 1976-02-27 | 1977-01-11 | Bruno Edward G | Combination scaffold and utility platform |
US4262773A (en) * | 1979-07-13 | 1981-04-21 | Basham Billy G | Portable scaffold |
EP0159467A2 (en) * | 1984-04-21 | 1985-10-30 | LISSMAC Maschinenbau GmbH | Platform for lifting persons |
US4641728A (en) * | 1985-03-22 | 1987-02-10 | Mccabe Raymond T | Scaffold system |
US4886139A (en) * | 1988-08-19 | 1989-12-12 | Dupont Gaston L | Mobile scaffold with power-operated platform elevation |
US4997062A (en) * | 1989-09-28 | 1991-03-05 | Remo Pizzo | Swing scaffold |
USRE34404E (en) * | 1988-08-19 | 1993-10-12 | Dupont Gaston L | Mobile platform with power operated platform elevation |
US20070125599A1 (en) * | 2004-04-27 | 2007-06-07 | Campbell Geoffrey G | Mast lift machine |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1090856A (en) * | 1913-04-17 | 1914-03-24 | Gustave Johnson | Hanging scaffold. |
US1616743A (en) * | 1922-12-29 | 1927-02-08 | Ericsson Henry | Scaffold |
-
1963
- 1963-05-29 US US284036A patent/US3169604A/en not_active Expired - Lifetime
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1090856A (en) * | 1913-04-17 | 1914-03-24 | Gustave Johnson | Hanging scaffold. |
US1616743A (en) * | 1922-12-29 | 1927-02-08 | Ericsson Henry | Scaffold |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3323616A (en) * | 1965-10-22 | 1967-06-06 | Frank S Best | Mason's scaffold |
US3851728A (en) * | 1973-04-11 | 1974-12-03 | Lowell A Williams | Scaffold |
US3880256A (en) * | 1973-08-02 | 1975-04-29 | Alexander Couris | Scaffolding with improved elevator mechanism |
US4002222A (en) * | 1976-02-27 | 1977-01-11 | Bruno Edward G | Combination scaffold and utility platform |
US4262773A (en) * | 1979-07-13 | 1981-04-21 | Basham Billy G | Portable scaffold |
EP0159467A2 (en) * | 1984-04-21 | 1985-10-30 | LISSMAC Maschinenbau GmbH | Platform for lifting persons |
EP0159467A3 (en) * | 1984-04-21 | 1987-03-25 | Lissmac Maschinenbau Gmbh | Platform for lifting persons |
US4641728A (en) * | 1985-03-22 | 1987-02-10 | Mccabe Raymond T | Scaffold system |
US4886139A (en) * | 1988-08-19 | 1989-12-12 | Dupont Gaston L | Mobile scaffold with power-operated platform elevation |
USRE34404E (en) * | 1988-08-19 | 1993-10-12 | Dupont Gaston L | Mobile platform with power operated platform elevation |
US4997062A (en) * | 1989-09-28 | 1991-03-05 | Remo Pizzo | Swing scaffold |
US20070125599A1 (en) * | 2004-04-27 | 2007-06-07 | Campbell Geoffrey G | Mast lift machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3323616A (en) | Mason's scaffold | |
EP0766769B1 (en) | Scaffolding assembly | |
US3671015A (en) | Portable hoisting unit | |
US3490558A (en) | Stepladder scaffold apparatus with elevating working platform | |
US7878338B2 (en) | Transport and storage container for scaffold frames and braces | |
US3850264A (en) | Ground supported scaffolding | |
US4064999A (en) | Adjustable building panel scaffold | |
US3797672A (en) | Apparatus attachable to a truck body or the like for use for hoisting or lifting, or as an elevated support | |
US3169604A (en) | Scaffold | |
US4444289A (en) | Construction platform and method | |
US4641728A (en) | Scaffold system | |
US5159993A (en) | Self-raising work platform assembly | |
US3089599A (en) | Hoist | |
US3851728A (en) | Scaffold | |
US3610368A (en) | Vertically adjustable platform for scaffolding | |
US3612219A (en) | Scaffold structure | |
KR20210003452A (en) | Height-adjustable movable work platform | |
US3464520A (en) | Self-operated elevator | |
USRE34404E (en) | Mobile platform with power operated platform elevation | |
US4886139A (en) | Mobile scaffold with power-operated platform elevation | |
US2599169A (en) | Ladder bracket | |
US2212384A (en) | Hoisting attachment for ladders | |
US3410365A (en) | Scaffold structure | |
US3083787A (en) | Scaffold structure | |
US805524A (en) | Adjustable standard. |