US2274082A - Method for construction of marine foundations - Google Patents
Method for construction of marine foundations Download PDFInfo
- Publication number
- US2274082A US2274082A US292766A US29276639A US2274082A US 2274082 A US2274082 A US 2274082A US 292766 A US292766 A US 292766A US 29276639 A US29276639 A US 29276639A US 2274082 A US2274082 A US 2274082A
- Authority
- US
- United States
- Prior art keywords
- pile
- place
- water
- members
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title description 15
- 238000010276 construction Methods 0.000 title description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 18
- 238000005553 drilling Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000009408 flooring Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000013459 approach Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000007429 general method Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
Definitions
- the present invention is directed to a method for the erection of Lfoundations for derricksin 'bodies of water, especially for theerection of drilling rigs for oil wells under bodies of water.
- the principal object of the present invention is the provision of a method for theerection of structures in bodies of Water for the aforesaid purpose which is at once simple, relatively inexpensive and productive of foundations of unusual stability and strength.
- Anancillary object of the present invention is the provision of structural members suitable for use in the practice of the method of the present invention.
- Figure 1 is a longitudinal section of a caisson or pile section ⁇ for'use in the present invention
- Figure 2 is a cross-section along the line A--A ⁇ of Figure 1; .v
- Figure 3 is a vertical section of a detail of the lowermost caisson of an assembly of such caissons
- Figure 4 is a act of setting a caisson or pile in place
- FIG. 1 is a similar view showing the means In all cases hitherto known it has been 'rugated or provided with wire netting 5 to act as reinforcement and binding surface for a layer of concrete 6.
- the cylinder I is usually made from a ilatpiece of ⁇ steel having one of its surfaces corrugated or provided with raised portions, such as those commonly found on safety treads.
- the flat sheet is rolled into a cylinder and welded, and the flanges are then welded in place.
- the metal cylinder is then placed inv a mold of larger diameter concentric .therewith and the annular space between the cylinder and the mold is lled with concrete.
- a plurality of these cylinders can be readily aligned merely by bolting the adjacent flanges of adiacent ⁇ sections together.
- the cylinders are usually of sumcient diameter to accommodate a workman.
- a pointed nose 1 is provided for the section which -is to be the bottom section of a group.
- This nose is made of a core 8 ,of steel having a pointed end and having molded thereon a body of concrete.
- bolts 9 are placed in the holes of a disc III carried by-the inner end of core 8.
- a plurality of .these sections are bolted together and are then loadedvon a barge and carried out to location.
- the number of sections bolted together will generally be sufiicient so that with the pointed end embedded in the bottom of the body of water, the uppermost section will protrude above the'surface.
- the upper end of the string of sections is connected to the lifting cable' II of the derrick mounted on the barge I2 Y by a suitable joint I3.
- Figure 6 is a vertical section of a cap member shown in place on the caisson
- Figure 'I is a plan view of Figure 6;
- Figure 8 is a vfront elevation of a completed support with the floor structure in place;
- Figure 9 is a plan view of Figure 8;
- Figure 10 is a sideelevation of a completed foundation;
- Figure ll is a plan view of Figure 10.
- numeral I designates a metal cylinder having at its either end an inwardly directed flange 2 provided withbolt holes 3 and having its outer surface cor-
- numeral I4 designates a body of water and numeral 'I5 the earth beneath it.
- a nozzle may be provided inthe lower end of the caisson and a suitable cavity formed in the earth by the jettirig action of a pressure fluid ejected through'the nozzle. caissonl in an upright self-supporting position' will occur to those skilled in the art.
- bracket I3 is removed and another section is bolted in place on the upper end of the assembly. Then weights are added to the upper end of the assembly to force it into the ground. These weights are shown in Figure A weights can be nested one upon the other. Each The.
- protruding arms I9 which can be engaged by a lifting cable.
- the assembled sections of ⁇ the caisson are forced down into the earth' until the upper end thereof approaches the water level. Then the weights are removed and another section is bolted into place and the weighting process repeated. This series of steps is repeated until .the caisson or pile strikes a solid foundation.
- a head member which is placed on each of the upright caissons or piles.
- This head member may be cast in place or may be precast and set in place.
- the head member is cast in place. This is accomplished by placing an impervious plate over the internal flange of the uppermost section of casing from the upper end of which the ange has been omitted or removed. A suitable form is then built up above the casing and concrete is poured into the form filling the uppermost section of the casing as well as the form. While the concrete is still soft, upright posts or metal rods 2l are set lin place at the various corners and in between the corners, and bolts 22 are also set in place with their threaded ends upward in position to receive a bed plate for the flooring framework of the foundation.
- the flooring framework as shown in Figures 8-11, consists of I-beams 23 suitably bolted together to form a square or rectangleas the case may be, and carrying at their corners a bed plate 24 provided with perforatlons to receive the bolts 22.
- This framework is set in place as a unit and the -bed plates are bolted down.
- are so spaced as to permit the setting in place of the flooring.
- Reenforcing rods or wires, so-c'alled stirrups are then tied to .the upright rods 2
- rods are designated by numeral 25.
- a suitable form is built up about the head member and concrete is poured around th'e reenforcing members 2
- This final concrete head 28 then embraces the corners of the floor members to form a solid unitary structure as shown in Figure 10.
- the floor members 23 are provided with longitudinal cross-beams 21 and with transverse cross pieces 28.
- a central opening 29 is left between .the longitudinal cross members and in this opening is arranged a pair of slidable cross pieces 3
- the members 30 and 3l are adapted to carry the conventional rotary table of a drilling rig and are made adjustable in both directions so as to facilitate the centering of the rotary table above the point where it is desired to drill.
- a folding steel plate cover with suitable apertures and trap doors is laid on the beam members constituting the ooring supports.
- the longitudinal cross members 21 extend on either side of the main members 23 so as to form a cantilever structure, that is, a main floor member with side bridges on either side th'ereof.
- These side bridges carry auxiliary drilling equipment such as the pumps and boilers and the like. This particular arrangement lends to great stability and convenience in operation.
- leg members are lled with Water before the caps are set in place.
- the cap members instead of being cast in place may be precast on shore in the shape shown in Figure 6 and merely set in place. In this ease, the joint between the caps and the uppermost section of the leg member is reenforced by wrapping it with strips of steel.
- the particular form of floor supporting the structure shown in Figure 11 is not essential to the general method or combination of the present invention and may be modified without departing from the scope thereof.
- a method for erecting a floor over a body of water which comprises assembling a plurality of hollow sections end to end to form a pile-like member, setting said assembly in an upright position in the body of water with its lower end embedded in the earth below water andits upper end protruding above the water, adding an additional section to the upper end of said pilelike member, adding successive nesting weights to the upper end of said added section until said pile-like member is forced into the earth a distance substantially corresponding to the length of said added section, removing said weights, adding another section to said pile-like member, and repeating operations until said pile-like member rests on a solid foundation, setting other pile-like members in a similar ymanner in an erect position spaced from said first pile-like member, and laying a floor on the upper ends of the pile-like members so arranged.
- a method beneath va'body of water which comprises 'disfor sinking a. pile into the earnhi posing the pile in an 'uprightposition4 'with its the surfacev of the water and superimposing di- ⁇ rectly on theexposed upper end ⁇ of the pile by means of'a. hoist a succession of self-centering weighting members provided with means for preventing Irelative lateralmovement thereof with respect to eachother suiiicient in number to drive the pile 'into the earth the desired distance and then removing the weights from the top of said pile.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Revetment (AREA)
Description
Feb. 24, 1942. .Q A MCCAMMQN METHOD FOR CONSTRUCTION oF MARTINE FoUNDATToNs Filed Aug. 31, 1959 AIIISheelZS-Sheet 1 n 1. .u .a0..0.00. lo n l l a' ......0 ..0l ......0C
...n.af.
Pfaff.
,INVENTOR y 7 ATTORNEY.
Feb. 24, 1942.
G. A. MccAMMoN METHOD FOR ONSTRUCTION OF MARINE FOUNDATIONS 4 Sheets-Sheet 2 Filed Aug. 3l, 1939 ATTORNEY.
4 sheets-sheet 3 G. A. MCCAMMON Filed Aug. 51, 1939 INVENTOR METHOD FOR CONSTRUCTION OF MARINE FOUNDATIONS Feb. 24, 1942.
2li/o o FIG- FIG 9..
KM/f
A'ITORNEY.
Feb. 24, 1942. G. A. M'CCAMMON METHOD FOR CONSTRUCTQIEON OF M/RINE FOUNDATIONS Filed Aug. 51, 1939 4 Sheets-Sheet 4 .FIG- .1f- /gf INVENTSR.
* vJTTORNEY.
i Patented Feb.' 24,1942
Marilou Fon coNs'rnUc'rloN or MARINE FouNnA'rroNs George A. McCammon, La Salina, Venezuela, as-
signor to Standard Oil Development Company, a corporation of Delaware t .Application August 31,1933, Serial No. 292,766 4 claims. (ci. (s1-so) y The present invention is directed to a method for the erection of Lfoundations for derricksin 'bodies of water, especially for theerection of drilling rigs for oil wells under bodies of water.
Since the advent' of submarinedrilling for oil several years ago, much thought has been given to ways and means for providing suitable foundations for the derricks which mustvbeused for the drilling operations. In the past, only complicated structures have been devised' and most of these were suitable for use only in shallow water. customary for the' erection of derricks for submarine drilling to be extremely expensive, far out of proportion with relation to the actual amount of construction work involved to the erection of' drilling rigs on land. i
The principal object of the present invention is the provision of a method for theerection of structures in bodies of Water for the aforesaid purpose which is at once simple, relatively inexpensive and productive of foundations of unusual stability and strength.
Anancillary object of the present invention is the provision of structural members suitable for use in the practice of the method of the present invention.
The present invention will be more clearly understood from the following detailed description of the accompanying drawings in whichf Figure 1 is a longitudinal section of a caisson or pile section` for'use in the present invention;
Figure 2 is a cross-section along the line A--A` of Figure 1; .v
Figure 3 is a vertical section of a detail of the lowermost caisson of an assembly of such caissons;
Figure 4 is a act of setting a caisson or pile in place;
Figure is a similar view showing the means In all cases hitherto known it has been 'rugated or provided with wire netting 5 to act as reinforcement and binding surface for a layer of concrete 6. In practice, the cylinder I is usually made from a ilatpiece of`steel having one of its surfaces corrugated or provided with raised portions, such as those commonly found on safety treads. The flat sheet is rolled into a cylinder and welded, and the flanges are then welded in place. The metal cylinder is then placed inv a mold of larger diameter concentric .therewith and the annular space between the cylinder and the mold is lled with concrete. A plurality of these cylinders can be readily aligned merely by bolting the adjacent flanges of adiacent` sections together. The cylinders are usually of sumcient diameter to accommodate a workman.
As shown in Figure 3, a pointed nose 1 is provided for the section which -is to be the bottom section of a group. This nose, as shown, is made of a core 8 ,of steel having a pointed end and having molded thereon a body of concrete. Before the concrete is setin place bolts 9 are placed in the holes of a disc III carried by-the inner end of core 8.
In the practice of the present invention, a plurality of .these sections are bolted together and are then loadedvon a barge and carried out to location. The number of sections bolted together will generally be sufiicient so that with the pointed end embedded in the bottom of the body of water, the uppermost section will protrude above the'surface. On location the upper end of the string of sections is connected to the lifting cable' II of the derrick mounted on the barge I2 Y by a suitable joint I3.
front eievauon of a barge in' the and method used in forcing lthe caisson into the l earth; v
Figure 6 is a vertical section of a cap member shown in place on the caisson;
Figure 'I is a plan view of Figure 6; Figure 8 is a vfront elevation of a completed support with the floor structure in place;
Figure 9 is a plan view of Figure 8; Figure 10 is a sideelevation of a completed foundation; and
Figure ll is a plan view of Figure 10. Referring to Figure l in detail, numeral I designates a metal cylinder having at its either end an inwardly directed flange 2 provided withbolt holes 3 and having its outer surface cor- In Figure 4, numeral I4 designates a body of water and numeral 'I5 the earth beneath it. By manipulationr of the derrick the -assembled sec-` tions are raised to a vertical position and then lowered through the water to the earth beneath. During the loweringy of the assembly it is held -in an upright vposition by feeding in suitable quantities of water into its hollow interior.
.In order to embed the pile or caisson in a self supporting manner in the earth beneath the water, it is generally necessary to spud it into place by virtue of its own weight. Alternatively, a nozzle may be provided inthe lower end of the caisson and a suitable cavity formed in the earth by the jettirig action of a pressure fluid ejected through'the nozzle. caissonl in an upright self-supporting position' will occur to those skilled in the art. f
After the assembled sections are placed in an Other ways of placing the upright position, the bracket I3 is removed and another section is bolted in place on the upper end of the assembly. Then weights are added to the upper end of the assembly to force it into the ground. These weights are shown in Figure A weights can be nested one upon the other. Each The.
of the weights is provided with protruding arms I9 which can be engaged by a lifting cable.
As the weights are added the assembled sections of `the caisson are forced down into the earth' until the upper end thereof approaches the water level. Then the weights are removed and another section is bolted into place and the weighting process repeated. This series of steps is repeated until .the caisson or pile strikes a solid foundation.
The whole series of operations is repeated at each of four locations constituting the four corners of th'e foundation. In each case the driving and building operation is terminated with the uppermost section just above th'e water level. If, in some cases, this is impossible by reason of the unevenness of the bed rock, the inequality in height is taken care 'in the manner hereinafter specified.
In Figure 6 is shown a head member which is placed on each of the upright caissons or piles. This head member may be cast in place or may be precast and set in place. In the embodiment shown in Figure 6 #the head member is cast in place. This is accomplished by placing an impervious plate over the internal flange of the uppermost section of casing from the upper end of which the ange has been omitted or removed. A suitable form is then built up above the casing and concrete is poured into the form filling the uppermost section of the casing as well as the form. While the concrete is still soft, upright posts or metal rods 2l are set lin place at the various corners and in between the corners, and bolts 22 are also set in place with their threaded ends upward in position to receive a bed plate for the flooring framework of the foundation.
From .the above discussion it will be apparent that when the tops of the caisson are not at the same level, this difference in level can be compensated for by regulating the lengths of the caps of the respective caissons. l
The flooring framework, as shown in Figures 8-11, consists of I-beams 23 suitably bolted together to form a square or rectangleas the case may be, and carrying at their corners a bed plate 24 provided with perforatlons to receive the bolts 22. This framework is set in place as a unit and the -bed plates are bolted down.- It will be noted that the upl'ghtrods 2| are so spaced as to permit the setting in place of the flooring. Reenforcing rods or wires, so-c'alled stirrups, are then tied to .the upright rods 2| as shown in Figures 8 and `9 and., passed through the I-beams which are suitably perforated for this purpose. These rods are designated by numeral 25. When the stirruping operation is completed, a suitable form is built up about the head member and concrete is poured around th'e reenforcing members 2|.and the rods 25, as well as the ends of the I-beams resting on the head member. This final concrete head 28 then embraces the corners of the floor members to form a solid unitary structure as shown in Figure 10.
As shown in Figure 11, the floor members 23 are provided with longitudinal cross-beams 21 and with transverse cross pieces 28. A central opening 29 is left between .the longitudinal cross members and in this opening is arranged a pair of slidable cross pieces 3|! which are connected together by a pair of slidable longitudinal members 3l. The members 30 and 3l are adapted to carry the conventional rotary table of a drilling rig and are made adjustable in both directions so as to facilitate the centering of the rotary table above the point where it is desired to drill. In practice, a folding steel plate cover with suitable apertures and trap doors is laid on the beam members constituting the ooring supports.
The longitudinal cross members 21 extend on either side of the main members 23 so as to form a cantilever structure, that is, a main floor member with side bridges on either side th'ereof. These side bridges carry auxiliary drilling equipment such as the pumps and boilers and the like. This particular arrangement lends to great stability and convenience in operation.
It will be apparent that many changes may be made in' the aforedescribed methods and structural elements without departing from the scope of the present invention. It may be mentionedhere that the leg members are lled with Water before the caps are set in place. As previously pointed out, the cap members instead of being cast in place may be precast on shore in the shape shown in Figure 6 and merely set in place. In this ease, the joint between the caps and the uppermost section of the leg member is reenforced by wrapping it with strips of steel. It will also be understood that the particular form of floor supporting the structure shown in Figure 11 is not essential to the general method or combination of the present invention and may be modified without departing from the scope thereof.
'I'he nature and objects of the present invention having been thus described and illustrated, what is claimed as new and useful and is desired to be secured by Letters Patent is:
l. A method for erecting a floor over a body of water which comprises assembling a plurality of hollow sections end to end to form a pile-like member, setting said assembly in an upright position in the body of water with its lower end embedded in the earth below water andits upper end protruding above the water, adding an additional section to the upper end of said pilelike member, adding successive nesting weights to the upper end of said added section until said pile-like member is forced into the earth a distance substantially corresponding to the length of said added section, removing said weights, adding another section to said pile-like member, and repeating operations until said pile-like member rests on a solid foundation, setting other pile-like members in a similar ymanner in an erect position spaced from said first pile-like member, and laying a floor on the upper ends of the pile-like members so arranged.
2. A method according to claim 1 in which the assembly is maintained in an upright position during the setting operation by adjusting its y y 2,274,082 l boyancyfby the addition ofwater vintoits hollow interior..
' 3. A method according `to lclaim liincluding ing upwardly from its` upper surface, setting beams between the `pile-like members`with their ends within the space dend by said r'ods, bindbottom end engaging theearth beneath'the body 4 of waterl and with itsupper end extending above the steps of -xing' to the top o! each pile member afcap member provided with spaced rods extend' ing thevends of said beams to. said rods and cast- 4im; concrete around said `rods and the ends ofv said beams.'
4. A method beneath va'body of water which comprises 'disfor sinking a. pile into the earnhi posing the pile in an 'uprightposition4 'with its the surfacev of the water and superimposing di-` rectly on theexposed upper end`of the pile by means of'a. hoist a succession of self-centering weighting members provided with means for preventing Irelative lateralmovement thereof with respect to eachother suiiicient in number to drive the pile 'into the earth the desired distance and then removing the weights from the top of said pile. i
v GEORGE A. MCCAMMON.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US292766A US2274082A (en) | 1939-08-31 | 1939-08-31 | Method for construction of marine foundations |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US292766A US2274082A (en) | 1939-08-31 | 1939-08-31 | Method for construction of marine foundations |
Publications (1)
Publication Number | Publication Date |
---|---|
US2274082A true US2274082A (en) | 1942-02-24 |
Family
ID=23126100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US292766A Expired - Lifetime US2274082A (en) | 1939-08-31 | 1939-08-31 | Method for construction of marine foundations |
Country Status (1)
Country | Link |
---|---|
US (1) | US2274082A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3499292A (en) * | 1968-12-20 | 1970-03-10 | Marine Space Enclosures | Method of making partially submerged structures |
NL1030631C2 (en) * | 2005-07-08 | 2007-01-09 | Betonson B V | Method for manufacturing a pile with filling elements (plus pile). |
EP1884598A1 (en) * | 2006-08-03 | 2008-02-06 | Siemens Aktiengesellschaft | Offshore foundation |
US8157481B1 (en) | 1994-05-02 | 2012-04-17 | Shell Oil Company | Method for templateless foundation installation |
-
1939
- 1939-08-31 US US292766A patent/US2274082A/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3499292A (en) * | 1968-12-20 | 1970-03-10 | Marine Space Enclosures | Method of making partially submerged structures |
US8157481B1 (en) | 1994-05-02 | 2012-04-17 | Shell Oil Company | Method for templateless foundation installation |
NL1030631C2 (en) * | 2005-07-08 | 2007-01-09 | Betonson B V | Method for manufacturing a pile with filling elements (plus pile). |
NL1029468C2 (en) * | 2005-07-08 | 2007-01-09 | Betonson B V | Method for preparing pile for building, involves pouring concrete into mold arranged with polystyrene foam such that foam is enclosed by concrete, and curing concrete, partially |
EP1741838A2 (en) * | 2005-07-08 | 2007-01-10 | Betonson B.V. | Method for preparing a pile provided with fill-elements and pile |
EP1741838A3 (en) * | 2005-07-08 | 2015-04-01 | Betonson B.V. | Method for preparing a pile provided with fill-elements and pile |
EP1884598A1 (en) * | 2006-08-03 | 2008-02-06 | Siemens Aktiengesellschaft | Offshore foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3184893A (en) | Contact foundation method | |
US2574140A (en) | Marine oil well derrick foundation | |
US2429952A (en) | Underwater foundation and method of erecting the same | |
US4812080A (en) | Offshore platform jacket and method of installation | |
US3528254A (en) | Offshore platform structure and construction method | |
US20090324341A1 (en) | Method of erecting a building structure in a water basin | |
US3094847A (en) | Offshore platform structure | |
US3315473A (en) | Offshore platform | |
US3624702A (en) | Offshore platform support | |
US2318685A (en) | Portable marine foundation | |
US1868494A (en) | Stabilized foundation construction and method of erecting the same | |
CN101392521A (en) | Rock-socketed steel dock structure and construction method thereof | |
US2274082A (en) | Method for construction of marine foundations | |
US3115013A (en) | Artificial island and method of constructing the same | |
US3091937A (en) | Underwater foundation structure and method therefor | |
US3256694A (en) | Structural piles and methods of preparing pipe foundations | |
US3686811A (en) | Spaced multi-wall construction unit | |
US2935854A (en) | Offshore drilling platform | |
CN214574092U (en) | Prefabricated assembly bottom sealing structure for bearing platform concrete in tidal water | |
CN210857277U (en) | Assembled underground structure | |
US563130A (en) | breuchaud | |
US1665796A (en) | Method of providing and placing piers | |
JP6938198B2 (en) | Construction method | |
US3107495A (en) | Method of erecting an offshore structure | |
RU2809049C1 (en) | Method for constructing bridge support in water area |