US20220259925A1 - Directional boring systems and methods - Google Patents
Directional boring systems and methods Download PDFInfo
- Publication number
- US20220259925A1 US20220259925A1 US17/176,393 US202117176393A US2022259925A1 US 20220259925 A1 US20220259925 A1 US 20220259925A1 US 202117176393 A US202117176393 A US 202117176393A US 2022259925 A1 US2022259925 A1 US 2022259925A1
- Authority
- US
- United States
- Prior art keywords
- reamer
- drill pipe
- pilot
- pipe
- bore hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000005553 drilling Methods 0.000 claims abstract description 43
- 238000005520 cutting process Methods 0.000 claims description 13
- 238000007789 sealing Methods 0.000 claims description 8
- 238000005086 pumping Methods 0.000 claims description 5
- 238000004140 cleaning Methods 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims description 4
- 230000001502 supplementing effect Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 14
- 239000012530 fluid Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 2
- UHZZMRAGKVHANO-UHFFFAOYSA-M chlormequat chloride Chemical compound [Cl-].C[N+](C)(C)CCCl UHZZMRAGKVHANO-UHFFFAOYSA-M 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 229910001204 A36 steel Inorganic materials 0.000 description 1
- 229910001209 Low-carbon steel Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000009747 swallowing Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
- E21B7/061—Deflecting the direction of boreholes the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/26—Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
- E21B21/015—Means engaging the bore entrance, e.g. hoods for collecting dust
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
- E21B37/10—Well swabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/28—Enlarging drilled holes, e.g. by counterboring
Definitions
- Various embodiments described herein generally relate to trenchless construction technologies and techniques and, in particular, to directional drilling technologies and methodologies involving/utilizing a reamer embodying a pressure vessel configured for directing flows of fresh mud through the reamer/pressure vessel and toward an entry side of a bore hole being drilled by the reamer and facilitating single pass ream directional drilling of bore holes after a pilot hole is drilled.
- HDD Horizontal Directional Drilling
- HDD begins with a bore plan identifying the entry and exit of the bore as well as the path to be followed between them.
- the Drill rig begins the pilot hole (small diameter hole drilled along the bore path with a steerable drill head) from the Entry side of the bore and continues to the Exit side of the bore.
- a contractor will set a drill rig on both entry and exit sides and drill in both directions meeting along the bore path for what is referred to as an intersect.
- the drill on entry side will then follow the pilot hole drilled by the exit side drill rig to the exit side. This will allow the drill on exit side to handle the Tail String (drill pipe added behind the reamer as the reamer advances).
- the reaming passes begin. This involves pulling drilling tools that are larger than the pilot hole to enlarge the bore path until it is large enough to install the utility. Depending on the size of the utility this is done in several steps or ream passes to get to the desired diameter. As an example for a finished diameter of 42 inches it would typically require after drilling the pilot hole to make ream passes of 16 inches, 24 inches, 36 inches and then 42 inches. While making these ream passes, drilling mud problematically may be exiting the bore on both the Entry and Exit sides of the project.
- the reamer when pull reaming the reamer is attached to the drill pipe on the Exit side and pulled toward the rig (Entry side). As the reamer is pulled drill pipe is added as a tail string to keep pipe throughout the length of the bore. As these ream passes are made the returns will normally alternate between entry and exit side pits and may be dealt with in different ways depending on available work space, equipment, and access to exit side. Some companies will put a cleaning system and mud pump on both sides so they can pump both ways and others may truck or pump any returns (drilling returns) from exit side back to the entry side.
- FIG. 1A is a diagram conceptually representing pilot drilling as described herein.
- FIG. 1B is a diagram conceptually representing reaming a bore hole utilizing a reamer and a pilot pipe as described herein.
- FIG. 2 shows DETAIL A of FIG. 1B .
- FIG. 3 is a cross-sectional side view of an example reamer and (reamer) drill pipe shown with a pilot pipe received within a channel of the reamer.
- FIG. 4 is a diagram conceptually representing an example Horizontal Directional Drilling (HDD) site plan.
- HDD Horizontal Directional Drilling
- FIG. 5 is a cross-sectional side perspective view of an example reamer and (reamer) drill pipe shown with a pilot pipe received within a channel of the reamer.
- FIG. 6A is a distal end view of the reamer and (reamer) drill pipe of FIG. 5 .
- FIG. 6B is another perspective view of the reamer and (reamer) drill pipe of FIG. 5 .
- FIGS. 7A and 7B are rear and side views respectively of an internal gear structural component of the reamer of FIG. 5 .
- FIG. 8A is a rear view of an external gear and seal mount component of the reamer of FIG. 5 .
- FIG. 8B is a cross-sectional left side view of the external gear and seal mount along A-A of FIG. 8A .
- FIG. 8C is a right side view of the external gear and seal mount of FIG. 8A showing hidden surfaces (inclusive of openings therethrough) in dashed lines.
- FIGS. 9A and 9B are distal end and side views respectively of a faceplate structural component of the reamer of FIG. 5 .
- FIGS. 10A and 10B are side and proximal end views respectively of a first housing structural component of the reamer of FIG. 5 .
- FIG. 10C is a cross-sectional distal end view of the first housing along A-A of FIG. 10A .
- FIG. 10D shows DETAIL B of FIG. 10A .
- FIGS. 11A and 11B are side and proximal end views respectively of a second housing mounting ring structural component of the reamer of FIG. 5 .
- FIG. 11C shows DETAIL A of FIG. 11A .
- FIGS. 12A and 12B are distal end and side views respectively of a second housing structural component of the reamer of FIG. 5 .
- FIG. 12C shows DETAIL A of FIG. 12B .
- FIGS. 13A and 13B are proximal end and side views respectively of a third housing mounting ring structural component of the reamer of FIG. 5 .
- FIG. 13C shows DETAIL A of FIG. 13B .
- FIGS. 14A and 14B are distal end and side views respectively of a third housing structural component of the reamer of FIG. 5 .
- FIGS. 15A and 15B are proximal end and side views respectively of a fourth housing mounting ring structural component of the reamer of FIG. 5 .
- FIG. 15C shows DETAIL A of FIG. 15B .
- FIGS. 16A and 16B are side and proximal end views respectively of a fourth housing structural component of the reamer of FIG. 5 .
- FIG. 16C shows DETAIL B of FIG. 16A .
- FIGS. 17A and 17B are distal end and side views respectively of a conical periphery structure of the reamer of FIG. 5 .
- FIGS. 18A and 18B are a flow chart showing an example method for directional drilling a bore hole in a single pass.
- FIGS. 1A-4 which (as numerically denoted therein) include: pilot drill rig 1 , pilot drill 2 , reamer 3 , pilot drill pipe 4 , pilot drill spoils pit 5 , reamer drill spoils pit 6 , reamer drill pipe 7 , fresh mud flow (through reamer) 8 , spoils mud flow 9 , fresh mud flow (through pilot drill pipe) 10 , fresh mud flow (through reamer drill pipe) 11 , reamer drill rig 12 , pilot drill pipe staging 13 , mud pre-mix 14 , object to clear 15 , reamer drill pipe staging 16 , and mud processing unit 17 .
- the aforementioned guide mechanism is the pilot drill pipe (or pilot pipe) which is left in the pilot hole after drilling of the pilot hole is completed.
- the pilot hole can be drilling from entry to exit with a smaller diameter drill pipe and thereafter securing the drill pipe to an anchor point on exit side.
- a smaller drill rig on exit side is used to drill toward entry side to the entry side pit, and the small drill is thereafter used to hold the smaller drill pipe in place.
- a reamer and (reamer) drill pipe as described herein is used to drill (push ream) a finish size bore hole by swallowing over the pilot drill pipe left in the pilot hole.
- the reamer may be replaced with the swab and the rig can then pull the swab to the rig leaving the pilot pipe in the finished bore hole.
- the rig may reattach to the drill pipe and connect (at the Exit side) to the product pipe to be pulled in.
- drilling mud returns are directed to the entry side for the majority of the ream pass and only a minimal amount of returns to the exit side near the end of the ream (upon the exiting of the reamer) and partial returns during the swab pass and pipe pull.
- a reamer embodying a pressure vessel configured for directing flows of fresh mud through the reamer/pressure vessel and toward an entry side of a bore hole being drilled by the reamer.
- the reamer as a whole is a pressure vessel for the fresh mud.
- the reamer 100 includes an assembly of chambers (or housings) 102 , a channel 104 (extending longitudinally through the reamer and configured to receive a pilot pipe 105 therethrough) and cutting bits 106 with cutter jets 107 (e.g., cone shaped cutters with pedestal/commercially available cutting wheels).
- the assembly of chambers (or housings) 102 includes a first housing 110 ( FIGS.
- FIGS. 5 and 10A-10D e.g., an inner and/or distal-most housing (e.g., 22 inch diameter), with a distal facing exterior surface 111 ( FIG. 6A ), an internal gear 112 ( FIGS. 5 and 7A and 7B ), a faceplate 113 ( FIGS. 5, 9A and 9B ), an external gear and seal mount 114 ( FIGS.
- the external gear ( FIG. 8A ) includes three openings 199 which are fluidically connected to the cutter jets 107 of the three cutting bits 106 secured to the exterior surface 111 ( FIG. 6A ).
- the reamer 100 also includes a second housing 120 ( FIGS. 5 and 12A-12C ) (e.g., circumferentially positioned about and secured to the first housing 110 as shown), with a distal facing exterior surface 121 ( FIG. 6A ) of a second housing mounting ring 122 ( FIGS. 5 and 11A-11C ) (which is secured, e.g., welded, to the distal end of the second housing 120 ).
- the second housing mounting ring 122 e.g., 40 inch diameter
- the second housing mounting ring 122 includes four openings 129 ( FIGS. 5 and 11B ) which are fluidically connected to the cutter jets 107 of the four cutting bits 106 secured to the exterior surface 121 ( FIG. 6A ).
- the reamer 100 also includes a third housing 130 ( FIGS. 5, 14A and 14B ) (e.g., circumferentially positioned about and secured to the first housing 110 as shown), with a distal facing exterior surface 131 ( FIG. 6A ) of a third housing mounting ring 132 ( FIGS. 5 and 13A-13C ) (which is secured, e.g., welded, to the distal end of the third housing 130 ).
- the mounting ring 132 e.g., 56 inch diameter
- the mounting ring 132 includes five openings 139 ( FIGS. 5 and 13A ) which are fluidically connected to the cutter jets 107 of the five cutting bits 106 secured to the exterior surface 131 ( FIG. 6A ).
- the reamer 100 also includes a fourth housing 140 ( FIGS. 5 and 16A-16C ) (e.g., dome shaped as shown), with a distal facing exterior surface 141 ( FIG. 6A ) of a mounting ring 142 ( FIGS. 5 and 15A-15C ) (which is secured/welded to the distal end of fourth housing 140 ).
- the mounting ring 142 e.g., 72 inch diameter
- the mounting ring 142 includes six openings 149 ( FIGS. 5 and 15A ) which are fluidically connected to the cutter jets 107 of the six cutting bits 106 secured to the exterior surface 141 ( FIG. 6A ).
- a proximal end portion 144 ( FIG. 16A ) of the fourth housing 140 has an opening 145 ( FIG. 16B ) within which is secured an outer seal flange 146 ( FIG. 5 ) which peripherally supports an outer seal 148 .
- the reamer 100 includes a rigside seal (or center seal) 150 which is secured (e.g., oriented as shown in relation) to the rigside seal mount 117 which includes openings 159 (e.g., six openings equidistantly spaced about the periphery of the seal mount 117 ).
- the rigside seal (or center seal) 150 can be installed in either direction depending on the size and length of the reamer.
- the end cap 118 (of the housing 110 ) includes an opening 198 adjoining an additional chamber 160 peripherally defined by a connecting pipe 162 which spans between the end cap 118 and the opening 145 (in the proximal end portion 144 of the fourth housing 140 ).
- the outer seal flange 146 is supported at opposite faces thereof by a proximal end of the connecting pipe 162 and a connection/adapter member 172 which includes an adapter portion 174 that couples to a distal end portion 176 of the (reamer) drill pipe 101 .
- the adapter portion 174 can include a threaded connection interface (e.g., as shown) thereby providing seal/bushing access.
- the outer seal flange 146 includes flange periphery openings 169 (e.g., nine openings equidistantly spaced about the periphery of the outer seal flange 146 ), and the connection/adapter member 172 includes connection member openings 179 .
- a flow intake chamber (or rather interface) 170 is defined by the outer seal flange 146 (and the outer seal 148 ) and the connection/adapter member 172 .
- the reamer 100 also includes a conical periphery structure 182 (e.g., configured as shown; FIGS. 5 and 17A-17B ) at a proximal end of the assembly.
- a conic chamber 180 is defined by exterior portions of the fourth housing 140 and the connection member 172 and by the interior surface of the conical periphery structure 182 .
- Pressurized fresh mud enters the reamer 100 at the flow intake chamber/interface 170 , that is, centrally via the flange periphery openings 169 and into the fourth housing 140 peripherally via the connection member openings 179 (into the conic chamber 180 ) and then entering the housing 140 via openings 189 ( FIGS. 5, 16A and 16B ) located at the proximal end portion 144 of the housing 140 (e.g., eight openings 189 equidistantly spaced about the opening 145 as shown in FIG. 16B ).
- the first housing 110 acts as a manifold for mud flow and also transmits torque to outer components, namely, the second housing 120 , the third housing 130 and the fourth housing 140 .
- the external gear and seal mount 114 is bolted to the faceplate 113 facilitating disassembly of the distal (or leading) end of the reamer to install and replace the rubber seals/bushings.
- the seal 115 forms a seal between the smaller pilot pipe 105 and the larger drill pipe 101 so the mud will flow through the jets in the reamer body at the cones.
- the external gear and seal mount 114 , the first housing 110 , the second housing 120 , the third housing 130 , the fourth housing 140 (and their respective mounting plates) and the connection/adapter member 172 can be fabricated (e.g., as shown herein) from A36 steel plate, low carbon steel tube.
- an example method 1800 for directional drilling a bore hole in a single pass includes: at 1802 , advancing a pilot pipe from an exit side to an entry side in relation to respective ends of a bore hole to be drilled, and then securing the pilot pipe at the entrance side (and/or at the exit side/pilot drill); and, at 1804 , utilizing a drill pipe and a reamer to drill the bore hole (in a single pass) advancing along (a drill path defined by) the pilot drill pipe (the reamer and drill pipe riding over the pilot pipe) while directing a flow of fresh mud through the reamer to exit via cutter jets of the reamer and toward the entry side of the bore hole being drilled.
- the reamer is placed over the pilot drill pipe and connected to the larger entrance drill via a large diameter drill pipe.
- the larger diameter drill pipe can have a diameter of around 12 inches.
- the pilot drill pipe is slipped inside the reamer through the rubber seals and then exits the back side of the reamer staying inside the larger drill pipe.
- the pilot drill pipe is held firm with the small exit drill while the larger drill rotates and pushes the reamer back toward the smaller exit drill.
- the smaller drill pipe acts as a guide to steer the reamer back to the small drill.
- the large entrance drill also has mud pumping capability. The large entrance drill rotates and pushes the reamer as it rotates and cuts the soil to form a larger bore.
- Fresh clean mud is pumped from the large entrance drill toward the reamer to carry the cut soil back to the entrance side where the mud is picked up and cleaned so it can return back down the pipe to carry more soil to the entrance side.
- the entrance drill is usually located in a remote area that is difficult to get resources to.
- the small exit drill is normally located where utilities have easier access.
- fresh mud (captured cleaned mud preferably, if available) is pumped down the large diameter pipe and supplemented as needed by extra mud provided through the pilot drill pipe.
- the mud flows from the exit drill through the pilot drill pipe exit inside the larger entrance drill pipe where the mud then travels towards the reamer and exit through the cutter jets into the bore hole.
- the mud then travels toward the entrance drill where it is picked up, cleaned and stored in large holding tanks ready to be pumped by the entrance drill towards the reamer.
- the pilot drill pipe does not move or rotate during the reaming process.
- the method 1800 further includes, at 1806 , once the reamer reaches the exit side, removing the reamer from the drill pipe.
- the method 1800 can further include, at 1808 , performing a swab pass to clean the bore hole while leaving the pilot pipe in the bore hole.
- the method 1800 further includes, at 1810 , using the pilot pipe to pull a product pipe in the bore hole, or replacing the pilot pipe with the larger drill pipe and using the drill pipe to pull the product pipe through the bore hole to the entry side.
- the method 1800 can further include, at 1812 , (while performing the step of utilizing a drill pipe and a reamer to drill the bore hole) collecting mudflow, that is spoils mud, exiting from the bore hole (being drilled) at the entry side; and cleaning solids from the spoils mud to provide (recycled) fresh mud and adjusting properties of the fresh mud (and storing the fresh mud in holding tanks).
- the step of adjusting properties of the fresh mud is performed based on a priori knowledge of geological characteristics at the present location (and/or soon/next to be drilled locations) in respect to the reamer (rather than determined on-the-fly).
- drilling fluid is formulated to match the geology to be encountered and optimized for cuttings removal.
- the drilling rate is strictly controlled to maintain a clean bore and efficient solids control.
- the drilling fluid design and drilling rates may be determined.
- the drilling fluid is formulated to give maximum control of the geology and provide cuttings removal. Determination of the drilling rates takes into consideration additional information regarding the drill pipe and tooling for the pilot hole as well as the capabilities of the rig and pump equipment. The efficiency of the solids control system is a key factor. Also, at this time, the cutter design for the reamer may be determined.
- the drilling fluid can be either mixed in a pre-mix tank or the mud system can be ran down to a known level then stop drilling and batch mix in known volume. This will keep the mix consistent and allow for close monitoring of drilling fluid and cutting volumes to determine hole cleaning efficiency and/or fluid loss.
- the method 1800 can further include, at 1814 , (while performing the step of utilizing a drill pipe and a reamer to drill the bore hole) pumping the fresh mud into the drill pipe from the entry side as needed to maintain a desired pressurization of a pressure vessel defined by the reamer such that a flow of fresh mud entering the pressure vessel, via openings in a proximal end chamber (e.g., dome-shaped chamber) of the reamer, is routed through the pressure vessel/reamer to exit via cutter jets of the reamer at locations external to the reamer and within the bore hole being drilled.
- a proximal end chamber e.g., dome-shaped chamber
- the method 1800 can further include, at 1816 , (while performing the step of utilizing a drill pipe and a reamer to drill the bore hole) supplementing the fresh mud as needed by pumping additional (new) fresh mud from the exit side through the pilot pipe into the drill pipe.
- a reamer (or reamer apparatus/device) for (directionally) drilling a bore hole includes: an assembly of fluidically interconnected chambers with a channel therethrough including seals, the channel being configured to receive a pilot drill pipe and to allow the reamer to advance along a drill path defined by the pilot drill pipe (extending between an exit side to an entry side, in relation to respective ends of a bore hole to be drilled) (the pilot drill pipe being anchored at the entry side and/or secured at the exit side—while the reamer advances toward the exit side), the assembly of chambers and at least one of the seals being configured such that a flow of fresh mud entering the assembly, via openings in a proximal end chamber (e.g., dome-shaped chamber) of the assembly, is routed through the assembly to exit via cutter jets of the reamer at locations external to the chambers and within the bore hole being drilled (rather than toward the exit side).
- a proximal end chamber e.g., dome-shaped chamber
- the seals are configured to fit about the pilot drill pipe (and serve as rotary bearings supporting the reamer) as the reamer is advanced along the pilot drill pipe.
- Portions of the assembly include openings that fluidically interconnect the chambers; and said at least one seal is secured within a distal portion of an innermost chamber of the assembly.
- the openings are located in housings (inclusive of mounting rings) of the chambers (and in one or more of the seals and/or in one or more seal mounts peripherally supporting the seals).
- the at least one seal spans between the channel and the pilot drill pipe when the pilot drill pipe is received within the channel.
- the innermost chamber includes a housing having openings fluidically interconnecting the innermost chamber to three (or more) other chambers of the assembly.
- Portions of the assembly include exit ports fluidically interconnecting the chambers (e.g., at distal-facing structures thereof) with the cutter jets.
- the proximal end chamber is an outermost chamber of the assembly in respect to (radial distance from) the channel.
- the proximal end chamber is dome-shaped.
- the assembly can include a conical periphery structure at a proximal end of the assembly.
- a horizontal directional drilling apparatus includes a reamer (or reaming apparatus) having: a plurality of fluidically interconnected chambers providing a housing exterior having a sequence of (circumferentially expanding) (distal-facing) surfaces supporting cutting bits (e.g., rotary cone bits), the surfaces increasing in circumference along the sequence toward a proximal end portion of the reamer; a channel (e.g., centrally located) that extends longitudinally through the reamer between a distal end portion and the proximal end portion thereof, the channel being defined at the distal end portion (of the reamer) by an inner-most (and distal-most) chamber of the plurality of chambers, the channel being configured to receive a pilot drill pipe and to allow the reamer to advance along a drill path defined by the pilot drill pipe; and a sealing device within, couple to and peripherally supported by the inner-most (and distal-most) chamber, the sealing device including an annular inner portion sized to receive
- the plurality of fluidically interconnected chambers includes four or more chambers (e.g., three cylindrical chambers and one dome-shaped chamber).
- the reamer includes a coupler (e.g., interiorally threaded) configured for connecting the plurality of nested fluidically interconnected chambers (at the proximal end portion of the reamer) to a drill pipe (e.g., exteriorally threaded and sized to fit within and engage with the coupler) that rotates and drives the reamer.
- a coupler e.g., interiorally threaded
- a drill pipe e.g., exteriorally threaded and sized to fit within and engage with the coupler
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
Directional drilling technologies and methodologies involve/utilize a reamer embodying a pressure vessel configured for directing flows of fresh mud through the reamer/pressure vessel and toward an entry side of a bore hole being drilled by the reamer, facilitating single ream pass directional drilling of bore holes, and preventing the reamer from deviating from the path of the pilot hole.
Description
- Various embodiments described herein generally relate to trenchless construction technologies and techniques and, in particular, to directional drilling technologies and methodologies involving/utilizing a reamer embodying a pressure vessel configured for directing flows of fresh mud through the reamer/pressure vessel and toward an entry side of a bore hole being drilled by the reamer and facilitating single pass ream directional drilling of bore holes after a pilot hole is drilled.
- Horizontal Directional Drilling (HDD) is a form of trenchless installation of utilities. HDD allows the installation of pipelines and other utilities in environmentally sensitive areas as well as avoiding other infrastructure by going under all obstacles.
- HDD begins with a bore plan identifying the entry and exit of the bore as well as the path to be followed between them. The Drill rig begins the pilot hole (small diameter hole drilled along the bore path with a steerable drill head) from the Entry side of the bore and continues to the Exit side of the bore. In some instances a contractor will set a drill rig on both entry and exit sides and drill in both directions meeting along the bore path for what is referred to as an intersect. The drill on entry side will then follow the pilot hole drilled by the exit side drill rig to the exit side. This will allow the drill on exit side to handle the Tail String (drill pipe added behind the reamer as the reamer advances).
- Once the pilot hole has been drilled, the reaming passes begin. This involves pulling drilling tools that are larger than the pilot hole to enlarge the bore path until it is large enough to install the utility. Depending on the size of the utility this is done in several steps or ream passes to get to the desired diameter. As an example for a finished diameter of 42 inches it would typically require after drilling the pilot hole to make ream passes of 16 inches, 24 inches, 36 inches and then 42 inches. While making these ream passes, drilling mud problematically may be exiting the bore on both the Entry and Exit sides of the project.
- Conventionally, when pull reaming the reamer is attached to the drill pipe on the Exit side and pulled toward the rig (Entry side). As the reamer is pulled drill pipe is added as a tail string to keep pipe throughout the length of the bore. As these ream passes are made the returns will normally alternate between entry and exit side pits and may be dealt with in different ways depending on available work space, equipment, and access to exit side. Some companies will put a cleaning system and mud pump on both sides so they can pump both ways and others may truck or pump any returns (drilling returns) from exit side back to the entry side.
- It would be helpful to be able to provide directional drilling technologies and methodologies that eliminate the inefficiencies and logistical (and other) issues resulting from creating a utility or product pipe hole utilizing multiple ream passes.
- It would be helpful to be able to provide directional drilling technologies and methodologies that eliminate the need in some conventional HDD drilling projects for use and processing of tail string.
- It would be helpful to be able to provide directional drilling technologies and methodologies that eliminate or substantially eliminate the flow of drilling fluid returns to the Exit side.
- It would be helpful to be able to provide directional drilling technologies and methodologies that facilitate directional drilling of bore holes in a single pass of a reamer.
- It would be helpful to be able to provide directional drilling technologies and methodologies that prevent the reamer from deviating from the path of the pilot hole.
- It would be helpful to be able to provide directional drilling technologies and methodologies that prevent dog legs in the bore (which are undesirable and pose issues installing the product pipe) when penetrating varying geology.
-
FIG. 1A is a diagram conceptually representing pilot drilling as described herein. -
FIG. 1B is a diagram conceptually representing reaming a bore hole utilizing a reamer and a pilot pipe as described herein. -
FIG. 2 shows DETAIL A ofFIG. 1B . -
FIG. 3 is a cross-sectional side view of an example reamer and (reamer) drill pipe shown with a pilot pipe received within a channel of the reamer. -
FIG. 4 is a diagram conceptually representing an example Horizontal Directional Drilling (HDD) site plan. -
FIG. 5 is a cross-sectional side perspective view of an example reamer and (reamer) drill pipe shown with a pilot pipe received within a channel of the reamer. -
FIG. 6A is a distal end view of the reamer and (reamer) drill pipe ofFIG. 5 . -
FIG. 6B is another perspective view of the reamer and (reamer) drill pipe ofFIG. 5 . -
FIGS. 7A and 7B are rear and side views respectively of an internal gear structural component of the reamer ofFIG. 5 . -
FIG. 8A is a rear view of an external gear and seal mount component of the reamer ofFIG. 5 . -
FIG. 8B is a cross-sectional left side view of the external gear and seal mount along A-A ofFIG. 8A . -
FIG. 8C is a right side view of the external gear and seal mount ofFIG. 8A showing hidden surfaces (inclusive of openings therethrough) in dashed lines. -
FIGS. 9A and 9B are distal end and side views respectively of a faceplate structural component of the reamer ofFIG. 5 . -
FIGS. 10A and 10B are side and proximal end views respectively of a first housing structural component of the reamer ofFIG. 5 . -
FIG. 10C is a cross-sectional distal end view of the first housing along A-A ofFIG. 10A . -
FIG. 10D shows DETAIL B ofFIG. 10A . -
FIGS. 11A and 11B are side and proximal end views respectively of a second housing mounting ring structural component of the reamer ofFIG. 5 . -
FIG. 11C shows DETAIL A ofFIG. 11A . -
FIGS. 12A and 12B are distal end and side views respectively of a second housing structural component of the reamer ofFIG. 5 . -
FIG. 12C shows DETAIL A ofFIG. 12B . -
FIGS. 13A and 13B are proximal end and side views respectively of a third housing mounting ring structural component of the reamer ofFIG. 5 . -
FIG. 13C shows DETAIL A ofFIG. 13B . -
FIGS. 14A and 14B are distal end and side views respectively of a third housing structural component of the reamer ofFIG. 5 . -
FIGS. 15A and 15B are proximal end and side views respectively of a fourth housing mounting ring structural component of the reamer ofFIG. 5 . -
FIG. 15C shows DETAIL A ofFIG. 15B . -
FIGS. 16A and 16B are side and proximal end views respectively of a fourth housing structural component of the reamer ofFIG. 5 . -
FIG. 16C shows DETAIL B ofFIG. 16A . -
FIGS. 17A and 17B are distal end and side views respectively of a conical periphery structure of the reamer ofFIG. 5 . -
FIGS. 18A and 18B are a flow chart showing an example method for directional drilling a bore hole in a single pass. - Technologies and methodologies described herein variously relate to apparatuses, devices and operating environments depicted in
FIGS. 1A-4 , which (as numerically denoted therein) include:pilot drill rig 1,pilot drill 2,reamer 3,pilot drill pipe 4, pilot drill spoilspit 5, reamer drill spoilspit 6,reamer drill pipe 7, fresh mud flow (through reamer) 8, spoilsmud flow 9, fresh mud flow (through pilot drill pipe) 10, fresh mud flow (through reamer drill pipe) 11,reamer drill rig 12, pilot drill pipe staging 13,mud pre-mix 14, object to clear 15, reamer drill pipe staging 16, andmud processing unit 17. - Technologies and methodologies described herein involve utilizing a guide mechanism for accurately steering a reamer along a path defined by a pilot hole. In example embodiments, the aforementioned guide mechanism is the pilot drill pipe (or pilot pipe) which is left in the pilot hole after drilling of the pilot hole is completed. The pilot hole can be drilling from entry to exit with a smaller diameter drill pipe and thereafter securing the drill pipe to an anchor point on exit side. Alternatively, a smaller drill rig on exit side is used to drill toward entry side to the entry side pit, and the small drill is thereafter used to hold the smaller drill pipe in place. In either case, a reamer and (reamer) drill pipe as described herein is used to drill (push ream) a finish size bore hole by swallowing over the pilot drill pipe left in the pilot hole. Once the reamer is on exit side it (the reamer) may be replaced with the swab and the rig can then pull the swab to the rig leaving the pilot pipe in the finished bore hole. Now the rig may reattach to the drill pipe and connect (at the Exit side) to the product pipe to be pulled in.
- By push reaming in a single pass the need for additional equipment on the exit side is all but eliminated. By utilizing the reamer technologies and methodologies described herein, drilling mud returns are directed to the entry side for the majority of the ream pass and only a minimal amount of returns to the exit side near the end of the ream (upon the exiting of the reamer) and partial returns during the swab pass and pipe pull.
- Technologies and methodologies described herein involve/utilize a reamer embodying a pressure vessel configured for directing flows of fresh mud through the reamer/pressure vessel and toward an entry side of a bore hole being drilled by the reamer. As further described herein, the reamer as a whole is a pressure vessel for the fresh mud.
- With reference to
FIGS. 5-17B , an example embodiment of areamer 100 is now described. Referring in particular toFIG. 5 , thereamer 100 and a (reamer)drill pipe 101 are coupled together and configured, e.g., as described herein, to facilitate drilling a bore hole in a single pass. Thereamer 100 includes an assembly of chambers (or housings) 102, a channel 104 (extending longitudinally through the reamer and configured to receive apilot pipe 105 therethrough) and cuttingbits 106 with cutter jets 107 (e.g., cone shaped cutters with pedestal/commercially available cutting wheels). In this example embodiment, the assembly of chambers (or housings) 102 includes a first housing 110 (FIGS. 5 and 10A-10D ) (e.g., an inner and/or distal-most housing) (e.g., 22 inch diameter), with a distal facing exterior surface 111 (FIG. 6A ), an internal gear 112 (FIGS. 5 and 7A and 7B ), a faceplate 113 (FIGS. 5, 9A and 9B ), an external gear and seal mount 114 (FIGS. 5, 8A, 8B and 8C ), aseal 115, a seal mount bolt-on 116 (for securing a periphery flange portion of theseal 115 against theseal mount 114, e.g., with bolts, screws or the like), arigside seal mount 117, anend cap 118 and openings 119 (in the housing 110). At the distal end ofhousing 110, the external gear (FIG. 8A ) includes threeopenings 199 which are fluidically connected to thecutter jets 107 of the three cuttingbits 106 secured to the exterior surface 111 (FIG. 6A ). - The
reamer 100 also includes a second housing 120 (FIGS. 5 and 12A-12C ) (e.g., circumferentially positioned about and secured to thefirst housing 110 as shown), with a distal facing exterior surface 121 (FIG. 6A ) of a second housing mounting ring 122 (FIGS. 5 and 11A-11C ) (which is secured, e.g., welded, to the distal end of the second housing 120). At the distal end ofhousing 120, the second housing mounting ring 122 (e.g., 40 inch diameter) includes four openings 129 (FIGS. 5 and 11B ) which are fluidically connected to thecutter jets 107 of the four cuttingbits 106 secured to the exterior surface 121 (FIG. 6A ). - The
reamer 100 also includes a third housing 130 (FIGS. 5, 14A and 14B ) (e.g., circumferentially positioned about and secured to thefirst housing 110 as shown), with a distal facing exterior surface 131 (FIG. 6A ) of a third housing mounting ring 132 (FIGS. 5 and 13A-13C ) (which is secured, e.g., welded, to the distal end of the third housing 130). At the distal end ofhousing 130, the mounting ring 132 (e.g., 56 inch diameter) includes five openings 139 (FIGS. 5 and 13A ) which are fluidically connected to thecutter jets 107 of the fivecutting bits 106 secured to the exterior surface 131 (FIG. 6A ). - The
reamer 100 also includes a fourth housing 140 (FIGS. 5 and 16A-16C ) (e.g., dome shaped as shown), with a distal facing exterior surface 141 (FIG. 6A ) of a mounting ring 142 (FIGS. 5 and 15A-15C ) (which is secured/welded to the distal end of fourth housing 140). At the distal end ofhousing 140, the mounting ring 142 (e.g., 72 inch diameter) includes six openings 149 (FIGS. 5 and 15A ) which are fluidically connected to thecutter jets 107 of the six cuttingbits 106 secured to the exterior surface 141 (FIG. 6A ). A proximal end portion 144 (FIG. 16A ) of thefourth housing 140 has an opening 145 (FIG. 16B ) within which is secured an outer seal flange 146 (FIG. 5 ) which peripherally supports anouter seal 148. - In this example embodiment and with reference to
FIG. 5 , thereamer 100 includes a rigside seal (or center seal) 150 which is secured (e.g., oriented as shown in relation) to therigside seal mount 117 which includes openings 159 (e.g., six openings equidistantly spaced about the periphery of the seal mount 117). The rigside seal (or center seal) 150 can be installed in either direction depending on the size and length of the reamer. The end cap 118 (of the housing 110) includes anopening 198 adjoining anadditional chamber 160 peripherally defined by a connectingpipe 162 which spans between theend cap 118 and the opening 145 (in theproximal end portion 144 of the fourth housing 140). - The
outer seal flange 146 is supported at opposite faces thereof by a proximal end of the connectingpipe 162 and a connection/adapter member 172 which includes anadapter portion 174 that couples to adistal end portion 176 of the (reamer)drill pipe 101. Theadapter portion 174 can include a threaded connection interface (e.g., as shown) thereby providing seal/bushing access. Theouter seal flange 146 includes flange periphery openings 169 (e.g., nine openings equidistantly spaced about the periphery of the outer seal flange 146), and the connection/adapter member 172 includesconnection member openings 179. A flow intake chamber (or rather interface) 170 is defined by the outer seal flange 146 (and the outer seal 148) and the connection/adapter member 172. - The
reamer 100 also includes a conical periphery structure 182 (e.g., configured as shown;FIGS. 5 and 17A-17B ) at a proximal end of the assembly. Aconic chamber 180 is defined by exterior portions of thefourth housing 140 and theconnection member 172 and by the interior surface of theconical periphery structure 182. - Pressurized fresh mud enters the
reamer 100 at the flow intake chamber/interface 170, that is, centrally via theflange periphery openings 169 and into thefourth housing 140 peripherally via the connection member openings 179 (into the conic chamber 180) and then entering thehousing 140 via openings 189 (FIGS. 5, 16A and 16B ) located at theproximal end portion 144 of the housing 140 (e.g., eightopenings 189 equidistantly spaced about theopening 145 as shown inFIG. 16B ). - The
first housing 110 acts as a manifold for mud flow and also transmits torque to outer components, namely, thesecond housing 120, thethird housing 130 and thefourth housing 140. In this example embodiment and referring toFIG. 5 , the external gear and sealmount 114 is bolted to thefaceplate 113 facilitating disassembly of the distal (or leading) end of the reamer to install and replace the rubber seals/bushings. Theseal 115 forms a seal between thesmaller pilot pipe 105 and thelarger drill pipe 101 so the mud will flow through the jets in the reamer body at the cones. - In respect to materials, the external gear and seal
mount 114, thefirst housing 110, thesecond housing 120, thethird housing 130, the fourth housing 140 (and their respective mounting plates) and the connection/adapter member 172 can be fabricated (e.g., as shown herein) from A36 steel plate, low carbon steel tube. - Referring to
FIGS. 18A and 18B , anexample method 1800 for directional drilling a bore hole in a single pass includes: at 1802, advancing a pilot pipe from an exit side to an entry side in relation to respective ends of a bore hole to be drilled, and then securing the pilot pipe at the entrance side (and/or at the exit side/pilot drill); and, at 1804, utilizing a drill pipe and a reamer to drill the bore hole (in a single pass) advancing along (a drill path defined by) the pilot drill pipe (the reamer and drill pipe riding over the pilot pipe) while directing a flow of fresh mud through the reamer to exit via cutter jets of the reamer and toward the entry side of the bore hole being drilled. - In this regard, for example, the reamer is placed over the pilot drill pipe and connected to the larger entrance drill via a large diameter drill pipe. The larger diameter drill pipe can have a diameter of around 12 inches. The pilot drill pipe is slipped inside the reamer through the rubber seals and then exits the back side of the reamer staying inside the larger drill pipe. The pilot drill pipe is held firm with the small exit drill while the larger drill rotates and pushes the reamer back toward the smaller exit drill. The smaller drill pipe acts as a guide to steer the reamer back to the small drill. The large entrance drill also has mud pumping capability. The large entrance drill rotates and pushes the reamer as it rotates and cuts the soil to form a larger bore. Fresh clean mud is pumped from the large entrance drill toward the reamer to carry the cut soil back to the entrance side where the mud is picked up and cleaned so it can return back down the pipe to carry more soil to the entrance side. The entrance drill is usually located in a remote area that is difficult to get resources to. The small exit drill is normally located where utilities have easier access. Once the reamer is attached, fresh mud (captured cleaned mud preferably, if available) is pumped down the large diameter pipe and supplemented as needed by extra mud provided through the pilot drill pipe. Referring also to
FIG. 3 , the mud flows from the exit drill through the pilot drill pipe exit inside the larger entrance drill pipe where the mud then travels towards the reamer and exit through the cutter jets into the bore hole. The mud then travels toward the entrance drill where it is picked up, cleaned and stored in large holding tanks ready to be pumped by the entrance drill towards the reamer. The pilot drill pipe does not move or rotate during the reaming process. - The
method 1800 further includes, at 1806, once the reamer reaches the exit side, removing the reamer from the drill pipe. Themethod 1800 can further include, at 1808, performing a swab pass to clean the bore hole while leaving the pilot pipe in the bore hole. Themethod 1800 further includes, at 1810, using the pilot pipe to pull a product pipe in the bore hole, or replacing the pilot pipe with the larger drill pipe and using the drill pipe to pull the product pipe through the bore hole to the entry side. - The
method 1800 can further include, at 1812, (while performing the step of utilizing a drill pipe and a reamer to drill the bore hole) collecting mudflow, that is spoils mud, exiting from the bore hole (being drilled) at the entry side; and cleaning solids from the spoils mud to provide (recycled) fresh mud and adjusting properties of the fresh mud (and storing the fresh mud in holding tanks). In example embodiments, the step of adjusting properties of the fresh mud is performed based on a priori knowledge of geological characteristics at the present location (and/or soon/next to be drilled locations) in respect to the reamer (rather than determined on-the-fly). - In example embodiments, drilling fluid is formulated to match the geology to be encountered and optimized for cuttings removal. The drilling rate is strictly controlled to maintain a clean bore and efficient solids control. In preparation for the process, after reviewing the geologic data and dimensions of the bore, the drilling fluid design and drilling rates may be determined. The drilling fluid is formulated to give maximum control of the geology and provide cuttings removal. Determination of the drilling rates takes into consideration additional information regarding the drill pipe and tooling for the pilot hole as well as the capabilities of the rig and pump equipment. The efficiency of the solids control system is a key factor. Also, at this time, the cutter design for the reamer may be determined.
- To control the consistency of the drilling fluid, it can be either mixed in a pre-mix tank or the mud system can be ran down to a known level then stop drilling and batch mix in known volume. This will keep the mix consistent and allow for close monitoring of drilling fluid and cutting volumes to determine hole cleaning efficiency and/or fluid loss.
- The
method 1800 can further include, at 1814, (while performing the step of utilizing a drill pipe and a reamer to drill the bore hole) pumping the fresh mud into the drill pipe from the entry side as needed to maintain a desired pressurization of a pressure vessel defined by the reamer such that a flow of fresh mud entering the pressure vessel, via openings in a proximal end chamber (e.g., dome-shaped chamber) of the reamer, is routed through the pressure vessel/reamer to exit via cutter jets of the reamer at locations external to the reamer and within the bore hole being drilled. - The
method 1800 can further include, at 1816, (while performing the step of utilizing a drill pipe and a reamer to drill the bore hole) supplementing the fresh mud as needed by pumping additional (new) fresh mud from the exit side through the pilot pipe into the drill pipe. - Thus, in an example embodiment, a reamer (or reamer apparatus/device) for (directionally) drilling a bore hole (e.g., suitable for receiving a product pipe) includes: an assembly of fluidically interconnected chambers with a channel therethrough including seals, the channel being configured to receive a pilot drill pipe and to allow the reamer to advance along a drill path defined by the pilot drill pipe (extending between an exit side to an entry side, in relation to respective ends of a bore hole to be drilled) (the pilot drill pipe being anchored at the entry side and/or secured at the exit side—while the reamer advances toward the exit side), the assembly of chambers and at least one of the seals being configured such that a flow of fresh mud entering the assembly, via openings in a proximal end chamber (e.g., dome-shaped chamber) of the assembly, is routed through the assembly to exit via cutter jets of the reamer at locations external to the chambers and within the bore hole being drilled (rather than toward the exit side). The seals are configured to fit about the pilot drill pipe (and serve as rotary bearings supporting the reamer) as the reamer is advanced along the pilot drill pipe. Portions of the assembly include openings that fluidically interconnect the chambers; and said at least one seal is secured within a distal portion of an innermost chamber of the assembly. In example embodiments, the openings are located in housings (inclusive of mounting rings) of the chambers (and in one or more of the seals and/or in one or more seal mounts peripherally supporting the seals). In example embodiments, the at least one seal spans between the channel and the pilot drill pipe when the pilot drill pipe is received within the channel. In example embodiments, the innermost chamber includes a housing having openings fluidically interconnecting the innermost chamber to three (or more) other chambers of the assembly.
- Portions of the assembly include exit ports fluidically interconnecting the chambers (e.g., at distal-facing structures thereof) with the cutter jets. In example embodiments, the proximal end chamber is an outermost chamber of the assembly in respect to (radial distance from) the channel. In example embodiments, the proximal end chamber is dome-shaped. The assembly can include a conical periphery structure at a proximal end of the assembly.
- Thus, in an example embodiment, a horizontal directional drilling apparatus includes a reamer (or reaming apparatus) having: a plurality of fluidically interconnected chambers providing a housing exterior having a sequence of (circumferentially expanding) (distal-facing) surfaces supporting cutting bits (e.g., rotary cone bits), the surfaces increasing in circumference along the sequence toward a proximal end portion of the reamer; a channel (e.g., centrally located) that extends longitudinally through the reamer between a distal end portion and the proximal end portion thereof, the channel being defined at the distal end portion (of the reamer) by an inner-most (and distal-most) chamber of the plurality of chambers, the channel being configured to receive a pilot drill pipe and to allow the reamer to advance along a drill path defined by the pilot drill pipe; and a sealing device within, couple to and peripherally supported by the inner-most (and distal-most) chamber, the sealing device including an annular inner portion sized to receive and closely fit about the pilot drill pipe, the sealing device spanning between the channel and the pilot drill pipe when the pilot drill pipe is received within the channel; wherein the fluidically interconnected chambers and the sealing device are configured to provide a pressure vessel that directs a flow of fresh mud entering the reamer at the proximal end portion thereof through (openings in) the chambers to exit via cutter jets of the cutting bits at locations external to the chambers and within a bore hole being drilled by the reamer and toward an entry side of the bore hole. In example embodiments, the plurality of fluidically interconnected chambers includes four or more chambers (e.g., three cylindrical chambers and one dome-shaped chamber). In example embodiments, the (distal-facing) surfaces of the housing exterior—from the distal end of the reamer—are circumferentially nested and sequentially increase in radial distance from the channel moving along the reamer toward the proximal end portion of the reamer. In example embodiments, the reamer includes a coupler (e.g., interiorally threaded) configured for connecting the plurality of nested fluidically interconnected chambers (at the proximal end portion of the reamer) to a drill pipe (e.g., exteriorally threaded and sized to fit within and engage with the coupler) that rotates and drives the reamer.
- While example embodiments have been described herein, it should be apparent, however, that various modifications, alterations and adaptations to those embodiments may occur to persons skilled in the art with the attainment of some or all of the advantages of the subject matter described herein. The disclosed embodiments are therefore intended to include all such modifications, alterations and adaptations without departing from the scope and spirit of the technologies and methodologies as described herein.
Claims (22)
1. A reamer for drilling a bore hole, comprising:
an assembly of fluidically interconnected chambers with a channel therethrough including seals, the channel being configured to receive a pilot drill pipe and to allow the reamer to advance along a drill path defined by the pilot drill pipe, the assembly of chambers and at least one of the seals being configured such that a flow of fresh mud entering the assembly, via openings in a proximal end chamber of the assembly, is routed through the assembly to exit via cutter jets of the reamer at locations external to the chambers and within the bore hole being drilled.
2. The reamer of claim 1 , wherein the seals are configured to fit about the pilot drill pipe and serve as rotary bearings supporting the reamer as the reamer is advanced along the pilot drill pipe.
3. The reamer of claim 1 , wherein portions of the assembly include openings that fluidically interconnect the chambers; and said at least one seal is secured within a distal portion of an innermost chamber of the assembly.
4. The reamer of claim 3 , wherein the openings are located in housings of the chambers and in one or more of the seals and/or in one or more seal mounts peripherally supporting the seals.
5. The reamer of claim 3 , wherein said at least one seal spans between the channel and the pilot drill pipe when the pilot drill pipe is received within the channel.
6. The reamer of claim 3 , wherein the innermost chamber includes a housing having openings fluidically interconnecting the innermost chamber to three or more other chambers of the assembly.
7. The reamer of claim 1 , wherein portions of the assembly include exit ports fluidically interconnecting the chambers with the cutter jets.
8. The reamer of claim 1 , wherein the proximal end chamber is an outermost chamber of the assembly in respect to the channel.
9. The reamer of claim 1 , wherein the proximal end chamber is dome-shaped.
10. The reamer of claim 1 , wherein the assembly includes a conical periphery structure at a proximal end of the assembly.
11. A method for directional drilling a bore hole with a single ream pass, comprising the steps of:
advancing a pilot pipe from an exit side to an entry side in relation to respective ends of a bore hole to be drilled, and then securing the pilot pipe at the entrance side and/or at the exit side; and
utilizing a drill pipe and a reamer to ream the bore hole advancing along the pilot drill pipe while directing a flow of fresh mud through the reamer to exit via cutter jets of the reamer and toward the entry side of the bore hole being drilled.
12. The method of claim 11 , further comprising:
once the reamer reaches the exit side, removing the reamer from the drill pipe.
13. The method of claim 12 , further comprising:
performing a swab pass to clean the bore hole while leaving the pilot pipe in the bore hole.
14. The method of claim 12 , further comprising:
using the pilot pipe to pull a product pipe in the bore hole, or replacing the pilot pipe with the drill pipe and using the drill pipe to pull the product pipe through the bore hole to the entry side.
15. The method of claim 11 , further comprising:
collecting mudflow, that is spoils mud, exiting from the bore hole at the entry side; and
cleaning solids from the spoils mud to provide fresh mud and adjusting properties of the fresh mud.
16. The method of claim 15 , wherein the step of adjusting properties of the fresh mud is performed based on a priori knowledge of geological characteristics at the present location and/or soon/next to be drilled locations in respect to the reamer.
17. The method of claim 15 , further comprising:
pumping the fresh mud into the drill pipe from the entry side as needed to maintain a desired pressurization of a pressure vessel defined by the reamer such that a flow of fresh mud entering the pressure vessel, via openings in a proximal end chamber of the reamer, is routed through the pressure vessel/reamer to exit via cutter jets of the reamer at locations external to the reamer and within the bore hole being drilled.
18. The method of claim 17 , further comprising:
supplementing the fresh mud as needed by pumping additional fresh mud from the exit side through the pilot pipe into the drill pipe.
19. A horizontal directional drilling apparatus comprising:
a reamer including
a plurality of fluidically interconnected chambers providing a housing exterior having a sequence of surfaces supporting cutting bits, the surfaces increasing in circumference along the sequence toward a proximal end portion of the reamer,
a channel that extends longitudinally through the reamer between a distal end portion and the proximal end portion thereof, the channel being defined at the distal end portion by an inner-most chamber of the plurality of chambers, the channel being configured to receive a pilot drill pipe and to allow the reamer to advance along a drill path defined by the pilot drill pipe, and
a sealing device within, couple to and peripherally supported by the inner-most chamber, the sealing device including an annular inner portion sized to receive and closely fit about the pilot drill pipe, the sealing device spanning between the channel and the pilot drill pipe when the pilot drill pipe is received within the channel,
wherein the fluidically interconnected chambers and the sealing device are configured to provide a pressure vessel that directs a flow of fresh mud entering the reamer at the proximal end portion thereof through the chambers to exit via cutter jets of the cutting bits at locations external to the chambers and within a bore hole being drilled by the reamer and toward an entry side of the bore hole.
20. The horizontal directional drilling apparatus of claim 19 , wherein the plurality of fluidically interconnected chambers includes four or more chambers.
21. The horizontal directional drilling apparatus of claim 19 , wherein the surfaces of the housing exterior—from the distal end of the reamer—are circumferentially nested and sequentially increase in radial distance from the channel moving along the reamer toward the proximal end portion of the reamer.
22. The horizontal directional drilling apparatus of claim 19 , wherein the reamer includes a coupler configured for connecting the plurality of nested fluidically interconnected chambers to a drill pipe that rotates and drives the reamer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/176,393 US20220259925A1 (en) | 2021-02-16 | 2021-02-16 | Directional boring systems and methods |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/176,393 US20220259925A1 (en) | 2021-02-16 | 2021-02-16 | Directional boring systems and methods |
Publications (1)
Publication Number | Publication Date |
---|---|
US20220259925A1 true US20220259925A1 (en) | 2022-08-18 |
Family
ID=82800224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/176,393 Abandoned US20220259925A1 (en) | 2021-02-16 | 2021-02-16 | Directional boring systems and methods |
Country Status (1)
Country | Link |
---|---|
US (1) | US20220259925A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116677320A (en) * | 2023-07-04 | 2023-09-01 | 浙江省电力建设有限公司 | Pipeline laying method for crossing grade highway |
USD1034722S1 (en) * | 2024-03-27 | 2024-07-09 | Yuanguo Cheng | PVC pipe reamer |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5314267A (en) * | 1992-08-27 | 1994-05-24 | Mark Osadchuk | Horizontal pipeline boring apparatus and method |
US5979574A (en) * | 1997-05-13 | 1999-11-09 | Ozzie's Pipeline Padder, Inc. | Horizontal boring apparatus and method of using the same |
US5979573A (en) * | 1997-05-13 | 1999-11-09 | Ozzie's Pipeline Padder, Inc. | Horizontal boring apparatus |
US6386299B1 (en) * | 2000-04-19 | 2002-05-14 | Japan Drilling Co., Ltd. | Method and apparatus for reaming pilot hole |
US7730969B2 (en) * | 2008-06-27 | 2010-06-08 | Southeast Directional Drilling, Llc | Reamer and methods for directional drilling |
US10113369B1 (en) * | 2017-06-27 | 2018-10-30 | Barbco, Inc. | Cutting assembly for a boring device |
US10180031B2 (en) * | 2014-03-06 | 2019-01-15 | Barbco, Inc. | Apparatus and method for drilling generally horizontal underground boreholes |
US10465460B2 (en) * | 2017-06-27 | 2019-11-05 | Barbco, Inc. | Cutting assembly for a boring device |
US10900302B2 (en) * | 2018-07-27 | 2021-01-26 | Country Landscapes & Tree Service, LLC | Directional drilling systems, apparatuses, and methods |
-
2021
- 2021-02-16 US US17/176,393 patent/US20220259925A1/en not_active Abandoned
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5314267A (en) * | 1992-08-27 | 1994-05-24 | Mark Osadchuk | Horizontal pipeline boring apparatus and method |
US5979574A (en) * | 1997-05-13 | 1999-11-09 | Ozzie's Pipeline Padder, Inc. | Horizontal boring apparatus and method of using the same |
US5979573A (en) * | 1997-05-13 | 1999-11-09 | Ozzie's Pipeline Padder, Inc. | Horizontal boring apparatus |
US6386299B1 (en) * | 2000-04-19 | 2002-05-14 | Japan Drilling Co., Ltd. | Method and apparatus for reaming pilot hole |
US7730969B2 (en) * | 2008-06-27 | 2010-06-08 | Southeast Directional Drilling, Llc | Reamer and methods for directional drilling |
US10180031B2 (en) * | 2014-03-06 | 2019-01-15 | Barbco, Inc. | Apparatus and method for drilling generally horizontal underground boreholes |
US10113369B1 (en) * | 2017-06-27 | 2018-10-30 | Barbco, Inc. | Cutting assembly for a boring device |
US10465460B2 (en) * | 2017-06-27 | 2019-11-05 | Barbco, Inc. | Cutting assembly for a boring device |
US10900302B2 (en) * | 2018-07-27 | 2021-01-26 | Country Landscapes & Tree Service, LLC | Directional drilling systems, apparatuses, and methods |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116677320A (en) * | 2023-07-04 | 2023-09-01 | 浙江省电力建设有限公司 | Pipeline laying method for crossing grade highway |
USD1034722S1 (en) * | 2024-03-27 | 2024-07-09 | Yuanguo Cheng | PVC pipe reamer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8151906B2 (en) | Microtunnelling system and apparatus | |
US4133396A (en) | Drilling and casing landing apparatus and method | |
US20220259925A1 (en) | Directional boring systems and methods | |
EP2396511B1 (en) | Tunneling apparatus | |
US4100981A (en) | Earth boring apparatus for geological drilling and coring | |
US7243737B2 (en) | Interchangeable reamer | |
JP2003519304A (en) | Drilling non-opening power unit equipped with a transmitter (SWB) that measures during boring for guiding borehole continuation | |
BRPI0512626B1 (en) | drilling systems and methods using multiple independently employable tubular columns | |
US20160160566A1 (en) | Apparatus and method for drilling generally horizontal underground boreholes | |
US10465460B2 (en) | Cutting assembly for a boring device | |
US4133397A (en) | Drilling with multiple in-hole motors | |
CN105507897A (en) | Rotation unit, rock drilling unit and method for rock drilling | |
CN101680281A (en) | Drilling system with a barrel drilling head driven by a downhole tractor | |
US8887833B2 (en) | Reamer assembly | |
NO20161434A1 (en) | A hole forming tool | |
US9290993B2 (en) | Method and system for installation of in-ground conduit | |
US10626679B2 (en) | Bidirectional cluster hammer reamer | |
CN118187729A (en) | Reverse circulation directional continuous core drilling tool and method based on hollow screw motor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: OVERREAM INC., CALIFORNIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TIBBAN, JAMES ANTHONY;WEST, MICHAEL;SIGNING DATES FROM 20210216 TO 20210217;REEL/FRAME:056108/0349 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |