US20080120936A1 - Basement finishing system - Google Patents
Basement finishing system Download PDFInfo
- Publication number
- US20080120936A1 US20080120936A1 US11/811,706 US81170607A US2008120936A1 US 20080120936 A1 US20080120936 A1 US 20080120936A1 US 81170607 A US81170607 A US 81170607A US 2008120936 A1 US2008120936 A1 US 2008120936A1
- Authority
- US
- United States
- Prior art keywords
- support
- panel
- wall
- existing
- installing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000000463 material Substances 0.000 claims abstract description 42
- 238000000034 method Methods 0.000 claims abstract description 16
- 239000007769 metal material Substances 0.000 claims description 3
- 238000000465 moulding Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 239000004744 fabric Substances 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000009429 electrical wiring Methods 0.000 description 1
- 239000011152 fibreglass Substances 0.000 description 1
- 239000002657 fibrous material Substances 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 229920000728 polyester Polymers 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/7675—Insulating linings for the interior face of exterior walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
Definitions
- the present invention relates to a wall for use in a basement which installs quickly and reduces the amount of moisture buildup.
- Lumber and drywall are suitable for above-ground areas, but are not always an ideal material to use in below-ground areas such as basements.
- Using typical lumber or drywall for finishing a basement presents several problems, the most common of which is that lumber and drywall can warp, rot, or allow for mold growth due to trapped moisture. This moisture is most prevalent in areas such as basements.
- drywall is used to finish off the walls.
- Hanging drywall is a time consuming process which requires patching the joints between adjacent drywall panels with a filling material and sanding the material after it dries. This is usually done several times in order to get an acceptable finish along the joints of adjacent drywall panels. Then the drywall must be painted in order to cover up the patches along the joints between the drywall panels.
- nail pop In order to fix the nail pops, the nail must be placed back in the drywall and lumber, a patching compound must be applied to the nail pop area, which is then sanded and painted.
- the wall construction system should be able to prevent damage caused by high-moisture and be easily constructed in order to provide a more efficient installation process when compared to a lumber and drywall finishing system.
- An embodiment of the present invention is a wall which can be used in conjunction with a pre-existing wall to create an improved aesthetic appearance, and eliminate or reduce the development of mold or mildew growing on a wall.
- the present invention is a method installing a wall structure including an existing wall, an existing ceiling, and an existing floor, the method for installing a wall structure providing the steps of: installing at least one support beam substantially vertical adjacent an interior side of the existing wall, installing at least one top support channel substantially horizontal along the existing ceiling, installing at least one bottom support channel substantially horizontal along the existing floor, connecting at least one panel to at least one support beam, connecting at least one intermediate support with at least one support beam, and connecting a flexible material of the panel with at least one intermediate support.
- FIG. 1 is a sectional side view of a basement wall, incorporating the present invention
- FIG. 2 is a sectional top view taken along line 2 - 2 of FIG. 1 ;
- FIG. 3 is front plan view of a basement wall, incorporating the present invention.
- FIG. 4 is a sectional top view of an intermediate support in accordance with the present invention.
- FIG. 5 is a sectional top view of a corner support in accordance with the present invention.
- the wall of the present invention is generally shown at 10 , and is used in combination with an existing wall 12 .
- the existing wall 12 is typically a wall in a below-ground level of a house; however, it is possible to use this type of invention 10 at a ground level or above ground level.
- the existing wall 12 is made of concrete, but the existing wall 12 can be made of any predetermined material in which additional materials can be connected to the existing wall 12 .
- the wall 10 of the present invention is also used in conjunction with a floor 14 and a ceiling 16 . There is also a top support channel 18 which contacts the ceiling 16 .
- a support beam 20 is arranged vertically, and extends from the top support channel 18 towards the floor 14 .
- the support beam 20 is two back-to-back 2′′ ⁇ 2.5′′ studs which are made of 20-gauge metal, where the longer surface of the two studs contacts one another.
- the studs are preferably metal, but could be made from other materials such as wood or plastic as well.
- a bottom support channel 22 contacts the floor 14 .
- the support beam 20 extends from the top support channel 18 to the bottom support channel 22 .
- the support beam 20 extends substantially vertical between the top support channel 18 and the bottom support channel 22 .
- the installer uses a level to ensure the support beam 20 is substantially vertical when installing the support beam 20 .
- There can be a gap 24 between the support beam 20 and the existing wall 12 which creates an air space between the existing wall 12 and the support beam 20 .
- a first bracket or an H-base 26 Connected to the support beam 20 is a first bracket or an H-base 26 .
- the H-base 26 is connected to the support beam 20 by any suitable fastener, such as but not limited to, a screw or rivet.
- a portion of the H-base 26 is parallel to and contacting the bottom support channel 22 .
- Another portion of the H-base 26 is perpendicular to the bottom support channel 22 and parallel to the floor 14 .
- a third portion of the H-base 26 which contacts the floor 14 , is parallel to the bottom support channel 22 .
- the H-base 26 supports a panel 28 , which in this embodiment has a thickness of approximately one inch, but it is within the scope of the invention that other thicknesses could be used for the panel 28 .
- the panel 28 is preferably made of a high-density fiberglass, but could be made of other materials as well.
- the panel 28 extends vertically between the top support channel 18 and the bottom support channel 22 .
- the panel 28 also extends horizontally between the support beams 20 which are spaced along the top support channel 18 and bottom support channel 22 .
- the top of the panel 28 is inserted into a second bracket or a J-bracket 30 , which is connected to the support beam 20 . Also connected to the J-bracket 30 is a ceiling support structure or ceiling track 32 which is fastened by any suitable fastener, such as but not limited to, a screw or rivet.
- the J-bracket 30 extends between the support beam 20 and the panel 28 .
- the J-bracket 30 then extends over the top of the panel 28 and between the panel 28 and the ceiling track 32 .
- the panel 28 extends from the H-base 26 to a predetermined point below the height of the support beam 20 .
- a drop ceiling or suspended ceiling 40 can be hung in accordance with a known method.
- FIGS. 2 and 4 a top view of the wall 10 is shown.
- an intermediate support 34 Connected to the support beam 20 is an intermediate support 34 which holds the panels 28 in place.
- a predetermined number of intermediate supports 34 are attached along the vertical axis of the support beam 20 .
- Each panel 28 has a flexible material 36 which is connected to the intermediate support 34 .
- the flexible material is an acoustical fabric which is laminated to the surface of each panel 28 .
- the flexible material 36 is wrapped at the top of the panel 28 , and the edge of the flexible material 36 is aligned with the bottom of each panel 28 . A portion of the flexible material 36 also overhangs off the edge of each panel 28 in the area of each intermediate support 34 .
- the intermediate support 34 grips and holds the panel 28 in place through the use of the flexible material 36 .
- the flexible material 36 is inserted into the intermediate support 34 , which creates an even surface between the adjacent panels 28 .
- additional supports or studs 38 can be placed between the top support channel 18 and bottom support channel 22 to provide additional support for the panels 28 .
- the supports 38 extend substantially vertical between the top support channel 18 and bottom support channel 22 .
- the supports 38 are placed intermediate the horizontal length of the panels 28 , between the support beams 20 .
- the supports 38 are preferably of the same size as the support beams 20 .
- the support 38 provides additional support for the panel 28 , but there are no intermediate supports 34 attached to the support 38 .
- a single support 38 is placed between the support beams 20 , but depending on the horizontal length of the panel 28 , additional supports 38 can be used to provide the necessary support for the panels 28 .
- the supports 38 are also positioned such that the center of each support 38 is approximately sixteen inches apart from the intermediate support 34 or, if more supports 38 are used, one another. The spacing of sixteen inches between supports 38 is standard in the construction of buildings.
- a corner support 42 is shown.
- the corner support 42 is for an outside corner, where the corner extends out from the wall rather than into the existing wall 12 , i.e., the outer surface of one panel 28 is two hundred and seventy degrees from the outer surface 28 of another panel.
- the corner support 42 can connect to either a support beam 20 or support 38 so long as the support beam 20 of support 38 is in a corner of the existing wall 12 . Similar to the intermediate support 34 , the corner support 42 grips the flexible material 36 to hold the panel 28 .
- the ceiling track 32 is used along with support wires 44 to support a suspended ceiling 40 (shown in FIG. 3 ).
- a suspended ceiling 40 can be installed using a suitable method.
- the suspended ceiling 40 provides an aesthetic feature which covers up the connection between the support beam 20 , the panel 28 , and the J-bracket 30 .
- the top support channel 18 , the support beam 20 , and the bottom support channel 22 are made of a galvanized metal material.
- the metal material provides adequate strength characteristics to support the structure and is not as susceptible to moisture as lumber is.
- the brackets 26 , 30 , 32 and the intermediate support 34 are made of metal.
- the panels 28 are made of a fiber material that is also not susceptible to moisture, and covered with an acoustical polyester fabric.
- the installation of the wall 10 is accomplished through several steps.
- the bottom support channel 22 is first connected to the floor 14 , and the top support channel 18 is connected to the ceiling 16 .
- the support beam 20 is then installed between the top support channel 18 and the bottom support channel 22 .
- a predetermined number of support beams 20 are used, depending upon the size of the existing wall 12 .
- the number of support beams 20 is dependent upon providing sufficient support for the panels 28 .
- the panels 28 have a predetermined horizontal length, so that the support beams 20 have to be spaced according to the horizontal length of the panel 28 in order to provide an attaching surface for the panels 28 .
- the bottom support channel 22 and the top support channel 18 can be cut to any predetermined length to fit the length of the existing wall 12 .
- the H-base 26 is then connected to bottom support channel 22 .
- the J-bracket 30 is then fastened to the support beam 20 at the desired height for the ceiling, the ceiling track 32 is then fastened to the J-bracket 30 , and the suspended ceiling system can then be installed in a conventional fashion.
- the ceiling track 32 is fastened to the J-bracket 30 by any suitable fastener, such as but not limited to, a screw or rivet.
- the top of the panel 28 is inserted into the J-bracket 30 and the bottom of the panel 28 is placed upon the H-base 26 .
- the intermediate support 34 is firmly pressed against the panel 28 and fastened to the support beams 20 using a suitable fastener.
- the portion of the flexible material 36 which is overhanging from the panel 28 is inserted into the jaw 48 of the intermediate support 34 .
- the preferable method for installing the flexible material 36 into the jaw 48 is through the use of a rolling tool, similar to a screen roller.
- the base molding 46 is then fastened to the H-base 26 .
- the ceiling track 32 and the base molding 46 can also be cut to any predetermined length to match the length of the existing wall 12 .
- support channels 18 , 22 and the support beam 20 are installed, additional materials can be installed. For example, electrical wiring and plumbing can be installed with relative ease prior to the panels 28 being installed.
- the panels 28 are also held in place by intermediate support 34 having the jaw 48 , which is attached to the support beam 20 .
- the panels 28 are connected to and secured by the H-base 26 and J-bracket 30 .
- Each panel 28 also includes a flexible material 36 , which is inserted into the jaw 48 .
- the flexible material 36 can be connected to each panel 28 , or each panel 28 can be installed, with the flexible material 36 placed over the panel 28 to hold each panel 28 in place.
- the jaw 48 grips and holds the panel 28 in place, and can hold the flexible material 36 for two adjacent panels 28 .
- the panels 28 will be substantially even with one another because of the flexible material 36 of each panel 28 being inserted into the jaw 48 .
- the panels can be any predetermined size so as to extend vertically between the J-bracket 30 and the H-base 26 , and horizontally between the support beams 20 , without departing from the scope of the present invention.
- the corner support 42 is connected to a support beam 20 or support 38 in the corner of the wall 10 .
- the corner support 42 has a jaw 48 a which grips the flexible material 36 of the panel 28 .
- the jaw 48 a is offset from the corner so that the flexible material 36 of one of the panels 28 connected to the corner support 42 extends over the corner to create an even corner surface.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Acoustics & Sound (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
Abstract
A wall used in conjunction with a pre-existing wall to create an improved aesthetic appearance, and eliminate the chances of mold, or mildew growing on a wall. A method for installing a wall having an existing wall, installing at least one support beam substantially vertical on the interior side of the existing wall. Installing at least one top support channel substantially horizontal along a top portion of the interior side of the existing wall. Installing at least one bottom support channel substantially horizontal along a bottom portion of the interior side of the existing wall. Connecting at least one panel to at least one of the support beams, the top support channels, and bottom support channels. Inserting a flexible material of the panels into the intermediate support channels and the corner support channels.
Description
- This application claims the benefit of U.S. Provisional Application No. 60/813,403, filed Jun. 14, 2006.
- The present invention relates to a wall for use in a basement which installs quickly and reduces the amount of moisture buildup.
- The walls of most homes are constructed using typical drywall or lumber. Lumber and drywall are suitable for above-ground areas, but are not always an ideal material to use in below-ground areas such as basements. Using typical lumber or drywall for finishing a basement presents several problems, the most common of which is that lumber and drywall can warp, rot, or allow for mold growth due to trapped moisture. This moisture is most prevalent in areas such as basements.
- In addition, when lumber is used for framing along concrete basement walls, drywall is used to finish off the walls. Hanging drywall is a time consuming process which requires patching the joints between adjacent drywall panels with a filling material and sanding the material after it dries. This is usually done several times in order to get an acceptable finish along the joints of adjacent drywall panels. Then the drywall must be painted in order to cover up the patches along the joints between the drywall panels. In addition, the nails or screws which are used to attach the drywall panels to the lumber can come loose and project out from the drywall which is known as a “nail pop.” In order to fix the nail pops, the nail must be placed back in the drywall and lumber, a patching compound must be applied to the nail pop area, which is then sanded and painted.
- Accordingly, it is desirable to develop a wall construction system for high-moisture areas such as basements which alleviates some of the problems of a drywall and lumber finished basement. The wall construction system should be able to prevent damage caused by high-moisture and be easily constructed in order to provide a more efficient installation process when compared to a lumber and drywall finishing system.
- An embodiment of the present invention is a wall which can be used in conjunction with a pre-existing wall to create an improved aesthetic appearance, and eliminate or reduce the development of mold or mildew growing on a wall. The present invention is a method installing a wall structure including an existing wall, an existing ceiling, and an existing floor, the method for installing a wall structure providing the steps of: installing at least one support beam substantially vertical adjacent an interior side of the existing wall, installing at least one top support channel substantially horizontal along the existing ceiling, installing at least one bottom support channel substantially horizontal along the existing floor, connecting at least one panel to at least one support beam, connecting at least one intermediate support with at least one support beam, and connecting a flexible material of the panel with at least one intermediate support.
- Further areas of applicability of the present invention will become apparent from the detailed description provided hereinafter. It should be understood that the detailed description and specific examples, while indicating the preferred embodiment of the invention, are intended for purposes of illustration only and are not intended to limit the scope of the invention.
- The present invention will become more fully understood from the detailed description and the accompanying drawings, wherein:
-
FIG. 1 is a sectional side view of a basement wall, incorporating the present invention; -
FIG. 2 is a sectional top view taken along line 2-2 ofFIG. 1 ; -
FIG. 3 is front plan view of a basement wall, incorporating the present invention; -
FIG. 4 is a sectional top view of an intermediate support in accordance with the present invention; and -
FIG. 5 is a sectional top view of a corner support in accordance with the present invention. - The following description of the preferred embodiment(s) is merely exemplary in nature and is in no way intended to limit the invention, its application, or uses.
- Referring to
FIG. 1 , the wall of the present invention is generally shown at 10, and is used in combination with an existingwall 12. The existingwall 12 is typically a wall in a below-ground level of a house; however, it is possible to use this type ofinvention 10 at a ground level or above ground level. Usually the existingwall 12 is made of concrete, but the existingwall 12 can be made of any predetermined material in which additional materials can be connected to the existingwall 12. Thewall 10 of the present invention is also used in conjunction with afloor 14 and aceiling 16. There is also atop support channel 18 which contacts theceiling 16. Asupport beam 20 is arranged vertically, and extends from thetop support channel 18 towards thefloor 14. In a preferred embodiment, thesupport beam 20 is two back-to-back 2″×2.5″ studs which are made of 20-gauge metal, where the longer surface of the two studs contacts one another. The studs are preferably metal, but could be made from other materials such as wood or plastic as well. Abottom support channel 22 contacts thefloor 14. Thesupport beam 20 extends from thetop support channel 18 to thebottom support channel 22. In a preferred embodiment, thesupport beam 20 extends substantially vertical between thetop support channel 18 and thebottom support channel 22. Ideally, the installer uses a level to ensure thesupport beam 20 is substantially vertical when installing thesupport beam 20. There can be agap 24 between thesupport beam 20 and the existingwall 12 which creates an air space between the existingwall 12 and thesupport beam 20. - Connected to the
support beam 20 is a first bracket or an H-base 26. In a preferred embodiment, the H-base 26 is connected to thesupport beam 20 by any suitable fastener, such as but not limited to, a screw or rivet. In a preferred embodiment, a portion of the H-base 26 is parallel to and contacting thebottom support channel 22. Another portion of the H-base 26 is perpendicular to thebottom support channel 22 and parallel to thefloor 14. A third portion of the H-base 26, which contacts thefloor 14, is parallel to thebottom support channel 22. The H-base 26 supports apanel 28, which in this embodiment has a thickness of approximately one inch, but it is within the scope of the invention that other thicknesses could be used for thepanel 28. Thepanel 28 is preferably made of a high-density fiberglass, but could be made of other materials as well. Thepanel 28 extends vertically between thetop support channel 18 and thebottom support channel 22. Thepanel 28 also extends horizontally between thesupport beams 20 which are spaced along thetop support channel 18 andbottom support channel 22. - The top of the
panel 28 is inserted into a second bracket or a J-bracket 30, which is connected to thesupport beam 20. Also connected to the J-bracket 30 is a ceiling support structure orceiling track 32 which is fastened by any suitable fastener, such as but not limited to, a screw or rivet. The J-bracket 30 extends between thesupport beam 20 and thepanel 28. The J-bracket 30 then extends over the top of thepanel 28 and between thepanel 28 and theceiling track 32. In a preferred embodiment, thepanel 28 extends from the H-base 26 to a predetermined point below the height of thesupport beam 20. Thus, a drop ceiling or suspendedceiling 40 can be hung in accordance with a known method. - Referring now to
FIGS. 2 and 4 , a top view of thewall 10 is shown. Connected to thesupport beam 20 is anintermediate support 34 which holds thepanels 28 in place. A predetermined number ofintermediate supports 34 are attached along the vertical axis of thesupport beam 20. In a preferred embodiment, there are at least twointermediate supports 34 attached to thesupport beam 20; however, a greater or lesser number ofintermediate supports 34 can be used depending on a particular application. Eachpanel 28 has aflexible material 36 which is connected to theintermediate support 34. In this embodiment, the flexible material is an acoustical fabric which is laminated to the surface of eachpanel 28. Theflexible material 36 is wrapped at the top of thepanel 28, and the edge of theflexible material 36 is aligned with the bottom of eachpanel 28. A portion of theflexible material 36 also overhangs off the edge of eachpanel 28 in the area of eachintermediate support 34. Theintermediate support 34 grips and holds thepanel 28 in place through the use of theflexible material 36. Thus, theflexible material 36 is inserted into theintermediate support 34, which creates an even surface between theadjacent panels 28. - Also, additional supports or
studs 38 can be placed between thetop support channel 18 andbottom support channel 22 to provide additional support for thepanels 28. The supports 38 extend substantially vertical between thetop support channel 18 andbottom support channel 22. The supports 38 are placed intermediate the horizontal length of thepanels 28, between the support beams 20. The supports 38 are preferably of the same size as the support beams 20. Thesupport 38 provides additional support for thepanel 28, but there are nointermediate supports 34 attached to thesupport 38. Typically, asingle support 38 is placed between the support beams 20, but depending on the horizontal length of thepanel 28,additional supports 38 can be used to provide the necessary support for thepanels 28. The supports 38 are also positioned such that the center of eachsupport 38 is approximately sixteen inches apart from theintermediate support 34 or, if more supports 38 are used, one another. The spacing of sixteen inches betweensupports 38 is standard in the construction of buildings. - Referring to
FIGS. 1 , 2, and 5, acorner support 42 is shown. Preferably, thecorner support 42 is for an outside corner, where the corner extends out from the wall rather than into the existingwall 12, i.e., the outer surface of onepanel 28 is two hundred and seventy degrees from theouter surface 28 of another panel. Thecorner support 42 can connect to either asupport beam 20 orsupport 38 so long as thesupport beam 20 ofsupport 38 is in a corner of the existingwall 12. Similar to theintermediate support 34, thecorner support 42 grips theflexible material 36 to hold thepanel 28. - Referring now to
FIGS. 1-5 , theceiling track 32 is used along withsupport wires 44 to support a suspended ceiling 40 (shown inFIG. 3 ). Thus, a suspendedceiling 40 can be installed using a suitable method. The suspendedceiling 40 provides an aesthetic feature which covers up the connection between thesupport beam 20, thepanel 28, and the J-bracket 30. There is abase molding 46 which is connected to the H-base 26 which provides an aesthetic feature to cover up the connection between thefloor 14, the H-base 26, and thepanel 28. - In a preferred embodiment the
top support channel 18, thesupport beam 20, and thebottom support channel 22 are made of a galvanized metal material. The metal material provides adequate strength characteristics to support the structure and is not as susceptible to moisture as lumber is. Also, thebrackets intermediate support 34 are made of metal. Preferably, thepanels 28 are made of a fiber material that is also not susceptible to moisture, and covered with an acoustical polyester fabric. - The installation of the
wall 10 is accomplished through several steps. Thebottom support channel 22 is first connected to thefloor 14, and thetop support channel 18 is connected to theceiling 16. Thesupport beam 20 is then installed between thetop support channel 18 and thebottom support channel 22. A predetermined number of support beams 20 are used, depending upon the size of the existingwall 12. Thus, the number of support beams 20 is dependent upon providing sufficient support for thepanels 28. Typically, thepanels 28 have a predetermined horizontal length, so that the support beams 20 have to be spaced according to the horizontal length of thepanel 28 in order to provide an attaching surface for thepanels 28. Also, thebottom support channel 22 and thetop support channel 18 can be cut to any predetermined length to fit the length of the existingwall 12. - Once the
top support channel 18,bottom support channel 22, andsupport beam 20 are in place, the H-base 26 is then connected tobottom support channel 22. The J-bracket 30 is then fastened to thesupport beam 20 at the desired height for the ceiling, theceiling track 32 is then fastened to the J-bracket 30, and the suspended ceiling system can then be installed in a conventional fashion. Theceiling track 32 is fastened to the J-bracket 30 by any suitable fastener, such as but not limited to, a screw or rivet. The top of thepanel 28 is inserted into the J-bracket 30 and the bottom of thepanel 28 is placed upon the H-base 26. Theintermediate support 34 is firmly pressed against thepanel 28 and fastened to the support beams 20 using a suitable fastener. The portion of theflexible material 36 which is overhanging from thepanel 28 is inserted into thejaw 48 of theintermediate support 34. The preferable method for installing theflexible material 36 into thejaw 48 is through the use of a rolling tool, similar to a screen roller. Thebase molding 46 is then fastened to the H-base 26. Theceiling track 32 and thebase molding 46 can also be cut to any predetermined length to match the length of the existingwall 12. - After the
support channels support beam 20 are installed, additional materials can be installed. For example, electrical wiring and plumbing can be installed with relative ease prior to thepanels 28 being installed. - In addition to the J-
bracket 30 andbase molding 46, thepanels 28 are also held in place byintermediate support 34 having thejaw 48, which is attached to thesupport beam 20. Thus, when thepanels 28 are installed, they are connected to and secured by the H-base 26 and J-bracket 30. Eachpanel 28 also includes aflexible material 36, which is inserted into thejaw 48. Theflexible material 36 can be connected to eachpanel 28, or eachpanel 28 can be installed, with theflexible material 36 placed over thepanel 28 to hold eachpanel 28 in place. Thejaw 48 grips and holds thepanel 28 in place, and can hold theflexible material 36 for twoadjacent panels 28. Once installed, thepanels 28 will be substantially even with one another because of theflexible material 36 of eachpanel 28 being inserted into thejaw 48. In the embodiment shown inFIG. 3 , there are twopanels 28. The panels can be any predetermined size so as to extend vertically between the J-bracket 30 and the H-base 26, and horizontally between the support beams 20, without departing from the scope of the present invention. - Similarly, the
corner support 42 is connected to asupport beam 20 orsupport 38 in the corner of thewall 10. Thecorner support 42 has a jaw 48 a which grips theflexible material 36 of thepanel 28. Preferably, the jaw 48 a is offset from the corner so that theflexible material 36 of one of thepanels 28 connected to thecorner support 42 extends over the corner to create an even corner surface. - The description of the invention is merely exemplary in nature and, thus, variations that do not depart from the gist of the invention are intended to be within the scope of the invention. Such variations are not to be regarded as a departure from the spirit and scope of the invention.
Claims (20)
1. A method for installing a wall structure including an existing wall, an existing ceiling, and an existing floor, said method for installing a wall structure comprising the steps of:
installing at least one support beam substantially vertical adjacent an interior side of said existing wall;
installing at least one top support channel substantially horizontal along said existing ceiling;
installing at least one bottom support channel substantially horizontal along said existing floor;
connecting at least one panel to said at least one support beam;
connecting at least one intermediate support to said at least one support beam; and
connecting a flexible material of said at least one panel with said at least one intermediate support.
2. The method for installing a wall of claim 1 further comprising a first bracket and a second bracket, wherein said at least one panel is connected to said first bracket and said second bracket.
3. The method for installing a wall of claim 1 further comprising the step of connecting said flexible material of said panel with a jaw of said intermediate support.
4. The method for installing a wall of claim 1 , wherein a first surface of said flexible material of a first panel is substantially even with a second surface of said flexible material of a second panel when said flexible material of said first panel and said second panel is connected to said intermediate support.
5. The method for installing a wall of claim 1 further comprising the step of installing a ceiling support structure prior to connecting said at least one panel to said at least one support beam.
6. The method for installing a wall of claim 1 , wherein said at least one support beam further comprises a plurality of support beams, said plurality of support beams are substantially evenly spaced adjacent said existing wall in accordance with the horizontal length of said panel.
7. The method for installing a wall of claim 1 , further comprising the step of installing supports substantially vertical between said top support channel and said bottom support channel.
8. The method for installing a wall of claim 1 , further comprising the step of leveling at least one of said at least one top support channel and said at least one support beam.
9. A wall structure including an existing wall, an existing ceiling, and an existing floor, said wall structure comprising:
at least one support beam extending substantially vertical adjacent said existing wall;
at least one top support channel extending substantially horizontal along said existing ceiling;
at least one bottom support channel extending substantially horizontal along said existing floor;
at least one intermediate support connected to said at least one support beam; and
at least one panel extending along said at least one support beam, wherein said at least one panel has a flexible material that is connected to said intermediate support.
10. The wall structure of claim 9 , further comprising a first bracket and a second bracket, wherein said at least one panel is connected to said first bracket and said second bracket.
11. The wall structure of claim 9 , wherein said flexible material is connected to a jaw of said at least one intermediate support.
12. The wall structure of claim 9 , wherein a first surface of said flexible material of a first panel is substantially even with a second surface of said flexible material of a second panel when said flexible material of said first panel and said second panel is connected to said intermediate support.
13. The wall structure of claim 9 , wherein said at least one support beam, said at least one top support channel, said at least one bottom support channel, and said at least one intermediate support channel is at least partially made of a metal material.
14. The wall structure of claim 8 , said at least one support beam further comprising a plurality of support beams, wherein said plurality of support beams are substantially evenly spaced adjacent said existing wall.
15. A wall structure including an existing wall, an existing ceiling, and an existing floor, said wall structure comprising:
a plurality of support beams extending substantially vertical adjacent said existing wall;
a plurality of top support channels extending substantially horizontal along said existing ceiling;
a plurality of bottom support channels extending substantially horizontal along said existing floor;
a plurality of intermediate supports connected to said plurality of support beams;
a plurality of panels extending between said plurality of support beams; and
at least one jaw on each of said plurality of intermediate supports, wherein a flexible material of said plurality of panels is connected to said intermediate support by said jaw.
16. The wall structure of claim 15 , wherein a first surface of said flexible material of a first panel is substantially even with a second surface of said flexible material of a second panel when said flexible material of said first panel and said second panel is inserted into said jaw of said intermediate support.
17. The wall structure of claim 15 , wherein said plurality of support beams, said plurality of top support channels, said plurality of bottom support channels, and said plurality of intermediate supports are at least partially made of a material resistant to moisture.
18. The wall structure of claim 15 , wherein said plurality of support beams are substantially evenly spaced along said existing wall.
19. The wall structure of claim 15 , further comprising a first bracket and a second bracket, wherein said plurality of panels are connected to said first bracket and said second bracket.
20. The wall structure of claim 15 , further comprising supports that extend substantially vertical between said plurality of top support channels and said plurality of bottom support channels.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/811,706 US20080120936A1 (en) | 2006-06-14 | 2007-06-12 | Basement finishing system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US81340306P | 2006-06-14 | 2006-06-14 | |
US11/811,706 US20080120936A1 (en) | 2006-06-14 | 2007-06-12 | Basement finishing system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20080120936A1 true US20080120936A1 (en) | 2008-05-29 |
Family
ID=39462285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/811,706 Abandoned US20080120936A1 (en) | 2006-06-14 | 2007-06-12 | Basement finishing system |
Country Status (1)
Country | Link |
---|---|
US (1) | US20080120936A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090223151A1 (en) * | 2008-03-05 | 2009-09-10 | Joseph A Albano | Wall finishing system |
US8684067B1 (en) * | 2012-11-06 | 2014-04-01 | Polargy, Inc. | Suspended panel system |
CN109072609A (en) * | 2016-03-07 | 2018-12-21 | 创新建筑技术有限责任公司 | The prefabricated point of family wall with outer conduit engagement function |
US10273696B2 (en) * | 2011-10-11 | 2019-04-30 | Jean-Marc Scherrer | Device for re-cladding a removeable false-wall panel |
Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4194336A (en) * | 1977-11-21 | 1980-03-25 | Weinar Roger N | Concealable retaining clip for wallboards |
US4265064A (en) * | 1979-05-29 | 1981-05-05 | Allen Parezo | Basement waterproofing system |
US4273813A (en) * | 1980-05-19 | 1981-06-16 | Dow Corning Corporation | Method of providing waterproof coating for masonry walls |
US4525960A (en) * | 1984-01-30 | 1985-07-02 | Owens-Corning Fiberglas Corporation | Basement wall insulating and waterproofing system and method |
US4546584A (en) * | 1983-07-11 | 1985-10-15 | Donn Incorporated | Wall panel system providing resilient joints |
US4735838A (en) * | 1986-01-10 | 1988-04-05 | Owens-Corning Fiberglas Corporation | Waterproof membrane |
US4907637A (en) * | 1986-10-10 | 1990-03-13 | Decoustics Limited | Fabric mounting system |
US4986332A (en) * | 1990-08-09 | 1991-01-22 | Craig S. Lanuza | Fastening track assembly for fabric wallcoverings |
US5214892A (en) * | 1991-02-25 | 1993-06-01 | Livingston Bryan K | Molding strip for mounting a flexible covering onto a support surface |
US5394665A (en) * | 1993-11-05 | 1995-03-07 | Gary Johnson | Stud wall framing construction |
US5412919A (en) * | 1993-12-21 | 1995-05-09 | Mitek Holdings, Inc. | Metal wall framing |
US5606836A (en) * | 1992-05-29 | 1997-03-04 | Haworth, Inc. | Separable post/panel system |
US5715638A (en) * | 1996-05-14 | 1998-02-10 | Anderson, Sr.; Andy | Fabric wall panel system |
US20050120662A1 (en) * | 2003-12-04 | 2005-06-09 | William Paul | Floor and ceiling receiving tracks for seating interconnecting metal studs exhibiting diamond shaped apertures |
US6918212B1 (en) * | 2002-07-23 | 2005-07-19 | Andy W. Anderson, Sr. | Seamed/seamless fabric wall panel system |
US20070068101A1 (en) * | 2004-12-09 | 2007-03-29 | Weir Charles R | Panel system for reaction-to-fire test applications |
US20070142692A1 (en) * | 2005-12-21 | 2007-06-21 | Hall Todd H | Method of refinishing a wall containing lead paint |
US20070193151A1 (en) * | 2006-02-21 | 2007-08-23 | Anderson Alan A | System and Method for Finishing Basement Walls |
US20070199270A1 (en) * | 2004-01-09 | 2007-08-30 | Weir Charles R | Vapor control facing for wall finishing system |
US7313891B2 (en) * | 2005-04-20 | 2008-01-01 | Showers Robert J | Wall finishing system |
-
2007
- 2007-06-12 US US11/811,706 patent/US20080120936A1/en not_active Abandoned
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4194336A (en) * | 1977-11-21 | 1980-03-25 | Weinar Roger N | Concealable retaining clip for wallboards |
US4265064A (en) * | 1979-05-29 | 1981-05-05 | Allen Parezo | Basement waterproofing system |
US4273813A (en) * | 1980-05-19 | 1981-06-16 | Dow Corning Corporation | Method of providing waterproof coating for masonry walls |
US4546584A (en) * | 1983-07-11 | 1985-10-15 | Donn Incorporated | Wall panel system providing resilient joints |
US4525960A (en) * | 1984-01-30 | 1985-07-02 | Owens-Corning Fiberglas Corporation | Basement wall insulating and waterproofing system and method |
US4735838A (en) * | 1986-01-10 | 1988-04-05 | Owens-Corning Fiberglas Corporation | Waterproof membrane |
US4907637A (en) * | 1986-10-10 | 1990-03-13 | Decoustics Limited | Fabric mounting system |
US4986332A (en) * | 1990-08-09 | 1991-01-22 | Craig S. Lanuza | Fastening track assembly for fabric wallcoverings |
US5214892A (en) * | 1991-02-25 | 1993-06-01 | Livingston Bryan K | Molding strip for mounting a flexible covering onto a support surface |
US5606836A (en) * | 1992-05-29 | 1997-03-04 | Haworth, Inc. | Separable post/panel system |
US5394665A (en) * | 1993-11-05 | 1995-03-07 | Gary Johnson | Stud wall framing construction |
US5412919A (en) * | 1993-12-21 | 1995-05-09 | Mitek Holdings, Inc. | Metal wall framing |
US5715638A (en) * | 1996-05-14 | 1998-02-10 | Anderson, Sr.; Andy | Fabric wall panel system |
US6918212B1 (en) * | 2002-07-23 | 2005-07-19 | Andy W. Anderson, Sr. | Seamed/seamless fabric wall panel system |
US7299595B1 (en) * | 2002-07-23 | 2007-11-27 | Anderson Sr Andy W | Seamed/seamless fabric wall panel system |
US20050120662A1 (en) * | 2003-12-04 | 2005-06-09 | William Paul | Floor and ceiling receiving tracks for seating interconnecting metal studs exhibiting diamond shaped apertures |
US20070199270A1 (en) * | 2004-01-09 | 2007-08-30 | Weir Charles R | Vapor control facing for wall finishing system |
US20070068101A1 (en) * | 2004-12-09 | 2007-03-29 | Weir Charles R | Panel system for reaction-to-fire test applications |
US7313891B2 (en) * | 2005-04-20 | 2008-01-01 | Showers Robert J | Wall finishing system |
US20070142692A1 (en) * | 2005-12-21 | 2007-06-21 | Hall Todd H | Method of refinishing a wall containing lead paint |
US20070193151A1 (en) * | 2006-02-21 | 2007-08-23 | Anderson Alan A | System and Method for Finishing Basement Walls |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090223151A1 (en) * | 2008-03-05 | 2009-09-10 | Joseph A Albano | Wall finishing system |
US10273696B2 (en) * | 2011-10-11 | 2019-04-30 | Jean-Marc Scherrer | Device for re-cladding a removeable false-wall panel |
US8684067B1 (en) * | 2012-11-06 | 2014-04-01 | Polargy, Inc. | Suspended panel system |
CN109072609A (en) * | 2016-03-07 | 2018-12-21 | 创新建筑技术有限责任公司 | The prefabricated point of family wall with outer conduit engagement function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2980094C (en) | Flush or lap siding system | |
US5937600A (en) | Exterior wall system and drip channel | |
US8522498B2 (en) | System and method for removably connecting trim to a wall or ceiling or both | |
US7441382B2 (en) | Clapboard siding installation clip and method of installing clapboard siding | |
US9032683B2 (en) | Clips for thin brick wall system | |
US8615950B1 (en) | Systems and methods of reducing stucco cracks at doors and windows | |
US7383669B2 (en) | Siding starter strip | |
US9885184B2 (en) | Stucco crack reduction at corners | |
US5542218A (en) | Structural support frame for ceramic tile corner seats and service trays | |
US20070163191A1 (en) | Mold resistant structural drywall track | |
US9032684B2 (en) | Clips for thin brick wall system | |
US10100530B1 (en) | Method and apparatus for construction of exterior wall system | |
US20070056238A1 (en) | Cement and Composite Siding Attachment and Alignment System | |
US20080120936A1 (en) | Basement finishing system | |
US9915073B1 (en) | Rainscreen building siding | |
US20090193739A1 (en) | Modular Basement Finishing System | |
CN109930944B (en) | Mounting method of hidden auxiliary sleeve | |
US12091863B2 (en) | Flood resistant wall | |
US3327446A (en) | Building siding and attaching means therefor | |
US8061093B2 (en) | Window frame with installation hooks | |
US20090223151A1 (en) | Wall finishing system | |
CN109930945B (en) | Mounting method of hidden auxiliary sleeve | |
AU2015271993A1 (en) | Apparatus and Method for Mounting Building Panels to the Framework Assembly of a Wall Structure | |
AU2010227027B2 (en) | Apparatus and Method for Mounting Building Panels to the Framework Assembly of a Wall Structure | |
CA2951198A1 (en) | Rainscreen building siding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: IMPRESSIVE TILE COMPANY, MICHIGAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HULL, DOUGLAS W.;REEL/FRAME:019803/0684 Effective date: 20070809 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |