US20060212188A1 - Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics - Google Patents

Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics Download PDF

Info

Publication number
US20060212188A1
US20060212188A1 US11/342,857 US34285706A US2006212188A1 US 20060212188 A1 US20060212188 A1 US 20060212188A1 US 34285706 A US34285706 A US 34285706A US 2006212188 A1 US2006212188 A1 US 2006212188A1
Authority
US
United States
Prior art keywords
movement
trains
congestion
selected route
over
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/342,857
Inventor
Joel Kickbusch
Joseph Philp
Mitchell Wills
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US10/785,059 external-priority patent/US20040172175A1/en
Application filed by General Electric Co filed Critical General Electric Co
Priority to US11/342,857 priority Critical patent/US20060212188A1/en
Assigned to GENERAL ELECTRIC COMPANY reassignment GENERAL ELECTRIC COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WILLS, MITCHELL SCOTT, PHILP, JOSEPH WESLEY, KICKBUSCH, JOEL
Publication of US20060212188A1 publication Critical patent/US20060212188A1/en
Priority to MX2008009578A priority patent/MX2008009578A/en
Priority to CN2007800041777A priority patent/CN101484857B/en
Priority to EP07763013A priority patent/EP1987322A4/en
Priority to BRPI0706962-6A priority patent/BRPI0706962A2/en
Priority to PCT/US2007/001342 priority patent/WO2007089441A2/en
Priority to AU2007210230A priority patent/AU2007210230B2/en
Priority to CA002637496A priority patent/CA2637496A1/en
Priority to ZA200807067A priority patent/ZA200807067B/en
Priority to US12/907,677 priority patent/US8589057B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/16Trackside optimisation of vehicle or train operation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • railroads consist of three primary components (1) a rail infrastructure, including track, switches, a communications system and a control system; (2) rolling stock, including locomotives and cars; and, (3) personnel (or crew) that operate and maintain the railway.
  • a rail infrastructure including track, switches, a communications system and a control system
  • rolling stock including locomotives and cars
  • personnel (or crew) that operate and maintain the railway.
  • each of these components are employed by the use of a high level schedule which assigns people, locomotives, and cars to the various sections of track and allows them to move over that track in a manner that avoids collisions and permits the railway system to deliver goods to various destinations.
  • a precision control system includes the use of an optimizing scheduler that will schedule all aspects of the rail system, taking into account the laws of physics, the policies of the railroad, the work rules of the personnel, the actual contractual terms of the contracts to the various customers and any boundary conditions or constraints which govern the possible solution or schedule such as passenger traffic, hours of operation of some of the facilities, track maintenance, work rules, etc.
  • the combination of boundary conditions together with a figure of merit for each activity will result in a schedule which maximizes some figure of merit such as overall system cost.
  • the planning system is hierarchical in nature in which the problem is abstracted to a relatively high level for the initial optimization process, and then the resulting course solution is mapped to a less abstract lower level for further optimization.
  • Statistical processing is used at all levels to minimize the total computational load, making the overall process computationally feasible to implement.
  • An expert system is used as a manager over these processes, and the expert system is also the tool by which various boundary conditions and constraints for the solution set are established. The use of an expert system in this capacity permits the user to supply the rules to be placed in the solution process.
  • a dispatcher's view of the controlled railroad territory can be considered myopic. Dispatchers view and processes information only within their own control territories and have little or no insight into the operation of adjoining territories, or the railroad network as a whole.
  • Current dispatch systems simply implement controls as a result of the individual dispatcher's decisions on small portions of the railroad network and the dispatchers are expected to resolve conflicts between movements of objects on the track (e.g. trains, maintenance vehicles, survey vehicles, etc.) and the available track resource limitations (e.g. limited number of tracks, tracks out of service, consideration of safety of maintenance crews near active tracks) as they occur, with little advanced insight or warning.
  • Congestion inevitably occurs in the routing of trains and often occurs in the same areas. Congestion is a significant problem.
  • the routing of trains into a congested area tends to exacerbate the congestion and may result in deadlock.
  • the delay in the movement of trains is subject to cost constraints including contract penalties, the tendency of dispatchers is to continue to push trains through an area as rapidly as possible, advancing their movement along the line of road whenever possible, and treating the resulting congestion as a track availability problem to be solved through the assignment of track resources to create alternative routes through the congested area.
  • the movement planners used by dispatchers in adjacent territories are often completely independent of each other and uninformed as to the status of the tracks in adjacent territories. As a result, dispatchers in uncongested areas may continue to send trains into a congested area in the adjacent territory.
  • the present invention relates to the anticipation and avoidance of congestion to maximize the throughput of trains in the overall system at the expense of the movement of trains over smaller sections of track.
  • Congestion generally is the after-the-fact result of acts set in motion by dispatchers assisted by train movement planners, i.e., by acts taken long prior to the development of actual congestion. By the time that congestion is actually detected, other trains are enroute through the congested area and in may cases have passed the point in the system where an alternative route may have been selected.
  • FIG. 1 is a simplified pictorial representation of one embodiment of the present invention for use with a rail network divided into control areas.
  • FIG. 2 is a simplified flow diagram for one embodiment of a scheduling method that predicts the occurrence of congestion over a selected route.
  • the global rail network 105 can be divided into one or more control areas 100 ( 100 A- 100 C), each of which has a dispatcher 110 ( 110 A- 110 C) assigned to manage the movement of trains ( 102 ) through his respective control area 100 .
  • a centralized movement planner 120 provides a network based movement plan for the global rail network 105 based on input received from the railroad information support center 130 .
  • the railroad information support center 130 provides information related to the track resources and other information suitable to plan the use of the resources.
  • Centralized movement planner 120 generates a movement plan for the resources in the track network 105 and provides the plan to the automated dispatcher 140 . Movement planner 120 may also received updates on the execution of the movement plan from automated dispatcher 140 and can update the current movement plan.
  • Automated dispatcher 140 provides each of the dispatchers 110 with the movement plan to manage the train resources in their respective control areas 110 .
  • the automated dispatcher 140 can be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers.
  • the automated dispatcher 140 communicates with trains 102 on the network of track via a suitable communication link 150 , such as a cellular telephone, satellite or wayside signaling.
  • the dispatcher issues and approves the issuance of movement authorities and track restrictions, schedule maintenance of way activities and communicates with train crews, yard managers and other railroad personnel consistent with an optimized operating plan for the railroad. While the dispatcher will rely on the movement planner to solve the complex problem of optimizing movement of trains, the dispatcher will be actively involved in entering the necessary data required to maintain an optimized plan and identify exceptions to the plan.
  • enhanced planning is facilitated by automatically supplying the movement planner 120 with information from the railroad information support center 130 which associates train consist events (e.g., pickups, crew changes, engine destinations) with planned train activities that occupy track resources for the duration of a dwell time, so that maintenance of the traditional train sheet data (via electronic messaging and user data entry) is automatically reflected in the train trip specifications for use for movement planning.
  • train consist events e.g., pickups, crew changes, engine destinations
  • the present application also is directed to the identification of areas that are prone to congestion and to take action sufficiently in advance of the predicted congestion to minimize or obviate avoid the congestion all together.
  • the maintenance of a historical data base of events that have resulted in congestion may be used in anticipating congestion.
  • analysis of a historical database may identify factors which are associated with congestion. Such factors may be temporal, e.g., between 3:00 and 5:00 p.m. or seasonal, e.g., during winter months, in nature.
  • the factors may include environmental conditions, track topography, type of train, identification of crew, or other factors which may affect the likelihood of congestion.
  • Each factor may be assigned a metric as a function of its contribution to the occurrence of congestion.
  • the factors may also be weighted depending on the contribution of the factor. Through statistical analysis, it may be determined for a particular route, that the planned usage of the route by its scheduled trains may cause the cumulative metric for the route to exceed a predetermined threshold indicating the likely occurrence of congestion. The congestion metrics may be used by the movement plan to schedule the trains to alternative routes in order to reduce the metric for a given route to below the predetermined threshold.
  • FIG. 2 illustrates one embodiment of the present application.
  • a method of scheduling the movement of trains may be accomplished by predicting the occurrence of congestion due to the planned movement of the trains over a selected route.
  • Factors are identified 200 which contribute to the congestion. The factors may be identified through the collection and analysis of the historical performance of trains over a selected route. Once the factors are identified, a metric can be assigned to each factor 210 to account for that factors contribution to congestion. The factor may be weighted appropriately with relation to other factors, or may be linked to other factors to account for the relationship that may exist between factors.
  • Each route can then be evaluated to determine the probability of congestion based on the planned movement of trains over the selected route. This can be accomplished by evaluating the metrics for each planned movement of a train over the selected route 220 . If the cumulative metrics for a given route exceed some predetermined threshold 230 , one or more of the planned movement of the trains can be rescheduled to an alternate route 240 .
  • a further evaluation can be done to determine the contribution of each planned train to the predicted congestion and the train contributing the most can be selected for rescheduling to an alternate route.
  • Other factors that may be considered to predict congestion include train density, type of train, the identity of the particular crew controlling a train, the type of load being carried by the train, physical constraints of the train, network topography including number of crossings, availability of sidings, zone restrictions or curfews.
  • the weighting of the factors can be based upon historical statistics and can vary as a function of other factors. For example, the weight of the train may be a factor that is weighted more heavily in those areas where the track topography factor indicates a steep incline.
  • the combined metric for a route need not exceed a predetermined threshold to take steps to reduce the probability of congestion.
  • the metric for a route can be compared against a metric for the same route with alternate planning to pick the planned movement over the route that results in the lowest congestion metric.
  • a route metric evaluation can be performed for a number of different planned movements over the route to select the planned movement resulting in the lowest probability of congestion.
  • Departure times may be delayed and/or safe places can be found for trains en route along the line-of-road. Deadlocks may thus be prevented and the alternate routes may remain unblocked for use by the movement planner 120 in clearing the congestion.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Mechanical Engineering (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Alternative routes through congested areas are automatically selected using congestion prediction metrics.

Description

    RELATED APPLICATIONS
  • This application is a continuation in part of application Ser. No. 10/785,059 filed Feb. 25, 2004, claiming the benefit of U.S. Provisional Application 60/449,849 filed on Feb. 27, 2003.
  • This application is also one of the below listed applications being concurrently filed:
  • GEH01 00166 application Ser. No. ______ entitled “Scheduler and Method for Managing Unpredictable Local Trains”;
  • GEH01 00167 application Ser. No. ______ entitled “Method And Apparatus For Optimizing Maintenance Of Right Of Way”;
  • GEH01 00168 application Ser. No. ______ entitled “Method and Apparatus for Coordinating Railway Line-Of-Road and Yard Planners”;
  • GEH01 00169 application Ser. No. ______ entitled “Method and Apparatus for Selectively Disabling Train Location Reports”;
  • GEH01 00170 application Ser. No. ______ entitled “Method And Apparatus For Automatic Selection Of Train Activity Locations”;
  • GEH01 00171 application Ser. No. ______ entitled “Method And Apparatus For Congestion Management”;
  • GEH01 00173 application Ser. No. ______ entitled “Method and Apparatus for Estimating Train Location”.
  • The disclosure of each of the above referenced applications including those concurrently filed herewith is hereby incorporated herein by reference.
  • BACKGROUND OF THE INVENTION
  • The present invention relates to the scheduling of movement of plural units through a complex movement defining system, and in the embodiment disclosed, to the scheduling of the movement of freight trains over a railroad system, and specifically to the alternating routing of trains through congested areas.
  • Systems and methods for scheduling the movement of trains over a rail network have been described in U.S. Pat. Nos. 6,154,735, 5,794,172, and 5,623,413, the disclosure of which is hereby incorporated by reference.
  • As disclosed in the referenced patents and applications, the complete disclosure of which is hereby incorporated herein by reference, railroads consist of three primary components (1) a rail infrastructure, including track, switches, a communications system and a control system; (2) rolling stock, including locomotives and cars; and, (3) personnel (or crew) that operate and maintain the railway. Generally, each of these components are employed by the use of a high level schedule which assigns people, locomotives, and cars to the various sections of track and allows them to move over that track in a manner that avoids collisions and permits the railway system to deliver goods to various destinations.
  • As disclosed in the referenced applications, a precision control system includes the use of an optimizing scheduler that will schedule all aspects of the rail system, taking into account the laws of physics, the policies of the railroad, the work rules of the personnel, the actual contractual terms of the contracts to the various customers and any boundary conditions or constraints which govern the possible solution or schedule such as passenger traffic, hours of operation of some of the facilities, track maintenance, work rules, etc. The combination of boundary conditions together with a figure of merit for each activity will result in a schedule which maximizes some figure of merit such as overall system cost.
  • As disclosed in the referenced applications, and upon determining a schedule, a movement plan may be created using the very fine grain structure necessary to actually control the movement of the train. Such fine grain structure may include assignment of personnel by name as well as the assignment of specific locomotives by number, and may include the determination of the precise time or distance over time for the movement of the trains across the rail network and all the details of train handling, power levels, curves, grades, track topography, wind and weather conditions. This movement plan may be used to guide the manual dispatching of trains and controlling of track forces, or provided to the locomotives so that it can be implemented by the engineer or automatically by switchable actuation on the locomotive.
  • The planning system is hierarchical in nature in which the problem is abstracted to a relatively high level for the initial optimization process, and then the resulting course solution is mapped to a less abstract lower level for further optimization. Statistical processing is used at all levels to minimize the total computational load, making the overall process computationally feasible to implement. An expert system is used as a manager over these processes, and the expert system is also the tool by which various boundary conditions and constraints for the solution set are established. The use of an expert system in this capacity permits the user to supply the rules to be placed in the solution process.
  • Currently, a dispatcher's view of the controlled railroad territory can be considered myopic. Dispatchers view and processes information only within their own control territories and have little or no insight into the operation of adjoining territories, or the railroad network as a whole. Current dispatch systems simply implement controls as a result of the individual dispatcher's decisions on small portions of the railroad network and the dispatchers are expected to resolve conflicts between movements of objects on the track (e.g. trains, maintenance vehicles, survey vehicles, etc.) and the available track resource limitations (e.g. limited number of tracks, tracks out of service, consideration of safety of maintenance crews near active tracks) as they occur, with little advanced insight or warning.
  • Congestion inevitably occurs in the routing of trains and often occurs in the same areas. Congestion is a significant problem. The routing of trains into a congested area tends to exacerbate the congestion and may result in deadlock. Because the delay in the movement of trains is subject to cost constraints including contract penalties, the tendency of dispatchers is to continue to push trains through an area as rapidly as possible, advancing their movement along the line of road whenever possible, and treating the resulting congestion as a track availability problem to be solved through the assignment of track resources to create alternative routes through the congested area. The movement planners used by dispatchers in adjacent territories are often completely independent of each other and uninformed as to the status of the tracks in adjacent territories. As a result, dispatchers in uncongested areas may continue to send trains into a congested area in the adjacent territory.
  • The present invention relates to the anticipation and avoidance of congestion to maximize the throughput of trains in the overall system at the expense of the movement of trains over smaller sections of track.
  • Congestion generally is the after-the-fact result of acts set in motion by dispatchers assisted by train movement planners, i.e., by acts taken long prior to the development of actual congestion. By the time that congestion is actually detected, other trains are enroute through the congested area and in may cases have passed the point in the system where an alternative route may have been selected.
  • Typically, the routing of trains through areas of expected congestion is handled by dispatchers utilizing tribal knowledge, i.e., knowledge gained through the dispatcher's personal experience and the experience of other dispatchers passed to him.
  • It is accordingly an object of the present invention to reduce congestion and avoid deadlock by the management of the entry of trains into a congested area.
  • These and many other objects and advantages of the present invention will be readily apparent to one skilled in the art to which the invention pertains from a perusal of the claims, the appended drawings, and the following detailed description of the preferred embodiments.
  • BRIEF DESCRIPTION OF THE DRAWING
  • FIG. 1 is a simplified pictorial representation of one embodiment of the present invention for use with a rail network divided into control areas.
  • FIG. 2 is a simplified flow diagram for one embodiment of a scheduling method that predicts the occurrence of congestion over a selected route.
  • DETAILED DESCRIPTION
  • As illustrated in FIG. 1, the global rail network 105 can be divided into one or more control areas 100 (100A-100C), each of which has a dispatcher 110 (110A-110C) assigned to manage the movement of trains (102) through his respective control area 100. A centralized movement planner 120 provides a network based movement plan for the global rail network 105 based on input received from the railroad information support center 130. The railroad information support center 130 provides information related to the track resources and other information suitable to plan the use of the resources. Centralized movement planner 120 generates a movement plan for the resources in the track network 105 and provides the plan to the automated dispatcher 140. Movement planner 120 may also received updates on the execution of the movement plan from automated dispatcher 140 and can update the current movement plan. Automated dispatcher 140 provides each of the dispatchers 110 with the movement plan to manage the train resources in their respective control areas 110.
  • As described in the referenced applications, the automated dispatcher 140 can be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers. The automated dispatcher 140 communicates with trains 102 on the network of track via a suitable communication link 150, such as a cellular telephone, satellite or wayside signaling.
  • The dispatcher issues and approves the issuance of movement authorities and track restrictions, schedule maintenance of way activities and communicates with train crews, yard managers and other railroad personnel consistent with an optimized operating plan for the railroad. While the dispatcher will rely on the movement planner to solve the complex problem of optimizing movement of trains, the dispatcher will be actively involved in entering the necessary data required to maintain an optimized plan and identify exceptions to the plan.
  • As disclosed in the referenced applications, enhanced planning is facilitated by automatically supplying the movement planner 120 with information from the railroad information support center 130 which associates train consist events (e.g., pickups, crew changes, engine destinations) with planned train activities that occupy track resources for the duration of a dwell time, so that maintenance of the traditional train sheet data (via electronic messaging and user data entry) is automatically reflected in the train trip specifications for use for movement planning.
  • From this information, and with the aid of suitable conventional traffic flow analysis algorithms desirably embedded in the movement planner 120, congestion in a particular geographic area can be identified and the dispatchers in other areas advised of the existence of the congestion and decline to push trains into the congested area. Thus, traffic flow analysis algorithms can detect and may also be used to predict the further occurrence of congestion.
  • The present application also is directed to the identification of areas that are prone to congestion and to take action sufficiently in advance of the predicted congestion to minimize or obviate avoid the congestion all together. In one embodiment, the maintenance of a historical data base of events that have resulted in congestion may be used in anticipating congestion. For example, analysis of a historical database may identify factors which are associated with congestion. Such factors may be temporal, e.g., between 3:00 and 5:00 p.m. or seasonal, e.g., during winter months, in nature. The factors may include environmental conditions, track topography, type of train, identification of crew, or other factors which may affect the likelihood of congestion. Each factor may be assigned a metric as a function of its contribution to the occurrence of congestion. The factors may also be weighted depending on the contribution of the factor. Through statistical analysis, it may be determined for a particular route, that the planned usage of the route by its scheduled trains may cause the cumulative metric for the route to exceed a predetermined threshold indicating the likely occurrence of congestion. The congestion metrics may be used by the movement plan to schedule the trains to alternative routes in order to reduce the metric for a given route to below the predetermined threshold.
  • FIG. 2 illustrates one embodiment of the present application. A method of scheduling the movement of trains may be accomplished by predicting the occurrence of congestion due to the planned movement of the trains over a selected route. Factors are identified 200 which contribute to the congestion. The factors may be identified through the collection and analysis of the historical performance of trains over a selected route. Once the factors are identified, a metric can be assigned to each factor 210 to account for that factors contribution to congestion. The factor may be weighted appropriately with relation to other factors, or may be linked to other factors to account for the relationship that may exist between factors. Each route can then be evaluated to determine the probability of congestion based on the planned movement of trains over the selected route. This can be accomplished by evaluating the metrics for each planned movement of a train over the selected route 220. If the cumulative metrics for a given route exceed some predetermined threshold 230, one or more of the planned movement of the trains can be rescheduled to an alternate route 240.
  • In another embodiment, if the cumulative metrics for a route exceed a predetermined threshold, a further evaluation can be done to determine the contribution of each planned train to the predicted congestion and the train contributing the most can be selected for rescheduling to an alternate route.
  • These methods of scheduling may be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers.
  • Other factors that may be considered to predict congestion include train density, type of train, the identity of the particular crew controlling a train, the type of load being carried by the train, physical constraints of the train, network topography including number of crossings, availability of sidings, zone restrictions or curfews. The weighting of the factors can be based upon historical statistics and can vary as a function of other factors. For example, the weight of the train may be a factor that is weighted more heavily in those areas where the track topography factor indicates a steep incline.
  • The combined metric for a route need not exceed a predetermined threshold to take steps to reduce the probability of congestion. The metric for a route can be compared against a metric for the same route with alternate planning to pick the planned movement over the route that results in the lowest congestion metric. Thus, a route metric evaluation can be performed for a number of different planned movements over the route to select the planned movement resulting in the lowest probability of congestion.
  • Departure times may be delayed and/or safe places can be found for trains en route along the line-of-road. Deadlocks may thus be prevented and the alternate routes may remain unblocked for use by the movement planner 120 in clearing the congestion.
  • While the delay of trains in uncongested areas may be costly, this cost may pale in comparison to the savings achieved as a result of the improvement of traffic flow through the system as a whole.
  • While preferred embodiments of the present invention have been described, it is understood that the embodiments described are illustrative only and the scope of the invention is to be defined solely by the appended claims when accorded a full range of equivalence, many variations and modifications naturally occurring to those of skill in the art from a perusal hereof.

Claims (8)

1. A method of scheduling the movement of trains, each over a selected route, by predicting the occurrence of congestion due to the planned movement of the trains over a selected route comprising:
(a) identifying factors which contribute to congestion;
(b) assigning a metric for each factor;
(c) evaluating the metrics associated with a selected route;
(d) if the evaluate metrics exceed a predetermined threshold, scheduling one or more trains scheduled for the selected route to alternate routes.
2. The method of claim 1 wherein the step of identifying includes evaluating the historical performance of train movement over a selected route.
3. The method of claim 1 wherein the factor is weighted as a function of its relative contribution to congestion.
4. The method of claim 1 wherein the step of evaluating includes cumulating the metrics for a selected route.
5. The method of claim 1 wherein the predetermined threshold is a selected as a function of the historical occurrence of congestion movement of trains over a selected route.
6. A method of scheduling the movement of trains, each over a selected route, by predicting the occurrence of congestion due to the planned movement of the trains over a selected route comprising:
(a) identifying factors which contribute to congestion;
(b) assigning a metric for each factor;
(c) evaluating the metrics associated with a first planned movement of plural trains over a selected route;
(d) evaluating the metric associated with a second planned movement over a selected route;
(e) selecting the planned movement having the lowest metric for scheduling the movement of trains over the selected route.
7. The method of claim 6 wherein the factors include at least one of train density, environmental, temporal, seasonal, and track topology.
8. The method of claim 1 where the step of scheduling one or more trains to an alternate route includes evaluating the metrics for each train planned for the selected route and selecting the train having the highest metrics for rescheduling on an alternate route.
US11/342,857 2003-02-27 2006-01-31 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics Abandoned US20060212188A1 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
US11/342,857 US20060212188A1 (en) 2003-02-27 2006-01-31 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
CA002637496A CA2637496A1 (en) 2006-01-31 2007-01-20 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
AU2007210230A AU2007210230B2 (en) 2006-01-31 2007-01-20 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
PCT/US2007/001342 WO2007089441A2 (en) 2006-01-31 2007-01-20 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
CN2007800041777A CN101484857B (en) 2006-01-31 2007-01-20 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
MX2008009578A MX2008009578A (en) 2006-01-31 2007-01-20 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics.
EP07763013A EP1987322A4 (en) 2006-01-31 2007-01-20 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
BRPI0706962-6A BRPI0706962A2 (en) 2006-01-31 2007-01-20 method and device for automatically selecting an alternate route through congested areas using congestion prediction metrics
ZA200807067A ZA200807067B (en) 2006-01-31 2008-08-15 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
US12/907,677 US8589057B2 (en) 2003-02-27 2010-10-19 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US44984903P 2003-02-27 2003-02-27
US10/785,059 US20040172175A1 (en) 2003-02-27 2004-02-25 System and method for dispatching by exception
US11/342,857 US20060212188A1 (en) 2003-02-27 2006-01-31 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/785,059 Continuation-In-Part US20040172175A1 (en) 1994-09-01 2004-02-25 System and method for dispatching by exception

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US12/907,677 Continuation US8589057B2 (en) 2003-02-27 2010-10-19 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics

Publications (1)

Publication Number Publication Date
US20060212188A1 true US20060212188A1 (en) 2006-09-21

Family

ID=38327859

Family Applications (2)

Application Number Title Priority Date Filing Date
US11/342,857 Abandoned US20060212188A1 (en) 2003-02-27 2006-01-31 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
US12/907,677 Expired - Lifetime US8589057B2 (en) 2003-02-27 2010-10-19 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics

Family Applications After (1)

Application Number Title Priority Date Filing Date
US12/907,677 Expired - Lifetime US8589057B2 (en) 2003-02-27 2010-10-19 Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics

Country Status (9)

Country Link
US (2) US20060212188A1 (en)
EP (1) EP1987322A4 (en)
CN (1) CN101484857B (en)
AU (1) AU2007210230B2 (en)
BR (1) BRPI0706962A2 (en)
CA (1) CA2637496A1 (en)
MX (1) MX2008009578A (en)
WO (1) WO2007089441A2 (en)
ZA (1) ZA200807067B (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070219681A1 (en) * 2006-03-20 2007-09-20 Ajith Kuttannair Kumar Method and apparatus for optimizing a train trip using signal information
US20080005314A1 (en) * 2006-05-30 2008-01-03 Sumeet Kaur Connection management mechanism
US20080033605A1 (en) * 2006-03-20 2008-02-07 Wolfgang Daum System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks
US20080082223A1 (en) * 2006-10-02 2008-04-03 Wolfgang Daum System and method for optimized fuel efficiency and emission output of a diesel powered system
US20100168942A1 (en) * 2008-12-29 2010-07-01 Joseph Forrest Noffsinger System And Method For Optimizing A Path For A Marine Vessel Through A Waterway
EP2402229A1 (en) 2010-06-22 2012-01-04 Universität Stuttgart Method and system for simulating, planning and/or controlling operating processes in a track guided transportation system
US8126601B2 (en) 2006-03-20 2012-02-28 General Electric Company System and method for predicting a vehicle route using a route network database
US8234023B2 (en) 2009-06-12 2012-07-31 General Electric Company System and method for regulating speed, power or position of a powered vehicle
US8249763B2 (en) 2006-03-20 2012-08-21 General Electric Company Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings
US8290645B2 (en) 2006-03-20 2012-10-16 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US8370007B2 (en) 2006-03-20 2013-02-05 General Electric Company Method and computer software code for determining when to permit a speed control system to control a powered system
US8401720B2 (en) 2006-03-20 2013-03-19 General Electric Company System, method, and computer software code for detecting a physical defect along a mission route
US8473127B2 (en) 2006-03-20 2013-06-25 General Electric Company System, method and computer software code for optimizing train operations considering rail car parameters
US8788135B2 (en) 2006-03-20 2014-07-22 General Electric Company System, method, and computer software code for providing real time optimization of a mission plan for a powered system
US8924049B2 (en) 2003-01-06 2014-12-30 General Electric Company System and method for controlling movement of vehicles
US9156477B2 (en) 2006-03-20 2015-10-13 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US9201409B2 (en) 2006-03-20 2015-12-01 General Electric Company Fuel management system and method
US9233696B2 (en) 2006-03-20 2016-01-12 General Electric Company Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear
US9527518B2 (en) 2006-03-20 2016-12-27 General Electric Company System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system
US9669851B2 (en) 2012-11-21 2017-06-06 General Electric Company Route examination system and method
US9682716B2 (en) 2012-11-21 2017-06-20 General Electric Company Route examining system and method
US9689681B2 (en) 2014-08-12 2017-06-27 General Electric Company System and method for vehicle operation
US9733625B2 (en) 2006-03-20 2017-08-15 General Electric Company Trip optimization system and method for a train
US9834237B2 (en) 2012-11-21 2017-12-05 General Electric Company Route examining system and method
CN108764579A (en) * 2018-06-01 2018-11-06 成都交大光芒科技股份有限公司 A kind of storage multi-robotic task dispatching method based on congestion control
US10308265B2 (en) 2006-03-20 2019-06-04 Ge Global Sourcing Llc Vehicle control system and method
US10569792B2 (en) 2006-03-20 2020-02-25 General Electric Company Vehicle control system and method
US20210026356A1 (en) * 2017-09-15 2021-01-28 Sony Corporation Control apparatus, control method, program, and mobile object
EP3771615A1 (en) * 2019-07-31 2021-02-03 Korea Railroad Research Institute Method and apparatus for providing dynamic train control
CN116580563A (en) * 2023-07-10 2023-08-11 中南大学 Markov chain-based regional congestion traffic source prediction method, device and equipment

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070225878A1 (en) * 2006-03-20 2007-09-27 Kumar Ajith K Trip optimization system and method for a train
US9828010B2 (en) 2006-03-20 2017-11-28 General Electric Company System, method and computer software code for determining a mission plan for a powered system using signal aspect information
DE102007047474A1 (en) * 2007-09-27 2009-04-02 Siemens Ag Timetable generation process for traffic systems with consideration of time limits
US9073562B2 (en) * 2007-10-12 2015-07-07 General Electric Company System and method for a simulation based movement planner
US20130116916A1 (en) * 2011-11-04 2013-05-09 Joel Kickbusch Transportation network scheduling system and method
US9327740B2 (en) 2014-07-31 2016-05-03 General Electric Company Method and system for communicating data with vehicles
CN106773711B (en) * 2017-01-13 2019-09-17 清华大学 A kind of the hybrid tasks scheduling method and model of railway locomotive operation steerable system
US10769946B1 (en) * 2017-04-24 2020-09-08 Ronald M Harstad Incentive-compatible, asymmetric-information, real-time traffic-routing differential-advice
JP7067937B2 (en) * 2018-01-24 2022-05-16 トヨタ自動車株式会社 Management system and control system
JP6969438B2 (en) * 2018-02-23 2021-11-24 トヨタ自動車株式会社 Shared vehicle management device
CN109229155B (en) * 2018-08-29 2019-11-05 北京交通大学 A kind of method that evading train operation deadlock state and train operation global optimization control method
CN109460036A (en) * 2018-12-18 2019-03-12 广东嘉腾机器人自动化有限公司 A kind of AGV traffic control dispatching method and storage device

Citations (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3944986A (en) * 1969-06-05 1976-03-16 Westinghouse Air Brake Company Vehicle movement control system for railroad terminals
US4361301A (en) * 1980-10-08 1982-11-30 Westinghouse Electric Corp. Vehicle train tracking apparatus and method
US4610206A (en) * 1984-04-09 1986-09-09 General Signal Corporation Micro controlled classification yard
US5332180A (en) * 1992-12-28 1994-07-26 Union Switch & Signal Inc. Traffic control system utilizing on-board vehicle information measurement apparatus
US5823481A (en) * 1996-10-07 1998-10-20 Union Switch & Signal Inc. Method of transferring control of a railway vehicle in a communication based signaling system
US6032905A (en) * 1998-08-14 2000-03-07 Union Switch & Signal, Inc. System for distributed automatic train supervision and control
US6144901A (en) * 1997-09-12 2000-11-07 New York Air Brake Corporation Method of optimizing train operation and training
US6250590B1 (en) * 1997-01-17 2001-06-26 Siemens Aktiengesellschaft Mobile train steering
US6351697B1 (en) * 1999-12-03 2002-02-26 Modular Mining Systems, Inc. Autonomous-dispatch system linked to mine development plan
US6377877B1 (en) * 2000-09-15 2002-04-23 Ge Harris Railway Electronics, Llc Method of determining railyard status using locomotive location
US6393362B1 (en) * 2000-03-07 2002-05-21 Modular Mining Systems, Inc. Dynamic safety envelope for autonomous-vehicle collision avoidance system
US6427114B1 (en) * 1998-08-07 2002-07-30 Dinbis Ab Method and means for traffic route control
US6611750B2 (en) * 2001-09-27 2003-08-26 International Business Machines Corporation Hierarchical traffic control system
US20030183729A1 (en) * 1996-09-13 2003-10-02 Root Kevin B. Integrated train control
US6637703B2 (en) * 2000-12-28 2003-10-28 Ge Harris Railway Electronics Llc Yard tracking system
US6654682B2 (en) * 2000-03-23 2003-11-25 Siemens Transportation Systems, Inc. Transit planning system
US20040034556A1 (en) * 1994-09-01 2004-02-19 Matheson William L. Scheduling system and method
US20040093196A1 (en) * 1999-09-24 2004-05-13 New York Air Brake Corporation Method of transferring files and analysis of train operational data
US6766228B2 (en) * 2001-03-09 2004-07-20 Alstom System for managing the route of a rail vehicle
US6789005B2 (en) * 2002-11-22 2004-09-07 New York Air Brake Corporation Method and apparatus of monitoring a railroad hump yard
US6799100B2 (en) * 2000-05-15 2004-09-28 Modular Mining Systems, Inc. Permission system for controlling interaction between autonomous vehicles in mining operation
US20040267415A1 (en) * 2003-06-27 2004-12-30 Alstom Method and apparatus for controlling trains, in particular a method and apparatus of the ERTMS type
US6853889B2 (en) * 2000-12-20 2005-02-08 Central Queensland University Vehicle dynamics production system and method
US20050107890A1 (en) * 2002-02-22 2005-05-19 Alstom Ferroviaria S.P.A. Method and device of generating logic control units for railroad station-based vital computer apparatuses
US20050192720A1 (en) * 2004-02-27 2005-09-01 Christie W. B. Geographic information system and method for monitoring dynamic train positions
US7006796B1 (en) * 1998-07-09 2006-02-28 Siemens Aktiengesellschaft Optimized communication system for radio-assisted traffic services
US20060074544A1 (en) * 2002-12-20 2006-04-06 Viorel Morariu Dynamic optimizing traffic planning method and system
US7219067B1 (en) * 1999-09-10 2007-05-15 Ge Harris Railway Electronics Llc Total transportation management system
US7428452B2 (en) * 2002-05-20 2008-09-23 Ausrail Technologies Pty Limited Scheduling method and system for rail networks

Family Cites Families (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3734433A (en) 1967-10-19 1973-05-22 R Metzner Automatically controlled transportation system
US3575594A (en) 1969-02-24 1971-04-20 Westinghouse Air Brake Co Automatic train dispatcher
GB1321054A (en) 1969-07-09 1973-06-20 Westinghouse Electric Corp Control of vehicle systems
CA925180A (en) 1969-07-09 1973-04-24 F. Harsch Albert Control of vehicle systems
US3839964A (en) 1969-11-04 1974-10-08 Matra Engins Installation for transportation by trains made of different types of carriages
BE795267A (en) 1972-02-10 1973-05-29 Secretary Environment Brit TRANSPORT SYSTEMS
US3794834A (en) 1972-03-22 1974-02-26 Gen Signal Corp Multi-computer vehicle control system with self-validating features
US4122523A (en) 1976-12-17 1978-10-24 General Signal Corporation Route conflict analysis system for control of railroads
US4099707A (en) 1977-02-03 1978-07-11 Allied Chemical Corporation Vehicle moving apparatus
US4361300A (en) 1980-10-08 1982-11-30 Westinghouse Electric Corp. Vehicle train routing apparatus and method
US4843575A (en) 1982-10-21 1989-06-27 Crane Harold E Interactive dynamic real-time management system
JPS5984663A (en) 1982-11-02 1984-05-16 川崎重工業株式会社 Device and method of controlling operation of train
US4669047A (en) 1984-03-20 1987-05-26 Clark Equipment Company Automated parts supply system
JPH0827811B2 (en) 1985-02-28 1996-03-21 株式会社日立製作所 Transportation planning method and system
US4791871A (en) 1986-06-20 1988-12-20 Mowll Jack U Dual-mode transportation system
US4883245A (en) 1987-07-16 1989-11-28 Erickson Jr Thomas F Transporation system and method of operation
US4937743A (en) 1987-09-10 1990-06-26 Intellimed Corporation Method and system for scheduling, monitoring and dynamically managing resources
US5222192A (en) 1988-02-17 1993-06-22 The Rowland Institute For Science, Inc. Optimization techniques using genetic algorithms
GB8810923D0 (en) 1988-05-09 1988-06-15 Westinghouse Brake & Signal Railway signalling system
JPH0719177B2 (en) 1988-09-13 1995-03-06 株式会社椿本チエイン Operation management method for mobile
CA1332975C (en) 1988-09-28 1994-11-08 Andrew Marsden Long System for energy conservation on rail vehicles
US4975865A (en) 1989-05-31 1990-12-04 Mitech Corporation Method and apparatus for real-time control
US5063506A (en) 1989-10-23 1991-11-05 International Business Machines Corp. Cost optimization system for supplying parts
JP3234925B2 (en) 1990-01-17 2001-12-04 株式会社日立製作所 Train control device
US5289563A (en) 1990-03-08 1994-02-22 Mitsubishi Denki Kabushiki Kaisha Fuzzy backward reasoning device
US5121467A (en) 1990-08-03 1992-06-09 E.I. Du Pont De Nemours & Co., Inc. Neural network/expert system process control system and method
EP0476562A3 (en) 1990-09-19 1993-02-10 Hitachi, Ltd. Method and apparatus for controlling moving body and facilities
US5229948A (en) 1990-11-03 1993-07-20 Ford Motor Company Method of optimizing a serial manufacturing system
US5265006A (en) 1990-12-14 1993-11-23 Andersen Consulting Demand scheduled partial carrier load planning system for the transportation industry
US5177684A (en) 1990-12-18 1993-01-05 The Trustees Of The University Of Pennsylvania Method for analyzing and generating optimal transportation schedules for vehicles such as trains and controlling the movement of vehicles in response thereto
US5237497B1 (en) 1991-03-22 1998-05-26 Numetrix Lab Ltd Method and system for planning and dynamically managing flow processes
US5331545A (en) 1991-07-05 1994-07-19 Hitachi, Ltd. System and method for planning support
US5365516A (en) 1991-08-16 1994-11-15 Pinpoint Communications, Inc. Communication system and method for determining the location of a transponder unit
US5311438A (en) 1992-01-31 1994-05-10 Andersen Consulting Integrated manufacturing system
GB2263993B (en) 1992-02-06 1995-03-22 Westinghouse Brake & Signal Regulating a railway vehicle
GB9202830D0 (en) 1992-02-11 1992-03-25 Westinghouse Brake & Signal A railway signalling system
JP3182888B2 (en) 1992-06-23 2001-07-03 三菱電機株式会社 Train operation management system
US5463552A (en) 1992-07-30 1995-10-31 Aeg Transportation Systems, Inc. Rules-based interlocking engine using virtual gates
US5487516A (en) 1993-03-17 1996-01-30 Hitachi, Ltd. Train control system
US5364047A (en) 1993-04-02 1994-11-15 General Railway Signal Corporation Automatic vehicle control and location system
US5420883A (en) 1993-05-17 1995-05-30 Hughes Aircraft Company Train location and control using spread spectrum radio communications
JP3213459B2 (en) 1993-10-20 2001-10-02 三洋電機株式会社 Non-aqueous electrolyte secondary battery
US5467268A (en) 1994-02-25 1995-11-14 Minnesota Mining And Manufacturing Company Method for resource assignment and scheduling
US7539624B2 (en) 1994-09-01 2009-05-26 Harris Corporation Automatic train control system and method
US5623413A (en) 1994-09-01 1997-04-22 Harris Corporation Scheduling system and method
US20040172175A1 (en) * 2003-02-27 2004-09-02 Julich Paul M. System and method for dispatching by exception
US5828979A (en) 1994-09-01 1998-10-27 Harris Corporation Automatic train control system and method
US5541848A (en) 1994-12-15 1996-07-30 Atlantic Richfield Company Genetic method of scheduling the delivery of non-uniform inventory
US5825660A (en) 1995-09-07 1998-10-20 Carnegie Mellon University Method of optimizing component layout using a hierarchical series of models
US5745735A (en) 1995-10-26 1998-04-28 International Business Machines Corporation Localized simulated annealing
US5850617A (en) 1996-12-30 1998-12-15 Lockheed Martin Corporation System and method for route planning under multiple constraints
US6115700A (en) 1997-01-31 2000-09-05 The United States Of America As Represented By The Secretary Of The Navy System and method for tracking vehicles using random search algorithms
FR2760548B1 (en) 1997-03-06 1999-04-09 Alsthom Cge Alcatel METHOD OF PLANNING REQUIREMENTS FOR A SATELLITE BY CONSTRAINED SIMULATED ANNNEALING
US6125311A (en) 1997-12-31 2000-09-26 Maryland Technology Corporation Railway operation monitoring and diagnosing systems
DE19904909C2 (en) * 1999-02-06 2003-10-30 Daimler Chrysler Ag Method and device for providing traffic information
AU7365500A (en) * 1999-09-10 2001-04-10 Ge-Harris Railways Electronics, L.L.C. Total transportation management system
US6615130B2 (en) * 2000-03-17 2003-09-02 Makor Issues And Rights Ltd. Real time vehicle guidance and traffic forecasting system
US6317686B1 (en) * 2000-07-21 2001-11-13 Bin Ran Method of providing travel time
US6459965B1 (en) 2000-11-22 2002-10-01 Ge-Harris Railway Electronics, Llc Method for advanced communication-based vehicle control
US6799097B2 (en) 2002-06-24 2004-09-28 Modular Mining Systems, Inc. Integrated railroad system

Patent Citations (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3944986A (en) * 1969-06-05 1976-03-16 Westinghouse Air Brake Company Vehicle movement control system for railroad terminals
US4361301A (en) * 1980-10-08 1982-11-30 Westinghouse Electric Corp. Vehicle train tracking apparatus and method
US4610206A (en) * 1984-04-09 1986-09-09 General Signal Corporation Micro controlled classification yard
US5332180A (en) * 1992-12-28 1994-07-26 Union Switch & Signal Inc. Traffic control system utilizing on-board vehicle information measurement apparatus
US20040034556A1 (en) * 1994-09-01 2004-02-19 Matheson William L. Scheduling system and method
US20030183729A1 (en) * 1996-09-13 2003-10-02 Root Kevin B. Integrated train control
US5823481A (en) * 1996-10-07 1998-10-20 Union Switch & Signal Inc. Method of transferring control of a railway vehicle in a communication based signaling system
US6250590B1 (en) * 1997-01-17 2001-06-26 Siemens Aktiengesellschaft Mobile train steering
US6144901A (en) * 1997-09-12 2000-11-07 New York Air Brake Corporation Method of optimizing train operation and training
US6587764B2 (en) * 1997-09-12 2003-07-01 New York Air Brake Corporation Method of optimizing train operation and training
US20030105561A1 (en) * 1997-09-12 2003-06-05 New York Air Brake Corporation Method of optimizing train operation and training
US7006796B1 (en) * 1998-07-09 2006-02-28 Siemens Aktiengesellschaft Optimized communication system for radio-assisted traffic services
US6427114B1 (en) * 1998-08-07 2002-07-30 Dinbis Ab Method and means for traffic route control
US6032905A (en) * 1998-08-14 2000-03-07 Union Switch & Signal, Inc. System for distributed automatic train supervision and control
US7219067B1 (en) * 1999-09-10 2007-05-15 Ge Harris Railway Electronics Llc Total transportation management system
US20040093196A1 (en) * 1999-09-24 2004-05-13 New York Air Brake Corporation Method of transferring files and analysis of train operational data
US6351697B1 (en) * 1999-12-03 2002-02-26 Modular Mining Systems, Inc. Autonomous-dispatch system linked to mine development plan
US6393362B1 (en) * 2000-03-07 2002-05-21 Modular Mining Systems, Inc. Dynamic safety envelope for autonomous-vehicle collision avoidance system
US6654682B2 (en) * 2000-03-23 2003-11-25 Siemens Transportation Systems, Inc. Transit planning system
US6799100B2 (en) * 2000-05-15 2004-09-28 Modular Mining Systems, Inc. Permission system for controlling interaction between autonomous vehicles in mining operation
US6377877B1 (en) * 2000-09-15 2002-04-23 Ge Harris Railway Electronics, Llc Method of determining railyard status using locomotive location
US6853889B2 (en) * 2000-12-20 2005-02-08 Central Queensland University Vehicle dynamics production system and method
US6637703B2 (en) * 2000-12-28 2003-10-28 Ge Harris Railway Electronics Llc Yard tracking system
US6766228B2 (en) * 2001-03-09 2004-07-20 Alstom System for managing the route of a rail vehicle
US6611750B2 (en) * 2001-09-27 2003-08-26 International Business Machines Corporation Hierarchical traffic control system
US20050107890A1 (en) * 2002-02-22 2005-05-19 Alstom Ferroviaria S.P.A. Method and device of generating logic control units for railroad station-based vital computer apparatuses
US7428452B2 (en) * 2002-05-20 2008-09-23 Ausrail Technologies Pty Limited Scheduling method and system for rail networks
US6789005B2 (en) * 2002-11-22 2004-09-07 New York Air Brake Corporation Method and apparatus of monitoring a railroad hump yard
US6856865B2 (en) * 2002-11-22 2005-02-15 New York Air Brake Corporation Method and apparatus of monitoring a railroad hump yard
US20060074544A1 (en) * 2002-12-20 2006-04-06 Viorel Morariu Dynamic optimizing traffic planning method and system
US7386391B2 (en) * 2002-12-20 2008-06-10 Union Switch & Signal, Inc. Dynamic optimizing traffic planning method and system
US20040267415A1 (en) * 2003-06-27 2004-12-30 Alstom Method and apparatus for controlling trains, in particular a method and apparatus of the ERTMS type
US20050192720A1 (en) * 2004-02-27 2005-09-01 Christie W. B. Geographic information system and method for monitoring dynamic train positions

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8924049B2 (en) 2003-01-06 2014-12-30 General Electric Company System and method for controlling movement of vehicles
US8290645B2 (en) 2006-03-20 2012-10-16 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US8751073B2 (en) * 2006-03-20 2014-06-10 General Electric Company Method and apparatus for optimizing a train trip using signal information
US8370006B2 (en) * 2006-03-20 2013-02-05 General Electric Company Method and apparatus for optimizing a train trip using signal information
US9233696B2 (en) 2006-03-20 2016-01-12 General Electric Company Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear
US9201409B2 (en) 2006-03-20 2015-12-01 General Electric Company Fuel management system and method
US9156477B2 (en) 2006-03-20 2015-10-13 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US10569792B2 (en) 2006-03-20 2020-02-25 General Electric Company Vehicle control system and method
US8903573B2 (en) 2006-03-20 2014-12-02 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US10308265B2 (en) 2006-03-20 2019-06-04 Ge Global Sourcing Llc Vehicle control system and method
US8126601B2 (en) 2006-03-20 2012-02-28 General Electric Company System and method for predicting a vehicle route using a route network database
US20070219681A1 (en) * 2006-03-20 2007-09-20 Ajith Kuttannair Kumar Method and apparatus for optimizing a train trip using signal information
US9733625B2 (en) 2006-03-20 2017-08-15 General Electric Company Trip optimization system and method for a train
US8249763B2 (en) 2006-03-20 2012-08-21 General Electric Company Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings
US9527518B2 (en) 2006-03-20 2016-12-27 General Electric Company System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system
US9266542B2 (en) 2006-03-20 2016-02-23 General Electric Company System and method for optimized fuel efficiency and emission output of a diesel powered system
US8788135B2 (en) 2006-03-20 2014-07-22 General Electric Company System, method, and computer software code for providing real time optimization of a mission plan for a powered system
US8370007B2 (en) 2006-03-20 2013-02-05 General Electric Company Method and computer software code for determining when to permit a speed control system to control a powered system
US8401720B2 (en) 2006-03-20 2013-03-19 General Electric Company System, method, and computer software code for detecting a physical defect along a mission route
US20130131898A1 (en) * 2006-03-20 2013-05-23 General Electric Company Method and apparatus for optimizing a train trip using signal information
US8473127B2 (en) 2006-03-20 2013-06-25 General Electric Company System, method and computer software code for optimizing train operations considering rail car parameters
US8630757B2 (en) * 2006-03-20 2014-01-14 General Electric Company System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks
US8725326B2 (en) 2006-03-20 2014-05-13 General Electric Company System and method for predicting a vehicle route using a route network database
US20080033605A1 (en) * 2006-03-20 2008-02-07 Wolfgang Daum System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks
US7826349B2 (en) * 2006-05-30 2010-11-02 Intel Corporation Connection management mechanism
US20080005314A1 (en) * 2006-05-30 2008-01-03 Sumeet Kaur Connection management mechanism
US20080082223A1 (en) * 2006-10-02 2008-04-03 Wolfgang Daum System and method for optimized fuel efficiency and emission output of a diesel powered system
JP2010512265A (en) * 2006-12-07 2010-04-22 ゼネラル・エレクトリック・カンパニイ Method and apparatus for optimizing train operation using signal information
WO2008073545A3 (en) * 2006-12-07 2008-08-07 Gen Electric Method and apparatus for optimizing a train trip using signal information
WO2008073545A2 (en) * 2006-12-07 2008-06-19 General Electric Company Method and apparatus for optimizing a train trip using signal information
AU2007294585B2 (en) * 2006-12-07 2013-01-17 General Electric Company Method and apparatus for optimizing a train trip using signal information
US8155811B2 (en) 2008-12-29 2012-04-10 General Electric Company System and method for optimizing a path for a marine vessel through a waterway
US20100168942A1 (en) * 2008-12-29 2010-07-01 Joseph Forrest Noffsinger System And Method For Optimizing A Path For A Marine Vessel Through A Waterway
US8234023B2 (en) 2009-06-12 2012-07-31 General Electric Company System and method for regulating speed, power or position of a powered vehicle
EP2402229A1 (en) 2010-06-22 2012-01-04 Universität Stuttgart Method and system for simulating, planning and/or controlling operating processes in a track guided transportation system
US9669851B2 (en) 2012-11-21 2017-06-06 General Electric Company Route examination system and method
US9682716B2 (en) 2012-11-21 2017-06-20 General Electric Company Route examining system and method
US9834237B2 (en) 2012-11-21 2017-12-05 General Electric Company Route examining system and method
US9689681B2 (en) 2014-08-12 2017-06-27 General Electric Company System and method for vehicle operation
US20210026356A1 (en) * 2017-09-15 2021-01-28 Sony Corporation Control apparatus, control method, program, and mobile object
US11500386B2 (en) * 2017-09-15 2022-11-15 Sony Corporation Control apparatus, control method, program, and mobile object
CN108764579A (en) * 2018-06-01 2018-11-06 成都交大光芒科技股份有限公司 A kind of storage multi-robotic task dispatching method based on congestion control
EP3771615A1 (en) * 2019-07-31 2021-02-03 Korea Railroad Research Institute Method and apparatus for providing dynamic train control
CN116580563A (en) * 2023-07-10 2023-08-11 中南大学 Markov chain-based regional congestion traffic source prediction method, device and equipment

Also Published As

Publication number Publication date
EP1987322A2 (en) 2008-11-05
AU2007210230A1 (en) 2007-08-09
US8589057B2 (en) 2013-11-19
CA2637496A1 (en) 2007-08-09
WO2007089441A3 (en) 2009-01-08
EP1987322A4 (en) 2011-05-25
BRPI0706962A2 (en) 2011-04-12
CN101484857A (en) 2009-07-15
ZA200807067B (en) 2009-10-28
AU2007210230B2 (en) 2012-04-26
MX2008009578A (en) 2008-11-12
CN101484857B (en) 2013-07-10
US20110035138A1 (en) 2011-02-10
WO2007089441A2 (en) 2007-08-09

Similar Documents

Publication Publication Date Title
US8589057B2 (en) Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
US7725249B2 (en) Method and apparatus for congestion management
US7734383B2 (en) Method and apparatus for planning the movement of trains using dynamic analysis
US7937193B2 (en) Method and apparatus for coordinating railway line of road and yard planners
US8082071B2 (en) System and method of multi-generation positive train control system
US20060212183A1 (en) Method and apparatus for estimating train location
US8498762B2 (en) Method of planning the movement of trains using route protection
US8433461B2 (en) Method of planning the movement of trains using pre-allocation of resources
US7797088B2 (en) Method and apparatus for planning linked train movements
US20060212187A1 (en) Scheduler and method for managing unpredictable local trains
US20060212186A1 (en) Method and apparatus for scheduling maintenance of way
US7797087B2 (en) Method and apparatus for selectively disabling train location reports
US20060212185A1 (en) Method and apparatus for automatic selection of train activity locations
US20070260497A1 (en) Method of planning train movement using a front end cost function
MX2008009580A (en) Method for congestion management in a railway system
Weather et al. The Dutch Winter Timetable
AU2004202558A1 (en) System and method of computer aided dispatching using a coordinating agent

Legal Events

Date Code Title Description
AS Assignment

Owner name: GENERAL ELECTRIC COMPANY, NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KICKBUSCH, JOEL;PHILP, JOSEPH WESLEY;WILLS, MITCHELL SCOTT;REEL/FRAME:017922/0174;SIGNING DATES FROM 20060501 TO 20060503

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION