US20060212188A1 - Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics - Google Patents
Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics Download PDFInfo
- Publication number
- US20060212188A1 US20060212188A1 US11/342,857 US34285706A US2006212188A1 US 20060212188 A1 US20060212188 A1 US 20060212188A1 US 34285706 A US34285706 A US 34285706A US 2006212188 A1 US2006212188 A1 US 2006212188A1
- Authority
- US
- United States
- Prior art keywords
- movement
- trains
- congestion
- selected route
- over
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- 230000033001 locomotion Effects 0.000 claims abstract description 52
- 230000007613 environmental effect Effects 0.000 claims description 2
- 230000001932 seasonal effect Effects 0.000 claims description 2
- 230000002123 temporal effect Effects 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 description 7
- 230000003137 locomotive effect Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000012876 topography Methods 0.000 description 4
- 230000001186 cumulative effect Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000005206 flow analysis Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Definitions
- railroads consist of three primary components (1) a rail infrastructure, including track, switches, a communications system and a control system; (2) rolling stock, including locomotives and cars; and, (3) personnel (or crew) that operate and maintain the railway.
- a rail infrastructure including track, switches, a communications system and a control system
- rolling stock including locomotives and cars
- personnel (or crew) that operate and maintain the railway.
- each of these components are employed by the use of a high level schedule which assigns people, locomotives, and cars to the various sections of track and allows them to move over that track in a manner that avoids collisions and permits the railway system to deliver goods to various destinations.
- a precision control system includes the use of an optimizing scheduler that will schedule all aspects of the rail system, taking into account the laws of physics, the policies of the railroad, the work rules of the personnel, the actual contractual terms of the contracts to the various customers and any boundary conditions or constraints which govern the possible solution or schedule such as passenger traffic, hours of operation of some of the facilities, track maintenance, work rules, etc.
- the combination of boundary conditions together with a figure of merit for each activity will result in a schedule which maximizes some figure of merit such as overall system cost.
- the planning system is hierarchical in nature in which the problem is abstracted to a relatively high level for the initial optimization process, and then the resulting course solution is mapped to a less abstract lower level for further optimization.
- Statistical processing is used at all levels to minimize the total computational load, making the overall process computationally feasible to implement.
- An expert system is used as a manager over these processes, and the expert system is also the tool by which various boundary conditions and constraints for the solution set are established. The use of an expert system in this capacity permits the user to supply the rules to be placed in the solution process.
- a dispatcher's view of the controlled railroad territory can be considered myopic. Dispatchers view and processes information only within their own control territories and have little or no insight into the operation of adjoining territories, or the railroad network as a whole.
- Current dispatch systems simply implement controls as a result of the individual dispatcher's decisions on small portions of the railroad network and the dispatchers are expected to resolve conflicts between movements of objects on the track (e.g. trains, maintenance vehicles, survey vehicles, etc.) and the available track resource limitations (e.g. limited number of tracks, tracks out of service, consideration of safety of maintenance crews near active tracks) as they occur, with little advanced insight or warning.
- Congestion inevitably occurs in the routing of trains and often occurs in the same areas. Congestion is a significant problem.
- the routing of trains into a congested area tends to exacerbate the congestion and may result in deadlock.
- the delay in the movement of trains is subject to cost constraints including contract penalties, the tendency of dispatchers is to continue to push trains through an area as rapidly as possible, advancing their movement along the line of road whenever possible, and treating the resulting congestion as a track availability problem to be solved through the assignment of track resources to create alternative routes through the congested area.
- the movement planners used by dispatchers in adjacent territories are often completely independent of each other and uninformed as to the status of the tracks in adjacent territories. As a result, dispatchers in uncongested areas may continue to send trains into a congested area in the adjacent territory.
- the present invention relates to the anticipation and avoidance of congestion to maximize the throughput of trains in the overall system at the expense of the movement of trains over smaller sections of track.
- Congestion generally is the after-the-fact result of acts set in motion by dispatchers assisted by train movement planners, i.e., by acts taken long prior to the development of actual congestion. By the time that congestion is actually detected, other trains are enroute through the congested area and in may cases have passed the point in the system where an alternative route may have been selected.
- FIG. 1 is a simplified pictorial representation of one embodiment of the present invention for use with a rail network divided into control areas.
- FIG. 2 is a simplified flow diagram for one embodiment of a scheduling method that predicts the occurrence of congestion over a selected route.
- the global rail network 105 can be divided into one or more control areas 100 ( 100 A- 100 C), each of which has a dispatcher 110 ( 110 A- 110 C) assigned to manage the movement of trains ( 102 ) through his respective control area 100 .
- a centralized movement planner 120 provides a network based movement plan for the global rail network 105 based on input received from the railroad information support center 130 .
- the railroad information support center 130 provides information related to the track resources and other information suitable to plan the use of the resources.
- Centralized movement planner 120 generates a movement plan for the resources in the track network 105 and provides the plan to the automated dispatcher 140 . Movement planner 120 may also received updates on the execution of the movement plan from automated dispatcher 140 and can update the current movement plan.
- Automated dispatcher 140 provides each of the dispatchers 110 with the movement plan to manage the train resources in their respective control areas 110 .
- the automated dispatcher 140 can be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers.
- the automated dispatcher 140 communicates with trains 102 on the network of track via a suitable communication link 150 , such as a cellular telephone, satellite or wayside signaling.
- the dispatcher issues and approves the issuance of movement authorities and track restrictions, schedule maintenance of way activities and communicates with train crews, yard managers and other railroad personnel consistent with an optimized operating plan for the railroad. While the dispatcher will rely on the movement planner to solve the complex problem of optimizing movement of trains, the dispatcher will be actively involved in entering the necessary data required to maintain an optimized plan and identify exceptions to the plan.
- enhanced planning is facilitated by automatically supplying the movement planner 120 with information from the railroad information support center 130 which associates train consist events (e.g., pickups, crew changes, engine destinations) with planned train activities that occupy track resources for the duration of a dwell time, so that maintenance of the traditional train sheet data (via electronic messaging and user data entry) is automatically reflected in the train trip specifications for use for movement planning.
- train consist events e.g., pickups, crew changes, engine destinations
- the present application also is directed to the identification of areas that are prone to congestion and to take action sufficiently in advance of the predicted congestion to minimize or obviate avoid the congestion all together.
- the maintenance of a historical data base of events that have resulted in congestion may be used in anticipating congestion.
- analysis of a historical database may identify factors which are associated with congestion. Such factors may be temporal, e.g., between 3:00 and 5:00 p.m. or seasonal, e.g., during winter months, in nature.
- the factors may include environmental conditions, track topography, type of train, identification of crew, or other factors which may affect the likelihood of congestion.
- Each factor may be assigned a metric as a function of its contribution to the occurrence of congestion.
- the factors may also be weighted depending on the contribution of the factor. Through statistical analysis, it may be determined for a particular route, that the planned usage of the route by its scheduled trains may cause the cumulative metric for the route to exceed a predetermined threshold indicating the likely occurrence of congestion. The congestion metrics may be used by the movement plan to schedule the trains to alternative routes in order to reduce the metric for a given route to below the predetermined threshold.
- FIG. 2 illustrates one embodiment of the present application.
- a method of scheduling the movement of trains may be accomplished by predicting the occurrence of congestion due to the planned movement of the trains over a selected route.
- Factors are identified 200 which contribute to the congestion. The factors may be identified through the collection and analysis of the historical performance of trains over a selected route. Once the factors are identified, a metric can be assigned to each factor 210 to account for that factors contribution to congestion. The factor may be weighted appropriately with relation to other factors, or may be linked to other factors to account for the relationship that may exist between factors.
- Each route can then be evaluated to determine the probability of congestion based on the planned movement of trains over the selected route. This can be accomplished by evaluating the metrics for each planned movement of a train over the selected route 220 . If the cumulative metrics for a given route exceed some predetermined threshold 230 , one or more of the planned movement of the trains can be rescheduled to an alternate route 240 .
- a further evaluation can be done to determine the contribution of each planned train to the predicted congestion and the train contributing the most can be selected for rescheduling to an alternate route.
- Other factors that may be considered to predict congestion include train density, type of train, the identity of the particular crew controlling a train, the type of load being carried by the train, physical constraints of the train, network topography including number of crossings, availability of sidings, zone restrictions or curfews.
- the weighting of the factors can be based upon historical statistics and can vary as a function of other factors. For example, the weight of the train may be a factor that is weighted more heavily in those areas where the track topography factor indicates a steep incline.
- the combined metric for a route need not exceed a predetermined threshold to take steps to reduce the probability of congestion.
- the metric for a route can be compared against a metric for the same route with alternate planning to pick the planned movement over the route that results in the lowest congestion metric.
- a route metric evaluation can be performed for a number of different planned movements over the route to select the planned movement resulting in the lowest probability of congestion.
- Departure times may be delayed and/or safe places can be found for trains en route along the line-of-road. Deadlocks may thus be prevented and the alternate routes may remain unblocked for use by the movement planner 120 in clearing the congestion.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Mechanical Engineering (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Alternative routes through congested areas are automatically selected using congestion prediction metrics.
Description
- This application is a continuation in part of application Ser. No. 10/785,059 filed Feb. 25, 2004, claiming the benefit of U.S. Provisional Application 60/449,849 filed on Feb. 27, 2003.
- This application is also one of the below listed applications being concurrently filed:
- GEH01 00166 application Ser. No. ______ entitled “Scheduler and Method for Managing Unpredictable Local Trains”;
- GEH01 00167 application Ser. No. ______ entitled “Method And Apparatus For Optimizing Maintenance Of Right Of Way”;
- GEH01 00168 application Ser. No. ______ entitled “Method and Apparatus for Coordinating Railway Line-Of-Road and Yard Planners”;
- GEH01 00169 application Ser. No. ______ entitled “Method and Apparatus for Selectively Disabling Train Location Reports”;
- GEH01 00170 application Ser. No. ______ entitled “Method And Apparatus For Automatic Selection Of Train Activity Locations”;
- GEH01 00171 application Ser. No. ______ entitled “Method And Apparatus For Congestion Management”;
- GEH01 00173 application Ser. No. ______ entitled “Method and Apparatus for Estimating Train Location”.
- The disclosure of each of the above referenced applications including those concurrently filed herewith is hereby incorporated herein by reference.
- The present invention relates to the scheduling of movement of plural units through a complex movement defining system, and in the embodiment disclosed, to the scheduling of the movement of freight trains over a railroad system, and specifically to the alternating routing of trains through congested areas.
- Systems and methods for scheduling the movement of trains over a rail network have been described in U.S. Pat. Nos. 6,154,735, 5,794,172, and 5,623,413, the disclosure of which is hereby incorporated by reference.
- As disclosed in the referenced patents and applications, the complete disclosure of which is hereby incorporated herein by reference, railroads consist of three primary components (1) a rail infrastructure, including track, switches, a communications system and a control system; (2) rolling stock, including locomotives and cars; and, (3) personnel (or crew) that operate and maintain the railway. Generally, each of these components are employed by the use of a high level schedule which assigns people, locomotives, and cars to the various sections of track and allows them to move over that track in a manner that avoids collisions and permits the railway system to deliver goods to various destinations.
- As disclosed in the referenced applications, a precision control system includes the use of an optimizing scheduler that will schedule all aspects of the rail system, taking into account the laws of physics, the policies of the railroad, the work rules of the personnel, the actual contractual terms of the contracts to the various customers and any boundary conditions or constraints which govern the possible solution or schedule such as passenger traffic, hours of operation of some of the facilities, track maintenance, work rules, etc. The combination of boundary conditions together with a figure of merit for each activity will result in a schedule which maximizes some figure of merit such as overall system cost.
- As disclosed in the referenced applications, and upon determining a schedule, a movement plan may be created using the very fine grain structure necessary to actually control the movement of the train. Such fine grain structure may include assignment of personnel by name as well as the assignment of specific locomotives by number, and may include the determination of the precise time or distance over time for the movement of the trains across the rail network and all the details of train handling, power levels, curves, grades, track topography, wind and weather conditions. This movement plan may be used to guide the manual dispatching of trains and controlling of track forces, or provided to the locomotives so that it can be implemented by the engineer or automatically by switchable actuation on the locomotive.
- The planning system is hierarchical in nature in which the problem is abstracted to a relatively high level for the initial optimization process, and then the resulting course solution is mapped to a less abstract lower level for further optimization. Statistical processing is used at all levels to minimize the total computational load, making the overall process computationally feasible to implement. An expert system is used as a manager over these processes, and the expert system is also the tool by which various boundary conditions and constraints for the solution set are established. The use of an expert system in this capacity permits the user to supply the rules to be placed in the solution process.
- Currently, a dispatcher's view of the controlled railroad territory can be considered myopic. Dispatchers view and processes information only within their own control territories and have little or no insight into the operation of adjoining territories, or the railroad network as a whole. Current dispatch systems simply implement controls as a result of the individual dispatcher's decisions on small portions of the railroad network and the dispatchers are expected to resolve conflicts between movements of objects on the track (e.g. trains, maintenance vehicles, survey vehicles, etc.) and the available track resource limitations (e.g. limited number of tracks, tracks out of service, consideration of safety of maintenance crews near active tracks) as they occur, with little advanced insight or warning.
- Congestion inevitably occurs in the routing of trains and often occurs in the same areas. Congestion is a significant problem. The routing of trains into a congested area tends to exacerbate the congestion and may result in deadlock. Because the delay in the movement of trains is subject to cost constraints including contract penalties, the tendency of dispatchers is to continue to push trains through an area as rapidly as possible, advancing their movement along the line of road whenever possible, and treating the resulting congestion as a track availability problem to be solved through the assignment of track resources to create alternative routes through the congested area. The movement planners used by dispatchers in adjacent territories are often completely independent of each other and uninformed as to the status of the tracks in adjacent territories. As a result, dispatchers in uncongested areas may continue to send trains into a congested area in the adjacent territory.
- The present invention relates to the anticipation and avoidance of congestion to maximize the throughput of trains in the overall system at the expense of the movement of trains over smaller sections of track.
- Congestion generally is the after-the-fact result of acts set in motion by dispatchers assisted by train movement planners, i.e., by acts taken long prior to the development of actual congestion. By the time that congestion is actually detected, other trains are enroute through the congested area and in may cases have passed the point in the system where an alternative route may have been selected.
- Typically, the routing of trains through areas of expected congestion is handled by dispatchers utilizing tribal knowledge, i.e., knowledge gained through the dispatcher's personal experience and the experience of other dispatchers passed to him.
- It is accordingly an object of the present invention to reduce congestion and avoid deadlock by the management of the entry of trains into a congested area.
- These and many other objects and advantages of the present invention will be readily apparent to one skilled in the art to which the invention pertains from a perusal of the claims, the appended drawings, and the following detailed description of the preferred embodiments.
-
FIG. 1 is a simplified pictorial representation of one embodiment of the present invention for use with a rail network divided into control areas. -
FIG. 2 is a simplified flow diagram for one embodiment of a scheduling method that predicts the occurrence of congestion over a selected route. - As illustrated in
FIG. 1 , theglobal rail network 105 can be divided into one or more control areas 100 (100A-100C), each of which has a dispatcher 110 (110A-110C) assigned to manage the movement of trains (102) through hisrespective control area 100. Acentralized movement planner 120 provides a network based movement plan for theglobal rail network 105 based on input received from the railroadinformation support center 130. The railroadinformation support center 130 provides information related to the track resources and other information suitable to plan the use of the resources.Centralized movement planner 120 generates a movement plan for the resources in thetrack network 105 and provides the plan to theautomated dispatcher 140.Movement planner 120 may also received updates on the execution of the movement plan fromautomated dispatcher 140 and can update the current movement plan.Automated dispatcher 140 provides each of the dispatchers 110 with the movement plan to manage the train resources in their respective control areas 110. - As described in the referenced applications, the
automated dispatcher 140 can be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers. Theautomated dispatcher 140 communicates withtrains 102 on the network of track via asuitable communication link 150, such as a cellular telephone, satellite or wayside signaling. - The dispatcher issues and approves the issuance of movement authorities and track restrictions, schedule maintenance of way activities and communicates with train crews, yard managers and other railroad personnel consistent with an optimized operating plan for the railroad. While the dispatcher will rely on the movement planner to solve the complex problem of optimizing movement of trains, the dispatcher will be actively involved in entering the necessary data required to maintain an optimized plan and identify exceptions to the plan.
- As disclosed in the referenced applications, enhanced planning is facilitated by automatically supplying the
movement planner 120 with information from the railroadinformation support center 130 which associates train consist events (e.g., pickups, crew changes, engine destinations) with planned train activities that occupy track resources for the duration of a dwell time, so that maintenance of the traditional train sheet data (via electronic messaging and user data entry) is automatically reflected in the train trip specifications for use for movement planning. - From this information, and with the aid of suitable conventional traffic flow analysis algorithms desirably embedded in the
movement planner 120, congestion in a particular geographic area can be identified and the dispatchers in other areas advised of the existence of the congestion and decline to push trains into the congested area. Thus, traffic flow analysis algorithms can detect and may also be used to predict the further occurrence of congestion. - The present application also is directed to the identification of areas that are prone to congestion and to take action sufficiently in advance of the predicted congestion to minimize or obviate avoid the congestion all together. In one embodiment, the maintenance of a historical data base of events that have resulted in congestion may be used in anticipating congestion. For example, analysis of a historical database may identify factors which are associated with congestion. Such factors may be temporal, e.g., between 3:00 and 5:00 p.m. or seasonal, e.g., during winter months, in nature. The factors may include environmental conditions, track topography, type of train, identification of crew, or other factors which may affect the likelihood of congestion. Each factor may be assigned a metric as a function of its contribution to the occurrence of congestion. The factors may also be weighted depending on the contribution of the factor. Through statistical analysis, it may be determined for a particular route, that the planned usage of the route by its scheduled trains may cause the cumulative metric for the route to exceed a predetermined threshold indicating the likely occurrence of congestion. The congestion metrics may be used by the movement plan to schedule the trains to alternative routes in order to reduce the metric for a given route to below the predetermined threshold.
-
FIG. 2 illustrates one embodiment of the present application. A method of scheduling the movement of trains may be accomplished by predicting the occurrence of congestion due to the planned movement of the trains over a selected route. Factors are identified 200 which contribute to the congestion. The factors may be identified through the collection and analysis of the historical performance of trains over a selected route. Once the factors are identified, a metric can be assigned to eachfactor 210 to account for that factors contribution to congestion. The factor may be weighted appropriately with relation to other factors, or may be linked to other factors to account for the relationship that may exist between factors. Each route can then be evaluated to determine the probability of congestion based on the planned movement of trains over the selected route. This can be accomplished by evaluating the metrics for each planned movement of a train over the selectedroute 220. If the cumulative metrics for a given route exceed somepredetermined threshold 230, one or more of the planned movement of the trains can be rescheduled to analternate route 240. - In another embodiment, if the cumulative metrics for a route exceed a predetermined threshold, a further evaluation can be done to determine the contribution of each planned train to the predicted congestion and the train contributing the most can be selected for rescheduling to an alternate route.
- These methods of scheduling may be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers.
- Other factors that may be considered to predict congestion include train density, type of train, the identity of the particular crew controlling a train, the type of load being carried by the train, physical constraints of the train, network topography including number of crossings, availability of sidings, zone restrictions or curfews. The weighting of the factors can be based upon historical statistics and can vary as a function of other factors. For example, the weight of the train may be a factor that is weighted more heavily in those areas where the track topography factor indicates a steep incline.
- The combined metric for a route need not exceed a predetermined threshold to take steps to reduce the probability of congestion. The metric for a route can be compared against a metric for the same route with alternate planning to pick the planned movement over the route that results in the lowest congestion metric. Thus, a route metric evaluation can be performed for a number of different planned movements over the route to select the planned movement resulting in the lowest probability of congestion.
- Departure times may be delayed and/or safe places can be found for trains en route along the line-of-road. Deadlocks may thus be prevented and the alternate routes may remain unblocked for use by the
movement planner 120 in clearing the congestion. - While the delay of trains in uncongested areas may be costly, this cost may pale in comparison to the savings achieved as a result of the improvement of traffic flow through the system as a whole.
- While preferred embodiments of the present invention have been described, it is understood that the embodiments described are illustrative only and the scope of the invention is to be defined solely by the appended claims when accorded a full range of equivalence, many variations and modifications naturally occurring to those of skill in the art from a perusal hereof.
Claims (8)
1. A method of scheduling the movement of trains, each over a selected route, by predicting the occurrence of congestion due to the planned movement of the trains over a selected route comprising:
(a) identifying factors which contribute to congestion;
(b) assigning a metric for each factor;
(c) evaluating the metrics associated with a selected route;
(d) if the evaluate metrics exceed a predetermined threshold, scheduling one or more trains scheduled for the selected route to alternate routes.
2. The method of claim 1 wherein the step of identifying includes evaluating the historical performance of train movement over a selected route.
3. The method of claim 1 wherein the factor is weighted as a function of its relative contribution to congestion.
4. The method of claim 1 wherein the step of evaluating includes cumulating the metrics for a selected route.
5. The method of claim 1 wherein the predetermined threshold is a selected as a function of the historical occurrence of congestion movement of trains over a selected route.
6. A method of scheduling the movement of trains, each over a selected route, by predicting the occurrence of congestion due to the planned movement of the trains over a selected route comprising:
(a) identifying factors which contribute to congestion;
(b) assigning a metric for each factor;
(c) evaluating the metrics associated with a first planned movement of plural trains over a selected route;
(d) evaluating the metric associated with a second planned movement over a selected route;
(e) selecting the planned movement having the lowest metric for scheduling the movement of trains over the selected route.
7. The method of claim 6 wherein the factors include at least one of train density, environmental, temporal, seasonal, and track topology.
8. The method of claim 1 where the step of scheduling one or more trains to an alternate route includes evaluating the metrics for each train planned for the selected route and selecting the train having the highest metrics for rescheduling on an alternate route.
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/342,857 US20060212188A1 (en) | 2003-02-27 | 2006-01-31 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
CA002637496A CA2637496A1 (en) | 2006-01-31 | 2007-01-20 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
AU2007210230A AU2007210230B2 (en) | 2006-01-31 | 2007-01-20 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
PCT/US2007/001342 WO2007089441A2 (en) | 2006-01-31 | 2007-01-20 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
CN2007800041777A CN101484857B (en) | 2006-01-31 | 2007-01-20 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
MX2008009578A MX2008009578A (en) | 2006-01-31 | 2007-01-20 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics. |
EP07763013A EP1987322A4 (en) | 2006-01-31 | 2007-01-20 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
BRPI0706962-6A BRPI0706962A2 (en) | 2006-01-31 | 2007-01-20 | method and device for automatically selecting an alternate route through congested areas using congestion prediction metrics |
ZA200807067A ZA200807067B (en) | 2006-01-31 | 2008-08-15 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
US12/907,677 US8589057B2 (en) | 2003-02-27 | 2010-10-19 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US44984903P | 2003-02-27 | 2003-02-27 | |
US10/785,059 US20040172175A1 (en) | 2003-02-27 | 2004-02-25 | System and method for dispatching by exception |
US11/342,857 US20060212188A1 (en) | 2003-02-27 | 2006-01-31 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/785,059 Continuation-In-Part US20040172175A1 (en) | 1994-09-01 | 2004-02-25 | System and method for dispatching by exception |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/907,677 Continuation US8589057B2 (en) | 2003-02-27 | 2010-10-19 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
Publications (1)
Publication Number | Publication Date |
---|---|
US20060212188A1 true US20060212188A1 (en) | 2006-09-21 |
Family
ID=38327859
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/342,857 Abandoned US20060212188A1 (en) | 2003-02-27 | 2006-01-31 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
US12/907,677 Expired - Lifetime US8589057B2 (en) | 2003-02-27 | 2010-10-19 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/907,677 Expired - Lifetime US8589057B2 (en) | 2003-02-27 | 2010-10-19 | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
Country Status (9)
Country | Link |
---|---|
US (2) | US20060212188A1 (en) |
EP (1) | EP1987322A4 (en) |
CN (1) | CN101484857B (en) |
AU (1) | AU2007210230B2 (en) |
BR (1) | BRPI0706962A2 (en) |
CA (1) | CA2637496A1 (en) |
MX (1) | MX2008009578A (en) |
WO (1) | WO2007089441A2 (en) |
ZA (1) | ZA200807067B (en) |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070219681A1 (en) * | 2006-03-20 | 2007-09-20 | Ajith Kuttannair Kumar | Method and apparatus for optimizing a train trip using signal information |
US20080005314A1 (en) * | 2006-05-30 | 2008-01-03 | Sumeet Kaur | Connection management mechanism |
US20080033605A1 (en) * | 2006-03-20 | 2008-02-07 | Wolfgang Daum | System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks |
US20080082223A1 (en) * | 2006-10-02 | 2008-04-03 | Wolfgang Daum | System and method for optimized fuel efficiency and emission output of a diesel powered system |
US20100168942A1 (en) * | 2008-12-29 | 2010-07-01 | Joseph Forrest Noffsinger | System And Method For Optimizing A Path For A Marine Vessel Through A Waterway |
EP2402229A1 (en) | 2010-06-22 | 2012-01-04 | Universität Stuttgart | Method and system for simulating, planning and/or controlling operating processes in a track guided transportation system |
US8126601B2 (en) | 2006-03-20 | 2012-02-28 | General Electric Company | System and method for predicting a vehicle route using a route network database |
US8234023B2 (en) | 2009-06-12 | 2012-07-31 | General Electric Company | System and method for regulating speed, power or position of a powered vehicle |
US8249763B2 (en) | 2006-03-20 | 2012-08-21 | General Electric Company | Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings |
US8290645B2 (en) | 2006-03-20 | 2012-10-16 | General Electric Company | Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable |
US8370007B2 (en) | 2006-03-20 | 2013-02-05 | General Electric Company | Method and computer software code for determining when to permit a speed control system to control a powered system |
US8401720B2 (en) | 2006-03-20 | 2013-03-19 | General Electric Company | System, method, and computer software code for detecting a physical defect along a mission route |
US8473127B2 (en) | 2006-03-20 | 2013-06-25 | General Electric Company | System, method and computer software code for optimizing train operations considering rail car parameters |
US8788135B2 (en) | 2006-03-20 | 2014-07-22 | General Electric Company | System, method, and computer software code for providing real time optimization of a mission plan for a powered system |
US8924049B2 (en) | 2003-01-06 | 2014-12-30 | General Electric Company | System and method for controlling movement of vehicles |
US9156477B2 (en) | 2006-03-20 | 2015-10-13 | General Electric Company | Control system and method for remotely isolating powered units in a vehicle system |
US9201409B2 (en) | 2006-03-20 | 2015-12-01 | General Electric Company | Fuel management system and method |
US9233696B2 (en) | 2006-03-20 | 2016-01-12 | General Electric Company | Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear |
US9527518B2 (en) | 2006-03-20 | 2016-12-27 | General Electric Company | System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system |
US9669851B2 (en) | 2012-11-21 | 2017-06-06 | General Electric Company | Route examination system and method |
US9682716B2 (en) | 2012-11-21 | 2017-06-20 | General Electric Company | Route examining system and method |
US9689681B2 (en) | 2014-08-12 | 2017-06-27 | General Electric Company | System and method for vehicle operation |
US9733625B2 (en) | 2006-03-20 | 2017-08-15 | General Electric Company | Trip optimization system and method for a train |
US9834237B2 (en) | 2012-11-21 | 2017-12-05 | General Electric Company | Route examining system and method |
CN108764579A (en) * | 2018-06-01 | 2018-11-06 | 成都交大光芒科技股份有限公司 | A kind of storage multi-robotic task dispatching method based on congestion control |
US10308265B2 (en) | 2006-03-20 | 2019-06-04 | Ge Global Sourcing Llc | Vehicle control system and method |
US10569792B2 (en) | 2006-03-20 | 2020-02-25 | General Electric Company | Vehicle control system and method |
US20210026356A1 (en) * | 2017-09-15 | 2021-01-28 | Sony Corporation | Control apparatus, control method, program, and mobile object |
EP3771615A1 (en) * | 2019-07-31 | 2021-02-03 | Korea Railroad Research Institute | Method and apparatus for providing dynamic train control |
CN116580563A (en) * | 2023-07-10 | 2023-08-11 | 中南大学 | Markov chain-based regional congestion traffic source prediction method, device and equipment |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070225878A1 (en) * | 2006-03-20 | 2007-09-27 | Kumar Ajith K | Trip optimization system and method for a train |
US9828010B2 (en) | 2006-03-20 | 2017-11-28 | General Electric Company | System, method and computer software code for determining a mission plan for a powered system using signal aspect information |
DE102007047474A1 (en) * | 2007-09-27 | 2009-04-02 | Siemens Ag | Timetable generation process for traffic systems with consideration of time limits |
US9073562B2 (en) * | 2007-10-12 | 2015-07-07 | General Electric Company | System and method for a simulation based movement planner |
US20130116916A1 (en) * | 2011-11-04 | 2013-05-09 | Joel Kickbusch | Transportation network scheduling system and method |
US9327740B2 (en) | 2014-07-31 | 2016-05-03 | General Electric Company | Method and system for communicating data with vehicles |
CN106773711B (en) * | 2017-01-13 | 2019-09-17 | 清华大学 | A kind of the hybrid tasks scheduling method and model of railway locomotive operation steerable system |
US10769946B1 (en) * | 2017-04-24 | 2020-09-08 | Ronald M Harstad | Incentive-compatible, asymmetric-information, real-time traffic-routing differential-advice |
JP7067937B2 (en) * | 2018-01-24 | 2022-05-16 | トヨタ自動車株式会社 | Management system and control system |
JP6969438B2 (en) * | 2018-02-23 | 2021-11-24 | トヨタ自動車株式会社 | Shared vehicle management device |
CN109229155B (en) * | 2018-08-29 | 2019-11-05 | 北京交通大学 | A kind of method that evading train operation deadlock state and train operation global optimization control method |
CN109460036A (en) * | 2018-12-18 | 2019-03-12 | 广东嘉腾机器人自动化有限公司 | A kind of AGV traffic control dispatching method and storage device |
Citations (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3944986A (en) * | 1969-06-05 | 1976-03-16 | Westinghouse Air Brake Company | Vehicle movement control system for railroad terminals |
US4361301A (en) * | 1980-10-08 | 1982-11-30 | Westinghouse Electric Corp. | Vehicle train tracking apparatus and method |
US4610206A (en) * | 1984-04-09 | 1986-09-09 | General Signal Corporation | Micro controlled classification yard |
US5332180A (en) * | 1992-12-28 | 1994-07-26 | Union Switch & Signal Inc. | Traffic control system utilizing on-board vehicle information measurement apparatus |
US5823481A (en) * | 1996-10-07 | 1998-10-20 | Union Switch & Signal Inc. | Method of transferring control of a railway vehicle in a communication based signaling system |
US6032905A (en) * | 1998-08-14 | 2000-03-07 | Union Switch & Signal, Inc. | System for distributed automatic train supervision and control |
US6144901A (en) * | 1997-09-12 | 2000-11-07 | New York Air Brake Corporation | Method of optimizing train operation and training |
US6250590B1 (en) * | 1997-01-17 | 2001-06-26 | Siemens Aktiengesellschaft | Mobile train steering |
US6351697B1 (en) * | 1999-12-03 | 2002-02-26 | Modular Mining Systems, Inc. | Autonomous-dispatch system linked to mine development plan |
US6377877B1 (en) * | 2000-09-15 | 2002-04-23 | Ge Harris Railway Electronics, Llc | Method of determining railyard status using locomotive location |
US6393362B1 (en) * | 2000-03-07 | 2002-05-21 | Modular Mining Systems, Inc. | Dynamic safety envelope for autonomous-vehicle collision avoidance system |
US6427114B1 (en) * | 1998-08-07 | 2002-07-30 | Dinbis Ab | Method and means for traffic route control |
US6611750B2 (en) * | 2001-09-27 | 2003-08-26 | International Business Machines Corporation | Hierarchical traffic control system |
US20030183729A1 (en) * | 1996-09-13 | 2003-10-02 | Root Kevin B. | Integrated train control |
US6637703B2 (en) * | 2000-12-28 | 2003-10-28 | Ge Harris Railway Electronics Llc | Yard tracking system |
US6654682B2 (en) * | 2000-03-23 | 2003-11-25 | Siemens Transportation Systems, Inc. | Transit planning system |
US20040034556A1 (en) * | 1994-09-01 | 2004-02-19 | Matheson William L. | Scheduling system and method |
US20040093196A1 (en) * | 1999-09-24 | 2004-05-13 | New York Air Brake Corporation | Method of transferring files and analysis of train operational data |
US6766228B2 (en) * | 2001-03-09 | 2004-07-20 | Alstom | System for managing the route of a rail vehicle |
US6789005B2 (en) * | 2002-11-22 | 2004-09-07 | New York Air Brake Corporation | Method and apparatus of monitoring a railroad hump yard |
US6799100B2 (en) * | 2000-05-15 | 2004-09-28 | Modular Mining Systems, Inc. | Permission system for controlling interaction between autonomous vehicles in mining operation |
US20040267415A1 (en) * | 2003-06-27 | 2004-12-30 | Alstom | Method and apparatus for controlling trains, in particular a method and apparatus of the ERTMS type |
US6853889B2 (en) * | 2000-12-20 | 2005-02-08 | Central Queensland University | Vehicle dynamics production system and method |
US20050107890A1 (en) * | 2002-02-22 | 2005-05-19 | Alstom Ferroviaria S.P.A. | Method and device of generating logic control units for railroad station-based vital computer apparatuses |
US20050192720A1 (en) * | 2004-02-27 | 2005-09-01 | Christie W. B. | Geographic information system and method for monitoring dynamic train positions |
US7006796B1 (en) * | 1998-07-09 | 2006-02-28 | Siemens Aktiengesellschaft | Optimized communication system for radio-assisted traffic services |
US20060074544A1 (en) * | 2002-12-20 | 2006-04-06 | Viorel Morariu | Dynamic optimizing traffic planning method and system |
US7219067B1 (en) * | 1999-09-10 | 2007-05-15 | Ge Harris Railway Electronics Llc | Total transportation management system |
US7428452B2 (en) * | 2002-05-20 | 2008-09-23 | Ausrail Technologies Pty Limited | Scheduling method and system for rail networks |
Family Cites Families (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3734433A (en) | 1967-10-19 | 1973-05-22 | R Metzner | Automatically controlled transportation system |
US3575594A (en) | 1969-02-24 | 1971-04-20 | Westinghouse Air Brake Co | Automatic train dispatcher |
GB1321054A (en) | 1969-07-09 | 1973-06-20 | Westinghouse Electric Corp | Control of vehicle systems |
CA925180A (en) | 1969-07-09 | 1973-04-24 | F. Harsch Albert | Control of vehicle systems |
US3839964A (en) | 1969-11-04 | 1974-10-08 | Matra Engins | Installation for transportation by trains made of different types of carriages |
BE795267A (en) | 1972-02-10 | 1973-05-29 | Secretary Environment Brit | TRANSPORT SYSTEMS |
US3794834A (en) | 1972-03-22 | 1974-02-26 | Gen Signal Corp | Multi-computer vehicle control system with self-validating features |
US4122523A (en) | 1976-12-17 | 1978-10-24 | General Signal Corporation | Route conflict analysis system for control of railroads |
US4099707A (en) | 1977-02-03 | 1978-07-11 | Allied Chemical Corporation | Vehicle moving apparatus |
US4361300A (en) | 1980-10-08 | 1982-11-30 | Westinghouse Electric Corp. | Vehicle train routing apparatus and method |
US4843575A (en) | 1982-10-21 | 1989-06-27 | Crane Harold E | Interactive dynamic real-time management system |
JPS5984663A (en) | 1982-11-02 | 1984-05-16 | 川崎重工業株式会社 | Device and method of controlling operation of train |
US4669047A (en) | 1984-03-20 | 1987-05-26 | Clark Equipment Company | Automated parts supply system |
JPH0827811B2 (en) | 1985-02-28 | 1996-03-21 | 株式会社日立製作所 | Transportation planning method and system |
US4791871A (en) | 1986-06-20 | 1988-12-20 | Mowll Jack U | Dual-mode transportation system |
US4883245A (en) | 1987-07-16 | 1989-11-28 | Erickson Jr Thomas F | Transporation system and method of operation |
US4937743A (en) | 1987-09-10 | 1990-06-26 | Intellimed Corporation | Method and system for scheduling, monitoring and dynamically managing resources |
US5222192A (en) | 1988-02-17 | 1993-06-22 | The Rowland Institute For Science, Inc. | Optimization techniques using genetic algorithms |
GB8810923D0 (en) | 1988-05-09 | 1988-06-15 | Westinghouse Brake & Signal | Railway signalling system |
JPH0719177B2 (en) | 1988-09-13 | 1995-03-06 | 株式会社椿本チエイン | Operation management method for mobile |
CA1332975C (en) | 1988-09-28 | 1994-11-08 | Andrew Marsden Long | System for energy conservation on rail vehicles |
US4975865A (en) | 1989-05-31 | 1990-12-04 | Mitech Corporation | Method and apparatus for real-time control |
US5063506A (en) | 1989-10-23 | 1991-11-05 | International Business Machines Corp. | Cost optimization system for supplying parts |
JP3234925B2 (en) | 1990-01-17 | 2001-12-04 | 株式会社日立製作所 | Train control device |
US5289563A (en) | 1990-03-08 | 1994-02-22 | Mitsubishi Denki Kabushiki Kaisha | Fuzzy backward reasoning device |
US5121467A (en) | 1990-08-03 | 1992-06-09 | E.I. Du Pont De Nemours & Co., Inc. | Neural network/expert system process control system and method |
EP0476562A3 (en) | 1990-09-19 | 1993-02-10 | Hitachi, Ltd. | Method and apparatus for controlling moving body and facilities |
US5229948A (en) | 1990-11-03 | 1993-07-20 | Ford Motor Company | Method of optimizing a serial manufacturing system |
US5265006A (en) | 1990-12-14 | 1993-11-23 | Andersen Consulting | Demand scheduled partial carrier load planning system for the transportation industry |
US5177684A (en) | 1990-12-18 | 1993-01-05 | The Trustees Of The University Of Pennsylvania | Method for analyzing and generating optimal transportation schedules for vehicles such as trains and controlling the movement of vehicles in response thereto |
US5237497B1 (en) | 1991-03-22 | 1998-05-26 | Numetrix Lab Ltd | Method and system for planning and dynamically managing flow processes |
US5331545A (en) | 1991-07-05 | 1994-07-19 | Hitachi, Ltd. | System and method for planning support |
US5365516A (en) | 1991-08-16 | 1994-11-15 | Pinpoint Communications, Inc. | Communication system and method for determining the location of a transponder unit |
US5311438A (en) | 1992-01-31 | 1994-05-10 | Andersen Consulting | Integrated manufacturing system |
GB2263993B (en) | 1992-02-06 | 1995-03-22 | Westinghouse Brake & Signal | Regulating a railway vehicle |
GB9202830D0 (en) | 1992-02-11 | 1992-03-25 | Westinghouse Brake & Signal | A railway signalling system |
JP3182888B2 (en) | 1992-06-23 | 2001-07-03 | 三菱電機株式会社 | Train operation management system |
US5463552A (en) | 1992-07-30 | 1995-10-31 | Aeg Transportation Systems, Inc. | Rules-based interlocking engine using virtual gates |
US5487516A (en) | 1993-03-17 | 1996-01-30 | Hitachi, Ltd. | Train control system |
US5364047A (en) | 1993-04-02 | 1994-11-15 | General Railway Signal Corporation | Automatic vehicle control and location system |
US5420883A (en) | 1993-05-17 | 1995-05-30 | Hughes Aircraft Company | Train location and control using spread spectrum radio communications |
JP3213459B2 (en) | 1993-10-20 | 2001-10-02 | 三洋電機株式会社 | Non-aqueous electrolyte secondary battery |
US5467268A (en) | 1994-02-25 | 1995-11-14 | Minnesota Mining And Manufacturing Company | Method for resource assignment and scheduling |
US7539624B2 (en) | 1994-09-01 | 2009-05-26 | Harris Corporation | Automatic train control system and method |
US5623413A (en) | 1994-09-01 | 1997-04-22 | Harris Corporation | Scheduling system and method |
US20040172175A1 (en) * | 2003-02-27 | 2004-09-02 | Julich Paul M. | System and method for dispatching by exception |
US5828979A (en) | 1994-09-01 | 1998-10-27 | Harris Corporation | Automatic train control system and method |
US5541848A (en) | 1994-12-15 | 1996-07-30 | Atlantic Richfield Company | Genetic method of scheduling the delivery of non-uniform inventory |
US5825660A (en) | 1995-09-07 | 1998-10-20 | Carnegie Mellon University | Method of optimizing component layout using a hierarchical series of models |
US5745735A (en) | 1995-10-26 | 1998-04-28 | International Business Machines Corporation | Localized simulated annealing |
US5850617A (en) | 1996-12-30 | 1998-12-15 | Lockheed Martin Corporation | System and method for route planning under multiple constraints |
US6115700A (en) | 1997-01-31 | 2000-09-05 | The United States Of America As Represented By The Secretary Of The Navy | System and method for tracking vehicles using random search algorithms |
FR2760548B1 (en) | 1997-03-06 | 1999-04-09 | Alsthom Cge Alcatel | METHOD OF PLANNING REQUIREMENTS FOR A SATELLITE BY CONSTRAINED SIMULATED ANNNEALING |
US6125311A (en) | 1997-12-31 | 2000-09-26 | Maryland Technology Corporation | Railway operation monitoring and diagnosing systems |
DE19904909C2 (en) * | 1999-02-06 | 2003-10-30 | Daimler Chrysler Ag | Method and device for providing traffic information |
AU7365500A (en) * | 1999-09-10 | 2001-04-10 | Ge-Harris Railways Electronics, L.L.C. | Total transportation management system |
US6615130B2 (en) * | 2000-03-17 | 2003-09-02 | Makor Issues And Rights Ltd. | Real time vehicle guidance and traffic forecasting system |
US6317686B1 (en) * | 2000-07-21 | 2001-11-13 | Bin Ran | Method of providing travel time |
US6459965B1 (en) | 2000-11-22 | 2002-10-01 | Ge-Harris Railway Electronics, Llc | Method for advanced communication-based vehicle control |
US6799097B2 (en) | 2002-06-24 | 2004-09-28 | Modular Mining Systems, Inc. | Integrated railroad system |
-
2006
- 2006-01-31 US US11/342,857 patent/US20060212188A1/en not_active Abandoned
-
2007
- 2007-01-20 AU AU2007210230A patent/AU2007210230B2/en active Active
- 2007-01-20 CN CN2007800041777A patent/CN101484857B/en active Active
- 2007-01-20 WO PCT/US2007/001342 patent/WO2007089441A2/en active Application Filing
- 2007-01-20 EP EP07763013A patent/EP1987322A4/en not_active Ceased
- 2007-01-20 CA CA002637496A patent/CA2637496A1/en not_active Abandoned
- 2007-01-20 BR BRPI0706962-6A patent/BRPI0706962A2/en active Search and Examination
- 2007-01-20 MX MX2008009578A patent/MX2008009578A/en active IP Right Grant
-
2008
- 2008-08-15 ZA ZA200807067A patent/ZA200807067B/en unknown
-
2010
- 2010-10-19 US US12/907,677 patent/US8589057B2/en not_active Expired - Lifetime
Patent Citations (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3944986A (en) * | 1969-06-05 | 1976-03-16 | Westinghouse Air Brake Company | Vehicle movement control system for railroad terminals |
US4361301A (en) * | 1980-10-08 | 1982-11-30 | Westinghouse Electric Corp. | Vehicle train tracking apparatus and method |
US4610206A (en) * | 1984-04-09 | 1986-09-09 | General Signal Corporation | Micro controlled classification yard |
US5332180A (en) * | 1992-12-28 | 1994-07-26 | Union Switch & Signal Inc. | Traffic control system utilizing on-board vehicle information measurement apparatus |
US20040034556A1 (en) * | 1994-09-01 | 2004-02-19 | Matheson William L. | Scheduling system and method |
US20030183729A1 (en) * | 1996-09-13 | 2003-10-02 | Root Kevin B. | Integrated train control |
US5823481A (en) * | 1996-10-07 | 1998-10-20 | Union Switch & Signal Inc. | Method of transferring control of a railway vehicle in a communication based signaling system |
US6250590B1 (en) * | 1997-01-17 | 2001-06-26 | Siemens Aktiengesellschaft | Mobile train steering |
US6144901A (en) * | 1997-09-12 | 2000-11-07 | New York Air Brake Corporation | Method of optimizing train operation and training |
US6587764B2 (en) * | 1997-09-12 | 2003-07-01 | New York Air Brake Corporation | Method of optimizing train operation and training |
US20030105561A1 (en) * | 1997-09-12 | 2003-06-05 | New York Air Brake Corporation | Method of optimizing train operation and training |
US7006796B1 (en) * | 1998-07-09 | 2006-02-28 | Siemens Aktiengesellschaft | Optimized communication system for radio-assisted traffic services |
US6427114B1 (en) * | 1998-08-07 | 2002-07-30 | Dinbis Ab | Method and means for traffic route control |
US6032905A (en) * | 1998-08-14 | 2000-03-07 | Union Switch & Signal, Inc. | System for distributed automatic train supervision and control |
US7219067B1 (en) * | 1999-09-10 | 2007-05-15 | Ge Harris Railway Electronics Llc | Total transportation management system |
US20040093196A1 (en) * | 1999-09-24 | 2004-05-13 | New York Air Brake Corporation | Method of transferring files and analysis of train operational data |
US6351697B1 (en) * | 1999-12-03 | 2002-02-26 | Modular Mining Systems, Inc. | Autonomous-dispatch system linked to mine development plan |
US6393362B1 (en) * | 2000-03-07 | 2002-05-21 | Modular Mining Systems, Inc. | Dynamic safety envelope for autonomous-vehicle collision avoidance system |
US6654682B2 (en) * | 2000-03-23 | 2003-11-25 | Siemens Transportation Systems, Inc. | Transit planning system |
US6799100B2 (en) * | 2000-05-15 | 2004-09-28 | Modular Mining Systems, Inc. | Permission system for controlling interaction between autonomous vehicles in mining operation |
US6377877B1 (en) * | 2000-09-15 | 2002-04-23 | Ge Harris Railway Electronics, Llc | Method of determining railyard status using locomotive location |
US6853889B2 (en) * | 2000-12-20 | 2005-02-08 | Central Queensland University | Vehicle dynamics production system and method |
US6637703B2 (en) * | 2000-12-28 | 2003-10-28 | Ge Harris Railway Electronics Llc | Yard tracking system |
US6766228B2 (en) * | 2001-03-09 | 2004-07-20 | Alstom | System for managing the route of a rail vehicle |
US6611750B2 (en) * | 2001-09-27 | 2003-08-26 | International Business Machines Corporation | Hierarchical traffic control system |
US20050107890A1 (en) * | 2002-02-22 | 2005-05-19 | Alstom Ferroviaria S.P.A. | Method and device of generating logic control units for railroad station-based vital computer apparatuses |
US7428452B2 (en) * | 2002-05-20 | 2008-09-23 | Ausrail Technologies Pty Limited | Scheduling method and system for rail networks |
US6789005B2 (en) * | 2002-11-22 | 2004-09-07 | New York Air Brake Corporation | Method and apparatus of monitoring a railroad hump yard |
US6856865B2 (en) * | 2002-11-22 | 2005-02-15 | New York Air Brake Corporation | Method and apparatus of monitoring a railroad hump yard |
US20060074544A1 (en) * | 2002-12-20 | 2006-04-06 | Viorel Morariu | Dynamic optimizing traffic planning method and system |
US7386391B2 (en) * | 2002-12-20 | 2008-06-10 | Union Switch & Signal, Inc. | Dynamic optimizing traffic planning method and system |
US20040267415A1 (en) * | 2003-06-27 | 2004-12-30 | Alstom | Method and apparatus for controlling trains, in particular a method and apparatus of the ERTMS type |
US20050192720A1 (en) * | 2004-02-27 | 2005-09-01 | Christie W. B. | Geographic information system and method for monitoring dynamic train positions |
Cited By (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8924049B2 (en) | 2003-01-06 | 2014-12-30 | General Electric Company | System and method for controlling movement of vehicles |
US8290645B2 (en) | 2006-03-20 | 2012-10-16 | General Electric Company | Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable |
US8751073B2 (en) * | 2006-03-20 | 2014-06-10 | General Electric Company | Method and apparatus for optimizing a train trip using signal information |
US8370006B2 (en) * | 2006-03-20 | 2013-02-05 | General Electric Company | Method and apparatus for optimizing a train trip using signal information |
US9233696B2 (en) | 2006-03-20 | 2016-01-12 | General Electric Company | Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear |
US9201409B2 (en) | 2006-03-20 | 2015-12-01 | General Electric Company | Fuel management system and method |
US9156477B2 (en) | 2006-03-20 | 2015-10-13 | General Electric Company | Control system and method for remotely isolating powered units in a vehicle system |
US10569792B2 (en) | 2006-03-20 | 2020-02-25 | General Electric Company | Vehicle control system and method |
US8903573B2 (en) | 2006-03-20 | 2014-12-02 | General Electric Company | Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable |
US10308265B2 (en) | 2006-03-20 | 2019-06-04 | Ge Global Sourcing Llc | Vehicle control system and method |
US8126601B2 (en) | 2006-03-20 | 2012-02-28 | General Electric Company | System and method for predicting a vehicle route using a route network database |
US20070219681A1 (en) * | 2006-03-20 | 2007-09-20 | Ajith Kuttannair Kumar | Method and apparatus for optimizing a train trip using signal information |
US9733625B2 (en) | 2006-03-20 | 2017-08-15 | General Electric Company | Trip optimization system and method for a train |
US8249763B2 (en) | 2006-03-20 | 2012-08-21 | General Electric Company | Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings |
US9527518B2 (en) | 2006-03-20 | 2016-12-27 | General Electric Company | System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system |
US9266542B2 (en) | 2006-03-20 | 2016-02-23 | General Electric Company | System and method for optimized fuel efficiency and emission output of a diesel powered system |
US8788135B2 (en) | 2006-03-20 | 2014-07-22 | General Electric Company | System, method, and computer software code for providing real time optimization of a mission plan for a powered system |
US8370007B2 (en) | 2006-03-20 | 2013-02-05 | General Electric Company | Method and computer software code for determining when to permit a speed control system to control a powered system |
US8401720B2 (en) | 2006-03-20 | 2013-03-19 | General Electric Company | System, method, and computer software code for detecting a physical defect along a mission route |
US20130131898A1 (en) * | 2006-03-20 | 2013-05-23 | General Electric Company | Method and apparatus for optimizing a train trip using signal information |
US8473127B2 (en) | 2006-03-20 | 2013-06-25 | General Electric Company | System, method and computer software code for optimizing train operations considering rail car parameters |
US8630757B2 (en) * | 2006-03-20 | 2014-01-14 | General Electric Company | System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks |
US8725326B2 (en) | 2006-03-20 | 2014-05-13 | General Electric Company | System and method for predicting a vehicle route using a route network database |
US20080033605A1 (en) * | 2006-03-20 | 2008-02-07 | Wolfgang Daum | System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks |
US7826349B2 (en) * | 2006-05-30 | 2010-11-02 | Intel Corporation | Connection management mechanism |
US20080005314A1 (en) * | 2006-05-30 | 2008-01-03 | Sumeet Kaur | Connection management mechanism |
US20080082223A1 (en) * | 2006-10-02 | 2008-04-03 | Wolfgang Daum | System and method for optimized fuel efficiency and emission output of a diesel powered system |
JP2010512265A (en) * | 2006-12-07 | 2010-04-22 | ゼネラル・エレクトリック・カンパニイ | Method and apparatus for optimizing train operation using signal information |
WO2008073545A3 (en) * | 2006-12-07 | 2008-08-07 | Gen Electric | Method and apparatus for optimizing a train trip using signal information |
WO2008073545A2 (en) * | 2006-12-07 | 2008-06-19 | General Electric Company | Method and apparatus for optimizing a train trip using signal information |
AU2007294585B2 (en) * | 2006-12-07 | 2013-01-17 | General Electric Company | Method and apparatus for optimizing a train trip using signal information |
US8155811B2 (en) | 2008-12-29 | 2012-04-10 | General Electric Company | System and method for optimizing a path for a marine vessel through a waterway |
US20100168942A1 (en) * | 2008-12-29 | 2010-07-01 | Joseph Forrest Noffsinger | System And Method For Optimizing A Path For A Marine Vessel Through A Waterway |
US8234023B2 (en) | 2009-06-12 | 2012-07-31 | General Electric Company | System and method for regulating speed, power or position of a powered vehicle |
EP2402229A1 (en) | 2010-06-22 | 2012-01-04 | Universität Stuttgart | Method and system for simulating, planning and/or controlling operating processes in a track guided transportation system |
US9669851B2 (en) | 2012-11-21 | 2017-06-06 | General Electric Company | Route examination system and method |
US9682716B2 (en) | 2012-11-21 | 2017-06-20 | General Electric Company | Route examining system and method |
US9834237B2 (en) | 2012-11-21 | 2017-12-05 | General Electric Company | Route examining system and method |
US9689681B2 (en) | 2014-08-12 | 2017-06-27 | General Electric Company | System and method for vehicle operation |
US20210026356A1 (en) * | 2017-09-15 | 2021-01-28 | Sony Corporation | Control apparatus, control method, program, and mobile object |
US11500386B2 (en) * | 2017-09-15 | 2022-11-15 | Sony Corporation | Control apparatus, control method, program, and mobile object |
CN108764579A (en) * | 2018-06-01 | 2018-11-06 | 成都交大光芒科技股份有限公司 | A kind of storage multi-robotic task dispatching method based on congestion control |
EP3771615A1 (en) * | 2019-07-31 | 2021-02-03 | Korea Railroad Research Institute | Method and apparatus for providing dynamic train control |
CN116580563A (en) * | 2023-07-10 | 2023-08-11 | 中南大学 | Markov chain-based regional congestion traffic source prediction method, device and equipment |
Also Published As
Publication number | Publication date |
---|---|
EP1987322A2 (en) | 2008-11-05 |
AU2007210230A1 (en) | 2007-08-09 |
US8589057B2 (en) | 2013-11-19 |
CA2637496A1 (en) | 2007-08-09 |
WO2007089441A3 (en) | 2009-01-08 |
EP1987322A4 (en) | 2011-05-25 |
BRPI0706962A2 (en) | 2011-04-12 |
CN101484857A (en) | 2009-07-15 |
ZA200807067B (en) | 2009-10-28 |
AU2007210230B2 (en) | 2012-04-26 |
MX2008009578A (en) | 2008-11-12 |
CN101484857B (en) | 2013-07-10 |
US20110035138A1 (en) | 2011-02-10 |
WO2007089441A2 (en) | 2007-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8589057B2 (en) | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics | |
US7725249B2 (en) | Method and apparatus for congestion management | |
US7734383B2 (en) | Method and apparatus for planning the movement of trains using dynamic analysis | |
US7937193B2 (en) | Method and apparatus for coordinating railway line of road and yard planners | |
US8082071B2 (en) | System and method of multi-generation positive train control system | |
US20060212183A1 (en) | Method and apparatus for estimating train location | |
US8498762B2 (en) | Method of planning the movement of trains using route protection | |
US8433461B2 (en) | Method of planning the movement of trains using pre-allocation of resources | |
US7797088B2 (en) | Method and apparatus for planning linked train movements | |
US20060212187A1 (en) | Scheduler and method for managing unpredictable local trains | |
US20060212186A1 (en) | Method and apparatus for scheduling maintenance of way | |
US7797087B2 (en) | Method and apparatus for selectively disabling train location reports | |
US20060212185A1 (en) | Method and apparatus for automatic selection of train activity locations | |
US20070260497A1 (en) | Method of planning train movement using a front end cost function | |
MX2008009580A (en) | Method for congestion management in a railway system | |
Weather et al. | The Dutch Winter Timetable | |
AU2004202558A1 (en) | System and method of computer aided dispatching using a coordinating agent |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: GENERAL ELECTRIC COMPANY, NEW YORK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KICKBUSCH, JOEL;PHILP, JOSEPH WESLEY;WILLS, MITCHELL SCOTT;REEL/FRAME:017922/0174;SIGNING DATES FROM 20060501 TO 20060503 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |