RU2334130C1 - Well jet unit "эмпи-угис-(11-20)дш" and method of its operation - Google Patents

Well jet unit "эмпи-угис-(11-20)дш" and method of its operation Download PDF

Info

Publication number
RU2334130C1
RU2334130C1 RU2007125689/06A RU2007125689A RU2334130C1 RU 2334130 C1 RU2334130 C1 RU 2334130C1 RU 2007125689/06 A RU2007125689/06 A RU 2007125689/06A RU 2007125689 A RU2007125689 A RU 2007125689A RU 2334130 C1 RU2334130 C1 RU 2334130C1
Authority
RU
Russia
Prior art keywords
well
jet pump
packer
housing
channel
Prior art date
Application number
RU2007125689/06A
Other languages
Russian (ru)
Inventor
Зиновий Дмитриевич Хоминец (UA)
Зиновий Дмитриевич Хоминец
Original Assignee
Зиновий Дмитриевич Хоминец
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Зиновий Дмитриевич Хоминец filed Critical Зиновий Дмитриевич Хоминец
Priority to RU2007125689/06A priority Critical patent/RU2334130C1/en
Priority to PCT/RU2008/000155 priority patent/WO2009008764A1/en
Priority to US12/667,521 priority patent/US20100326661A1/en
Priority to CA2692562A priority patent/CA2692562C/en
Application granted granted Critical
Publication of RU2334130C1 publication Critical patent/RU2334130C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/124Adaptation of jet-pump systems
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • E21B23/14Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells for displacing a cable or a cable-operated tool, e.g. for logging or perforating operations in deviated wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/008Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04FPUMPING OF FLUID BY DIRECT CONTACT OF ANOTHER FLUID OR BY USING INERTIA OF FLUID TO BE PUMPED; SIPHONS
    • F04F5/00Jet pumps, i.e. devices in which flow is induced by pressure drop caused by velocity of another fluid flow
    • F04F5/44Component parts, details, or accessories not provided for in, or of interest apart from, groups F04F5/02 - F04F5/42
    • F04F5/46Arrangements of nozzles
    • F04F5/464Arrangements of nozzles with inversion of the direction of flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04FPUMPING OF FLUID BY DIRECT CONTACT OF ANOTHER FLUID OR BY USING INERTIA OF FLUID TO BE PUMPED; SIPHONS
    • F04F5/00Jet pumps, i.e. devices in which flow is induced by pressure drop caused by velocity of another fluid flow
    • F04F5/54Installations characterised by use of jet pumps, e.g. combinations of two or more jet pumps of different type

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

FIELD: engines and pumps.
SUBSTANCE: well jet unit allows creating a number of various preset pressure difference depressions using a jet pump in the well subpacker zone. Using a logging device allows recording the well physical parameters and those of the medium pumped out from the well. Making the stepped flow-through channel diameter, just below the unit mounting seat, not less than that of the parker axial flow-through hole allows feeding chemical reagents or fracturing liquid into the pay-out bed via the casing. Check valves arranged in the feed channels prevent, during pumping in, an ingress of media pumped in the payout bed into the well behind-the-string subparker space.
EFFECT: optimising well testing procedure, higher reliability and efficiency of well jet unit.
2 cl, 3 dwg

Description

Изобретение относится к области насосной техники, преимущественно к скважинным струйным установкам для проведения каротажных работ.The invention relates to the field of pumping technology, mainly to downhole jet installations for logging.

Известна скважинная струйная установка, содержащая колонну труб со струйным насосом и пакером с возможностью прокачки жидкой рабочей среды через струйный насос (см. RU 2059891 C1, F04F 5/02, 10.05.1996).A well-known jet installation containing a pipe string with an jet pump and a packer with the ability to pump liquid working medium through the jet pump (see RU 2059891 C1, F04F 5/02, 05/10/1996).

Из этого же патента известен способ работы скважинной струйной установки, включающий установку в скважине на колонне труб струйного насоса и размещенного ниже струйного насоса в колонне насосно-компрессорных труб геофизического прибора, спуск в скважину колонны труб со струйным насосом, пакером и геофизическим прибором и прокачку жидкой рабочей среды через струйный насос.From the same patent, there is known a method of operating a downhole jet installation, including installing a geophysical device located in a well on a pipe string of a jet pump and a geophysical device located below a jet pump in a well, lowering a pipe string with a jet pump, a packer and a geophysical device into the well and pumping liquid working medium through the jet pump.

Данный способ работы скважинной струйной установки позволяет проводить откачку из скважины различных добываемых сред, например нефти, с одновременной обработкой добываемой среды и прискважинной зоны пласта, однако в данном способе работы установки возможности работ по исследованию скважины ограничены, что в ряде случаев сужает область использования данной установки и способа ее работы.This method of operation of a downhole jet installation allows pumping out various produced media, such as oil, from the well while processing the produced environment and the near-wellbore zone of the formation, however, in this method of operation of the installation, the possibilities of researching the well are limited, which in some cases narrows the scope of use of this installation and how it works.

В части устройства, как объекта изобретения, наиболее близкой к изобретению по технической сущности и достигаемому результату является скважинная струйная установка, содержащая колонну труб, пакер и струйный насос, в корпусе которого установлены активное сопло с камерой смешения и выполнен проходной канал с посадочным местом для установки герметизирующего узла с осевым каналом, при этом выход струйного насоса подключен к колонне труб выше герметизирующего узла, вход канала для подвода откачиваемой среды струйного насоса подключен к колонне труб ниже герметизирующего узла, а вход канала подачи рабочей среды в активное сопло подключен к пространству, окружающему колонну насосно-компрессорных труб, и в корпусе струйного насоса выполнено несколько каналов подвода откачиваемой среды (см. патент RU 2106540, кл. F04F 5/02, 10.03.1998).In the part of the device, as an object of the invention, the closest to the invention in terms of technical essence and the achieved result is a downhole jet installation containing a pipe string, a packer and an jet pump, in the housing of which an active nozzle with a mixing chamber is installed and a passage channel is made with a mounting seat a sealing unit with an axial channel, while the output of the jet pump is connected to the pipe string above the sealing unit, the input of the channel for supplying a pumped medium of the jet pump is connected to the tubing is lower than the sealing unit, and the input of the working medium supply channel into the active nozzle is connected to the space surrounding the tubing string, and several channels for supplying the pumped medium are made in the jet pump housing (see patent RU 2106540, class F04F 5/02 , 03/10/1998).

Из этого же патента известен наиболее близким к изобретению в части способа работы, как объекта изобретения, по технической сущности и достигаемому результату способ работы скважинной струйной установки, включающий размещение в скважине на колонне труб пакера и струйного насоса, при этом пакер устанавливают над продуктивным пластом, на кабеле спускают герметизирующий узел и каротажный прибор, а через затрубное пространство колонны труб в сопло струйного насоса закачивают активную рабочую среду, например воду, и таким образом снижают давление в подпакерной зоне, создавая депрессию на пласт, во время работы струйного насоса проводят контроль параметров откачиваемой среды пласта, после прекращения подачи активной рабочей среды путем перетока жидкости через проточную часть струйного насоса выравнивают давления вдоль проточной части струйного насоса.From the same patent, the closest to the invention is known in terms of the method of operation, as an object of the invention, according to the technical essence and the achieved result, the method of operation of a downhole jet installation, comprising placing a packer and an jet pump in a well on a pipe string, wherein the packer is installed above the reservoir, the sealing unit and the logging tool are lowered on the cable, and an active working medium, for example water, is pumped through the annular space of the pipe string into the nozzle of the jet pump, and thus reduce Adding a packer zone, creating a depression in the reservoir during operation of the jet pump are monitored parameters of the pumped medium reservoir after stopping supplying the active working fluid through the fluid flow through the flow part of the jet pump equalize the pressure along the flow part of the jet pump.

Данные установка и способ ее работы позволяют проводить различные технологические операции в скважине ниже уровня установки струйного насоса, в том числе путем снижения перепада давлений над и под герметизирующим узлом. Однако данная установка не позволяет в полной мере использовать ее возможности вследствие невозможности сохранения депрессии на пласт при неработающем струйном насосе, что не позволяет в полной мере провести исследование скважины.These installation and the method of its operation allow to carry out various technological operations in the well below the installation level of the jet pump, including by reducing the pressure drop above and below the sealing unit. However, this installation does not allow to fully use its capabilities due to the impossibility of maintaining depression on the reservoir with an idle jet pump, which does not allow to fully investigate the well.

Задачей, на решение которой направлено настоящее изобретение, является предотвращение самопроизвольного перетока активной рабочей среды при прекращении работы струйного насоса и поддержание депрессии на пласт при неработающем струйном насосеThe problem to which the present invention is directed, is to prevent spontaneous overflow of an active working medium when the jet pump ceases to work and to maintain depression on the formation with an idle jet pump

Техническим результатом, на достижение которого направлено настоящее изобретение, является повышение надежности и производительности работы скважинной струйной установки при проведении испытания скважины и оптимизация последовательности действий при проведении испытаний скважины.The technical result, the achievement of which the present invention is directed, is to increase the reliability and productivity of a well jet device during a well test and to optimize the sequence of actions when conducting a well test.

В части устройства, как объекта изобретения, поставленная техническая задача решается за счет того, что скважинная струйная установка содержит смонтированный на колонне труб струйный насос и пакер с осевым проходным отверстием, причем в корпусе струйного насоса соосно установлены активное сопло и камера смешения с диффузором, а также выполнены ступенчатый проходной канал с посадочным местом между ступенями, канал подвода откачиваемой из скважины среды, сообщенный ниже посадочного места посредством боковых отверстий в корпусе струйного насоса со ступенчатым проходным каналом, и канал подвода активной рабочей среды, сообщенный со стороны выхода из него с активным соплом и со стороны входа в него с затрубным пространством колонны труб, при этом канал подвода откачиваемой среды сообщен через обратный клапан с колонной труб ниже ступенчатого проходного канала, а в последнем предусмотрена возможность установки герметизирующего узла, который выполнен в виде полого ступенчатого цилиндрического корпуса, в верхней части полости которого размещен уплотнительный элемент, а ниже, в полости расположен с упором в кольцевой уступ в полости корпуса герметизирующего узла ступенчатый поршень, подпружиненный относительно уплотнительного элемента, причем в стенке корпуса герметизирующего узла выполнены отверстия напротив боковых отверстий корпуса струйного насоса и в нижнем положении ступенчатого поршня последним перекрыты отверстия в стенке корпуса герметизирующего узла, а в верхнем положении ступенчатого поршня через боковые отверстия в корпусе струйного насоса и отверстия в стенке корпуса герметизирующего узла канал подвода откачиваемой из скважины среды сообщен с колонной труб ниже корпуса струйного насоса, при этом в ступенчатом поршне и уплотнительном элементе выполнены соосно осевые каналы для пропуска через них каротажного кабеля, на котором посредством кабельной головки ниже корпуса струйного насоса подвешен каротажный прибор, при этом в канале подвода активной рабочей среды установлен обратный клапан, а диаметр ступенчатого проходного канала ниже посадочного места не меньше диаметра осевого проходного отверстия пакера.In the part of the device, as an object of the invention, the technical task is solved due to the fact that the downhole jet installation includes a jet pump mounted on a pipe string and a packer with an axial bore, and an active nozzle and a mixing chamber with a diffuser are coaxially mounted in the jet pump housing, and also made a stepped passage channel with a seat between the steps, a channel for supplying a medium pumped out of the well, communicated below the seat by means of side holes in the jet housing about a pump with a stepped passage channel, and a channel for supplying an active working medium, communicated from the exit side with the active nozzle and from the side of the entrance to it with the annulus of the pipe string, while the channel for supplying the pumped medium is communicated through a check valve with a pipe string below the stepped passage channel, and the latter provides for the possibility of installing a sealing unit, which is made in the form of a hollow stepped cylindrical body, in the upper part of the cavity of which a sealing element is placed, and furthermore, a step piston spring-loaded relative to the sealing element is located in the cavity with an emphasis in an annular ledge in the cavity of the housing of the sealing assembly, and holes are made in the wall of the housing of the sealing assembly opposite the side openings of the jet pump housing and the holes in the sealing housing are closed last in the lower position of the stepped piston node, and in the upper position of the stepped piston through the side holes in the housing of the jet pump and the holes in the wall of the housing of the sealing of the assembly, the supply channel for the medium pumped out from the well is in communication with the pipe string below the jet pump housing, while the step piston and the sealing element have axial axial channels for passing a wireline through them, on which a wireline tool is suspended by means of a cable head below the jet pump body, a check valve is installed in the inlet channel of the active working medium, and the diameter of the stepped passage channel below the seat is not less than the diameter of the axial passage hole of the packer.

Указанная задача в части способа, как объекта изобретения решается за счет того, что способ работы скважинной струйной установки заключается в том, что проводят сборку колонны труб путем установки на колонне труб струйного насоса и пакера, после чего спускают сборку в скважину, проводят распакеровку пакера, подают под напором по колонне труб в продуктивный пласт жидкость гидроразрыва пласта или кислотный раствор и проводят спуск в скважину на каротажном кабеле герметизирующего узла с закрепленным на кабеле посредством кабельной головки каротажным прибором, герметизирующий узел устанавливают на посадочное место в ступенчатом проходном канале струйного насоса, а каротажный прибор располагают в зоне продуктивного пласта, при этом в ходе спуска регистрируют каротажным прибором фоновые значения физических полей горных пород вдоль ствола скважины, в частности тепловые поля, далее струйным насосом путем подачи по затрубному пространству колонны труб в активное сопло активной рабочей среды создают депрессию на продуктивный пласт и откачивают из продуктивного пласта жидкость гидроразрыва или продукты химической обработки продуктивного пласта, а затем при работающем струйном насосе проводят регистрацию текущих значений физических полей горных пород и поступающего в скважину пластового флюида, причем в ходе регистрации посредством каротажного кабеля проводят перемещение каротажного прибора вдоль ствола скважины, включая и продуктивный пласт, потом прекращают работу струйного насоса и посредством обратного клапана в канале подвода откачиваемой среды разобщают внутреннюю полость колонны труб над струйным насосом вместе с затрубным пространством над пакером и внутреннюю полость колонны труб под струйным насосом вместе с подпакерным пространством, сохраняя под пакером пониженное забойное давление и регистрируя при этом кривую восстановления пластового давления под пакером с помощью каротажного прибора, затем с помощью каротажного кабеля приподнимают каротажный прибор и кабельной головкой нажимают снизу на ступенчатый поршень, перемещают его вверх и, таким образом, сообщают через отверстия в стенке корпуса герметизирующего узла и боковые отверстия в корпусе струйного насоса подпакерное пространство скважины с внутренней полостью колонны труб выше струйного насоса и затрубным пространством выше пакера и за счет этого выравнивают давление над и под пакером, после чего извлекают из скважины каротажный прибор вместе с герметизирующим узлом.The specified problem in terms of the method, as an object of the invention is solved due to the fact that the method of operation of a downhole jet installation consists in assembling a pipe string by installing an jet pump and a packer on the pipe string, and then lowering the assembly into the well, unpacking the packer, hydraulic fracturing fluid or acidic solution is fed under pressure along the pipe string into the producing formation and run down into the well on the well cable of the sealing unit with the cable head fixed to the cable with a logging device, the sealing unit is installed on a seat in the stepped passage channel of the jet pump, and the logging device is placed in the zone of the reservoir, while during the descent, the background values of the rock physical fields along the borehole are recorded by the logging device, in particular thermal fields, then by jet the pump by feeding through the annular space of the pipe string into the active nozzle of the active working medium creates a depression on the reservoir and pumped out of the reservoir hydraulic fracturing or products of chemical treatment of the reservoir, and then, when the jet pump is running, the current values of the physical fields of the rocks and the reservoir fluid entering the well are recorded, and during the logging, the logging tool is moved along the wellbore, including the reservoir, then the jet pump is stopped and by means of a check valve in the supply channel of the pumped-out medium, the internal cavity of the pipe string is divided over with the pump hole together with the annular space above the packer and the inner cavity of the pipe string under the jet pump together with the sub-packer space, keeping the bottom hole pressure under the packer and registering the reservoir pressure recovery curve under the packer with a logging tool, then using a logging cable, lift the logging device and with a cable head press the step piston from below, move it up and, thus, communicate through the holes in the wall of the housing of the sealing unit lateral openings in the housing of the jet pump well packer space with the interior of the tubing string above the jet pump and the annulus above the packer and thereby equalize the pressure above and below the packer, and then removed from the well logging tool with the sealing unit.

Анализ различных конструкций показал, что надежность работы можно повысить путем увеличения функциональных возможностей установки при испытании и освоении скважин.Analysis of various designs showed that the reliability can be improved by increasing the functionality of the installation during testing and development of wells.

Было выявлено, что указанный выше набор элементов конструкции скважинной установки позволяет организовать такую последовательность действий, при которой наиболее эффективно используется оборудование, которое установлено на колонне труб при проведении каротажных работ по исследованию, испытанию и освоению продуктивных пластов горных пород. При этом созданы условия как для получения полной и достоверной информации о состоянии продуктивных пластов, так и для проведения обработки продуктивных пластов в ходе проведения исследования. Скважинная установка дает возможность создавать ряд различных депрессий с помощью струйного насоса в подпакерной зоне скважины с заданной величиной перепада давления, а с помощью каротажного прибора проводить регистрации давления, температуры и других физических параметров скважины и откачиваемой из скважины среды проводить исследование и испытание скважины, также проводить регистрацию кривой восстановления пластового давления в подпакерном пространстве скважины без использования специально для этого предназначенной функциональной вставки. Однако в ряде случаев проведения только исследований или обработки продуктивного пласта с помощью каротажного прибора, например путем обработки продуктивного плата физическими полями, в частности ультразвуком недостаточно для интенсификации притока из продуктивного пласта. Выполнение струйной установки с обратными клапанами в каналах подвода активной рабочей и откачиваемой сред в сочетании с выполнением диаметра ступенчатого проходного канала ниже посадочного места не меньше диаметра осевого проходного отверстия пакера позволяет организовать подачу по колонне труб в продуктивный пласт химических реактивов или жидкости гидроразрыва без использования каких-либо дополнительных приспособлений или функциональных вставок по колонне труб, повысить производительность работ, а обратные клапаны при этом предотвращают поступление закачиваемых в продуктивный пласт сред в заколонное надпакерное пространство скважины в период их закачки. При этом важно указанное выше соотношение между диаметрами ступенчатого проходного канала и осевого проходного отверстия пакера. Выполнение диаметра ступенчатого проходного канала не меньше диаметра осевого проходного отверстия пакера необходимо для организации возможности спуска в подпакерное пространство скважины каротажного прибора для обработки пласта физическими полями (указанная выше обработка ультразвуком или, например, создание теплового поля) и снижения гидравлического сопротивления как при закачке сред в продуктивный пласт, так и для откачки из продуктивного пласта продуктов его обработки и добываемой из продуктивного пласта среды при создании депрессии на продуктивный пласт. Одновременно представляется возможность контролировать величину депрессии путем управления скоростью прокачки активной рабочей среды. При проведении испытания пластов можно регулировать режим откачки посредством изменения давления активной рабочей среды, подаваемой в активное сопло струйного насоса. В то же время исключена возможность самопроизвольного перетока рабочей среды в подпакерную зону как при работающем, так и при неработающем струйном насосе.It was revealed that the above set of structural elements of the well installation allows you to organize a sequence of actions in which the equipment that is installed on the pipe string when carrying out well logging to study, test and develop productive rock formations is most effectively used. At the same time, conditions have been created both for obtaining complete and reliable information about the state of productive formations, and for conducting processing of productive formations during the study. The downhole installation makes it possible to create a number of different depressions using a jet pump in the sub-packer zone of the well with a given pressure drop, and using a logging tool to record pressure, temperature and other physical parameters of the well and the medium pumped out of the well, conduct research and testing of the well, also registration of the reservoir pressure recovery curve in the under-packer space of the well without using specially designed functionality hydrochloric insert. However, in some cases, conducting only research or processing the reservoir using a logging tool, for example, by treating the reservoir with physical fields, in particular with ultrasound, is not enough to intensify the inflow from the reservoir. Performing a jet installation with check valves in the supply channels of the active working and pumped-out fluids in combination with performing the diameter of the step-by-step passage channel below the seat not less than the diameter of the axial feedthrough of the packer allows you to organize the flow of chemical reagents or hydraulic fracture through the pipe string without using any either additional devices or functional inserts along the pipe string, to increase productivity, and check valves while they prevent the flow of media injected into the reservoir into the annular nadpakerny space of the well during their injection. It is important that the above ratio between the diameters of the stepped bore and the axial bore of the packer. The diameter of the stepped bore channel is not less than the diameter of the axial bore hole of the packer necessary for organizing the possibility of launching a logging tool for treating the formation with physical fields into the sub-borehole space (the aforementioned sonication or, for example, creating a thermal field) and lowering the hydraulic resistance as when injecting media into productive formation, and for pumping from the productive formation the products of its processing and the environment extracted from the productive formation when creating Ress on the producing formation. At the same time, it is possible to control the magnitude of depression by controlling the rate of pumping of the active working medium. During the formation test, it is possible to adjust the pumping mode by changing the pressure of the active working medium supplied to the active nozzle of the jet pump. At the same time, the possibility of spontaneous overflow of the working medium into the under-packer zone is excluded both with the working and non-working jet pump.

В результате достигается интенсификация работ по исследованию и освоению скважин, что позволяет проводить качественное исследование и испытание скважин после бурения и при капитальном ремонте, а также подготовку скважины к эксплуатации с проведением всестороннего исследования и испытания в различных режимах и за счет этого повышение надежности работы установки.As a result, intensification of work on research and development of wells is achieved, which allows for high-quality research and testing of wells after drilling and during overhaul, as well as preparation of a well for operation with comprehensive research and testing in various modes, and thereby increasing the reliability of the installation.

На фиг.1 представлен продольный разрез скважинной струйной установки без герметизирующего узла и каротажного прибора.Figure 1 presents a longitudinal section of a downhole jet unit without a sealing unit and a logging tool.

На фиг.2 представлен продольный разрез скважинной струйной установки с герметизирующим узлом и каротажным прибором, расположенным в зоне продуктивного пласта.Figure 2 presents a longitudinal section of a downhole jet unit with a sealing unit and a logging tool located in the zone of the reservoir.

На фиг.3 представлен продольный разрез скважинной струйной установки во время подготовки скважинной струйной установки к подъему каротажного прибора и герметизирующего узла на поверхность.Figure 3 presents a longitudinal section of a downhole jet unit during preparation of a downhole jet unit for raising the logging tool and the sealing unit to the surface.

Скважинная струйная установка содержит смонтированный на колонне труб 1 струйный насос 2 и пакер 3, причем в корпусе 4 струйного насоса 2 соосно установлены активное сопло 5 и камера смешения 6 с диффузором, а также выполнены ступенчатый проходной канал 7 с посадочным местом 8 между ступенями, канал 9 подвода откачиваемой из скважины среды, сообщенный ниже посадочного места 8 посредством боковых отверстий 10 в корпусе 4 струйного насоса 2 со ступенчатым проходным каналом 7, и канал 11 подвода активной рабочей среды, сообщенный со стороны выхода из него с активным соплом 5 и со стороны входа в него с затрубным пространством колонны труб 1. Канал 9 подвода откачиваемой среды сообщен через обратный клапан 12 с колонной труб 1 ниже ступенчатого проходного канала 7, а в последнем предусмотрена возможность установки герметизирующего узла 13, который выполнен в виде полого ступенчатого цилиндрического корпуса 14, в верхней части полости которого размещен уплотнительный элемент 15, а ниже в полости расположен с упором в кольцевой уступ 16 в полости корпуса 14 герметизирующего узла 13 ступенчатый поршень 17, подпружиненный посредством пружины 18 относительно уплотнительного элемента 15. В стенке корпуса 14 герметизирующего узла 13 выполнены отверстия 19 напротив боковых отверстий 10 корпуса 4 струйного насоса 2 и в нижнем положении ступенчатого поршня 17 последним перекрыты отверстия 19 в стенке корпуса 14 герметизирующего узла 13, а в верхнем положении ступенчатого поршня 17 через боковые отверстия 10 в корпусе 4 струйного насоса 2 и отверстия 19 в стенке корпуса 14 герметизирующего узла 13 канал 9 подвода откачиваемой из скважины среды сообщен с колонной труб 1 ниже корпуса 4 струйного насоса 2. В ступенчатом поршне 17 и уплотнительном элементе 15 выполнены соосно осевые каналы для пропуска через них каротажного кабеля 20, на котором посредством кабельной головки 21 ниже корпуса 4 струйного насоса 2 подвешен каротажный прибор 22 с возможностью его перемещения вдоль скважины и расположения его в зоне продуктивного пласта 23. В канале 11 подвода активной рабочей среды установлен обратный клапан 24, пакер 3 выполнен с осевым проходным отверстием 25, а диаметр d ступенчатого проходного канала 7 ниже посадочного места 8 не меньше диаметра D осевого проходного отверстия 25 пакера 3.The downhole jet installation comprises a jet pump 2 and a packer 3 mounted on a pipe string 1, wherein an active nozzle 5 and a mixing chamber 6 with a diffuser are coaxially mounted in the housing 4 of the jet pump 2, and a stepped passage channel 7 with a seat 8 between the steps is made, a channel 9 supply of the medium pumped out of the well, reported below the seat 8 through the side openings 10 in the housing 4 of the jet pump 2 with a stepped passage channel 7, and the channel 11 for supplying an active working medium, communicated from the exit side it with an active nozzle 5 and from the entrance to it with the annular space of the pipe string 1. The channel 9 for supplying a pumped medium is communicated through a check valve 12 with a pipe string 1 below the step-through passage channel 7, and in the latter it is possible to install a sealing unit 13, which is made in the form of a hollow stepped cylindrical body 14, in the upper part of the cavity of which a sealing element 15 is placed, and lower in the cavity is located with an emphasis in an annular ledge 16 in the cavity of the body 14 of the sealing assembly 13, stepwise a rod 17, spring-loaded by means of a spring 18 relative to the sealing element 15. In the wall of the housing 14 of the sealing assembly 13, holes 19 are made opposite the side holes 10 of the housing 4 of the jet pump 2 and the holes 19 in the wall of the housing 14 of the sealing assembly 13 are last blocked in the lower position of the step piston 17, and in the upper position of the stepped piston 17 through the side holes 10 in the housing 4 of the jet pump 2 and the holes 19 in the wall of the housing 14 of the sealing unit 13, the channel 9 for supplying the medium pumped out of the well is communicated with core pipes 1 below the housing 4 of the jet pump 2. In the stepped piston 17 and the sealing element 15 are made coaxially axial channels for passing through them a logging cable 20, on which, using the cable head 21 below the housing 4 of the jet pump 2 suspended logging device 22 with the possibility of its movement along the well and its location in the zone of the reservoir 23. In the channel 11 for supplying an active working medium, a check valve 24 is installed, the packer 3 is made with an axial bore 25, and the diameter d of the stepped bore 7 is lower the seat 8 is not smaller than the diameter D of the axial passage hole 25 of the packer 3.

Способ работы скважинной струйной установки заключается в том, что проводят сборку колонны труб 1 путем установки на колонне труб 1 струйного насоса 2 и пакера 3. Проводят спуск сборки в скважину и распакеровку пакера 3. Подают под напором по колонне труб 1 в продуктивный пласт 23 жидкость гидроразрыва пласта или кислотный раствор, после чего спускают в скважину на каротажном кабеле 20 герметизирующий узел 13 с закрепленным на кабеле 20 посредством кабельной головки 21 каротажным прибором 22. Герметизирующий узел 13 устанавливают на посадочное место 8 в ступенчатом проходном канале 7 струйного насоса 2, а каротажный прибор 22 располагают в зоне продуктивного пласта 23. В ходе спуска регистрируют каротажным прибором 22 фоновые значения физических полей горных пород вдоль ствола скважины, в частности, тепловые поля. Далее струйным насосом 2 путем подачи по затрубному пространству колонны труб 1 в активное сопло 5 активной рабочей среды откачивают из продуктивного пласта 23 жидкость гидроразрыва или продукты химической обработки продуктивного пласта. Затем при работающем струйном насосе 2 проводят регистрацию текущих значений физических полей горных пород и поступающего в скважину пластового флюида, причем в ходе регистрации посредством каротажного кабеля 20 проводят перемещение каротажного прибора 22 вдоль ствола скважины, включая и продуктивный пласт 23. Потом прекращают работу струйного насоса 2 и посредством обратного клапана 12 в канале 9 подвода откачиваемой среды разобщают внутреннюю полость колонны труб 1 над струйным насосом 2 вместе с затрубным пространством над пакером 3 и внутреннюю полость колонны труб 1 под струйным насосом 2 вместе с подпакерным пространством, сохраняя под пакером 3 пониженное забойное давление и регистрируя при этом кривую восстановления пластового давления под пакером 3 с помощью каротажного прибора 22. Затем с помощью каротажного кабеля 20 приподнимают каротажный прибор 22 и кабельной головкой 21 нажимают снизу на ступенчатый поршень 17, перемещают его вверх и, таким образом, сообщают через отверстия 19 в стенке корпуса 14 герметизирующего узла 13 и боковые отверстия 10 в корпусе 4 струйного насоса 2 подпакерное пространство скважины с внутренней полостью колонны труб 1 выше струйного насоса 2 и затрубным пространством выше пакера 3 и за счет этого выравнивают давление над и под струйным насосом 2, после чего извлекают из скважины каротажный прибор 22 вместе с герметизирующим узлом 13.The method of operation of a downhole jet installation consists in assembling a pipe string 1 by installing an jet pump 2 and a packer 3 on a pipe string 1. The assembly is launched into the well and unpacking the packer 3. The fluid is fed under pressure along the pipe string 1 into the reservoir 23 fracturing of the formation or acid solution, and then lowered into the well on the logging cable 20, the sealing unit 13 with the logging tool 22 mounted on the cable 20 by the cable head 21. The sealing unit 13 is installed on the landing month about 8 stepwise in the through passage 7 of the jet pump 2, a logging instrument 22 is disposed in the zone of the productive formation 23. During lowering the logging tool 22 is recorded baseline values of the physical fields of rock along the borehole, in particular thermal field. Next, a jet pump 2 by feeding through the annular space of the pipe string 1 into the active nozzle 5 of the active working medium is pumped from the reservoir 23 fracturing fluid or chemical treatment of the reservoir. Then, when the jet pump 2 is operating, the current values of the rock physical fields and the formation fluid entering the well are recorded, and during the registration, the logging tool 22 is moved along the wellbore, including the producing formation 23, by means of a well logging cable 23. Then, the jet pump 2 is stopped and by means of a check valve 12 in the channel 9 for supplying a pumped-off medium, the internal cavity of the pipe string 1 above the jet pump 2 is disconnected together with the annulus above the packer 3 and the upper cavity of the pipe string 1 under the jet pump 2 together with the under-packer space, keeping the bottomhole pressure below the packer 3 and recording the reservoir pressure recovery curve under the packer 3 using the logging tool 22. Then, using the logging cable 20, the logging device 22 and the cable with the head 21 press the step piston 17 from the bottom, move it up and, thus, communicate through the openings 19 in the wall of the housing 14 of the sealing assembly 13 and the side holes 10 in the housing 4 of the jet pump CA 2 sub-packer space of the well with the internal cavity of the pipe string 1 above the jet pump 2 and the annulus above the packer 3 and thereby equalize the pressure above and below the jet pump 2, after which the logging tool 22 is removed from the well together with the sealing unit 13.

Настоящее изобретение может быть использовано в нефтегазодобывающей промышленности при освоении скважин после бурения или при каротажных работах во всех типах скважин.The present invention can be used in the oil and gas industry for well development after drilling or for logging in all types of wells.

Claims (2)

1. Скважинная струйная установка, содержащая смонтированный на колонне труб струйный насос и пакер с осевым проходным отверстием, причем в корпусе струйного насоса соосно установлены активное сопло и камера смешения с диффузором, а также выполнены ступенчатый проходной канал с посадочным местом между ступенями, канал подвода откачиваемой из скважины среды, сообщенный ниже посадочного места посредством боковых отверстий в корпусе струйного насоса со ступенчатым проходным каналом, и канал подвода активной рабочей среды, сообщенный со стороны выхода из него с активным соплом и со стороны входа в него с затрубным пространством колонны труб, при этом канал подвода откачиваемой среды сообщен через обратный клапан с колонной труб ниже ступенчатого проходного канала, а в последнем предусмотрена возможность установки герметизирующего узла, который выполнен в виде полого ступенчатого цилиндрического корпуса, в верхней части полости которого размещен уплотнительный элемент, а ниже в полости расположен с упором в кольцевой уступ в полости корпуса герметизирующего узла ступенчатый поршень, подпружиненный относительно уплотнительного элемента, причем в стенке корпуса герметизирующего узла выполнены отверстия напротив боковых отверстий корпуса струйного насоса и в нижнем положении ступенчатого поршня последним перекрыты отверстия в стенке корпуса герметизирующего узла, а в верхнем положении ступенчатого поршня через боковые отверстия в корпусе струйного насоса и отверстия в стенке корпуса герметизирующего узла канал подвода откачиваемой из скважины среды сообщен с колонной труб ниже корпуса струйного насоса, при этом в ступенчатом поршне и уплотнительном элементе выполнены соосно осевые каналы для пропуска через них каротажного кабеля, на котором посредством кабельной головки ниже корпуса струйного насоса подвешен каротажный прибор, при этом в канале подвода активной рабочей среды установлен обратный клапан, а диаметр ступенчатого проходного канала ниже посадочного места не меньше диаметра осевого проходного отверстия пакера.1. A downhole jet installation comprising a jet pump mounted on a pipe string and a packer with an axial bore, and an active nozzle and a mixing chamber with a diffuser coaxially mounted in the body of the jet pump, and a stepped bore channel with a seat between the steps, a feed channel for pumping out from the well of the medium, communicated below the seat by means of side holes in the housing of the jet pump with a stepped passage channel, and the channel for supplying the active working medium, communicated with orons of exit from it with an active nozzle and from the entrance to it with the annular space of the pipe string, while the channel for supplying a pumped medium is communicated through a check valve with a pipe string below the stepped passage channel, and in the latter it is possible to install a sealing assembly, which is made in the form hollow stepped cylindrical body, in the upper part of the cavity of which a sealing element is placed, and lower in the cavity is located with an emphasis in an annular ledge in the cavity of the housing of the sealing unit of the steps a piston spring-loaded with respect to the sealing element, the holes being made in the wall of the housing of the sealing assembly opposite the side openings of the housing of the jet pump and the lower position of the stepped piston closing the holes in the wall of the housing of the sealing assembly, and in the upper position of the stepped piston through the side holes in the housing of the jet pump and holes in the wall of the housing of the sealing unit, the channel for supplying the medium pumped out from the well is in communication with the pipe string below the housing of the jet while, in the stepped piston and sealing element, axial axial channels are made for passing a wireline through them, on which a wireline tool is suspended by means of a cable head below the jet pump housing, while a check valve is installed in the channel for supplying the active working medium, and the diameter of the step-through channel below the seat is not less than the diameter of the axial bore of the packer. 2. Способ работы скважинной струйной установки, заключающийся в том, что проводят сборку колонны труб путем установки на колонне труб струйного насоса и пакера, после чего спускают сборку в скважину, проводят распакеровку пакера, подают под напором по колонне труб в продуктивный пласт жидкость гидроразрыва пласта или кислотный раствор и проводят спуск в скважину на каротажном кабеле герметизирующего узла с закрепленным на кабеле посредством кабельной головки каротажным прибором, герметизирующий узел устанавливают на посадочное место в ступенчатом проходном канале струйного насоса, а каротажный прибор располагают в зоне продуктивного пласта, при этом в ходе спуска регистрируют каротажным прибором фоновые значения физических полей горных пород вдоль ствола скважины, в частности тепловые поля, далее струйным насосом путем подачи по затрубному пространству колонны труб в активное сопло активной рабочей среды создают депрессию на продуктивный пласт и откачивают из продуктивного пласта жидкость гидроразрыва или продукты химической обработки продуктивного пласта, а затем при работающем струйном насосе проводят регистрацию текущих значений физических полей горных пород и поступающего в скважину пластового флюида, причем в ходе регистрации посредством каротажного кабеля проводят перемещение каротажного прибора вдоль ствола скважины, включая и продуктивный пласт, потом прекращают работу струйного насоса и посредством обратного клапана в канале подвода откачиваемой среды разобщают внутреннюю полость колонны труб над струйным насосом вместе с затрубным пространством над пакером и внутреннюю полость колонны труб под струйным насосом вместе с подпакерным пространством, сохраняя под пакером пониженное забойное давление и регистрируя при этом кривую восстановления пластового давления под пакером с помощью каротажного прибора, затем с помощью каротажного кабеля приподнимают каротажный прибор и кабельной головкой нажимают снизу на ступенчатый поршень, перемещают его вверх и, таким образом, сообщают через отверстия в стенке корпуса герметизирующего узла и боковые отверстия в корпусе струйного насоса подпакерное пространство скважины с внутренней полостью колонны труб выше струйного насоса и затрубным пространством выше пакера и за счет этого выравнивают давление над и под пакером, после чего извлекают из скважины каротажный прибор вместе с герметизирующим узлом.2. The method of operation of a downhole jet installation, which consists in assembling a pipe string by installing an jet pump and a packer on the pipe string, then lowering the assembly into the well, unpacking the packer, and pumping the hydraulic fluid under pressure through the pipe string into the reservoir or an acid solution, and a descent into the well is carried out on a well-logging cable of the sealing unit with a logging tool fixed to the cable by means of the cable head, the sealing-off unit is mounted on a seat in a stepped passage channel of the jet pump, and the logging device is located in the zone of the reservoir, while during the descent, the background values of the rock physical fields along the wellbore, in particular thermal fields, are recorded by the logging device, then by the jet pump by feeding the pipe string into the active the nozzle of the active working medium creates depression on the reservoir and hydraulic fracturing fluid or chemical treatment products of the reservoir are pumped out of the reservoir; When the jet pump is running, the current values of the physical fields of the rocks and the formation fluid entering the well are recorded, and during the registration, the logging tool is moved along the wellbore, including the productive formation, using the logging cable, then the jet pump is stopped and the check valve the channel for supplying the pumped medium disconnect the internal cavity of the pipe string above the jet pump together with the annulus above the packer and the internal cavity pipe columns under the jet pump together with the under-packer space, keeping the bottom hole pressure below the packer and registering the reservoir pressure recovery curve under the packer using the logging tool, then using the logging cable, lift the logging tool and press the step piston from below with a cable head, move it upwards and, thus, through the openings in the wall of the housing of the sealing unit and the side openings in the housing of the jet pump, the under-packer space of the well s with the interior of the tubing string above the jet pump and the annulus above the packer and thereby equalize the pressure above and below the packer, and then removed from the well logging tool with the sealing unit.
RU2007125689/06A 2007-07-09 2007-07-09 Well jet unit "эмпи-угис-(11-20)дш" and method of its operation RU2334130C1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
RU2007125689/06A RU2334130C1 (en) 2007-07-09 2007-07-09 Well jet unit "эмпи-угис-(11-20)дш" and method of its operation
PCT/RU2008/000155 WO2009008764A1 (en) 2007-07-09 2008-03-19 Well jet device and the operation method thereof
US12/667,521 US20100326661A1 (en) 2007-07-09 2008-03-19 Well jet device and the operation method thereof
CA2692562A CA2692562C (en) 2007-07-09 2008-03-19 Well jet device and the operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2007125689/06A RU2334130C1 (en) 2007-07-09 2007-07-09 Well jet unit "эмпи-угис-(11-20)дш" and method of its operation

Publications (1)

Publication Number Publication Date
RU2334130C1 true RU2334130C1 (en) 2008-09-20

Family

ID=39868025

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2007125689/06A RU2334130C1 (en) 2007-07-09 2007-07-09 Well jet unit "эмпи-угис-(11-20)дш" and method of its operation

Country Status (4)

Country Link
US (1) US20100326661A1 (en)
CA (1) CA2692562C (en)
RU (1) RU2334130C1 (en)
WO (1) WO2009008764A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2795009C1 (en) * 2022-05-27 2023-04-27 Салават Анатольевич Кузяев Method for well exploration and stimulation of oil and gas inflows and a jet pump for its implementation

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587886A (en) * 2012-03-20 2012-07-18 西南石油大学 Testing device and testing method for flow conductivity of acid-eroded fractures
US20180100382A1 (en) * 2016-10-12 2018-04-12 Weatherford Technology Holdings, Llc Jet pump lift system for producing hydrocarbon fluids
CN111119836A (en) * 2018-10-29 2020-05-08 中国石油化工股份有限公司 Production fluid profile testing pipe column and method
US11359440B2 (en) 2019-08-21 2022-06-14 Tier 1 Energy Tech, Inc. Cable head for attaching a downhole tool to a wireline

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4930454A (en) * 1981-08-14 1990-06-05 Dresser Industries, Inc. Steam generating system
RU2059891C1 (en) * 1989-06-14 1996-05-10 Зиновий Дмитриевич Хоминец Borehole jet set
RU2106540C1 (en) * 1997-03-14 1998-03-10 Зиновий Дмитриевич Хоминец Well jet pumping unit
RU2160364C1 (en) * 1999-08-20 2000-12-10 Открытое акционерное общество "Технологии оптимизации нефтедобычи" Process to run in, to examine wells and to intensify oil and gas influxes and gear to realize it
RU2188970C1 (en) * 2001-04-05 2002-09-10 Зиновий Дмитриевич Хоминец Downhole jet plant
RU2188342C1 (en) * 2001-05-21 2002-08-27 Зиновий Дмитриевич Хоминец Method of operation of well jet plant at testing and completion of wells, and well jet plant
US7090011B2 (en) * 2001-07-31 2006-08-15 Zinoviy Dmitrievich Khomynets Method for operating a well jet device during repair and insulating operations and device for carrying out said method
RU2303171C1 (en) * 2006-03-22 2007-07-20 Зиновий Дмитриевич Хоминец Well jet plant for logging operations and method for operating the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2795009C1 (en) * 2022-05-27 2023-04-27 Салават Анатольевич Кузяев Method for well exploration and stimulation of oil and gas inflows and a jet pump for its implementation

Also Published As

Publication number Publication date
WO2009008764A1 (en) 2009-01-15
US20100326661A1 (en) 2010-12-30
CA2692562A1 (en) 2009-01-15
CA2692562C (en) 2012-12-04

Similar Documents

Publication Publication Date Title
RU2341692C1 (en) Well jet facility for hydro-break-up of reservoir and reserch of horizontal wells and method of this facility employment
US20090095467A1 (en) Bypass gas lift system and method for producing a well
RU2334131C1 (en) Well jet unit "эмпи-угис-(31-40)ш"
RU2303172C1 (en) Well jet plant and its operation method
US20100032153A1 (en) Bypass gas lift system and method for producing a well
RU2334130C1 (en) Well jet unit "эмпи-угис-(11-20)дш" and method of its operation
RU2345214C2 (en) Method of oil and gas influx development and intensification, waterproofing procedure and related device for implementation thereof
WO2007149008A1 (en) Method for operating a well jet device at a hydraulic fracturing of multilayer hydrocarbon reservoirs
RU2324843C1 (en) Bore hole jet stream installation эмпи-угис-(1-10)кд - for logging and tests of horisontal bores
RU2303171C1 (en) Well jet plant for logging operations and method for operating the same
RU2329409C1 (en) Well-deep jet unit for hydraulic formation fracturing and well analysis
RU2329410C1 (en) "эмпи-угис-(31-40)д" deep-well jet pump unit
RU2324079C1 (en) Blast-hole fluidic unit on flexible plain pipe for horizontal well investigation
RU2397375C1 (en) Downhole spray unit кэу-12 for logging and development of horizontal wells
RU2362914C2 (en) Facility for treatment and survey of wells
RU2315208C1 (en) Oil-well jet plant for logging operations at abnormally low formation pressure and method of its operation
RU2320899C1 (en) Oil well jet plant
RU2282760C1 (en) Oil-well jet pump and method of its operation
RU2374503C1 (en) Downhole jet unit for perforation of benches, intensification of inflow and oil-and-gas well development
RU2332592C1 (en) Horizontal well jet acidising and analysing plant
EA008076B1 (en) Well jet device for logging horizontal wells and operating method thereof
RU2256102C1 (en) Ejector multifunctional formation tester for testing and completion of horizontal wells
RU2300671C1 (en) Well jet device for horizontal wells and method for operating said device
RU2280787C1 (en) Oil-well pump and method of its operation
WO2008057009A1 (en) Well jet device

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20180710