Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Instytut Badawczy Dróg i Mostów, Soley Spółka Z Ograniczoną OdpowiedzialnościąfiledCriticalInstytut Badawczy Dróg i Mostów
Priority to PL389717ApriorityCriticalpatent/PL219705B1/en
Publication of PL389717A1publicationCriticalpatent/PL389717A1/en
Publication of PL219705B1publicationCriticalpatent/PL219705B1/en