Offorestaion mothod of slope Download PDFInfo
- Publication number
- KR900001582B1 KR900001582B1 KR1019860010861A KR860010861A KR900001582B1 KR 900001582 B1 KR900001582 B1 KR 900001582B1 KR 1019860010861 A KR1019860010861 A KR 1019860010861A KR 860010861 A KR860010861 A KR 860010861A KR 900001582 B1 KR900001582 B1 KR 900001582B1
- Authority
- KR
- South Korea
- Prior art keywords
- vegetation
- soil
- spraying
- slope
- rock
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Cultivation Of Plants (AREA)
Abstract
Description
제1도는 불규칙한 기존암반을 정리하면서 우물통을 설치하는 제1공정.1 is a first step of installing the well while arranging irregular existing rock.
제2도는 정리된 경사면에 앙카볼트로 네트를 설치하는 제2공정.2 is a second step of installing the net with anchor bolt on the inclined surface.
제3도는 특수 식생재료를 단립구조로 부착하여 식생기반을 형성하는 제3공정.3 is a third step of forming a vegetation base by attaching a special vegetation material in a unitary structure.
제4도는 기반조성후 제4공정의 초목종자를 분사파종하여 녹화달성된 상태도.4 is a state in which greening is achieved by spraying and seeding vegetation seeds of the fourth process after the foundation.
본 발명은 국토개발에 의해 발생하는 많은 나지(裸地)중 표토가 전혀없는 암반지역 또는 강마사토질, 극도의 척박지(비료성분이 전혀없는 토질), 임해매립지, 오염토양매립지등의 지역, 특히 급경사암반이나 수평상의 콘크리트 상면과 같은 불투수층지역에 최소의 인공물을 설치후 특수식생재료를 뿜어붙이기(고압분사식)로 고정하고 각종 초목류(草木類)를 파종하여 식물로 자연상태를 회복함은 물론 경사지를 안정되게 보호할 수 있게하는 특수식생재료를 뿜어붙이기에 의한 법면녹화공법에 관한 것이다.The present invention is a rocky area without any topsoil, or river masses, extreme crushed land (no fertilizers), coastal landfills, contaminated soil landfills, especially steep slopes. After installing a minimum of artifacts in the impervious layer area such as rock or horizontal concrete surface, it is fixed by sprinkling special vegetation materials (high pressure injection type) and sowing various vegetation plants to restore natural state as well as slope. It is related with the surface greening method by spraying special vegetation material which can protect the plant stably.
현재 암반 또는 강사토지역은 자연회복을 시키는 별다른 공법이 없어 낙석방지 시설을 하여 방치하거나 비식생공법인 옹벽, 블록쌓기, 시멘트 뿜어붙이기로 마감처리하여 왔거나, 설령, 암반등에 녹화를 시도했다하더라도 잔디에 필요한 공급수의 함유가 특히 갈수기때에는 부족하여서 잔디가 고사되어 버리는 결과를 초래하였다.Currently, rock or instructor soil has no special method of natural recovery, so it has been left as a rockfall prevention facility or finished with non-vegetable retaining wall, block stacking, cement spraying, or even greenery. The amount of water needed for the feedstock was insufficient, especially during the dry season, resulting in grass death.
따라서, 본 발명은 기존의 종자살포 공법이나 통상의 어떤 공법으로도 식생녹화가 불가능한 불투수층지역 즉, 암반의 경사면이나 콘크리트 상면을 안정되게 보호하면서 특히, 갈수기때에도 녹화된 식생의 착근에 필요한 수분공급이 용이하도록 하여 식물에 의한 녹화로 자연을 회복하므로서 인간의 생활환경을 보호할 수 있는 녹화공법을 제공함에 목적이 있는 것이다.Therefore, the present invention provides a stable protection of the impervious layer area, that is, the slope of the rock or the upper surface of the rock, which cannot be vegetated by the existing seed dispersing method or any conventional method. It aims to provide a greening method that can protect human living environment by restoring nature by greening by plants.
본 발명의 실시예를 첨부도면에 의하여 설명하면 다음과 같다.An embodiment of the present invention will be described with reference to the accompanying drawings.
제1도는 시공지역의 불규칙한 기존법면(1)을 시공에 적합한 조건으로 정리하는 제1공정으로서 법면 상부의 도수로 암거배수로, 측구등을 확인정비하고, 적당크기(약 15㎝×10㎝×10㎝)의 우물통(2)을 ㎡당 2개이상 계단형이나 단독형으로 설치하는 것이 바람직하며, 자연적인 불규칙굴곡면은 조경미에 알맞은 조건이 되도록 정비한후 우물통을 형성한다.FIG. 1 is a first step to arrange irregular existing surface (1) of construction area under suitable conditions for construction, and to check and maintain channel, culvert drainage, side hole, etc. at the upper surface of the surface, and to adjust appropriate size (about 15cm × 10cm × 10cm It is preferable to install two or more well tanks (2) per square meter in a staircase type or a single type. The natural irregular curved surface is maintained to be suitable for the landscape, and the wells are formed.
본 발명의 불투수층을 주대상으로 하면서 우물통을 설치하여 식물의 생육에 필요한 함수능력을 크게하고 그 외에도 객토고정, 착근에 유리하도록 한것이다.The water permeable layer of the present invention as the main target is to install a well bucket to increase the water capacity necessary for the growth of the plant, and in addition to the advantage in the fixed land, the work.
제2도는 제1공정이 완료된 법면에 네트를 설치하는 제2공정으로서 풍화에 의한 부분적인 법면의 붕괴방지와 급경사지에 식생재료를 고정하기 위한 목적으로 설치하는 것이다.2 is a second step of installing the net on the surface where the first step is completed, and is installed for the purpose of preventing the collapse of the partial surface due to weathering and fixing the vegetation material on the steep slope.
네트(3)는 필요에 따라 신축성있는 능형철망 또는 나이론망을 설치한다. 철망은 법면이 길고 경사가 급하여 낙석, 부분적인 붕괴위험이 있을때 설치되며, 나이론망은 경사가 완만하고 법면이 짧을시 사용가능하다.The net 3 installs an elastic ridged wire or nylon net as necessary. The wire mesh is installed when the slope is long and the slope is steep and there is a risk of falling rocks and partial collapse. The nylon mesh can be used when the slope is gentle and the slope is short.
이러한 네트설치는 표준인 장력을 유지하여서 견고하도록 상, 하부에 앙카볼트(4)를 이용하여 고정시키며 법면과의 사이에 간격을 갖도록 설치하는 것이다.This net installation is to be installed to have a gap between the surface and the fixing by using the anchor bolt (4) in the upper and lower, so as to maintain a standard tension.
제3도는 제2공정이 완료된 법면에 특수식생재료를 단립 구조로 부착하는 제3공정이다.3 is a third step of attaching the special vegetation material in a monolithic structure on the surface where the second step is completed.
특수식생재료라 함은 식물의 생존 및 생육을 보장하는 주재료로서 식생토(5)를 말한다. 색생토는 식물의 생육에 필요한 수분과 무기물, 유기물등을 보유하고 뿌리를 유지할 수 있는 공간을 제공하는 인공배합 재료로서, 특수부식질재료(부엽토 및 이에 유사한 재료)에 토양개량제, 유기질비료, 접착성 점토, 양생제를 혼합하고 특수발포제를 첨가하여 보수(保水), 보비(保肥)성이 가장 좋으며 단립구조 형성이 가능한 특수 객토를 조제하는 것이다. 이때 각 재료의 배합율은 지반의 토성, 법면의 경사도, 살포 두께, 기후, 퐁토에 따라 결정하는 것이다.Special vegetation material refers to vegetation soil (5) as the main material to ensure the survival and growth of plants. Colored soil is an artificial blending material that provides moisture, minerals, organic matter, etc. necessary for plant growth and provides space for maintaining roots. Soil improver, organic fertilizer, adhesiveness to special corrosive materials (leaf and similar materials) By mixing clay and curing agent and adding special foaming agent, it is to prepare special soil which has the best water retention and maintenance, and enables the formation of single grain structure. At this time, the blending ratio of each material is determined according to the soil soil, slope of the surface, spray thickness, climate, and fonto.
특히, 불투수층에 보수능력이 크도록 하면서 뿌리의 착근성을 좋도록 하기 위해서 식생층에 공극율을 크게 하여야 하는데, 본 발명은 이를 위해서 토양개량제에다 피트모스와 부숙톱밥을 첨가한 것이며, 이러한 첨가물의 특성이 불투수층의 우물통 기능과 결합하게 되므로 보수능력이 항상 문제시 되었던 것을 해결하고 보수성을 향상시키게 되는 것이다.In particular, the porosity must be increased in the vegetation layer in order to increase the water repellency of the impermeable layer and to improve the rooting ability. The present invention is to add pitmos and boiled sawdust to the soil improving agent. Combined with the well's function of the water will solve the problem that was always a problem, and improve the water retention.
여기에서, 토양개량제에 첨가하는 피트모스와 부숙톱밥은 식생층내의 공극율을 크게 하면서 보수능력을 갖게하고, 수분의 증발을 최소화 할수 있는 작용을 하므로서, 불투수층상의 식생층 지반의 안정도와 뿌리의 착근성을 좋게할 수 있는 것이다.Here, the peat moss and the boiled sawdust added to the soil improving agent have a water retention capacity while increasing the porosity in the vegetation layer and minimize the evaporation of water, thereby improving the stability of the vegetation layer on the impermeable layer and the root proximity. You can do it.
여기서 양생제는 각 재료를 연결하여 토양 단립구조를 형성하는 식물성 섬유질로서 접합력을 목적으로 사용되며 특수 객토의 배합율에 따라 그 첨가량도 결정한다.Here, the curing agent is a vegetable fiber that connects each material to form a soil monolithic structure and is used for the purpose of bonding strength. The amount of the curing agent is also determined according to the mixing ratio of the special soil.
발포단립제는 특수용도의 단립구조를 조합유지하여 법면에 부착시켜며 일종의 벌집형태처럼 공극을 갖도록 발포시키는 단립구조 형성을 목적으로 사용되고 강우등 기후, 풍토와 살포 두께에 따라 첨가량을 결정한다.Foaming granules are used for the purpose of forming a monolithic structure that foams to have voids like a honeycomb type by maintaining the specially-formed monolithic structure in combination, and decides the addition amount according to the weather, weather and thickness of the rain.
특수접착제인 안정제와 화학비료를 자연수로 혼합하면서 고압으로 분사하여 제3도에서와 같이 법면에 적당두께의 식생기반을 갖게 하는 것이다.The special adhesive stabilizer and chemical fertilizer are mixed with natural water and sprayed at high pressure to provide a vegetation foundation of suitable thickness on the surface as shown in FIG.
여기서 시공지역의 조건에 따른 재료살포 두께의 적용기준은 아래와 같다.The application criteria of the material spraying thickness according to the conditions of the construction area are as follows.
상기 도표에서 볼때 각각의 지역조건에 따라서 식생재료의 두께가 달라져야 하며 두께가 두터워짐에 따라 지반의 안정도 및 부착력을 보강하기 위해 네트를 설치하여 고온과 동결에 의한 팽창, 수축에 적응할수 있는 신축성 있는 식생층을 갖게 되는 것이다.As shown in the above chart, the thickness of vegetation material should be different according to each local condition. As the thickness becomes thicker, it is elastic to adapt to expansion and contraction by high temperature and freezing by installing net to reinforce ground stability and adhesion. You will have a vegetation layer.
이러한 식생층이 충분히 안정된후 통상의 스프레이(HIERO SEEDING)공법으로 종자를 살포하여주는 제4공정이 이루어지며 발아에 필요한 수분과 온도를 유지할 수 있도록 하여 제4도에서와 같이 식물의 녹화를 달성할 수 있는 것이다.After the vegetation layer is sufficiently stabilized, the fourth step of spraying the seeds by a conventional HIERO SEEDING method is performed, and the greening of the plant can be achieved as shown in FIG. 4 by maintaining the moisture and temperature necessary for germination. It can be.
이와같은 본 발명은 합수능력이 전혀 없는 암반지역이나 콘크리트면과 같은 불투수층에 다수의 우물통의 형성하여 물이 고여지게하는 함수능력을 크게 하므로서 잔디생육에 필요한 수분공급이 용이하게 되고, 갈수기에도 수분공급이 용이하여 불투수층의 식물생육이 가능하도록 한것이며, 식생재료에 의해 이루어지는 식생층에 있어서도 토양개량제에다 피트모스와 부숙톱밥을 첨가혼합하여 양생제 및 안정제와 혼합제조하므로서 식생토내의 공극형성이 좋아지게 되어 잔디뿌리의 착근을 좋게할 수 있는 것이다.The present invention, such as the formation of a large number of wells in the impermeable layer, such as a rock area or a concrete surface that does not have any capacity to increase the water capacity to increase the water is easy to supply the moisture required for grass growth, even in the dry season It is easy to supply and it is possible to grow plants of impervious layers. In addition, it is possible to improve the pore formation in the vegetation soil by adding and mixing peat moss and boiled sawdust with soil improver in the vegetation layer made of vegetative materials. This will improve the rooting of the grass roots.
그러므로 이제까지 식물생육이 불가능하던 암, 강마사지역, 임해매립지, 오염토양지역등에 녹화를 가능케하여 훼손된 자연을 회복하므로서 인간의 생활환경을 보존하고 미관이 수려하며 법면을 영구적으로 안정화 시킬 수 있으므로 국토개발지역 조경사업에 효과적으로 사용될 수 있는 것이다.Therefore, it is possible to plant greenery in cancers, river masses, coastal landfills, and contaminated soil areas, where plant growth has not been possible, thus restoring the damaged nature, preserving human living environment, beautiful scenery, and stabilizing the law permanently. It can be effectively used for local landscaping projects.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019860010861A KR900001582B1 (en) | 1986-12-18 | 1986-12-18 | Offorestaion mothod of slope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019860010861A KR900001582B1 (en) | 1986-12-18 | 1986-12-18 | Offorestaion mothod of slope |
Publications (2)
Publication Number | Publication Date |
---|---|
KR880007880A KR880007880A (en) | 1988-08-29 |
KR900001582B1 true KR900001582B1 (en) | 1990-03-15 |
Family
ID=19254101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019860010861A KR900001582B1 (en) | 1986-12-18 | 1986-12-18 | Offorestaion mothod of slope |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR900001582B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100785743B1 (en) * | 2007-08-30 | 2007-12-18 | 주식회사 한국종합기술 | A composite and method of tree planting |
KR20190103759A (en) * | 2018-02-28 | 2019-09-05 | 정병현 | Recovery method of waste mine |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100385160B1 (en) * | 1999-12-16 | 2003-05-22 | 삼성에버랜드 주식회사 | method for constructing Imperata cylindrica Beauv vegetative community using Imperata cylindrica Beauv runner |
-
1986
- 1986-12-18 KR KR1019860010861A patent/KR900001582B1/en active Pre-grant Review Request
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100785743B1 (en) * | 2007-08-30 | 2007-12-18 | 주식회사 한국종합기술 | A composite and method of tree planting |
KR20190103759A (en) * | 2018-02-28 | 2019-09-05 | 정병현 | Recovery method of waste mine |
Also Published As
Publication number | Publication date |
---|---|
KR880007880A (en) | 1988-08-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104255280B (en) | A kind of high precipitous rock slope vegetation implantation methods | |
CN101818499B (en) | Revegetation system on steep rocky slopes and implementing method thereof | |
CN107100176B (en) | A kind of expressway slope greening system | |
CN101748719A (en) | Method of vegetation restoration and reconstruction of bare rock slope in East China | |
CN108476648A (en) | A kind of method and system of rock coast Difficult site revegetation | |
CN107237334B (en) | A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening | |
CN108547307A (en) | Protecting slope ecology method based on artificial loam | |
CN107439320A (en) | A kind of greening method of concordant limestone breakage mountain body | |
KR101995968B1 (en) | A composite of vegetation base layer for vegetation composition of slope and greening works | |
CN110036832A (en) | A kind of Qinghai-Tibet Platean ore mining traces revegetation method | |
CN113529753A (en) | Construction method for quickly treating collapse hillock by fast-setting high polymer grouting | |
CN101457525B (en) | Loess slope heavy layer flaking diseases treatment method | |
US3600852A (en) | Hardenable plant-seed-containing compositions and method for establishing plant growth | |
KR100355175B1 (en) | Soil addition composition for greening slope land | |
KR900001582B1 (en) | Offorestaion mothod of slope | |
CN111576453A (en) | Slope anchor hanging net and exposed rock mass ecological restoration method using same | |
JP4351719B2 (en) | Ground covering method and ground covering method | |
CN111886959A (en) | Ecological greening method for steep slope of mine | |
CN212506332U (en) | Slope anchor hanging net structure | |
KR20160128778A (en) | Method for green planting a slope by jute-net and pulp | |
CN212896409U (en) | Three-dimensional geotechnique's net pad grass planting slope protection structure | |
CN114931069A (en) | Ecological restoration anti-erosion fiber spray-seeding method | |
KR100496118B1 (en) | Method to keep a green slope surface | |
KR100307198B1 (en) | Greening method using green net | |
KR20060130987A (en) | Forest mat construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
G160 | Decision to publish patent application | ||
O035 | Opposition [patent]: request for opposition |
Free format text: OPPOSITION NUMBER: 001990002157001990002472; OPPOSITION DATE: 23790131 |
|
J2X1 | Appeal (before the patent court) |
Free format text: APPEAL AGAINST DECISION TO DECLINE REFUSAL Free format text: TRIAL NUMBER: 1990201001835; APPEAL AGAINST DECISION TO DECLINE REFUSAL |