KR102261784B1 - Cable Guide Device Having Rail Fixing Part - Google Patents

Cable Guide Device Having Rail Fixing Part Download PDF

Info

Publication number
KR102261784B1
KR102261784B1 KR1020210009803A KR20210009803A KR102261784B1 KR 102261784 B1 KR102261784 B1 KR 102261784B1 KR 1020210009803 A KR1020210009803 A KR 1020210009803A KR 20210009803 A KR20210009803 A KR 20210009803A KR 102261784 B1 KR102261784 B1 KR 102261784B1
Authority
KR
South Korea
Prior art keywords
cable
block
guide
tire
cable guide
Prior art date
Application number
KR1020210009803A
Other languages
Korean (ko)
Inventor
이지환
Original Assignee
이지환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이지환 filed Critical 이지환
Priority to KR1020210009803A priority Critical patent/KR102261784B1/en
Application granted granted Critical
Publication of KR102261784B1 publication Critical patent/KR102261784B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/12Driving gear incorporating electric motors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details
    • B66D1/40Control devices
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G11/00Arrangements of electric cables or lines between relatively-movable parts
    • H02G11/02Arrangements of electric cables or lines between relatively-movable parts using take-up reel or drum
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0406Details thereof
    • H02G3/0418Covers or lids; Their fastenings
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K7/00Arrangements for handling mechanical energy structurally associated with dynamo-electric machines, e.g. structural association with mechanical driving motors or auxiliary dynamo-electric machines
    • H02K7/10Structural association with clutches, brakes, gears, pulleys or mechanical starters
    • H02K7/116Structural association with clutches, brakes, gears, pulleys or mechanical starters with gears

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Power Engineering (AREA)
  • Transmission Devices (AREA)

Abstract

The present invention relates to a cable guide device with a rail fixing part to prevent tiers and cables from being damaged. According to the present invention, the cable guide device comprises: a body plate (40) including an upper surface (40a), a bottom surface (40b), and a through-hole (41); first and second tiers (21, 31) installed on the upper surface (40a); and first and second rail fixing blocks (90a, 90b) installed on the lower part of the bottom surface (40b). The first rail fixing block (90a) includes: first and second vertical walls (91a, 92a); a first horizontal portion (93a) interconnecting the first and second vertical walls (91a, 92a) on the lower part of the first and second vertical walls (91a, 92a); and a first screw fixing part (170a) formed on the first vertical wall (91a), wherein the height of the first vertical wall (91a) is smaller than the that of the second vertical wall (92a).

Description

레일 고정부를 구비한 케이블 가이드 장치 {Cable Guide Device Having Rail Fixing Part}Cable Guide Device Having Rail Fixing Part}

본 발명은 케이블 가이드 장치에 관한 것으로 특히 케이블을 가이드 하는 레일에 고정할수 있는 고정부를 구비한 케이블 가이드 장치에 관한 것이다.The present invention relates to a cable guide device, and more particularly, to a cable guide device having a fixing part that can be fixed to a rail for guiding a cable.

본 발명은 케이블 가이드 장치에 관한 것으로, 아파트 및 건물 시공등에 있어서 건물 내부에 설치되는 케이블을 일정한 장소에서 정리할 수 있도록 가이드 하는 장치에 관한 것이다.The present invention relates to a cable guide device, and to a device for guiding cables installed inside a building to be arranged in a predetermined place in apartment and building construction.

상기 가이드 장치에서는 모터(29)의 축에 연결된 제1 타이어(21)가 회전하며 케이블을 진행 방향으로 밀어내고 모터에 연결되지 않은 제2 타이어(31)는 케이블과의 마찰에 의해 회전하고, 제1 및 제2 타이어(21, 31)는 동일한 사이즈로 제작되어, 케이블이 좌우 휘어짐 없이 직선으로 이동하게 한다.In the guide device, the first tire 21 connected to the shaft of the motor 29 rotates and pushes the cable in the traveling direction, and the second tire 31 not connected to the motor rotates by friction with the cable, The first and second tires 21 and 31 are manufactured to have the same size, so that the cable moves in a straight line without bending left and right.

케이블 작업 전, 케이블 가이드 장치(100)은 설치자가 케이블이 가이드 되는 레일(200)에 고정하는 것과 제2 타이어(31)의 위치를 좌우로 조정하여 케이블 두께보다 조금 작게 제1 및 제2 타이어(21, 31)의 간격을 맞추게 된다.Before the cable work, the cable guide device 100 allows the installer to fix the cable on the rail 200 to which the cable is guided and adjust the position of the second tire 31 left and right to make the first and second tires ( 21, 31) are aligned.

가이드 장치(100)를 레일(200)에 레일(200)에 고정하는 경우, 레일의 종류마다 좀 달라서 고정부의 조정이 필요하다. When the guide device 100 is fixed to the rail 200 on the rail 200 , it is slightly different for each type of rail, so adjustment of the fixing part is required.

또한, 일반적으로 케이블이 제1 및 제2 타이어(21, 31)의 사이를 통과하기 전에는 타이어 사이의 간격의 적합 여부를 판단하기 어렵다.Also, in general, it is difficult to determine whether the distance between the tires is appropriate before the cables pass between the first and second tires 21 and 31 .

제1 및 제2 타이어(21, 31)의 간격이 너무 좁을 경우, 케이블이 타이어 사이로 통과시, 좌우 타이어의 회전 중심축이 밀려서 부러지거나 케이블 피복이 손상될 수 있다.If the distance between the first and second tires 21 and 31 is too narrow, when the cable passes between the tires, the rotational axis of the left and right tires may be pushed and broken or the cable covering may be damaged.

등록 특허 제10-0669231-0000호 (2007.01.09)Registered Patent No. 10-0669231-0000 (2007.01.09) 공개 특허 제10-2020-0016029호 (2020.02.14)Publication No. 10-2020-0016029 (2020.02.14)

본 발명에서는 케이블 가이드 장치를 레일에 고정하는 경우 레일마다 조금씩 다른 형상에 맞추어 고정시킬수 있는 고정부를 구비할 수 있도록 하고자 한다.In the present invention, when the cable guide device is fixed to a rail, it is intended to be provided with a fixing part that can be fixed according to a slightly different shape for each rail.

본 발명에서는 케이블 가이드 장치의 작동중 제1 및 제2 타이어(21, 31) 사이의 압력을 체크하여 상기 사이의 거리를 조정할 수 있도록 하고자 한다.In the present invention, the pressure between the first and second tires 21 and 31 is checked during operation of the cable guide device so that the distance therebetween can be adjusted.

또한, 본 발명에서는 제1 및 제2 타이어의 양쪽에 케이블 가이드 블록(50A, 50B)을 설치하여 제1 및 제2 타이어(21, 31)의 사이를 지난 케이블의 위치가 틀어지지 않고 일정하게 이동할 수 있도록 하고자 한다.In addition, in the present invention, by installing the cable guide blocks 50A and 50B on both sides of the first and second tires, the positions of the cables passing between the first and second tires 21 and 31 are not shifted and can be moved constantly. want to be able to

본 발명은 상부면(40a), 바닥면(40b) 및 관통홀(41)을 포함하는 본체 플레이트(40); 상기 상부면(40a)에 설치되는 제1 및 제2 타이어(21, 31); 및 상기 바닥면(40b)의 하부에 설치되는 제1 및 제2 레일 고정 블록(90a, 90b); 를 포함하고, 상기 제1 레일 고정 블록(90a)은 제1 및 제2 수직벽(91a, 92a), 상기 제1 및 제2 수직벽(91a, 92)의 하부에서 제1 및 제2 수직벽(91a, 92a)을 서로 연결해주는 제1 수평부(93a) 및 제1 수직벽(91a)에 형성된 제1 나사 고정부(170a)를 포함하고, 상기 제1 수직벽(91a)의 높이는 제2 수직벽(92a)의 높이보다 작게 형성된 것을 특징으로 하는 케이블 가이드 장치에 관한 것이다.The present invention is a body plate 40 including an upper surface (40a), a bottom surface (40b) and a through hole (41); first and second tires 21 and 31 installed on the upper surface 40a; and first and second rail fixing blocks 90a and 90b installed under the bottom surface 40b; Including, the first rail fixing block (90a) is the first and second vertical walls (91a, 92a), the first and second vertical walls in the lower portion of the first and second vertical walls (91a, 92) A first horizontal portion 93a connecting the 91a and 92a to each other and a first screw fixing portion 170a formed on the first vertical wall 91a, wherein the height of the first vertical wall 91a is a second It relates to a cable guide device, characterized in that formed smaller than the height of the vertical wall (92a).

또한, 본 발명에서 상기 케이블 가이드 장치는 상기 제1 및 제2 타이어(21, 31)의 양측에 위치하는 제1 및 제2 케이블 가이드 블록(50A, 50B), 상기 제1 및 제2 케이블 가이드 블록(50A, 50B)의 양측에 위치하는 제1 및 제2 손잡이(10A, 10B)를 추가로 포함하고, 케이블(90)은 제1 및 제2 타이어(21, 31) 사이를 지나가며, 상기 케이블(90)은 제1 및 제2 타이어(21, 31) 사이를 지나기 전 또는 지난 후 제1 및 제2 케이블 가이드 블록(50A, 50B)에 의하여 가이드되고, 상기 바닥면(40b)에는 제2 타이어(31)의 위치를 변경시키기 위한 제2 타이어 이송 수단(30)과 제1 타이어(21)를 회전 시키기 위한 제1 모터(29) 및 제1 기어 박스(24)가 설치될 수 있다.In addition, in the present invention, the cable guide device includes first and second cable guide blocks 50A and 50B located on both sides of the first and second tires 21 and 31, and the first and second cable guide blocks. Further comprising first and second handles (10A, 10B) positioned on opposite sides of (50A, 50B), the cable (90) passing between the first and second tires (21, 31), the cable The 90 is guided by the first and second cable guide blocks 50A and 50B before or after passing between the first and second tires 21 and 31, and the second tire is provided on the bottom surface 40b. A second tire transport means 30 for changing the position of the 31 , and a first motor 29 and a first gear box 24 for rotating the first tire 21 may be installed.

또한, 본 발명에서 상기 제2 타이어 이송 수단(30)은 제2 모터(39), 상기 제2 모터(39)에 연결된 제2 기어 박스(38), 상기 제2 기어 박스(38)에 의하여 회전하는 나사축(35), 상기 나사축(35)의 회전에 따라 수평 이동이 되는 수평 이동 블록(34), 상기 수평 이동 블록(34)을 관통하며 상기 수평 이동 블록(34)의 이동시 선형 가이드 역활을 하는 제1 및 제2 선형 가이드 봉(36a, 36b) 및 상기 나사축(35) 및 제1 및 제2 선형 가이드 봉(36a, 36b)의 양쪽 단부를 지지하는 제1 및 제2 지지 블록(37a, 37b)을 포함할 수 있다.In addition, in the present invention, the second tire transport means 30 is rotated by a second motor 39 , a second gear box 38 connected to the second motor 39 , and the second gear box 38 . The screw shaft 35, the horizontal movement block 34 that is horizontally moved according to the rotation of the screw shaft 35, passes through the horizontal movement block 34 and serves as a linear guide when the horizontal movement block 34 moves First and second linear guide rods 36a and 36b and first and second support blocks for supporting both ends of the screw shaft 35 and the first and second linear guide rods 36a and 36b ( 37a, 37b).

또한, 본 발명에서 상기 나사축(35)은 상기 제1 지지 블록(37a)를 관통하여 상기 제2 기어 박스(38)와 연결되어 제2 모터(39)의 회전에 의해 상기 나사축(35)은 회전하고, 상기 수평 이동 블록(34)에는 베어링부(34a)가 설치되어 있고 상기 베어링부(34a)는 상기 제2 타이어(31)의 회전 중심축(31a)와 연결되며, 상기 제2 타이어(31)의 공기 주입부에는 타이어 압력 모니터링 센서를 장착하여 타이어 압력을 기준치와 비교하여 상기 수평 이동 블록(34)의 위치를 변경시킬 수 있다.In addition, in the present invention, the screw shaft 35 passes through the first support block 37a and is connected to the second gear box 38 so that the screw shaft 35 is rotated by the second motor 39 . is rotated, and a bearing part 34a is installed in the horizontal movement block 34 , and the bearing part 34a is connected to the rotation center shaft 31a of the second tire 31 , and the second tire A tire pressure monitoring sensor may be mounted in the air injection part of 31 to change the position of the horizontal moving block 34 by comparing the tire pressure with a reference value.

또한 상부 플레이트 상부면(40a)에는 'ㅗ' 형상 단면(43aa)을 구비한 제1 홈(43a)이 형성되어 있어서 'ㅗ'형상의 블록(70)이 끼워져 움직일 수 있고, 상기 'ㅗ' 형상 블록(70)의 상부면에는 나사 홈(71a)이 형성되어 있고, 상기 나사 홈(71a)은 제2 가이드 블록(50B)의 제1 및 제2 체결부(51ba, 51bb)에 놓여지는 볼트와 체결되어 상기 제2 가이드 블록(50B)을 상기 플레이트 상부면(40a)에서의 위치를 변경하며 고정할 수 있다.In addition, a first groove 43a having an 'ㅗ'-shaped cross section 43aa is formed on the upper surface 40a of the upper plate, so that the 'ㅗ'-shaped block 70 can be inserted and moved, and the 'ㅗ' shape A screw groove 71a is formed on the upper surface of the block 70, and the screw groove 71a includes a bolt placed on the first and second fastening portions 51ba and 51bb of the second guide block 50B. It is fastened to change the position of the second guide block 50B on the plate upper surface 40a to be fixed.

또한, 상기 제2 가이드 블록(50B)는 상부 중앙에 위치하는 타원형 형상이며 다수의 구형 비드(55)가 설치된 케이블 가이드 면(54b)와 양쪽 측부에 위치하는 제1 및 제2 체결부(51ba, 51bb)를 포함하고, 상기 제2 가이드 블록(50B)에는 상부에서 보면, 중앙의 케이블 가이드 면(54b)와 상기 케이블 가이드면(54b)의 양측에 위치하는 제1 및 제2 상부면(53ba, 53bb), 및 상기 제1 및 제2 상부면(53ba, 53bb)의 양측에 위치하는 제3 및 제4 상부면(52ba, 52bb)이 형성되어 있고, 상기 제3 및 제4 상부면(52ba, 52bb)에 제1 및 제2 체결부(51ba, 51bb)가 설치되고, 제1 및 제2 상부면(53ba, 53bb)는 제3 및 제4 상부면(52ba, 52bb)에 비하여 높이가 높고, 제1 및 제2 상부면(53ba, 53bb)는 서로 높이가 같으며, 제3 및 제4 상부면(52ba, 52bb)의 높이도 서로 같을 수 있다.In addition, the second guide block 50B has an elliptical shape located in the center of the upper portion, the cable guide surface 54b on which a plurality of spherical beads 55 are installed, and first and second fastening portions 51ba located on both sides; 51bb), and the second guide block 50B has first and second upper surfaces 53ba located on both sides of the central cable guide surface 54b and the cable guide surface 54b when viewed from above; 53bb), and third and fourth upper surfaces 52ba and 52bb positioned on both sides of the first and second upper surfaces 53ba and 53bb, and the third and fourth upper surfaces 52ba, 52bb), the first and second fastening portions 51ba and 51bb are installed, and the first and second upper surfaces 53ba and 53bb are higher in height than the third and fourth upper surfaces 52ba and 52bb, The first and second upper surfaces 53ba and 53bb may have the same height, and the third and fourth upper surfaces 52ba and 52bb may have the same height.

또한, 상기 제2 가이드 블록(50B)의 상부와 체결되어 케이블(90)이 지나갈수 있는 케이블 개구(89)를 형성하는 케이블 덮개(80)가 추가로 포함되고, 상기 제2 가이드 블록(50B)은 제1 및 제2 체결부(51ba, 51bb)의 외측에 형성되는 제3 및 제4 체결부(51bc, 51bd)를 추가로 포함하고, 상기 케이블 덮개(80)은 제1 및 제2 상부면(53ba, 53bb)과 접촉하는 제1 및 제2 바닥면(83a, 83b), 제3 및 제4 상부면(52ba, 52bb)과 접촉하는 제3 및 제4 바닥면(82a, 82b) 및 상기 케이블 가이드 면(54b)과 함께 케이블 개구(89)를 형성하는 제5 바닥면(84)를 포함하고, 상기 케이블 덮개(80)에는 상기 제3 및 제4 바닥면(82a, 82b)을 관통하는 제1 및 제2 덮개 체결부(81a, 81b)가 형성되어 있고, 제1 및 제2 덮개 체결부(81a, 81b)를 통해 볼트가 제3 및 제4 체결부(51bc, 51bd)의 나사산과 체결되어 상기 케이블 덮개(80)는 상기 제2 가이드 블록(50B)와 결합될 수 있고, 상기 제1 손잡이(10A)는 단면이 원형인 수평 봉(11a), 상기 수평 봉(11a)의 양쪽에 위치하는 제1 및 제2 경사 플레이트(12aa, 12ab) 및 상기 제1 및 제2 경사 플레이트(12aa, 12ab) 각각을 상기 상부면(40a)에 고정하는 제1 및 제2 고정 플레이(13aa, 13ab)를 포함할 수 있다.In addition, a cable cover 80 that is fastened with the upper portion of the second guide block 50B to form a cable opening 89 through which the cable 90 can pass is further included, and the second guide block 50B further includes third and fourth fastening parts 51bc and 51bd formed outside the first and second fastening parts 51ba and 51bb, and the cable cover 80 has first and second upper surfaces first and second bottom surfaces 83a and 83b in contact with 53ba and 53bb, third and fourth bottom surfaces 82a and 82b in contact with third and fourth top surfaces 52ba and 52bb, and the a fifth bottom surface (84) which together with the cable guide surface (54b) defines a cable opening (89); The first and second cover fastening parts 81a and 81b are formed, and the bolts are connected to the threads of the third and fourth fastening parts 51bc and 51bd through the first and second cover fastening parts 81a and 81b. The cable cover 80 is fastened to be coupled to the second guide block 50B, and the first handle 10A is a horizontal rod 11a having a circular cross section, on both sides of the horizontal rod 11a. The positioned first and second inclined plates 12aa and 12ab and the first and second fixed plates 13aa and 13ab for fixing each of the first and second inclined plates 12aa and 12ab to the upper surface 40a ) may be included.

본 발명에서는 케이블 가이드 장치를 레일에 고정하는 경우 레일마다 조금씩 다른 형상에 맞추어 고정시킬수 있는 고정부를 구비할 수 있도록 하고자 한다.In the present invention, when the cable guide device is fixed to a rail, it is intended to be provided with a fixing part that can be fixed according to a slightly different shape for each rail.

본 발명에서는 케이블 가이드 장치의 작동중 제1 및 제2 타이어(21, 31)의 사이의 압력을 체크하여 상기 사이의 거리를 조정할 수 있도록 하여 타이어 및 케이블의 손상을 방지할 수 있게 하였다.In the present invention, by checking the pressure between the first and second tires 21 and 31 during operation of the cable guide device, the distance therebetween can be adjusted to prevent damage to the tire and the cable.

또한, 본 발명에서는 제1 및 제2 타이어의 양쪽에 케이블 가이드 블록(50A, 50B)을 설치하여 제1 및 제2 타이어(21, 31)의 사이를 지난 케이블의 위치가 틀어지지 않고 일정하게 이동할 수 있게 하였다.In addition, in the present invention, by installing the cable guide blocks 50A and 50B on both sides of the first and second tires, the positions of the cables passing between the first and second tires 21 and 31 are not shifted and can be moved constantly. made it possible

도 1a은 본 발명 작업 상태에서의 본 발명의 평면도이다.
도 1b는 본 발명 작업 상태의 하부에서 본 사시도이다.
도 1c는 본 발명의 작업 레일 사시도이다.
도 2는 본 발명 상부 사시도이다.
도 3은 본 발명 하부 사시도이다.
도 4a는 본 발명 제1 레일 고정부(90a)의 평면도이다.
도 4b는 본 발명 제1 레일 고정부(90a)의 우측면도이다.
도 5a는 본 발명 제2 레일 고정부(90b)의 평면도이다.
도 5b는 본 발명 제2 레일 고정부(90b)의 좌측면도이다.
도 6은 도 2에서 제2 타이어(31)가 제거된 상태의 사시도이다.
도 7는 도 6에서 도 7의 확대도이다.
도 8a는 제2 케이블 가이드 블록(50B)의 사시도이다.
도 8b는 제2 케이블 가이드 블록(50B)의 평면도이다.
도 8c는 제2 케이블 가이드 블록(50B)의 정면도이다.
도 9은 제2 케이블 블록(50B)와 케이블 덮개(80)의 또 다른 실시예에 대한 정면도이다.
도 10a 및 10b는 제2 케이블 블록(50B)의 또 다른 실시예에 대한 정면도 및 평면도이다.
도 11a 및 11b는 케이블 덮개(80)의 정면도 및 평면도이다.
도 12는 본 발명에 사용되는 'ㅗ'형상의 블록(70)의 사시도이다.
1A is a plan view of the present invention in the working state of the present invention;
Figure 1b is a perspective view from the bottom of the present invention working state.
1C is a perspective view of a work rail of the present invention;
2 is a top perspective view of the present invention.
3 is a lower perspective view of the present invention.
Figure 4a is a plan view of the first rail fixing portion (90a) of the present invention.
Figure 4b is a right side view of the first rail fixing portion (90a) of the present invention.
Figure 5a is a plan view of the second rail fixing portion (90b) of the present invention.
Figure 5b is a left side view of the second rail fixing portion (90b) of the present invention.
6 is a perspective view of a state in which the second tire 31 is removed in FIG. 2 .
FIG. 7 is an enlarged view of FIG. 7 in FIG. 6 .
8A is a perspective view of the second cable guide block 50B.
8B is a plan view of the second cable guide block 50B.
8C is a front view of the second cable guide block 50B.
9 is a front view of another embodiment of the second cable block 50B and the cable cover 80 .
10A and 10B are a front view and a plan view of another embodiment of the second cable block 50B.
11A and 11B are front and top views of the cable sheath 80 .
12 is a perspective view of the 'ㅗ'-shaped block 70 used in the present invention.

이하, 첨부된 도면을 참조하여 본 발명을 보다 상세히 설명한다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

첨부된 도면은 본 발명의 예시적인 형태를 도시한 것으로, 이는 본 발명을 보다 상세히 설명하기 위해 제공되는 것일 뿐, 이에 의해 본 발명의 기술적인 범위가 한정되는 것은 아니다.The accompanying drawings show exemplary forms of the present invention, which are only provided to explain the present invention in more detail, and the technical scope of the present invention is not limited thereby.

도 1a는 본 발명 작업 상태에서의 평면도이고 도 1b는 하부에서 본 사시도 도 1c는 본 발명의 작업 레일 사시도이고, 도 2는 본 발명 케이블 가이드 장치(100)의 상부 사시도 도 3은 상기 장치(100)의 하부 사시도이다.1A is a plan view in a working state of the present invention, FIG. 1B is a perspective view from the bottom, FIG. 1C is a perspective view of a working rail of the present invention, and FIG. 2 is a top perspective view of the cable guide device 100 of the present invention. ) is a lower perspective view.

케이블 가이드 장치(100)은 레일(200)에 고정되어 케이블(90)을 감는 것으고, 본체 플레이트(40)의 상부면(40a)에는 제1 및 제2 타이어(21, 31), 제1 및 제2 타이어(21, 31)의 양측에 위치하는 제1 및 제2 케이블 가이드 블록(50A, 50B) 및 제1 및 제2 케이블 가이드 블록(50A, 50B)의 양측에 위치하는 제1 및 제2 손잡이(10A, 10B)가 설치되어 있다.The cable guide device 100 is fixed to the rail 200 to wind the cable 90 , and the first and second tires 21 and 31 , the first and second tires 21 and 31 are provided on the upper surface 40a of the body plate 40 . First and second cable guide blocks 50A and 50B positioned on both sides of the second tires 21 and 31 and first and second cables positioned on both sides of the first and second cable guide blocks 50A and 50B Handles 10A and 10B are provided.

케이블(90)은 제1 및 제2 타이어(21, 31) 사이를 지나가며, 제1 및 제2 타이어(21, 31) 사이의 양측에 위치하는 제1 및 제2 케이블 가이드 블록(50A, 50B)에 의해서 제1 및 제2 타이어(21, 31) 사이를 지나기 전 또는 지난 후의 케이블(90)이 가이드된다.The cable 90 passes between the first and second tires 21 and 31 , and the first and second cable guide blocks 50A and 50B located on both sides between the first and second tires 21 and 31 . ), the cable 90 before or after passing between the first and second tires 21 and 31 is guided.

도 3, 도 4a 내지 도 4b 및 도 5a 내지 도 5b에 도시된 것과 같이 본 발명의 본체 플레이트(40)의 바닥면(40b)에는 제1 및 제2 레일 고정 블록(90a, 90b)가 설치되어 있다.3, 4a to 4b and 5a to 5b, the first and second rail fixing blocks 90a and 90b are installed on the bottom surface 40b of the body plate 40 of the present invention. have.

레일(200)은 일반적으로 2개의 제1 및 제2 측벽(210A, 210B)와 사이의 바닥부(220)를 구비하고 본 발명 제1 및 제2 레일 고정 블럭(90a, 90b)은 제1 측벽(210A) 또는 제2 측벽(210B)에 설치된다.The rail 200 generally has two first and second sidewalls 210A, 210B and a bottom portion 220 therebetween, and the first and second rail fixing blocks 90a and 90b of the present invention are connected to the first sidewall. It is installed on the 210A or the second side wall 210B.

제1 고정 블럭(90a)은 제1 및 제2 수직벽(91a, 92a)와 상기 제1 및 제2 수직벽(91a, 92)의 하부에서 서로 연결해주는 제1 수평부(93a)을 포함하고 상기 레일의 제1 측벽(210A)는 상기 제1 및 제2 수직벽(91a, 92a)의 사이로 끼워지고, 제1 수직벽(91a)에 형성된 제1 나사 고정부(170a)에 의하여 고정한다.The first fixing block 90a includes first and second vertical walls 91a and 92a and a first horizontal portion 93a connecting to each other at the lower portions of the first and second vertical walls 91a and 92, and The first side wall 210A of the rail is sandwiched between the first and second vertical walls 91a and 92a, and is fixed by a first screw fixing part 170a formed on the first vertical wall 91a.

상기 제1 수직벽(91a)의 높이는 제2 수직벽(92a)의 높이보다 작게 형성하며 이는 레일(20)의 바닥부(220)의 형상에 있어서 차이가 있기 때문이다. 제1 수직벽(91a)은 제1 측벽(210A)의 안쪽에 위치하게 되는 경우 레일(20)의 바닥부(220)에 돌출부가 형성되어 있거나 균일하지 않은 경우가 있으므로 제1 수직벽(91a)은 보다 짧게 형성하고, 제2 수직벽(92a)는 제1 측벽(210A)의 외부에 위치하므로 좀 더 길게 하여 제1 측벽(210A)을 지지할 수 있도록 하고자 한다.The height of the first vertical wall 91a is formed to be smaller than the height of the second vertical wall 92a because there is a difference in the shape of the bottom 220 of the rail 20 . When the first vertical wall 91a is located inside the first sidewall 210A, there is a case in which a protrusion is formed on the bottom 220 of the rail 20 or is not uniform, so the first vertical wall 91a is formed shorter, and since the second vertical wall 92a is located outside the first sidewall 210A, it is intended to be made longer to support the first sidewall 210A.

제2 고정 블럭(90b) 또한, 제3 및 제4 수직벽(91b, 92b)와 상기 제3 및 제4 수직벽(91b, 92b)의 하부에서 서로 연결해주는 제2 수평부(93b)을 포함하고 상기 레일의 제1 측벽(210A)는 상기 제3 및 제4 수직벽(91b, 92b)의 사이로 끼워지고, 제3 수직벽(91b)에 형성된 제2 나사 고정부(170b)에 의하여 고정한다.The second fixing block 90b also includes the third and fourth vertical walls 91b and 92b and a second horizontal part 93b connecting the third and fourth vertical walls 91b and 92b to each other at the lower part of the third and fourth vertical walls 91b and 92b. and the first sidewall 210A of the rail is sandwiched between the third and fourth vertical walls 91b and 92b, and is fixed by a second screw fixing part 170b formed on the third vertical wall 91b. .

제2 고정 블럭(90b)에서도 상기 제3 수직벽(91b)의 높이는 제4 수직벽(92b)의 높이보다 작게 형성한다.In the second fixing block 90b, the height of the third vertical wall 91b is smaller than the height of the fourth vertical wall 92b.

또한, 본 발명에서는 도 3 및 도 6에서 알수 있는 것과 같이 본체 플레이트(40)에는 관통홀(41)이 설치되어 있으며, 본체 플레이트(40)의 바닥면(40b)에는 제2 타이어(31)의 위치를 변경시키기 위한 제2 타이어 이송 수단(30)과 제1 타이어(21)를 회전 시키기 위한 제1 모터(29) 및 제1 기어 박스(24)가 설치되어 있다.In addition, in the present invention, as can be seen from FIGS. 3 and 6 , a through hole 41 is installed in the body plate 40 , and the bottom surface 40b of the body plate 40 is provided with the second tire 31 . A second tire transport means 30 for changing a position, and a first motor 29 and a first gear box 24 for rotating the first tire 21 are installed.

상기 제2 타이어 이송 수단(30)은 제2 모터(39), 제2 기어 박스(38), 상기 제2 기어 박스(38)에 의하여 회전하는 나사축(35), 상기 나사축(35)의 회전에 따라 수평 이동이 되는 수평 이동 블록(34), 상기 수평 이동 블록(34)을 관통하며 상기 수평 이동 블록(34)의 이동시 선형 가이드 역활을 하는 제1 및 제2 선형 가이드 봉(36a, 36b) 및 상기 나사축(35) 및 제1 및 제2 선형 가이드 봉(36a, 36b)의 양쪽 단부를 지지하는 제1 및 제2 지지 블록(37a, 37b)을 포함한다.The second tire transport means 30 includes a second motor 39 , a second gear box 38 , a screw shaft 35 rotated by the second gear box 38 , and the screw shaft 35 . First and second linear guide rods 36a and 36b passing through the horizontal movement block 34, which are horizontally moved according to rotation, and serve as a linear guide when the horizontal movement block 34 is moved. ) and first and second support blocks 37a and 37b for supporting both ends of the screw shaft 35 and the first and second linear guide rods 36a and 36b.

상기 나사축(35)은 상기 제1 지지 블록(37a)를 관통하여 상기 제2 기어 박스(38)와 연결되어 제2 모터(39)의 회전에 의해 상기 나사축(35)도 회전하게 된다.The screw shaft 35 passes through the first support block 37a and is connected to the second gear box 38 so that the screw shaft 35 also rotates by the rotation of the second motor 39 .

상기 수평 이동 블록(34)에는 베어링부(34a)가 설치되어 있고 상기 베어링부(34a)는 상기 제2 타이어(31)의 회전 중심축(31a)와 연결되어 있다.A bearing part 34a is installed in the horizontal moving block 34 , and the bearing part 34a is connected to the rotation center shaft 31a of the second tire 31 .

상기 제1 모터(29)의 작동에 의해 제1 기어 박스(24)는 상부면(40a)에 설치된 제1 타이어(21)를 회전시키고, 제2 모터(39)의 작동에 의해 수평 이동 블록(34)이 이동이 되며 수평 이동 블록(34)의 베어링부(34a)의 이동에 의하여 제2 타이어(31)의 위치가 변경이 되어 제1 및 제2 타이어(21, 31) 사이의 간격이 조정이 된다.By the operation of the first motor 29, the first gearbox 24 rotates the first tire 21 installed on the upper surface 40a, and by the operation of the second motor 39, the horizontal movement block ( 34) is moved, and the position of the second tire 31 is changed by the movement of the bearing part 34a of the horizontal movement block 34, so that the distance between the first and second tires 21 and 31 is adjusted. becomes this

상기 제2 타이어(31)의 공기 주입부에는 타이어 압력 모니터링 센서를 장착하여 타이어 압력이 기준치보다 높으면 제2 타이어(31)의 축을 우측으로 이동하여 타이어 간격을 크게 하고, 타이어 압력이 기준치보다 낮으면 우측 타이어의 축을 좌측으로 이동하여 타이어 간격을 축소 시킨다.A tire pressure monitoring sensor is installed in the air injection part of the second tire 31 so that, when the tire pressure is higher than the reference value, the axis of the second tire 31 is moved to the right to increase the tire spacing, and when the tire pressure is lower than the reference value Reduce the tire spacing by moving the axle of the right tire to the left.

도 6 및 도 7에 도시된 것과 같이 플레이트 상부면(40a)에는 'ㅗ' 형상 단면(43aa)을 구비한 제1 홈(43a)이 형성되어 있으며, 도 12의 'ㅗ'형상의 블록(70)이 끼워져 움직일 수 있다.As shown in FIGS. 6 and 7 , a first groove 43a having an 'ㅗ'-shaped cross-section 43aa is formed on the plate upper surface 40a, and the 'ㅗ'-shaped block 70 of FIG. ) and can be moved.

상기 'ㅗ' 형상 블록(70)의 상부면에는 나사 홈(71a)이 형성되어 있고, 상기 나사 홈(71a)은 제2 가이드 블록(50B)의 제1 및 제2 체결부(51ba, 51bb)에 놓여지는 볼트와 체결되어 상기 제2 가이드 블록(50B)을 상기 플레이트 상부면(40a)에서의 위치를 변경하며 고정할 수 있다.A screw groove 71a is formed on the upper surface of the 'ㅗ'-shaped block 70, and the screw groove 71a is the first and second fastening parts 51ba and 51bb of the second guide block 50B. The second guide block 50B may be fixed by changing the position of the second guide block 50B on the plate upper surface 40a.

마찬가지로, 상기 플레이트 상부면(40a)에는 'ㅗ' 형상 단면을 구비한 제2 홈(43b)이 형성되어 있으며, 상기 제2 홈(43b)의 단면을 지나가는 'ㅗ'형상의 블록(70)과 제1 가이드 블록(50A)이 고정되어 상기 플레이트 상부면(40a)에 상기 제1 가이드 블록(50A)이 고정된다.Similarly, a second groove 43b having an 'X'-shaped cross section is formed on the upper surface of the plate 40a, and a 'ㅗ'-shaped block 70 passing through the cross section of the second groove 43b and The first guide block 50A is fixed, and the first guide block 50A is fixed to the plate upper surface 40a.

상기 제1 및 제2 가이드 블록(50A, 50B)는 동일한 형상이며, 제2 가이드 블록(50B)는 상부 중앙에 위치하는 타원형 형상의 케이블 가이드 면(54b)와 양쪽 측부에 위치하는 제1 및 제2 체결부(51ba, 51bb)를 포함한다.The first and second guide blocks 50A and 50B have the same shape, and the second guide block 50B includes an oval-shaped cable guide surface 54b located in the upper center and first and second guide blocks located on both sides. 2 fastening parts 51ba and 51bb are included.

상기 케이블 가이드 면(54b)에는 구형 비드(55)가 설치되어 케이블 가이드 면(54b)을 지나가는 케이블(90)과의 마찰을 최소화 한다.A spherical bead 55 is installed on the cable guide surface 54b to minimize friction with the cable 90 passing through the cable guide surface 54b.

상기 제2 가이드 블록(50B)은 상부에서 보면, 중앙의 케이블 가이드 면(54b)와 상기 케이블 가이드면(54b)의 양측에 위치하는 제1 및 제2 상부면(53ba, 53bb), 및 상기 제1 및 제2 상부면(53ba, 53bb)의 양측에 위치하는 제3 및 제4 상부면(52ba, 52bb)를 포함하며, 상기 제3 및 제4 상부면(52ba, 52bb)에 제1 및 제2 체결부(51ba, 51bb)가 설치되고, 제1 및 제2 상부면(53ba, 53bb)는 제3 및 제4 상부면(52ba, 52bb)에 비하여 높이가 높고, 제1 및 제2 상부면(53ba, 53bb)는 서로 높이가 같으며, 제3 및 제4 상부면(52ba, 52bb)의 높이도 서로 같다.When viewed from above, the second guide block 50B includes a central cable guide surface 54b, first and second upper surfaces 53ba and 53bb located on both sides of the cable guide surface 54b, and the first It includes third and fourth upper surfaces 52ba and 52bb positioned on both sides of the first and second upper surfaces 53ba and 53bb, and first and fourth upper surfaces 52ba and 52bb on the third and fourth upper surfaces 52ba and 52bb. 2 fastening parts 51ba and 51bb are installed, the first and second upper surfaces 53ba and 53bb have a higher height than the third and fourth upper surfaces 52ba and 52bb, and the first and second upper surfaces (53ba and 53bb) have the same height as each other, and the third and fourth upper surfaces 52ba and 52bb have the same height.

도 9은 제2 케이블 블록(50B)와 케이블 덮개(80)의 또 다른 실시예에 대한 정면도로서, 제2 가이드 블록(50B)에는 추가로 제3 및 제4 체결부(51bc, 51bd)를 포함하고, 상기 제2 가이드 블록(50B)의 상부에는 케이블 덮개(80)가 체결되어 케이블 개구(89)를 형성하고 상기 케이블(90)은 상기 케이블 개구를 지나갈 수 있다.9 is a front view of another embodiment of the second cable block 50B and the cable cover 80, wherein the second guide block 50B further includes third and fourth fastening portions 51bc and 51bd. and a cable cover 80 is fastened to an upper portion of the second guide block 50B to form a cable opening 89 , and the cable 90 may pass through the cable opening.

상기 제3 및 제4 체결부(51bc, 51bd)은 제1 및 제2 체결부(51ba, 51bb)의 외측에 형성된다.The third and fourth fastening parts 51bc and 51bd are formed outside the first and second fastening parts 51ba and 51bb.

상기 케이블 덮개(80)은 제1 및 제2 상부면(53ba, 53bb)과 접촉하는 제1 및 제2 바닥면(83a, 83b), 제3 및 제4 상부면(52ba, 52bb)과 접촉하는 제3 및 제4 바닥면(82a, 82b) 및 상기 케이블 가이드 면(54b)과 함께 케이블 개구(89)를 형성하는 제5 바닥면(84)를 포함한다.The cable cover 80 has first and second bottom surfaces 83a and 83b in contact with the first and second top surfaces 53ba and 53bb, and third and fourth top surfaces 52ba and 52bb in contact with third and fourth bottom surfaces 82a, 82b and a fifth bottom surface 84 which together with the cable guide surface 54b form a cable opening 89 .

상기 케이블 덮개(80)은 제3 및 제4 바닥면(82a, 82b)을 관통하는 제1 및 제2 덮개 체결부(81a, 81b)가 형성되어 있고, 제1 및 제2 덮개 체결부(81a, 81b)를 통해 볼트가 제3 및 제4 체결부(51bc, 51bd)의 나사산과 체결되어 상기 케이블 덮개(80)는 상기 제2 가이드 블록(50B)와 결합될 수 있다.The cable cover 80 has first and second cover fastening parts 81a and 81b penetrating through the third and fourth bottom surfaces 82a and 82b, and the first and second cover fastening parts 81a. , 81b), the bolts are fastened with the threads of the third and fourth fastening parts 51bc and 51bd, so that the cable cover 80 may be coupled to the second guide block 50B.

또한, 본 발명에서의 제1 손잡이(10A)와 제2 손잡이(10B)는 동일한 형태이며 제1 손잡이(10A)는 단면이 원형인 수평 봉(11a), 상기 수평 봉(11a)의 양쪽에 위치하는 제1 및 제2 경사 플레이트(12aa, 12ab) 및 상기 제1 및 제2 경사 플레이트(12aa, 12ab) 각각을 상기 상부면(40a)에 고정하는 제1 및 제2 고정 플레이(13aa, 13ab)를 포함하고, 상기 제1 및 제2 손잡이(10A, 10B)는 세워지는 제1 상태와 누여지는 제2 상태를 포함할 수 있다.In addition, the first handle (10A) and the second handle (10B) in the present invention are of the same shape, and the first handle (10A) is a horizontal rod (11a) having a circular cross section, located on both sides of the horizontal rod (11a) first and second inclined plates 12aa and 12ab, and first and second fixed plates 13aa and 13ab for fixing each of the first and second inclined plates 12aa and 12ab to the upper surface 40a. Including, the first and second handles (10A, 10B) may include a first state and a second state to be laid down.

이상의 설명은 본 발명의 기술사상을 예시적으로 설명한 것에 불과한 것으로 본 발명이 속하는 기술분야에서 통 상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서 본 발명에 개시된 실시예는 본 발명의 기술사상을 한정하기 위한 것이 아니라 설명하기 위한 것 이고, 이러한 실시예에 의하여 본 발명의 기술사상의 범위가 한정되는 것은 아니다. 본 발명의 보호범위는 아래 의 특허청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술사상은 본 발명의 권리범위 에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and various modifications and variations will be possible without departing from the essential characteristics of the present invention by those skilled in the art to which the present invention pertains. Therefore, the embodiments disclosed in the present invention are not intended to limit the technical spirit of the present invention, but to illustrate, and the scope of the technical spirit of the present invention is not limited by these embodiments. The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the scope equivalent thereto should be interpreted as being included in the scope of the present invention.

100: 전선 가이드 장치 10A, 10B: 제1 및 제2 손잡이
21, 31: 제1 및 제2 타이어
100: wire guide device 10A, 10B: first and second handle
21, 31: first and second tires

Claims (3)

상부면(40a), 바닥면(40b) 및 관통홀(41)을 포함하는 본체 플레이트(40);
상기 상부면(40a)에 설치되는 제1 및 제2 타이어(21, 31); 및
상기 바닥면(40b)의 하부에 설치되는 제1 및 제2 레일 고정 블록(90a, 90b); 를 포함하고,
상기 제1 레일 고정 블록(90a)은 제1 및 제2 수직벽(91a, 92a), 상기 제1 및 제2 수직벽(91a, 92)의 하부에서 제1 및 제2 수직벽(91a, 92a)을 서로 연결해주는 제1 수평부(93a) 및 제1 수직벽(91a)에 형성된 제1 나사 고정부(170a)를 포함하고,
상기 제1 수직벽(91a)의 높이는 제2 수직벽(92a)의 높이보다 작게 형성되고,
케이블 가이드 장치는 상기 제1 및 제2 타이어(21, 31)의 양측에 위치하는 제1 및 제2 케이블 가이드 블록(50A, 50B), 상기 제1 및 제2 케이블 가이드 블록(50A, 50B)의 양측에 위치하는 제1 및 제2 손잡이(10A, 10B)를 추가로 포함하고,
케이블(90)은 제1 및 제2 타이어(21, 31) 사이를 지나가며,
상기 케이블(90)은 제1 및 제2 타이어(21, 31) 사이를 지나기 전 또는 지난 후 제1 및 제2 케이블 가이드 블록(50A, 50B)에 의하여 가이드되고,
상기 바닥면(40b)에는 제2 타이어(31)의 위치를 변경시키기 위한 제2 타이어 이송 수단(30)과 제1 타이어(21)를 회전 시키기 위한 제1 모터(29) 및 제1 기어 박스(24)가 설치되고,
상기 제2 타이어 이송 수단(30)은 제2 모터(39), 상기 제2 모터(39)에 연결된 제2 기어 박스(38), 상기 제2 기어 박스(38)에 의하여 회전하는 나사축(35), 상기 나사축(35)의 회전에 따라 수평 이동이 되는 수평 이동 블록(34), 상기 수평 이동 블록(34)을 관통하며 상기 수평 이동 블록(34)의 이동시 선형 가이드 역활을 하는 제1 및 제2 선형 가이드 봉(36a, 36b) 및 상기 나사축(35) 및 제1 및 제2 선형 가이드 봉(36a, 36b)의 양쪽 단부를 지지하는 제1 및 제2 지지 블록(37a, 37b)을 포함하고,
상기 나사축(35)은 상기 제1 지지 블록(37a)를 관통하여 상기 제2 기어 박스(38)와 연결되어 제2 모터(39)의 회전에 의해 상기 나사축(35)은 회전하고,
상기 수평 이동 블록(34)에는 베어링부(34a)가 설치되어 있고 상기 베어링부(34a)는 상기 제2 타이어(31)의 회전 중심축(31a)와 연결되며,
상기 제2 타이어(31)의 공기 주입부에는 타이어 압력 모니터링 센서를 장착하여 타이어 압력을 기준치와 비교하여 상기 수평 이동 블록(34)의 위치를 변경시킬 수 있고,
상부 플레이트 상부면(40a)에는 'ㅗ' 형상 단면(43aa)을 구비한 제1 홈(43a)이 형성되어 있어서 'ㅗ'형상의 블록(70)이 끼워져 움직일 수 있고,
상기 'ㅗ' 형상 블록(70)의 상부면에는 나사 홈(71a)이 형성되어 있고, 상기 나사 홈(71a)은 제2 가이드 블록(50B)의 제1 및 제2 체결부(51ba, 51bb)에 놓여지는 볼트와 체결되어 상기 제2 가이드 블록(50B)을 상기 플레이트 상부면(40a)에서의 위치를 변경하며 고정할 수 있는 것을 특징으로 하는 케이블 가이드 장치.
a body plate 40 including an upper surface 40a, a bottom surface 40b, and a through hole 41;
first and second tires 21 and 31 installed on the upper surface 40a; and
first and second rail fixing blocks (90a, 90b) installed under the bottom surface (40b); including,
The first rail fixing block 90a includes first and second vertical walls 91a and 92a, and first and second vertical walls 91a and 92a below the first and second vertical walls 91a and 92. ) including a first horizontal portion (93a) and a first screw fixing portion (170a) formed on the first vertical wall (91a) for connecting to each other,
The height of the first vertical wall (91a) is formed smaller than the height of the second vertical wall (92a),
The cable guide device includes first and second cable guide blocks 50A and 50B located on both sides of the first and second tires 21 and 31, and the first and second cable guide blocks 50A and 50B. Further comprising first and second handles (10A, 10B) located on both sides,
A cable (90) passes between the first and second tires (21, 31),
The cable 90 is guided by the first and second cable guide blocks 50A and 50B before or after passing between the first and second tires 21 and 31,
On the bottom surface 40b, a second tire transport means 30 for changing the position of the second tire 31, a first motor 29 for rotating the first tire 21, and a first gear box ( 24) is installed,
The second tire transport means 30 includes a second motor 39 , a second gear box 38 connected to the second motor 39 , and a screw shaft 35 rotated by the second gear box 38 . ), a horizontal movement block 34 that is horizontally moved according to the rotation of the screw shaft 35, a first and a linear guide that passes through the horizontal movement block 34 and serves as a linear guide when the horizontal movement block 34 moves second linear guide rods 36a, 36b and first and second support blocks 37a and 37b for supporting both ends of the screw shaft 35 and the first and second linear guide rods 36a and 36b; including,
The screw shaft 35 passes through the first support block 37a and is connected to the second gear box 38 so that the screw shaft 35 rotates by the rotation of the second motor 39,
A bearing part 34a is installed in the horizontal moving block 34, and the bearing part 34a is connected to the rotational center shaft 31a of the second tire 31,
A tire pressure monitoring sensor may be mounted in the air injection part of the second tire 31 to change the position of the horizontal movement block 34 by comparing the tire pressure with a reference value,
A first groove 43a having an 'ㅗ'-shaped cross-section 43aa is formed on the upper surface 40a of the upper plate, so that the 'ㅗ'-shaped block 70 can be inserted and moved,
A screw groove 71a is formed on the upper surface of the 'ㅗ'-shaped block 70, and the screw groove 71a is the first and second fastening parts 51ba and 51bb of the second guide block 50B. A cable guide device, characterized in that it is fastened to a bolt placed on the , and can be fixed by changing the position of the second guide block (50B) on the plate upper surface (40a).
제1항에 있어서,
상기 제2 가이드 블록(50B)는 상부 중앙에 위치하는 타원형 형상이며 다수의 구형 비드(55)가 설치된 케이블 가이드 면(54b)와 양쪽 측부에 위치하는 제1 및 제2 체결부(51ba, 51bb)를 포함하고,
상기 제2 가이드 블록(50B)에는 상부에서 보면, 중앙의 케이블 가이드 면(54b)와 상기 케이블 가이드면(54b)의 양측에 위치하는 제1 및 제2 상부면(53ba, 53bb), 및 상기 제1 및 제2 상부면(53ba, 53bb)의 양측에 위치하는 제3 및 제4 상부면(52ba, 52bb)이 형성되어 있고,
상기 제3 및 제4 상부면(52ba, 52bb)에 제1 및 제2 체결부(51ba, 51bb)가 설치되고, 제1 및 제2 상부면(53ba, 53bb)는 제3 및 제4 상부면(52ba, 52bb)에 비하여 높이가 높고, 제1 및 제2 상부면(53ba, 53bb)는 서로 높이가 같으며, 제3 및 제4 상부면(52ba, 52bb)의 높이도 서로 같고,
상기 제2 가이드 블록(50B)의 상부와 체결되어 케이블(90)이 지나갈수 있는 케이블 개구(89)를 형성하는 케이블 덮개(80)가 추가로 포함되고,
상기 제2 가이드 블록(50B)은 제1 및 제2 체결부(51ba, 51bb)의 외측에 형성되는 제3 및 제4 체결부(51bc, 51bd)를 추가로 포함하고,
상기 케이블 덮개(80)은 제1 및 제2 상부면(53ba, 53bb)과 접촉하는 제1 및 제2 바닥면(83a, 83b), 제3 및 제4 상부면(52ba, 52bb)과 접촉하는 제3 및 제4 바닥면(82a, 82b) 및 상기 케이블 가이드 면(54b)과 함께 케이블 개구(89)를 형성하는 제5 바닥면(84)를 포함하고,
상기 케이블 덮개(80)에는 상기 제3 및 제4 바닥면(82a, 82b)을 관통하는 제1 및 제2 덮개 체결부(81a, 81b)가 형성되어 있고, 제1 및 제2 덮개 체결부(81a, 81b)를 통해 볼트가 제3 및 제4 체결부(51bc, 51bd)의 나사산과 체결되어 상기 케이블 덮개(80)는 상기 제2 가이드 블록(50B)와 결합될 수 있고
상기 제1 손잡이(10A)는 단면이 원형인 수평 봉(11a), 상기 수평 봉(11a)의 양쪽에 위치하는 제1 및 제2 경사 플레이트(12aa, 12ab) 및 상기 제1 및 제2 경사 플레이트(12aa, 12ab) 각각을 상기 상부면(40a)에 고정하는 제1 및 제2 고정 플레이(13aa, 13ab)를 포함하는 것을 특징으로 하는 케이블 가이드 장치.
According to claim 1,
The second guide block 50B has an elliptical shape positioned in the upper center of the cable guide face 54b on which a plurality of spherical beads 55 are installed, and first and second fastening parts 51ba and 51bb positioned on both sides. including,
When viewed from above, the second guide block 50B has a central cable guide surface 54b, first and second upper surfaces 53ba and 53bb located on both sides of the cable guide surface 54b, and the first Third and fourth upper surfaces 52ba and 52bb located on both sides of the first and second upper surfaces 53ba and 53bb are formed,
First and second fastening portions 51ba and 51bb are installed on the third and fourth upper surfaces 52ba and 52bb, and the first and second upper surfaces 53ba and 53bb are third and fourth upper surfaces (52ba, 52bb) is higher than the height, the first and second upper surfaces (53ba, 53bb) have the same height, and the third and fourth upper surfaces (52ba, 52bb) have the same height,
A cable cover 80 that is fastened with the upper portion of the second guide block 50B to form a cable opening 89 through which the cable 90 can pass is further included,
The second guide block 50B further includes third and fourth fastening parts 51bc and 51bd formed outside the first and second fastening parts 51ba and 51bb,
The cable cover 80 has first and second bottom surfaces 83a and 83b in contact with the first and second top surfaces 53ba and 53bb, and third and fourth top surfaces 52ba and 52bb in contact with third and fourth bottom surfaces (82a, 82b) and a fifth bottom surface (84) which together with said cable guide surface (54b) forms a cable opening (89);
The cable cover 80 is formed with first and second cover fastening parts 81a and 81b penetrating the third and fourth bottom surfaces 82a and 82b, and the first and second cover fastening parts ( Bolts are fastened with the threads of the third and fourth fastening parts 51bc and 51bd through 81a and 81b, so that the cable cover 80 can be coupled to the second guide block 50B.
The first handle 10A includes a horizontal rod 11a having a circular cross section, first and second inclined plates 12aa and 12ab positioned on both sides of the horizontal rod 11a, and the first and second inclined plates. and first and second fixing plates (13aa, 13ab) for fixing each of (12aa, 12ab) to the upper surface (40a).
삭제delete
KR1020210009803A 2021-01-24 2021-01-24 Cable Guide Device Having Rail Fixing Part KR102261784B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210009803A KR102261784B1 (en) 2021-01-24 2021-01-24 Cable Guide Device Having Rail Fixing Part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210009803A KR102261784B1 (en) 2021-01-24 2021-01-24 Cable Guide Device Having Rail Fixing Part

Publications (1)

Publication Number Publication Date
KR102261784B1 true KR102261784B1 (en) 2021-06-07

Family

ID=76374677

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210009803A KR102261784B1 (en) 2021-01-24 2021-01-24 Cable Guide Device Having Rail Fixing Part

Country Status (1)

Country Link
KR (1) KR102261784B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102535742B1 (en) * 2022-12-26 2023-05-26 주식회사 현이엔지 An Electrical Cable Alignment Device Installed on Guide Rail And Alignment System Including the Same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100669231B1 (en) 2006-06-05 2007-01-16 지에스네오텍 주식회사 Electric wire guide apparatus for exchanging an electric wire
KR20070117036A (en) * 2006-06-07 2007-12-12 (주)엠피에스코리아 Electric wire/cable feeding equipment
KR20200016029A (en) 2018-08-06 2020-02-14 삼성전자주식회사 Cable guide device for multi-articular joint robot
KR102190804B1 (en) * 2020-03-11 2020-12-14 이은상 cable feeder apparatus for installing electric cable

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100669231B1 (en) 2006-06-05 2007-01-16 지에스네오텍 주식회사 Electric wire guide apparatus for exchanging an electric wire
KR20070117036A (en) * 2006-06-07 2007-12-12 (주)엠피에스코리아 Electric wire/cable feeding equipment
KR20200016029A (en) 2018-08-06 2020-02-14 삼성전자주식회사 Cable guide device for multi-articular joint robot
KR102190804B1 (en) * 2020-03-11 2020-12-14 이은상 cable feeder apparatus for installing electric cable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102535742B1 (en) * 2022-12-26 2023-05-26 주식회사 현이엔지 An Electrical Cable Alignment Device Installed on Guide Rail And Alignment System Including the Same

Similar Documents

Publication Publication Date Title
JP4629963B2 (en) Elevator apparatus and method for arranging drive machine of elevator apparatus
KR102215662B1 (en) Cable Guide Device
KR102261784B1 (en) Cable Guide Device Having Rail Fixing Part
US8522927B2 (en) Drive motor for an elevator installation and method of mounting a drive motor
KR20020006023A (en) Traction sheave elevator
KR102160808B1 (en) Ceiling mounted type cable duct to lay electric cable and telecommunication cable separately
US5361873A (en) Rope suspension arrangement
JP4200603B2 (en) Elevator equipment
EP1396460B1 (en) Elevator system
KR102272689B1 (en) Cable Guide Device Operated by DC Motor
ES2333407T3 (en) ELEVATOR SYSTEM THAT USES A MINIMUM CONSTRUCTION SPACE.
EP1754680A1 (en) Elevator apparatus
CN1087379C (en) Access floor system
EP3517477A2 (en) Deflector sheave mounting bracket
EP1327596B1 (en) Elevator device
EP0574817A1 (en) Device for suspending a working cage
KR910009723B1 (en) Suspended travel device for panels
CN213292278U (en) Link type automatic power walking mechanism and tunnel inspection system
CA1281235C (en) Bogie for cable-drawn vehicle with enhanced cable handling system
CN1556887A (en) Cover arrangement
US5052862A (en) Trench supporting assembly
CN219602991U (en) Counterweight bearing beam of elevator with machine room and mounting structure thereof
CN219064549U (en) Building site noise raise dust monitoring facilities
CN114873373B (en) Paying-off pulley device
KR100531749B1 (en) Pantograph

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant