KR101899844B1 - Powder coating system using zinc primer and powder coating method thereof - Google Patents

Powder coating system using zinc primer and powder coating method thereof Download PDF

Info

Publication number
KR101899844B1
KR101899844B1 KR1020160107959A KR20160107959A KR101899844B1 KR 101899844 B1 KR101899844 B1 KR 101899844B1 KR 1020160107959 A KR1020160107959 A KR 1020160107959A KR 20160107959 A KR20160107959 A KR 20160107959A KR 101899844 B1 KR101899844 B1 KR 101899844B1
Authority
KR
South Korea
Prior art keywords
workpiece
zinc
loading
zinc primer
unloading
Prior art date
Application number
KR1020160107959A
Other languages
Korean (ko)
Other versions
KR20180022479A (en
Inventor
김광식
Original Assignee
신도산업 주식회사
정도산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신도산업 주식회사, 정도산업 주식회사 filed Critical 신도산업 주식회사
Priority to KR1020160107959A priority Critical patent/KR101899844B1/en
Publication of KR20180022479A publication Critical patent/KR20180022479A/en
Application granted granted Critical
Publication of KR101899844B1 publication Critical patent/KR101899844B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D7/00Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials
    • B05D7/24Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials for applying particular liquids or other fluent materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0207Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the work being an elongated body, e.g. wire or pipe
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D1/00Processes for applying liquids or other fluent materials
    • B05D1/02Processes for applying liquids or other fluent materials performed by spraying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/02Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by baking
    • B05D3/0254After-treatment
    • B05D3/0272After-treatment with ovens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D7/00Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials
    • B05D7/14Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials to metal, e.g. car bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C1/00Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods
    • B24C1/08Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods for polishing surfaces, e.g. smoothing a surface by making use of liquid-borne abrasives
    • B24C1/086Descaling; Removing coating films
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D1/00Coating compositions, e.g. paints, varnishes or lacquers, based on inorganic substances

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

본 발명은 징크프라이머 분체도장시스템과 이를 이용한 분체도장방법에 관한 것이다. 본 발명은 본 발명은 피작업물을 싣거나 내리기 위한 로딩/언로딩장치(100)와, 일정궤도를 따라 이동되도록 연속적으로 작동하면서 로딩된 피작업물을 이송하는 이송장치(10)와, 상기 이송장치(10)의 경로 상에 위치하여 상기 다수개의 피작업물의 표면을 세척하는 쇼트블래스트장치(150)와, 상기 이송장치(10)의 경로 상에서 상기 쇼트블래스트의 다음 순서에 위치하고 상기 피작업물에 아연도료를 도포하여 표면을 코팅하는 징크프라이머장치(200)와, 상기 이송장치(10)의 경로 상에서 상기 징크프라이머장치(200)의 다음 순서에 위치하고 아연도포된 상기 피작업물을 가열하는 가열장치(420)를 포함한다. 본 발명에서는 아연재질을 피작업물의 표면에 도포하여 열연용융아연도금강판과 유사한 내부식성 등의 효과를 얻을 수 있고, 별도의 도금과정을 거치지 않고 징크프라이머를 이용하여 도포작업이 이루어지므로 작업속도가 향상된다. The present invention relates to a zinc primer powder coating system and a powder coating method using the same. The present invention relates to a loading / unloading apparatus (100) for loading or unloading a workpiece, a transfer device (10) for transferring the loaded workpiece while continuously moving to move along a predetermined orbit, A short blast device (150) for cleaning the surfaces of the plurality of workpieces (10), the cleaning device being located on the path of the transfer device (10) A zinc primer device 200 for applying a zinc coating to the zinc primer device 200 and coating the surface of the zinc primer device 200 on the surface of the zinc primer device 200; Device 420 as shown in FIG. In the present invention, since the zinc material is coated on the surface of the workpiece to obtain a corrosion resistance similar to that of the hot-dip galvanized steel sheet, and the coating operation is performed using zinc primer without a separate plating process, .

Figure R1020160107959
Figure R1020160107959

Description

징크프라이머 분체도장시스템과 이를 이용한 분체도장방법{Powder coating system using zinc primer and powder coating method thereof}[0001] The present invention relates to a zinc primer powder coating system and a powder coating method using the zinc primer powder coating system,

본 발명은 분체도장시스템에 관한 것으로, 더욱 상세하게는 징크프라이머 방식을 통해 내부식성이 뛰어난 징크프라이머를 이용하여 분체를 도장하는 시스템과, 이를 이용하여 분체도장을 실시할 수 있는 방법에 관한 것이다. The present invention relates to a powder coating system, and more particularly, to a system for coating a powder using a zinc primer having excellent corrosion resistance through a zinc primer system and a method for powder coating using the system.

일반적으로 가드레일과 같은 금속 산업제품의 생산 라인에서 도장 공정은 제품의 형태가 완성된 후, 부식을 방지하고 미관을 수려하게 하기 위해 이루어진다. 최근에 들어서는 액상 도료를 적용하는 상기 도장 시스템과 달리, 액상 도료에 대한 환경 문제가 범세계적인 규제로 법규화됨에 따라 휘발성 유기화합물(VOC)을 포함하지 않는 분체 도료를 적용하여 도장을 실시할 수 있는 도장 시스템의 지속적인 개발 및 적용이 요구되고 있다.Generally, in the production lines of metal industrial products such as guard rails, the painting process is carried out to prevent corrosion and enhance the appearance after the product is completed. Recently, unlike the above-mentioned coating system in which the liquid coating material is applied, since the environmental problem of the liquid coating material is regulated by the global regulations, it is possible to apply the powder coating material containing no volatile organic compound (VOC) There is a demand for continuous development and application of coating systems.

이러한 분체 도료를 이용한 분체도장 작업은 피도장물의 외면에 도료를 도포한 후에 건조시키는 과정을 거친다. 일반적으로, 정전 분체도장은 액체도장과 달리 무용제타입의 도료인 분체 도료를 이용하여 피도체에 도착시키고, 이를 가열 용융시켜 도장막을 얻게 하는 것을 일컫는다.The powder coating operation using such a powder coating material is performed by applying a paint to the outer surface of the material to be coated and then drying it. In general, the electrostatic powder coating is a method of obtaining a coating film by using a powder coating material, which is a solvent-free coating material, unlike a liquid coating, and arriving at the object to be heated and melting it.

이와 같은 분체 도료 방식 이외에, 제품의 내부식성을 더욱 높이기 위해서 열연용융아연도금강판(HGI, HOT DIPPED GALVANZED-IRON)이 사용되기도 한다. 이와 같은 열연용융아연도금강판은 철판에 아연을 도금해 내부식성을 높인 것으로, 자동차 등 여러 분야에서 사용된다. In addition to such a powder coating method, a hot dip galvanized steel sheet (HGI, HOT DIPPED GALVANZED-IRON) may be used to further enhance the corrosion resistance of the product. Such a hot-dip galvanized steel sheet is coated with zinc on the steel plate to increase the corrosion resistance and is used in various fields such as automobiles.

하지만, 이러한 열연용융아연도금강판을 얻기 위한 아연도금작업은 종래의 분체 도료 설비에서 함께 이루어지지 못하고, 도금설비가 갖추어진 외부에서 별도의 작업을 거쳐야 한다. 따라서 열연용유아연도금 방식을 종래의 분체 도료 설비에 적용할 경우에 전체적인 작업속도가 떨어지고 제조비용이 증가하는 문제점이 있다. However, the galvanizing operation for obtaining the hot-rolled hot-dip galvanized steel sheet can not be performed together with the conventional powder coating facility, and a separate operation must be performed outside the plating facility. Therefore, when the hot-dip galvanizing method is applied to a conventional powder coating facility, the overall operation speed is lowered and the manufacturing cost is increased.

대한민국 공개특허 제10-2014-0003202호Korean Patent Publication No. 10-2014-0003202 대한민국 공개특허 제10-2003-0004018호Korean Patent Publication No. 10-2003-0004018

본 발명은 상기한 바와 같은 종래기술의 문제점을 해결하기 위한 것으로, 본 발명의 목적은 종래의 분체도료 설비를 이용하여 징크프라이머를 피작업물의 표면에 도포함으로써 제품의 내부식성을 높이는 것이다. SUMMARY OF THE INVENTION The present invention has been made to solve the problems of the prior art as described above, and it is an object of the present invention to improve the corrosion resistance of a product by applying a zinc primer to the surface of a workpiece using a conventional powder coating facility.

상기한 바와 같은 목적을 달성하기 위한 본 발명의 특징에 따르면, 본 발명은 일정궤도를 따라 이동되도록 연속적으로 작동하면서 로딩된 피작업물을 이송하는 이송장치와, 상기 이송장치의 경로 상에 위치하여 상기 다수개의 피작업물의 표면을 세척하는 쇼트블래스트장치와, 상기 이송장치의 경로 상에서 상기 쇼트블래스트의 다음 순서에 위치하고 상기 피작업물에 아연도료를 도포하여 표면을 코팅하는 징크프라이머장치와, 상기 이송장치의 경로 상에서 상기 징크프라이머장치의 다음 순서에 위치하고 아연도포된 상기 피작업물을 가열하는 가열장치와 상기 이송장치의 경로 상에서 상기 가열장치의 다음 순서에 위치하고 상기 가열장치를 통과한 피작업물을 건조시키는 건조장치가 포함되고, 상기 징크프라이머장치는 접착성분이 함유된 아연도료를 상기 피작업물의 표면에 분사하여 코팅한다. According to an aspect of the present invention for achieving the above-mentioned object, the present invention provides a transfer apparatus for transferring a workpiece to be loaded while being continuously moved to move along a predetermined orbit, A zinc primer device positioned in the following sequence of the shot blast on the path of the transfer device and applying a zinc paint to the workpiece to coat the surface thereof; A heating device for heating the zinc-coated workpiece located in the following sequence of the zinc primer device on the path of the device, and a workpiece passing through the heating device located in the following sequence on the path of the transfer device, Wherein the zinc primer device comprises zinc < RTI ID = 0.0 > It is coated by spraying the charge on the blood surface of the workpiece.

삭제delete

상기 쇼트블래스트장치, 상기 징크프라이머장치 및 상기 가열장치는 상기 이송장치를 따라 연속적으로 연장되는 순환경로 상에 설치된다. The shot blast apparatus, the zinc primer apparatus, and the heating apparatus are installed on a circulation path continuously extending along the conveying apparatus.

삭제delete

상기 가열장치는 상기 피작업물을 가열하는 오븐으로 구성된다. The heating device comprises an oven for heating the workpiece.

입구와 출구를 각각 형성하는 한 쌍의 에어커튼 사이의 작업공간에는 건조유닛이 설치되고, 상기 건조유닛에는 집진장치와 2차가열장치가 연속적으로 구비된다. A drying unit is provided in a work space between a pair of air curtains forming an inlet and an outlet, respectively, and the drying unit is provided with a dust collecting device and a secondary heating device continuously.

상기 이송장치에는 다수개의 경로전환장치가 구비되고, 상기 경로전환장치는 상기 피작업물의 이송방향을 바꾸어 상기 이송장치의 전체 설치면적을 줄인다. The transfer device is provided with a plurality of path switching devices, and the path switching device changes the transfer direction of the workpiece to reduce the entire installation area of the transfer device.

본 발명의 다른 특징에 따르면, 본 발명은 다수의 피작업물이 하나의 행거에 나란히 걸리는 로딩단계와, 상기 다수개의 피작업물의 표면이 쇼트블래스트장치에 의해 세척되는 세척단계와, 상기 피작업물의 표면에 징크프라이머장치에 의해 아연도료가 도포되어 표면이 코팅되는 징크프라이머단계와, 상기 징크프라이머단계에 이어 피작업물이 가열장치를 통과하면서 표면이 경화되는 가열단계와, 상기 이송장치의 경로 상에서 상기 가열장치의 다음 순서에 위치하는 건조장치에 의해 상기 피작업물이 건조되는 건조단계와, 다수의 피작업물이 행거에서 분리되는 언로딩단계를 포함하고, 상기 로딩단계 내지 언로딩단계는 순환경로를 형성하는 이송장치를 따라 연속적으로 이루어지고, 상기 징크프라이머장치는 접착성분이 함유된 아연도료를 상기 피작업물의 표면에 분사하여 코팅한다.According to another aspect of the present invention, there is provided a method of manufacturing a workpiece comprising a loading step in which a plurality of workpieces are juxtaposed in one hanger, a washing step in which the surfaces of the plurality of workpieces are cleaned by a shot blast apparatus, A zinc primer step of applying a zinc primer on the surface of the zinc primer coating the surface of the zinc primer to coat the surface of the zinc primer on the surface of the zinc primer, A drying step in which the workpiece is dried by a drying device located in the next step of the heating device and an unloading step in which a plurality of workpieces are separated from the hanger, Wherein the zinc primer apparatus is a zinc coating apparatus comprising a zinc coating material containing an adhesive component, Work is coated by spraying on the surface of the water.

삭제delete

위에서 살핀 바와 같은 본 발명에 의한 징크프라이머 분체도장시스템과 이를 이용한 분체도장방법에는 다음과 같은 효과가 있다. The zinc primer powder coating system and the powder coating method using the zinc primer powder coating system according to the present invention as described above have the following effects.

본 발명에서는 아연재질을 피작업물의 표면에 도포하여 열연용융아연도금강판과 유사한 내부식성 등의 효과를 얻을 수 있고, 별도의 도금과정을 거치지 않고 징크프라이머를 이용하여 도포작업이 이루어지므로 작업속도가 향상되는 효과가 있다. In the present invention, since the zinc material is coated on the surface of the workpiece to obtain a corrosion resistance similar to that of the hot-dip galvanized steel sheet, and the coating operation is performed using zinc primer without a separate plating process, There is an effect to be improved.

특히, 본 발명에서 징크프라이머 도포 과정은 종래의 분체도포 설비를 그대로 이용할 수 있으므로 생산성이 향상되고, 제조비용이 감소하므로 경제적인 효과를 얻을 수 있다. Particularly, in the present invention, the zinc primer coating process can use the conventional powder coating equipment as it is, so that the productivity can be improved and the manufacturing cost can be reduced, so that the economical effect can be obtained.

또한, 본 발명에서 징크프라이머 도포를 포함한 모든 작업은 순환경로 상에 설치된 이송장치를 따라 연속적으로 이루어지므로 작업속도를 더욱 높일 수 있고, 이러한 순환경로는 경로전환장치를 통해 방향을 바꾸어가며 배치되므로 전체 설치면적을 줄여 공간활용률을 높일 수 있다. Further, in the present invention, all the operations including the application of the zinc primer are continuously performed along the conveying device installed on the circulation path, so that the operation speed can be further increased. Since the circulation path is arranged to be changed in direction through the path switching device Reducing the footprint can increase space utilization.

도 1은 본 발명에 의한 징크프라이머 분체도장시스템의 일실시례의 개략적인 구성을 보인 구조도.
도 2는 본 발명 일실시례를 구성하는 징크프라이머장치를 중심으로 한 주변 장치의 모습을 보인 구조도.
도 3은 본 발명에 의한 분체도장방법의 일실시례를 보인 순서도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic view showing a schematic configuration of an embodiment of a zinc primer powder coating system according to the present invention. FIG.
BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a zinc primer device, and more particularly to a zinc primer device.
3 is a flowchart showing an embodiment of a powder coating method according to the present invention.

이하, 본 발명의 일부 실시례들을 예시적인 도면을 통해 상세하게 설명한다. 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명의 실시례를 설명함에 있어, 관련된 공지구성 또는 기능에 대한 구체적인 설명이 본 발명의 실시례에 대한 이해를 방해한다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, some embodiments of the present invention will be described in detail with reference to exemplary drawings. It should be noted that, in adding reference numerals to the constituent elements of the drawings, the same constituent elements are denoted by the same reference symbols as possible even if they are shown in different drawings. In the following description of the embodiments of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the understanding why the present invention is not intended to be interpreted.

또한, 본 발명의 실시례의 구성 요소를 설명하는 데 있어서, 제 1, 제 2, A, B, (a), (b) 등의 용어를 사용할 수 있다. 이러한 용어는 그 구성 요소를 다른 구성 요소와 구별하기 위한 것일 뿐, 그 용어에 의해 해당 구성 요소의 본질이나 차례 또는 순서 등이 한정되지 않는다. 어떤 구성 요소가 다른 구성요소에 "연결", "결합" 또는 "접속"된다고 기재된 경우, 그 구성 요소는 그 다른 구성요소에 직접적으로 연결되거나 접속될 수 있지만, 각 구성 요소 사이에 또 다른 구성 요소가 "연결", "결합" 또는 "접속"될 수도 있다고 이해되어야 할 것이다.In describing the components of the embodiment of the present invention, terms such as first, second, A, B, (a), and (b) may be used. These terms are intended to distinguish the constituent elements from other constituent elements, and the terms do not limit the nature, order or order of the constituent elements. When a component is described as being "connected", "coupled", or "connected" to another component, the component may be directly connected or connected to the other component, Quot; may be "connected," "coupled," or "connected. &Quot;

본 발명은 피작업물의 표면에 도장을 실시하기 위한 징크프라이머 분체도장시스템과 이를 이용한 분체도장방법에 관한 것으로, 도장의 대상이 되는 피도장물(이하 '피작업물'이라 함)은 다양한 예가 가능하다. 이하에서는 피작업물은 일방향으로 길게 형성되는 금속재질의 가드레일인 것으로 예를 들어 설명하기로 한다. The present invention relates to a zinc primer powder coating system for coating a surface of a workpiece and a powder coating method using the zinc primer powder coating system, and various objects to be painted (hereinafter, referred to as "workpiece") are available Do. Hereinafter, the workpiece will be described as an example of a guard rail made of metal which is formed in a long direction in one direction.

도 1에서 보듯이, 피작업물은 순환경로를 형성한 이송장치(10)를 따라 이동하게 되는데, 개략적으로 살펴보면 피작업물을 대상으로 로딩-표면처리-도포-건조-언로딩 순으로 작업이 이루어진다. 여기서 로딩은 적재된 피작업물을 이송장치(10)에 고정하여 피작업물이 이송장치(10)에 의해 이동될 수 있도록 하는 것을 의미하고, 언로딩은 피작업물을 이송장치(10)로부터 분리하여 적재하는 것을 의미한다. As shown in FIG. 1, the workpiece moves along the transfer device 10 forming the circulation path. As shown schematically, the workpiece is loaded, surface-treated, applied, dried, . The loading means that the workpiece is fixed to the transfer device 10 so that the workpiece can be moved by the transfer device 10. Unloading means that the workpiece is transferred from the transfer device 10 Means to separate and load.

순차적으로 살펴보면, 먼저 이송장치(10)는 일종의 공정이 단절되지 않는 순환경로를 형성하여 피작업물이 연속적으로 이동할 수 있도록 한다. 상기 이송장치(10)에는 가이드레일을 따라 이동하는 이송체인(도시되지 않음)이 구비되고, 상기 이송체인은 이송구동원(110)의 구동력에 의해 이송장치(10)의 경로를 따라 회전하게 된다. First, the transfer device 10 forms a circulation path in which a kind of process is not disconnected so that the workpiece can be continuously moved. The conveying unit 10 is provided with a conveying chain (not shown) that moves along the guide rail, and the conveying chain is rotated along the path of the conveying unit 10 by the driving force of the conveying driving source 110.

상기 이송체인은 지면으로부터 소정 높이만큼 이격되고, 따라서 피작업물 역시 지면으로부터 이격된 상태로 이송된다. 상기 이송체인은 이송장치(10)의 순환경로를 따라 연속적으로 회전될 수 있다. 상기 이송장치(10)에는 이송체인과 상기 이송체인에 연결되어 피작업물이 걸려 고정되는 행거(미도시)가 포함되는데, 상기 행거에 피작업물을 걸어 로딩하거나, 이로부터 분리하는 언로딩작업은 아래에서 설명될 로딩/언로딩장치(100)에 의해 이루어진다. The transport chain is spaced a predetermined height from the ground, so that the workpiece is also transported away from the ground. The conveyance chain can be continuously rotated along the circulation path of the conveying device 10. [ The transfer device 10 includes a transfer chain and a hanger (not shown) connected to the transfer chain for hitting and fixing the workpiece. An unloading operation for loading or unloading the workpiece to / from the hanger Unloading apparatus 100 will be described below.

이때, 상기 피작업물은 다수개가 중력방향으로 서로 연결될 수 있다. 즉, 다수개의 피작업물이 서로 연결된 상태로 이송장치(10)를 따라 함께 이동되면서 작업이 이루어지므로, 전체 작업속도가 향상될 수 있다. 서로 연결되는 상기 피작업물의 개수는 한정될 필요는 없다.At this time, a plurality of workpieces may be connected to each other in the gravity direction. That is, since the work is performed while the plurality of workpieces are moved together along the transfer device 10 while being connected to each other, the overall operation speed can be improved. The number of the workpieces to be connected to each other need not be limited.

상기 피작업물은 로딩/언로딩장치(100)에 의해 이송장치(10)에 실리거나, 또는 반대로 이송장치(10)로부터 분리될 수 있다. 상기 로딩/언로딩장치(100)는 중 로딩장치(160)는 다수개의 피작업물을 작업자가 보다 쉽게 이송장치(10)에 고정할 수 있도록 돕는 장치인데, 로딩/언로딩장치(100)에는 자동 리프팅 장치가 적용되거나 또는 작업자에 의해 수동으로 로딩이 이루어질 수도 있다. The workpiece can be loaded on the transfer device 10 by the loading / unloading device 100 or conversely can be separated from the transfer device 10. The loading / unloading apparatus 100 includes a loading / unloading apparatus 100, a loading / unloading apparatus 100, and a loading / unloading apparatus 100. The loading / unloading apparatus 100 includes a loading / unloading apparatus 100, An automatic lifting device may be applied or manual loading may be performed by an operator.

반대로, 언로딩장치(160')는 상기 로딩장치(160) 보다 후방에 설치되어, 표면처리-도포-건조의 일련의 작업이 완료된 피작업물이 상기 이송장치(10)로부터 분리하는 작업이 보다 용이하게 이루어지도록 한다. 이를 위해 상기 언로딩장치(160')에도 리프팅수단(미도시)이 구비되어 피작업물이 자동으로 승강될 수 있도록 한다. 물론, 언로딩 작업도 작업자에 의해 수동으로 이루어질 수 있다. In contrast, the unloading device 160 'is disposed behind the loading device 160, and the operation of separating the workpiece having completed the series of surface treatment-coating-drying operations from the transfer device 10 . To this end, the unloading device 160 'is also provided with lifting means (not shown) so that the workpiece can be automatically lifted and lowered. Of course, the unloading operation can also be done manually by the operator.

이때, 상기 로딩장치(160) 및 상기 언로딩장치(160')는 이송장치(10) 상의 일정구간을 따라 왕복하면서 피작업물의 언로딩이 이루어질 수 있도록 한다. 즉 상기 로딩장치(160) 및 언로딩장치(160')는 이송장치(10)의 이송속도와 동기화된 속도로 왕복이동하게 되는 것이다. 이를 통해서 이송장치(10)를 멈추지 않고 연속적으로 동작하는 과정에서 피작업물의 로딩과 언로딩이 이루어질 수 있다. 물론, 상기 로딩장치(160) 및 언로딩장치(160')는 하나로 구성되어, 하나의 이동수단(이동대차)를 이용하여 로딩과 언로딩이 이루어질 수도 있다. 이 경우에는 하나의 이동대차 상에 후술할 리프팅수단이 각각 설치될 수 있다. At this time, the loading device 160 and the unloading device 160 'allow unloading of the workpiece while reciprocating along a predetermined section on the transfer device 10. That is, the loading device 160 and the unloading device 160 'reciprocate at a speed synchronized with the conveying speed of the conveying device 10. So that the loading and unloading of the workpiece can be performed in a process of continuously operating the transfer device 10 without stopping. Of course, the loading device 160 and the unloading device 160 'may be composed of a single unit, and may be loaded and unloaded using one moving unit (moving truck). In this case, lifting means to be described later may be installed on one moving truck, respectively.

상기 로딩/언로딩장치(100)는 상기 이송장치(10)의 경로에서 가장 바깥쪽에 나란히 설치된다. 이는 상기 로딩/언로딩장치(100)의 작업 과정에서 피작업물이 외부로 반출되거나 외부로부터 반입되는 작업이 보다 용이하게 이루어질 수 있도록 하기 위한 것이다. The loading / unloading apparatus 100 is installed on the outermost side in the path of the transferring apparatus 10. This is to make it easier for the work to be carried out of the loading / unloading apparatus 100 to be taken out or taken in from the outside during the work of the loading / unloading apparatus 100.

물론 앞서 설명한 바와 같이, 상기 로딩장치(160) 및 상기 언로딩장치(160')는 이동하지 않고, 고정된 상태에서 작업자에 의해 피작업물의 로딩/언로딩 작업이 이루어지거나, 또는 별도의 로딩장치(160)나 상기 언로딩장치(160') 없이 일정 구역에서 수작업으로 로딩과 언로딩이 이루어질 수도 있다. Of course, as described above, the loading device 160 and the unloading device 160 'do not move, and the loading / unloading operation of the workpiece is performed by the operator in a fixed state, The loading and unloading may be manually performed in a certain area without using the unloading device 160 or the unloading device 160 '.

상기 로딩/언로딩장치(100)에 인접한 장소에는 쇼트블래스트장치(150)가 설치된다. 상기 쇼트블래스트장치(150)는 상기 이송장치(10)의 경로 상에 위치하여 상기 다수개의 피작업물의 표면을 세척하는 역할을 한다. 쇼트블래스트장치(150)는 금속 또는 비금속의 미세한 입자를 고속으로 회전시켜 모래 등 이물질이 녹아 붙은 주물(피작업물)에 투사하여 원심력에 의해 자동적으로 피작업물의 표면을 세척하는 장치이다. 이러한 쇼트블래스트장치(150)를 이용함으로써 기존의 샌드블라스트(sand blast)보다 10분의 1의 시간으로 표면세척작업을 끝낼 수 있다. A shot blast device 150 is installed at a location adjacent to the loading / unloading device 100. The shot blast device 150 is located on the path of the transfer device 10 and serves to clean the surfaces of the plurality of workpieces. The shot blast device 150 is a device that automatically rotates the surface of a workpiece by centrifugal force by rotating fine metal or non-metal particles at a high speed to project it on a casting (workpiece) By using such a shot blast device 150, the surface cleaning operation can be completed in a time that is one-tenth of that of the existing sand blast.

상기 쇼트블래스트장치(150)에 의해 피작업물의 표면이 처리되면, 다음 공정에서 이루어지는 아연도료의 도포작업 품질이 향상될 수 있고, 기존에 도금된 피작업물이라 하더라도 쇼트블래스트장치(150)에 의해 표면처리를 거칠 경우에 재도장(도포) 작업이 용이하게 이루어질 수 있다. 또한 본 발명에서는 쇼트블래스트장치(150)에 의해 표면처리가 이루어지므로, 수세 약품을 사용할 경우에 발생하는 폐수 등으로 인한 환경오염이 줄어들 수 있다. When the surface of the workpiece is processed by the shot blasting device 150, the quality of the coating operation of the zinc paint in the next process can be improved, and even if the plated workpieces are already processed by the shot blast device 150 When the surface treatment is carried out, the re-coating (coating) work can be easily performed. In addition, in the present invention, since the surface treatment is performed by the shot blast device 150, environmental pollution due to wastewater or the like generated when using a flushing medicine can be reduced.

본 실시례에서 상기 로딩/언로딩장치(100)와 상기 쇼트블래스트장치(150) 사이에는 제1경로전환장치(300A)가 구비된다. 상기 제1경로전환장치(300A)는 상기 피작업물의 이송방향을 바꾸어 상기 이송장치(10)의 전체 설치면적을 줄이는 역할을 한다. 본 실시례에서는 제1경로전환장치 내지 제5경로전환장치(300A~300E)가 설치되어 피작업물의 이동방향이 총 5회 변경된다. 이러한 경로전환장치를 이용하여 피작업물의 이송경로가 최적화될 수 있고, 결과적으로 본 발명에 의한 징크프라이머 분체도장시스템을 설치하기 위한 설치면적이 효율적으로 관리될 수 있다. In this embodiment, a first path switching device 300A is provided between the loading / unloading device 100 and the shot blasting device 150. [ The first path switching device 300A serves to reduce the entire installation area of the conveying device 10 by changing the conveying direction of the work. In this embodiment, the first to fifth path switching devices 300A to 300E are provided so that the moving direction of the workpiece is changed five times in total. By using such a path switching device, the conveyance path of the workpiece can be optimized, and as a result, the installation area for installing the zinc primer powder coating system according to the present invention can be efficiently managed.

상기 쇼트블래스트장치(150)에 인접하여 제2경로전환장치(300B)가 설치되고, 상기 제2경로전환장치(300B)를 통해 이동방향이 바뀐 이송장치(10)의 경로에는 징크프라이머장치(200)가 설치된다. 상기 징크프라이머장치(200)는 상기 이송장치(10)의 경로 상에서 상기 쇼트블래스트장치(150)의 다음 순서에 위치하고 상기 피작업물에 아연도료를 도포하여 표면을 코팅하는 역할을 한다. 상기 징크프라이머장치(200)는 접착성분이 함유된 아연도료를 상기 피작업물의 표면에 분사하여 코팅하는 작업을 한다. 이러한 작업은 피작업물의 표면에 정전인력을 발생시키고 이를 이용해 도료를 도포하는 방식으로 이루어질 수도 있다. The second path switching device 300B is installed adjacent to the shot blast device 150 and the path of the transfer device 10 whose moving direction is changed through the second path switching device 300B is connected to the zinc primer device 200 Is installed. The zinc primer device 200 is positioned in the following sequence of the shot blasting device 150 on the path of the transfer device 10 and serves to coat the surface of the workpiece with a zinc coating material. The zinc primer device 200 performs a coating operation by spraying a zinc paint containing an adhesive component onto the surface of the workpiece. Such an operation may be performed by applying electrostatic attraction to the surface of the workpiece and applying the paint thereto.

상기 징크프라이머장치(200)에 의해 분사되는 도료는 아연성분을 갖고, 여기에 접착성분이 함유됨으로써 피작업물의 표면에 일정 두께 이상의 아연도포층을 형성할 수 있다. 이와 같은 아연성분을 갖는 아연도포층은 피작업물의 도포부위에 내열성의 다량의 아연도금말을 형성하여 방청 및 부식방지효과를 가져온다. 특히, 염분이 많거나 부식되기 쉬운 가혹한 환경에서도 우수한 방청력을 가질 수 있으며, 고순도의 미립자 아연분으로 균일한 분사가 가능하여 방청 및 접착성이 우수한 효과가 있다. The paint sprayed by the zinc primer device 200 has a zinc component, and an adhesive component is contained therein, thereby forming a zinc coating layer having a predetermined thickness or more on the surface of the workpiece. The zinc coating layer having a zinc component forms a large amount of heat-resistant zinc-plated coating on the coating portion of the workpiece, thereby providing anti-rust and anti-corrosion effects. Particularly, it has an excellent sound-proofing ability even in a severe environment where salinity is high or is likely to be corroded, and is capable of uniform spraying with high-purity fine-particle zinc powder, and is excellent in anti-rusting and adhesive properties.

참고로, 본 실시례에서 상기 피작업물은 열연강판(HR)이다. 열연강판은 약 800 ℃ 이상의 고온으로 압연된 것으로 것이다. 물론, 피작업물이 반드시 열연강판에 한정될 필요는 없다. For reference, the workpiece in this embodiment is a hot-rolled steel plate (HR). The hot-rolled steel sheet will be rolled to a high temperature of about 800 ° C or higher. Of course, the workpiece is not necessarily limited to the hot-rolled steel sheet.

상기 이송장치(10)의 경로 상에서 상기 징크프라이머장치(200)에 이어서 가열장치(420)가 설치된다. 상기 가열장치(420)는 상기 아연도포된 피작업물을 가열하기 위한 것으로, 상기 가열장치(420)는 상기 아연도포된 피작업물을 가열하여 표면의 아연도포층을 경화하여 도막을 형성하는 역할을 한다. 상기 가열장치(420)는 오븐이나 열경화로 등 다양한 예가 가능한데, 본 실시례에서는 오븐으로 구성된다. 상기 가열장치(420)는 약 3분 이내에서 140℃의 고온으로 피작업물의 표면을 가열하여 아연도포층을 경화시킨다. A heating device 420 is installed on the path of the transfer device 10 following the zinc primer device 200. The heating device 420 is for heating the zinc-coated workpiece, and the heating device 420 heats the zinc-coated workpiece to cure the zinc coating layer on the surface to form a coating film . The heating device 420 may be an oven or a thermosetting furnace. In this embodiment, the heating device 420 is an oven. The heating device 420 heats the surface of the workpiece to a high temperature of 140 ° C within about 3 minutes to cure the zinc coating layer.

상기 가열장치(420)를 거친 피작업물은 제3경로전환장치(300C)를 통과하면서 방향이 바뀌면, 건조유닛을 통과하여 건조가 이루어진다. 여기서 건조유닛은 이송장치(10)의 경로 상에 설치되는 것으로, 피작업물의 외면을 재가열하여 건조시키는 것으로, 다시 크게 집진장치(430)와 2차가열장치(450)를 포함하여 구성될 수 있다. 아래에서 보듯이, 본 실시례에서 상기 집진장치(430)는 상기 건조유닛의 일부를 구성하는 것으로 설명되나, 상기 집진장치(430)는 건조유닛과 별도로 구성될 수 있다. 예를 들어, 상기 집진장치(430)는 상기 징크프라이머장치(200)와 건조장치(420) 사이에 구비되거나, 또는 상기 징크프라이머장치(200)의 일부 구성일 수도 있다.When the workpiece passed through the heating device 420 passes through the third path switching device 300C and changes its direction, drying is performed through the drying unit. Here, the drying unit is installed on the path of the transfer device 10, and reheats and dries the outer surface of the workpiece. The drying unit may again include the dust collecting device 430 and the secondary heating device 450 . As described below, in the present embodiment, the dust collecting apparatus 430 is described as a part of the drying unit. However, the dust collecting apparatus 430 may be configured separately from the drying unit. For example, the dust collecting device 430 may be provided between the zinc primer device 200 and the drying device 420, or may be a part of the zinc primer device 200.

상기 집진장치(430)는 징크프라이머장치(200)의 도포작업 중에 발생한 분진을 흡입하여 배출하는 것으로, 복수의 필터와 상기 필터를 통해 흡입된 도료를 모으는 덕트를 포함한다. 상기 필터는 도료의 입자 크기에 대응되는 무수한 통기공들이 직물, 부직포, 합성수지 등의 원재료에 형성된 상태에서 도료를 흡입하면서 불순물들을 걸러내는 역할을 하며, 덕트는 도료의 흡입을 위해 외부의 흡입팬과 연결될 수 있다.The dust collecting device 430 sucks and discharges dust generated during the application work of the zinc primer device 200 and includes a plurality of filters and a duct collecting the paint sucked through the filter. The filter serves to filter out impurities while sucking the paint in a state where a large number of air vents corresponding to the particle size of the paint are formed on raw materials such as fabrics, nonwoven fabrics, synthetic resins, etc., and the duct is provided with an external suction fan Can be connected.

상기 집진장치(430)의 일측에 구비되는 2차가열장치(450)는 복수의 가열기가 내부에 설치되어 이를 이용해 상기 피작업물에 도포된 도료를 가열 용해시켜 도막을 형성하는 역할을 한다. 상기 가열기는 카본코일에 전기를 통하여 빛과 열 및 원적외선을 발산하는 전열기의 일종이다. 상기 2차가열장치(450)를 통해 상기 가열장치(420)에서 1차 건조된 피작업물을 완전하게 건조할 수 있다. The secondary heater 450 provided at one side of the dust collecting apparatus 430 is provided with a plurality of heaters to heat and dissolve the coating material applied to the workpiece to form a coated film. The heater is a type of electric heater that emits light, heat, and far-infrared rays through a carbon coil. The workpiece primarily dried in the heating device 420 can be completely dried through the secondary heating device 450.

한편, 상기 건조유닛의 입구 및 출구에는 각각 에어커튼장치(480,480')가 설치된다. 상기 에어커튼장치(480,480')는 건조유닛의 입구 및 출구에 압축공기를 분출하여 건조유닛 외부로 도료가 배출되는 것을 방지하고, 건조유닛 내부의 온도를 유지시키는 역할을 한다. 즉, 상기 에어커튼장치는 공기 유막을 형성시켜 건조유닛 내부의 온습도를 유지할 수 있도록 한다. Air curtain devices 480 and 480 'are installed at the entrance and exit of the drying unit, respectively. The air curtain devices 480 and 480 'eject compressed air to the inlet and the outlet of the drying unit to prevent the paint from being discharged to the outside of the drying unit and to maintain the temperature inside the drying unit. That is, the air curtain device forms an air film to maintain the temperature and humidity inside the drying unit.

이하에서는 본 발명에 의한 분체도장방법을 설명하기로 한다. Hereinafter, a powder coating method according to the present invention will be described.

먼저 로딩장치(160)에 의해 다수의 피작업물이 하나의 행거에 나란히 걸리는 로딩단계가 선행된다(S100). 이를 통해 다수개의 피작업물이 나란히 행거에 걸린다. 상기 로딩장치(160)는 상기 이송장치(10)와 함께 동기화되어 이동될 수 있으므로, 이송장치(10)를 멈추지 않더라도 피작업물의 로딩이 이루어질 수 있다. 상기 로딩장치(160)에는 리프팅수단이 구비되어 작업자가 보다 쉽게 피작업물을 이송장치(10)의 행거에 걸 수 있다. 참고로 상기 로딩장치(160)가 도 1의 화살표①방향으로 이동하면서 로딩단계가 이루어질 수 있다. First, a loading step in which a plurality of workpieces are juxtaposed to one hanger is precedently performed by the loading device 160 (S100). This results in multiple workpieces hanging side by side on the hanger. Since the loading device 160 can be moved synchronously with the transfer device 10, loading of the workpiece can be performed without stopping the transfer device 10. The loading device 160 is provided with lifting means, so that the worker can easily hang the workpiece on the hanger of the transfer device 10. The loading step may be performed while the loading device 160 moves in the direction of arrow 1 in FIG.

다수개의 피작업물이 적재되면, 피작업물들은 이송장치(10)를 따라 이동하면서 쇼트블래스트장치(150)에 의해 세척된다(S110). 상기 피작업물의 표면이 처리되면, 다음 공정에서 이루어지는 아연도료의 도포작업 품질이 향상될 수 있고, 기존에 도금된 피작업물이라 하더라도 쇼트블래스트장치(150)에 의해 표면처리를 거칠 경우에 재도장(도포) 작업이 용이하게 이루어질 수 있다. 또한 본 발명에서는 쇼트블래스트장치(150)에 의해 표면처리가 이루어지므로, 수세 약품을 사용할 경우에 발생하는 폐수 등으로 인한 환경오염이 줄어들 수 있다. 이와 같은 단계는 도 1의 화살표②방향에서 볼 수 있다. When a plurality of workpieces are loaded, the workpieces are cleaned by the shot blast device 150 while moving along the transfer device 10 (S110). When the surface of the workpiece is processed, the quality of the coating operation of the zinc paint in the subsequent process can be improved. Even if the coated workpiece is subjected to the surface treatment by the shot blast device 150, (Coating) work can be easily performed. In addition, in the present invention, since the surface treatment is performed by the shot blast device 150, environmental pollution due to wastewater or the like generated when using a flushing medicine can be reduced. This step can be seen in the direction of arrow 2 in Fig.

상기 피작업물은 상기 쇼트블래스트장치(150)에 의한 표면처리가 이루어진 후에, 이송장치(10)를 따라 이동하여 징크프라이머장치(200)에 의해 아연도료가 표면에 도포된다(S120). 상기 징크프라이머장치(200)에 의해 분사되는 도료는 아연성분을 갖고, 여기에 접착성분이 함유됨으로써 피작업물의 표면에 일정 두께 이상의 아연도포층을 형성할 수 있다. 이와 같은 아연성분을 갖는 아연도포층은 피작업물의 도포부위에 내열성의 다량의 아연도금말을 형성하여 방청 및 부식방지효과를 가져온다. 이와 같은 단계는 도 1의 화살표③방향에서 볼 수 있다. After the workpiece is subjected to the surface treatment by the shot blast device 150, the workpiece moves along the transfer device 10 and the zinc primer is applied to the surface by the zinc primer device 200 (S120). The paint sprayed by the zinc primer device 200 has a zinc component, and an adhesive component is contained therein, thereby forming a zinc coating layer having a predetermined thickness or more on the surface of the workpiece. The zinc coating layer having a zinc component forms a large amount of heat-resistant zinc-plated coating on the coating portion of the workpiece, thereby providing anti-rust and anti-corrosion effects. This step can be seen in the direction of arrow ③ in Fig.

상기 피작업물은 이송장치(10)를 따라 이동하는 과정에서 어느 정도 건조가 이루어지고(S130), 가열장치(420)에 의해 가열단계가 이어진다(S140). 상기 가열단계는 피작업물이 가열장치(420)를 통과하면서 이루어지는데, 상기 가열장치(420)는 오븐으로 구성되어 상기 피작업물의 표면에 고열을 가하여 경화가 이루어지도록 한다. 이에 따라 상기 피작업물의 표면에 도포되었던 아연도포층이 경화되면서 도막을 형성하게 된다. The workpiece is dried to some extent in the process of moving along the transfer device 10 (S130), and the heating process is continued by the heater 420 (S140). The heating step is performed while the workpiece is passed through the heating device 420. The heating device 420 is composed of an oven so that high temperature is applied to the surface of the workpiece for curing. As a result, the zinc coating layer applied on the surface of the workpiece is cured to form a coating film.

그리고 피작업물은 이송장치(10)를 따라 계속 이동하면서 건조유닛을 통과한다. 상기 피작업물이 상기 건조유닛을 통과하면 집진장치(430)에 의해 도포작업 중에 발생한 분진이 흡입되어 배출된다. 이때, 집진장치(430)에 구비된 필터를 통해 흡입된 도료는 덕트에 모인다. 상기 덕트는 도료의 흡입을 위해 외부의 흡입팬과 연결될 수도 있다. 이와 같은 단계는 도 1의 화살표④방향에서 볼 수 있다. Then, the workpiece continues to move along the transfer device 10 and passes through the drying unit. When the workpiece passes through the drying unit, the dust generated during the coating operation is sucked and discharged by the dust collector 430. At this time, the paint sucked through the filter provided in the dust collector 430 is collected in the duct. The duct may be connected to an external suction fan for suction of the paint. This step can be seen in the direction of arrow ④ in FIG.

상기 건조유닛에 포함된 2차가열장치(450)는 복수의 가열기가 내부에 설치되고 이를 이용해 상기 피작업물에 도포된 도료를 건조하여 완전히 경화시킨다. 물론, 상기 2차가열은 생략될 수도 있다. 이와 같은 단계는 도 1의 화살표⑤방향에서 볼 수 있다. In the secondary heating unit 450 included in the drying unit, a plurality of heaters are installed inside, and the paint applied to the work is dried and completely cured. Of course, the secondary heating may be omitted. This step can be seen in the direction of arrow 5 in Fig.

마지막으로, 로딩/언로딩장치(100) 중 언로딩장치(160')에 의해 다수의 피작업물이 행거에서 분리되는 언로딩단계가 이어진다(S150). 피작업물은 앞선 공정을 통해 표면에 아연도포층이 형성되어 작업이 완료된 상태이므로, 상기 언로딩장치(160')에 의해 이송장치(10)로부터 분리되어 적재되고, 외부로 반출된다. 이와 같은 단계는 도 1의 화살표⑥방향에서 볼 수 있다. Finally, an unloading step is performed in which a plurality of workpieces are separated from the hanger by the unloading device 160 'of the loading / unloading device 100 (S150). The workpiece is separated from the transfer device 10 by the unloading device 160 ', and is taken out to the outside because the work is formed with the zinc coating layer formed on the surface through the previous process. This step can be seen in the direction of the arrow ⑥ in FIG.

본 발명에서 상기 로딩단계 내지 언로딩단계는 순환경로를 형성하는 이송장치(10)를 따라 연속적으로 이루어져 빠른 작업속도가 가능하고, 징크프라이머장치(200)를 추가설치함으로써 종래의 설비를 그대로 활용할 수 있다. In the present invention, the loading step and the unloading step are continuously performed along the conveying device 10 forming the circulation path, thereby enabling a fast operation speed. Further, by installing the zinc primer device 200, have.

또한, 앞선 공정을 통해 아연재질을 피작업물의 표면에 도포하여 열연용융아연도금강판과 유사한 내부식성 등의 효과를 얻을 수 있고, 별도의 도금과정을 거치지 않고 징크프라이머를 이용하여 도포작업이 이루어질 수 있다. 즉, 아연도금을 위해 피작업물을 외부의 도금설비로 반출하였다가 다시 반입하여 작업을 할 필요가 없이, 본 발명에 의한 징크프라이머 분체도장시스템에 의해 모든 작업을 일괄적이고 연속적으로 할 수 있는 것이다. In addition, by applying the zinc material to the surface of the workpiece through the above process, it is possible to obtain effects such as corrosion resistance similar to that of the hot-dip galvanized steel sheet, and the coating operation can be performed using a zinc primer without a separate plating process have. That is, it is not necessary to take the workpiece out of the plating facility for carrying out the zinc plating and carry it in again, so that the zinc primer powder coating system according to the present invention can perform all operations in a batch and continuous manner .

이상에서, 본 발명에 따른 실시례를 구성하는 모든 구성 요소들이 하나로 결합하거나 결합하여 동작하는 것으로 설명되었다고 해서, 본 발명이 반드시 이러한 실시례에 한정되는 것은 아니다. 즉, 본 발명의 목적 범위 안에서라면, 그 모든 구성 요소들이 하나 이상으로 선택적으로 결합하여 동작할 수도 있다. 또한, 이상에서 기재된 "포함하다", "구성하다" 또는 "가지다" 등의 용어는, 특별히 반대되는 기재가 없는 한, 해당 구성 요소가 내재할 수 있음을 의미하는 것이므로, 다른 구성 요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수 있는 것으로 해석되어야 한다. 기술적이거나 과학적인 용어를 포함한 모든 용어들은, 다르게 정의되지 않는 한, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미가 있다. 사전에 정의된 용어와 같이 일반적으로 사용되는 용어들은 관련 기술의 문맥상의 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.While the present invention has been described in connection with what is presently considered to be the most practical and preferred embodiments, it is to be understood that the invention is not limited to the disclosed embodiments. That is, within the scope of the present invention, all of the components may be selectively coupled to one or more of them. Furthermore, the terms "comprises", "comprising", or "having" described above mean that a component can be implanted unless otherwise specifically stated, But should be construed as including other elements. All terms, including technical and scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, unless otherwise defined. Commonly used terms, such as predefined terms, should be interpreted to be consistent with the contextual meanings of the related art, and are not to be construed as ideal or overly formal, unless expressly defined to the contrary.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시례들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시례에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The foregoing description is merely illustrative of the technical idea of the present invention, and various changes and modifications may be made by those skilled in the art without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the scope of the present invention but to limit the scope of the technical idea of the present invention. The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.

예를 들어 상기한 실시례에서 집진장치(420) 또는 2차가열장치(450) 중 어느 하나는 생략될 수 있다. For example, in the above embodiment, either the dust collecting device 420 or the secondary heating device 450 may be omitted.

10: 이송장치 100: 로딩/언로딩장치
150: 쇼트블래스트장치 160: 로딩장치
160': 언로딩장치 200: 징크프라이머장치
420: 가열장치 430: 집진장치
450: 2차가열장치
10: Feeding device 100: Loading / unloading device
150: shot blast device 160: loading device
160 ': unloading device 200: zinc primer device
420: Heating device 430: Dust collector
450: Secondary heating device

Claims (9)

일정궤도를 따라 이동되도록 연속적으로 작동하면서 로딩된 피작업물을 이송하는 이송장치와,
상기 피작업물을 이송장치에 싣거나 반대로 이송장치에서 분리시키는 로딩/언로딩장치와,
상기 이송장치의 경로 상에 위치하여 상기 피작업물의 표면을 세척하는 쇼트블래스트장치와,
상기 이송장치의 경로 상에서 상기 쇼트블래스트의 다음 순서에 위치하고 상기 피작업물에 아연도료를 도포하여 표면을 코팅하는 징크프라이머장치와,
상기 이송장치의 경로 상에서 상기 징크프라이머장치의 다음 순서에 위치하고 아연도포된 상기 피작업물을 가열하여 표면의 아연도포층을 경화함으로써 도막을 형성하는 가열장치와,
상기 이송장치의 경로 상에서 상기 가열장치의 다음 순서에 위치하고 상기 가열장치를 통과한 피작업물을 건조시키는 건조장치와,
입구와 출구를 각각 형성하는 한 쌍의 에어커튼 사이의 작업공간에 설치되고 집진장치와 2차가열장치가 연속적으로 구비되는 건조유닛을 포함하고,
상기 징크프라이머장치는 접착성분이 함유된 아연도료를 상기 피작업물의 표면에 분사하여 코팅하며,
상기 로딩/언로딩장치, 쇼트블래스트장치, 징크프라이머장치 및 건조유닛은 상기 이송장치를 따라 연속적으로 연장되는 순환경로 상에 설치되되, 다수개의 경로전환장치가 로딩/언로딩장치, 쇼트블래스트장치, 징크프라이머장치 및 건조유닛 사이사이에 설치되어 로딩/언로딩장치, 쇼트블래스트장치, 징크프라이머장치 및 건조유닛이 서로 평행하게 연장되게 하는 징크프라이머 분체도장시스템.
A transfer device for transferring the loaded workpiece while continuously operating to move along a predetermined trajectory;
A loading / unloading device for loading the workpiece on the transfer device or for separating the workpiece from the transfer device,
A short blast device positioned on the path of the transfer device for cleaning the surface of the workpiece;
A zinc primer device positioned in the following sequence of the shot blast on the path of the transfer device and applying a zinc paint to the workpiece to coat the surface thereof;
A heating device for forming a coating film on the path of the transfer device in the following order of the zinc primer device and heating the zinc-coated workpiece to cure the zinc coating layer on the surface;
A drying device positioned in the following sequence of the heating device on the path of the transfer device and drying the workpiece passed through the heating device;
And a drying unit which is installed in a working space between a pair of air curtains forming an inlet and an outlet, and in which a dust collecting device and a secondary heating device are continuously provided,
The zinc primer device is formed by spraying a zinc paint containing an adhesive component onto the surface of the workpiece,
Wherein the loading / unloading device, the shot blast device, the zinc primer device, and the drying unit are installed on a circulation path continuously extending along the conveying device, wherein the plurality of path switching devices are a loading / unloading device, a shot blasting device, A zinc primer powder coating system installed between the zinc primer unit and the drying unit such that the loading / unloading unit, the shot blast unit, the zinc primer unit and the drying unit are extended in parallel with each other.
삭제delete 삭제delete 삭제delete 제 1 항에 있어서, 상기 가열장치는 상기 피작업물을 가열하는 오븐으로 구성되는 징크프라이머 분체도장시스템.
The zinc primer powder coating system according to claim 1, wherein the heating device comprises an oven for heating the workpiece.
삭제delete 제 1 항 또는 제 5 항에 있어서, 상기 경로전환장치는 상기 피작업물의 이송방향을 바꾸어 상기 이송장치의 전체 설치면적을 줄이는 징크프라이머 분체도장시스템.
The zinc primer powder coating system according to claim 1 or 5, wherein the path switching device changes the conveying direction of the workpiece to reduce the entire installation area of the conveying device.
피작업물이 하나의 행거에 나란히 걸리는 로딩단계와,
상기 피작업물의 표면이 쇼트블래스트장치에 의해 세척되는 세척단계와,
상기 피작업물의 표면에 징크프라이머장치에 의해 아연도료가 도포되어 표면이 코팅되는 징크프라이머단계와,
상기 징크프라이머단계에 이어 피작업물이 가열장치를 통과하면서 아연도포된 상기 피작업물이 가열되어 표면의 아연도포층이 경화됨으로써 도막이 형성되는 가열단계와,
이송장치의 경로 상에서 상기 가열장치의 다음 순서에 위치하는 건조장치에 의해 상기 피작업물이 건조되는 건조단계와,
피작업물이 행거에서 분리되는 언로딩단계를 포함하고,
상기 로딩단계 내지 언로딩단계는 순환경로를 형성하는 이송장치를 따라 연속적으로 이루어지고,
상기 징크프라이머장치는 접착성분이 함유된 아연도료를 상기 피작업물의 표면에 분사하여 코팅하며,
상기 로딩단계 및 언로딩단계는 상기 피작업물을 이송장치에 싣거나 반대로 이송장치에서 분리시키는 로딩/언로딩장치에 의해 이루어지고,
상기 건조단계는 입구와 출구를 각각 형성하는 한 쌍의 에어커튼 사이의 작업공간에 설치되고 집진장치와 2차가열장치가 연속적으로 구비되는 건조유닛에 의해 이루어지며,
상기 징크프라이머장치는 접착성분이 함유된 아연도료를 상기 피작업물의 표면에 분사하여 코팅하고,
상기 로딩/언로딩장치, 쇼트블래스트장치, 징크프라이머장치 및 건조유닛은 상기 이송장치를 따라 연속적으로 연장되는 순환경로 상에 설치되되, 다수개의 경로전환장치가 로딩/언로딩장치, 쇼트블래스트장치, 징크프라이머장치 및 건조유닛 사이사이에 설치되어 로딩/언로딩장치, 쇼트블래스트장치, 징크프라이머장치 및 건조유닛이 서로 평행하게 연장되게 하는 징크프라이머 분체도장방법.
A loading step in which the workpiece is juxtaposed in one hanger,
A cleaning step in which the surface of the workpiece is cleaned by a shot blast apparatus,
A zinc primer step in which a surface of the workpiece is coated with a zinc coating material by a zinc primer apparatus,
A heating step in which the workpiece is passed through a heating device after the zinc primer step to form a coating film by heating the zinc-coated workpiece to cure the zinc coating layer on the surface,
A drying step in which the workpiece is dried by a drying device located in the following sequence of the heating device on the path of the transfer device,
Comprising an unloading step in which the workpiece is separated from the hanger,
Wherein the loading step and the unloading step are continuously performed along a transfer device forming a circulation path,
The zinc primer device is formed by spraying a zinc paint containing an adhesive component onto the surface of the workpiece,
Wherein the loading step and the unloading step are carried out by a loading / unloading device which loads the workpiece on the transfer device or separates the workpiece from the transfer device on the contrary,
The drying step is performed by a drying unit which is installed in a work space between a pair of air curtains forming an inlet and an outlet, and is continuously provided with a dust collecting device and a secondary heating device,
Wherein the zinc primer device is formed by spraying a zinc paint containing an adhesive component onto the surface of the workpiece,
Wherein the loading / unloading device, the shot blast device, the zinc primer device, and the drying unit are installed on a circulation path continuously extending along the conveying device, wherein the plurality of path switching devices are a loading / unloading device, a shot blasting device, A method for coating a zinc primer powder, which is installed between a zinc primer unit and a drying unit to cause a loading / unloading unit, a shot blast unit, a zinc primer unit and a drying unit to extend in parallel with each other.
삭제delete
KR1020160107959A 2016-08-24 2016-08-24 Powder coating system using zinc primer and powder coating method thereof KR101899844B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160107959A KR101899844B1 (en) 2016-08-24 2016-08-24 Powder coating system using zinc primer and powder coating method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160107959A KR101899844B1 (en) 2016-08-24 2016-08-24 Powder coating system using zinc primer and powder coating method thereof

Publications (2)

Publication Number Publication Date
KR20180022479A KR20180022479A (en) 2018-03-06
KR101899844B1 true KR101899844B1 (en) 2018-09-19

Family

ID=61727652

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160107959A KR101899844B1 (en) 2016-08-24 2016-08-24 Powder coating system using zinc primer and powder coating method thereof

Country Status (1)

Country Link
KR (1) KR101899844B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112691837A (en) * 2021-03-25 2021-04-23 山东共达电力设备有限公司 Plastic-coated and heating integrated equipment for large-diameter plastic-coated composite steel pipe
KR102340407B1 (en) * 2021-11-09 2021-12-17 주식회사 대성에스앤피 Shot blast and primer powder coating system using short balls with excellent strength and abrasion resistance, and powder coating method using the same
KR102546594B1 (en) 2023-01-12 2023-06-21 서재승 The powder coating system
KR102675347B1 (en) 2024-02-07 2024-06-14 (주)일신분체 Powder coating system

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108636677B (en) * 2018-07-17 2024-07-02 青岛恒林工业集团股份有限公司 Steel tube bundle shot blasting, paint spraying and drying integrated machine
CN113083544A (en) * 2021-03-31 2021-07-09 伍梦文 Anti-aging cable bridge manufacturing surface treatment process
CN113083583B (en) * 2021-04-05 2022-05-17 芜湖职业技术学院 Automobile rod spraying process and device
CN113499915A (en) * 2021-07-09 2021-10-15 南京业恒达智能系统股份有限公司 Shot blasting coating production line and shot blasting coating method
KR102622810B1 (en) * 2023-03-16 2024-01-24 주식회사 대성에스앤피 Shot blasting and primer liquid coating system using a shot ball with excellent strength and abrasion resistance and liquid coating method using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016024653A1 (en) * 2014-08-13 2016-02-18 주식회사 켐프 Pigment separable type aqueous paint composition mixed with plate-like zinc powder

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0687649B2 (en) * 1985-05-24 1994-11-02 三菱電機株式会社 Brushless motor
KR20140003202A (en) * 2012-06-29 2014-01-09 이은주 Powder coating method and powder coated film manufactured thereby
KR20160103924A (en) * 2015-02-24 2016-09-02 (주)영공 Flammability galvanized steel sheet production method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016024653A1 (en) * 2014-08-13 2016-02-18 주식회사 켐프 Pigment separable type aqueous paint composition mixed with plate-like zinc powder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112691837A (en) * 2021-03-25 2021-04-23 山东共达电力设备有限公司 Plastic-coated and heating integrated equipment for large-diameter plastic-coated composite steel pipe
KR102340407B1 (en) * 2021-11-09 2021-12-17 주식회사 대성에스앤피 Shot blast and primer powder coating system using short balls with excellent strength and abrasion resistance, and powder coating method using the same
KR102546594B1 (en) 2023-01-12 2023-06-21 서재승 The powder coating system
KR102675347B1 (en) 2024-02-07 2024-06-14 (주)일신분체 Powder coating system

Also Published As

Publication number Publication date
KR20180022479A (en) 2018-03-06

Similar Documents

Publication Publication Date Title
KR101899844B1 (en) Powder coating system using zinc primer and powder coating method thereof
CN105289903B (en) A kind of antifog paint automatic spraying production line of car light
CN105983503B (en) A kind of full-automatic plastic cement vacuum coating paint line and film plating process
US10543502B2 (en) Work piece processing arrangements
KR101585493B1 (en) Powder coating method, powder coating device and guardrail manufactured by using same
CN105457820B (en) A kind of intelligent streamline of Shift speed segmentally and flexible docking spraying
CN104368476A (en) UV paint spraying production line and production method thereof
US20070224343A1 (en) Method for powder coating a non-conductive plastic substrate wherein an adhesive/primer is used in the process to increase the surface conductivity of the substrate
WO2015069303A1 (en) Spray coating system and method
CN208341004U (en) A kind of bridge Wavelike steel webplate automatic spraying system
CN105057150B (en) Be exclusively used in the integrated production equipment of furniture part and assembly
ITBO20000278A1 (en) METHOD AND APPARATUS FOR THE HORIZONTAL PAINTING OF WOODEN OR WOOD DERIVATED ITEMS AND OF PREVALENT FLAT EXTENSION.
CN209968761U (en) Large object coating baking finish system
JP4505736B2 (en) Painting machine
KR102340407B1 (en) Shot blast and primer powder coating system using short balls with excellent strength and abrasion resistance, and powder coating method using the same
CN110000040A (en) A kind of SMC product automatic spraying production line
CN105251649A (en) Automatic equipment for spraying three coats of paint on fingerprint identification chips
CN204429548U (en) A kind of UV paints spray-painting production line
KR101806087B1 (en) Inside corner form powder coating machine
KR102622810B1 (en) Shot blasting and primer liquid coating system using a shot ball with excellent strength and abrasion resistance and liquid coating method using the same
KR100913798B1 (en) Fluidized bed type coating apparatus of inner and outer side of a coating tube, and method thereof
JP2013000708A (en) Powder coating device
JP6736119B1 (en) APPARATUS AND METHOD FOR PRODUCING PAINTED COALED STEEL
US20170009349A1 (en) Facility and method for applying coatings to elongated automotive parts
RU2659547C1 (en) Method for producing anti-corrosive coating on a metallic product (embodiments)

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant