KR101186053B1 - Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab - Google Patents

Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab Download PDF

Info

Publication number
KR101186053B1
KR101186053B1 KR1020100075927A KR20100075927A KR101186053B1 KR 101186053 B1 KR101186053 B1 KR 101186053B1 KR 1020100075927 A KR1020100075927 A KR 1020100075927A KR 20100075927 A KR20100075927 A KR 20100075927A KR 101186053 B1 KR101186053 B1 KR 101186053B1
Authority
KR
South Korea
Prior art keywords
precast concrete
concrete
slab
concrete slab
formwork
Prior art date
Application number
KR1020100075927A
Other languages
Korean (ko)
Other versions
KR20120013739A (en
Inventor
이상섭
배규웅
허병욱
박금성
곽명근
Original Assignee
한국건설기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국건설기술연구원 filed Critical 한국건설기술연구원
Priority to KR1020100075927A priority Critical patent/KR101186053B1/en
Publication of KR20120013739A publication Critical patent/KR20120013739A/en
Application granted granted Critical
Publication of KR101186053B1 publication Critical patent/KR101186053B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/18Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly cast between filling members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/26Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with filling members between the beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/165Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with elongated load-supporting parts, cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

본 발명은 프리캐스트 콘크리트 슬래브와 현장타설 철근콘크리트 보의 접합 방법에 관한 것으로, 보다 상세하게는 프리캐스트 콘크리트 슬래브를 가설한 다음 이를 이용해 보 거푸집을 매달고 보 콘크리트와 덧침 콘크리트를 현장타설하는 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법에 관한 것이다.
본 발명의 적절한 실시 형태에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법은, 동바리를 설치하고 프리캐스트 콘크리트 슬래브를 동바리 위에 안착시켜 프리캐스트 콘크리트 슬래브를 가설하는 단계; 보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계; 보와 슬래브 상부 철근을 배근하고 보 콘크리트와 덧침 콘크리트를 동시에 타설하는 단계; 및 콘크리트 경화 후 보 거푸집을 탈거하는 단계를 포함한다.
The present invention relates to a method of joining precast concrete slabs and cast-in-place reinforced concrete beams. More specifically, after pre-installing precast concrete slabs, the construction of the precast concrete slabs is used to suspend the beam formwork and to cast the beam concrete and the overlay concrete. A method of constructing cast-in-place reinforced concrete beams using cast concrete slabs.
In accordance with a preferred embodiment of the present invention, the method of constructing a cast-in-place reinforced concrete beam using a precast concrete slab includes: installing a copper bar and placing a precast concrete slab on the copper bar to construct a precast concrete slab; Lifting beam formwork and suspending it to the precast concrete slab; Reinforcing beam and slab upper reinforcing bars and placing beam concrete and overlay concrete at the same time; And removing the formwork after concrete hardening.

Description

선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법{Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab}Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab}

본 발명은 프리캐스트 콘크리트 슬래브와 현장타설 철근콘크리트 보의 접합 방법에 관한 것으로, 보다 상세하게는 프리캐스트 콘크리트 슬래브를 가설한 다음 이를 이용해 보 거푸집을 매달고 보 콘크리트와 덧침 콘크리트를 현장타설하는 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법에 관한 것이다. The present invention relates to a method of joining precast concrete slabs and cast-in-place reinforced concrete beams, and more specifically, the construction of precast concrete slabs, and then using them to suspend the beam formwork and precast the beam concrete and the overlay concrete A method of constructing cast-in-place reinforced concrete beams using cast concrete slabs.

건축물의 주요 구조부재로는 기둥, 보, 슬래브, 벽체 등이 있다. 이들 구조부재는 현장타설 콘크리트 방식으로 일체로 제작되거나 또는 프리캐스트 콘크리트 방식으로 제작되고 공사현장에서 조립될 수 있다. 현장타설공법은 공사현장에서 거푸집을 설치하고 철근을 배근한 뒤 콘크리트를 타설하여 건물을 완성하는 것이고 프리캐스트 콘크리트 공법(이하 간단히 'PC공법'이라 함)은 구조부재들을 공장에서 제작한 후 현장으로 운반, 조립하여 건물을 완성하는 공법이다. The main structural members of the building are pillars, beams, slabs and walls. These structural members may be manufactured integrally in a cast-in-place concrete method or may be manufactured in a precast concrete method and assembled at a construction site. On-site casting method is to install the formwork at the construction site, reinforce the reinforcing bar, and cast concrete to complete the building, and precast concrete method (hereinafter simply referred to as 'PC method') is to make the structural members at the factory It is the construction method to complete the building by transporting and assembling.

국내에서 가장 널리 사용되고 있는 PC공법은 골조 PC복합화공법으로서 기둥, 보, 슬래브로 이루어지는 구조물을 PC화하는 공법으로서 부분 PC화된 구조부재를 사용하여 현장타설공법과 PC공법을 합리적으로 조합시키는 것을 말한다. 즉, 기둥, 보, 슬래브를 모두 PC화하고 이들을 현장에서 조립한 다음 현장에서 덧침 콘크리트를 타설하여 이들 접합부를 일체화하는 방법이다.The most widely used PC method in Korea is a frame PC compounding method, which is a method of PC-forming a structure consisting of pillars, beams, and slabs. It is a rational combination of the site casting method and the PC method using a partly PCized structural member. In other words, all columns, beams, and slabs are made into PCs, and these are assembled at the site, and the concrete is poured at the site to integrate these joints.

이 공법은 덧침 콘크리트만 현장타설로 시공하면 되므로 현장타설 콘크리트의 물량이 적어 공기가 단축되고 품질관리가 용이하며 깨끗한 현장을 유지할 수 있다는 장점이 있는 반면에 접합부의 설계가 복잡하고 품질을 유지하기 곤란할 뿐만 아니라 시공성이 떨어질 수 있다는 단점을 가진다. This method has the advantage of shortening the amount of on-site concrete so that the air can be shortened, quality control is easy, and the clean site can be maintained, while the design of the joint is complicated and difficult to maintain the quality. In addition, there is a disadvantage that the workability can be reduced.

본 발명은 현장타설공법과 거의 동등한 일체성을 확보하는 접합부를 얻을 수 있고 보 거푸집 지지용 동바리의 생략이 가능하여 경제성, 시공성을 향상시킬 수 있는 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 제공하는 것을 목적으로 한다.The present invention can obtain a joint to secure almost the same integrity as the cast-in-place method, and it is possible to omit the frame for supporting the formwork, so that the economical and constructability can be improved, the cast-in-place reinforced concrete beam using precast concrete slab The purpose is to provide a construction method.

본 발명의 적절한 실시 형태에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법은, 동바리를 설치하고 프리캐스트 콘크리트 슬래브를 동바리 위에 안착시켜 프리캐스트 콘크리트 슬래브를 가설하는 단계; 보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계; 보와 슬래브 상부 철근을 배근하고 보 콘크리트와 덧침 콘크리트를 동시에 타설하는 단계; 및 콘크리트 경화 후 보 거푸집을 탈거하는 단계를 포함한다.In accordance with a preferred embodiment of the present invention, the method of constructing a cast-in-place reinforced concrete beam using a precast concrete slab includes: installing a copper bar and placing a precast concrete slab on the copper bar to construct a precast concrete slab; Lifting beam formwork and suspending it to the precast concrete slab; Reinforcing beam and slab upper reinforcing bars and placing beam concrete and overlay concrete at the same time; And removing the formwork after concrete hardening.

본 발명의 다른 적절한 실시 형태에 따르면, 보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계는, 프리캐스트 콘크리트 슬래브에 미리 설치된 인서트 너트에 보 거푸집을 관통하여 볼트를 체결하는 방법으로 이루어진다.According to another suitable embodiment of the present invention, the step of lifting the beam formwork and suspending it to the precast concrete slab consists of a method of fastening the bolt through the formwork to the insert nut pre-installed in the precast concrete slab.

본 발명의 또 다른 적절한 실시 형태에 따르면, 보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계는, 프리캐스트 콘크리트 슬래브에 걸치는 걸침면과 보 거푸집이 고정되는 결합면을 가지도록 강판을 절곡한 클립을 설치하고 볼트를 이용해 보 거푸집를 클립의 결합면에 고정하는 방법으로 이루어진다.According to another suitable embodiment of the present invention, the step of lifting the beam formwork and suspending it to the precast concrete slab, the clip bent the steel sheet so as to have a mating surface over the precast concrete slab and a joining surface to which the formwork is fixed This is done by mounting and bolting the formwork to the mating surface of the clip.

본 발명의 또 다른 적절한 실시 형태에 따르면, 보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계는, 프리캐스트 콘크리트 슬래브의 가설 전에 미리 천공된 구멍에 장볼트 또는 달대를 삽입 고정하고 보 거푸집을 장볼트 또는 달대에 고정하는 방법으로 이루어진다.According to another suitable embodiment of the present invention, the step of lifting the beam formwork and suspending it to the precast concrete slab includes inserting and fixing a long bolt or a sill into a pre-drilled hole before the construction of the precast concrete slab and fixing the formwork to the long bolt. Or fixed to the moon.

본 발명은 현장타설 철근콘크리트 보와 프리캐스트 콘크리트 슬래브를 접합한 형식의 PC복합화공법으로써 프리캐스트 콘크리트 보 부재를 이용하는 종래 PC복합화공법에 비해 보를 현장타설방법으로 시공함으로써 보-슬래브 접합부의 일체성이 현장타설공법과 동등한 수준으로 확보될 수 있는 이점이 있다. 또한 프리캐스트 콘크리트 슬래브를 동바리로 지지한 상태에서 미리 조립된 보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 방식으로서 보 거푸집을 지지하는 동바리가 불필요하다는 이점을 가진다. The present invention is a PC compounding method in which a cast-in-place reinforced concrete beam and a precast concrete slab are bonded to each other, thereby integrating the beam-slab joints by constructing the beam by the in-place casting method compared to the conventional PC compounding method using a precast concrete beam member. There is an advantage that can be secured to the same level as the site casting method. In addition, the pre-fabricated slabs are pre-assembled in the state in which the precast concrete slabs are supported by copper bars, and the method of hanging the pre-cast concrete slabs to the precast concrete slabs is unnecessary.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1은 본 발명에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 나타낸 흐름도이다.
도 2는 본 발명의 제1 실시 예에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 설명하기 위한 예시도이다.
도 3은 본 발명의 제2 실시 예에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 설명하기 위한 예시도이다.
도 4는 본 발명의 제3 실시 예에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 설명하기 위한 예시도이다.
The following drawings, which are attached in this specification, illustrate the preferred embodiments of the present invention, and together with the detailed description thereof, serve to further understand the technical spirit of the present invention. It should not be construed as limited.
1 is a flow chart showing a construction method of cast-in-place reinforced concrete beams using a pre-installed precast concrete slab according to the present invention.
Figure 2 is an exemplary view for explaining the construction method of in-site reinforcement concrete beam using the pre-installed precast concrete slab according to the first embodiment of the present invention.
Figure 3 is an exemplary view for explaining the construction method of in-site reinforcement concrete beam using a pre-installed precast concrete slab according to a second embodiment of the present invention.
Figure 4 is an exemplary view for explaining the construction method of on-site reinforcement concrete beam using a pre-installed precast concrete slab according to a third embodiment of the present invention.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in the accompanying drawings, but the present invention is not limited thereto.

도 1은 본 발명에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 순서대로 나타낸 사시도이고, 도 2는 프리캐스트 콘크리트 슬래브에 보 거푸집이 매단 상태를 나타낸 단면도이다.1 is a perspective view sequentially showing the construction method of the site-casting reinforced concrete beam using the pre-installed precast concrete slab according to the present invention, Figure 2 is a cross-sectional view showing the formwork is suspended in the precast concrete slab.

도시된 바와 같이 본 발명에 따른 현장타설 철근콘크리트 보의 시공방법은, 프리캐스트 콘크리트 슬래브를 가설하는 단계(도 1의 (a),(b)), 보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계(도 1의 (c)); 보와 슬래브 상부 철근을 배근하고 보 콘크리트와 덧침 콘크리트를 동시에 타설하는 단계(도 1의 (d)), 및 콘크리트 경화 후 보 거푸집을 탈거하는 단계(도 1의 (e))를 포함한다.As shown in the construction method of the cast-in-place reinforced concrete beam according to the present invention, the step of laying the precast concrete slab ((a), (b) of Fig. 1), the beam formwork is suspended in the precast concrete slab Step (FIG. 1C); Reinforcing the beam and the slab upper reinforcement and placing the beam concrete and the overlay concrete at the same time (Fig. 1 (d)), and the step of removing the formwork after curing the concrete (Fig. 1 (e)).

본 발명에서는 프리캐스트 콘크리트 슬래브(21)를 동바리(11)로 지지한 상태에서 미리 조립된 보 거푸집(31)을 양중하여 프리캐스트 콘크리트 슬래브(21)에 매다는 방식으로서 보 거푸집(31)을 지지하는 동바리가 불필요하다는 이점을 가진다. 그리고 프리캐스트 콘크리트 보 부재를 이용하는 종래 PC복합화공법에 비해 보를 현장타설방법으로 시공함으로써 보-슬래브 접합부의 일체성이 현장타설공법과 동등한 수준으로 확보될 수 있는 이점이 있다. In the present invention, the prefabricated concrete slab 21 is supported by the shell 11 by supporting the preformed concrete slab 21 by lifting the pre-assembled beam formwork 31 in a state of being supported. It has the advantage that the group is unnecessary. In addition, compared with the conventional PC compounding method using a precast concrete beam member, by constructing the beam in the field casting method, there is an advantage that the integrity of the beam-slab joint can be secured to the same level as the site casting method.

도면에서 프리캐스트 콘크리트 슬래브(21)로는 슬래브 상면에 돌출된 리브를 두고 리브에 프리스트레스를 도입한 리브 슬래브가 적용된 것으로 도시되었으나 본 발명은 이에 한정되지 않으며 예를 들어 트러스 보강형 하프 슬래브, 처짐 및 균열제어에 유리하도록 프리스트레스를 도입한 피에스 하프 슬래브, 내부에 중공을 가지는 할로우 코어 슬래브, 슬래브 하면에 돌출된 스템을 가지는 더블티 슬래브 등 이 분야에서 공지된 임의의 프리캐스트 콘크리트 슬래브가 적용될 수 있다. In the drawings, the precast concrete slab 21 is shown to have a rib slab having a rib protruding on the upper surface of the slab and a prestress introduced into the rib. However, the present invention is not limited thereto, for example, a truss-reinforced half slab, sag and cracks. Any precast concrete slab known in the art may be applied, such as a PS half slab with prestress introduced to control, a hollow core slab with a hollow inside, a double tee slab with a stem protruding from the bottom of the slab.

아래에서는 보 거푸집을 프리캐스트 콘크리트 슬래브에 매다는 구조를 중심으로 본 발명의 다양한 실시 예를 구체적으로 설명한다.Hereinafter, various embodiments of the present invention will be described in detail with a focus on the structure of suspending the formwork to the precast concrete slab.

도 2는 본 발명의 제1 실시 예에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 설명하기 위한 예시도이다. Figure 2 is an exemplary view for explaining the construction method of in-site reinforcement concrete beam using the pre-installed precast concrete slab according to the first embodiment of the present invention.

도 1, 2를 참조하면, 제1 실시 예에 따른 방법은 동바리(11)를 설치하고 프리캐스트 콘크리트 슬래브(21)를 동바리(11) 위에 안착시켜 프리캐스트 콘크리트 슬래브(21)를 가설한 다음, 미리 조립된 보 거푸집(31)을 장비를 이용하여 양중하고 프리캐스트 콘크리트 슬래브(21)에 미리 설치된 인서트 너트(311)에 볼트(312)를 체결해 보 거푸집(31)을 매단 뒤, 보 거푸집(31) 내부에 철근을 배근하고 프리캐스트 콘크리트 슬래브(21)의 상부에도 철근을 배근한 다음 보 콘크리트(41) 및 덧침 콘크리트(51)를 타설하고, 콘크리트(41,51)가 경화된 다음 보 거푸집(31)을 탈거하고 동바리(11)를 철거하는 순서로 시공이 완료된다. 1 and 2, in the method according to the first embodiment, a precast concrete slab 21 is installed by installing a copper wheel 11 and seating a precast concrete slab 21 on the copper wheel 11. After fastening the beam formwork 31 by fastening the bolts 312 to the insert nut 311 which is pre-assembled by using the equipment and the preformed concrete formwork 31 is pre-installed on the precast concrete slab 21. 31) Reinforce the reinforcement inside, reinforce the reinforcement to the upper part of the precast concrete slab 21, and then cast the beam concrete (41) and the overlaid concrete (51), and the concrete (41, 51) is cured and then the formwork The construction is completed by removing the 31 and removing the club 11.

동바리(11)는 프리캐스트 콘크리트 슬래브(21)의 길이방향에 수직한 방향으로 일정 간격을 두고 설치되며 동바리(11)의 상부에 가로띠장(12)에 설치되고 그 위에 프리캐스트 콘크리트 슬래브(21)를 양중하여 안착하는 방법으로 프리캐스트 콘크리트 슬래브(21)가 가설될 수 있다. 프리캐스트 콘크리트 슬래브(21)를 가설하는 방법은 이에 제한되지는 않으며 보 콘크리트가 타설, 경화되어 프리캐스트 콘크리트 슬래브와 일체로 되어 동바리로 지지될 필요가 없을 때까지 프리캐스트 콘크리트 슬래브를 안전하게 지지할 수 있는 것이라면 이 분야에서 공지된 어떠한 방법이라도 가능하다.The copper bar 11 is installed at regular intervals in a direction perpendicular to the longitudinal direction of the precast concrete slab 21 and is installed on the horizontal strip 12 on the upper part of the copper bar 11 and the precast concrete slab 21 thereon. Precast concrete slab 21 may be hypothesized in a manner of lifting and lifting. The method of laying the precast concrete slab 21 is not limited thereto, and the precast concrete slab can be safely supported until the beam concrete is poured and cured so that it is not integrated with the precast concrete slab and does not need to be supported by the clubs. If so, any method known in the art is possible.

동바리(11)로는 파이프 서포트, 틀 서포트 등 이 분야에서 공지된 임의의 동바리가 사용될 수 있으며 동바리(11)는 자립될 수 있도록 바닥면에 적절하게 고정될 수 있다. As the club 11, any club known in the art, such as a pipe support or a frame support, may be used, and the club 11 may be appropriately fixed to the bottom surface so as to be self-supporting.

이 실시 예에 따르면 프리캐스트 콘크리트 슬래브(21)에 제조시 미리 인서트 너트(311)를 매입해 두고 볼트(312)를 이용해 보 거푸집(31)을 고정함으로써 보 거푸집(31)의 설치가 간편하게 이루어질 수 있고 보 거푸집(31)의 탈거시 볼트(312)를 해체하는 것으로 간단하게 이루어질 수 있다는 이점을 가진다. According to this embodiment, when inserting the insert nut 311 in preparation to the precast concrete slab 21 and secures the formwork 31 using the bolt 312 can be easily installed the formwork 31. And dismantling the bolt 312 upon removal of the formwork 31.

이 실시 예를 포함하여 아래의 실시 예들에서 보 거푸집(31)은 이 분야에서 공지된 임의의 재료를 이용해 양중 전에 미리 성형될 보의 형상대로 조립될 수 있으며 예를 들어 합판, 플라스틱 또는 강재를 이용해 제조될 수 있다. In the following examples, including this embodiment, the beam formwork 31 may be assembled in the shape of a beam to be preformed before lifting using any material known in the art, for example using plywood, plastic or steel. Can be prepared.

도 3은 본 발명의 제2 실시 예에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 설명하기 위한 예시도이다.Figure 3 is an exemplary view for explaining the construction method of in-site reinforcement concrete beam using a pre-installed precast concrete slab according to a second embodiment of the present invention.

도 1, 3을 참조하면, 제2 실시 예에 따른 방법은 제1 실시 예서와 같이 프리캐스트 콘크리트 슬래브(21)를 가설한 다음, 미리 조립된 보 거푸집(31)을 장비를 이용하여 양중하고 프리캐스트 콘크리트 슬래브(21)에 강판을 절곡하여 구성된 클립(321)을 설치하고 볼트(322)를 체결해 보 거푸집(31)을 클립(321)을 이용해 매단 뒤, 보 거푸집(31) 내부에 철근을 배근하고 프리캐스트 콘크리트 슬래브(21)의 상부에도 철근을 배근한 다음 콘크리트(41,51)를 타설하고, 콘크리트(41,51)가 경화된 다음 보 거푸집(31)을 탈거하고 동바리(11)를 철거하는 순서로 시공이 완료된다. 1 and 3, the method according to the second embodiment of the present invention presupposes the precast concrete slab 21 as in the first embodiment, and then doubles the pre-assembled beam formwork 31 using equipment and free Install the clip 321 formed by bending the steel plate on the cast concrete slab 21 and fasten the bolts 322 to tie the beam formwork 31 with the clip 321, and then reinforce the steel bars inside the formwork 31. Reinforcement is added to the upper part of the precast concrete slab (21), and the concrete (41, 51) is poured, the concrete (41, 51) is cured, then remove the formwork (31) and the copper club (11) Construction is completed in the order of removal.

이 실시 예에서는 프리캐스트 콘크리트 슬래브(21)에 걸치는 걸침면(321a)과 보 거푸집(31)이 고정되는 결합면(321b)을 가지도록 강판을 절곡한 클립(321)을 이용하여 보 거푸집(31)을 매달게 되므로 앞서 설명한 실시 예와 달리 프리캐스트 콘크리트 슬래브(21)를 제조할 때 미리 볼트(312)를 체결하기 위한 인서트 너트(311)를 설치할 필요가 없다는 이점을 가진다.In this embodiment, the formwork 31 using the clip 321 bent the steel plate to have a mating surface 321a that extends over the precast concrete slab 21 and a coupling surface 321b to which the formwork 31 is fixed. Unlike the above-described embodiment, there is no need to install the insert nut 311 to fasten the bolt 312 when manufacturing the precast concrete slab 21.

도 4는 본 발명의 제3 실시 예에 따른 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법을 설명하기 위한 예시도이다. Figure 4 is an exemplary view for explaining the construction method of on-site reinforcement concrete beam using a pre-installed precast concrete slab according to a third embodiment of the present invention.

도 1, 4를 참조하면, 제3 실시 예에 따른 방법은 프리캐스트 콘크리트 슬래브(21)를 가설한 다음, 프리캐스트 콘크리트 슬래브(21)에 미리 천공된 구멍에 장볼트 또는 달대(331)를 삽입 고정하고 미리 조립된 보 거푸집(31)을 장비를 이용하여 양중하고 장볼트 또는 달대(331)에 고정하여 보 거푸집(31)을 매단 뒤, 보 거푸집(31) 내부에 철근을 배근하고 프리캐스트 콘크리트 슬래브의 상부에도 철근을 배근한 다음 콘크리트(41,51)를 타설하고, 콘크리트(41,51)가 경화된 다음 보 거푸집(31)을 탈거하고 동바리(11)를 철거하는 순서로 시공이 완료된다. Referring to FIGS. 1 and 4, the method according to the third embodiment hypothesizes a precast concrete slab 21, and then inserts a long bolt or a stand 331 into a hole previously drilled in the precast concrete slab 21. Fixed and pre-assembled beam formwork (31) using the equipment, and fixed to the long bolts or moon 331 to fasten the beam formwork (31), reinforcing the reinforcing bar inside the formwork (31) and precast concrete Reinforcement is added to the upper part of the slab, and concrete (41, 51) is poured, concrete (41, 51) is cured, and then the formwork (31) is removed and the construction is completed in the order of removing the copper bar (11). .

이 실시 예에 따르면 프리캐스트 콘크리트 슬래브(21)를 가설하기 전에 미리 구멍을 천공해 두고 이 구멍에 장볼트 또는 달대(331)를 삽입 고정하고 보 거푸집(31)을 관통시켜 너트를 체결함으로써 보 거푸집(31)을 고정하게 되므로 현장에서 간편하에 보 거푸집(31)의 설치를 위한 수단을 마련할 수 있고 보 거푸집(31)의 탈거가 너트를 해체하는 것으로 간단하게 이루어질 수 있다는 이점을 가진다. According to this embodiment, before laying the precast concrete slab 21, a hole is drilled in advance, and a long bolt or a stand 331 is inserted and fixed in this hole, and the nut is passed through the formwork 31 to tighten the nut. Since the 31 is fixed, it is possible to easily provide a means for installing the formwork 31 in the field, and the removal of the formwork 31 has the advantage that the removal can be made simply by dismantling the nut.

이상에서 설명한 것처럼, 본 발명에 따른 방법은 프리캐스트 콘크리트 슬래브와 현장타설 철근콘크리트 보를 간편하게 접합하는 효과적인 것으로서 보 거푸집을 프리캐스트 콘크리트 슬래브에 매다는 구조를 취함으로써 보 거푸집을 지지하기 위한 동바리가 불필요하다는 이점을 가진다. 또한 보 거푸집의 전용율을 높일 수 있다는 이점을 가진다. As described above, the method according to the present invention is an effective method of easily joining precast concrete slabs and cast-in-place reinforced concrete beams, and has the advantage of eliminating the need for a copper wheel for supporting the formwork by taking the structure of suspending the formwork to the precast concrete slab. Has In addition, there is an advantage that can increase the capacity ratio of the formwork.

위에서 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention . The invention is not limited by these variations and modifications, but is limited only by the claims appended hereto.

11: 동바리
12: 가로띠장
21: 프리캐스트 콘크리트 슬래브
31: 보 거푸집
311: 인서트 너트
312: 볼트
321: 클립
331: 장볼트 또는 달대
41: 보 콘크리트
51: 덧침 콘크리트
11: Dong Buri
12: horizontal strip
21: Precast Concrete Slab
31: Show Formwork
311: insert nut
312: Bolt
321: clips
331: long bolt or moon stand
41: beam concrete
51: overlay concrete

Claims (4)

삭제delete 동바리를 설치하고 프리캐스트 콘크리트 슬래브를 동바리 위에 안착시켜 프리캐스트 콘크리트 슬래브를 가설하는 단계;
보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계;
보와 슬래브 상부 철근을 배근하고 보 콘크리트와 덧침 콘크리트를 동시에 타설하는 단계; 및
콘크리트 경화 후 보 거푸집을 탈거하는 단계를 포함하며,
보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계는,
프리캐스트 콘크리트 슬래브에 미리 설치된 인서트 너트에 보 거푸집을 관통하여 볼트를 체결하는 방법으로 이루어지는 것을 특징으로 하는 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법.
Installing a club and placing a precast concrete slab on the club to construct a precast concrete slab;
Lifting beam formwork and suspending it to the precast concrete slab;
Reinforcing beam and slab upper reinforcing bars and placing beam concrete and overlay concrete at the same time; And
Removing the formwork after concrete hardening,
The step of lifting beam formwork and suspending it to precast concrete slab,
A method of constructing cast-in-place reinforced concrete beams using a pre-installed precast concrete slab, characterized in that it consists of a method of fastening bolts through a bore die to an insert nut pre-installed on a precast concrete slab.
동바리를 설치하고 프리캐스트 콘크리트 슬래브를 동바리 위에 안착시켜 프리캐스트 콘크리트 슬래브를 가설하는 단계;
보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계;
보와 슬래브 상부 철근을 배근하고 보 콘크리트와 덧침 콘크리트를 동시에 타설하는 단계; 및
콘크리트 경화 후 보 거푸집을 탈거하는 단계를 포함하며,
보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계는,
프리캐스트 콘크리트 슬래브에 걸치는 걸침면과 보 거푸집이 고정되는 결합면을 가지도록 강판을 절곡한 클립을 설치하고 볼트를 이용해 보 거푸집를 클립의 결합면에 고정하는 방법으로 이루어지는 것을 특징으로 하는 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법.
Installing a club and placing a precast concrete slab on the club to construct a precast concrete slab;
Lifting beam formwork and suspending it to the precast concrete slab;
Reinforcing beam and slab upper reinforcing bars and placing beam concrete and overlay concrete at the same time; And
Removing the formwork after concrete hardening,
The step of lifting beam formwork and suspending it to precast concrete slab,
The preliminary hypothesis pre-cast characterized in that the clip is bent to have a mating surface and the joining surface is fixed to the precast concrete slab and the bolt is fixed to the joining surface of the clip using a bolt Construction method of cast-in-place reinforced concrete beam using concrete slab.
동바리를 설치하고 프리캐스트 콘크리트 슬래브를 동바리 위에 안착시켜 프리캐스트 콘크리트 슬래브를 가설하는 단계;
보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계;
보와 슬래브 상부 철근을 배근하고 보 콘크리트와 덧침 콘크리트를 동시에 타설하는 단계; 및
콘크리트 경화 후 보 거푸집을 탈거하는 단계를 포함하며,
보 거푸집을 양중하여 프리캐스트 콘크리트 슬래브에 매다는 단계는,
프리캐스트 콘크리트 슬래브의 가설 전에 미리 천공된 구멍에 장볼트 또는 달대를 삽입 고정하고 보 거푸집을 장볼트 또는 달대에 고정하는 방법으로 이루어지는 것을 특징으로 하는 선가설 프리캐스트 콘크리트 슬래브를 이용한 현장타설 철근콘크리트 보의 시공방법.
Installing a club and placing a precast concrete slab on the club to construct a precast concrete slab;
Lifting beam formwork and suspending it to the precast concrete slab;
Reinforcing beam and slab upper reinforcing bars and placing beam concrete and overlay concrete at the same time; And
Removing the formwork after concrete hardening,
The step of lifting beam formwork and suspending it to precast concrete slab,
Pre-cast concrete slab cast-in-place reinforced concrete beams, characterized by consisting of a method of inserting and fixing long bolts or girdles in the pre-drilled holes before installation of the precast concrete slab and fixing the formwork to long bolts or girdles Construction method.
KR1020100075927A 2010-08-06 2010-08-06 Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab KR101186053B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100075927A KR101186053B1 (en) 2010-08-06 2010-08-06 Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100075927A KR101186053B1 (en) 2010-08-06 2010-08-06 Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab

Publications (2)

Publication Number Publication Date
KR20120013739A KR20120013739A (en) 2012-02-15
KR101186053B1 true KR101186053B1 (en) 2012-09-25

Family

ID=45837169

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100075927A KR101186053B1 (en) 2010-08-06 2010-08-06 Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab

Country Status (1)

Country Link
KR (1) KR101186053B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210125264A (en) * 2020-04-08 2021-10-18 롯데건설 주식회사 Reinforcing device for preventing shrinkage crack of apartment underground parking lot delay joint and construction method thereof

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019589A (en) * 2015-08-14 2015-11-04 东南大学 Assembly-integral type non-reinforced concrete ribbed floor and construction method thereof
CN105544734A (en) * 2015-12-18 2016-05-04 山西建筑工程(集团)总公司 Method for connecting wooden corbel bracket with concrete column
KR102321341B1 (en) * 2018-08-09 2021-11-03 정인혁 Structure of the drift type to facilitate a wide range of segments for tunnel Ventilation slab
KR102321338B1 (en) * 2018-12-28 2021-11-02 정인혁 Segmental precast concrete ventilating slabs of structure and construction way in tunnel for rapid installation
CN110258881A (en) * 2019-07-18 2019-09-20 深圳市海龙钢结构材料有限公司 A kind of novel composite floor mounting device and its installation method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1161981A (en) 1997-08-19 1999-03-05 Nippon Kokan Light Steel Kk Beam form structure
JP2000291132A (en) 1999-04-05 2000-10-17 Ohbayashi Corp Method for constructing reinforced concrete beam using precast member

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1161981A (en) 1997-08-19 1999-03-05 Nippon Kokan Light Steel Kk Beam form structure
JP2000291132A (en) 1999-04-05 2000-10-17 Ohbayashi Corp Method for constructing reinforced concrete beam using precast member

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210125264A (en) * 2020-04-08 2021-10-18 롯데건설 주식회사 Reinforcing device for preventing shrinkage crack of apartment underground parking lot delay joint and construction method thereof
KR102333870B1 (en) * 2020-04-08 2021-12-01 롯데건설 주식회사 Reinforcing device for preventing shrinkage crack of apartment underground parking lot delay joint and construction method thereof

Also Published As

Publication number Publication date
KR20120013739A (en) 2012-02-15

Similar Documents

Publication Publication Date Title
KR101186053B1 (en) Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab
KR101890860B1 (en) Double PC wall assembly and construction method of composite wall structure using the same
JP5620344B2 (en) Construction method of pier
KR101228593B1 (en) Composite girder using inner molding member and bridge construction method therwith
KR101478131B1 (en) Construction Method of Precast Pier
KR101663132B1 (en) Self-supporting type column structure
KR101458434B1 (en) Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same
KR102000534B1 (en) Construction method using textile reinforcing panel of high durability for combined usage of permanent form
KR101242395B1 (en) Construction method for rhamen bridge
JP5386379B2 (en) Precast slab joints in bridges
JP2018123537A (en) Method of constructing mat foundation, tubular formwork and mat foundation structure
KR101196343B1 (en) Concrete arch-slab bridge of stone facing
KR20140110491A (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
KR200431156Y1 (en) Concrete Pier having Copping
KR101472027B1 (en) Method of building concrete structure using attachment plates adjoining ends of concrete beam with walls of abutments
KR20070107495A (en) Concrete-mold assembly and construction method using the same
JP2008075449A (en) Rigid-frame viaduct construction method
KR100540625B1 (en) Constructing Method of Composite Beam Stiffened with In-Situ Concrete Panel Having Embedded Lower Flange
JP5207078B2 (en) Construction method for seismic control columns
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
JP2007332631A (en) Reinforced concrete structure and method of constructing reinforced concrete structure
KR100568904B1 (en) Structure, Method and Apparatus for Fiberglass Reinforced Plastics Deck-to-Girder Connections
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
KR200383489Y1 (en) System for constructing composite reinforced concrete girders and beams using FRP
KR200417368Y1 (en) Rebar and Piping Attachment Formwork

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150902

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160830

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee