KR100920027B1 - Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails - Google Patents
Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails Download PDFInfo
- Publication number
- KR100920027B1 KR100920027B1 KR1020070078297A KR20070078297A KR100920027B1 KR 100920027 B1 KR100920027 B1 KR 100920027B1 KR 1020070078297 A KR1020070078297 A KR 1020070078297A KR 20070078297 A KR20070078297 A KR 20070078297A KR 100920027 B1 KR100920027 B1 KR 100920027B1
- Authority
- KR
- South Korea
- Prior art keywords
- vegetation
- curtain wall
- slope
- mat
- anchor
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01C—PLANTING; SOWING; FERTILISING
- A01C1/00—Apparatus, or methods of use thereof, for testing or treating seed, roots, or the like, prior to sowing or planting
- A01C1/04—Arranging seed on carriers, e.g. on tapes, on cords ; Carrier compositions
- A01C1/044—Sheets, multiple sheets or mats
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G20/00—Cultivation of turf, lawn or the like; Apparatus or methods therefor
- A01G20/20—Cultivation on mats
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/20—Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
- A01G24/22—Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material containing plant material
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/40—Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
- A01G24/44—Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/13—Geometrical or physical properties having at least a mesh portion
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0051—Including fibers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0075—Textiles
- E02D2300/0076—Textiles non-woven
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Soil Sciences (AREA)
- Revetment (AREA)
Abstract
본 발명은 기존 콘크리트 포장 사면, 호안 블록 사면, 돌 붙임 사면, 암반 절개지 사면 등에 조경 녹화를 함에 있어서 폭우, 홍수 등의 기후 조건에서도 최소 30cm 두께 이상으로 성토된 식생 기반토층을 유지하여 세굴이나 유실을 방지할 수 있는 토목섬유 보강 커튼 월 녹화공법에 관한 것이다. According to the present invention, in the landscaping of existing concrete pavement slopes, revetment block slopes, stone slopes, rock incision slopes, and the like, the vegetation foundation soil layer that has been deposited at least 30 cm thick even under heavy weather conditions such as heavy rains and floods is used to prevent scour or loss. The present invention relates to a geotextile reinforced curtain wall greening method that can be prevented.
본 발명은 식생지반 사면의 구조적 안정성 보강을 위한 커튼 월 구조물과 폭우, 홍수시에도 식생 기반토층의 붕괴 억제와 유실을 방지할 수 있는 앵커 매트 및 침식방지매트의 다중 구조로 보강하는 새로운 형태의 녹화공법을 구현함으로써, 어떠한 기후조건에서도 사면부에 성토되는 식생 기반토층의 구조적인 안정성을 확보할 수 있고, 식생 초목의 생육에 필요한 수분을 충분히 확보할 수 있으며, 홍수, 폭우 등의 기상 악조건에서도 식생토층의 유실과 세굴, 특히 식생 기반토층의 표면에서 발생될 수 있는 유실과 세굴을 효과적으로 방지할 수 있는 등 50년 이상의 장기 구조적 안정성을 가지는 항구적인 녹화 사면을 유지할 수 있는 토목섬유 보강 커튼 월 녹화공법을 제공한다.The present invention is a new type of greening to reinforce with the structure of the curtain wall structure for reinforcing the structural stability of vegetation slopes and the multiple structure of the anchor mat and the erosion prevention mat to prevent the collapse and loss of the vegetation soil layer even during heavy rain and flood. By implementing the method, it is possible to secure the structural stability of the vegetation foundation soil deposited on slopes under any climatic conditions, to secure enough moisture for the growth of vegetation vegetation, and to keep the vegetation soil in bad weather conditions such as flooding and heavy rain. Geosynthetic reinforcement curtain wall greening method to maintain permanent green slopes with long-term structural stability for more than 50 years such as to effectively prevent loss and scour, especially from the surface of vegetation soil layer. to provide.
커튼 월, 사면, 조경 녹화, 앵커 매트, 침식방지매트,습식 씨드 스프레이 Curtain Wall, Slope, Landscaping Green, Anchor Mat, Anti-Erosion Mat, Wet Seed Spray
Description
본 발명은 성토 사면, 절토 사면, 기존 호안 블록 사면, 암반 절개지 사면 등의 조경 녹화 시공을 위한 녹화공법에 관한 것으로, 더욱 상세하게는 식생 기반토층 사면에 소정간격으로 식생토를 채울 수 있도록 하는 수평 칸막이 형태의 커튼 월 구조물를 제공하며 폭우나 홍수시에도 상기 식생 기반토층의 붕괴 억제와 유실을 방지할 수 있는 앵커 매트 및 침식방지매트의 다중 구조로 보강하는 새로운 형태의 녹화공법을 구현함으로써 항구적인 녹화 사면을 유지할 수 있는 토목섬유 보강 커튼 월 구조 및 녹화공법에 관한 것이다. The present invention relates to a greening method for landscaping greening construction, such as fill slope, cut slope, existing revetment block slope, rock incision slope, and more specifically, to the vegetation soil layer slope to fill the vegetation soil at a predetermined interval Providing partitioned curtain wall structure and implementing new type of greening method to reinforce with multiple structure of anchor mat and anti-erosion mat to prevent the collapse and loss of vegetation soil layer in case of heavy rain or flood. The present invention relates to a geotextile reinforced curtain wall structure and a greening method capable of maintaining a slope.
일반적으로 도로 확포장 공사, 하천사면보호 공사에 의해 조성되는 사면 녹화공법은 절토 또는 성토를 하거나, 기존 사면을 다짐하고 난 후, 식생기반 조성을 위해 식생매트 또는 식생블록 등의 구조물을 설치하는 공법이다.
그러나, 천재지변 또는 인위적 공사에 의해 훼손 및 조성되는 사면은 토사의 교란으로 인해 식물의 장기 생육이 없는 경우 이듬해에 폭우에 의한 붕괴 가능성이 크다.
따라서 당해 연도의 녹화사업 효과 정도에 따라 붕괴 위험성으로 부터 안전할 수 있다.
이러한 녹화공법은 대체적으로 식생매트에 의한 녹화공법, 식생고정셀에 의한 녹화공법, 식생블록에 의한 녹화공법 등으로 구분되며, 식생매트에 의한 녹화공법은 초기 식생에 실패시 식생토사의 붕괴로 이어지는 사례가 많으며, 이를 보완하는 식생고정셀은 조성사면을 소규모로 세분화함에 따라 장기간의 공사기간과 공사비의 증가로 인해 조기 녹화에 실패하는 사례가 많다.
또한, 식생블록은 대부분 콘크리트 구조물에 의지하여 시공됨에 따라 초기 목표인 자연형 하천과 다소 동떨어지는 것으로 이용하는 인근 주민과 관광객에 친밀성을 떨어뜨려 경관상의 이질감을 부여하여 할뿐 아니라, 콘크리트에 의한 또다른 환경 친밀성을 저해하는 결과를 초래한다.
최근 하천이나 수로의 제방 및 절ㆍ성토 경사면 등 사면의 유실을 방지하고, 기상 이변으로 인한 홍수피해를 최소로 줄이고자 시행되고 있는 시공방식은 자연 생태계의 보존 및 주변 환경과 조화를 이루도록 녹지를 조성하여 환경 친화적으로 시공되고 있는 추세이다.
보통 제방이나 배수로는 지반의 침식과 침하를 방지하고, 수로의 유실을 방지하고자 다양한 형태의 호안블록과 돌망태 등이 시공되고 있으며, 최근 돌망태는 하천의 주변환경과 조화를 이루지 못할 뿐만 아니라 하천 생태계의 단절을 초래함으로써, 최근에는 자연 생태계의 보존 및 하천의 주변 환경과 조화를 이루는 환경 친화적인 블록이 선호되고 있다.
그러나, 기존 환경 친화적인 식생 블록은 사방으로 인접하는 다른 블록들과 상호 결합되어 유동이나 유실 및 이탈이 방지되고, 블록에 녹지 조성용 식물이 식재되어 성장할 수 있는 식생공간을 형성하여 녹지가 조성되게 함으로써, 하천의 주변환경과 조화를 이루도록 시공되고 있으나, 이러한 기존 환경 친화적인 블록의 구조는 녹지 조성용 식물이 식재되는 식생공간이 협소하고, 사면의 지반에 블록 간의 결속력이 빈약함으로써, 기상 이변으로 집중호우가 내릴 경우 녹화 사면 전체가 무너져 홍수피해를 야기하거나, 녹화 사면의 잦은 쇄굴과 유실로 보수나 재시공 작업이 반복되는 등 사회경제적으로 손실이 매우 큰 문제점이 있다.
또한, 토목현장 등에서 시공 설치되고 있는 절취 사면의 녹화공법은 시공 장소인 절취사면의 표면부에 PVC망을 깔아 설치한 후, 적정위치에 고정핀을 박아 PVC망이 절취사면의 표면부에 착지되도록 설치한 다음, PVC망이 설치된 절취사면의 표면부에 인공 조성물을 혼합하여 일괄적으로 부착 설치하는 공법인데, 이러한 종래의 절취사면의 녹화공법은 절취사면의 표면부와 인공 객토의 부착상태가 견고하지 못하여 집중호우 등의 우기(雨期)에 표면이 쉽게 침식되어 탈락되고, 또한 건기(乾期)에는 토양의 보습상태가 낮아 토양 및 식물의 활착력이 불량하게 되어 초화류나 관목류 등의 식물 생장이 원활하지 못하였으며, 또 장기적으로 식생할 수 없는 결점이 있다. Generally, the slope greening method created by road expansion work and river slope protection work is a method of installing structures such as vegetation mats or vegetation blocks for cutting vegetation or laying soil, or after committing existing slopes to create a vegetation base. .
However, slopes damaged and created by natural disasters or artificial construction are likely to collapse due to heavy rain in the following year if there is no long-term growth of plants due to disturbance of soil.
Therefore, depending on the degree of greening effect of the year, it may be safe from the risk of collapse.
Such greening methods are generally divided into vegetation method by vegetation mat, vegetation method by vegetation fixation cell, vegetation method by vegetation block, etc., and vegetation method by vegetation mat leads to collapse of vegetation soil when initial vegetation fails There are many cases, and the vegetation fixation cell that compensates for this is often broken down in small scale, so early greening fails due to long construction period and increase of construction cost.
In addition, since most vegetation blocks are built on concrete structures, they are not separated from natural rivers, which are the initial targets. Results in impaired other environmental intimacy.
Recently, the construction method, which is designed to prevent the loss of slopes such as banks, waterways, banks, and embankments, and to minimize flood damage due to extreme weather, creates green areas in harmony with the preservation of natural ecosystems and the surrounding environment. This is a trend that is being constructed environmentally friendly.
In general, various types of shore banks and gabions are being constructed to prevent the erosion and settlement of the ground and to prevent the loss of waterways. Recently, the gabions are not compatible with the surrounding environment of the rivers. By causing breaks, in recent years, environmentally friendly blocks that harmonize with the conservation of natural ecosystems and the surrounding environment of rivers have been preferred.
However, the existing eco-friendly vegetation block is combined with other adjacent blocks in all directions to prevent flow, loss and departure, and to form a green vegetation by forming a vegetation space in which the green vegetation plant is planted and grows on the block. Although it is constructed to harmonize with the surrounding environment of the river, the existing eco-friendly block structure has a narrow vegetation space in which green plants are planted, and the cohesion between blocks is poor on the slope of the slope, resulting in heavy rainfall due to extreme weather. If there is a fall, the entire green slope collapses and causes flood damage, or the renovation or reconstruction work is repeated due to frequent crushing and loss of the green slope.
In addition, the greening method of the cut slope installed in the civil engineering site is to install the PVC net on the surface of the cut slope, which is the construction site, and then put the fixing pin in the proper position so that the PVC net lands on the surface of the cut slope. After the installation, a method of mixing and installing the artificial composition mixed to the surface portion of the cut slope is installed in PVC net, the conventional greening method of the cut slope is a solid attachment state of the surface portion of the cut slope and the artificial land In case of rain, the surface is easily eroded by rainy season such as heavy rains, and it is eliminated. Also, during the dry season, soil moisture is low, so the stickiness of soil and plants is poor, and plants such as plants and shrubs grow smoothly. There is also a flaw that cannot be vegetated in the long run.
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
따라서, 본 발명은 이와 같은 점을 감안하여 안출한 것으로서, 식생지반 사면의 구조적 안정성 보강을 위한 인장강도가 보강된 부직포 형태의 복합포를 수평방향으로 길게 입설하여 식생토를 채우도록 설치하는 커튼 월 구조물과 폭우, 홍수 시에도 식생토층의 붕괴 억제와 유실을 방지할 수 있도록 식생토층 위로 침식방지매트 및 앵커 매트를 깔아 설치하는 다중 구조를 포함하는 새로운 형태의 녹화공법을 구현함으로써, 어떠한 기후조건에서도 사면부에 성토되는 식생 기반토층의 구조적인 안정성을 확보할 수 있고, 식생 초목의 생육에 필요한 수분을 충분히 확보할 수 있으며, 또 홍수, 폭우 등의 기상 악조건에서도 식생토층의 유실과 세굴, 특히 식생 기반토층의 표면에서 발생될 수 있는 유실과 세굴을 효과적으로 방지할 수 있는 등 50년 이상의 장기 구조 안정성을 가지는 항구적인 녹화 사면을 유지할 수 있는 토목섬유 보강 커튼 월 구조 및 녹화공법을 제공하는데 그 목적이 있다. Accordingly, the present invention has been made in view of the above, the curtain wall is installed to fill the vegetation soil by placing a long non-woven composite fabric reinforced with tensile strength for reinforcing the structural stability of the vegetation ground slope in the horizontal direction In order to prevent the collapse and loss of the vegetation soil in the event of heavy rains and floods, a new type of greening method is implemented including a multi-layered structure where an erosion prevention mat and an anchor mat are installed on the vegetation soil layer. It can secure the structural stability of the vegetation foundation soil deposited on the slope, and can secure enough moisture for vegetation vegetation growth, and also the loss and scour of vegetation soil in bad weather conditions such as flooding and heavy rain. For more than 50 years, it can effectively prevent loss and scour from occurring on the surface of soil layers. The purpose of the present invention is to provide a geotextile-reinforced curtain wall structure and greening method that can maintain a permanent green slope with long-term structural stability.
상기 목적을 달성하기 위한 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 구조는 일정한 높이로서 구비되면서 투수성을 가진 부직포 형태로 이루어지는 복합포와; 상하 직사각 형상의 폐쇄링 형상으로 구비하여 상기 복합포의 일정 간격마다 상기 복합포의 일부가 끼워지도록 하는 아연 도금된 철재 버클과; 목침형태로 구비되어 상기 철재 버클에 끼워진 상기 복합포에 감싸지도록 하면서 상기 철재 버클과 상기 복합포 사이에 삽입되어 상기 사면에 고정 지지되는 앵커 네일; 로서 커튼 월 구조물을 구비하고, 상기 커튼 월 구조물이 블록 사면이나 암반 절개지 사면에서 수평 방향으로 고정되도록 하면서 사면의 경사면을 따라서는 일정 간격으로 연속 배열되도록 설치하고, 상기 커튼 월 구조물과 커튼 월 구조물 사이에는 식생 기반토가 채워지도록 하는 것을 특징으로 한다.
또한, 상기 식생토가 채워져 있는 커튼 월 구조물의 상부로는 침식방지매트를 덮어 설치하게 되며, 침식방지매트는 코코넛 매트와 같은 천연섬유로 구성한 것을 특징으로 한다.
또한, 상기 침식방지매트의 상부로는 앵커 매트를 덧씌워 설치하는 것을 특징으로 한다.
또한, 상기 앵커 매트의 표면으로는 습식 씨드 스프레이를 이용해 조경용 잔디 또는 향토 초목류를 파종 혹은 식재하는 것을 특징으로 한다.
또한, 호안 블록 사면이나 암반 절개지 사면 등을 녹화하는 공법에 있어서,
지표수의 원활한 배수를 위하여 사면을 따라 부직포를 설치하는 1단계 작업과, 투수성을 갖는 복합포를 일정 간격으로 직사각형의 철재 버클과 목침형상의 앵카 네일로 결속하여 사면에 고정시킨 커튼 월 구조물에 의해 형성한 공간에 식생토를 채운 후 다져주는 2단계 작업과, 상기 커튼 월 구조물에 채운 식생토에는 상부에 천연섬유인 코코넛 매트로 된 침식방지매트를 씌우고, 상기 침식방지매트에는 8mm 이상의 두께를 가지면서 망 형태로 되는 앵커 매트를 설치하는 3단계 작업과, 상기 다층 구조물 및 앵커 매트의 안정적인 고정을 위하여 다수의 앵커 핀을 일정 간격으로 사면에 박아 고정설치하는 4단계 작업과, 조경용 잔디 또는 향토 초목류를 파종 혹은 식재하는 5단계 작업과, 상기 5단계 작업 후 우수나 지표수가 사면측으로 유입되는 것을 배제하기 위하여 사면의 상부와 하부의 각 경계선상에서 사면 길이방향을 따라 U형 측구를 설치하는 작업을 더 포함하는 포함하는 토목섬유 보강 커튼 월 녹화공법을 제공하는 것을 특징으로 한다.
또한, 상기 3단계 작업에서는 3~7mm의 두께를 가지고 조직의 개공 크기가 작아 식생토의 침식을 방지하는 천연 섬유로 제직된 침식방지매트를 기반 식생토층 위에 밀착시켜 전 면적에 포설 한 후, 그 위에 고탄성 폴리에스터사로 가로세로 직교하여 형성한 수평 실사와 상하 불규칙한 파형으로 형성된 수직 실사를 결합하여 3방향 구조 보강을 할 수 있는 인장강도가 30kN/m 이상이 되도록 일체화시킨 앵카 매트를 포설하여 사면에 구축된 기반 식생토층 구조물의 유실을 방지하여 주는 것을 특징으로 한다.
또한, 상기 조경용 잔디 또는 향토 초목류를 파종 혹은 식재하는 5단계 작업은 습식 씨드 스프레이를 이용하여 파종 또는 식재하되 조성물 씨앗 뿜어 붙이기 작업에서 조성물의 구성을 잔디,향토 초목류 종자의 1종 이상에 더하여 홍수에 의한 5일 이상의 장시간 침수된 상태에서도 생육이 가능한 수생식물 종자인 수크령, 창포, 돌미나리, 갈대 등의 1종 이상과, 식생토, 비료, 토양 안정제를 조성한 후 습식으로 뿜어 붙이기 한 것을 특징으로 한다.
상기와 같은 본 발명의 토목섬유 보강 커튼 월 녹화공법은 식생지반 사면의 구조적 안정성 보강을 위하여 투수성이 우수한 복합포로 형성된 구조물과 폭우, 홍수시에도 식생토층의 붕괴 억제와 유실을 방지할 수 있는 침식방지매트 및 앵커 매트의 다중 구조의 보강으로 구축하는 사면 녹화공법이다.
이러한 토목섬유 보강 커튼 월 녹화공법은 기존 호안 블록 사면을 녹화하기 위해서는 최소 30cm 두께 이상의 기반 식생토층을 필요로 하므로, 토층의 함수비가 높을 때 토층의 흐름을 방지한 다중 구조 보강 녹화공법이다.
또한, 본 발명의 토목섬유 보강 커튼 월 녹화공법에 따르면, 구 토목섬유 보강 커튼 월 구조물 간의 투수속도가 채움 토사의 투수속도(1×10-3cm/sec 이하)보다 빨라 구조물 속에 토사의 함수비를 낮게 평균화시킴으로써 세굴 방지와 커튼 월 간의 수분의 흐름이 원활해 질 수 있게 된다.
또한, 토목섬유 보강 커튼 월 구조물 보강 식생토층 위에 침식방지매트 및 앵커 매트를 사용하여 이중으로 보강함으로써 폭우, 홍수시에도 식생토층의 유실이 방지되는 장기 50년 이상의 내구성을 가지는 항구적인 녹화 사면을 구축할 수 있게 된다.
따라서, 사면부에 성토되는 식생토층을 어떠한 기후조건에서도 구조적인 안정성이 유지되게 하여 항구적인 녹화 사면을 유지하고, 또 식생초목의 뿌리에 공급될 수분을 확보하기 위하여 투수속도가 빠른 토목섬유 보강재인 복합포, 철재 버클, 앵카 네일로 형성된 토목섬유 보강 커튼 월 구조물을 채용하고, 또한 홍수시 빠른 유속과 수압으로 인한 녹화 사면의 유실, 붕괴를 방지하기 위하여 물리적인 구조 보강의 기능을 가지면서 식생토층의 흘러내림을 방지할 수 있는 마찰력이 보강된 앵커 매트를 채용한 공법으로 녹화 사면을 구축함으로써, 시설 후 50 년 이상의 장기간 안정된 사면을 유지할 수 있게 된다. Geosynthetic reinforcing curtain wall structure according to an embodiment of the present invention for achieving the above object is provided with a constant height composite fabric made of a non-woven fabric having a permeability; A galvanized iron buckle provided in a closed ring shape having an upper and lower rectangular shape so that a part of the composite cloth is fitted at regular intervals of the composite cloth; An anchor nail provided in the shape of a needle to be wrapped between the steel buckle and the composite fabric while being wrapped in the composite fabric fitted to the steel buckle and fixedly supported on the slope; And a curtain wall structure, the curtain wall structure being fixed in a horizontal direction on a block slope or a rock incision slope, and arranged to be continuously arranged at regular intervals along an inclined surface of the slope, between the curtain wall structure and the curtain wall structure. The vegetation is characterized in that the soil is filled.
In addition, the vegetation soil is filled with the curtain wall structure is filled with an erosion prevention mat is installed on the top, the erosion prevention mat is characterized in that composed of natural fibers, such as coconut mat.
In addition, the upper portion of the erosion prevention mat is characterized in that the installation to cover the anchor mat.
In addition, the surface of the anchor mat is characterized by sowing or planting landscaping grass or native vegetation using a wet seed spray.
In addition, in the construction method for recording a rake block slope, a rock cut slope, etc.,
In addition, in the three-stage operation, the erosion prevention mat woven from natural fibers that have a thickness of 3 ~ 7mm and the opening size of the tissue to prevent the erosion of the vegetation soil close to the base vegetation soil layer and installed on the entire area, then Anchor mat integrated with horizontal elastic yarns formed by high elastic polyester yarns vertically and vertically yarns formed with irregular waveforms up and down to form three-way structural reinforcement to provide 30kN / m or more of tensile strength. It is characterized by preventing the loss of the foundation vegetation soil structure.
In addition, the five-stage operation of planting or planting the landscaping grass or native vegetation is sowing or planting using a wet seed spray, but adding the composition of the composition to one or more of the grass, native vegetation seeds in the spraying of the composition seeds One or more species of aquatic plant seeds, such as sukkyeong, iris, stone parsley, and reed, which are able to grow even after being flooded for a long time for more than 5 days by flooding, and planted soil, fertilizer, soil stabilizer, and then sprayed by wet. It is done.
Geotechnical reinforcement curtain wall greening method of the present invention as described above is a structure formed of a composite permeability excellent in permeability for reinforcing the structural stability of vegetation ground slope and erosion that can prevent the collapse and loss of vegetation soil layer even during heavy rains, floods Slope greening method constructed by reinforcement of multiple structure of prevention mat and anchor mat.
The geotechnical reinforcement curtain wall greening method requires a base vegetation soil layer of at least 30 cm thickness to record the existing shore bank slope, and is a multi-structure reinforcement greening method that prevents the flow of soil layers when the soil water content is high.
In addition, according to the geosynthetic reinforcement curtain wall greening method of the present invention, the water permeation rate between the old geosynthetic reinforcement curtain wall structure is faster than the permeation rate (1 × 10 -3 cm / sec or less) of the filled soil, so that the water content of the soil in the structure By averaging low, the scour prevention and the flow of moisture between the curtain walls can be facilitated.
In addition, geosynthetic reinforcement curtain wall structure reinforcement is doubled by using erosion prevention mat and anchor mat on the vegetation soil layer to build a permanent green slope with durability for more than 50 years, which prevents loss of vegetation soil layer during heavy rain and flood. You can do it.
Therefore, the composite vegetation reinforcement material with high permeability rate is maintained in order to maintain the vegetation stability of the vegetation soil layered on the slope at any climatic condition, and to maintain moisture greening slope and to secure moisture to be supplied to the root of vegetation vegetation. Geotextile-reinforced curtain wall structure formed of fabric, steel buckle, and anchor nail, and physical structure reinforcement to prevent loss of greening slope and collapse due to rapid flow and water pressure during flooding. By constructing a green slope with a method using an anchor mat that is reinforced with friction to prevent it from flowing down, it is possible to maintain a stable slope for a long time more than 50 years after the facility.
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
이상에서 설명한 바와 같이 본 발명은 투수속도가 빠른 토목섬유 보강재인 복합포와, 이를 사면에 입설시키는 철재 버클과 앵커 네일, 외부의 물을 흡수하며 식생토의 수분을 장기간 보존할 수 있게 하며 침식을 방지하는 침식방지매트, 우수한 마찰력 및 식생 초목의 뿌리가 잘 침투되고 결속될 수 있는 앵커 매트의 구조를 적용한 토목섬유 보강 커튼 월 녹화공법을 구현함으로써 다음과 같은 효과를 얻게 된다.
식생의 생육이 원활히 되어 지표수 흐름에 의한 식생토층의 사면 경계선에서의 세굴이나 유실을 효과적으로 방지할 수 있다.
또한, 식생초목의 생육에 필요한 수분을 충분하게 확보할 수 있다.
아울러, 홍수, 폭우 등의 기상 악조건에서도 식생토층의 유실 및 세굴을 방지할 수 있으므로 장기적으로 안정적인 최소 30cm 이상 두께의 항구적인 녹생 사면을 유지할 수 있다.
또한, 관리 및 유지가 용이하고 경제적이며, 특히 갈수기에도 최소 30cm 두께의 토층이 가지는 수분 보유능력으로 식재된 식물 뿌리의 고사를 방지할 수 있는 등 관리 및 유지 비용을 줄일 수 있다.
또한, 시공 후 50~60년 이상의 내구성을 확보할 수 있으므로 예산을 절감할 수 있다.
또한, 다른 공법에 비해 시공이 용이하고 공기 단축 및 공사비 절감의 효과를 기대할 수 있다.
또한, 잔디, 초화류, 야생화 등의 식재가 가능하여 다양한 형태의 녹화 조경을 구현할 수 있는 등 우수한 녹화 효과를 기대할 수 있다.
또한, 성토 사면, 절토 사면, 기존 호안 블록 사면, 암반 절개지 사면 등을 친환경적이고 생태 공학적으로 조성할 수 있으며, 전국의 모든 하천 사면, 절토 사면에 확장 적용할 수 있는 장점이 있다. As described above, the present invention is a composite fabric reinforcing material fast fast penetration rate, and iron buckle and anchor nail to be placed on the slope, absorbs the water from the outside to preserve the moisture of the vegetation soil for a long time to prevent erosion By implementing the geotextile-reinforced curtain wall greening method applying the structure of the anchor mat, which can prevent the erosion mat, excellent friction, and the roots of vegetation vegetation can penetrate and bind well, the following effects are obtained.
The vegetation grows smoothly and effectively prevents scour or loss at the slope of the vegetation soil due to surface water flow.
In addition, it is possible to secure a sufficient amount of water necessary for the growth of vegetation vegetation.
In addition, it is possible to prevent loss and scour of the vegetation soil layer even in bad weather conditions such as flooding and heavy rain, so that it can maintain a long-term stable green rust slope of at least 30 cm.
In addition, it is easy to manage and maintain and economical, especially in the dry season, it is possible to reduce the management and maintenance costs, such as to prevent the death of plant roots planted by the water retention capacity of the soil layer having a minimum thickness of 30cm.
In addition, since the durability can be secured for 50 to 60 years or more after construction, the budget can be reduced.
In addition, the construction is easier than other construction methods and can be expected to reduce the air and construction costs.
In addition, it is possible to plant grass, flowers, wildflowers, etc. can be expected to achieve an excellent greening effect, such as to implement a variety of greening landscape.
In addition, it is possible to create an environment-friendly and ecologically engineered slopes, cut slopes, existing raft block slopes, rock incision slopes, etc., and can be extended to all river slopes and cut slopes throughout the country.
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
이하, 첨부한 도면을 참조하여 본 발명의 일 구현 예에 따른 토목섬유 보강 커튼 월 구조 및 녹화공법에 대해 상세히 설명하면 다음과 같다.
도 1은 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 구조 및 녹화공법의 전체적인 설치구조를 보인 단면도, 도 2는 본 발명에 있어서, 커튼 월 구조물을 보인 사시도, 도 3은 본 발명에 있어서, 커튼 월 구조물의 복합포를 보인 사시도, 도 4는 본 발명에 있어서, 침식방지매트 및 앵커 매트를 보인 사시도를 각각 도시하고 있다.
본 발명은 호안 블록,콘크리트 사면 또는 돌 붙임 등의 식생 기반토층이 없는 사면이나 암반 절개지 사면(이하, "사면"이라 함)을 따라서 소정의 높이, 즉 10㎝(±3㎝), 30㎝(±3㎝), 45㎝(±3㎝) 등으로 된 투수성을 가진 복합포를 사면바닥면에 고정하는 지지수단으로 결속하면서 사면의 수평방향으로 길게 입설하는 커튼 월 구조물(12)을 사면(10)의 경사각에 따라 소정 간격으로 연속적으로 배열 설치하고 구조물의 사이 구간에 식생 기반토를 구조물 상단까지 채운 후 다져주는 것을 특징으로 하는 것이다.
이때, 상기 커튼 월 구조물(12)은 상기 지지수단으로서 하단부가 첨예한 목침형태의 길다란 스틸바 또는 합성수지바로 된 앵커 네일(12a)과 상하로 세우게 되면 직사각 형상의 폐쇄링으로 되고 상기 앵커 네일(12a)의 일측 상부에 근접되게 위치되는 아연도금 된 철재 버클(12b)과 투수성을 가진 부직포 형태로서 복합포(12c)로 구성되며, 상기 복합포(12c)는 철재 버클(12b)의 일측 내측(도면상 전면홀)을 끼움식으로 통과하여 앵커 네일(12b)의 몸체 외측을 감은 상태로 다시 철재 버클(12b)의 타측 내측을 통과하는 방식으로 결속된다. 여기서 복합포가 결속되는 커튼 월 구조물(12)의 상호 설치폭 간격은 1~2m로 연속 결속시키는 것이 바람직하다. 또한 철재 버클은 아연도금을 함으로써 부식의 염려가 없다.
이에 따라 상기 사면(10)의 수평으로 단계적으로 설치되는 커튼 월 구조물(12) 상기 앵커 네일이 사면에 깊숙이 박힘으로써 복합포를 입설한 상태로 지지하게 된다.
또한, 상기 커튼 월 구조물(12)은 사면(10)의 경사각에 따라 상호 상하 단계적으로 설치되는 폭을 달리할 수 있다.
즉, 통상 사면의 경사각도가 50도 이하 일때는 1.0~2.0m 간격으로 설치되며, 그 이상일 때는 0.5~1m 간격으로 설치하는 것이 바람직하다 할 것이다.
상기 식생토가 채워져 있는 커튼 월 구조물(12)의 상부로는 침식방지매트(13)를 덮어 설치하게 되며, 이때의 침식방지매트(13)는 천연 솜털망 또는 코코넛 매트로 구성한다.
상기와 같은 침식방지매트(13)는 천연 섬유로 되어 있어 일정시간이 지나면 분해되어 식생에 필요한 거름이 되며, 초기에는 식물의 뿌리가 내리면 견실하게 지탱해 주는 역할과 물을 흡수한 상태에서 특히 갈수기에 최소 30cm 두께의 식생 기반토층이 가지는 수분 보유능력으로 식재된 식물 뿌리의 고사를 방지할 수 있는 역할을 한다.
상기 침식방지매트(13)의 상부로는 앵커 매트(14)를 덧씌워 설치한다. 이때의 앵커 매트(14)는 입체형의 그물망 구조로서 다음 공정인 조성물의 습식 씨드 스프레이(16) 파종시 흡착이 용이하다.
즉, 상기 앵커 매트(14)의 표면으로는 습식 씨드 스프레이(16)를 이용해 조경용 잔디 또는 향토 초목류를 파종 혹은 식재하게 되며, 침식방지매트와 마찬가지로 식물의 뿌리가 내려 견실하게 잡아주는 역할을 하게 된다.
상기 침식방지매트(13) 및 앵커 매트(14)의 설치 후에는 이를 사면에 밀착시켜 지지해주기 위한 “ㄷ"자 형상의 앵커 핀(15)를 소정 간격으로 꽂아 설치한다.
도 5 내지 도 8은 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 녹화공법의 각 단계별 작업과정을 보여주는 단면도를 도시하고 있다.
도 5에 도시한 바와 같이, 먼저 1단계 작업으로서, 하천의 호안 블록의 사면(10)에 전체 면적에 걸쳐 부직포(11)를 덮어 씌우는 형태로 설치하는 작업을 수행한다.
이렇게 설치되는 부직포(11)는 원래의 지반인 사면과 성토될 식생토층 사이에 흐르는 지표수에 의해 식생 기반토층이 유실되는 것을 막아주고, 지표수가 원활하게 배제될 수 있도록 해주는 기능을 한다.
다음, 2단계 작업으로서, 사면(10)에 설치되어 있는 부직포(11) 위에 복합포(12c)를 철재 버클(12b)과 앵커 네일(12a)로 결속 고정한 토목섬유 보강 커튼 월 구조물(12)을 사면(10)을 따라 단계적으로 설치한다.
즉, 사면(10)의 경사면을 따라 최소 0.5m 간격 이상 다중으로 설치하고, 이렇게 설치한 커튼 월과 월 사이에 식생 기반토를 채운 다음, 다짐작업으로 마무리한다.
이때의 식생토는 최소 30cm 이상의 두께로 채우는 것이 가장 바람직하며, 보통 커튼 월 구조물(12) 사이에 꽉 채운 후, 월과 동일한 높이로 다짐하여 주는 것이 가장 바람직하다.
특히, 상기 토목섬유 보강 커튼 월 구조물(12)이 사면에 안정되게 자리 잡도록 하기 위하여 일정간격마다 앵커 네일(12a)과 철재 버클(12b)로 복합포(12c)를 결속하여 사면바닥면에 앵커 네일(12a)을 박아 고정한다. 이때의 앵커 네일(13)은 그 상단부를 철재 버클(12b)로 커튼 월 구조물(12)의 벽면에 밀착되게 결속하면서 사면 깊숙하게 박아놓는 형태로 설치하는 것이 바람직하다.
이렇게 앵커 네일(13)에 의해 지지되는 토목섬유 보강 커튼 월 구조물(12)은 어느 한쪽으로 쏠리거나 흘러내리지 않게 되고, 결국 토목섬유 보강 커튼 월 속에 채워져 있는 식생 기반토층을 50년 이상 장기간 안정적으로 유지하여 주는 효과를 얻을 수 있다.
이러한 토목섬유 보강 커튼 월 구조물은 투수속도가 1×10-2cm/sec 이상의 매우 빠른 복합포(12c)로 제조되며, 토목섬유 보강 커튼 월 속의 식생토층을 대략 최소 30cm 이상의 층두께로 유지해 줌으로써, 식생토층의 사면 흐름을 효과적으로 방지하면서 식생초목의 뿌리에 공급될 수분을 보유할 수 있는 기본적인 식생토층을 확보해 줄 수 있게 된다.
즉, 빠른 투수성(1×10-2cm/sec 이상)으로 표류수를 완화하여 유수에 의한 침식이나 유실을 방지하는 기능을 하게 되고, 결국 식생토층의 사면흐름방지 효과로 사면이 붕괴되는 것을 구조적으로 막아주는 기능을 하게 된다.
다음, 3단계 작업으로서, 토목섬유 보강 커튼 월 구조물(12)에 식생토층을 대략 최소 30cm이상의 두께로 성토한 후, 최저 3mm이상 두께의 침식 방지용 천연 솜털망이나 코코넛 매트로 된 침식방지매트(13)를 포설 한 후, 그 위에 입체형 그물망 형태로 되어 있는 앵커 매트(14)를 설치한다.
상기 앵커 매트(14)는 최소 8mm 이상의 두께를 가지면서 폴리에스터 재질의 헝클어진 망 형태로 이루어져 있으며, 물리적으로 마찰력을 발휘하여 사면 흐름을 방지하는 기능을 하게 되고, 어떠한 악조건의 기후 조건에서도 기본 식생토층의 사면의 유실을 방지하여주는 역할을 할 수 있게 된다.
보다 상세히 그 구조를 설명하면, 상기 앵커 매트(14)는 일정두께를 가지면서 망 형태로 되어 있고, 가로 세로 직교하여 형성한 수평실사와 상하 불규칙한 파형으로 형성된 수직 실사를 결합하여 3방향 구조 보강을 할 수 있도록 입체화시켜 구성되어 있다.
또한, 상기 앵커 매트(14)는 일정 두께의 식생 기반토층의 사면 흐름을 방지할 수 있도록 마찰력을 증대시킬 수 있게 되며, 최소 10mm 이상의 두께로 취부되는 씨앗조성물(16)을 습식 씨드 스프레이로 뿜어 견고하게 부착될 수 있게 하는 역할을 하여 준다.
또한, 상기 앵커 매트(14)는 녹화되는 식물의 뿌리와의 결속으로 식생토층의 안정성을 높여주는 기능을 갖게 되는데, 즉 식물의 뿌리가 앵커 매트 사이 사이로 엉킨 형태로 결속되므로, 식물의 뿌리를 포함하는 식생토층과 앵커 매트 간의 결착력이 강화되면서 식생토층이 안정적으로 유지될 수 있게 된다.
한편, 앵커 매트(14)가 사면 전체 면적에 걸쳐 안정되게 자리 잡도록 하기 위하여 일정간격마다 군데 군데 앵커 핀(15)을 설치한다.
이때의 앵커 핀(15)은 그 상단부를 앵커 매트측에 걸려지게 하면서 사면 식생토층에 박아 놓는 형태로 설치한다.
이렇게 사면에 박혀 있는 앵커 핀(15)에 의해 앵커 매트(14)의 견고한 설치상태가 유지될 수 있고, 결국 앵커 매트(14)를 포함하고 있는 식생토층의 안정화를 도모할 수 있게 된다.
보통 앵커 매트는 인장강도 30kN/m 이상, 인장신도 13% 이하, 두께 8mm 이상의 규격을 가지는 폭과 길이가 4.5m×100m 이상의 롤 형태의 것을 사용하여 시공할 수 있다.
다음, 4단계 작업으로 상기 침식방지매트(13) 및 앵커 매트(14)를 안정되게 고정시킬 수 있는 앵커 핀(15)을 일정 간격으로 설치하게 되는데, 이들의 결합 설치를 더욱 견고하게 상부로부터 둘 다 지지하는 형태로 사면까지 깊숙이 박아 놓는 것이 바람직하다 할 것이다.
다음, 5단계 작업은 식생초목을 식재하기 위한 작업으로서, 앵커 매트(14) 위에 최소 10mm 두께 이상의 조성물인 습식 씨드 스프레이(16)를 이용해 씨앗 뿜어 붙이기로 식생 녹화를 한다.
이때의 씨드 스프레이의 습식 씨앗 뿜어 붙이기는 잔디,향토 초화류 씨앗의 1종 이상에 더하여 홍수에 의한 5일 이상의 장시간 침수된 상태에서도 생육이 가능한 수생식물(수크령, 창포, 돌미나리, 갈대등) 종자의 1종 이상과, 식생토, 비료, 토양 안정제를 겔상으로 조성한 후 습식으로 뿜어 붙여 시공성이 우수하고 초기 피복 효과가 뛰어나게 하여 공사비가 저렴하고 시공성이 우수하며, 다양한 다채로운 경관 조성을 할 수 있다.
상기 5단계 작업 후에는 시공의 마무리 작업 중의 하나로서, 우수나 지표수가 사면측으로 유입되는 것을 원천적으로 배제하기 위한 측구를 설치한다.
이때의 측구는 사면(10)의 상부와 하부의 각 경계선상에서 사면 길이방향을 따라 설치되는 U형 측구(17)를 적용하는 것이 바람직하다.
이와 같은 각 단계의 작업을 모두 거치면 토목섬유 보강 커튼 월 녹화공법의 시공을 완료할 수 있게 된다.Hereinafter, with reference to the accompanying drawings will be described in detail with respect to geotextile reinforced curtain wall structure and greening method according to an embodiment of the present invention.
1 is a cross-sectional view showing the overall structure of the geosynthetic reinforcement curtain wall structure and the greening method according to an embodiment of the present invention, Figure 2 is a perspective view showing a curtain wall structure in the present invention, Figure 3 in the present invention , Perspective view showing a composite fabric of the curtain wall structure, Figure 4 shows a perspective view of the anti-erosion mat and the anchor mat in the present invention, respectively.
The present invention is a predetermined height, that is, 10cm (± 3cm), 30cm (below "slopes") or slopes without rock vegetation soil layer, such as raft block, concrete slope or stone sticking (hereinafter referred to as "slope") Slope
At this time, the curtain wall structure (12) is a vertically closed ring ring and the anchor nail (12a) when standing up and down with an anchor nail (12a) made of elongated steel bar or synthetic resin bar having a sharp bottom end as the support means Galvanized steel buckle (12b) located in close proximity to the upper side of one side and a permeable non-woven fabric composed of a composite fabric (12c), the composite fabric (12c) is the inner side of one side of the steel buckle (12b) In the drawing, the front hole is fitted in a manner of passing through the other side of the
Accordingly, the
In addition, the
In other words, when the inclination angle of the slope is 50 degrees or less, it is preferably installed at intervals of 1.0 to 2.0m, and when it is more than that, it is preferable to install at intervals of 0.5 to 1m.
An upper portion of the
The
An upper portion of the
That is, the surface of the
After the installation of the
5 to 8 are cross-sectional views showing the operation of each step of the geotextile reinforced curtain wall greening method according to an embodiment of the present invention.
As shown in FIG. 5, first, as a one-step operation, the installation is performed in such a manner that the
The
Next, as a two-stage operation, the geosynthetic reinforcement
That is, at least 0.5m intervals along the inclined surface of the
At this time, it is most preferable to fill the vegetation soil with a thickness of at least 30 cm, and most preferably, after filling the space between the
In particular, in order for the geosynthetic reinforcement
The geosynthetic reinforcement
The geosynthetic reinforcing curtain wall structure is made of a very fast composite fabric (12c) with a permeation rate of 1 × 10 -2 cm / sec or more, by maintaining the vegetation soil layer in the geosynthetic reinforcing curtain wall at least 30 cm or more, It is possible to secure a basic vegetation soil layer that can hold moisture to be supplied to the roots of vegetation vegetation while effectively preventing the flow of vegetation soil slope.
In other words, it acts as a fast permeability (1 × 10 -2 cm / sec or more) to mitigate the drift water to prevent erosion or loss due to the runoff, and eventually the slope is collapsed by the slope flow prevention effect of the vegetation soil layer It is a structural blocking function.
Next, as a three-step operation, after laying the vegetation soil layer in the geotextile reinforced
The
In more detail, the
In addition, the
In addition, the
On the other hand, in order to ensure that the
At this time, the
Thus, the
Ordinarily, anchor mats may be constructed using rolls having a width and length of 4.5 m x 100 m or more, having specifications of 30 kN / m or more in tensile strength, 13% or less in tensile strength, and 8 mm or more in thickness.
Next, the
Next, the fifth step is to plant the vegetation vegetation, the vegetation greening by spraying the seeds using a wet seed spray (16) of a composition of at least 10 mm thick on the anchor mat (14).
The seed spraying of seed sprays at this time is in addition to at least one species of grass and local herbaceous seeds, which can be grown even after being flooded for 5 days or longer by flooding (sucyeong, irises, rocks, reeds). One or more kinds of vegetation soil, fertilizer, and soil stabilizer are formed in a gel form, and then sprayed with wet, so that the workability is excellent and the initial coating effect is excellent, the construction cost is low, the workability is excellent, and various landscapes can be formed.
After the five-stage operation, as one of the finishing work of the construction, the side port for removing the rainwater or surface water to the slope side is installed.
At this time, it is preferable to apply the
If you go through all of these steps, it is possible to complete the construction of geosynthetic reinforcement curtain wall greening method.
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
도 1은 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 구조 및 녹화공법의 전체적인 설치구조를 보인 단면도1 is a cross-sectional view showing the overall structure of the geosynthetic reinforcement curtain wall structure and greening method according to an embodiment of the present invention
도 2는 본 발명에 있어서, 커튼 월 구조물을 보인 사시도Figure 2 is a perspective view of the curtain wall structure in the present invention,
도 3은 본 발명에 있어서, 커튼 월 구조물의 결속 구조를 보인 사시도Figure 3 is a perspective view showing the binding structure of the curtain wall structure in the present invention
도 4는 본 발명에 있어서, 침식방지매트 및 앵커 매트를 보인 사시도Figure 4 is a perspective view of the anti-erosion mat and anchor mat in the present invention,
도 5는 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 녹화공법의 1단계 작업을 나타내는 단면도Figure 5 is a cross-sectional view showing a
도 6은 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 녹화공법의 2단계 작업을 나타내는 단면도Figure 6 is a cross-sectional view showing a two-stage operation of geotextile reinforced curtain wall greening method according to an embodiment of the present invention
도 7은 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 녹화공법의 3,4단계 작업을 나타내는 단면도Figure 7 is a cross-sectional view showing the 3, 4 steps of the geotextile reinforced curtain wall greening method according to an embodiment of the present invention
도 8은 본 발명의 일 실시예에 따른 토목섬유 보강 커튼 월 녹화공법의 5단계 작업을 나타내는 단면도8 is a cross-sectional view showing a five-stage operation of geotextile reinforced curtain wall greening method according to an embodiment of the present invention
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10. 사면 10. Slope
11. 부직포11.Nonwoven
12. 커튼 월 구조물 --- 12a. 버클, 12b. 앵커네일, 12c. 복합포12. Curtain Wall Structure --- 12a. Buckle, 12b. Anchor nail, 12c. Composite
13. 침식방지매트 13. Erosion Prevention Mat
14. 앵커 매트14. Anchor Mat
15. 앵커 핀15. Anchor Pins
16. 습식 씨드 스프레이16. Wet Seed Spray
17. U형 측구17.U-shaped side opening
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070078297A KR100920027B1 (en) | 2007-08-03 | 2007-08-03 | Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070078297A KR100920027B1 (en) | 2007-08-03 | 2007-08-03 | Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090014058A KR20090014058A (en) | 2009-02-06 |
KR100920027B1 true KR100920027B1 (en) | 2009-10-06 |
Family
ID=40684251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070078297A KR100920027B1 (en) | 2007-08-03 | 2007-08-03 | Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100920027B1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104264694A (en) * | 2014-09-29 | 2015-01-07 | 南京赛伯通建筑工程有限公司 | Expansive soil slope and construction method |
KR101492010B1 (en) * | 2013-03-14 | 2015-02-10 | 김현태 | Drainage apparatus for decreasing underground water level and drainage system |
CN104878764A (en) * | 2015-03-24 | 2015-09-02 | 内蒙古大学 | Ecological curtain laying and planting method |
CN109797758A (en) * | 2019-03-07 | 2019-05-24 | 北京林业大学 | Exposed scar greening structure and method |
KR102218233B1 (en) * | 2020-09-01 | 2021-02-19 | 김윤춘 | Method of constructing coconut mats |
KR102218234B1 (en) * | 2021-01-19 | 2021-02-19 | 김윤춘 | Method of constructing coconut mats |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105569056A (en) * | 2016-01-05 | 2016-05-11 | 中山大学 | Reusable side slope anti-scouring ecological protection net |
CN105887757A (en) * | 2016-06-06 | 2016-08-24 | 长江勘测规划设计研究有限责任公司 | Ecological slope protection composite retaining wall structure and construction method |
CN108149822B (en) * | 2018-01-27 | 2023-08-11 | 厦门大学嘉庚学院 | Raw soil curtain wall hanging plate and manufacturing method thereof |
CN108547256B (en) * | 2018-05-07 | 2023-10-27 | 重庆诺为生态环境工程有限公司 | River course ecology bank slope protection system |
KR102118346B1 (en) * | 2018-09-12 | 2020-06-03 | 현대건설(주) | Method of planting grass on slope of artificial ground |
CN109183817A (en) * | 2018-09-27 | 2019-01-11 | 中铁工程设计咨询集团有限公司 | A kind of construction method of the tall and big effective soil horizon of precipitous rock slope ecological safeguard structure |
CN109371993B (en) * | 2018-11-30 | 2024-08-02 | 苏州金螳螂园林绿化景观有限公司 | Concrete abrupt slope ecological greening collapse prevention system |
CN110004951A (en) * | 2019-05-10 | 2019-07-12 | 湖南科技大学 | A kind of side slope ecological protection structure and its construction method with water accumulating and supplying system |
CN110741845B (en) * | 2019-11-06 | 2022-08-16 | 重庆交通大学 | Biological nail and hydro-fluctuation belt bank slope greening protection method thereof |
KR102264637B1 (en) * | 2020-11-19 | 2021-06-15 | 한국건설기술연구원 | River bank Shore Erosion Prevention Structure Using Coated Biopolymer Porous on Concrete block, and Construction Method therefor |
CN114635432A (en) * | 2022-04-22 | 2022-06-17 | 中建三局绿色产业投资有限公司 | Construction method of composite ecological slope protection of foundation pit |
CN118048921A (en) * | 2024-04-01 | 2024-05-17 | 中铁隧道局集团建设有限公司 | Efficient side slope flexible supporting system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07229149A (en) * | 1994-02-18 | 1995-08-29 | Nikken Metal:Kk | Steel sheathing wall |
JPH09217354A (en) * | 1996-02-09 | 1997-08-19 | Koiwa Kanaami Kk | Support body for plant growing base, and slope greening method |
JPH10292380A (en) | 1997-04-19 | 1998-11-04 | Okabe Co Ltd | Slope greening method |
KR200408273Y1 (en) | 2005-08-01 | 2006-02-08 | 지홍기 | Vegetation restoration improvement for revetmentriparian protection |
-
2007
- 2007-08-03 KR KR1020070078297A patent/KR100920027B1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07229149A (en) * | 1994-02-18 | 1995-08-29 | Nikken Metal:Kk | Steel sheathing wall |
JPH09217354A (en) * | 1996-02-09 | 1997-08-19 | Koiwa Kanaami Kk | Support body for plant growing base, and slope greening method |
JPH10292380A (en) | 1997-04-19 | 1998-11-04 | Okabe Co Ltd | Slope greening method |
KR200408273Y1 (en) | 2005-08-01 | 2006-02-08 | 지홍기 | Vegetation restoration improvement for revetmentriparian protection |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101492010B1 (en) * | 2013-03-14 | 2015-02-10 | 김현태 | Drainage apparatus for decreasing underground water level and drainage system |
CN104264694A (en) * | 2014-09-29 | 2015-01-07 | 南京赛伯通建筑工程有限公司 | Expansive soil slope and construction method |
CN104264694B (en) * | 2014-09-29 | 2016-08-17 | 南京赛伯通建筑工程有限公司 | A kind of expansive soil slope and construction method |
CN104878764A (en) * | 2015-03-24 | 2015-09-02 | 内蒙古大学 | Ecological curtain laying and planting method |
CN109797758A (en) * | 2019-03-07 | 2019-05-24 | 北京林业大学 | Exposed scar greening structure and method |
CN109797758B (en) * | 2019-03-07 | 2023-12-12 | 北京林业大学 | Bare rock surface greening structure and method |
KR102218233B1 (en) * | 2020-09-01 | 2021-02-19 | 김윤춘 | Method of constructing coconut mats |
KR102218234B1 (en) * | 2021-01-19 | 2021-02-19 | 김윤춘 | Method of constructing coconut mats |
Also Published As
Publication number | Publication date |
---|---|
KR20090014058A (en) | 2009-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100920027B1 (en) | Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails | |
CN101818499B (en) | Revegetation system on steep rocky slopes and implementing method thereof | |
CN108589743B (en) | Ecological geogrid for slope protection | |
CN107893422B (en) | A kind of reinforcement type ecological slope protection structure and its construction method | |
CN109723068B (en) | Steep concrete sash Liang Hupo system beneficial to slope vegetation growth and construction method | |
KR100860748B1 (en) | Honey cell greening works | |
CN113718711B (en) | Anti-scouring water and soil conservation slope protection structure and construction method thereof | |
CN110552356A (en) | comprehensive treatment system for slope slag adhering under plateau area road and construction method thereof | |
CN210031857U (en) | Ecological embankment side slope structure | |
CN113235623A (en) | Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof | |
RU2582814C1 (en) | Method for construction of landslide protection structure of biopositive | |
KR101025260B1 (en) | Slope stabilization method which uses prefabricated shore protection block and coir mat | |
JPH11323943A (en) | Protective afforesting structure of slope face, wall surface and shore surface | |
JP6694889B2 (en) | It is an impervious body, specifically a dike | |
CN114164844B (en) | Construction method of square grid type organic material slope protection structure | |
CN212896409U (en) | Three-dimensional geotechnique's net pad grass planting slope protection structure | |
CN114086507A (en) | Ecological revetment process with high water and soil retention | |
KR100884017B1 (en) | Method of Constructing Bank Walls with Recovering Natural Environment | |
CN211037008U (en) | Comprehensive treatment system for slope slag-adhering under plateau area road | |
KR101860018B1 (en) | Vegetation with sleeper | |
CN212561559U (en) | Green protection architecture in steep hillside based on biological stake and tendril plant | |
KR100805934B1 (en) | An afforestation construction method of slope | |
KR100427226B1 (en) | The stone wire-net friendly relations with environment | |
CN213897161U (en) | Rock slope ecological slope protection structure in high and cold overcast and humid area | |
CN114635432A (en) | Construction method of composite ecological slope protection of foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20120925 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20130924 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140917 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |