JPH0673923A - Concrete fence and construction method thereof - Google Patents
Concrete fence and construction method thereofInfo
- Publication number
- JPH0673923A JPH0673923A JP23045992A JP23045992A JPH0673923A JP H0673923 A JPH0673923 A JP H0673923A JP 23045992 A JP23045992 A JP 23045992A JP 23045992 A JP23045992 A JP 23045992A JP H0673923 A JPH0673923 A JP H0673923A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- fence
- reinforcing bar
- concrete fence
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Fencing (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、住宅等の敷地の周囲に
配置立設されるコンクリ−ト塀及びその施工方法に関す
るものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete fence which is erected around a site such as a house and a construction method thereof.
【0002】[0002]
【従来の技術】従来から、図7に示す如く、コンクリ−
ト製のブロック(イ)を積み重ね、その中空内部に鉄筋
(ロ)を挿通すると共に、同中空内部にセメント(ハ)
を充填して立設され、これが横方向に並設されて形成さ
れるコンクリ−ト塀は知られている。2. Description of the Related Art Conventionally, as shown in FIG.
Blocks (a) made of G are stacked, and the reinforcing bars (b) are inserted into the hollow inside, and the cement (c) is inside the hollow.
There is known a concrete fence which is formed by filling up with and arranging it upright, and arranging this in a lateral direction.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上記従
来の技術においては、現場にてブロック(イ)を積み重
ねる必要があって施工が大変であり、しかも、各ブロッ
ク(イ)間に段差が発生し易くて外観良く施工され難
く、又、強固なコンクリ−ト塀とはなり難いものであっ
た。However, in the above-mentioned conventional technique, it is necessary to stack the blocks (a) on site and the construction is difficult, and moreover, a step is generated between the blocks (a). It was easy and difficult to construct with good appearance, and it was difficult to form a strong concrete fence.
【0004】そこで、図8に示す如く、コンクリ−トに
て予め所定の形状に成形したコンクリ−ト塀(ニ)が考
えられた。該コンクリ−ト塀(ニ)は、基礎(ホ)上に
立設載置され、その下端部分の周囲にセメント(ハ)が
打設されて埋設固定されるものである。Therefore, as shown in FIG. 8, a concrete wall (d) preformed into a predetermined shape by a concrete is considered. The concrete fence (d) is placed upright on a foundation (e), and cement (c) is cast around the lower end portion of the foundation to be embedded and fixed.
【0005】しかしながらこの場合、セメント(ハ)を
打設する際にコンクリ−ト塀(ニ)がぐらつき動き易く
て、該コンクリ−ト塀(ニ)が傾いて施工され易く、
又、同コンクリ−ト塀(ニ)は確実強固には立設施工さ
れ難いものであった。In this case, however, the concrete fence (d) is apt to wobble and move when the cement (c) is placed, and the concrete fence (d) is inclined and constructed easily.
Further, the concrete wall (d) was difficult to be erected and installed reliably and firmly.
【0006】本発明は、上記従来の技術における問題を
解決するために発明されたもので、すなわちその課題
は、現場にて一体物として簡単に立設固定して施工する
ことができ、しかも、その際、ぐらついたり傾いたりす
ることがなく、一体物として外観良好となり、且つ、確
実強固に立設固定されるコンクリ−ト塀及びその施工方
法を提供することである。The present invention has been invented in order to solve the above-mentioned problems in the prior art, that is, the problem is that it can be easily installed upright and fixed as an integrated body on site, and furthermore, In this case, it is an object of the present invention to provide a concrete fence which does not wobble or tilt, has a good appearance as an integrated body, and is reliably and firmly erected and fixed, and a construction method thereof.
【0007】[0007]
【課題を解決するための手段】請求項1)記載のコンク
リ−ト塀は、コンクリ−トにて予め成形された塀本体の
下端部に、両側へ突出した支持片を設けると共に、同塀
本体の下端部付近に表裏に貫通した鉄筋挿通用孔を形成
してなり、又、請求項2)記載のコンクリ−ト塀の施工
方法は、上記コンクリ−ト塀を基礎上に立設載置し、そ
の際、両側の支持片を基礎上面に当接支持せしめ、この
状態で、鉄筋挿通用孔に鉄筋を挿通して該鉄筋を基礎に
連結固着し、その後、同鉄筋挿通用孔内にセメントが入
り込むように該セメントをコンクリ−ト塀の下端部分の
周囲に打設して、該コンクリ−ト塀の下端部分を同セメ
ント内に埋設固定することを特徴とするものであり、同
コンクリ−ト塀によって、そして、同施工方法を採用す
ることによって、上記課題が解決されたものである。A concrete fence according to a first aspect of the present invention is provided with a supporting piece projecting to both sides at a lower end portion of a fence main body previously molded by the concrete, and the same main body. In the construction of the concrete fence according to claim 2), a reinforcing bar insertion hole is formed penetrating the front and back in the vicinity of the lower end of the concrete fence, and the concrete fence is erected on the foundation. , At that time, support pieces on both sides are supported by abutting against the upper surface of the foundation, and in this state, the reinforcing bar is inserted through the reinforcing bar insertion hole, and the reinforcing bar is connected and fixed to the foundation. The cement is cast around the lower end portion of the concrete fence so that the cement enters, and the lower end portion of the concrete fence is embedded and fixed in the cement. By using the fence and by adopting the same construction method, Those whose serial issue has been resolved.
【0008】[0008]
【作用】本発明のコンクリ−ト塀は、コンクリ−トにて
予め成形された塀本体の下端部に、両側へ突出した支持
片を設けると共に、同塀本体の下端部付近に表裏に貫通
した鉄筋挿通用孔を形成してなり、基礎上に立設載置さ
れる際、両側の支持片が基礎上面に当接支持され、この
状態で、鉄筋挿通用孔に鉄筋が挿通されて該鉄筋が基礎
に連結固着され、その後、同鉄筋挿通用孔内にセメント
が入り込むように該セメントがコンクリ−ト塀の下端部
分の周囲に打設されて、該コンクリ−ト塀の下端部分が
同セメント内に埋設固定されるものである。すなわち、
該コンクリ−ト塀は立設固定するだけで一体物として簡
単且つ外観良好に施工され、その施工の際、セメントを
打設する場合にも同コンクリ−ト塀は両側の支持片によ
ってぐらつかないように直立状態に確実に支持され、し
かも、セメントが硬化した施工後にあっては、支持片が
アンカ−の役目を果たすと共に、鉄筋挿通用孔に鉄筋が
挿通され且つ同鉄筋挿通用孔にセメントが入り込んでい
て、同コンクリ−ト塀は確実強固に立設固定されるもの
である。The concrete fence of the present invention is provided with support pieces protruding to both sides at the lower end portion of the fence body preformed by the concrete, and penetrates the front and back sides near the lower end portion of the fence body. When the reinforcing bar insertion hole is formed and is erected on the foundation, the supporting pieces on both sides are abutted against and supported by the upper surface of the foundation. In this state, the reinforcing bar is inserted into the reinforcing bar insertion hole and the reinforcing bar is inserted. Is connected and fixed to the foundation, and then the cement is cast around the lower end portion of the concrete fence so that the cement enters the rebar insertion hole, and the lower end portion of the concrete fence is cemented. It is to be embedded and fixed inside. That is,
The concrete fence can be easily installed as an integral body with good appearance by simply fixing it upright, and even when cement is placed, the concrete fence does not wobble due to the support pieces on both sides. Is securely supported in an upright state, and after the cement has hardened, the supporting piece serves as an anchor, and the reinforcing bar is inserted into the reinforcing bar insertion hole and cement is inserted into the reinforcing bar insertion hole. The concrete wall, which is inside, is firmly and erected and fixed firmly.
【0009】[0009]
【実施例】図1、図2に示すコンクリ−ト塀4は、本発
明の一実施例で、コンクリ−トにて予め成形された塀本
体1の下端部に、両側へ突出した支持片2を設けると共
に、同塀本体1の下端部付近に表裏に貫通した鉄筋挿通
用孔3を形成してなるものである。又、該コンクリ−ト
塀4の施工方法は、まず、コンクリ−ト塀4を基礎5上
に立設載置し、その際、両側の支持片2を基礎5上面に
当接支持せしめ、この状態で、鉄筋挿通用孔3に鉄筋6
を挿通して該鉄筋6を基礎5に連結固着し、その後、同
鉄筋挿通用孔3内にセメント7が入り込むように該セメ
ント7をコンクリ−ト塀4の下端部分の周囲に打設し
て、該コンクリ−ト塀4の下端部分を同セメント7内に
埋設固定することを特徴とするものである。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A concrete fence 4 shown in FIGS. 1 and 2 is an embodiment of the present invention, and a support piece 2 projecting to both sides is formed at a lower end portion of a fence main body 1 preformed by the concrete. And a reinforcing bar insertion hole 3 penetrating through the front and back sides is formed in the vicinity of the lower end of the same wall body 1. Further, the construction method of the concrete fence 4 is as follows. First, the concrete fence 4 is placed upright on the foundation 5, and at this time, the support pieces 2 on both sides are contacted and supported on the upper surface of the foundation 5. In the state, the reinforcing bar 6 is inserted in the reinforcing bar insertion hole 3.
The reinforcing bar 6 is connected and fixed to the foundation 5, and then the cement 7 is driven around the lower end portion of the concrete fence 4 so that the cement 7 enters the hole 3 for inserting the reinforcing bar. The lower end portion of the concrete fence 4 is embedded and fixed in the cement 7.
【0010】コンクリ−ト塀4の塀本体1は、通称PC
版で矩形状に形成されており、その下端から一定距離の
位置に全周に亘る目印線8が設けられている。該目印線
8より下側の部分が地中に埋設されて、同コンクリ−ト
塀4は地上に立設されるものである。又、同目印線8よ
りも下側位置に、支持片2、鉄筋挿通用孔3等が設けら
れる。The fence main body 1 of the concrete fence 4 is commonly called a PC.
The plate is formed in a rectangular shape, and a mark line 8 is provided over the entire circumference at a position at a constant distance from the lower end of the plate. A portion below the mark line 8 is buried in the ground, and the concrete fence 4 is erected on the ground. Further, the support piece 2, the reinforcing bar insertion hole 3 and the like are provided at a position below the same mark line 8.
【0011】支持片2は、塀本体1の下端部の両端付近
の両側に合計四個設けられており、略L型金具9の一片
が固定ボルト10によって塀本体1の下端付近の壁面に固
着され、同略L型金具9の他片が支持片2として外側水
平方向へ突設されている。Four support pieces 2 are provided on both sides of the lower end portion of the wall body 1 near both ends, and one piece of the substantially L-shaped metal fitting 9 is fixed to the wall surface near the lower end of the wall body 1 by a fixing bolt 10. The other piece of the substantially L-shaped metal fitting 9 is provided as the support piece 2 so as to project outward in the horizontal direction.
【0012】該コンクリ−ト塀4を施工するにあたって
は、まず、図3に示す如く、基礎5が形成されるもので
ある。すなわち、(a)地面に埋設用穴11を掘設し、
(b)該埋設用穴11内に型枠12を設置して砕石13を敷き
詰め、充分に転圧をかけて基礎5の下地層13を形成し、
(c)同下地層13の上に固定鉄筋14を設置し、(d)該
固定鉄筋14の上から同下地層13上に基礎用コンクリ−ト
を流し込んで、基礎5の表面層15を形成し、その際、複
数の固定鉄筋14の先端部分が同表面層15の上面より突設
されるものである。又、その後、表面層15の基礎用コン
クリ−トが硬化した後に、上記型枠12は取り外し除去さ
れるものである。In constructing the concrete fence 4, the foundation 5 is first formed as shown in FIG. That is, (a) a burial hole 11 is dug in the ground,
(B) The mold 12 is installed in the burial hole 11 and the crushed stones 13 are spread, and the base layer 13 of the foundation 5 is formed by applying sufficient rolling pressure.
(C) A fixed reinforcing bar 14 is installed on the same underlayer 13, and (d) a concrete for a foundation is poured from above the fixed reinforcing bar 14 onto the underlayer 13 to form a surface layer 15 of the foundation 5. At that time, the tip portions of the plurality of fixed reinforcing bars 14 are provided so as to project from the upper surface of the surface layer 15. After that, after the base concrete of the surface layer 15 is hardened, the mold 12 is removed and removed.
【0013】次に、図4に示す如く、コンクリ−ト塀4
が上記基礎5上に立設載置され、該実施例においては、
同コンクリ−ト塀4の高さ及び傾きが調整される。この
場合、各支持片2には脚ボルト16が上下動移動調整自在
に螺合取着され、該脚ボルト16の下端が支持片2の一部
として基礎5上面に当接されている。該脚ボルト16は六
角レンチ17により回動されることによって上下動操作さ
れ、各脚ボルト16の下方への突出量が相互に調整される
ことにより、同コンクリ−ト塀4の高さと共に傾きが調
整されるものである。Next, as shown in FIG. 4, the concrete fence 4
Is placed upright on the foundation 5, and in this embodiment,
The height and inclination of the concrete fence 4 are adjusted. In this case, leg bolts 16 are screwed and attached to each support piece 2 so as to be vertically movable and adjustable, and the lower ends of the leg bolts 16 are in contact with the upper surface of the base 5 as a part of the support pieces 2. The leg bolts 16 are vertically moved by being rotated by a hexagonal wrench 17, and the downward protrusion amounts of the leg bolts 16 are adjusted to each other, whereby the leg walls 16 are tilted together with the height of the concrete fence 4. Is to be adjusted.
【0014】次に、図5に示す如く、該実施例において
は、コンクリ−ト塀4が同基礎5上に仮固定される。こ
の場合、支持片2に穿設された固定用孔18にアンカ−ボ
ルト19が挿入され、該アンカ−ボルト19が金槌20によっ
て基礎5上面に打ち込み固定され、同アンカ−ボルト19
に固定ナット21が螺子締めつけられて、同支持片2が同
基礎5上に仮固定される。Next, as shown in FIG. 5, in this embodiment, the concrete fence 4 is temporarily fixed on the foundation 5. In this case, an anchor bolt 19 is inserted into a fixing hole 18 formed in the support piece 2, and the anchor bolt 19 is driven and fixed on the upper surface of the foundation 5 by a hammer 20 to form the anchor bolt 19.
The fixing nut 21 is screw-fastened to the support piece 2 and the support piece 2 is temporarily fixed on the base 5.
【0015】次に、図1に示す如く、コンクリ−ト塀4
の各鉄筋挿通用孔3に鉄筋6が挿通され、該各鉄筋6の
両端部が基礎5より突設される上記固定鉄筋14に各々係
止結合されて、該各鉄筋6は固定鉄筋14を介して各々基
礎5に連結固着されるものである。Next, as shown in FIG. 1, the concrete fence 4
Reinforcing bars 6 are inserted through the respective reinforcing bar insertion holes 3, and both ends of each reinforcing bar 6 are respectively locked and coupled to the fixed reinforcing bars 14 projecting from the foundation 5, so that each reinforcing bar 6 is fixed by the fixed reinforcing bars 14. The bases 5 are connected and fixed to each other via the bases.
【0016】最後に、図2に示す如く、コンクリ−ト塀
4の下端部分の周囲に型枠12が設置されてその内側にセ
メント7が流し込まれて打設され、この場合、上記鉄筋
挿通用孔3内に同セメント7が入り込むものであり、該
セメント7が養生硬化されることによって、同コンクリ
−ト塀4の下端部分が支持片2、鉄筋6等と共に同セメ
ント7内に埋設固定されるものである。セメント7が養
生硬化された後には、上記型枠12が取り外し除去され、
埋設用穴11内にコンクリ−ト塀4の目印線8の高さまで
土が埋め戻されるものである。Finally, as shown in FIG. 2, a form 12 is installed around the lower end of the concrete fence 4 and cement 7 is poured into the inside of the form 12, and in this case, the reinforcing bar is inserted. The cement 7 is inserted into the hole 3, and by curing and hardening the cement 7, the lower end portion of the concrete fence 4 is embedded and fixed in the cement 7 together with the support piece 2, the reinforcing bar 6, and the like. It is something. After the cement 7 is cured and hardened, the form 12 is removed and removed,
The earth is filled in the burying hole 11 up to the height of the marking line 8 of the concrete fence 4.
【0017】したがって、該実施例のコンクリ−ト塀4
及びその施工方法においては、該コンクリ−ト塀4を立
設固定するだけで、積み重ね施工することなく、一体物
として簡単に且つ外観良好に施工されるものである。
又、その施工の際、セメント7を打設する場合にも、該
コンクリ−ト塀4は両側の支持片2によってぐらつかな
いように直立状態に確実に支持され、特に、該実施例に
あっては、同コンクリ−ト塀4が高さ及び傾き調整され
た後、確実に仮固定された状態で、セメント7が打設さ
れるものである。しかも、セメント7が硬化した施工後
にあっては、支持片2がアンカ−の役目を果たすと共
に、鉄筋挿通用孔3に鉄筋6が挿通され且つ同鉄筋挿通
用孔3にセメント7が入り込んでいて、同コンクリ−ト
塀4は確実強固に立設固定されるものである。Therefore, the concrete fence 4 of the embodiment
In addition, in the construction method thereof, the concrete fence 4 is simply erected and fixed, and the concrete fence 4 can be easily constructed as an integrated body with good appearance without stacking construction.
Further, when the cement 7 is placed during the construction, the concrete fence 4 is surely supported by the support pieces 2 on both sides in an upright state so as not to wobble. The cement 7 is placed in the concrete fence 4 after the height and inclination of the concrete fence 4 are adjusted, and the cement fence 7 is securely temporarily fixed. Moreover, after the cement 7 is hardened, the supporting piece 2 serves as an anchor, the reinforcing bar 6 is inserted into the reinforcing bar insertion hole 3, and the cement 7 is inserted into the reinforcing bar insertion hole 3. The concrete wall 4 is securely and erected and fixed.
【0018】なお、本発明のコンクリ−ト塀及びその施
工方法においては、図6に示す実施例の如きであっても
良いものである。すなわち、該実施例においては、コン
クリ−ト塀4の下端部に帯板材22が嵌合固着され、該帯
板材22の両端部分が支持片2として同コンクリ−ト塀4
の両側へ突設されている。この場合、帯板材22の中程上
面に凹溝部23が形成され、該凹溝部23にコンクリ−ト塀
4の下端部が嵌合固着されている。又、同両支持片2を
有する帯板材22は、その下面全体が基礎5の上面に直接
に当接されており、該コンクリ−ト塀4は高さ調整はな
されないものである。The concrete fence and the method for constructing the same according to the present invention may be the embodiment shown in FIG. That is, in this embodiment, the strip 22 is fitted and fixed to the lower end of the concrete fence 4, and both end portions of the strip 22 serve as the support pieces 2 of the concrete fence 4.
Are projected to both sides of. In this case, a concave groove portion 23 is formed in the middle upper surface of the band plate material 22, and the lower end portion of the concrete fence 4 is fitted and fixed to the concave groove portion 23. The entire lower surface of the strip 22 having the support pieces 2 is in direct contact with the upper surface of the foundation 5, and the height of the concrete fence 4 is not adjusted.
【0019】[0019]
【発明の効果】上述の如く、本発明のコンクリ−ト塀及
びその施工方法においては、立設固定するだけで一体物
として簡単且つ外観良好に施工され、その施工の際、セ
メントを打設する場合にも、該コンクリ−ト塀は両側の
支持片によってぐらつかないように直立状態に確実に支
持され、しかも、セメントが硬化した施工後にあって
は、支持片がアンカ−の役目を果たすと共に、鉄筋挿通
用孔に鉄筋が挿通され且つ同鉄筋挿通用孔にセメントが
入り込んでいて、同コンクリ−ト塀は確実強固に立設固
定されるものである。As described above, according to the concrete fence of the present invention and the method for constructing the concrete fence, the concrete fence can be simply and satisfactorily constructed as a unit by standing and fixing it, and cement can be placed during the construction. Also in this case, the concrete fence is surely supported by the support pieces on both sides in an upright state so as not to wobble, and after the cement is hardened, the support pieces serve as anchors, The reinforcing bars are inserted through the reinforcing bar insertion holes and the cement is inserted into the reinforcing bar insertion holes, so that the concrete fence can be firmly and erected.
【図1】本発明のコンクリ−ト塀及びその施工方法の一
実施例を示す斜視図である。FIG. 1 is a perspective view showing an embodiment of a concrete fence and a construction method thereof according to the present invention.
【図2】同実施例の一施工過程を示す斜視図である。FIG. 2 is a perspective view showing one construction process of the embodiment.
【図3】同実施例の基礎の製作過程(a)(b)(c)(d)を示す
斜視図である。FIG. 3 is a perspective view showing a manufacturing process (a), (b), (c), and (d) of the foundation of the embodiment.
【図4】同実施例の一施工過程を示す断面図である。FIG. 4 is a cross-sectional view showing one construction process of the same embodiment.
【図5】同実施例の一施工過程を示す断面図である。FIG. 5 is a cross-sectional view showing one construction process of the same embodiment.
【図6】別の実施例を示す断面図である。FIG. 6 is a sectional view showing another embodiment.
【図7】本発明の従来例を示す斜視図である。FIG. 7 is a perspective view showing a conventional example of the present invention.
【図8】本発明の従来改善案を示す断面図である。FIG. 8 is a cross-sectional view showing a conventional improvement plan of the present invention.
1 塀本体 2 支持片 3 鉄筋挿通用孔 4 コンクリ−ト塀 5 基礎 6 鉄筋 7 セメント 1 Fence body 2 Support piece 3 Rebar insertion hole 4 Concrete fence 5 Foundation 6 Reinforcing bar 7 Cement
Claims (2)
の下端部に、両側へ突出した支持片を設けると共に、同
塀本体の下端部付近に表裏に貫通した鉄筋挿通用孔を形
成してなるコンクリ−ト塀。1. A support piece projecting to both sides is provided at the lower end of a fence main body preformed by concrete, and a reinforcing bar insertion hole penetrating through the front and back is formed near the lower end of the same fence main body. A concrete fence made up of.
上に立設載置し、その際、両側の支持片を基礎上面に当
接支持せしめ、この状態で、鉄筋挿通用孔に鉄筋を挿通
して該鉄筋を基礎に連結固着し、その後、同鉄筋挿通用
孔内にセメントが入り込むように該セメントをコンクリ
−ト塀の下端部分の周囲に打設して、該コンクリ−ト塀
の下端部分を同セメント内に埋設固定することを特徴と
するコンクリ−ト塀の施工方法。2. The concrete fence according to claim 1) is erected on a foundation, and at that time, support pieces on both sides are supported by abutting against the upper surface of the foundation. In this state, the concrete fence is inserted into the rebar insertion hole. The reinforcing bar is inserted and fixedly connected to a foundation, and then the cement is cast around the lower end portion of the concrete fence so that the cement enters the hole for inserting the reinforcing bar, and the concrete A method of constructing a concrete fence, characterized in that the lower end portion of the fence is embedded and fixed in the same cement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP23045992A JPH0673923A (en) | 1992-08-28 | 1992-08-28 | Concrete fence and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP23045992A JPH0673923A (en) | 1992-08-28 | 1992-08-28 | Concrete fence and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0673923A true JPH0673923A (en) | 1994-03-15 |
Family
ID=16908190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP23045992A Pending JPH0673923A (en) | 1992-08-28 | 1992-08-28 | Concrete fence and construction method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0673923A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017218880A (en) * | 2016-06-08 | 2017-12-14 | 株式会社 メナック | Trench digging method using foaming synthetic resin plate |
CN108716307A (en) * | 2018-07-12 | 2018-10-30 | 成都城投建筑科技投资管理集团有限公司 | It can prevent the assembled that wallboard is toppled over from revealing the green enclosure wall |
CN109854074A (en) * | 2019-04-01 | 2019-06-07 | 四川智陆科技有限公司 | Combined type wave type is recycled assembled architecture enclosing wall |
-
1992
- 1992-08-28 JP JP23045992A patent/JPH0673923A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017218880A (en) * | 2016-06-08 | 2017-12-14 | 株式会社 メナック | Trench digging method using foaming synthetic resin plate |
CN108716307A (en) * | 2018-07-12 | 2018-10-30 | 成都城投建筑科技投资管理集团有限公司 | It can prevent the assembled that wallboard is toppled over from revealing the green enclosure wall |
CN109854074A (en) * | 2019-04-01 | 2019-06-07 | 四川智陆科技有限公司 | Combined type wave type is recycled assembled architecture enclosing wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4887691A (en) | Modular wall construction using posts and panels | |
US6120723A (en) | Foundation footing construction method, particularly as serve to efficiently precisely emplace wall anchors | |
JP2002256573A (en) | Foundation for existing foundation reinforcing steel tower and construction method for it | |
JPH0673923A (en) | Concrete fence and construction method thereof | |
JP2004017645A (en) | Form device for pre-cast concrete foundation block, pre-cast concrete foundation block, and foundation technique using pre-cast concrete foundation block | |
JP3778392B2 (en) | Basic block | |
JP3028011B2 (en) | Concrete wall fixing structure and construction method | |
JP3612600B2 (en) | Unit anchor and structural steel foundation beam | |
JPS5961626A (en) | Construction of foundation, pillar and leg | |
JP3700119B2 (en) | Pillar construction method | |
JP3396812B2 (en) | Underground foundation construction material, underground foundation and its construction method | |
JPH0681520A (en) | Concrete fence and construction thereof | |
JPH10195887A (en) | Precast concrete clustered foundation | |
JPH076363Y2 (en) | Fixture for concrete formwork | |
JP2943083B2 (en) | Architectural foundation block structure | |
AU727660B2 (en) | Slab construction method | |
JP2992160B2 (en) | Precast foundation structure | |
JPH0681522A (en) | Concrete fence and construction thereof | |
JPH01315525A (en) | Snowslide preventing and slope stabilizing structure | |
JPH0673925A (en) | Concrete fence and construction method thereof | |
JPH08189230A (en) | Structure of foundation | |
KR200365179Y1 (en) | Anchor block | |
KR200365181Y1 (en) | Anchor block | |
JPH03260223A (en) | Positioning plate for base construction of housing | |
JP2024150310A (en) | Roof structure construction method |