JP2576755B2 - Pile head treatment method for ready-made prestressed concrete pile - Google Patents

Pile head treatment method for ready-made prestressed concrete pile

Info

Publication number
JP2576755B2
JP2576755B2 JP6526693A JP6526693A JP2576755B2 JP 2576755 B2 JP2576755 B2 JP 2576755B2 JP 6526693 A JP6526693 A JP 6526693A JP 6526693 A JP6526693 A JP 6526693A JP 2576755 B2 JP2576755 B2 JP 2576755B2
Authority
JP
Japan
Prior art keywords
pile
cotter
plate
ready
pile head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6526693A
Other languages
Japanese (ja)
Other versions
JPH06272245A (en
Inventor
耕喜 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP6526693A priority Critical patent/JP2576755B2/en
Publication of JPH06272245A publication Critical patent/JPH06272245A/en
Application granted granted Critical
Publication of JP2576755B2 publication Critical patent/JP2576755B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、打設する既製プレスト
レストコンクリート杭の杭頭構造ならびにその既製プレ
ストレストコンクリート杭を打設したのちの杭頭処理工
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile head structure for a precast prestressed concrete pile to be cast and a pile head treatment method after the precast prestressed concrete pile is cast.

【0002】[0002]

【従来の技術】従来の既製プレストレストコンクリート
杭の打設は打ち込み工法あるいは埋め込み工法で行わ
れ、打設後の杭頭処理は、杭径の約2倍程度まで杭内側
を清掃し、そこにカゴ鉄筋を配置してコンクリートを打
設して杭と基礎を一体化させる方法で行っている。既製
プレストレストコンクリート杭の内表面には遠心成形に
伴うレイタンスが層状に付着しており、清掃しても容易
には除去できないので、打設するコンクリートとの付着
性能を低下させている。特に、埋め込み工法では、オー
バーフローした掘削溶液(後で固形物になる)を杭の内
側に入れる場合が多く、清掃してもこの固形物を除去し
きれない。かかる幾つかの原因が重なって杭の内表面の
コンクリートとの付着性能は低下しているが、通常はこ
のままでコンクリートが打設されている。
2. Description of the Related Art Conventionally, precast prestressed concrete piles are driven by a driving method or an embedding method. After the driving of the pile head, the inside of the pile is cleaned to about twice the diameter of the pile, and the basket is placed there. This is done by arranging rebar and casting concrete to integrate the pile with the foundation. Laitance due to centrifugal molding adheres to the inner surface of the ready-made prestressed concrete pile in a layered form and cannot be easily removed even by cleaning, thus reducing the adhesion performance with the concrete to be poured. In particular, in the embedding method, an overflowing drilling solution (which later becomes a solid) is often put inside the pile, and the solid cannot be completely removed even by cleaning. Due to the overlap of several causes, the adhesion performance of the inner surface of the pile to the concrete is reduced, but the concrete is usually poured as it is.

【0003】[0003]

【発明が解決しようとする課題】従って、本発明は、杭
頭部の内表面とコンクリートとの付着性能を改善しよう
とするものである。
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to improve the adhesion performance between the inner surface of a pile head and concrete.

【0004】[0004]

【課題を解決するための手段】本発明に第1発明は、杭
内面の円周に沿って複数個のコッタープレートが埋設さ
れ、このコッタープレート群が杭軸方向に複数群埋設さ
れ、最下段のコッタープレート群の内の複数個のコッタ
ープレートは中央部に切り込みがあるような既製プレス
トレストコンクリート杭を所定位置に打設した後、杭頭
内側を所定の深さまで清掃し、杭頭内側に底鉄板と一体
となったカゴ鉄筋を挿入し、底鉄板端部をコッタープレ
ート中央部の切り込みに嵌合して固定したあと杭頭部に
コンクリートを打設することを特徴とする既製プレスト
レストコンクリート杭の杭頭処理工法である。
According to a first aspect of the present invention, a plurality of cotter plates are buried along the circumference of the pile inner surface, and a plurality of cotter plate groups are buried in the pile axis direction. A plurality of cotter plates in the group of cotter plates are prepared by placing a pre-stressed concrete pile having a cut in the center at a predetermined position, then cleaning the inside of the pile head to a predetermined depth, and bottling the inside of the pile head. A pre-stressed concrete pile, characterized by inserting a cage rebar integrated with an iron plate, fitting the end of the bottom iron plate into the cut in the center of the cotter plate, fixing it, and then pouring concrete into the pile head. It is a pile head treatment method.

【0005】第1発明は、既製プレストレストコンクリ
ート杭側の改良とカゴ鉄筋側の改良とに分けることがで
きる。まず、既製プレストレストコンクリート杭側の改
良は、杭内面の円周に沿って複数個のコッタープレート
を1群として埋設し、このコッタープレート群を杭軸方
向に複数群設置し、さらに、最下段のコッタープレート
群の内の複数個のコッタープレートには中央部に切り込
みを設けた、点である。そして、カゴ鉄筋側の改良は、
その底に底鉄板を溶接などにより固着し、底鉄板の形状
を杭内側に挿入でき、所定の位置まで挿入して円周方向
に回転させたとき、その端部が最下段のコッタープレー
トの中央部の切り込みに嵌合できる形状とした、点であ
る。この両面の改良が相まって、カゴ鉄筋は杭内側にし
っかりと拘束され、後打ちコンクリートの杭頭部内表面
との付着性能はコッタープレートにより、大幅に改善さ
れる。この結果、カゴ鉄筋の定着長は杭径と同じ程度に
まで短くすることができ、その副次効果として杭頭部内
側の清掃部の体積、面積を少なくすることができる。さ
らに、カゴ鉄筋に底鉄板を一体化させることによりコン
クリート打設時の底型枠は不要になる。
[0005] The first invention can be divided into an improvement on the ready-made prestressed concrete pile side and an improvement on the cage rebar side. First, the improvement of the ready-made prestressed concrete pile side is to bury a plurality of cotter plates as a group along the circumference of the pile inner surface, install a plurality of cotter plate groups in the pile axis direction, and furthermore, The cotter plate group has a plurality of cotter plates in which a notch is provided at the center. And the improvement of the cage rebar side,
The bottom iron plate is fixed to the bottom by welding etc., the shape of the bottom iron plate can be inserted inside the pile, and when inserted to the predetermined position and rotated in the circumferential direction, the end is the center of the lowermost cotter plate This is a point that has a shape that can be fitted into the cut of the portion. Together with the improvement on both sides, the cage rebar is firmly restrained inside the pile, and the adhesion of the post-cast concrete to the inner surface of the pile head is greatly improved by the cotter plate. As a result, the anchoring length of the cage rebar can be reduced to the same extent as the pile diameter, and as a secondary effect, the volume and area of the cleaning section inside the pile head can be reduced. Further, by integrating the bottom iron plate with the cage rebar, a bottom formwork at the time of casting concrete is not required.

【0006】第2発明は、既製プレストレストコンクリ
ート杭側の改良にかかるものでコッタープレートのほか
に、さらに、停止プレートを最下段コッタープレート群
とほぼ同じ高さの箇所に埋設しておくものである。この
停止プレートを設けることにより、底鉄板と一体となっ
たカゴ鉄筋を杭内側に挿入する際、底鉄板の端部がこの
停止プレート上に静置される形となり、カゴ鉄筋はそれ
より下方には挿入されず、カゴ鉄筋の挿入作業が簡略化
される。
A second aspect of the present invention relates to an improvement of a precast prestressed concrete pile, in which, besides the cotter plate, a stop plate is buried at a position substantially at the same height as the lowermost cotter plate group. . By providing this stop plate, when inserting the cage rebar integrated with the bottom iron plate into the inside of the pile, the end of the bottom iron plate is left standing on this stop plate, and the cage rebar is positioned below it Is not inserted, and the work of inserting the cage rebar is simplified.

【0007】第3発明も、既製プレストレストコンクリ
ート杭側の改良にかかるもので、杭頭内面のコッタープ
レート埋設部全面(後打ちコンクリートの打設時に接す
る面)を保護シートで覆った状態で既製プレストレスト
コンクリート杭を打設するものである。前述のように打
設後の杭頭内側には土砂、掘削溶液固化物などが詰まっ
ており、これらを排出し、清掃したのちコンクリートを
打設するのであるが、本発明においては杭頭内面にコッ
タープレートが埋設されていて清掃し難い箇所が多くな
る。このため、杭頭内面の汚染を予防し、清掃作業を簡
略化しようとするものである。
[0007] The third invention also relates to an improvement of the ready-made prestressed concrete pile side, in which the entire surface of the cotter plate buried portion on the inner surface of the pile head (the surface that comes in contact with the post-cast concrete) is covered with a protective sheet. This is where concrete piles are cast. As described above, the inside of the pile head after casting is clogged with earth and sand, solidified drilling solution, etc., and these are discharged and cleaned, and then concrete is poured, but in the present invention, the inside of the pile head is There are many places where the cotter plate is buried and it is difficult to clean. Therefore, contamination of the inner surface of the pile head is prevented, and the cleaning operation is simplified.

【0008】[0008]

【実施例】以下図面を参照しながら本発明を説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.

【0009】図1(a)は本発明で使用する既製プレス
トレストコンクリート杭の杭頭部にカゴ鉄筋を挿入して
静置した状態を示す立断面図であり、図1(b)は既製
プレストレストコンクリート杭の杭頭内面を保護シート
で覆った状態を示す立断面図である。
FIG. 1 (a) is a vertical sectional view showing a state in which a cage rebar is inserted into a pile head of a pre-stressed concrete pile used in the present invention and left standing, and FIG. 1 (b) is a pre-stressed concrete. It is a sectional elevational view showing the state where the pile head inner surface of the pile was covered with the protection sheet.

【0010】図2(a)は図1(a)のA−A矢視図で
あり、図2(b)は図1(a)のB−B矢視図であり、
図2(c)は底鉄板の平面図である。(なお、矢視図で
はカゴ鉄筋は省略してある。)まず、既製プレストレス
トコンクリート杭の杭頭部について説明する。
FIG. 2A is a view taken in the direction of arrows AA in FIG. 1A, FIG. 2B is a view taken in the direction of arrows BB in FIG.
FIG. 2C is a plan view of the bottom iron plate. (In addition, the cage rebar is omitted in the arrow view.) First, the pile head of the ready-made prestressed concrete pile will be described.

【0011】既製プレストレストコンクリート杭1の内
面に8個のコッタープレート2を1群として3群のコッ
タープレート2が上、中、下段に埋設されている。下段
の8個のコッタープレート2のうち4個はコッタープレ
ート兼底鉄板保持プレート5であり、中央部に切り込み
10を有している。1群のコッタープレート2の個数、
群数ならびに最下段のコッタープレート2のうち何個を
コッタープレート兼底鉄板保持プレート5とするかは既
製プレストレストコンクリート杭1の径などに応じて適
宜決定される。カゴ鉄筋の挿入作業を容易にするために
図2(b)に示すように停止プレート6を所定の箇所に
数個埋設するのが好ましく、この停止プレート6はコッ
タープレート2に比較して円周方向の弧長を長くしてお
くのが好ましい。これらの埋設プレートは既製プレスト
レストコンクリート杭1の製造時に既製プレストレスト
コンクリート杭1の補強筋(図示せず)に溶接などによ
り固着されている。図1(b)に既製プレストレストコ
ンクリート杭の杭頭内面を保護シート8で覆った例を示
したが、この保護シート8は筒状の保護シート8を直接
杭頭内面に接着してもよいが、筒状の保護シート8の両
端に予め環状プレート9を取りつけて置き、この環状プ
レート9を杭頭内面に接着など取りつける方が操作が容
易である。
On the inner surface of a pre-stressed concrete pile 1, three groups of cotter plates 2 are buried in the upper, middle and lower tiers with eight cotter plates 2 as one group. Four of the eight lower cotter plates 2 are cotter plate / bottom iron plate holding plates 5 and have a cut 10 at the center. The number of cotter plates 2 in one group,
The number of groups and how many of the lowermost cotter plates 2 are used as the cotter plate / bottom iron plate holding plate 5 are appropriately determined according to the diameter of the pre-stressed concrete pile 1 and the like. In order to facilitate the work of inserting the cage rebar, it is preferable to embed several stop plates 6 at predetermined positions as shown in FIG. It is preferable to increase the arc length in the direction. These buried plates are fixed to reinforcing bars (not shown) of the pre-stressed concrete pile 1 at the time of manufacturing the pre-stressed concrete pile 1 by welding or the like. FIG. 1 (b) shows an example in which the inner surface of the pile head of the ready-made prestressed concrete pile is covered with the protective sheet 8, but this protective sheet 8 may be formed by directly bonding the cylindrical protective sheet 8 to the inner surface of the pile head. It is easier to mount the annular plate 9 on both ends of the cylindrical protective sheet 8 in advance, and to attach the annular plate 9 to the inner surface of the pile head by bonding or the like.

【0012】つぎに、カゴ鉄筋底部についてついて説明
する。
Next, the cage rebar bottom will be described.

【0013】カゴ鉄筋3の底には底鉄板4が溶接されて
いる。図2(c)に示すように、底鉄板4の周端にはコ
ッタープレート2の1群の個数に対応した数の切り込み
7が設けられており、その切り込み7の形状はコッター
プレート2の断面形状と相似しており、底鉄板4と一体
となったカゴ鉄筋がコッタープレート2に邪魔されるこ
となく杭頭内側に挿入できるようになっている。このカ
ゴ鉄筋は杭頭内側の所定の位置まで挿入され、円周方向
に回転してその端部をコッタープレート兼底鉄板保持プ
レート5の切り込み10に嵌合して杭1に固定される。
A bottom iron plate 4 is welded to the bottom of the cage reinforcing bar 3. As shown in FIG. 2C, a number of cuts 7 corresponding to the number of the groups of the cotter plates 2 are provided at the peripheral end of the bottom iron plate 4, and the shape of the cuts 7 is a cross section of the cotter plate 2. The cage rebar is similar to the shape, and can be inserted inside the pile head without disturbing the cotter plate 2 with the cage rebar integrated with the bottom iron plate 4. The cage rebar is inserted to a predetermined position inside the pile head, is rotated in the circumferential direction, and its end is fitted into the notch 10 of the cotter plate / bottom iron plate holding plate 5 to be fixed to the pile 1.

【0014】本発明の施工順序について図3を参照して
説明する。
The construction sequence of the present invention will be described with reference to FIG.

【0015】(1)既製プレストレストコンクリート杭
1の杭頭内側の土砂、固化物などを排出する。保護シー
トを使用した場合は保護シートを撤去する。杭頭内面を
清掃する。(図3(a)) (2)カゴ鉄筋3を吊り下げながら既製プレストレスト
コンクリート杭1の杭頭内側に挿入する。(図3
(b)) (3)カゴ鉄筋3が所定の位置に到達したらカゴ鉄筋3
を円周方向に回転して底鉄板4の端部をコッタープレー
ト兼底鉄板保持プレート5の切り込み10に嵌合する。
(図3(c)) (4)既製プレストレストコンクリート杭1の杭頭部に
コンクリートを打設して作業を完了する。(図3
(d))
(1) Soil, solidified matter and the like inside the pile head of the ready-made prestressed concrete pile 1 are discharged. If a protective sheet is used, remove the protective sheet. Clean the inside of the pile head. (FIG. 3 (a)) (2) The cage reinforcing bar 3 is suspended and inserted into the inside of the head of the pre-stressed concrete pile 1. (FIG. 3
(B)) (3) When the cage rebar 3 reaches a predetermined position, the cage rebar 3
Is rotated in the circumferential direction to fit the end of the bottom iron plate 4 into the notch 10 of the cotter plate / bottom iron plate holding plate 5.
(FIG. 3 (c)) (4) Concrete is poured into the pile head of the ready-made prestressed concrete pile 1 to complete the work. (FIG. 3
(D))

【0016】[0016]

【発明の効果】後打ちコンクリートの杭頭部内表面との
付着性能が向上し、カゴ鉄筋の定着長を杭径と同じ程度
にまで短くすることができ、その副次効果として杭頭部
内側の清掃部の体積、面積を少なくすることができる。
さらに、コンクリート打設時の底型枠を無くすることが
できる。
According to the present invention, the adhesion performance of the post-cast concrete to the inner surface of the pile head is improved, and the anchoring length of the cage rebar can be reduced to about the same as the diameter of the pile. The volume and area of the cleaning unit can be reduced.
Furthermore, the bottom formwork at the time of concrete casting can be eliminated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明で使用する既製プレストレストコンクリ
ート杭の杭頭部ならびにカゴ鉄筋の立断面図であり、
(a)既製プレストレストコンクリート杭の杭頭部にカ
ゴ鉄筋を挿入して静置した状態を示し、(b)は既製プ
レストレストコンクリート杭の杭頭内面を保護シートで
覆った状態を示す。
FIG. 1 is a vertical sectional view of a pile head and a cage rebar of a ready-made prestressed concrete pile used in the present invention,
(A) shows a state in which a cage rebar is inserted into the pile head of the ready-made prestressed concrete pile and allowed to stand, and (b) shows a state in which the inner surface of the pile head of the ready-made prestressed concrete pile is covered with a protective sheet.

【図2】(a)は図1(a)のA−A矢視図であり、
(b)は図1(a)のB−B矢視図であり、(c)は底
鉄板の平面図である。
FIG. 2A is a view taken in the direction of arrows AA in FIG. 1A;
(B) is a BB view of FIG. 1 (a), and (c) is a plan view of the bottom iron plate.

【図3】本発明の施工順序を示す立断面図である。FIG. 3 is an elevational sectional view showing a construction order of the present invention.

【符号の説明】[Explanation of symbols]

1・・既製プレストレストコンクリート杭、2・・コッ
タープレート、3・・カゴ鉄筋、4・・底鉄板、5・・
コッタープレート兼底鉄板保持プレート、6・・停止プ
レート、7・・底鉄板切り込み、8・・保護シート、9
・・環状プレート、10・・コッタープレート兼底鉄板
保持プレートの切り込み
1. Precast prestressed concrete piles, 2. Cotter plates, 3. Basket reinforcement, 4. Bottom iron plate, 5.
Cotter plate and bottom iron plate holding plate, 6 ... stop plate, 7 ... bottom iron plate cut, 8 ... protection sheet, 9
..Circular plate, 10 ... Cotter plate and bottom iron plate holding plate notch

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 杭内面の円周に沿って複数個のコッター
プレートが埋設され、このコッタープレート群が杭軸方
向に複数群埋設され、最下段のコッタープレート群の内
の複数個のコッタープレートは中央部に切り込みがある
ような既製プレストレストコンクリート杭を所定位置に
打設した後、杭頭内側を所定の深さまで清掃し、杭頭内
側に底鉄板と一体となったカゴ鉄筋を挿入し、底鉄板端
面をコッタープレート中央部の切り込みに嵌合して固定
したあと杭頭部にコンクリートを打設することを特徴と
する既製プレストレストコンクリート杭の杭頭処理工法
1. A plurality of cotter plates are buried along a circumference of an inner surface of a pile, a plurality of cotter plates are buried in a pile axis direction, and a plurality of cotter plates in a lowermost cotter plate group are buried. After casting a ready-made prestressed concrete pile with a notch in the center at a predetermined position, clean the inside of the pile head to a predetermined depth, insert a cage steel bar integrated with the bottom iron plate inside the pile head, Pile head treatment method for ready-made prestressed concrete piles, which is characterized in that the end face of the bottom iron plate is fitted and fixed in the notch in the center of the cotter plate and then concrete is poured into the pile head
【請求項2】 最下段のコッタープレート群とほぼ同じ
高さの箇所に底鉄板を停止する停止プレートをコッター
プレートに加えて埋設した既製プレストレストコンクリ
ート杭を使用することを特徴とする請求項1記載の既製
プレストレストコンクリート杭の杭頭処理工法
2. A pre-stressed concrete pile in which a stop plate for stopping a bottom iron plate is added to a cotter plate at a position substantially at the same height as the lowermost cotter plate group to bury the cotter plate. Head treatment method for ready-made prestressed concrete piles
【請求項3】 杭頭内面のコッタープレート埋設部全面
を保護シートで覆った状態の既製プレストレストコンク
リート杭を所定位置に打設し、カゴ鉄筋の挿入前に保護
シートを撤去することを特徴とする請求項1または請求
項2記載の既製プレストレストコンクリート杭の杭頭処
理工法
3. A pre-stressed concrete pile in which a cotter plate buried portion on the inner surface of a pile head is entirely covered with a protective sheet is cast into a predetermined position, and the protective sheet is removed before inserting a cage rebar. Pile head treatment method for the ready-made prestressed concrete pile according to claim 1 or 2.
JP6526693A 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile Expired - Lifetime JP2576755B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6526693A JP2576755B2 (en) 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6526693A JP2576755B2 (en) 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile

Publications (2)

Publication Number Publication Date
JPH06272245A JPH06272245A (en) 1994-09-27
JP2576755B2 true JP2576755B2 (en) 1997-01-29

Family

ID=13281952

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6526693A Expired - Lifetime JP2576755B2 (en) 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile

Country Status (1)

Country Link
JP (1) JP2576755B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966101A (en) * 2012-11-29 2013-03-13 青岛昊河水泥制品有限责任公司 Prestressed concrete solid square pile and making method thereof

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7697027B2 (en) 2001-07-31 2010-04-13 Donnelly Corporation Vehicular video system
EP1504276B1 (en) 2002-05-03 2012-08-08 Donnelly Corporation Object detection system for vehicle
US7526103B2 (en) 2004-04-15 2009-04-28 Donnelly Corporation Imaging system for vehicle
US7881496B2 (en) 2004-09-30 2011-02-01 Donnelly Corporation Vision system for vehicle
US7720580B2 (en) 2004-12-23 2010-05-18 Donnelly Corporation Object detection system for vehicle
JP2006336217A (en) * 2005-05-31 2006-12-14 Shimizu Corp Existing concrete pile and axial shear reinforcing structure inside pile head
WO2008024639A2 (en) 2006-08-11 2008-02-28 Donnelly Corporation Automatic headlamp control system
US8446470B2 (en) 2007-10-04 2013-05-21 Magna Electronics, Inc. Combined RGB and IR imaging sensor
WO2010099416A1 (en) 2009-02-27 2010-09-02 Magna Electronics Alert system for vehicle
JP5226611B2 (en) * 2009-06-10 2013-07-03 鹿島建設株式会社 Pile head inner surface treatment method for ready-made piles
US8874317B2 (en) 2009-07-27 2014-10-28 Magna Electronics Inc. Parking assist system
WO2011028686A1 (en) 2009-09-01 2011-03-10 Magna Mirrors Of America, Inc. Imaging and display system for vehicle
WO2012075250A1 (en) 2010-12-01 2012-06-07 Magna Electronics Inc. System and method of establishing a multi-camera image using pixel remapping
US9264672B2 (en) 2010-12-22 2016-02-16 Magna Mirrors Of America, Inc. Vision display system for vehicle
CN102808409B (en) * 2011-05-30 2015-04-22 宝山钢铁股份有限公司 Coaxially-nested multi-section prefabricated tube pile and construction method thereof
US10457209B2 (en) 2012-02-22 2019-10-29 Magna Electronics Inc. Vehicle vision system with multi-paned view
US9723272B2 (en) 2012-10-05 2017-08-01 Magna Electronics Inc. Multi-camera image stitching calibration system
US9743002B2 (en) 2012-11-19 2017-08-22 Magna Electronics Inc. Vehicle vision system with enhanced display functions
US10179543B2 (en) 2013-02-27 2019-01-15 Magna Electronics Inc. Multi-camera dynamic top view vision system
US9205776B2 (en) 2013-05-21 2015-12-08 Magna Electronics Inc. Vehicle vision system using kinematic model of vehicle motion
US9916660B2 (en) 2015-01-16 2018-03-13 Magna Electronics Inc. Vehicle vision system with calibration algorithm
US10946799B2 (en) 2015-04-21 2021-03-16 Magna Electronics Inc. Vehicle vision system with overlay calibration
CN116791598A (en) * 2023-05-18 2023-09-22 中国建筑第四工程局有限公司 Method for treating seepage of open-type prestressed pipe pile head under silt geology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966101A (en) * 2012-11-29 2013-03-13 青岛昊河水泥制品有限责任公司 Prestressed concrete solid square pile and making method thereof
CN102966101B (en) * 2012-11-29 2013-09-18 青岛昊河水泥制品有限责任公司 Prestressed concrete solid square pile and making method thereof

Also Published As

Publication number Publication date
JPH06272245A (en) 1994-09-27

Similar Documents

Publication Publication Date Title
JP2576755B2 (en) Pile head treatment method for ready-made prestressed concrete pile
US5456051A (en) Compression spacer for bar reinforcement
JP2576756B2 (en) Pile head treatment method for ready-made prestressed concrete pile
JPS6156393B2 (en)
JP3728653B2 (en) Bonding structure between flat slab and concrete-filled steel pipe column and flat slab construction method
US4797037A (en) Piling
KR100661301B1 (en) Support structure for concreting in a head of steel pile and construction method using it
JP2576757B2 (en) Pile head treatment method for ready-made prestressed concrete pile
JPH09328748A (en) Pile cap of reinforced concrete pile, base plate of pile cap, and construction method for reinforced concrete pile
JPH0315605Y2 (en)
JPS5965122A (en) Construction of on-site reinforced concrete pile
JPS63300120A (en) Joint structure of pile head and base concrete
JP2649205B2 (en) Anchor bolt burying method
JPH0643219Y2 (en) Core body attached to the inner circumference of the head of a concrete pile
JP3752654B2 (en) Construction method of cast-in-place reinforced concrete piles
JPS5927026A (en) On-site pile head treatment work
JPS6290445A (en) Block for foundation and its manufacture
JPH01219214A (en) Pile head processing method for cast-in-place concrete pile
JPS6011972Y2 (en) Brake cast concrete pile cap for steel pipe piles
JPH0449249Y2 (en)
JPS585329B2 (en) Processing method for excess concrete in cast-in-place concrete piles
JPH06330522A (en) Pile head joint construction
JPH0718675A (en) Sc pile and executing method thereof
JP3772978B2 (en) Improvement method of soft ground and basic structure of building on soft ground
JP3022082U (en) Concrete pile pile head cement removal device

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960917