JP2005120622A - Construction method of underground structure - Google Patents

Construction method of underground structure Download PDF

Info

Publication number
JP2005120622A
JP2005120622A JP2003354766A JP2003354766A JP2005120622A JP 2005120622 A JP2005120622 A JP 2005120622A JP 2003354766 A JP2003354766 A JP 2003354766A JP 2003354766 A JP2003354766 A JP 2003354766A JP 2005120622 A JP2005120622 A JP 2005120622A
Authority
JP
Japan
Prior art keywords
guide
construction method
underground structure
concrete box
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003354766A
Other languages
Japanese (ja)
Other versions
JP3834571B2 (en
Inventor
Makoto Uemura
誠 植村
Shinichi Maruta
新市 丸田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2003354766A priority Critical patent/JP3834571B2/en
Publication of JP2005120622A publication Critical patent/JP2005120622A/en
Application granted granted Critical
Publication of JP3834571B2 publication Critical patent/JP3834571B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a construction method of an underground structure capable of positively preventing the collapse of a working face by easily improving soil with the injection of a chemical solution without constructing a special heading for the injection of the chemical solution in the construction method of the underground structure by towing concrete box bodies. <P>SOLUTION: In this construction method of the underground structure by towing the concrete box bodies, a guide heading 13 into which a traction member is inserted is constructed in the advance direction of the concrete box bodies 1, and a pipe roof 12 is constructed to improve soil by injecting the chemical solution inside the pipe roof 12 from the guide heading 13. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

この発明は、フロンテジャッキング工法などのコンクリート函体を牽引により地中に前進させて所定位置に埋設する地下構造物の施工法に関するものである。   The present invention relates to a construction method for an underground structure in which a concrete box such as a fronte jacking method is advanced by being pulled into the ground and buried in a predetermined position.

例えば、営業中の線路下、生活・産業の連絡網となる道路下、また、河川・移設不可能な構築物等の下に、地下道や共同溝、水路等を構築する場合、上面の鉄道や道路交通、河川に影響を与えることはできない。このため、かかる場所に地下構造物を構築するには、通常の運行を確保しながら立体交差工事を施工する工法として、シールド工法が採用される。   For example, when constructing an underground passage, a common ditch, a waterway, etc. under a railway line that is in operation, under a road that serves as a connection network for life and industry, or under a structure that cannot be relocated, such as a river, a railway or road on the top surface It cannot affect traffic and rivers. For this reason, in order to construct an underground structure in such a place, a shield method is employed as a method for constructing a solid intersection while ensuring normal operation.

フロンテジャッキング工法は、その一例で、例えば地下道となる地下構造物を構築する場合、地中に埋設しようとする図6に示すようなプレキャストされたコンクリート函体1を前方より引っ張って直接挿入し所定の位置に引き込み埋設する工法で、前方に反力壁(アンカー)を設置し、PC鋼線によりフロンテジャッキを使用しコンクリート函体1を牽引挿入するもので、図5について基本的な行程を説明する。   The fronte jacking method is an example. For example, when constructing an underground structure as an underpass, a precast concrete box 1 as shown in FIG. 6 to be buried in the ground is directly pulled and inserted. This is a construction method in which a reaction wall (anchor) is installed in the front by pulling it in place, and the concrete box 1 is pulled and inserted using a front jack with PC steel wire. explain.

まず、第1行程は水平ボーリング工であり、図5(a)に示すように、水平ボーリング専用機2を使用し、発進立坑3より到達立坑4に向かい、ケーシング5で削孔を行う。   First, the first stroke is a horizontal boring work. As shown in FIG. 5A, the horizontal boring machine 2 is used, and the casing 5 drills holes from the starting shaft 3 toward the reaching shaft 4.

第2行程として図5(b)に示すように、貫通されたボーリング孔内にPC鋼線6を挿入し、ケーシング5を抜き取る。また、刃口7の定着を行う。   As shown in FIG. 5 (b) as the second stroke, the PC steel wire 6 is inserted into the bored borehole and the casing 5 is pulled out. Further, the blade edge 7 is fixed.

第3行程は、図5(c)に示すように、まず、牽引準備工として発進立坑3内にシールド発進台を、到達立坑4内には牽引ジャッキ架台および反力設備(反力壁8)を各々築造し、ジャッキ架台上にはフロンテジャッキ9を所定の位置にセットする。PC鋼線6とフロンテジャッキ9およびシールド機の定着を行う。そして、牽引工として、PC鋼線6にコンクリート函体1を緊結し、到達立坑4に設置したフロンテジャッキ9によりPC鋼線6を介して地中に引き込み貫通させる。図中10は止水ボックスを示す。   In the third stroke, as shown in FIG. 5 (c), first, as a traction preparation work, a shield starter is installed in the start shaft 3, and a tow jack stand and reaction force equipment (reaction wall 8) are provided in the reach shaft 4. The front jack 9 is set at a predetermined position on the jack stand. Fix PC steel wire 6, front jack 9 and shield machine. Then, as a traction work, the concrete box 1 is tightly connected to the PC steel wire 6, and it is drawn and penetrated into the ground through the PC steel wire 6 by the front jack 9 installed in the reach shaft 4. In the figure, 10 indicates a water stop box.

図5(d)は牽引工完成状態を示し、フロンテジャッキ9などの牽引設備を撤去し、刃口内処理工を施工した。   FIG. 5 (d) shows the state of completion of the traction work, the traction equipment such as the front jack 9 was removed, and the in-blade treatment was applied.

このようなフロンテジャッキング工法などのシールド工法では、自立性の低い、例えば未固結の軟弱地盤においてトンネルを構築する場合は、トンネル掘削に先行してトンネル断面ならびにその周辺部の地盤を薬液注入により固結し、トンネル掘削時に本坑や切羽が崩壊しないようにすることがある。   In the shield method such as the fronte jacking method, when a tunnel is constructed on a soft ground with low independence, for example, unconsolidated soft ground, a chemical solution is injected into the tunnel cross section and the surrounding ground prior to tunnel excavation. May cause the main shaft and face to not collapse during tunnel excavation.

この薬液注入の方法として、例えば、構築しようとするトンネルの下方近傍に、トンネルと平行に長さ方向に導坑を掘削形成し、この導坑をトンネル掘削時の地盤改良を行うに際しての作業坑として利用し、この導坑内からトンネル掘削部およびその周辺の地盤改良を行うものがある(例えば特許文献1参照)。
特開平07−082735号公報
As a method of injecting this chemical solution, for example, a shaft is formed in the vicinity of the lower part of the tunnel to be constructed in parallel with the tunnel in the length direction, and this shaft is improved when the ground is improved during tunnel excavation. The tunnel excavation part and its surrounding ground are improved from within this guide shaft (see, for example, Patent Document 1).
Japanese Patent Application Laid-Open No. 07-082735

前記特開平07−082735号公報に記載の地盤改良方法は、薬液注入のための作業坑として導坑を別途構築するものであり、施工性がよくない。   The ground improvement method described in Japanese Patent Application Laid-Open No. 07-082735 separately constructs a guide pit as a work mine for injecting a chemical solution, and has poor workability.

この発明の目的は前記従来例の不都合を解消し、コンクリート函体の牽引による地下構造物の施工法におけるものとして、薬液注入のための導坑を別途格別に構築せずに簡単に薬液注入による地盤改良が行え、切羽の崩壊を確実に防止できる地下構造物の施工法を提供することにある。   The object of the present invention is to eliminate the inconvenience of the conventional example, and as a construction method of an underground structure by towing a concrete box, by simply injecting the chemical solution without separately constructing a guide pit for injecting the chemical solution The purpose is to provide a construction method for an underground structure that can improve the ground and reliably prevent the face from collapsing.

請求項1記載の発明は、コンクリート函体の牽引による地下構造物の施工法において、コンクリート函体の前進方向に牽引部材が挿入されるガイド導坑を築造するとともに、パイプルーフを施行し、前記ガイド導坑からパイプルーフの内側に薬液を注入して地盤改良することを要旨とするものである。   The invention according to claim 1 is a construction method of an underground structure by towing a concrete box, and constructs a guide guide shaft into which a towing member is inserted in a forward direction of the concrete box, and enforces a pipe roof, The gist is to improve the ground by injecting a chemical solution from the guide shaft into the pipe roof.

請求項1記載の本発明によれば、ガイド導坑を利用して薬液注入が行えるから、薬液注入のための導坑を別途格別に埋設する必要がなく、施工性がよい。また、パイプルーフの内側の部分を地盤改良することで、パイプルーフとの相乗効果でより確実に切羽の崩壊を防ぐことができる。   According to the first aspect of the present invention, since the chemical solution can be injected using the guide guide shaft, it is not necessary to separately bury a guide shaft for injecting the chemical solution, and the workability is good. In addition, by improving the ground inside the pipe roof, it is possible to more reliably prevent the face from collapsing due to a synergistic effect with the pipe roof.

請求項2記載の発明は、前記ガイド導坑を鋼管で構成することを要旨とするものである。   The gist of the invention described in claim 2 is that the guide guide mine is formed of a steel pipe.

請求項2記載の本発明によれば、鋼管を埋設するだけの作業でガイド導坑を築造できるから施工性がよい。   According to the second aspect of the present invention, since the guide guide pit can be built only by embedding the steel pipe, the workability is good.

以上述べたようにこの発明の地下構造物の施工法は、コンクリート函体の牽引によるトンネルなどの地下構造物の施工法におけるものとして、牽引部材が挿入されるガイド導坑を利用してここから薬物注入を行うようにしたから、薬物注入のための導坑を別途格別に構築せずに簡単に地盤改良が行え、さらに、パイプルーフとの相乗効果で切羽の崩壊を確実に防止できる。   As described above, the construction method of the underground structure according to the present invention is as follows in the construction method of the underground structure such as a tunnel by towing the concrete box, using the guide guide shaft into which the towing member is inserted. Since the drug injection is performed, ground improvement can be easily performed without separately constructing a guide shaft for drug injection, and the collapsing effect with the pipe roof can surely prevent the face from collapsing.

以下、図面についてこの発明の実施の形態を詳細に説明する。図1はこの発明の地下構造物の施工法の実施の形態を示す縦断側面図で、フロンテジャッキング工法に実施する場合で、図5に示したフロンテジャッキング工法の行程図と同一の構成要素には同一の参照符号を付してある。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a longitudinal side view showing an embodiment of the construction method of an underground structure according to the present invention, which is the same component as the process diagram of the fronte jacking method shown in FIG. Are denoted by the same reference symbols.

図示の例は発進立坑3と到達立坑4の両方からコンクリート函体1を前進させる相互牽引工法であり、上部の鉄道11の下方に防護工としてパイプルーフ12を施工し、発進立坑3と到達立坑4の両方にコンクリート函体1をセットし、発進立坑3の側のコンクリート函体1にフロンテジャッキ9を取り付け、到達立坑4側に設置したコンクリート函体1を反力体として発進立坑3の側のコンクリート函体1をフロンテジャッキ9で牽引し前進させる。   The illustrated example is a mutual traction method in which the concrete box 1 is advanced from both the starting shaft 3 and the reaching shaft 4, and a pipe roof 12 is constructed as a protective work under the upper railway 11, and the starting shaft 3 and the reaching shaft are constructed. 4, set the concrete box 1 on both sides, attach the front jack 9 to the concrete box 1 on the start shaft 3 side, and use the concrete box 1 installed on the end shaft 4 side as the reaction force side of the start shaft 3 The concrete box 1 is moved forward by a front jack 9.

この発明では、かかる相互牽引方式のフロンテジャッキング工法において、上部の水平ボーリング孔の穿孔とともに、ガイド導坑13を下部に築造し、このガイド導坑13の内部にPC鋼線6を集中挿入する。これにより、水平ボーリング孔の穿孔数を減らすことができる。   According to the present invention, in such a mutual pulling type fronte jacking method, the guide shaft 13 is built at the lower portion together with the drilling of the upper horizontal boring hole, and the PC steel wire 6 is centrally inserted into the guide shaft 13. . Thereby, the number of perforations in the horizontal boring hole can be reduced.

このガイド導坑13の形状は、種々のタイプがあるが、この発明では図2、図3に示すように、鋼管19またはヒューム管を使用する。この鋼管19の埋設方法は、例えば、推進シリンダを有する推進装置と先端にカッターヘッドを有する先導管を使用し、発進立坑3の側にこの推進装置と先導管をセットし、先導管内に配設した油圧駆動モータで先端のカッタを回転させて切羽前面を掘削して推進を開始し、次いで、推進装置の推進ジャッキを後退させてスクリューを内蔵させた埋設管である鋼管19を先導管に接続する。掘削排土はカッタを回転させるモータとは別の専用のモータで掘削量に応じて排土量を制御する。   Although there are various types of shapes of the guide guide shaft 13, as shown in FIGS. 2 and 3, a steel pipe 19 or a fume pipe is used in the present invention. The steel pipe 19 is embedded using, for example, a propulsion device having a propulsion cylinder and a leading conduit having a cutter head at the tip, and the propulsion device and the leading conduit are set on the start shaft 3 side, and disposed in the leading conduit. Rotate the cutter at the tip with the hydraulic drive motor and start excavating the front face of the face to start propulsion, then retreat the propulsion jack of the propulsion device and connect the steel pipe 19 which is a buried pipe with a built-in screw to the leading conduit To do. The excavation earthing is controlled by a dedicated motor different from the motor for rotating the cutter according to the excavation quantity.

かかる動作を繰り返して鋼管19を順次接続し推進させて埋設し、先導管を到達立坑4に到達させ、先導管のみを到達立坑4から回収する。このようにして、鋼管19を発進立坑3と到達立坑4との間に埋設する。   By repeating this operation, the steel pipes 19 are sequentially connected and propelled to be buried, the leading conduit reaches the reaching shaft 4, and only the leading conduit is recovered from the reaching shaft 4. In this way, the steel pipe 19 is buried between the starting shaft 3 and the reaching shaft 4.

かかるガイド導坑13は、図2に示すように例えば、コンクリート函体1の底部支持箇所に対応する箇所で左右2箇所に設けた。   As shown in FIG. 2, the guide guide shafts 13 are provided at two locations on the left and right sides, for example, at locations corresponding to the bottom support locations of the concrete box 1.

鋼管19によるガイド導坑13の構築時に、このガイド導坑13を作業坑として、ここからパイプルーフ12の内側に薬液を注入して地盤改良する。図4は、斜め上方への薬液注入の行程図で、第1行程として図4(a)に示すように注入設備14を鋼管19内に設置し、薬液注入部分を削孔して注入管15を斜め上方に配設されているパイプルーフ12の方向に向けて設置する。   At the time of constructing the guide guide 13 by the steel pipe 19, the guide guide 13 is used as a working shaft, and the ground is improved by injecting a chemical solution into the pipe roof 12 from here. FIG. 4 is a process chart for injecting the chemical solution obliquely upward. As shown in FIG. 4A, the injection facility 14 is installed in the steel pipe 19 as a first process, and the injection part 15 is formed by drilling the chemical injection part. Is installed in the direction of the pipe roof 12 disposed obliquely upward.

次いで、図4(b)のように瞬結性グラウト剤16を注入して注入管15の周囲をシールしてから、図4(c)に示すように瞬結性グラウト剤16を注入管15の先端から吐出して荒詰め注入する。   Next, after the instantaneous grouting agent 16 is injected as shown in FIG. 4B and the periphery of the injection tube 15 is sealed, the instantaneous grouting agent 16 is injected into the injection tube 15 as shown in FIG. Discharge from the tip of the tube and inject roughly.

その後、瞬結性グラウト剤16を注入した部分に、図4(d)に示すように浸透性グラウト剤17を注入して浸透させ、これにより図4(e)の注入作業終了となる。以上のようにして、ガイド導坑13の箇所から図3に示すようにパイプルーフ12の内側の各部に薬液を注入して地盤改良する。   Thereafter, as shown in FIG. 4 (d), the permeable grout agent 17 is injected and penetrated into the portion where the instantaneous setting grout agent 16 is injected, thereby completing the injection operation of FIG. 4 (e). As described above, the ground is improved by injecting the chemical solution from the location of the guide guide 13 into each part inside the pipe roof 12 as shown in FIG.

このようにして地盤改良されたならば、例えばフロンテジャッキング工法によってコンクリート函体1を牽引する。この場合、基本行程は前記従来例と同様であるが、コンクリート函体1をフロンテジャッキ9で牽引する行程において、鋼管19によるガイド導坑13内に挿入してあるPC鋼線6で発進立坑3側のコンクリート函体1を牽引する。これにより、コンクリート函体1はガイド導坑13をガイドとして前進するから、前進時の方向性がよく施工精度が向上する。   If the ground is improved in this way, the concrete box 1 is pulled by the fronte jacking method, for example. In this case, the basic stroke is the same as that of the conventional example, but in the stroke where the concrete box 1 is pulled by the front jack 9, the start shaft 3 is made of the PC steel wire 6 inserted into the guide shaft 13 by the steel pipe 19. Pull the concrete box 1 on the side. Thereby, since the concrete box 1 moves forward using the guide guide 13 as a guide, the directionality at the time of advancement is good and the construction accuracy is improved.

なお、導坑形式はアーチ型トンネルとすることも可能であり、これは掘削しながら支保工であるH形鋼またはライナープレートの建て込みによって土留めを行う方式である。   The guide shaft type can also be an arch type tunnel, which is a system in which earth retaining is performed by digging a H-shaped steel or liner plate as a supporting work while excavating.

本発明の地下構造物の施工法の実施形態を示す縦断側面図である。It is a vertical side view which shows embodiment of the construction method of the underground structure of this invention. 本発明の地下構造物の施工法の実施形態を示す側面図である。It is a side view which shows embodiment of the construction method of the underground structure of this invention. 本発明の地下構造物の施工法の実施形態を示す正面図である。It is a front view which shows embodiment of the construction method of the underground structure of this invention. 本発明の地下構造物の施工法の実施形態を示す薬液注入行程の説明図である。It is explanatory drawing of the chemical | medical solution injection | pouring process which shows embodiment of the construction method of the underground structure of this invention. フロンテジャッキング工法の説明図である。It is explanatory drawing of a fronte jacking construction method. コンクリート函体の正面図である。It is a front view of a concrete box.

符号の説明Explanation of symbols

1…コンクリート函体 2…水平ボーリング専用機
3…発進立坑 4…到達立坑
5…ケーシング 6…PC鋼線
7…刃口 8…反力壁
9…フロンテジャッキ 10…止水ボックス
11…鉄道 12…パイプルーフ
13…ガイド導坑 14…注入設備
15…注入管 16…瞬結性グラウト剤
17…浸透性グラウト剤 19…鋼管
DESCRIPTION OF SYMBOLS 1 ... Concrete box 2 ... Machine for exclusive use of horizontal boring 3 ... Starting shaft 4 ... Reaching shaft 5 ... Casing 6 ... PC steel wire 7 ... Cutting edge 8 ... Reaction force wall 9 ... Front jack 10 ... Water stop box 11 ... Railway 12 ... Pipe roof 13 ... Guide shaft 14 ... Injection equipment 15 ... Injection pipe 16 ... Instantaneous grout agent 17 ... Penetration grout agent 19 ... Steel pipe

Claims (2)

コンクリート函体の牽引による地下構造物の施工法において、コンクリート函体の前進方向に牽引部材が挿入されるガイド導坑を築造するとともに、パイプルーフを施行し、前記ガイド導坑からパイプルーフの内側に薬液を注入して地盤改良することを特徴とした地下構造物の施工法。   In the construction method of the underground structure by towing the concrete box, a guide shaft where a pulling member is inserted in the advancing direction of the concrete box is constructed, and a pipe roof is enforced. A construction method for underground structures characterized by injecting chemicals into the ground to improve the ground. 前記ガイド導坑は鋼管で構成することを特徴とする地下構造物の施工法。   The construction method of an underground structure characterized in that the guide guide mine is composed of a steel pipe.
JP2003354766A 2003-10-15 2003-10-15 Construction method for underground structures Expired - Lifetime JP3834571B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003354766A JP3834571B2 (en) 2003-10-15 2003-10-15 Construction method for underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003354766A JP3834571B2 (en) 2003-10-15 2003-10-15 Construction method for underground structures

Publications (2)

Publication Number Publication Date
JP2005120622A true JP2005120622A (en) 2005-05-12
JP3834571B2 JP3834571B2 (en) 2006-10-18

Family

ID=34612580

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003354766A Expired - Lifetime JP3834571B2 (en) 2003-10-15 2003-10-15 Construction method for underground structures

Country Status (1)

Country Link
JP (1) JP3834571B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007191972A (en) * 2006-01-20 2007-08-02 Ps Mitsubishi Construction Co Ltd Underpass construction method
CN100464055C (en) * 2007-10-17 2009-02-25 中铁十八局集团有限公司 Construction method of shallow buried underground excavating tunnel super large section using PBA method
JP2013241756A (en) * 2012-05-18 2013-12-05 Kajima Corp Construction method of underground structure
CN107059812A (en) * 2017-06-03 2017-08-18 中水东北勘测设计研究有限责任公司 The intake tunnel layout pattern of non-coplanar upper and lower flat section is connected by vertical shaft

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5175559B2 (en) * 2008-01-10 2013-04-03 鹿島建設株式会社 Box propulsion method with roof protection
CN101701646B (en) * 2009-10-29 2011-07-27 上海广联建设发展有限公司 Method for slurry-water balance type pipe-pulling construction of underground pipeline
CN102182464A (en) * 2011-03-31 2011-09-14 上海建工集团股份有限公司 Construction structure and construction method of channel structure
CN102359659B (en) * 2011-08-09 2013-11-13 上海交通大学 Method for optimizing pipeline design in construction of reinforced concrete jacking pipe
CN104265305B (en) * 2014-08-05 2016-06-01 中铁二十一局集团有限公司 What be merged into room, a big cross section hole from room, two light section holes digs method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007191972A (en) * 2006-01-20 2007-08-02 Ps Mitsubishi Construction Co Ltd Underpass construction method
JP4599303B2 (en) * 2006-01-20 2010-12-15 株式会社ピーエス三菱 Underpass construction method
CN100464055C (en) * 2007-10-17 2009-02-25 中铁十八局集团有限公司 Construction method of shallow buried underground excavating tunnel super large section using PBA method
JP2013241756A (en) * 2012-05-18 2013-12-05 Kajima Corp Construction method of underground structure
CN107059812A (en) * 2017-06-03 2017-08-18 中水东北勘测设计研究有限责任公司 The intake tunnel layout pattern of non-coplanar upper and lower flat section is connected by vertical shaft

Also Published As

Publication number Publication date
JP3834571B2 (en) 2006-10-18

Similar Documents

Publication Publication Date Title
JP2010126996A (en) Method for preventing lining body from floating up
JP3834571B2 (en) Construction method for underground structures
JP4296549B2 (en) Underground support structure, its construction method and tunnel construction method
JP3889750B2 (en) Face stabilization method in underground structure construction method
CN109505633B (en) Lining back guide pipe grouting water plugging device for muddy stratum and construction method
JP3363099B2 (en) Supporting ground improvement method for existing structures
JP5284168B2 (en) Excavation member for earth retaining member construction and earth retaining member construction method
JP4669538B2 (en) Obstacle removal method and equipment
JP2005180112A (en) Ground improvement structure and ground improvement method
JP4322796B2 (en) Reinforcement method of natural ground
JP2001182496A (en) Water leakage measure of tunnel
JP2001193383A (en) Tunnel construction method and tunnel
JP5282542B2 (en) Ground deformation prevention method and ground deformation prevention structure
JP2011252319A (en) Reinforcement material for natural ground reinforcement earth method and natural ground reinforcement earth method
JP2955120B2 (en) Drainage pipe laying method
CN111396073A (en) Over-fault advance support method
JP3616898B2 (en) Method for joining underground structures using propulsion device
KR102191503B1 (en) The Tunnel construction method to use retangular pipe
JP2004162256A (en) Removable buried pipe
KR20230047673A (en) the improvement structure and this formation method of the oscillation work outlet facilitating the input of the propulsion pipe
JP3598293B2 (en) Face protection method for construction of underground structures
JP2001026929A (en) Method for removing underground obstacle
JP2006176988A (en) Long-sized forepoling construction method
JP2003261934A (en) Soil improvement method
KR20240135925A (en) the connecting apparatus for pipe and the connecting structure for pipe

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060303

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060404

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060601

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060718

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060724

R150 Certificate of patent or registration of utility model

Ref document number: 3834571

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100728

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100728

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110728

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130728

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130728

Year of fee payment: 7

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130728

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130728

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140728

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term