JP2003090303A - Hydraulic circuit of working machine - Google Patents
Hydraulic circuit of working machineInfo
- Publication number
- JP2003090303A JP2003090303A JP2001283707A JP2001283707A JP2003090303A JP 2003090303 A JP2003090303 A JP 2003090303A JP 2001283707 A JP2001283707 A JP 2001283707A JP 2001283707 A JP2001283707 A JP 2001283707A JP 2003090303 A JP2003090303 A JP 2003090303A
- Authority
- JP
- Japan
- Prior art keywords
- oil passage
- valve
- pilot
- hydraulic
- oil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Fluid-Pressure Circuits (AREA)
- Control Of Positive-Displacement Pumps (AREA)
- Operation Control Of Excavators (AREA)
- Component Parts Of Construction Machinery (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、掘削旋回作業車等
の油圧式作業機械の油圧回路の技術に関する。より詳し
くは、パイロットバルブやパイロット油路の油圧配管構
成を簡単する技術に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique of a hydraulic circuit of a hydraulic work machine such as an excavation and turning work vehicle. More specifically, the present invention relates to a technique for simplifying a hydraulic piping configuration of a pilot valve and a pilot oil passage.
【0002】[0002]
【従来の技術】掘削旋回作業車の作業機となるブーム、
アームおよびバケット等を回動操作を行ったり、旋回や
走行するために、運転席に操作レバーを設けて各油圧ア
クチュエータを作動できるようにしている。該操作レバ
ーは、切換バルブのスプールを直接操作できるように
し、または、パイロットバルブを操作して切換バルブを
切り換える構成としている。従来、前記パイロットバル
ブにパイロット圧油を供給する回路において、図7に示
すように、ポンプ101に開閉バルブ油路102の一端
を接続し、他端をセーフティバルブ103のポンプポー
トに接続する。セーフティバルブ103のタンクポート
は、油タンクに接続されており、セーフティバルブ10
3がオフ操作時に、ポンプからの圧油を油タンクに流し
ている。そして、セーフティバルブ103の出力ポート
に、パイロット油路104の一端が接続されている。該
パイロット油路104の他端は、分岐点が設けられ、パ
イロット油路105と分岐パイロット油路106の一端
が接続されている。また、該パイロット油路105の他
端にも、分岐点が設けられ、第一パイロット油路107
および第二パイロット油路108が接続され、該第一パ
イロット油路107および第二パイロット油路108
は、それぞれパイロットバルブ109・109に接続さ
れている。このような回路で、ポンプ101からの圧油
をパイロットバルブ109・109に供給する技術が、
特許第3153118号により公知となっている。2. Description of the Related Art A boom, which is a working machine for excavation and turning work vehicles,
An operating lever is provided in the driver's seat so that each hydraulic actuator can be operated in order to rotate, rotate, or travel the arm and bucket. The operation lever is configured to directly operate the spool of the switching valve or operate the pilot valve to switch the switching valve. Conventionally, in a circuit for supplying pilot pressure oil to the pilot valve, as shown in FIG. 7, one end of an on-off valve oil passage 102 is connected to a pump 101 and the other end is connected to a pump port of a safety valve 103. The tank port of the safety valve 103 is connected to the oil tank, and the safety valve 10
When 3 is turned off, pressure oil from the pump is flowing into the oil tank. Then, one end of the pilot oil passage 104 is connected to the output port of the safety valve 103. A branch point is provided at the other end of the pilot oil passage 104, and one ends of the pilot oil passage 105 and the branched pilot oil passage 106 are connected to each other. A branch point is also provided at the other end of the pilot oil passage 105, and the first pilot oil passage 107 is provided.
And the second pilot oil passage 108 are connected, and the first pilot oil passage 107 and the second pilot oil passage 108 are connected.
Are connected to the pilot valves 109, 109, respectively. With such a circuit, the technique of supplying pressure oil from the pump 101 to the pilot valves 109, 109 is
It is known from Japanese Patent No. 3153118.
【0003】[0003]
【発明が解決しようとする課題】しかし、従来の油圧回
路では、油圧ポンプ101からセーフティバルブ103
への配管102、セーフティバルブ103から分岐部ま
での配管104、分岐部から二つの配管105・10
6、さらに一方の油路から分岐してパイロットバルブ1
09・109までの配管107・108と配管されてお
り、配管数が多く煩雑でコスト高、組立工数が増加して
しまうという不具合があった。However, in the conventional hydraulic circuit, from the hydraulic pump 101 to the safety valve 103.
Pipe 102 to the safety valve 103, pipe 104 from the safety valve 103 to the branch, and two pipes 105 and 10 from the branch
6 、 Pilot valve 1 branched from one oil passage
Since it is connected to the pipes 107 and 108 up to 09.109, there are problems that the number of pipes is large and complicated, the cost is high, and the number of assembling steps is increased.
【0004】[0004]
【課題を解決するための手段】本発明の解決しようとす
る課題は以上の如くであり、次にこの課題を解決するた
めの手段を説明する。The problem to be solved by the present invention is as described above, and the means for solving this problem will be described below.
【0005】即ち、請求項1においては、複数の油圧ア
クチュエータの油圧供給制御を、対応する各制御バルブ
でそれぞれ行うよう構成し、各制御バルブの切換操作
を、パイロット操作手段と手動操作手段または電気的操
作手段等の他の操作手段との両操作手段が用いられてい
る作業機械において、油タンクに至るアンロード油路
と、前記各油圧アクチュエータの制御バルブへ供給する
油路と、油圧供給源との間にアンロード油路切換バルブ
を設けるととにも、油圧ポンプの吐出油路に2系統の出
力ポートを同時に、オンまたはオフの切換を行う開閉バ
ルブを設け、一方の系統の出力ポートを前記制御バルブ
へのパイロット圧油の供給切換を行うバルブに接続し、
他方の系統を前記アンロード油路切換バルブのパイロッ
ト操作部に接続したものである。That is, according to the first aspect of the present invention, the hydraulic pressure supply control of the plurality of hydraulic actuators is performed by each corresponding control valve, and the switching operation of each control valve is performed by the pilot operating means, the manual operating means or the electric operating means. In a working machine in which both operating means such as a mechanical operating means and the like are used, an unloading oil passage leading to an oil tank, an oil passage supplying the control valve of each hydraulic actuator, and a hydraulic pressure supply source. An unloading oil passage switching valve is installed between and, and an opening / closing valve for switching on / off two output ports at the same time is provided in the discharge oil passage of the hydraulic pump. Connected to the valve for switching the supply of pilot pressure oil to the control valve,
The other system is connected to the pilot operation part of the unload oil passage switching valve.
【0006】請求項2においては、複数の油圧アクチュ
エータの油圧供給制御を、対応する各制御バルブでそれ
ぞれ行うよう構成し、各制御バルブの切換操作を、複数
のパイロット操作手段と手動操作手段または電気的操作
手段等の他の操作手段との操作手段が用いられている作
業機械において、油タンクに至るアンロード油路と、前
記各油圧アクチュエータの制御バルブへ供給する油路
と、油圧供給源との間にアンロード油路切換バルブを設
けるととにも、油圧ポンプの吐出油路に少なくとも3系
統の出力ポートを同時に、オンまたはオフの切換を行う
開閉バルブを設け、少なくとも二つの系統の出力ポート
を前記制御バルブへのパイロット圧油の供給切換を行う
バルブに接続し、他方の系統を前記アンロード油路切換
バルブのパイロット操作部に接続したものである。According to a second aspect of the present invention, the hydraulic pressure supply control of the plurality of hydraulic actuators is performed by each corresponding control valve, and the switching operation of each control valve is performed by the plurality of pilot operating means and the manual operating means or the electric operating means. In a work machine in which an operating means such as a dynamic operating means is used, an unloading oil passage to an oil tank, an oil passage to supply to a control valve of each hydraulic actuator, and a hydraulic supply source are provided. In addition to providing an unloading oil passage switching valve between the two, an opening / closing valve for switching on or off at least three output ports of the hydraulic pump at the same time is provided in the discharge oil passage of the hydraulic pump. Connect the port to the valve that switches the supply of pilot pressure oil to the control valve, and connect the other system to the pilot of the unload oil passage switching valve. Which are connected to the work unit.
【0007】請求項3においては、前記油圧ポンプのボ
ディーに油路を設け、前記開閉バルブのボディーにも油
路を設け、ボディー同士を結合し、各々の油路を接続し
たものである。In the present invention, an oil passage is provided in the body of the hydraulic pump, an oil passage is also provided in the body of the opening / closing valve, the bodies are connected to each other, and the respective oil passages are connected.
【0008】[0008]
【発明の実施の形態】次に、発明の配管構成を油圧式作
業機械として掘削旋回作業車(バックホー)に配設した
実施の形態を説明する。図1は本発明に係る油圧回路を
有する掘削旋回作業車の全体側面図、図2は第一実施例
の油圧回路図、図3は第二実施例の油圧回路図である。
図4は第三実施例の油圧回路図、図5は油圧ポンプと開
閉バルブを示した側面図、図6は同じく正面図、図7は
従来の油圧回路図である。図1に示す如く、掘削旋回作
業車は、クローラ式走行装置1の上部中央に垂直方向に
軸心を有する旋回台軸受7を介して旋回フレーム8を旋
回可能に支持しており、該クローラ式走行装置1の前後
一端部には、ブレード10を上下回動自在に配設してい
る。旋回フレーム8の上方にはエンジン等を被覆するボ
ンネット9が配設され、該ボンネット9の上方にシート
22が取り付けられている。該シート22の前方には、
フロントコラム19に走行操作や旋回操作や作業機2の
操作を行うためのレバー類を配設している。該フロント
コラム19とボンネット9との間にはステップ20が配
置されている。BEST MODE FOR CARRYING OUT THE INVENTION Next, a description will be given of an embodiment in which the piping structure of the present invention is provided as a hydraulic working machine in an excavating and turning work vehicle (backhoe). FIG. 1 is an overall side view of an excavation and turning work vehicle having a hydraulic circuit according to the present invention, FIG. 2 is a hydraulic circuit diagram of a first embodiment, and FIG. 3 is a hydraulic circuit diagram of a second embodiment.
4 is a hydraulic circuit diagram of the third embodiment, FIG. 5 is a side view showing a hydraulic pump and an opening / closing valve, FIG. 6 is a front view thereof, and FIG. 7 is a conventional hydraulic circuit diagram. As shown in FIG. 1, the excavation revolving work vehicle rotatably supports a revolving frame 8 via a revolving base bearing 7 having an axis in the vertical direction at the upper center of the crawler type traveling device 1. A blade 10 is vertically rotatably disposed at one of the front and rear ends of the traveling device 1. A bonnet 9 that covers the engine and the like is disposed above the revolving frame 8, and a seat 22 is attached above the bonnet 9. In front of the seat 22,
The front column 19 is provided with levers for running operation, turning operation and operation of the working machine 2. A step 20 is arranged between the front column 19 and the hood 9.
【0009】旋回フレーム8の前端部には作業機2が装
着されており、該作業機2はブームブラケット12が左
右回動自在に取り付けられ、該ブームブラケット12に
はブーム6の下端部が前後回動自在に支持されている。
該ブーム6は途中部で前方に屈曲しており、側面視にお
いて略「く」字状に形成されている。該ブーム6の他端
部にはアーム5が回動自在に支持され、該アーム5の先
端部には作業用アタッチメントとしてのバケット4が回
動自在に支持されている。A working machine 2 is attached to the front end of the revolving frame 8, and a boom bracket 12 is attached to the working machine 2 so as to be rotatable left and right. It is rotatably supported.
The boom 6 is bent forward in the middle, and is formed in a substantially V shape in a side view. An arm 5 is rotatably supported at the other end of the boom 6, and a bucket 4 as a work attachment is rotatably supported at the tip of the arm 5.
【0010】また、ブームブラケット12とブーム6の
途中部前面に設けられたブームシリンダブラケット25
との間にブームシリンダ23が介装され、ブーム6の途
中部背面に設けられるアームシリンダボトムブラケット
26とアーム5基端部に設けられるバケットシリンダブ
ラケット27との間にアームシリンダ29が介装され、
該バケットシリンダブラケット27とバケット4に連結
されるステー11との間にバケットシリンダ24が介装
されている。A boom cylinder bracket 25 provided on the front surface of the boom bracket 12 and the boom 6 in the middle thereof.
The boom cylinder 23 is interposed between the arm cylinder bottom bracket 26 and the bucket cylinder bracket 27 provided at the base end of the arm 5, and the arm cylinder 29 is interposed between the boom cylinder 23 and the bucket cylinder bracket 27.
A bucket cylinder 24 is interposed between the bucket cylinder bracket 27 and the stay 11 connected to the bucket 4.
【0011】こうして、前記ブーム6はブームシリンダ
23により回動され、アーム5はアームシリンダ29に
より回動され、バケット4はバケットシリンダ24によ
り回動される。該ブームシリンダ23、アームシリンダ
29、及びバケットシリンダ24は油圧シリンダで構成
され、各シリンダ23・29・24はフロントコラム1
9に配設した操作レバーの操作により、その下方に配置
した切換バルブを切り換えて、油圧ポンプからの圧油を
供給することにより伸縮駆動される。Thus, the boom 6 is rotated by the boom cylinder 23, the arm 5 is rotated by the arm cylinder 29, and the bucket 4 is rotated by the bucket cylinder 24. The boom cylinder 23, the arm cylinder 29, and the bucket cylinder 24 are hydraulic cylinders, and each of the cylinders 23, 29, and 24 is a front column 1.
By operating the operation lever disposed on the switch 9, the switching valve disposed below the switch is switched, and the pressure oil from the hydraulic pump is supplied to perform expansion / contraction drive.
【0012】また、前記旋回フレーム8の側部には、ス
イングシリンダ17が配置されて、その基部が旋回フレ
ームに枢支され、該スイングシリンダ17のシリンダロ
ッドの先端はブームブラケット12に接続されており、
スイングシリンダ17により、ブームブラケット12を
旋回フレーム8に対して左右に回動でき、作業機2を左
右回動できるようにしている。A swing cylinder 17 is disposed on a side portion of the swing frame 8, a base portion of the swing cylinder 17 is pivotally supported by the swing frame, and a tip end of a cylinder rod of the swing cylinder 17 is connected to a boom bracket 12. Cage,
The swing cylinder 17 allows the boom bracket 12 to rotate left and right with respect to the revolving frame 8 and the working machine 2 to rotate left and right.
【0013】また、旋回フレーム8は旋回台軸受7の上
部に設けた旋回モータ(図示せず)の作動によって36
0度左右旋回可能としており、前記ブレード10は排土
板の後部とクローラ式走行装置1のトラックフレーム3
との間に介装したブレードシリンダ14の作動によって
昇降可能としている。なお、旋回モータ13は油圧モー
タに構成される。更に、該トラックフレーム3の前後一
側に配置した駆動スプロケット16・16の内側にはそ
れぞれ走行油圧モータが配置されて、クローラ式走行装
置1を走行駆動可能としている。そしてこれら油圧アク
チュエータとなる油圧シリンダや油圧モータは、フロン
トコラム19及びステップ20上に設けた操作レバーや
ペダルの操作によって駆動できるようにしている。Further, the revolving frame 8 is moved by an operation of a revolving motor (not shown) provided above the revolving base bearing 7 so that the revolving frame 8 is rotated by 36.
The blade 10 can be turned to the left and right, and the blade 10 is provided at the rear of the earth dumping plate and the track frame 3 of the crawler type traveling device 1.
The blade cylinder 14 is interposed between the upper and lower ends of the blade cylinder 14 so that it can be moved up and down. The swing motor 13 is a hydraulic motor. Further, traveling hydraulic motors are respectively disposed inside the drive sprockets 16 and 16 arranged on one side of the front and rear of the track frame 3 so that the crawler type traveling device 1 can be driven to travel. The hydraulic cylinders and hydraulic motors that serve as these hydraulic actuators can be driven by operating the operation levers and pedals provided on the front column 19 and the step 20.
【0014】次に、油圧アクチュエータとなる油圧シリ
ンダや油圧モータを配置した掘削旋回作業車における油
圧回路について、図2より説明する。まず、ボンネット
9内に収納されたエンジンEの出力軸に油圧供給源とな
る第一油圧ポンプ31と第二油圧ポンプ32が並列に連
動連結されて駆動される。該第一油圧ポンプ31の2本
の出力油路33・34には、アンロード油路切換バルブ
35が連通され、該アンロード油路切換バルブ35には
センタ油路36・40と油タンクに通じるアンロード油
路49が接続され、センタ油路36・40には各制御バ
ルブと接続され各油圧アクチュエータを駆動できるよう
にしている。前記出力油路33の出力側の第一センタ油
路36に、出力油圧を設定するリリーフ弁(図示せず)
が並列接続され、左右一側(本実施例では右側)の走行
油圧モータ(図示せず)への送油を切換える走行モータ
用方向切換バルブ37Rと、ブームシリンダ23(図
1)への送油を切り換えるブーム用方向切換バルブ38
と、バケットシリンダ24(図1)への送油を切り換え
るバケット用方向切換バルブ39が、タンデム接続され
ている。ブーム用方向切換バルブ38およびバケット用
方向切換バルブ39の操作部に、パイロットポート38
a・38b・39a・39bが形成されており、操作レ
バー43の操作により後述するパイロットバルブを切り
換えて制御バルブを切り換えて、油圧アクチュエータ
(ブームシリンダ23、バケットシリンダ24)を作動
可能としている。Next, the hydraulic circuit in the excavating and swinging work vehicle in which the hydraulic cylinders and hydraulic motors that serve as hydraulic actuators are arranged will be described with reference to FIG. First, the output shaft of the engine E housed in the bonnet 9 is driven by the first hydraulic pump 31 and the second hydraulic pump 32, which are hydraulic pressure supply sources, being interlocked and connected in parallel. An unload oil passage switching valve 35 is connected to the two output oil passages 33 and 34 of the first hydraulic pump 31, and the unload oil passage switching valve 35 is connected to center oil passages 36 and 40 and an oil tank. An unloading oil passage 49 communicating therewith is connected, and the center oil passages 36 and 40 are connected to respective control valves so that respective hydraulic actuators can be driven. A relief valve (not shown) for setting the output hydraulic pressure in the first center oil passage 36 on the output side of the output oil passage 33.
Are connected in parallel, and a travel motor direction switching valve 37R for switching the oil supply to the travel hydraulic motor (not shown) on the left and right side (the right side in this embodiment) and the oil supply to the boom cylinder 23 (FIG. 1). Direction switching valve for boom 38
And a bucket direction switching valve 39 for switching the oil supply to the bucket cylinder 24 (FIG. 1) are connected in tandem. The pilot port 38 is provided on the operation portion of the boom direction switching valve 38 and the bucket direction switching valve 39.
a. 38b, 39a, and 39b are formed, and by operating the operation lever 43, the pilot valve described later is switched to switch the control valve, and the hydraulic actuator (boom cylinder 23, bucket cylinder 24) can be operated.
【0015】また、出力油路34に第二センタ油路40
が接続され、該第二センタ油路40に、出力油圧を設定
するリリーフ弁(図示せず)が並列接続され、左右他側
(本実施例では左側)の走行油圧モータ(図示せず)へ
の送油を切換える走行モータ用方向切換バルブ37L
と、スイングシリンダ17(図1)への送油を切り換え
るスイング用方向切換バルブ41と、アームシリンダ2
9(図1)への送油を切り換えるアーム用方向切換バル
ブ42がタンデム接続されている。スイング用方向切換
バルブ41およびアーム用方向切換バルブ42の操作部
に、パイロットポート41a・41b・42a・42b
が形成されており、操作レバー44の操作により後述す
るパイロットバルブを切り換えて制御バルブを切り換え
て、油圧アクチュエータ(スイングシリンダ17、アー
ムシリンダ29)を作動可能としている。ただし、本実
施例では、制御バルブである切換バルブ37R・38・
39・37L・41・42を6個としているが、個数お
よび作動させる油圧アクチュエータは限定されるもので
はなく、他の切換バルブを加えることもできる。Further, the second center oil passage 40 is connected to the output oil passage 34.
Is connected, and a relief valve (not shown) for setting the output hydraulic pressure is connected in parallel to the second center oil passage 40, and is connected to a traveling hydraulic motor (not shown) on the left and right other sides (left side in this embodiment). Direction switch valve 37L for traveling motor that switches the oil supply of
A swing direction switching valve 41 for switching the oil supply to the swing cylinder 17 (FIG. 1), and the arm cylinder 2
9 (FIG. 1) is a tandem connection of an arm direction switching valve 42 for switching the oil supply. Pilot ports 41a, 41b, 42a, 42b are provided on the operation portions of the swing direction switching valve 41 and the arm direction switching valve 42.
Is formed, and a control valve is switched by switching a pilot valve described later by operating the operation lever 44, and the hydraulic actuator (swing cylinder 17, arm cylinder 29) can be operated. However, in the present embodiment, the switching valves 37R, 38.
Although the number of 39, 37L, 41, and 42 is 6, the number and the number of hydraulic actuators to be operated are not limited, and other switching valves can be added.
【0016】走行モータ用方向切換バルブ37Rと走行
モータ用方向切換バルブ37Lは、操作レバー37a・
37bの操作により、ブーム用方向切換バルブ38と、
バケット用方向切換バルブ39、スイング用方向切換バ
ルブ41、アーム用方向切換バルブ42は、各々の操作
レバー43・44の操作により、第一・第二油圧ポンプ
31・32からの圧油を油圧アクチュエータに供給しな
い中立位置Xから、対応する各油圧アクチュエータの一
方の入出力ポートに圧油を供給する油圧供給位置Y、あ
るいは他方の入出力ポートに圧油を供給する供給位置Z
に切り換えられる。これら切換バルブのうち、操作レバ
ー43・44によって切り換るスイング用、アーム用、
ブーム用、バケット用の各切換バルブ41・42・38
・39はパイロット操作式としており、後述する各パイ
ロットバルブ56・57・58・59から、各切換バル
ブ38・39・41・42に形成されている各パイロッ
トポート38a・38b・39a・39b・41a・4
1b・42a・42bに、パイロット圧油が供給される
ことで、中立位置Xから圧油供給位置YまたはZに切換
わるように構成されている。また、左右の走行モータ用
方向切換バルブ37R ・37L は、各切換バルブにリン
ケージ等を介して直接的に連結される操作レバー37a
・37bの操作に基づいて中立位置Xから圧油供給位置
YまたはZに切換わる手動式のものに構成されている。
尚、本実施の形態においては、パイロット操作以外の操
作として前述したように手動式のものが採用されている
が、これに限定されることなく、本発明は、機械操作、
電気操作等の種々の操作手段が採用されているものにも
実施できる。The traveling motor direction switching valve 37R and the traveling motor direction switching valve 37L are provided with an operating lever 37a.
By operating 37b, the boom direction switching valve 38,
The bucket directional control valve 39, the swing directional control valve 41, and the arm directional control valve 42 operate by operating the respective operating levers 43 and 44 so that the pressure oil from the first and second hydraulic pumps 31 and 32 is hydraulically actuated. From a neutral position X that does not supply pressure oil to one input / output port of each corresponding hydraulic actuator, or a supply position Z that supplies pressure oil to the other input / output port.
Is switched to. Of these switching valves, for swings, arms, which are switched by the operation levers 43 and 44,
Boom, bucket switching valves 41, 42, 38
-39 is a pilot operated type, and from each pilot valve 56, 57, 58, 59 described later, each pilot port 38a, 38b, 39a, 39b, 41a formed in each switching valve 38, 39, 41, 42.・ 4
When the pilot pressure oil is supplied to the 1b, 42a, and 42b, the neutral position X is switched to the pressure oil supply position Y or Z. Further, the left and right traveling motor direction switching valves 37R and 37L are operation levers 37a which are directly connected to the respective switching valves via linkages or the like.
It is configured as a manual type that switches from the neutral position X to the pressure oil supply position Y or Z based on the operation of 37b.
Incidentally, in the present embodiment, a manual type operation is employed as described above as an operation other than the pilot operation, but the present invention is not limited to this, and the present invention is not limited to the mechanical operation,
The present invention can also be carried out to those in which various operation means such as electric operation are adopted.
【0017】次に、本発明のパイロット圧油の供給回路
について説明する。まず、パイロット圧油の供給回路の
第一実施例を、図2を用いて説明する。第二油圧ポンプ
(油圧供給源)32から供給される圧油の一部がパイロ
ット圧油として用いられる構成となっている。第二油圧
ポンプ32からのパイロット圧油は、開閉バルブ油路5
1を介して開閉バルブ(セーフティバルブ)50に供給
される。該開閉バルブ50は、4ポート2位置切換のバ
ルブであって、出力側2系統の油路を同時にオン・オフ
の切換ができる切換バルブである。そして、該開閉バル
ブ50には操作レバー50aが配設され、該操作レバー
50aで2系統の油路(二つの出力ポート)を同時にオ
ン・オフの切換ができる。つまり、二次側へ圧油を送油
できる位置と二次側の圧油をドレンする位置に切り換え
られる。Next, the pilot pressure oil supply circuit of the present invention will be described. First, a first embodiment of the pilot pressure oil supply circuit will be described with reference to FIG. A part of the pressure oil supplied from the second hydraulic pump (hydraulic pressure supply source) 32 is used as pilot pressure oil. The pilot pressure oil from the second hydraulic pump 32 is supplied to the open / close valve oil passage 5
It is supplied to the opening / closing valve (safety valve) 50 via 1. The on-off valve 50 is a 4-port 2-position switching valve, and is a switching valve capable of simultaneously switching on / off the oil passages of the two output side systems. The opening / closing valve 50 is provided with an operation lever 50a, and the operation lever 50a can simultaneously switch on / off two oil passages (two output ports). That is, it is possible to switch between a position where the pressure oil can be sent to the secondary side and a position where the pressure oil on the secondary side is drained.
【0018】該開閉バルブ50のポンプポートは開閉バ
ルブ油路51に、タンクポートは油タンクに、接続さ
れ、二次側の第一出力ポートは各パイロットバルブ56
・57・58・59へのパイロット油路53が、第二出
力ポートはアンロード油路切換バルブ35のパイロット
操作部35aへの油路52が接続されている。また、パ
イロット油路53の他端には、分岐が形成され、第一パ
イロット油路54および第二パイロット油路55の一端
が接続されている。該第一パイロット油路54の他端
は、ブーム用パイロットバルブ56およびバケット用パ
イロットバルブ57のポンプポートに接続され、該第二
パイロット油路55の他端は、スイング用パイロットバ
ルブ58およびアーム用パイロットバルブ59のポンプ
ポートに接続され、第二油圧ポンプ32からの圧油を各
パイロットバルブ56・57・58・59に供給できる
構成としている。The pump port of the opening / closing valve 50 is connected to the opening / closing valve oil passage 51, the tank port is connected to the oil tank, and the first output port on the secondary side is the pilot valve 56.
The pilot oil passage 53 to 57, 58 and 59 is connected to the second output port, and the oil passage 52 to the pilot operating portion 35a of the unload oil passage switching valve 35 is connected to the second output port. Further, a branch is formed at the other end of the pilot oil passage 53, and one ends of the first pilot oil passage 54 and the second pilot oil passage 55 are connected thereto. The other end of the first pilot oil passage 54 is connected to the pump ports of the boom pilot valve 56 and the bucket pilot valve 57, and the other end of the second pilot oil passage 55 is connected to the swing pilot valve 58 and the arm. It is connected to the pump port of the pilot valve 59 so that the pressure oil from the second hydraulic pump 32 can be supplied to each pilot valve 56, 57, 58, 59.
【0019】そして、該ブーム用、バケット用、スイン
グ用、アーム用パイロットバルブ56・57・58・5
9から、パイロット圧油は、前記ブーム用、バケット
用、スイング用、アーム用方向切換バルブ38・39・
41・42の、各々のパイロット操作部38a・38b
・39a・39b・41a・41b・42a・42bに
供給されている。よって、操作レバー50aがオフ操作
時には、第一出力ポートおよび第二出力ポートが閉じ、
ポンプポートからの圧油は、タンクポートつまり油タン
クに流れ、ブーム用、バケット用、スイング用、アーム
用パイロットバルブ56・57・58・59には圧油が
送油されず、操作レバー43・44を操作しても制御バ
ルブは切り換えられず油圧アクチュエータは作動するこ
とがない。また、アンロード油路切換バルブ35のパイ
ロット操作部35aにも圧油が送油されないため、出力
油路33・34からの圧油はセンタ油路36・40に流
れずアンロード油路49からタンクへ流れて、油圧アク
チュエータへは送油されないのである。よって、操作レ
バー37a・37bを操作しても走行することはないの
である。そして、操作レバー50aがオン操作時には、
第一出力ポートおよび第二出力ポートが開き、パイロッ
ト油路53およびアンロード油路切換バルブ35への油
路52に圧油が供給され、制御バルブを切換可能とな
り、油圧アクチュエータも駆動可能となるのである。The boom, bucket, swing, and arm pilot valves 56, 57, 58.5
From 9, the pilot pressure oil is used for the boom, bucket, swing, arm direction switching valves 38, 39 ,.
41 and 42 of the pilot operating parts 38a and 38b, respectively
-Supplied to 39a, 39b, 41a, 41b, 42a, 42b. Therefore, when the operation lever 50a is turned off, the first output port and the second output port are closed,
The pressure oil from the pump port flows to the tank port, that is, the oil tank, and the pressure oil is not fed to the pilot valves 56, 57, 58, 59 for the boom, bucket, swing, and arm, and the operation lever 43. Even if 44 is operated, the control valve cannot be switched and the hydraulic actuator will not operate. Further, since the pressure oil is not sent to the pilot operation portion 35a of the unload oil passage switching valve 35, the pressure oil from the output oil passages 33 and 34 does not flow to the center oil passages 36 and 40 and the unload oil passage 49. It flows to the tank and is not sent to the hydraulic actuator. Therefore, even if the operation levers 37a and 37b are operated, the vehicle does not travel. When the operation lever 50a is turned on,
The first output port and the second output port are opened, pressure oil is supplied to the pilot oil passage 53 and the oil passage 52 to the unload oil passage switching valve 35, the control valve can be switched, and the hydraulic actuator can also be driven. Of.
【0020】このように、第二油圧ポンプ32からのパ
イロット圧油を、2系統の油路を同時にオン・オフの切
換ができる開閉バルブ50に供給することにより、開閉
バルブ50に、パイロットバルブへのパイロット油路5
3と、アンロード油路切換バルブ35のパイロット操作
部35aへの油路52を、個別に接続でき、分岐を減ら
すことができる。従って、配管本数を削減でき、生産性
が向上し、コスト低減が可能になるのである。In this way, by supplying the pilot pressure oil from the second hydraulic pump 32 to the opening / closing valve 50 capable of simultaneously switching on / off the oil passages of the two systems, the opening / closing valve 50 is supplied to the pilot valve. Pilot oilway 5
3 and the oil passage 52 to the pilot operation portion 35a of the unload oil passage switching valve 35 can be individually connected, and branching can be reduced. Therefore, the number of pipes can be reduced, productivity can be improved, and cost can be reduced.
【0021】次に、パイロット圧油の供給回路の第二実
施例を、図3を用いて説明する。第二油圧ポンプ32か
ら供給される圧油の一部がパイロット圧油として用いら
れる構成となっている。第二油圧ポンプ32からのパイ
ロット圧油は、開閉バルブ油路61を介して開閉バルブ
60に供給される。該開閉バルブ60は、5ポート2位
置切換のバルブで構成され、操作レバー60aで、出力
側の3系統の油路(3つの出力ポート)を同時にオン・
オフの切換ができる開閉バルブとしている。本実施例で
は、出力側の3系統の油路を同時にオン・オフの切換が
できる開閉バルブとしているが、これに限定されるもの
ではなく、3系統以上の油路を出力側(二次側)に有す
るバルブを同時にオン・オフの切換ができる開閉バルブ
を使用することもできる。Next, a second embodiment of the pilot pressure oil supply circuit will be described with reference to FIG. A part of the pressure oil supplied from the second hydraulic pump 32 is used as pilot pressure oil. Pilot pressure oil from the second hydraulic pump 32 is supplied to the opening / closing valve 60 via the opening / closing valve oil passage 61. The on-off valve 60 is composed of a 5-port 2-position switching valve, and the operating lever 60a simultaneously turns on the three oil passages (three output ports) on the output side.
It is an on-off valve that can be switched off. In this embodiment, the three oil passages on the output side are open / close valves that can be switched on and off at the same time. However, the present invention is not limited to this, and three or more oil passages on the output side (secondary side) can be used. It is also possible to use an opening / closing valve capable of simultaneously switching on / off the valve provided in).
【0022】該開閉バルブ60のポンプポートは開閉バ
ルブ油路61に、タンクポートは油タンクに、接続さ
れ、第一出力ポートには第一パイロット油路63が、第
二出力ポートには第二パイロット油路64が、第三出力
ポートにはアンロード油路切換バルブ35のパイロット
操作部35aへの油路62が接続されている。操作レバ
ー60aがオフ操作時には、第一出力ポート、第二出力
ポート、および第三出力ポートが閉じ、第一ポートから
の圧油は、タンクポートつまり油タンクに流れ、制御バ
ルブを切り換えることはできず、油圧アクチュエータも
駆動することはできない。操作レバー60aがオン操作
時には、第一出力ポート、第二出力ポート、および第三
出力ポートが開き、第一、第二パイロット油路63・6
4およびアンロード油路切換バルブ35への油路35b
に圧油が供給され、制御バルブを切換可能となり、油圧
アクチュエータも駆動可能となる。該第一パイロット油
路63は、ブーム用パイロットバルブ56およびバケッ
ト用パイロットバルブ57に接続され、該第二パイロッ
ト油路64の他端は、スイング用パイロットバルブ58
およびアーム用パイロットバルブ59に接続され、第二
油圧ポンプ32からの圧油を各パイロットバルブ56・
57・58・59に供給する構成としている。そして、
第一実施例と同様に、パイロット圧油は、該ブーム用、
バケット用、スイング用、アーム用パイロットバルブ5
6・57・58・59から、前記ブーム用、バケット
用、スイング用、アーム用パイロット操作部38a・3
8b・39a・39b・41a・41b・42a・42
bに供給可能とされている。A pump port of the opening / closing valve 60 is connected to an opening / closing valve oil passage 61, a tank port is connected to an oil tank, a first pilot oil passage 63 is provided at a first output port, and a second pilot port is provided at a second output port. The pilot oil passage 64 is connected to the third output port, and the oil passage 62 to the pilot operating portion 35a of the unload oil passage switching valve 35 is connected. When the operation lever 60a is turned off, the first output port, the second output port, and the third output port are closed, the pressure oil from the first port flows to the tank port, that is, the oil tank, and the control valve cannot be switched. In addition, the hydraulic actuator cannot be driven. When the operation lever 60a is turned on, the first output port, the second output port, and the third output port are opened, and the first and second pilot oil passages 63.6 are opened.
4 and the oil passage 35b to the unload oil passage switching valve 35
The pressure oil is supplied to the control valve, the control valve can be switched, and the hydraulic actuator can be driven. The first pilot oil passage 63 is connected to a boom pilot valve 56 and a bucket pilot valve 57, and the other end of the second pilot oil passage 64 has a swing pilot valve 58.
And the pilot valve 59 for the arm to connect the pressure oil from the second hydraulic pump 32 to each pilot valve 56.
It is configured to supply to 57, 58 and 59. And
Similar to the first embodiment, the pilot pressure oil is used for the boom,
Pilot valve 5 for bucket, swing, arm
From 6/57/58/59, the pilot operation parts 38a / 3 for the boom, bucket, swing, arm
8b ・ 39a ・ 39b ・ 41a ・ 41b ・ 42a ・ 42
b can be supplied.
【0023】このように、第二油圧ポンプ32らからの
パイロット圧油を、少なくとも3系統の油路を同時にオ
ン・オフの切換ができる開閉バルブ60に供給し、開閉
バルブ60に、パイロットバルブ56・57・58・5
9への第一および第二パイロット油路63・64と、ア
ンロード油路切換バルブ35のパイロット操作部35a
への油路62を、個別に接続でき、分岐をさらに減らす
ことができる。従って、さらに配管本数を削減でき、生
産が向上し、コスト低減効果が上がるのである。As described above, the pilot pressure oil from the second hydraulic pump 32 is supplied to the opening / closing valve 60 capable of simultaneously switching on / off the oil passages of at least three systems, and the opening / closing valve 60 is connected to the pilot valve 56.・ 57 ・ 58.5
9, first and second pilot oil passages 63 and 64, and a pilot operation portion 35a of the unload oil passage switching valve 35
The oil passages 62 to can be individually connected to further reduce branching. Therefore, the number of pipes can be further reduced, the production is improved, and the cost reduction effect is improved.
【0024】次に、パイロット圧油の供給回路の第三実
施例を、図4乃至図6を用いて説明する。このパイロッ
ト圧油の供給回路は前記第二実施例と略同じであり、ポ
ンプのボディー70と開閉バルブ60のボディー60b
を一体的に結合して前記開閉バルブ油路61を構成する
配管をなくして配管構成を簡単にしようとするものであ
る。即ち、図5および図6に示すように、前記第一油圧
ポンプ31及び第二油圧ポンプ32を収納したポンプボ
ディー70に開閉バルブ60のバルブボディー60bが
連結固定されている。該ボディー70には第二油圧ポン
プ32の吐出部に連通される吐出油路70aが設けら
れ、前記開閉バルブ60のボディー60bには該吐出油
路70aに連通される油路60cが穿設されている。従
って、第二油圧ポンプ32からの圧油は、第二油圧ポン
プ32の油路70aを介して、開閉バルブ60油路60
cに供給される。なお、第一油圧ポンプ31は可変油圧
ポンプにより構成され、操作部74により吐出油量を変
更可能としている。また、開閉バルブ60は内部にスプ
ール60dが摺動可能に配設され、該スプール60dの
一端はボディー60bより突出して、リンク機構等を介
して操作レバー60aと連結されて、該操作レバー60
aの回動により摺動操作して開閉バルブ60のオン・オ
フの切換を行い、第二実施例と同様に、オンの場合は、
該油路60cからの圧油が、第一、第二パイロット油路
63・64およびアンロード油路切換バルブ35への油
路62に供給される。図4に示すように、開閉バルブ6
0の構造およびパイロットバルブ56・57・58・5
9への油路63・64は、第二実施例と同様の構成とな
っており、第一実施例と同様に、パイロット圧油は、該
ブーム用、バケット用、スイング用、アーム用パイロッ
トバルブ56・57・58・59から、前記ブーム用、
バケット用、スイング用、アーム用パイロットポート3
8a・38b・39a・39b・41a・41b・42
a・42bに供給されている。Next, a third embodiment of the pilot pressure oil supply circuit will be described with reference to FIGS. The pilot pressure oil supply circuit is substantially the same as that of the second embodiment, and includes a pump body 70 and an opening / closing valve 60 body 60b.
It is an object of the present invention to simplify the piping structure by integrally connecting the above with the piping forming the opening / closing valve oil passage 61. That is, as shown in FIGS. 5 and 6, the valve body 60b of the opening / closing valve 60 is connected and fixed to the pump body 70 that houses the first hydraulic pump 31 and the second hydraulic pump 32. The body 70 is provided with a discharge oil passage 70a communicating with the discharge portion of the second hydraulic pump 32, and the body 60b of the opening / closing valve 60 is provided with an oil passage 60c communicating with the discharge oil passage 70a. ing. Therefore, the pressure oil from the second hydraulic pump 32 passes through the oil passage 70 a of the second hydraulic pump 32 and opens / closes the valve 60 and the oil passage 60.
is supplied to c. The first hydraulic pump 31 is composed of a variable hydraulic pump, and the discharge oil amount can be changed by the operation unit 74. A spool 60d is slidably disposed inside the opening / closing valve 60, and one end of the spool 60d protrudes from the body 60b and is connected to an operating lever 60a via a link mechanism or the like, so that the operating lever 60d.
The opening / closing valve 60 is switched on / off by the sliding operation by the rotation of a, and when it is on, as in the second embodiment,
The pressure oil from the oil passage 60c is supplied to the first and second pilot oil passages 63 and 64 and the oil passage 62 to the unload oil passage switching valve 35. As shown in FIG. 4, the on-off valve 6
0 structure and pilot valves 56, 57, 58.5
The oil passages 63 and 64 to 9 have the same structure as in the second embodiment, and pilot pressure oil is used for the boom, bucket, swing, arm pilot valves as in the first embodiment. From 56.57.58.59, for the boom,
Pilot port 3 for bucket, swing, arm
8a, 38b, 39a, 39b, 41a, 41b, 42
It is supplied to a 42b.
【0025】以上のような構成で、第二油圧ポンプ32
および開閉バルブ60の各ボディー70・60bを結合
し、該ボディー70・60bに油路70a・60cを設
け、該油路同士を接続したので、第二油圧ポンプ32と
開閉バルブ60との間の前記開閉バルブ油路61(第二
実施例)に設ける配管を減らすことができる。従って、
従来では図7に示すように、油圧ポンプ101の吐出部
から102・104・105・106・107・108
の少なくとも6本の配管が必要であったが、第一実施例
においては、図2に示すように、分岐管を一つ減少でき
て、51・52・53・54・55の少なくとも5本の
配管で連通することが可能となり、第二実施例において
は、図3に示すように、従来よりも分岐管を二つ減少し
て、61・62・63・64の4本の配管で連通するこ
とができる。さらに、第三実施例においては、図4に示
すように、61の配管をなくすことができて、3本の配
管で連通することができて、配管本数を削減でき、ボル
ト等によりボディ同士を固着するので、コンパクトとな
って生産が向上し、コスト低減効果が上がるのである。With the above structure, the second hydraulic pump 32
Since the bodies 70 and 60b of the opening / closing valve 60 are connected to each other, and the oil passages 70a and 60c are provided in the bodies 70 and 60b, and the oil passages are connected to each other, the space between the second hydraulic pump 32 and the opening / closing valve 60 is It is possible to reduce the number of pipes provided in the opening / closing valve oil passage 61 (second embodiment). Therefore,
Conventionally, as shown in FIG. 7, from the discharge part of the hydraulic pump 101 to 102.104.105.106.107.108.
However, in the first embodiment, as shown in FIG. 2, the number of branch pipes can be reduced by one, and at least 5 pipes of 51, 52, 53, 54, and 55 are required. It becomes possible to communicate by piping, and in the second embodiment, as shown in FIG. 3, the number of branch pipes is reduced by two as compared with the conventional one, and communication is achieved by four pipings 61, 62, 63 and 64. be able to. Furthermore, in the third embodiment, as shown in FIG. 4, the piping of 61 can be eliminated, the three piping can communicate with each other, the number of piping can be reduced, and the bodies can be connected to each other by bolts or the like. Since it is fixed, it becomes compact and production is improved, and the cost reduction effect is improved.
【0026】[0026]
【発明の効果】本発明は、以上のように構成したので、
以下に示すような効果を奏する。Since the present invention is constructed as described above,
The following effects are achieved.
【0027】即ち、請求項1に示す如く、複数の油圧ア
クチュエータの油圧供給制御を、対応する各制御バルブ
でそれぞれ行うよう構成し、各制御バルブの切換操作
を、パイロット操作手段と手動操作手段または電気的操
作手段等の他の操作手段との両操作手段が用いられてい
る作業機械において、油タンクに至るアンロード油路
と、前記各油圧アクチュエータの制御バルブへ供給する
油路と、油圧供給源との間にアンロード油路切換バルブ
を設けるととにも、油圧ポンプの吐出油路に2系統の出
力ポートを同時に、オンまたはオフの切換を行う開閉バ
ルブを設け、一方の系統の出力ポートを前記制御バルブ
へのパイロット圧油の供給切換を行うバルブに接続し、
他方の系統を前記アンロード油路切換バルブのパイロッ
ト操作部に接続したので、配管の本数が減り、分岐管の
数も減少することができ、組立工数も減少できて、生産
性が向上し、コスト低減が可能となるのである。That is, as described in claim 1, the hydraulic pressure supply control of the plurality of hydraulic actuators is configured to be performed by each corresponding control valve, and the switching operation of each control valve is controlled by the pilot operation means and the manual operation means. In a working machine in which both operating means such as electric operating means and the like are used, an unloading oil passage leading to an oil tank, an oil passage supplying the control valve of each hydraulic actuator, and a hydraulic pressure supply. In addition to providing an unloading oil passage switching valve with the power source, an opening / closing valve for simultaneously switching on or off the output ports of two systems is provided in the discharge oil passage of the hydraulic pump, and the output of one system is output. Connect the port to the valve that switches the supply of pilot pressure oil to the control valve,
Since the other system is connected to the pilot operation part of the unload oil passage switching valve, the number of pipes can be reduced, the number of branch pipes can be reduced, the number of assembling steps can be reduced, and the productivity can be improved. The cost can be reduced.
【0028】請求項2に示す如く、複数の油圧アクチュ
エータの油圧供給制御を、対応する各制御バルブでそれ
ぞれ行うよう構成し、各制御バルブの切換操作を、複数
のパイロット操作手段と手動操作手段または電気的操作
手段等の他の操作手段との操作手段が用いられている作
業機械において、油タンクに至るアンロード油路と、前
記各油圧アクチュエータの制御バルブへ供給する油路
と、油圧供給源との間にアンロード油路切換バルブを設
けるととにも、油圧ポンプの吐出油路に少なくとも3系
統の出力ポートを同時に、オンまたはオフの切換を行う
開閉バルブを設け、少なくとも二つの系統の出力ポート
を前記制御バルブへのパイロット圧油の供給切換を行う
バルブに接続し、他方の系統を前記アンロード油路切換
バルブのパイロット操作部に接続したので、配管本数が
さらに減り、分岐管の数も減少することができ、組立工
数も減少できて、生産性向上、コスト低減効果が上が
る。According to a second aspect of the present invention, the hydraulic pressure supply control of the plurality of hydraulic actuators is performed by each corresponding control valve, and the switching operation of each control valve is performed by a plurality of pilot operating means and a manual operating means. In a working machine in which an operating means such as an electric operating means is used, an unloading oil passage leading to an oil tank, an oil passage supplying the control valve of each hydraulic actuator, and a hydraulic pressure supply source. In addition to providing an unload oil passage switching valve between and, an opening / closing valve for switching on or off at least three output ports of the hydraulic pump at the same time is provided in the discharge oil passage of the hydraulic pump, and at least two system output valves are provided. Connect the output port to the valve that switches the supply of pilot pressure oil to the control valve, and connect the other system to the pilot of the unload oil passage switching valve. Having connected to the work unit, further reduces piping number, the number of the branch pipe can also be reduced, assembling steps also can be reduced, productivity improvement, the cost reduction effect is enhanced.
【0029】請求項3に示す如く、前記油圧ポンプのボ
ディーに油路を設け、前記開閉バルブのボディーにも油
路を設け、ボディー同士を結合し、各々の油路を接続し
たので、配管本数がさらに減り省スペース化が図れ、組
立工数も減少できて組立精度も向上でき、生産性向上、
コスト低減効果が上がる。Since the oil passage is provided in the body of the hydraulic pump, the oil passage is also provided in the body of the opening / closing valve, the bodies are connected to each other, and the respective oil passages are connected to each other, the number of pipes is increased. Can be further reduced, space can be saved, the number of assembling steps can be reduced, the assembling accuracy can be improved, and the productivity can be improved.
The cost reduction effect increases.
【図1】本発明に係る油圧回路を有する掘削旋回作業車
の全体側面図。FIG. 1 is an overall side view of an excavation and swing work vehicle having a hydraulic circuit according to the present invention.
【図2】第一実施例の油圧回路図。FIG. 2 is a hydraulic circuit diagram of the first embodiment.
【図3】第二実施例の油圧回路図。FIG. 3 is a hydraulic circuit diagram of a second embodiment.
【図4】第三実施例の油圧回路図。FIG. 4 is a hydraulic circuit diagram of a third embodiment.
【図5】油圧ポンプと開閉バルブを示した側面図。FIG. 5 is a side view showing a hydraulic pump and an opening / closing valve.
【図6】同じく正面図。FIG. 6 is a front view of the same.
【図7】従来の油圧回路図。FIG. 7 is a conventional hydraulic circuit diagram.
1 クローラ式走行車 31 第一油圧ポンプ 32 第二油圧ポンプ 35 アンロード油路切換バルブ 37 走行モーター用方向切換バルブ 38 ブーム用方向切換バルブ 39 バケット用方向切換バルブ 41 スイング用方向切換バルブ 42 アーム用方向切換バルブ 50 開閉バルブ 51 開閉バルブ油路 53 パイロット油路 60 開閉バルブ 63 第一パイロット油路 64 第二パイロット油路 1 crawler type traveling vehicle 31 First hydraulic pump 32 Second hydraulic pump 35 Unload oil passage switching valve 37 Directional switching valve for traveling motor 38 Directional valve for boom 39 Bucket Directional Valve 41 Directional switching valve for swing 42 Directional switching valve for arm 50 open / close valve 51 Open / close valve oil passage 53 Pilot oil passage 60 open / close valve 63 First pilot oil passage 64 Second pilot oil passage
フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) // E02F 9/24 F15B 11/00 H Fターム(参考) 2D003 AA01 BA07 CA03 DA03 EA04 2D015 GA02 GB02 3H045 AA16 AA24 AA32 BA00 DA15 DA31 EA04 3H089 AA05 AA60 BB27 CC11 DA03 DA08 DB07 EE22 GG02 JJ01Front page continued (51) Int.Cl. 7 Identification code FI theme code (reference) // E02F 9/24 F15B 11/00 HF term (reference) 2D003 AA01 BA07 CA03 DA03 EA04 2D015 GA02 GB02 3H045 AA16 AA24 AA32 BA00 DA15 DA31 EA04 3H089 AA05 AA60 BB27 CC11 DA03 DA08 DB07 EE22 GG02 JJ01
Claims (3)
御を、対応する各制御バルブでそれぞれ行うよう構成
し、各制御バルブの切換操作を、パイロット操作手段と
手動操作手段または電気的操作手段等の他の操作手段と
の両操作手段が用いられている作業機械において、油タ
ンクに至るアンロード油路と、前記各油圧アクチュエー
タの制御バルブへ供給する油路と、油圧供給源との間に
アンロード油路切換バルブを設けるととにも、油圧ポン
プの吐出油路に2系統の出力ポートを同時に、オンまた
はオフの切換を行う開閉バルブを設け、一方の系統の出
力ポートを前記制御バルブへのパイロット圧油の供給切
換を行うバルブに接続し、他方の系統を前記アンロード
油路切換バルブのパイロット操作部に接続したことを特
徴とする作業機械の油圧回路。1. The hydraulic supply control of a plurality of hydraulic actuators is configured to be performed by each corresponding control valve, and the switching operation of each control valve is performed by other than pilot operating means, manual operating means, electrical operating means, or the like. In the working machine in which both the operating means and the operating means are used, the unloading oil passage leading to the oil tank, the oil passage supplying the control valve of each hydraulic actuator, and the hydraulic supply source are unloaded. In addition to providing an oil passage switching valve, an opening / closing valve for simultaneously switching on / off two output ports of the hydraulic pump is provided in the discharge oil passage of the hydraulic pump, and the output port of one system is connected to the control valve. Oil for a working machine, characterized in that it is connected to a valve for switching the supply of pilot pressure oil, and the other system is connected to the pilot operation part of the unload oil passage switching valve. Pressure circuit.
御を、対応する各制御バルブでそれぞれ行うよう構成
し、各制御バルブの切換操作を、複数のパイロット操作
手段と手動操作手段または電気的操作手段等の他の操作
手段との操作手段が用いられている作業機械において、
油タンクに至るアンロード油路と、前記各油圧アクチュ
エータの制御バルブへ供給する油路と、油圧供給源との
間にアンロード油路切換バルブを設けるととにも、油圧
ポンプの吐出油路に少なくとも3系統の出力ポートを同
時に、オンまたはオフの切換を行う開閉バルブを設け、
少なくとも二つの系統の出力ポートを前記制御バルブへ
のパイロット圧油の供給切換を行うバルブに接続し、他
方の系統を前記アンロード油路切換バルブのパイロット
操作部に接続したことを特徴とする作業機械の油圧回
路。2. The hydraulic supply control of a plurality of hydraulic actuators is configured to be performed by each corresponding control valve, and the switching operation of each control valve is performed by a plurality of pilot operating means and manual operating means or electrical operating means, etc. In a work machine in which the operation means with other operation means of is used,
An unloading oil passage leading to an oil tank, an oil passage supplying the control valve of each hydraulic actuator, and an unloading oil passage switching valve provided between the oil pressure supply source and the discharge oil passage of the hydraulic pump. An on-off valve for switching on or off at least three output ports at the same time,
Work characterized in that at least two output ports of the system are connected to a valve for switching the supply of pilot pressure oil to the control valve, and the other system is connected to the pilot operation part of the unload oil passage switching valve. The hydraulic circuit of the machine.
け、前記開閉バルブのボディーにも油路を設け、ボディ
ー同士を結合し、各々の油路を接続したことを特徴とす
る請求項1または請求項2に記載の作業機械の油圧回
路。3. An oil passage is provided in a body of the hydraulic pump, an oil passage is also provided in a body of the opening / closing valve, the bodies are coupled to each other, and the respective oil passages are connected to each other. The hydraulic circuit of the working machine according to claim 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001283707A JP2003090303A (en) | 2001-09-18 | 2001-09-18 | Hydraulic circuit of working machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001283707A JP2003090303A (en) | 2001-09-18 | 2001-09-18 | Hydraulic circuit of working machine |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2003090303A true JP2003090303A (en) | 2003-03-28 |
Family
ID=19107158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001283707A Pending JP2003090303A (en) | 2001-09-18 | 2001-09-18 | Hydraulic circuit of working machine |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2003090303A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007262778A (en) * | 2006-03-29 | 2007-10-11 | Kobelco Contstruction Machinery Ltd | Pipe connecting device of working machine |
JP2010236288A (en) * | 2009-03-31 | 2010-10-21 | Hitachi Constr Mach Co Ltd | Construction machine |
CN114352594A (en) * | 2021-11-18 | 2022-04-15 | 斯特林液压制造(宁波)有限公司 | Simply connected pumping oscillating cylinder valve |
-
2001
- 2001-09-18 JP JP2001283707A patent/JP2003090303A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007262778A (en) * | 2006-03-29 | 2007-10-11 | Kobelco Contstruction Machinery Ltd | Pipe connecting device of working machine |
JP2010236288A (en) * | 2009-03-31 | 2010-10-21 | Hitachi Constr Mach Co Ltd | Construction machine |
CN114352594A (en) * | 2021-11-18 | 2022-04-15 | 斯特林液压制造(宁波)有限公司 | Simply connected pumping oscillating cylinder valve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6298716B2 (en) | Work machine | |
KR19980063733A (en) | Compact excavator with improved valve placement | |
JP6434504B2 (en) | Excavator and control method thereof | |
JP5358148B2 (en) | Switching valve operating mechanism for work vehicles | |
JP2003090303A (en) | Hydraulic circuit of working machine | |
WO2002048553A1 (en) | Change-over valve for boom cylinder of excavating/slewing work truck | |
JP3597693B2 (en) | Hydraulic drive circuit | |
JP7071198B2 (en) | Hydraulic circuit of work vehicle | |
JP3659549B2 (en) | Upper swing body for construction machinery | |
JP2003097505A (en) | Hydraulic circuit for working machine | |
JP2012021311A (en) | Hydraulic driving device for construction machine | |
JP4569940B2 (en) | Backhoe hydraulic circuit | |
CN113557339B (en) | Electrohydraulic device for earthmoving machine | |
JP2942102B2 (en) | Backhoe hydraulic circuit structure | |
JP4392142B2 (en) | Hydraulic equipment for excavating and turning work vehicle | |
JP2669943B2 (en) | Backhoe hydraulic operation structure | |
JP6786648B2 (en) | Work machine hydraulic system | |
JP2018071095A (en) | Oil passage switching control device for work vehicle | |
JP2574070Y2 (en) | Hydraulic oil switching device for actuator | |
JP2024140510A (en) | Hydraulic Drive System | |
JP2583139B2 (en) | Travel speed switching device for hydraulic excavator | |
JP2538709Y2 (en) | Hydraulic circuit of small excavator | |
JPH11270504A (en) | Hydraulic circuit | |
JPH09151479A (en) | Hydraulic circuit in civil working machine | |
JPH1037234A (en) | Hydraulic circuit of construction machine |