JP2002161560A - Piping method by centralized temperature adjustment, centralized temperature adjustment header, and piping material - Google Patents
Piping method by centralized temperature adjustment, centralized temperature adjustment header, and piping materialInfo
- Publication number
- JP2002161560A JP2002161560A JP2000358736A JP2000358736A JP2002161560A JP 2002161560 A JP2002161560 A JP 2002161560A JP 2000358736 A JP2000358736 A JP 2000358736A JP 2000358736 A JP2000358736 A JP 2000358736A JP 2002161560 A JP2002161560 A JP 2002161560A
- Authority
- JP
- Japan
- Prior art keywords
- water
- pipe
- hot water
- water supply
- hot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Domestic Plumbing Installations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、プレハブによる戸建住
宅や一戸建住宅など住居用の水回り配管に関し、台所、
浴室、トイレ、洗面台、洗濯機などの給水端末への給
湯、給水温度の温度調節を集中的に行なえるようにした
配管工法と、この配管に用いる集中温度調節ヘッダー及
び配管材に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a plumbing system for a residence such as a prefabricated detached house or a detached house.
The present invention relates to a plumbing method capable of centrally controlling the supply of hot water to a water supply terminal such as a bathroom, a toilet, a wash basin, and a washing machine, and a temperature control of a water supply temperature, and a centralized temperature control header and piping materials used for the piping. .
【0002】[0002]
【発明が解決しようとする課題】従来、住居用の水回り
配管は、給水引込み管から加熱給湯器を介した熱水配管
と冷水配管からの個別水流をそれぞれのヘッダーにおい
て配分し、熱水と冷水を格別に台所、浴室などの端末水
栓部に供給し、端末混合栓で熱水と冷水を混合させるこ
とにより使用水温の温度調節を行なうようにしてきてい
る。Conventionally, water plumbing pipes for residential use have been arranged such that individual water flows from a hot water pipe through a heating water heater and a cold water pipe from a water supply pipe are distributed in respective headers, and hot water and Cold water is specially supplied to a terminal faucet portion of a kitchen, a bathroom or the like, and hot water and cold water are mixed by a terminal mixer tap to control the temperature of the water used.
【0003】そのため、配分ヘッダーから各端末まで間
は熱水配管と冷水配管の2本の配管が必要となり、配管
材、配管スペース共に2倍の材料とスペースを用いなけ
ればならないという無駄が生じている。[0003] Therefore, two pipes, a hot water pipe and a cold water pipe, are required from the distribution header to each terminal, so that the use of twice as much material and space for both the pipe material and the pipe space occurs. I have.
【0004】また、従来の方式では各端末にツーバルブ
式の温度調節機構を備え、それぞれ混合水栓を用いなけ
ればならないという無駄もあった。Further, in the conventional system, each terminal is provided with a two-valve type temperature control mechanism, and it is necessary to use a mixing faucet.
【0005】更に、住居用の水回り配管については、寒
冷地や冬季における配管部の凍結に対して何らの対応が
なされておらず、凍結した場合の解凍に多大な労力を費
やさなければならないといった問題もあった。[0005] Furthermore, with respect to water plumbing pipes for residential use, no measures are taken against freezing of the pipes in cold regions or in winter, and a great deal of labor must be spent on thawing when frozen. There were also problems.
【0006】[0006]
【課題を解決するための手段】本発明は上記した課題に
対応しようとするものであり、給水引込み管からの配管
を加熱給湯器を介して集中温度調節ヘッダーに至る給湯
経路と、直接集中温度調節ヘッダーに至る給水経路に分
岐させると共に、集中温度調節ヘッダーにおいて、熱水
と冷水の混合調節及び給湯端末と給水端末への配分を行
なって各端末への直接配管を行なうようにした。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and has been made to solve the above-mentioned problem by connecting a pipe from a water supply inlet pipe to a centralized temperature control header via a heated water heater and a direct concentrated water temperature. In addition to branching into a water supply path leading to the control header, the centralized temperature control header controls mixing of hot water and cold water and distributes the hot water to the hot water supply terminal and the water supply terminal so that direct piping to each terminal is performed.
【0007】また、集中温度調節ヘッダーに遠隔操作可
能な熱水と冷水の流量調節バルブを内蔵し、各端末への
配分流路と配管ヘッドを備えたものを採用し、各給湯端
末に設置した操作パネルから発せられる電磁または電気
的信号により、流量調節バルブを操作して熱水と冷水の
混合調節操作を行なえるようにした。[0007] The centralized temperature control header incorporates a flow control valve for hot water and cold water which can be remotely operated, and has a distribution channel to each terminal and a piping head, and is installed at each hot water supply terminal. An electromagnetic or electric signal emitted from the operation panel operates the flow control valve so that the mixing control of hot water and cold water can be performed.
【0008】更に、住居用の水回り配管の寒冷地や冬季
における配管部の凍結に対して、管壁に難燃性樹脂被覆
加工を行なった発熱線を電源に対して直列回路構成とし
て沿設し、その外側を保温材で被覆した架橋ポリエチレ
ン管等の合成樹脂管を用いて、電源の入切により解凍操
作を行なえるようにし、その解凍操作を各給湯端末に設
置した操作パネルから発せられる電磁または電気的信号
により行なえるようにした。[0008] Further, in the cold district of water plumbing pipes for residential use and in the freezing of the pipe section in winter, a heat generating wire whose pipe wall is coated with a flame-retardant resin is arranged in series with a power supply in a series circuit configuration. Then, using a synthetic resin tube such as a crosslinked polyethylene tube whose outside is covered with a heat insulating material, the thawing operation can be performed by turning the power on and off, and the thawing operation is issued from the operation panel installed at each hot water supply terminal. It can be done by electromagnetic or electrical signals.
【0009】[0009]
【実施例】以下、本発明の実施例を図面を参照して説明
する。1は量水器を介した給水引込み管からの冷水給水
管で、分岐部11において加熱給湯器Aへの流路管12と集
中温度調節ヘッダー3の冷水ヘッダー32への流路管13に
分岐して、それぞれへの給水流路を構成している。Embodiments of the present invention will be described below with reference to the drawings. Reference numeral 1 denotes a cold water supply pipe from a water supply pipe through a water meter, which branches into a flow pipe 12 to a heating water heater A and a flow pipe 13 to a cold water header 32 of the centralized temperature control header 3 at a branch portion 11. Thus, a water supply flow path to each is formed.
【0010】流路管12の供給水は加熱給湯器Aにおいて
加熱され、熱水供給管2により集中温度調節ヘッダー3
に至り、流量調節バルブを内蔵する熱水ヘッダー31を経
て混合部33に、流路管13の供給水はヘッダー3内の配分
流路において水洗便器など冷水のみの使用端末への流路
4と、流量調節バルブを内蔵する冷水ヘッダー32を経て
混合部33に至る流路に配分供給される。The supply water of the flow pipe 12 is heated in the heating water heater A, and the hot water supply pipe 2 controls the centralized temperature control header 3.
To the mixing section 33 via a hot water header 31 having a built-in flow control valve, and the supply water of the flow path pipe 13 is distributed in a distribution flow path in the header 3 to a flow path 4 to a terminal using only cold water such as a flush toilet. The water is distributed and supplied to a flow path leading to a mixing section 33 through a cold water header 32 having a built-in flow control valve.
【0011】ヘッダー3内の混合部には、熱水ヘッダー
31と冷水ヘッダー32から各端末部に設置した操作パネル
6もしくは所定の場所に設置した集中操作パネルから発
せられる電磁または電気的信号により、所定の流量に調
節された熱水と冷水が混合合流部33で合流して端末での
使用温度に調節され、流路5によって使用端末に供給さ
れるものである。The mixing section in the header 3 includes a hot water header.
The hot water and the cold water, which are adjusted to a predetermined flow rate by the electromagnetic or electric signal emitted from the operation panel 6 installed at each terminal unit from the cold water header 32 or the centralized operation panel installed at a predetermined place from the header 31, are mixed and joined. They are joined at 33 and adjusted to the use temperature at the terminal, and supplied to the use terminal through the flow path 5.
【0012】次に、冬季に凍結する恐れのある地域にお
いて用いる配管材について説明すると、1aは経路配管と
して用いられる架橋ポリエチレン等の合成樹脂製流路管
本体で、管壁に架橋ポリエチレン等の難燃性樹脂による
被覆加工を行なった発熱線1bを電源に対して直列回路構
成として沿設され、その外周は保温材1cによって流路管
本体1aと一体に被覆されている。Next, a pipe material used in an area where there is a risk of freezing in winter will be described. A heating wire 1b coated with a flammable resin is provided along a power supply in a series circuit configuration, and the outer periphery thereof is integrally coated with a flow path tube main body 1a by a heat insulating material 1c.
【0013】発熱線1bは、13A及び14Aのニッケル線を
素材とし操作パネル6によって入切操作される電源に対
して直列回路構成となっているので、パネル6の電源入
切操作部63の操作によって所要部に入電されると、所要
部の発熱線1bが発熱し管本体1aを加熱して解凍が行なわ
れる。Since the heating wire 1b is made of nickel wires of 13A and 14A and has a serial circuit configuration with respect to a power supply which is turned on and off by the operation panel 6, the operation of the power on / off operation section 63 of the panel 6 is performed. When power is input to the required portion, the heating wire 1b of the required portion generates heat and heats the pipe body 1a to perform thawing.
【0014】電源は100V、15A専用電源で消費電力2000
Wh程度であり、解凍時間は30〜40分程度となっている。
なお、必要な場合には温度センサーによって自動的に電
源入切が行なわれるようにしても良い。The power supply is a dedicated power supply of 100V, 15A and power consumption of 2000
It is about Wh, and the thawing time is about 30 to 40 minutes.
If necessary, the power may be turned on and off automatically by the temperature sensor.
【0015】本発明は以上のように構成したので、配管
材料と施工労力を大幅に節約できると共に、寒冷地にお
いては集中操作によってワンタッチで凍結部の解凍を行
なうこともできる使い勝手の良い水回り端末を提供する
ことができたものである。Since the present invention is constructed as described above, the plumbing material and the construction labor can be largely saved, and in a cold region, the freezing part can be thawed with a single touch by a centralized operation. Was able to be provided.
【0016】[0016]
【図1】 本発明の実施例による配管工法の各端末への
配管施工状况を示す適用住居土台部分の全体斜視図FIG. 1 is an overall perspective view of a base portion of an applied dwelling, showing a state of a plumbing work at each terminal in a plumbing method according to an embodiment of the present invention.
【図2】 同じく、集中温度調節ヘッダー部の拡大斜視
図FIG. 2 is an enlarged perspective view of a centralized temperature control header part.
【図3】 同じく、集中温度調節ヘッダー操作パネルの
一例を示すパネルの正面図FIG. 3 is a front view of a panel showing an example of a centralized temperature control header operation panel.
【図4】 同じく、発熱線を沿設した経路配管材の一例
を示す配管材の断面拡大図FIG. 4 is an enlarged cross-sectional view of a pipe member showing an example of a route pipe member along a heating wire.
1 給水引込み管からの冷水給水管 11 冷水給水管の分岐部 12 加熱給湯器への流路管 13 冷水給水の流路管 1a 合成樹脂製流路管本体 1b 難燃性樹脂による被覆加工を行なった発熱線 1c 流路管周を被覆する保温材 2 加熱給湯器からの熱水供給管 3 集中温度調節ヘッダー 31 集中温度調節ヘッダーの熱水ヘッダー 32 集中温度調節ヘッダーの冷水ヘッダー 33 熱水と冷水の混合合流部 4 冷水のみの使用端末への流路 5 適温調節された給湯ヘッドから使用端末への供
給流路 6 温度調節ヘッダー操作パネル 61 操作パネルの温度表示部 62 操作パネルの温度調節操作部 63 操作パネルの電源入切操作部 A 加熱給湯器1 Cold water supply pipe from water supply inlet pipe 11 Branch of cold water supply pipe 12 Flow path pipe to heating water heater 13 Flow path pipe for cold water supply 1a Synthetic resin flow pipe main body 1b Coating with flame-retardant resin Heated wire 1c Heat insulator covering the circumference of the flow pipe 2 Hot water supply pipe from the heating water heater 3 Centralized temperature control header 31 Hot water header of centralized temperature control header 32 Cold water header of centralized temperature control header 33 Hot water and cold water 4 The flow path from the hot water supply head whose temperature has been adjusted to the usage terminal 6 The temperature adjustment header Operation panel 61 The temperature display section of the operation panel 62 The temperature adjustment operation section of the operation panel 63 Operation panel power on / off operation section A Heating water heater
Claims (5)
して集中温度調節ヘッダーに至る給湯経路と、直接集中
温度調節ヘッダーに至る給水経路に分岐させると共に、
集中温度調節ヘッダーにおいて、熱水と冷水の混合調節
及び給湯端末と給水端末への配分を行なって各端末への
直接配管を行なうようにしたことを特徴とする集中温度
調節による配管工法1. A pipe from a feed water supply pipe is branched into a hot water supply path via a heating water heater to a centralized temperature control header and a water supply path directly to a centralized temperature control header.
A piping method based on centralized temperature control, characterized in that, in the centralized temperature control header, mixing of hot water and cold water and distribution to hot water supply terminals and water supply terminals are performed and direct piping to each terminal is performed.
脂被覆加工を行なった発熱線を電源に対して直列回路構
成として沿設し、その外側を保温材で被覆した合成樹脂
管を用いて、電源の入切により解凍操作を行なえるよう
にした請求項1記載の集中温度調節による配管工法2. A synthetic resin pipe in which a heat-generating wire having a flame-retardant resin coating applied to a pipe wall is arranged in series with a power supply on a piping material in each path, and the outside thereof is covered with a heat insulating material. 3. The piping method according to claim 1, wherein the thawing operation can be performed by turning on / off the power supply.
冷水の混合調節操作及び解凍電源の入切操作を、各給湯
端末に設置した操作パネルにより行なえるようにした請
求項1又は請求項2記載の集中温度調節による配管工法3. The hot water and cold water mixing control operation, the hot water and cold water mixing control operation, and the thawing power on / off operation can be performed by an operation panel installed at each hot water supply terminal. Item 2. Plumbing method by centralized temperature control
ブを内蔵し、各端末への配分流路と配管ヘッドを備えて
成る集中温度調節ヘッダー4. A centralized temperature control header including a remotely controllable flow valve for hot water and cold water, a distribution channel to each terminal, and a piping head.
行なった発熱線を電源に対して直列回路構成として沿設
し、その外側を保温材で被覆した住居用の水回り配管材5. A water plumbing pipe for a residential house in which a heat-generating wire having a flame-retardant resin coating applied to a tube wall of a synthetic resin pipe is arranged in series with a power supply, and the outside thereof is covered with a heat insulating material. Lumber
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000358736A JP2002161560A (en) | 2000-11-27 | 2000-11-27 | Piping method by centralized temperature adjustment, centralized temperature adjustment header, and piping material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000358736A JP2002161560A (en) | 2000-11-27 | 2000-11-27 | Piping method by centralized temperature adjustment, centralized temperature adjustment header, and piping material |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002118701A Division JP2003027535A (en) | 2002-04-22 | 2002-04-22 | Plumbing method for water and its piping |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2002161560A true JP2002161560A (en) | 2002-06-04 |
Family
ID=18830587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000358736A Pending JP2002161560A (en) | 2000-11-27 | 2000-11-27 | Piping method by centralized temperature adjustment, centralized temperature adjustment header, and piping material |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2002161560A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114305177A (en) * | 2021-12-27 | 2022-04-12 | 席贻桥 | Shower cabinet |
-
2000
- 2000-11-27 JP JP2000358736A patent/JP2002161560A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114305177A (en) * | 2021-12-27 | 2022-04-12 | 席贻桥 | Shower cabinet |
CN114305177B (en) * | 2021-12-27 | 2024-05-17 | 安徽劳尚智能家居有限公司 | Shower cabinet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20050006402A1 (en) | Method of operating a plumbing system | |
GB2052698A (en) | Domestic Hot Water Supply | |
JP2002161560A (en) | Piping method by centralized temperature adjustment, centralized temperature adjustment header, and piping material | |
CN103776084A (en) | Conversion type water-saving electric assistant rapid heating water supply device and central heating non-central water supply system | |
KR20110060598A (en) | Cool and hot water control apparatus having a hot water supplying unit | |
ES2190088T3 (en) | WATER CONTROL DEVICE. | |
JPH10170005A (en) | Floor heating system | |
JP2003027535A (en) | Plumbing method for water and its piping | |
JP4168315B2 (en) | Hot water double pipe joint, outer pipe joint, hot water double header and hot water piping system | |
WO2003023155A1 (en) | Withdrawable single-pipe sanitary system | |
CN207113250U (en) | Water heater intelligent water route handover module and the dual or multi water-heater system for having the module | |
US20100258062A1 (en) | Cold water pre-heater | |
KR101486551B1 (en) | cold and hot water supplying system | |
JPH11247260A (en) | Toilet hot water hand washer | |
KR101525097B1 (en) | cold and hot water supplying system | |
KR20140068694A (en) | Water saving device using Bimetal sensor and Water supplying system having the device | |
CN211695378U (en) | Bidirectional water supply water heater | |
JPS6231813Y2 (en) | ||
JP2010071506A (en) | Floor cooling/heating device | |
US10087606B1 (en) | Plumbing system | |
JPH11337175A (en) | Electric water heater | |
CA1294851C (en) | Electrically actuated plumbing system | |
JPH0755256A (en) | Electric continuous water heater with switch | |
JPH11211110A (en) | Method and device for floor heating and floor heating unit | |
AU2022268319A1 (en) | Domestic hot water system |