GB325093A - Improvements relating to the provision of substructures, particularly for subaqueous work - Google Patents
Improvements relating to the provision of substructures, particularly for subaqueous workInfo
- Publication number
- GB325093A GB325093A GB417129A GB417129A GB325093A GB 325093 A GB325093 A GB 325093A GB 417129 A GB417129 A GB 417129A GB 417129 A GB417129 A GB 417129A GB 325093 A GB325093 A GB 325093A
- Authority
- GB
- United Kingdom
- Prior art keywords
- pile
- caisson
- piles
- pier
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/48—Foundations inserted underneath existing buildings or constructions
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Revetment (AREA)
Abstract
325,093. Formunt, J. A. Feb. 7, 1929. Piers; walls; piles, driving. - Sub-structures are placed below a pier or a like structure by inserting a caisson laterally under it, and maintaining the air pressure in the caisson; inside this sectional piles are driven so as to support the pier &c., and the caisson is finally filled with concrete. In preparation for underpinning the pier 1, a temporary pile 4 is driven equidistant from two piles 3 supporting the pier. A caisson consisting of a top plate 5 preferably of non-corrodible steel, a leading wall 6, and two side plates is lowered until the wall 6 is beneath the raft 2, and the chamber 9 and air-shaft 10 are attached. Compressed air is then forced in, and the soil under the wall 6 is removed. The caisson 5 is then gradually thrust forward by a winch 12 and rope 13, or by hydraulic or other means, the pile 4 and a cross-beam 28 being utilized for this purpose. The pile 4 is then cut down, and a permanent pile 16 utilized. These permanent piles consist of tubular sections of metal or concrete, and are pressed down in succession by a hydraulic ram 17, set between the roof 5 and the pile.' The earth &c. having been removed from the interior of the pile, it is filled with reinforcements and concrete. A packing-piece is then placed under the roof 5 and above the pile, and the space between the pile and the packing-piece is filled by fitting an inverted cup over the top end of the pile, end filling it with grout under pressure. When all the piles are driven and the load transferred to them, the whole of the caisson, except the chamber 9, is filled with reinforced or other concrete. When this is set, the shaft 10 and other parts are removed. The apparatus may be used to raise structures which have subsided.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB417129A GB325093A (en) | 1929-02-07 | 1929-02-07 | Improvements relating to the provision of substructures, particularly for subaqueous work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB417129A GB325093A (en) | 1929-02-07 | 1929-02-07 | Improvements relating to the provision of substructures, particularly for subaqueous work |
Publications (1)
Publication Number | Publication Date |
---|---|
GB325093A true GB325093A (en) | 1930-02-13 |
Family
ID=9772034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB417129A Expired GB325093A (en) | 1929-02-07 | 1929-02-07 | Improvements relating to the provision of substructures, particularly for subaqueous work |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB325093A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2451777A (en) * | 1946-09-06 | 1948-10-19 | Salas Miguel | Combination jack and concrete form |
US4255071A (en) * | 1979-08-27 | 1981-03-10 | Bochumer Eisenhutte Heintzmann Gmbh & Co. | Supporting of excavation roofs |
US4338047A (en) * | 1980-09-15 | 1982-07-06 | E. F. David, Inc. | System for pier underpinning of settling foundation |
FR2541704A1 (en) * | 1983-02-24 | 1984-08-31 | Deshais Marc | METHOD FOR MAKING A PREFABRICATED BASEMENT |
US4787779A (en) * | 1987-01-29 | 1988-11-29 | Clark Howard E | Method and apparatus for raising and supporting a foundation |
FR2634236A1 (en) * | 1988-07-18 | 1990-01-19 | Schutz Charles | METHOD FOR REPAIRING A FOUNDATION COMPRISING DETERIORATED PILE HEADS, ESPECIALLY WOOD PILES |
US4906140A (en) * | 1987-01-29 | 1990-03-06 | Clark Howard E | Method and apparatus for raising and supporting a foundation |
US6539685B2 (en) | 2000-11-28 | 2003-04-01 | Thomas A. Bell | Apparatus and method for lifting sunken foundations |
US7470090B2 (en) | 2006-06-13 | 2008-12-30 | Edward Heppner | Lifting bracket system supported on a pier for lifting a foundation |
EP2236677A3 (en) * | 2009-03-31 | 2013-06-19 | AS Amhold | Method for creating a building under an architectural monument |
CN115305939A (en) * | 2022-08-24 | 2022-11-08 | 中冶集团武汉勘察研究院有限公司 | Active pile-raft foundation settlement coordination structure and construction method |
-
1929
- 1929-02-07 GB GB417129A patent/GB325093A/en not_active Expired
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2451777A (en) * | 1946-09-06 | 1948-10-19 | Salas Miguel | Combination jack and concrete form |
US4255071A (en) * | 1979-08-27 | 1981-03-10 | Bochumer Eisenhutte Heintzmann Gmbh & Co. | Supporting of excavation roofs |
US4338047A (en) * | 1980-09-15 | 1982-07-06 | E. F. David, Inc. | System for pier underpinning of settling foundation |
FR2541704A1 (en) * | 1983-02-24 | 1984-08-31 | Deshais Marc | METHOD FOR MAKING A PREFABRICATED BASEMENT |
EP0165355A1 (en) * | 1983-02-24 | 1985-12-27 | Marc Deshais | Method of realizing a basement underneath an existing structure |
US4906140A (en) * | 1987-01-29 | 1990-03-06 | Clark Howard E | Method and apparatus for raising and supporting a foundation |
US4787779A (en) * | 1987-01-29 | 1988-11-29 | Clark Howard E | Method and apparatus for raising and supporting a foundation |
FR2634236A1 (en) * | 1988-07-18 | 1990-01-19 | Schutz Charles | METHOD FOR REPAIRING A FOUNDATION COMPRISING DETERIORATED PILE HEADS, ESPECIALLY WOOD PILES |
WO1990001089A1 (en) * | 1988-07-18 | 1990-02-08 | Schuetz Charles | Process for repairing foundations including damaged pile heads, in particular for timber piles |
US6539685B2 (en) | 2000-11-28 | 2003-04-01 | Thomas A. Bell | Apparatus and method for lifting sunken foundations |
US7470090B2 (en) | 2006-06-13 | 2008-12-30 | Edward Heppner | Lifting bracket system supported on a pier for lifting a foundation |
EP2236677A3 (en) * | 2009-03-31 | 2013-06-19 | AS Amhold | Method for creating a building under an architectural monument |
CN115305939A (en) * | 2022-08-24 | 2022-11-08 | 中冶集团武汉勘察研究院有限公司 | Active pile-raft foundation settlement coordination structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201883438U (en) | Pit-in-foundation-pit steel sheet pile foundation pit supporting structure | |
GB2067621A (en) | Erection of a structure on piles | |
GB325093A (en) | Improvements relating to the provision of substructures, particularly for subaqueous work | |
CN209243794U (en) | A kind of pile foundation building inclination rectification cuts stake and underpins position limiting structure | |
US12012715B2 (en) | Extensible shells and related methods for constructing a ductile support pier | |
US1598300A (en) | Foundation and the like | |
US2381014A (en) | Foundation and method of forming the same | |
Nonveiller | Open caissons for deep foundations | |
US2101358A (en) | Method of making load sustaining structures | |
GB263997A (en) | Improvements in and relating to the construction of quay walls, piers and other marine structures | |
WO2018232391A1 (en) | Extensible shells and related methods for constructing a ductile support pier | |
GB2104137A (en) | Kentledge apparatus | |
US1751835A (en) | Cofferdam and method of construction | |
Lengkeek et al. | Eemdijk full-scale field test programme: ground dyke and sheet pile dyke failure test | |
GB385647A (en) | Improvements in or relating to the construction of concrete piles | |
Mohan et al. | Remedial Underpinning of Steel Tank Foundation | |
US957844A (en) | Constructing foundations of buildings. | |
US1665796A (en) | Method of providing and placing piers | |
US1505238A (en) | Breakwater-wall construction | |
US933776A (en) | Sinking shafts and the like. | |
GB208620A (en) | Improvements in and relating to caissons, coffer dams, platforms and the like | |
US1221068A (en) | Method of building and placing piers. | |
US1418879A (en) | Cofferdam construction | |
GB104691A (en) | Improvement in Method of Providing Substructures for Structures. | |
US745457A (en) | Subaqueous tunnel. |