EP2313568A1 - Method for forming connecting structure between pillar and beam, and connecting structure between pillar and beam - Google Patents

Method for forming connecting structure between pillar and beam, and connecting structure between pillar and beam

Info

Publication number
EP2313568A1
EP2313568A1 EP09769429A EP09769429A EP2313568A1 EP 2313568 A1 EP2313568 A1 EP 2313568A1 EP 09769429 A EP09769429 A EP 09769429A EP 09769429 A EP09769429 A EP 09769429A EP 2313568 A1 EP2313568 A1 EP 2313568A1
Authority
EP
European Patent Office
Prior art keywords
pillar
pillars
beams
storey
connecting point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09769429A
Other languages
German (de)
French (fr)
Other versions
EP2313568A4 (en
Inventor
Simo Peltonen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peikko Group Oy
Original Assignee
Peikko Group Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peikko Group Oy filed Critical Peikko Group Oy
Publication of EP2313568A1 publication Critical patent/EP2313568A1/en
Publication of EP2313568A4 publication Critical patent/EP2313568A4/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
    • E04B5/043Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement having elongated hollow cores
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/166Connectors or means for connecting parts for reinforcements the reinforcements running in different directions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions

Definitions

  • the invention relates to a method for forming a connecting structure between a pillar and beam, in which method multi-storey reinforced concrete pillars or multi-storey composite pillars and single-span beams are prefabricated and transported to the construction site, the pillars are mounted in place, and the beams and pillars connected at the construction site to form a connection.
  • the invention further relates to a connecting structure between a pillar and beam.
  • framework systems are continuously developed that differ from each other in the dimensions of components, materials, prefabhcation degree, mounting manner, load transmission manner, and various other matters.
  • the invention relates to a framework system having as load-bearing structures pillars, beams, and slabs.
  • Such frameworks may be constructed entirely at the construction site, constructed entirely from prefabricated elements or by using composite structures, whereby cast-in-place structures, that is, structures obtained by concreting at the construction site, are connected to prefabricated elements that also serve as moulds.
  • On-site casting generally means slow moulding work, reinforcement work, lots of supporting work, and other corresponding work phases, which means that a completely cast-in-place structure is today rare owing to its expensiveness.
  • Pillars are vertical structures to which primary horizontal structures, or beams, supporting secondary horizontal structures, or slabs, are supported.
  • the pillars may be of different lengths, as high as one storey, that is, single-storey pillars, or as high as several storeys, that is, multi-storey pillars.
  • the beams may also be of different lengths, in other words, single-span beams that extend to adjacent pillars at both ends or continuous beams that extend over several pillars.
  • a double-span beam extends from one pillar over an adjacent pillar to a third one.
  • single-span beams are generally used, and they support themselves to consoles in the pillars and are, thus, disposed between the pillars.
  • An advantage of the multi-storey pillars is that the number of pillars is small and there are no extension connectors.
  • their disadvantages are the consoles that cause extra costs and also the fact that static dimensioning of multi-storey pillars is arduous.
  • An advantage of the single-storey pillars is that there are no consoles and static dimensioning is simple. Their disadvantages are in turn the extension connectors of the pillars and the large number of pillars.
  • An advantage of a continuous beam is that its structure is lower and the fact that less beams are required. Another advantage is a good dynamic damping capacity of the structure. A disadvantage is in turn the fact that static dimensioning is arduous and also that a continuous beam requires reinforcements at the pillar.
  • An advantage of a single-span beam is that static dimensioning is simple and that no reinforcements are required at the pillar.
  • a disadvantage is that the beam is higher and the number of beams is high.
  • a structure formed by a single-span beam also has a poor damping capacity.
  • extension connectors of pillars are generally bolts and pillar shoes or steel plates.
  • extension connectors When using extension connectors, the amount of steel in the pillar increases, which adds to the costs.
  • the consoles in the pillar are either concrete consoles protruding from the pillar or steel consoles protruding from the pillar that are fas- tened after casting.
  • openings need to be made in the mould of the pillar, and the console protruding from the pillar needs to be moulded separately. This is slow and, therefore, also expensive.
  • steel consoles no holes need necessarily be made in the mould, but the amount of steel in the pillar increases, thus increasing the costs of the pillar.
  • consoles also affects the strain of the pillars. When a support reaction of a beam arrives at a console protruding from a pillar, its point of action is outside the cross-section of the pillar.
  • This eccentricity in other words, the distance between the point of action of the load and the centre of gravity of the pillar, causes a bending moment in the pillar, which needs to be taken into consideration in the static dimensioning of the pillar.
  • the pillar has to endure this bending moment without buckling, for example.
  • the bending moment increases the strain on the pillar and, thus, increases the cross-section and/or amount of steel in the pillar. This, in turn, increases the costs of the pillar.
  • Many console solutions of pillars are also so high that they often extend below the bottom surface of the beam. This is an architecturally poor solution and also complicates piping and partition wall work in the building.
  • Static dimensioning of a multi-storey pillar is somewhat more arduous than the dimensioning of a single-storey pillar. This is due to the increase in the number of load alternatives and a more complex operational model of the pillar.
  • a hinge-supported single-span beam is able to turn freely when bending on a support. This leads to needing a sufficiently rigid cross- section for the beam so that the bending in the middle of the beam does not become too large for the use of the building. This is why single-span beams are high.
  • An increase in the height of the beam affects not only material consumption and increases the weight of the structure, but also increases the total building height and the space to be heated.
  • a high beam extends below the floor and impedes piping and partition wall work and other mounting work in the building. All these add to the costs of the building.
  • beams extending below the floor impede later alteration work in the building, thus reducing its adaptability to change.
  • the damping capacity of a structure refers to the ability of the structure to absorb vibration energy. If the damping capacity of a structure is low, the movements of the structural parts may during vibration become stronger in the building when the frequency of the vibration is in range with the frequency of the structure. In such a case, the structures may be damaged or collapse.
  • the damping capacity of a structure is significant when building in an area where tremors and vibration may take place.
  • a continuous beam generally needs reinforcements at the pillar line so that loads from the pillar above can be transmitted to the pillars below through the beam. This usually means additional steel parts in the beam. These increase the cost of the beam. Additional steel parts also cause local stress centres in the pillars which, therefore, need additional reinforcing fittings, for instance, to prevent splitting.
  • Static dimensioning of single-span beams is somewhat simpler than that of continuous beams. This is due to the fact that single-span beams are generally designed hinge-supported at their ends.
  • console solution discloses in Finnish patent application No. 20060075, in which a concrete console mounted later on the pillar is used.
  • the drawbacks of this solution are steel parts in the console that add to the cost of the pillar.
  • the load coming to the console is also far from the centre of gravity of the pillar and, thus, adds to the loads coming to the pillar. This results in an increase in the cross-section and cost of the pillar.
  • the solution is also only suitable for use with hinge-supported single-span beams.
  • Continuous beams are made either very long or else by connecting shorter beams to each other with bolted joints, for instance, at the construction site. Extensions are slow to make at the site and require exact manufacturing and mounting tolerances. A connecting joint often also remains visible as an aesthetic flaw and causes a special point for fire protection. A connection may also be done at the site by welding, which is slow and expensive and requires good quality assurance. Continuous structures are also made by on-site casting, whereby the work is very slow with many work phases including moulding, reinforcing, supporting, casting, and the like.
  • the method of the invention is characterised in that the reinforcing steel fittings (6) are arranged to extend into a hole/notch at the end of the beam and to support on its rim.
  • the connecting structure of the invention is, in turn, characterised in that the reinforcing steel fittings (6) are arranged to extend into a hole/notch at the end of the beam and to support to its rim.
  • the invention provides a structure made of a multistorey pillar without consoles and a continuous beam made of single-span beams, and a method for forming it.
  • the invention has the advantages of a multi-storey pillar without the drawbacks caused by the consoles and the advantages of a continuous beam without reinforcements at the pillars.
  • the invention provides the advantage that the number of pillars remains low and there are no extensions and consoles.
  • the structure of the invention is also low. There are only a few beams at the site, and the damping capacity of the structure is good.
  • the solution of the invention also does not require reinforcements at the pillar.
  • Figure 1 is a general perspective view of a possible pillar of a connection of the invention
  • Figure 2 is a general side view of the basic principle of a connecting structure of the invention
  • Figures 3 to 4 are general perspective views of a connecting structure of the invention with several different solutions for supporting a beam
  • Figure 5 is a general perspective view of the example of Figure 4 in a situation in which slabs are mounted on the beam, and
  • Figures 6 to 8 are general perspective views of various embodiments of a connecting structure of the invention.
  • the invention relates to a method for forming a connecting structure between a pillar and beam, and to a connecting structure.
  • multi-storey reinforced concrete pillars or multi- storey composite pillars and single-span beams are prefabricated and transported to a construction site, the pillars are mounted in place, and the beams and pillars are connected to each other at the construction site to form a connection.
  • the invention is a combination of a multi-storey pillar without consoles and a continuous beam made of single-span beams. This solution provides the advantages of a multi-storey pillar without the drawbacks caused by the consoles and the advantages of a continuous beam without reinforcements at the pillars.
  • FIG. 1 is a general view of an embodiment of the above-mentioned pillars.
  • the pillar is marked with reference number 1.
  • the connecting point of the beams is marked with reference number 2.
  • the reinforcement and/or other steel parts visible at the connecting point are marked with reference number 3.
  • the reinforcement and/or other steel parts of the pillar are completely visible, in other words, the connecting point only has the reinforcement and/or other steel parts.
  • the connecting point In large pillars, there may be a concrete neck in the middle of the pillar.
  • the connecting points 2 of the pillar and beam have not been concreted when they are brought to the construction site.
  • Single-span beams 4 with a connector 5 at both ends are also brought to the construction site.
  • the connector 5 may be made of a metal material, such as a steel material.
  • the beam may be a reinforced concrete composite beam.
  • the figures show the steel part of the beam. The basic principle of the connecting structure of the invention is shown in Figure 2.
  • the method comprises steps for prefabricating multi-storey reinforced concrete pillars or multi-storey composite pillars 1 in such a manner that there is only reinforcement 3 at the connecting point 2 of the beam and pillar.
  • Single- span beams 4 are prefabricated in such a manner that both ends of the beams have a connector 5.
  • the beams are mounted and supported between stationary pillars 1 in such a manner that the connectors 5 at the ends of the beams or their action extend inside the pillar 1 at the connecting point 2 of the beam and pillar.
  • Reinforcing steel fittings 6 extending through the pillar 1 at the con- necting point 2 are mounted in the area of the beam end.
  • the beam 4 and connecting point 2 are concreted together.
  • the beams 4 are mounted between the pillars 1 at a correct height on a support in such a manner that the ends of the beams are in a way embedded into the pillar 1.
  • the support of the beam 4 may be a part 7 fastened to the pillar 1 and later removed, as shown in Figure 3, for example.
  • the beam may also be supported from below by means of support members 8, as shown in Figure 4.
  • the beam 4 is only supported at its ends.
  • Reinforcing steel fittings 6 extending through the pillar at the connecting point are mounted at the connecting point of the pillar and beam to provide a connection.
  • the above-mentioned reinforcing steel fittings 6 extending through the beam and parallel thereto are separate elements to be mounted on site, for instance deformed reinforcing steel bars.
  • the reinforcing steel fittings 6 may extend through a hole or notch at the end of the beam and support on its rim as shown in Figures 6 to 8, for instance.
  • the holes or notches may either be in the connector 5 or in a flange at the end of the beam or in both as shown in the figures.
  • the reinforcing steel fittings 6 may also extend to the side of the beam 4 as shown in Figure 7, or inside the beam as shown in Figure 8. At this stage, it is also possible to mount slabs 9 on the beam as shown in Figures 5 and 6.
  • the reinforcing steel fittings 6 may preferably be bound to the reinforcements and/or structures of the pillar 1 and beam 4.
  • the beam 4 is concreted at the same time as the slabs 9, in other words, the steel part of the beam 4 is also filled with concrete and, at the same time, the connecting point 2 is concreted. After the concrete is hardened, the mounting supports of the beam may be removed. After this, the reinforcing steel fittings 6 extending through the pillar at the end of the beam serve as extension steel fittings and form continuous structures of the beams 4. The above-mentioned reinforcing steel fittings mounted on site do not require any special skills or conditions.
  • connection between the pillar 1 and beam 4 remains completely hidden inside the concreting, so it is already fire protected by concrete and a separate protecting phase with special materials is not needed.
  • the connection is also invisible, so the visible structure is neat and clean and does not require covering.
  • the bottom surface of the beam is uniform along the entire length of the beam. It does not have a downward-opening slot for a console, for instance, which would be visible from a finished structure as an irregularity.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a method for forming a connecting structure between a pillar and beam, the method comprising prefabricating multi-storey reinforced concrete pillars or multi-storey composite pillars (1 ) and single-span beams (4) and transporting them to a construction site, mounting the pillars in place, and connecting the beams and pillars to each other at the construction site to form a connection, and to a connecting structure between a beam and pillar. In the invention, the multi-storey reinforced concrete pillars or multistorey composite pillars are prefabricated in such a manner that reinforcement and/or other steel parts (3) are visible at the connecting point (2) of beam and pillar. The single-span beams (4) are prefabricated in such a manner that both ends of the beams have a connector (5). The beams (4) are mounted and supported between stationary pillars (1 ) in such a manner that the connectors (5) at the ends of the beams or their action extends inside the pillar at the connecting point (2) of the beam and pillar. In the area of the end of the beam (4) reinforcing steel fittings (6) extending through the pillar (1 ) at the connecting point (2) are mounted, and the beam (4) and connecting point (2) are concreted together.

Description

Method for forming connecting structure between pillar and beam, and connecting structure between pillar and beam
[0001] The invention relates to a method for forming a connecting structure between a pillar and beam, in which method multi-storey reinforced concrete pillars or multi-storey composite pillars and single-span beams are prefabricated and transported to the construction site, the pillars are mounted in place, and the beams and pillars connected at the construction site to form a connection. The invention further relates to a connecting structure between a pillar and beam.
[0002] In construction, framework systems are continuously developed that differ from each other in the dimensions of components, materials, prefabhcation degree, mounting manner, load transmission manner, and various other matters. The invention relates to a framework system having as load-bearing structures pillars, beams, and slabs. Such frameworks may be constructed entirely at the construction site, constructed entirely from prefabricated elements or by using composite structures, whereby cast-in-place structures, that is, structures obtained by concreting at the construction site, are connected to prefabricated elements that also serve as moulds.
[0003] On-site casting generally means slow moulding work, reinforcement work, lots of supporting work, and other corresponding work phases, which means that a completely cast-in-place structure is today rare owing to its expensiveness.
[0004] Full prefabricated building in turn sets high requirements on the connections between the elements in terms of their load-transmission capability, tightness, sound-proofing capability, and appearance.
[0005] Today, it is becoming more common to use structures with prefabricated steel, reinforced concrete, or composite structures and to combine them at the site with some casting. This way, it is possible to combine the speed of prefabricated building, while the prefabricated elements serve as moulds at the same time, and the advantages derived from on-site casting.
[0006] Pillars are vertical structures to which primary horizontal structures, or beams, supporting secondary horizontal structures, or slabs, are supported. The pillars may be of different lengths, as high as one storey, that is, single-storey pillars, or as high as several storeys, that is, multi-storey pillars. [0007] The beams may also be of different lengths, in other words, single-span beams that extend to adjacent pillars at both ends or continuous beams that extend over several pillars. A double-span beam extends from one pillar over an adjacent pillar to a third one.
[0008] With multi-storey pillars, single-span beams are generally used, and they support themselves to consoles in the pillars and are, thus, disposed between the pillars.
[0009] With single-storey pillars, continuous beams are generally used, and the pillars of the next storey support themselves on the top surface of the beam.
[0010] An advantage of the multi-storey pillars is that the number of pillars is small and there are no extension connectors. Correspondingly, their disadvantages are the consoles that cause extra costs and also the fact that static dimensioning of multi-storey pillars is arduous.
[0011] An advantage of the single-storey pillars is that there are no consoles and static dimensioning is simple. Their disadvantages are in turn the extension connectors of the pillars and the large number of pillars.
[0012] An advantage of a continuous beam is that its structure is lower and the fact that less beams are required. Another advantage is a good dynamic damping capacity of the structure. A disadvantage is in turn the fact that static dimensioning is arduous and also that a continuous beam requires reinforcements at the pillar.
[0013] An advantage of a single-span beam is that static dimensioning is simple and that no reinforcements are required at the pillar. A disadvantage is that the beam is higher and the number of beams is high. A structure formed by a single-span beam also has a poor damping capacity.
[0014] The number of pillars makes it necessary to cast, move, transport, and mount each pillar separately. If the number of such steps increases, both the total costs and total time consumed increases significantly. One three-storey high pillar contains a third of these steps in comparison with the steps required by three single-storey pillars.
[0015] The extension connectors of pillars are generally bolts and pillar shoes or steel plates. When using extension connectors, the amount of steel in the pillar increases, which adds to the costs.
[0016] The consoles in the pillar are either concrete consoles protruding from the pillar or steel consoles protruding from the pillar that are fas- tened after casting. When using concrete consoles, openings need to be made in the mould of the pillar, and the console protruding from the pillar needs to be moulded separately. This is slow and, therefore, also expensive. When using steel consoles, no holes need necessarily be made in the mould, but the amount of steel in the pillar increases, thus increasing the costs of the pillar. Using consoles also affects the strain of the pillars. When a support reaction of a beam arrives at a console protruding from a pillar, its point of action is outside the cross-section of the pillar. This eccentricity, in other words, the distance between the point of action of the load and the centre of gravity of the pillar, causes a bending moment in the pillar, which needs to be taken into consideration in the static dimensioning of the pillar. The pillar has to endure this bending moment without buckling, for example. The bending moment increases the strain on the pillar and, thus, increases the cross-section and/or amount of steel in the pillar. This, in turn, increases the costs of the pillar. Many console solutions of pillars are also so high that they often extend below the bottom surface of the beam. This is an architecturally poor solution and also complicates piping and partition wall work in the building.
[0017] Static dimensioning of a multi-storey pillar is somewhat more arduous than the dimensioning of a single-storey pillar. This is due to the increase in the number of load alternatives and a more complex operational model of the pillar.
[0018] A hinge-supported single-span beam is able to turn freely when bending on a support. This leads to needing a sufficiently rigid cross- section for the beam so that the bending in the middle of the beam does not become too large for the use of the building. This is why single-span beams are high. An increase in the height of the beam affects not only material consumption and increases the weight of the structure, but also increases the total building height and the space to be heated. In addition, a high beam extends below the floor and impedes piping and partition wall work and other mounting work in the building. All these add to the costs of the building. In addition, beams extending below the floor impede later alteration work in the building, thus reducing its adaptability to change.
[0019] The number of beams makes it necessary to cast, move, transport, and mount each beam separately. If the number of such steps increases, both the total costs and total time consumed increases significantly. One double-span beam contains half of these steps in comparison with the steps of two pieces of single-span beams.
[0020] The damping capacity of a structure refers to the ability of the structure to absorb vibration energy. If the damping capacity of a structure is low, the movements of the structural parts may during vibration become stronger in the building when the frequency of the vibration is in range with the frequency of the structure. In such a case, the structures may be damaged or collapse. The damping capacity of a structure is significant when building in an area where tremors and vibration may take place.
[0021] A continuous beam generally needs reinforcements at the pillar line so that loads from the pillar above can be transmitted to the pillars below through the beam. This usually means additional steel parts in the beam. These increase the cost of the beam. Additional steel parts also cause local stress centres in the pillars which, therefore, need additional reinforcing fittings, for instance, to prevent splitting.
[0022] Static dimensioning of single-span beams is somewhat simpler than that of continuous beams. This is due to the fact that single-span beams are generally designed hinge-supported at their ends.
[0023] As an example of solutions known in the art is the console solution discloses in Finnish patent application No. 20060075, in which a concrete console mounted later on the pillar is used. The drawbacks of this solution are steel parts in the console that add to the cost of the pillar. The load coming to the console is also far from the centre of gravity of the pillar and, thus, adds to the loads coming to the pillar. This results in an increase in the cross-section and cost of the pillar. The solution is also only suitable for use with hinge-supported single-span beams.
[0024] Another example of known solutions is the console solution disclosed in EP 1 405 957, in which a steel console mounted later on the pillar is used. This solution has the same drawbacks as the solution of the Finnish application No. 20060075.
[0025] Continuous beams are made either very long or else by connecting shorter beams to each other with bolted joints, for instance, at the construction site. Extensions are slow to make at the site and require exact manufacturing and mounting tolerances. A connecting joint often also remains visible as an aesthetic flaw and causes a special point for fire protection. A connection may also be done at the site by welding, which is slow and expensive and requires good quality assurance. Continuous structures are also made by on-site casting, whereby the work is very slow with many work phases including moulding, reinforcing, supporting, casting, and the like.
[0026] It is an object of the invention to provide a method and structure with which the drawbacks of the prior-art solutions may be eliminated. This is achieved with the method and structure of the invention. The method of the invention is characterised in that the reinforcing steel fittings (6) are arranged to extend into a hole/notch at the end of the beam and to support on its rim.
[0027] The connecting structure of the invention is, in turn, characterised in that the reinforcing steel fittings (6) are arranged to extend into a hole/notch at the end of the beam and to support to its rim.
[0028] Thus, the invention provides a structure made of a multistorey pillar without consoles and a continuous beam made of single-span beams, and a method for forming it. The invention has the advantages of a multi-storey pillar without the drawbacks caused by the consoles and the advantages of a continuous beam without reinforcements at the pillars. The invention provides the advantage that the number of pillars remains low and there are no extensions and consoles. The structure of the invention is also low. There are only a few beams at the site, and the damping capacity of the structure is good. The solution of the invention also does not require reinforcements at the pillar.
[0029] In the following, the invention will be described in more detail by means of the working examples disclosed in the drawings, in which
Figure 1 is a general perspective view of a possible pillar of a connection of the invention,
Figure 2 is a general side view of the basic principle of a connecting structure of the invention,
Figures 3 to 4 are general perspective views of a connecting structure of the invention with several different solutions for supporting a beam,
Figure 5 is a general perspective view of the example of Figure 4 in a situation in which slabs are mounted on the beam, and
Figures 6 to 8 are general perspective views of various embodiments of a connecting structure of the invention.
[0030] As stated above, the invention relates to a method for forming a connecting structure between a pillar and beam, and to a connecting structure. In the invention, multi-storey reinforced concrete pillars or multi- storey composite pillars and single-span beams are prefabricated and transported to a construction site, the pillars are mounted in place, and the beams and pillars are connected to each other at the construction site to form a connection. Thus, the invention is a combination of a multi-storey pillar without consoles and a continuous beam made of single-span beams. This solution provides the advantages of a multi-storey pillar without the drawbacks caused by the consoles and the advantages of a continuous beam without reinforcements at the pillars.
[0031] According to the essential idea of the invention, multi-storey reinforced concrete pillars or multi-storey composite pillars made at a prefabri- cation factory and having reinforcement and/or other steel parts visible at the connecting points of the beams are transported to the site and mounted in place. Figure 1 is a general view of an embodiment of the above-mentioned pillars. The pillar is marked with reference number 1. The connecting point of the beams is marked with reference number 2. The reinforcement and/or other steel parts visible at the connecting point are marked with reference number 3.
[0032] In the embodiment of Figure 1 , the reinforcement and/or other steel parts of the pillar are completely visible, in other words, the connecting point only has the reinforcement and/or other steel parts. In large pillars, there may be a concrete neck in the middle of the pillar.
[0033] As stated above, the connecting points 2 of the pillar and beam have not been concreted when they are brought to the construction site. Single-span beams 4 with a connector 5 at both ends are also brought to the construction site. The connector 5 may be made of a metal material, such as a steel material. The beam may be a reinforced concrete composite beam. The figures show the steel part of the beam. The basic principle of the connecting structure of the invention is shown in Figure 2.
[0034] According to the essential idea of the method of the invention, the method comprises steps for prefabricating multi-storey reinforced concrete pillars or multi-storey composite pillars 1 in such a manner that there is only reinforcement 3 at the connecting point 2 of the beam and pillar. Single- span beams 4 are prefabricated in such a manner that both ends of the beams have a connector 5. The beams are mounted and supported between stationary pillars 1 in such a manner that the connectors 5 at the ends of the beams or their action extend inside the pillar 1 at the connecting point 2 of the beam and pillar. Reinforcing steel fittings 6 extending through the pillar 1 at the con- necting point 2 are mounted in the area of the beam end. Finally, the beam 4 and connecting point 2 are concreted together.
[0035] Thus, the beams 4 are mounted between the pillars 1 at a correct height on a support in such a manner that the ends of the beams are in a way embedded into the pillar 1. The support of the beam 4 may be a part 7 fastened to the pillar 1 and later removed, as shown in Figure 3, for example. The beam may also be supported from below by means of support members 8, as shown in Figure 4. The beam 4 is only supported at its ends.
[0036] Reinforcing steel fittings 6 extending through the pillar at the connecting point are mounted at the connecting point of the pillar and beam to provide a connection. The above-mentioned reinforcing steel fittings 6 extending through the beam and parallel thereto are separate elements to be mounted on site, for instance deformed reinforcing steel bars. The reinforcing steel fittings 6 may extend through a hole or notch at the end of the beam and support on its rim as shown in Figures 6 to 8, for instance. The holes or notches may either be in the connector 5 or in a flange at the end of the beam or in both as shown in the figures. The reinforcing steel fittings 6 may also extend to the side of the beam 4 as shown in Figure 7, or inside the beam as shown in Figure 8. At this stage, it is also possible to mount slabs 9 on the beam as shown in Figures 5 and 6.
[0037] The reinforcing steel fittings 6 may preferably be bound to the reinforcements and/or structures of the pillar 1 and beam 4.
[0038] The beam 4 is concreted at the same time as the slabs 9, in other words, the steel part of the beam 4 is also filled with concrete and, at the same time, the connecting point 2 is concreted. After the concrete is hardened, the mounting supports of the beam may be removed. After this, the reinforcing steel fittings 6 extending through the pillar at the end of the beam serve as extension steel fittings and form continuous structures of the beams 4. The above-mentioned reinforcing steel fittings mounted on site do not require any special skills or conditions.
[0039] The connection between the pillar 1 and beam 4 remains completely hidden inside the concreting, so it is already fire protected by concrete and a separate protecting phase with special materials is not needed. The connection is also invisible, so the visible structure is neat and clean and does not require covering. The bottom surface of the beam is uniform along the entire length of the beam. It does not have a downward-opening slot for a console, for instance, which would be visible from a finished structure as an irregularity.
[0040] The above embodiments of the invention are not intended to restrict the invention in any way, but the invention may be varied freely within the scope of the claims. The dimensioning of the structure of the invention and the number and design of various elements may differ considerably from the examples of the figures.

Claims

Claims
1. A method for forming a connecting structure between a pillar and beam, the method comprising prefabricating multi-storey reinforced concrete pillars or multi-storey composite pillars (1) and single-span beams (4) and transporting them to a construction site, mounting the pillars in place, and connecting the beams and pillars to each other at the construction site to form a connection, the method comprising the following steps of:
- prefabricating the multi-storey reinforced concrete pillars or multistorey composite pillars in such a manner that reinforcement and/or other steel parts (3) are visible at the connecting point (2),
- prefabricating the single-span beams (4) in such a manner that both ends of the beams have a connector (5).
- mounting and supporting the beams (4) between stationary pillars (1) in such a manner that the connectors (5) at the ends of the beams or their action extends inside the pillar (1) at the connecting point (2) of the beam and pillar,
- mounting in the area of the end of the beam (4) reinforcing steel fittings (6) extending through the pillar (1) at the connecting point (2), and
- concreting the beam (4) and connecting point (2) together, characterised in that the reinforcing steel fittings (6) are arranged to extend into a hole/notch at the end of the beam and to support on its rim.
2. A method as claimed in claim ^ characterised in that the holes/notches at the end of the beam are arranged to the connector (5) and/or a flange at the end of the beam.
3. A method as claimed in claim ^ characterised in that the multi-storey reinforced concrete pillars or multi-storey composite pillars are prefabricated in such a manner that there is only reinforcement and/or other steel parts (3) at the connecting point (2) of the beam and pillar.
4. A method as claimed in claim ^ characterised in that the reinforcing steel fittings (6) are bound to the reinforcement/structures of the pillar and beam in such a manner that the reinforcing steel fittings (6) connect the beams to each other through the pillar.
5. A method as claimed in claim ^ characterised in that the mounting-time supports (7, 8) of the beam are removed after the concrete has hardened.
6. A method as claimed in claim ^ characterised in that the reinforcing steel fittings (6) are also arranged to extend to the sides of the beam (4).
7. A method as claimed in claim ^ characterised in that slabs (9) are mounted on the beams (4) and that the beam (4) and the connecting point (2) between the beam and pillar are concreted together at the same time as the slab seams are concreted.
8. A connecting structure between a pillar and beam, in which prefabricated multi-storey reinforced concrete pillars or multi-storey composite pillars (1) and single-span beams (4) are connected to each other to form a connection, whereby the prefabricated multi-storey reinforced concrete pillars or multi-storey composite pillars (1) are made in such a manner that reinforcement and/or other steel parts (3) are visible at the connecting point (2) of the beam and pillar and the ends of the beam have connectors (5), that the beam is mounted and supported on the pillar in such a manner that the connectors
(5) at the ends of the beam or their action extends inside the pillar at the connecting point (2) of the beam and pillar, that reinforcing steel fittings (6) extending through the pillar (1) at the connecting point (2) are mounted in the area of the end of the beam, and that the beam (4) and connecting point (2) are concreted, whereby after the concrete has hardened, the reinforcing steel fittings
(6) extending through the pillar serve as extension steel fittings and form continuous structures of the beams (4), characterised in that the reinforcing steel fittings (6) are arranged to extend into a hole/notch at the end of the beam and to support to its rim.
9. A connecting structure as claimed in claim 8, characterised in that the holes/notches at the end of the beam are arranged to the connector (5) and/or a flange at the end of the beam.
10. A connecting structure as claimed in claim 8, characterised in that there is only reinforcement and/or other steel parts (3) at the connecting point of the beam and pillar.
11. A connecting structure as claimed in claim 8, characterised in that the reinforcing steel fittings (6) are bound to the reinforcement/structures of the pillar and beam and that the reinforcing steel fittings (6) are arranged to connect the beams to each other through the pillar.
12. A connecting structure as claimed in claim 8, characterised in that the reinforcing steel fittings (6) are arranged to extend to the sides of the beam (4).
13. A connecting structure as claimed in claim 8, characterised in that the connectors (5) at the ends of the beams are parts made of a metal material.
EP09769429.3A 2008-06-27 2009-06-24 Method for forming connecting structure between pillar and beam, and connecting structure between pillar and beam Withdrawn EP2313568A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI20085658A FI125420B (en) 2008-06-27 2008-06-27 Method for providing a joint construction between a pillar and a beam and a joint construction between a pillar and a beam
PCT/FI2009/050560 WO2009156586A1 (en) 2008-06-27 2009-06-24 Method for forming connecting structure between pillar and beam, and connecting structure between pillar and beam

Publications (2)

Publication Number Publication Date
EP2313568A1 true EP2313568A1 (en) 2011-04-27
EP2313568A4 EP2313568A4 (en) 2014-10-01

Family

ID=39589419

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09769429.3A Withdrawn EP2313568A4 (en) 2008-06-27 2009-06-24 Method for forming connecting structure between pillar and beam, and connecting structure between pillar and beam

Country Status (3)

Country Link
EP (1) EP2313568A4 (en)
FI (1) FI125420B (en)
WO (1) WO2009156586A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010025839B4 (en) * 2010-07-01 2012-10-04 Alexander Wien Ventilation network with a hat profile support and at least one ceiling element
JP5818363B2 (en) * 2012-06-05 2015-11-18 鹿島建設株式会社 Beam member holding member and beam member holding device at column / beam joint
SG10201703171UA (en) * 2012-10-18 2017-06-29 Merhis Pty Ltd Methods, systems and components for multi-storey building construction
JP6442314B2 (en) * 2015-02-06 2018-12-19 鹿島建設株式会社 Joint structure of reinforced concrete column and steel beam
FI11529U1 (en) * 2017-01-16 2017-01-30 Anstar Oy Håldäcksavväxling
WO2019114912A1 (en) * 2017-12-14 2019-06-20 Mellah Djaffar Riadh New method for constructing heavy precast buildings from earthquake-resistant concrete
CN208668721U (en) * 2018-04-19 2019-03-29 沈阳建筑大学 Detachable prefabricated assembled steel-concrete composite beam plate
CN109183985A (en) * 2018-10-19 2019-01-11 沈华 A kind of novel dry full-prefabricated assembled concrete frame linked system
CN110029729B (en) * 2019-04-04 2021-03-12 山东大学 Splicing joint of prefabricated reinforced concrete main beam and secondary beam and construction method
CN110965639B (en) * 2019-10-12 2021-02-23 中国建筑股份有限公司 Prefabricated assembly dry type connecting frame structure system and construction method thereof
CN112177153A (en) * 2020-08-10 2021-01-05 锦萧建筑科技有限公司 Connecting mechanism and connecting method of frame nodes

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4081935A (en) * 1976-07-26 1978-04-04 Johns-Manville Corporation Building structure utilizing precast concrete elements
FR2491977A1 (en) * 1980-10-15 1982-04-16 Saret Joint connection for building frame in reinforced concrete - has open reinforcement column cage retaining angled beams with connecting bars
ES2220236A1 (en) * 2004-06-24 2004-12-01 Hormigones Prefabricados De España, S.A. Multiplant building structure, has work holding part holding in work of self-supporting beams and armor elements crossing junction of pillars and extended in preslab direction, and hyper-static knots placed in situ concrete
KR20060098555A (en) * 2005-03-03 2006-09-19 한밭대학교 산학협력단 Connection system with headed reinforcements for precast concrete beam-column joint
EP1930513A1 (en) * 2006-11-30 2008-06-11 Tecnostrutture SRL Pillar for building constructions and structural node consisting of said pillar and one or more horizontal structural elements

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT9318U (en) * 1996-09-27 2000-04-28 Pretensados Del Louro Sa PRE-MANUFACTURED PILLAR OF VARIOUS HEIGHTS

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4081935A (en) * 1976-07-26 1978-04-04 Johns-Manville Corporation Building structure utilizing precast concrete elements
FR2491977A1 (en) * 1980-10-15 1982-04-16 Saret Joint connection for building frame in reinforced concrete - has open reinforcement column cage retaining angled beams with connecting bars
ES2220236A1 (en) * 2004-06-24 2004-12-01 Hormigones Prefabricados De España, S.A. Multiplant building structure, has work holding part holding in work of self-supporting beams and armor elements crossing junction of pillars and extended in preslab direction, and hyper-static knots placed in situ concrete
KR20060098555A (en) * 2005-03-03 2006-09-19 한밭대학교 산학협력단 Connection system with headed reinforcements for precast concrete beam-column joint
EP1930513A1 (en) * 2006-11-30 2008-06-11 Tecnostrutture SRL Pillar for building constructions and structural node consisting of said pillar and one or more horizontal structural elements

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2009156586A1 *

Also Published As

Publication number Publication date
FI125420B (en) 2015-10-15
FI20085658A0 (en) 2008-06-27
FI20085658A (en) 2009-12-28
WO2009156586A1 (en) 2009-12-30
EP2313568A4 (en) 2014-10-01

Similar Documents

Publication Publication Date Title
WO2009156586A1 (en) Method for forming connecting structure between pillar and beam, and connecting structure between pillar and beam
AU2015246120B2 (en) Open web composite shear connector construction
CN107989227B (en) Assembled steel reinforced concrete shear wall structure and preparation and installation methods thereof
CN108005410B (en) Assembled steel-concrete combined structure residential system and construction method thereof
CZ284825B6 (en) Concrete-framed construction of a building
NZ575214A (en) Reinforced masonry panel structures with infill
CN107989228B (en) Prefabricated steel reinforced concrete shear wall structure and preparation and installation methods thereof
JP2019526004A (en) Precast concrete formwork, floor system, and construction method
EA034805B1 (en) Construction of the prefabricated column and beam type
EP2076637B1 (en) Building floor structure comprising framed floor slab
KR200414349Y1 (en) Connection structure of precast concrete structure
KR101407502B1 (en) Joint structure of modular building and method thereof
KR200383490Y1 (en) System for constructing composite reinforced concrete girders and beams using FRP
KR100578641B1 (en) Steel-Concrete Hybrid Column, Hybrid Structure System Using the Same, and Construction Method Thereof
KR101171061B1 (en) Modular unit with connector and floor heating plate
KR20190052638A (en) Beam-reinforced deck plate and construction method using the same
RU2197578C2 (en) Structural system of multistory building and process of its erection ( variants )
KR200383489Y1 (en) System for constructing composite reinforced concrete girders and beams using FRP
KR100579586B1 (en) System for constructing composite reinforced concrete girders and beams using frp
KR102721559B1 (en) Composite beam using modular floor boards and columns for coupling
CN218911772U (en) Combined node of vertical transverse bearing members of assembled building wall, beam and plate
KR100579543B1 (en) System for constructing composite reinforced concrete girders and beams using FRP
RU2793496C1 (en) Building frame
US20240328154A1 (en) Primary Shell Structure Consisting of Plane Load-bearing Modules Made of Elements and Assembly Methods
CN115613707A (en) Assembled building wall, beam, vertical horizontal bearing member's of board combination node

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20101217

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20140828

RIC1 Information provided on ipc code assigned before grant

Ipc: E04C 5/16 20060101ALI20140822BHEP

Ipc: E04B 1/58 20060101ALI20140822BHEP

Ipc: E04B 1/18 20060101ALI20140822BHEP

Ipc: E04B 1/21 20060101AFI20140822BHEP

Ipc: E04B 1/19 20060101ALI20140822BHEP

Ipc: E04B 5/04 20060101ALI20140822BHEP

17Q First examination report despatched

Effective date: 20151217

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20160429