EP1651826B1 - Formwork fixing and method - Google Patents
Formwork fixing and method Download PDFInfo
- Publication number
- EP1651826B1 EP1651826B1 EP04743315A EP04743315A EP1651826B1 EP 1651826 B1 EP1651826 B1 EP 1651826B1 EP 04743315 A EP04743315 A EP 04743315A EP 04743315 A EP04743315 A EP 04743315A EP 1651826 B1 EP1651826 B1 EP 1651826B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- post
- fixing
- formwork
- support portion
- fixings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 79
- 238000000034 method Methods 0.000 title claims abstract description 29
- 239000004567 concrete Substances 0.000 claims abstract description 44
- 239000007858 starting material Substances 0.000 claims description 38
- 238000007796 conventional method Methods 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 5
- 238000011065 in-situ storage Methods 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 229920003023 plastic Polymers 0.000 description 4
- 239000004033 plastic Substances 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/064—Spacers placed on the bottom of the mould
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/14—Bracing or strutting arrangements for formwalls; Devices for aligning forms
Definitions
- the present invention relates to a formwork fixing and to a method of fixing a formwork.
- a starter wall also known as an upstand wall or kicker, is a short wall which is upstanding from a concrete slab that forms the base or floor of a building.
- the starter wall provides a base for a main wall.
- a formwork may be secured to the starter wall in order to allow the main wall to be cast.
- a starter wall has within it reinforcement or "starter" bars which are tied to the main slab reinforcement, and to which further reinforcement is subsequently tied for the main wall.
- a starter wall is typically poured monolithically with the concrete slab.
- the fixing of a formwork for allowing the starter wall to be formed has always been a difficult and time-consuming task in the construction industry, for a number of reasons.
- the formwork for the starter wall has to be suspended above the slab which is being poured, which is difficult in practice and means that the formwork for the starter wall is susceptible to movement and may not be arranged as vertically as required.
- the slab typically contains reinforcement, often in the form of a steel mesh or grid, which impedes the use of formwork supports.
- the starter wall formwork fixing has to be firmly supported because in practice operatives will inevitably walk on or hit the formwork fixing with shovels, and the like. It will be understood that proper vertical and horizontal alignment of the formwork for the starter wall is practically essential.
- EP-A-1106748 , FR-A-2642460 and US1672760 disclose various devices for supporting formworks that are used when forming or casting a kerb of a pavement. To achieve some stability, each has a spiked peg which is driven into the ground adjacent the region where the kerb is to be formed.
- plural such fixings will be used in order to provide support for a formwork.
- the fixings have application in supporting a formwork for a starter wall.
- the fixing allows for, in practice, horizontal and vertical adjustment of the position of the support portion, which allows the support portions of plural such fixings to be set for line and level.
- the fixing can be made of an inert material, such as plastics, which means that the fixing can be left in situ after the starter or other wall has been formed.
- the fixing comprises a second post on which the first post is movably mounted, the first and second posts being arranged so that the first post can be moved relative to the second post in a direction generally along or parallel to the longitudinal axis of the first post so that the height of the support portions relative to a said floor can be adjusted.
- the bottom of the second post will be in contact with the decking or other surface on which the concrete slab floor is to be poured.
- the first post is screw-threadedly mounted to the second post whereby rotation of the second post relative to the first post causes the first post to move relative to the second post in a direction generally along or parallel to the longitudinal axis of the first post (i.e. in practice vertically). This provides for easy adjustment of the position of the first post relative to the second post, whilst friction in the thread holds the first post in position relative to the second post.
- the support portions are slidably mounted at one end of the second post. This provides for easy adjustment of the support portion relative to the first post.
- the fixing comprises a block slidably mounted in the first support portion and to which the post is movably fitted to mount the first support portion on the post. This sliding movement of the block allows the (usually) horizontal position of the support portion to be adjusted relative to the post.
- the post is fitted to the block by a screw threaded connection whereby rotation of the post relative to the block enables the height of the support portions relative to a said floor to be adjusted.
- the first support portion may have a lug around which a tie can be fixed to fix a said beam of a formwork to the fixing. This helps to retain the beam in the desired position whilst concrete is being poured for example.
- the second support portion may have a lug around which a tie can be fixed to fix a said beam of a formwork to the fixing. This further helps to retain the beam in the desired position whilst concrete is being poured for example.
- the second support portion has an opening therethrough through which a tie rod can be passed.
- the clamp can be used to support the fixings in position during pouring of concrete, and helps to keep the second support portions parallel to each other and vertical.
- a fixing as described above, an anchor plate and a connecting arrangement
- the channel of the second support portion of the fixing receiving in use one end of the connecting arrangement and the other end of the connecting arrangement being fixable in use to the anchor plate so as to connect the anchor plate to the fixing.
- the second support portion of the fixing preferably has an opening therethrough through which a tie rod can be passed in use to engage with at least one of the connector and the anchor plate.
- a method of monolithically forming a concrete slab floor with a starter wall comprising: fixing a formwork using a plurality of fixings, each fixing comprising a support portion on which the base of a beam of a formwork can be supported above a deck floor; and, a post on which the support portion is movably mounted, the post having a longitudinal axis; the post and support portion being arranged so that the support portion can be moved relative to the post in at least one direction generally perpendicular to the longitudinal axis of the post and so that the height of the support portion relative to a said floor can be adjusted; the fixing method comprising: placing posts of plural ones of the fixings at intervals on the deck floor so that the posts are substantially vertical; horizontally and vertically moving the support portions as necessary so that the support portions are arranged in a line; and, fitting the beam of the formwork to the support portions; and, monolithically forming the concrete slab floor with the starter wall by pouring concrete over
- the method may comprise repeating the placing, moving and fitting steps for a second series of fixings and a second beam of the formwork such that the second beam of the formwork is fitted substantially parallel to the first beam.
- a so-called slab end-shutter may act in lieu of the second series of fixings and second beam.
- the method may comprise prior to the pouring of the concrete, clamping respective ones of the fixings of the first and second series of fixings together.
- a method of monolithically forming a concrete slab floor with a starter wall comprising: fixing a formwork using a plurality of fixings, each fixing comprising a support portion on which the base of a beam of a formwork can be supported above a floor; and, a post on which the support portion is movably mounted, the post having a longitudinal axis; the post and support portion being arranged so that the support portion can be moved relative to the post in at least one direction generally perpendicular to the longitudinal axis of the post and so that the height of the support portion relative to a said floor can be adjusted; the fixing method comprising: fitting plural said fixings to the beam of the formwork; and, placing the assembly of said fixings and said beam on the floor and horizontally and vertically moving the support portions as necessary; and, monolithically forming the concrete slab floor with the starter wall by pouring concrete over the deck and around the formwork.
- the method may comprise repeating the fitting and placing steps for a second series of fixings and a second beam of the formwork such that the second beam of the formwork is fitted substantially parallel to the first beam.
- the method preferably comprises clamping the first and second beams together prior to placing either of said beams on the floor, and then placing the assembly of the clamped beams and respective fixings on a said floor.
- the method may comprise connecting an anchor plate to at least one of the fixings to provide an anchor point for a tie rod.
- At least one of the fixings is preferably a fixing as described above.
- a first example of a formwork fixing 1 has a first generally planar support portion 2 and a second generally planar support portion 3 arranged perpendicularly to the first planar support portion 2.
- the first planar support portion 2 will be horizontal and the second planar support portion 3 will be vertical.
- the planar support portions 2,3 are provided by perpendicular faces of a support 4 which has a generally L-shape cross-section.
- the underneath surface of the support 4 has recessed channels or a slot 5 (shown in dashed lines in Figures 1 and 2 ) which receives the head 6 of a first post 7.
- the slot 5 is open at the rear of the support 4 in order to allow the head 6 of the first post 7 to be inserted, the slot 5 stopping short of the front of the support 4 in order to prevent the first post 7 passing straight through.
- this arrangement allows the support 4 to be moved relative to the first post in a direction generally parallel to the plane of the first support portion 2 which, in practice, is in a horizontal plane and in a direction from the front to the back of the support 4.
- the first post 7 is hollow and has an internal screw thread 8.
- a second post 9 is provided as a discrete item and has a corresponding external screw thread 10 at at least one end.
- the second post 9 can be screwed into the first post 7 as far as is necessary, as will be discussed further below.
- the second post 9 has a hexagonal or other polygonal male head 11 at one end and a correspondingly shaped female recess 12 at the other end, which facilitates adjustment, as will again be described further below .
- plural such fixings 1 are first taken and fixed in a horizontal line. These fixings 1 can be fixed in place, at least loosely, by tying the first posts 7 to the steel grid or other reinforcement 13. A typical spacing between the fixings 1 might be of the order of 1 metre or so.
- the horizontal position of the supports 4 is adjusted as necessary, by sliding the supports 4 on the respective first posts 7, so that the second or vertical planar support portions 3 are all aligned.
- the vertical position of the first or horizontal planar support portions 2 of the fixings 1 is adjusted so that the horizontal planar support portions 2 are all in approximately the same plane.
- This vertical adjustment is achieved by screwing the second post 9 into the first posy 7 of a fixing 1.
- Rotation of the second post 9 within the first post 7 can be carried out by use of another second post 9 which has its male head 11 inserted into the female end 12 of the second post 9 of the fixing 1, entry being obtainable through an opening in the surface of the horizontal planar support portion 2 of the fixing 1.
- each second post 9 seats against the floor or "decking” or “blinding”. This means that the fixings 1 are effectively supported on the decking independent of the steel grid 13, and are not suspended above the decking as in the prior art, which makes the formwork more stable.
- a second row of fixings 1 is then set into place parallel to the first row of fixings 1 and their horizontal and vertical positions adjusted as necessary.
- Respective timber joists or, more preferably, plastics beams 14 are then placed on the rows of fixings 1 parallel to each other and separated by a distance equal to the width of the wall to be cast.
- the beams 14 can be fixed in this position by nailing timber straps between the beams 14 at intervals along the beams 14.
- the beams 14 can alternatively or additionally be temporarily secured to the fixings 1 by tying wire. Lugs 15,16 projecting from the planar support portions 2,3 can be used as attachment points for the tying wire.
- each beam 14 with its plural fixings 1 it is also possible to pre-assemble each beam 14 with its plural fixings 1.
- plural fixings 1 can be attached at intervals along each beam 14. If necessary or desirable, tying wire can be used to secure the beams 14 to the fixings 1, though this may not always be necessary.
- the pair of beams 14 with their fixings 1 can then be fixed parallel to each other by for example nailing timber straps between the beams 14 at intervals along the beams.
- the beams 14 are again spaced by a distance equal to the width of the wall to be cast. This assembly of the two beams 14 and their respective fixings 1 can then be lowered manually into position on the decking, the fine position of the fixings 1 being adjusted vertically and horizontally as necessary.
- Concrete is then poured to form the concrete slab 17 and also into the space between the two rows of fixings 1 and beams 14 in order to form the starter wall 18.
- the starter wall 18 is thereby formed monolithically with the concrete slab 17.
- the fixings 1 are preferably made of an inert material, such as plastics, which will not rust or otherwise affect the concrete, so that the fixings 1 do not have to be removed. It will be understood that the fixings 1 will typically be bound to the concrete and so their removal would be difficult.
- shutters are then positioned either side of the starter wall 18 to allow the main wall (not shown) to be formed on the starter wall 18.
- Conventional L-shape starter bars 19 and lacers 19' are shown in Figure 5 .
- the fixings 1 accordingly provide in a very simple manner a fixing for a formwork for a starter wall in which the fixings 1 can be adjusted in vertical and horizontal directions in order to achieve alignment.
- the alignment of the support portions 4 is not affected or constrained by the presence of the reinforcing mesh 13.
- feet may be fitted under the second posts 9 during the fitting of the fixings 1.
- a range of second posts 9 having different lengths may be provided and the fitter simply selects the second post of the appropriate length.
- FIG. 6 to 9 a second example of a formwork fixing 1 is shown.
- the same reference numerals as used for the first example are used for the same or corresponding features in the second example.
- a screw block 60 having an internally screw-threaded through hole 61 is slidably mounted in the channel 5 so as to be able to slide in use in a horizontal plane (i.e. to the left and right in Figure 6 ).
- the support 4 is supported on the concrete floor or decking by a plastics screw-threaded rod 62 which passes through the open lower surface of the support 4, is threaded into the screw block 60, and passes through the open upper surface of the first support portion 2.
- the height of the support 4 relative to the decking can be adjusted by screwing the screw rod 62 in the screw block 60, and the horizontal position of the support 4 can be adjusted simply by sliding the screw block 60 in the channel 5.
- the second (vertical) support portion 3 has an opening 64 therethrough, the purpose of which will be described below.
- a ledge or stop 63 is mounted on the upper surface of the first support portion 2 on each side of the channel 5.
- Each stop 63 may be integrally formed with the support 4.
- the distance from the stop 63 to the second support portion 3 may be a standard width, such as 75mm, so as to be able to accommodate and fix the beam 14 in position. This avoids having to tie the beams 14 to the support 1, which simplifies assembly.
- the lugs 15, 16 do not have to be provided on the supports 1.
- a clamp 70 in the form of an inverted rectangular U-shape is used to hold the supports 4 in position.
- the clamp 70 has downwardly projecting parallel legs 71 which are received in a respective channel 72 in the supports 4.
- the clamp 70 is preferably made of a rigid material, such as metal.
- the supports 4 can first be placed individually in position on the decking, and then the beams 14 put in position on the supports 4 and, in this example, the clamps 70 positioned between respective pairs of supports 4.
- pre-assembly of the beams 14 and supports 4 can be carried out, clamps 70 again being used to hold the pre-assembled beams 14 and supports 4 together, and the whole assembly then being lifted into position.
- this clamp 70 can be used with a suitably adapted version of the first example of a support 4 shown in Figures 1 to 4 .
- the clamp 70 has a further pair of parallel depending legs 73 (shown in dashed lines in Figure 9 ) which are positioned outwardly of and parallel to the first pair of depending legs 71.
- the spacing between the respective pairs of first and second depending legs 71,72 is preferably a standard width, of for example 75mm.
- an external shutter 20 has a water bar 21 which has projections 22 that are intended to prevent ingress of water through the joint between the top of the starter wall 23 and the main wall that is subsequently cast above the starter wall 23.
- projections 22 that are intended to prevent ingress of water through the joint between the top of the starter wall 23 and the main wall that is subsequently cast above the starter wall 23.
- tie bars for the formwork for forming the main wall have had to be placed above the water bar 21 in waterlogged conditions, but even then the formed main wall is still susceptible to seepage of water through the bolt hole above the water bar 21.
- the anchor plate 24 is generally square and has plural holes 25 which allow for additional steel bars to be tied to it if required by specific designs.
- the anchor plate 24 in the example of Figures 10 and 10A has a centrally positioned.and externally screw-threaded tie rod 26 projecting outwardly therefrom.
- the tie rod 26 may be integrally formed with the body of the anchor plate 24 or welded or otherwise fixed thereto.
- An internally threaded connecting tube 27 is screwed at one end onto the tie rod 26 of the anchor plate 24, and is received at the other end in a channel 28 provided in the first support portion 3 of the support 4.
- the connecting tube 27 can slide up and down in the channel 28, allowing the vertical position of the connecting tube 27 to be adjusted, at least down to a predetermined height above the first support portion 2 by a stop (not shown) in the channel 28.
- a clamp 80 of generally lazy Z-shape cross-section is used to hold the respective supports 4 in position.
- This clamp 80 has a downwardly depending leg 81 which is received in the channel 28 of the support 4.
- a facing leg or plate 82 at the other end of the clamp 80 can be nailed or otherwise fixed to the shutter 20.
- a further downwardly depending leg 83 may be provided outwardly of the first depending leg 81 so as to accommodate the beam 14 therebetween.
- a connecting tube 29 is fixed to or integrally formed with the anchor plate 24 and a short piece of threaded tie rod 30 is used to connect between the connecting tube 29 of the anchor plate 24, and the connecting tube 27 that is slidably received in the support 4. Walls of different widths can easily be accommodated by using tie rods 30 of different lengths.
- Props 35 are conventionally bolted into the concrete slab 17.
- this bolting of the props 35 into the concrete slab 17 means that it is necessary to drill into the slab 17, which is a labour-intensive exercise, especially as steel reinforcement may be encountered, and an error in drilling can allow ingress of water.
- a long tie bar 36 is screwed into the first end of the connector tube 27 through the opening 64 in the second support portion 3, the internal shutter 32 and its soldier 34.
- An adjustable anchor 38 is mounted over the free end of the long tie bar 36 and can be slid along the length of the long tie bar 36.
- a nut 39 is screw threaded on the free end of the long tie bar 36 in order to limit the movement of the adjustable anchor 38.
- the prop 35 is pivotally mounted at one end to the adjustable anchor 38. The other end of the prop 35 is pivotally mounted via a tilt plate 40 which is fixed to the soldier 34.
- This arrangement which uses the connector tube 27, means that the internal shutter 32 is fully propped and yet it is not necessary to drill into the concrete slab 17 in order to provide an anchor point for the propping arrangement.
- the anchor points for the subsequent wall formwork are provided by the anchor plates 24 and connector tubes 27 and are therefore optimally positioned low down in the wall.
- the use of the connector tube 27 and adjustable anchor 38 also makes fixing and alignment of the prop 35 much easier and quicker.
- a nut 41 on the short tie bar 37 secures the lower end of the internal soldier 34.
- Additional tie bars 42 and nuts 43 tie the internal and external soldiers 34,33, with walers 44 being positioned between the soldiers 33, 34 and the shutters 20',32 as is conventional.
- a formwork support 4 is provided either side of the region where the main wall is to be formed.
- the formwork supports 4 are then positioned at the correct horizontal position and correct vertical position as described above, in this example by sliding the screw blocks 60 in the respective supports 4 and by screwing the rods 62 relatively up and down in the screw blocks 60 as required.
- the respective pairs of supports 4 can then be clamped relative to each other using the clamp 70 as described above, with the additional depending legs 73 to hold the beams 14 in position.
- a respective short internally threaded connecting tube 50 is fitted to each support 4, with one end of each connecting tube 50 being vertically slidably received in the respective channel 72 in the supports 4 and pushed down to the stop (not shown) in the channel 72 to be at the optimum vertical position.
- a short threaded tie bar 51 is screwed between pairs of connecting tubes 50 to hold the pairs of supports 4 in position.
- the connecting tubes 50 can then receive screw threaded tie bars 36/37.
- these tie bars 36/37 can be used to adjustably mount a prop 35 and other necessary equipment for the formwork fixings to allow the main wall to be poured.
- the short threaded rod 51 have a downwardly depending leg 52 which is set in the concrete of the main concrete floor 17.
- the present invention provides fixings for formwork which do not have to be suspended above a decking on which a concrete floor is to be poured.
- the formwork fixings of the preferred embodiments can be supported on and by the decking whilst the concrete floor and, optionally, a kicker wall is poured.
- the height of the support portion of the formwork fixings can be easily adjusted, and the position of the support posts for the fixings can easily be adjusted in a horizontal plane.
- the formwork fixings of the present invention are able to provide a much more stable support during the phase of concrete pouring and setting. Certain embodiments help to ensure that the kicker is formed vertically with parallel sides.
- Certain embodiments provide for anchor points to facilitate the fixing of the subsequent wall formwork. Such anchor points can be accurately placed to suit the formwork design.
- the fixings can be used in the formation of columns, etc.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Piles And Underground Anchors (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
- The present invention relates to a formwork fixing and to a method of fixing a formwork.
- A starter wall, also known as an upstand wall or kicker, is a short wall which is upstanding from a concrete slab that forms the base or floor of a building. The starter wall provides a base for a main wall. A formwork may be secured to the starter wall in order to allow the main wall to be cast. Typically, a starter wall has within it reinforcement or "starter" bars which are tied to the main slab reinforcement, and to which further reinforcement is subsequently tied for the main wall.
- A starter wall is typically poured monolithically with the concrete slab. The fixing of a formwork for allowing the starter wall to be formed has always been a difficult and time-consuming task in the construction industry, for a number of reasons. For example, conventionally the formwork for the starter wall has to be suspended above the slab which is being poured, which is difficult in practice and means that the formwork for the starter wall is susceptible to movement and may not be arranged as vertically as required. The slab typically contains reinforcement, often in the form of a steel mesh or grid, which impedes the use of formwork supports. As a practical point, the starter wall formwork fixing has to be firmly supported because in practice operatives will inevitably walk on or hit the formwork fixing with shovels, and the like. It will be understood that proper vertical and horizontal alignment of the formwork for the starter wall is practically essential.
- An example of a formwork fixing for a starter wall is disclosed in
US-A-3473778 . However, this known formwork fixing is complicated to use and/or does not provide for sufficient flexibility in order to allow accurate alignment of the fixings. -
EP-A-1106748 ,FR-A-2642460 US1672760 disclose various devices for supporting formworks that are used when forming or casting a kerb of a pavement. To achieve some stability, each has a spiked peg which is driven into the ground adjacent the region where the kerb is to be formed. - According to a first aspect of the present invention, there is provided a formwork fixing in accordance with claim 1.
- Typically, plural such fixings will be used in order to provide support for a formwork. The fixings have application in supporting a formwork for a starter wall. The fixing allows for, in practice, horizontal and vertical adjustment of the position of the support portion, which allows the support portions of plural such fixings to be set for line and level. The fixing can be made of an inert material, such as plastics, which means that the fixing can be left in situ after the starter or other wall has been formed.
- In an embodiment, the fixing comprises a second post on which the first post is movably mounted, the first and second posts being arranged so that the first post can be moved relative to the second post in a direction generally along or parallel to the longitudinal axis of the first post so that the height of the support portions relative to a said floor can be adjusted. In practice, the bottom of the second post will be in contact with the decking or other surface on which the concrete slab floor is to be poured. In one preferred embodiment, the first post is screw-threadedly mounted to the second post whereby rotation of the second post relative to the first post causes the first post to move relative to the second post in a direction generally along or parallel to the longitudinal axis of the first post (i.e. in practice vertically). This provides for easy adjustment of the position of the first post relative to the second post, whilst friction in the thread holds the first post in position relative to the second post.
- In an embodiment, the support portions are slidably mounted at one end of the second post. This provides for easy adjustment of the support portion relative to the first post.
- In an embodiment, the fixing comprises a block slidably mounted in the first support portion and to which the post is movably fitted to mount the first support portion on the post. This sliding movement of the block allows the (usually) horizontal position of the support portion to be adjusted relative to the post. In an embodiment, the post is fitted to the block by a screw threaded connection whereby rotation of the post relative to the block enables the height of the support portions relative to a said floor to be adjusted.
- The first support portion may have a lug around which a tie can be fixed to fix a said beam of a formwork to the fixing. This helps to retain the beam in the desired position whilst concrete is being poured for example.
- The second support portion may have a lug around which a tie can be fixed to fix a said beam of a formwork to the fixing. This further helps to retain the beam in the desired position whilst concrete is being poured for example.
- In an embodiment, the second support portion has an opening therethrough through which a tie rod can be passed.
- There may be provided in combination, two fixings as described above and a clamp having at least two depending legs which can be respectively received in the channels provided in the second support portions of said fixings so that the fixings can be clamped together. The clamp can be used to support the fixings in position during pouring of concrete, and helps to keep the second support portions parallel to each other and vertical.
- There may be provided in combination, a fixing as described above, an anchor plate and a connecting arrangement, the channel of the second support portion of the fixing receiving in use one end of the connecting arrangement and the other end of the connecting arrangement being fixable in use to the anchor plate so as to connect the anchor plate to the fixing. The second support portion of the fixing preferably has an opening therethrough through which a tie rod can be passed in use to engage with at least one of the connector and the anchor plate.
- According to a second aspect of the present invention, there is provided a method of monolithically forming a concrete slab floor with a starter wall, the method comprising: fixing a formwork using a plurality of fixings, each fixing comprising a support portion on which the base of a beam of a formwork can be supported above a deck floor; and, a post on which the support portion is movably mounted, the post having a longitudinal axis; the post and support portion being arranged so that the support portion can be moved relative to the post in at least one direction generally perpendicular to the longitudinal axis of the post and so that the height of the support portion relative to a said floor can be adjusted; the fixing method comprising: placing posts of plural ones of the fixings at intervals on the deck floor so that the posts are substantially vertical; horizontally and vertically moving the support portions as necessary so that the support portions are arranged in a line; and, fitting the beam of the formwork to the support portions; and, monolithically forming the concrete slab floor with the starter wall by pouring concrete over the deck and around the formwork.
- The method may comprise repeating the placing, moving and fitting steps for a second series of fixings and a second beam of the formwork such that the second beam of the formwork is fitted substantially parallel to the first beam. On the other hand, for an end starter wall, a so-called slab end-shutter may act in lieu of the second series of fixings and second beam.
- The method may comprise prior to the pouring of the concrete, clamping respective ones of the fixings of the first and second series of fixings together.
- According to a third aspect of the present invention, there is provided a method of monolithically forming a concrete slab floor with a starter wall, the method comprising: fixing a formwork using a plurality of fixings, each fixing comprising a support portion on which the base of a beam of a formwork can be supported above a floor; and, a post on which the support portion is movably mounted, the post having a longitudinal axis; the post and support portion being arranged so that the support portion can be moved relative to the post in at least one direction generally perpendicular to the longitudinal axis of the post and so that the height of the support portion relative to a said floor can be adjusted; the fixing method comprising: fitting plural said fixings to the beam of the formwork; and, placing the assembly of said fixings and said beam on the floor and horizontally and vertically moving the support portions as necessary; and, monolithically forming the concrete slab floor with the starter wall by pouring concrete over the deck and around the formwork.
- The method may comprise repeating the fitting and placing steps for a second series of fixings and a second beam of the formwork such that the second beam of the formwork is fitted substantially parallel to the first beam. The method preferably comprises clamping the first and second beams together prior to placing either of said beams on the floor, and then placing the assembly of the clamped beams and respective fixings on a said floor.
- In either aspect of the method, the method may comprise connecting an anchor plate to at least one of the fixings to provide an anchor point for a tie rod.
- At least one of the fixings is preferably a fixing as described above.
- Embodiments of the present invention will now be described by way of example with reference to the accompanying drawings, in which:
-
Fig. 1 is a side elevation of a first example of a fixing in accordance with an embodiment of the present invention; -
Fig. 2 is a front elevation of the fixing ofFigure 1 ; -
Fig. 3 is a rear elevation of the fixing ofFigure 1 ; -
Fig. 4 is an elevation of a second post of the fixing ofFigure 1 ; -
Fig. 5 shows a cross-section through a monolithic concretes slab and internal starter wall showing a first example of a formwork in situ; -
Fig. 6 is a side elevation of a second example of a fixing in accordance with an embodiment of the present invention; -
Fig. 7 is a front elevation of the fixing ofFigure 6 ; -
Fig. 8 is a rear elevation of the fixing ofFigure 6 ; -
Fig. 9 shows a cross-section through a monolithic concrete slab and internal starter wall showing a second example of a formwork in situ; -
Fig. 10 shows a first example of a formwork fixings and anchor point for use at an end wall; -
Fig. 11 shows a second example of a formwork fixings and anchor point for use at an end wall; -
Fig. 12 shows a cross-section through a monolithic concrete slab and starter wall at an end wall showing an example of a formwork in situ; -
Fig. 13 shows a cross-section through a monolithic concrete slab for a kickerless system; and, -
Fig. 14 is a view similar toFigure 13 showing the formwork in situ. - Referring first to
Figures 1 to 5 , a first example of a formwork fixing 1 has a first generallyplanar support portion 2 and a second generallyplanar support portion 3 arranged perpendicularly to the firstplanar support portion 2. In practice, the firstplanar support portion 2 will be horizontal and the secondplanar support portion 3 will be vertical. - The
planar support portions support 4 which has a generally L-shape cross-section. The underneath surface of thesupport 4 has recessed channels or a slot 5 (shown in dashed lines inFigures 1 and 2 ) which receives thehead 6 of afirst post 7. Theslot 5 is open at the rear of thesupport 4 in order to allow thehead 6 of thefirst post 7 to be inserted, theslot 5 stopping short of the front of thesupport 4 in order to prevent thefirst post 7 passing straight through. As will be appreciated, this arrangement allows thesupport 4 to be moved relative to the first post in a direction generally parallel to the plane of thefirst support portion 2 which, in practice, is in a horizontal plane and in a direction from the front to the back of thesupport 4. - The
first post 7 is hollow and has an internal screw thread 8. A second post 9 is provided as a discrete item and has a correspondingexternal screw thread 10 at at least one end. The second post 9 can be screwed into thefirst post 7 as far as is necessary, as will be discussed further below. In the preferred embodiment, the second post 9 has a hexagonal or other polygonal male head 11 at one end and a correspondingly shapedfemale recess 12 at the other end, which facilitates adjustment, as will again be described further below . - In order to set up the fixings 1 in order to provide a formwork for a starter or similar wall, in one example method plural such fixings 1 are first taken and fixed in a horizontal line. These fixings 1 can be fixed in place, at least loosely, by tying the
first posts 7 to the steel grid orother reinforcement 13. A typical spacing between the fixings 1 might be of the order of 1 metre or so. The horizontal position of thesupports 4 is adjusted as necessary, by sliding thesupports 4 on the respectivefirst posts 7, so that the second or verticalplanar support portions 3 are all aligned. Similarly, where necessary, the vertical position of the first or horizontalplanar support portions 2 of the fixings 1 is adjusted so that the horizontalplanar support portions 2 are all in approximately the same plane. This vertical adjustment is achieved by screwing the second post 9 into thefirst posy 7 of a fixing 1. Rotation of the second post 9 within thefirst post 7 can be carried out by use of another second post 9 which has its male head 11 inserted into thefemale end 12 of the second post 9 of the fixing 1, entry being obtainable through an opening in the surface of the horizontalplanar support portion 2 of the fixing 1. - Importantly, the lower end of each second post 9 seats against the floor or "decking" or "blinding". This means that the fixings 1 are effectively supported on the decking independent of the
steel grid 13, and are not suspended above the decking as in the prior art, which makes the formwork more stable. - A second row of fixings 1 is then set into place parallel to the first row of fixings 1 and their horizontal and vertical positions adjusted as necessary.
- Respective timber joists or, more preferably, plastics beams 14 are then placed on the rows of fixings 1 parallel to each other and separated by a distance equal to the width of the wall to be cast. The
beams 14 can be fixed in this position by nailing timber straps between thebeams 14 at intervals along thebeams 14. Thebeams 14 can alternatively or additionally be temporarily secured to the fixings 1 by tying wire.Lugs 15,16 projecting from theplanar support portions - As an alternative to the fixing method described above, it is also possible to pre-assemble each
beam 14 with its plural fixings 1. In particular, plural fixings 1 can be attached at intervals along eachbeam 14. If necessary or desirable, tying wire can be used to secure thebeams 14 to the fixings 1, though this may not always be necessary. The pair ofbeams 14 with their fixings 1 can then be fixed parallel to each other by for example nailing timber straps between thebeams 14 at intervals along the beams. Thebeams 14 are again spaced by a distance equal to the width of the wall to be cast. This assembly of the twobeams 14 and their respective fixings 1 can then be lowered manually into position on the decking, the fine position of the fixings 1 being adjusted vertically and horizontally as necessary. - Concrete is then poured to form the
concrete slab 17 and also into the space between the two rows of fixings 1 and beams 14 in order to form thestarter wall 18. Thestarter wall 18 is thereby formed monolithically with theconcrete slab 17. - Once the concrete has set, the
beams 14 are then removed. The fixings 1 are preferably made of an inert material, such as plastics, which will not rust or otherwise affect the concrete, so that the fixings 1 do not have to be removed. It will be understood that the fixings 1 will typically be bound to the concrete and so their removal would be difficult. - In a known manner, shutters (not shown) are then positioned either side of the
starter wall 18 to allow the main wall (not shown) to be formed on thestarter wall 18. Conventional L-shape starter bars 19 and lacers 19' are shown inFigure 5 . - The fixings 1 accordingly provide in a very simple manner a fixing for a formwork for a starter wall in which the fixings 1 can be adjusted in vertical and horizontal directions in order to achieve alignment. The alignment of the
support portions 4 is not affected or constrained by the presence of the reinforcingmesh 13. - Given that the floor or blinding may not be level and/or may have irregularities that affect its height, feet (not shown) may be fitted under the second posts 9 during the fitting of the fixings 1. Alternatively or additionally, a range of second posts 9 having different lengths may be provided and the fitter simply selects the second post of the appropriate length.
- Referring now to
Figures 6 to 9 , a second example of a formwork fixing 1 is shown. The same reference numerals as used for the first example are used for the same or corresponding features in the second example. - In this second example, a
screw block 60 having an internally screw-threaded throughhole 61 is slidably mounted in thechannel 5 so as to be able to slide in use in a horizontal plane (i.e. to the left and right inFigure 6 ). In this example, thesupport 4 is supported on the concrete floor or decking by a plastics screw-threadedrod 62 which passes through the open lower surface of thesupport 4, is threaded into thescrew block 60, and passes through the open upper surface of thefirst support portion 2. Similarly to the first example described above, the height of thesupport 4 relative to the decking can be adjusted by screwing thescrew rod 62 in thescrew block 60, and the horizontal position of thesupport 4 can be adjusted simply by sliding thescrew block 60 in thechannel 5. The second (vertical)support portion 3 has anopening 64 therethrough, the purpose of which will be described below. - Referring particularly now to
Figure 9 , the setting up of the fixings 1 of this second example is similar to the setting up of the fixings 1 of the first example and will therefore not be described in detail and only the significant differences will be discussed. In this second example, a ledge or stop 63 is mounted on the upper surface of thefirst support portion 2 on each side of thechannel 5. Eachstop 63 may be integrally formed with thesupport 4. As shown particularly clearly inFigure 9 , the distance from thestop 63 to thesecond support portion 3 may be a standard width, such as 75mm, so as to be able to accommodate and fix thebeam 14 in position. This avoids having to tie thebeams 14 to the support 1, which simplifies assembly. Moreover, it means that thelugs 15, 16 do not have to be provided on the supports 1. - In this example, a
clamp 70 in the form of an inverted rectangular U-shape is used to hold thesupports 4 in position. Theclamp 70 has downwardly projectingparallel legs 71 which are received in arespective channel 72 in thesupports 4. Theclamp 70 is preferably made of a rigid material, such as metal. Thus, once thesupports 4 are in position and thebeams 14 placed in position on thesupports 4, arespective clamp 70 is fixed between opposed pairs ofsupports 4. This arrangement ensures that thesupports 4 are firmly held in position relative to each other with thesecond support portions 3 held parallel to each other and vertically arranged. This therefore provides for a very quick and simple arrangement for ensuring that the formwork itself is vertically arranged and securely held. - As in the first example described above, the
supports 4 can first be placed individually in position on the decking, and then thebeams 14 put in position on thesupports 4 and, in this example, theclamps 70 positioned between respective pairs ofsupports 4. Alternatively, again as in the second example, pre-assembly of thebeams 14 and supports 4 can be carried out, clamps 70 again being used to hold thepre-assembled beams 14 and supports 4 together, and the whole assembly then being lifted into position. - After the
starter wall 18 is poured and cast, thebeams 14 and theclamps 70 can be removed and reused. It will be appreciated that thisclamp 70 can be used with a suitably adapted version of the first example of asupport 4 shown inFigures 1 to 4 . - In one variation, the
clamp 70 has a further pair of parallel depending legs 73 (shown in dashed lines inFigure 9 ) which are positioned outwardly of and parallel to the first pair of dependinglegs 71. The spacing between the respective pairs of first and second dependinglegs first legs 71 are inserted into therespective supports 4, theouter depending legs 73 fit round therespective beams 14 to hold thebeams 14 in position, thus avoiding the need to use tying wire. - Referring now to
Figure 10 and11 , there are shown first and second examples of formwork fixings 1 for use at an end wall. Those parts that are the same as or that correspond to parts in the example described above have the same reference numerals. - Typically, an
external shutter 20 has awater bar 21 which hasprojections 22 that are intended to prevent ingress of water through the joint between the top of thestarter wall 23 and the main wall that is subsequently cast above thestarter wall 23. Conventionally, tie bars for the formwork for forming the main wall have had to be placed above thewater bar 21 in waterlogged conditions, but even then the formed main wall is still susceptible to seepage of water through the bolt hole above thewater bar 21. - This can be avoided by using an
anchor plate 24 in conjunction with eachsupport 4. Theanchor plate 24 is generally square and hasplural holes 25 which allow for additional steel bars to be tied to it if required by specific designs. Theanchor plate 24 in the example ofFigures 10 and 10A has a centrally positioned.and externally screw-threadedtie rod 26 projecting outwardly therefrom. Thetie rod 26 may be integrally formed with the body of theanchor plate 24 or welded or otherwise fixed thereto. An internally threaded connectingtube 27 is screwed at one end onto thetie rod 26 of theanchor plate 24, and is received at the other end in achannel 28 provided in thefirst support portion 3 of thesupport 4. The connectingtube 27 can slide up and down in thechannel 28, allowing the vertical position of the connectingtube 27 to be adjusted, at least down to a predetermined height above thefirst support portion 2 by a stop (not shown) in thechannel 28. In this example, aclamp 80 of generally lazy Z-shape cross-section is used to hold therespective supports 4 in position. Thisclamp 80 has a downwardly dependingleg 81 which is received in thechannel 28 of thesupport 4. A facing leg orplate 82 at the other end of theclamp 80 can be nailed or otherwise fixed to theshutter 20. Similarly to the example of aclamp 70 described above, a further downwardly dependingleg 83 may be provided outwardly of the first dependingleg 81 so as to accommodate thebeam 14 therebetween. - In an alternative arrangement shown in
Figure 11 , a connectingtube 29 is fixed to or integrally formed with theanchor plate 24 and a short piece of threadedtie rod 30 is used to connect between the connectingtube 29 of theanchor plate 24, and the connectingtube 27 that is slidably received in thesupport 4. Walls of different widths can easily be accommodated by usingtie rods 30 of different lengths. - Referring to
Figure 12 , once the concrete for theslab 17 andstarter wall 23 has been poured and has set, theclamps 80,beam 14 andexternal slab shutter 20 are removed. Depending on site conditions, a conventional external shutter 20', with "walers" 44 and "soldiers" 33,34, may be used and a similar conventionalinternal shutter 32 is then fixed in place. The external shutter 20', if used, can be propped from the outside in a manner known per se. Theinternal shutter 32 is propped byprops 35. - Props 35, as shown in the inset drawing in
Figure 12 , are conventionally bolted into theconcrete slab 17. However, this bolting of theprops 35 into theconcrete slab 17 means that it is necessary to drill into theslab 17, which is a labour-intensive exercise, especially as steel reinforcement may be encountered, and an error in drilling can allow ingress of water. - To avoid this, a
long tie bar 36, optionally via ashort tie bar 37 and tie bar connector 37' as shown, is screwed into the first end of theconnector tube 27 through theopening 64 in thesecond support portion 3, theinternal shutter 32 and itssoldier 34. Anadjustable anchor 38 is mounted over the free end of thelong tie bar 36 and can be slid along the length of thelong tie bar 36. Anut 39 is screw threaded on the free end of thelong tie bar 36 in order to limit the movement of theadjustable anchor 38. Theprop 35 is pivotally mounted at one end to theadjustable anchor 38. The other end of theprop 35 is pivotally mounted via atilt plate 40 which is fixed to thesoldier 34. This arrangement, which uses theconnector tube 27, means that theinternal shutter 32 is fully propped and yet it is not necessary to drill into theconcrete slab 17 in order to provide an anchor point for the propping arrangement. The anchor points for the subsequent wall formwork are provided by theanchor plates 24 andconnector tubes 27 and are therefore optimally positioned low down in the wall. The use of theconnector tube 27 andadjustable anchor 38 also makes fixing and alignment of theprop 35 much easier and quicker. A nut 41 on theshort tie bar 37 secures the lower end of theinternal soldier 34. Additional tie bars 42 andnuts 43 tie the internal andexternal soldiers soldiers shutters 20',32 as is conventional. - Referring now to
Figures 13 and14 , in some circumstances it is desired to be able to pour a concrete main wall without having first formed a kicker wall. This is sometimes known as a kickerless system. Thesupports 4 of any of the examples described above can be used in such a system. - Referring first to
Figure 13 , similarly to the examples described above, aformwork support 4 is provided either side of the region where the main wall is to be formed. The formwork supports 4 are then positioned at the correct horizontal position and correct vertical position as described above, in this example by sliding the screw blocks 60 in therespective supports 4 and by screwing therods 62 relatively up and down in the screw blocks 60 as required. The respective pairs ofsupports 4 can then be clamped relative to each other using theclamp 70 as described above, with the additional dependinglegs 73 to hold thebeams 14 in position. - Importantly in this example, a respective short internally threaded connecting
tube 50 is fitted to eachsupport 4, with one end of each connectingtube 50 being vertically slidably received in therespective channel 72 in thesupports 4 and pushed down to the stop (not shown) in thechannel 72 to be at the optimum vertical position. A short threadedtie bar 51 is screwed between pairs of connectingtubes 50 to hold the pairs ofsupports 4 in position. Once theconcrete floor 17 has been poured and set, the connectingtubes 50 can then receive screw threaded tie bars 36/37. As in the example shown inFigure 12 , these tie bars 36/37 can be used to adjustably mount aprop 35 and other necessary equipment for the formwork fixings to allow the main wall to be poured. To provide additional support, it is preferred that the short threadedrod 51 have a downwardly dependingleg 52 which is set in the concrete of the mainconcrete floor 17. - In various embodiments, the present invention provides fixings for formwork which do not have to be suspended above a decking on which a concrete floor is to be poured. The formwork fixings of the preferred embodiments can be supported on and by the decking whilst the concrete floor and, optionally, a kicker wall is poured. The height of the support portion of the formwork fixings can be easily adjusted, and the position of the support posts for the fixings can easily be adjusted in a horizontal plane. The formwork fixings of the present invention are able to provide a much more stable support during the phase of concrete pouring and setting. Certain embodiments help to ensure that the kicker is formed vertically with parallel sides. Certain embodiments provide for anchor points to facilitate the fixing of the subsequent wall formwork. Such anchor points can be accurately placed to suit the formwork design. Moreover, as well as being used to form walls, the fixings can be used in the formation of columns, etc.
- Embodiments of the present invention have been described with particular reference to the examples illustrated. However, it will be appreciated that variations and modifications may be made to the examples described within the scope of the present invention, as defined by the attached claims.
Claims (20)
- A formwork fixing (1) for providing support to a formwork for a starter wall to be poured monolithically with a concrete slab, the fixing comprising:a first support portion (2) on which the base of a beam (14) of the formwork can be supported above a floor;a second support portion (3) for supporting a rear wall of a said beam (14) of a formwork; and characterised in that it further comprisesa post (9,62) on which the support portions (2,3) are movably mounted, the post (9,62) having a longitudinal axis and a lower end suitable for seating against the floor;the post (9,62) and support portions (2,3) being arranged so that the support portions (2,3) can be moved relative to the post (9,62) in at least one direction generally perpendicular to the longitudinal axis of the post (9,62) and so that the height of the support portions (2,3) relative to a said floor can be adjusted;the second support portion (3) having a channel (28,64,72) for receiving a connector or clamp leg.
- A fixing (1) according to claim 1, comprising a second post (7) on which the first post (9) is movably mounted, the first and second posts (9,7) being arranged so that the first post (9) can be moved relative to the second post (7) in a direction generally along or parallel to the longitudinal axis of the first post (9) so that the height of the support portions (2,3) relative to a said floor can be adjusted.
- A fixing (1) according to claim 2, wherein the first post (9) is screw-threadedly mounted to the second post (7) whereby rotation of the second post (7) relative to the first post (9) causes the first post (9) to move relative to the second post (7) in a direction generally along or parallel to the longitudinal axis of the first post (9).
- A fixing (1) according to claim 2 or claim 3, wherein the support portions (2,3) are slidably mounted at one end of the second post (7).
- A fixing (1) according to claim 1, comprising a block (60) slidably mounted in the first support portion (2) and to which the post (62) is movably fitted to mount the first support portion (2) on the post (62).
- A fixing (1) according to claim 5, wherein the post (62) is fitted to the block (60) by a screw threaded connection whereby rotation of the post (62) relative to the block (60) enables the height of the support portions (2,3) relative to a said floor to be adjusted.
- A fixing (1) according to any of claims 1 to 6, wherein the first support portion (2) has a lug (15) around which a tie can be fixed to fix a said beam (14) of a formwork to the fixing (1).
- A fixing according to any of claims 1 to 7, wherein the.second support portion (3) has a lug (16) around which a tie can be fixed to fix a said beam (14) of a formwork to the fixing (1).
- A fixing (1) according to any of claims 1 to 8, wherein the second support portion (3) has an opening therethrough through which a tie rod can be passed.
- A combination comprising two fixings (1) according to any of claims 1 to 9 and a clamp (70) having at least two depending legs (71) which can be respectively received in the channels (72) provided in the second support portions (3) of said fixings (1) so that the fixings (1) can be clamped together.
- A combination comprising a fixing according to any of claims 1 to 7, an anchor plate (24) and a connecting arrangement (27), the channel (28) of the second support portion (3) of the fixing (1) receiving in use one end of the connecting arrangement (27) and the other end of the connecting arrangement (27) being fixable in use to the anchor plate (24) so as to connect the anchor plate (24) to the fixing (1).
- A combination according to claim 11, wherein the second support portion (3) of the fixing (1) has an opening therethrough through which a tie rod can be passed in use to engage with at least one of the connecting arrangement (22) and the anchor plate.
- A method of monolithically forming a concrete slab floor with a starter wall, the method comprising:fixing a formwork using a plurality of fixings (1), each fixing (1) comprising a support portion (2) on which the base of a beam (14) of a formwork can be supported above a deck floor; and, a post (9,62) on which the support portion (2) is movably mounted, the post (9,62) having a longitudinal axis; the post (9,62) and support portion (2) being arranged so that the support portion (2) can be moved relative to the post (9,62) in at least one direction generally perpendicular to the longitudinal axis of the post (9,62) and so that the height of the support portion (2) relative to a said floor can be adjusted; the fixing method comprising:placing posts (9,62) of plural ones of the fixings (1) at intervals on the deck floor so that the posts (9, 62) are substantially vertical;horizontally and vertically moving the support portions (9,62) as necessary so that the support portions (2) are arranged in a line; and,fitting the beam (14) of the formwork to the support portions (2); and,monolithically forming the concrete slab floor with the starter wall by pouring concrete over the deck and within the formwork.
- A method according to claim 13, comprising repeating the placing, moving and fitting steps for a second series of fixings (1) and a second beam (14) of the formwork such that the second beam (14) of the formwork is fitted substantially parallel to the first beam (14).
- A method according to claim 14, comprising, prior to the pouring of the concrete, clamping respective ones of the fixings (1) of the first and second series of fixings (1) together.
- A method of monolithically forming a concrete slab floor with a starter wall, the method comprising:fixing a formwork using a plurality of fixings (1), each fixing (1) comprising a support portion (2) on which the base of a beam (14) of a formwork can be supported above a floor; and, a post (9,62) on which the support portion (2) is movably mounted, the post (9,62) having a longitudinal axis; the post (9,62) and support portion (2) being arranged so that the support portion (2) can be moved relative to the post (9,62) in at least one direction generally perpendicular to the longitudinal axis of the post (9,62) and so that the height of the support portions (2) relative to a said floor can be adjusted; the fixing method comprising:fitting plural said fixings (1) to the beam (14) of the formwork; and,placing the assembly of said fixings (1) and said beam (14) on the floor and horizontally and vertically moving the support portions (2) as necessary; and,monolithically forming the concrete slab floor with the starter wall by pouring concrete over the deck and within the formwork.
- A method according to claim 16, comprising repeating the fitting and placing steps for a second series of fixings (1) and a second beam (14) of the formwork such that the second beam (14) of the formwork is fitted substantially parallel to the first beam (14).
- a method according to claim 17, comprising clamping the first and second beams (14) together prior to placing either of said beams (14) on the floor, and then placing the assembly of the clamped beams (14) and respective fixings (1) on a said floor.
- A method according to claim 13 or claim 16, comprising connecting an anchor plate (24) to at least one of the fixings (1) to provide an anchor point for a tie rod.
- A method according to any of claims 13 to 19, wherein at least one of the fixings (1) is a fixing according to any of claims 2 to 9.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GBGB0316304.5A GB0316304D0 (en) | 2003-07-11 | 2003-07-11 | Formwork fixing and method |
PCT/GB2004/002974 WO2005007995A1 (en) | 2003-07-11 | 2004-07-09 | Formwork fixing and method |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1651826A1 EP1651826A1 (en) | 2006-05-03 |
EP1651826B1 true EP1651826B1 (en) | 2009-03-04 |
Family
ID=27742030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04743315A Expired - Lifetime EP1651826B1 (en) | 2003-07-11 | 2004-07-09 | Formwork fixing and method |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1651826B1 (en) |
AT (1) | ATE424492T1 (en) |
DE (1) | DE602004019785D1 (en) |
GB (1) | GB0316304D0 (en) |
WO (1) | WO2005007995A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2454882B (en) * | 2007-11-20 | 2012-06-13 | James Gerald Mccoy | A support |
CN112240099A (en) * | 2020-11-08 | 2021-01-19 | 广东电白建设集团有限公司 | Loop beam template line type fixing system |
CN117868483B (en) * | 2024-03-13 | 2024-05-14 | 山西冶金岩土工程勘察有限公司 | House building template and method |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1672760A (en) * | 1923-07-16 | 1928-06-05 | John N Heltzel | Concrete form |
GB620311A (en) * | 1945-08-09 | 1949-03-23 | Ubaldo Fiorenzi | Improvements in or relating to shuttering for casting concrete walls in situ |
US2764798A (en) * | 1953-08-24 | 1956-10-02 | John P Huff | Concrete form |
US3797800A (en) * | 1971-06-02 | 1974-03-19 | E Loy | Portable reusable form for concrete foundations |
FR2642460A1 (en) * | 1989-01-27 | 1990-08-03 | Aspord Roland | Formwork device for a screed on a horizontal surface |
EP0993533A1 (en) * | 1997-06-27 | 2000-04-19 | Richard Neil Fearn | Reusable building foundation form apparatus and method |
IT1308962B1 (en) * | 1999-12-03 | 2002-01-15 | Gino Cerato | SUPPORT AND SEALING DEVICE FOR POSITIONING FORMWORK |
-
2003
- 2003-07-11 GB GBGB0316304.5A patent/GB0316304D0/en not_active Ceased
-
2004
- 2004-07-09 DE DE602004019785T patent/DE602004019785D1/en not_active Expired - Lifetime
- 2004-07-09 WO PCT/GB2004/002974 patent/WO2005007995A1/en active Application Filing
- 2004-07-09 AT AT04743315T patent/ATE424492T1/en not_active IP Right Cessation
- 2004-07-09 EP EP04743315A patent/EP1651826B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
WO2005007995A1 (en) | 2005-01-27 |
DE602004019785D1 (en) | 2009-04-16 |
GB0316304D0 (en) | 2003-08-13 |
ATE424492T1 (en) | 2009-03-15 |
EP1651826A1 (en) | 2006-05-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6591574B2 (en) | Bracket assembly for installation of concrete forms for building foundations | |
US9677297B2 (en) | Method of installation of a structural support apparatus | |
JP4491030B2 (en) | Anchor bolt set device | |
US20100175205A1 (en) | Scaffold Arrangement and Method for Repairing the Edge Structure of a Concrete Bridge | |
US20060188336A1 (en) | Adjustable support bracket for concrete reinforcing bars | |
US20080224022A1 (en) | Method for Introducing Vertical Built-In Parts Into Structures Erected with a Sliding Formwork, Particularly in Annular Concrete Walls, and Device for Performing the Method | |
US20050246981A1 (en) | Device for, and method of, supporting a glass panel for forming a frameless glass panel fence | |
CA2403074A1 (en) | Column hung shoring system | |
WO2013016760A1 (en) | Improvements in formwork construction | |
KR101777746B1 (en) | A support | |
US8061680B1 (en) | Inter-truss frame for supporting concrete formwork | |
EP1651826B1 (en) | Formwork fixing and method | |
US20090165408A1 (en) | Construction elements and methods of construction | |
KR200439843Y1 (en) | Support frame of 2-layer wall with adjustable height | |
JPH1171897A (en) | Scaffold support device for placing concrete | |
KR20070025483A (en) | The one body puncheons for bridge construction | |
KR20020036198A (en) | A temporary bracket for construction of precast concrete beam bridge and the temporary work method using the same | |
TWM510942U (en) | Precasted concrete foundation for upright shape steel post | |
WO2007038214A2 (en) | Concrete forming structure frame locking device | |
BE1017137A3 (en) | Anchor for securing safety railing supports in wall, includes connectors at both ends for securing inside wall and to railing support stand | |
KR200464842Y1 (en) | Safety railing apparatus | |
JPH0138947B2 (en) | ||
KR200285372Y1 (en) | Horizontal Adjustable Underpinning for Wall Foam Panel | |
KR100459011B1 (en) | Structure of connecting support portion of multi-concrete building and its setting process | |
KR200277918Y1 (en) | supporter for establishing railings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20060203 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 602004019785 Country of ref document: DE Date of ref document: 20090416 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090604 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090615 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090604 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
26N | No opposition filed |
Effective date: 20091207 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090731 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090605 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090709 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090304 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20200703 Year of fee payment: 17 Ref country code: FR Payment date: 20200701 Year of fee payment: 17 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602004019785 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210731 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20230622 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20230622 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20240708 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MK9A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20240709 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20240708 |