DE2243085A1 - GUIDELINE FOR CHANNELS - Google Patents
GUIDELINE FOR CHANNELSInfo
- Publication number
- DE2243085A1 DE2243085A1 DE19722243085 DE2243085A DE2243085A1 DE 2243085 A1 DE2243085 A1 DE 2243085A1 DE 19722243085 DE19722243085 DE 19722243085 DE 2243085 A DE2243085 A DE 2243085A DE 2243085 A1 DE2243085 A1 DE 2243085A1
- Authority
- DE
- Germany
- Prior art keywords
- sections
- channel
- guardrail
- guard rail
- shots
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G19/00—Conveyors comprising an impeller or a series of impellers carried by an endless traction element and arranged to move articles or materials over a supporting surface or underlying material, e.g. endless scraper conveyors
- B65G19/18—Details
- B65G19/28—Troughs, channels, or conduits
- B65G19/287—Coupling means for trough sections
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Description
Leitplanke für Förderrinnen Die Erfindung betrifft eine aus in der Länge den Rinnenschüssen entsprechenden Schüssen zusammengesetzte Leitplanke für Förderrinnen insbesondere für den Bergbau, deren mit den Rinnenschüssen verbundene Schüsse in der Horizontalen und in der Vertikalen begrenzt gegeneinander abknickbar miteinander verbunden sind0 Insbesondere zur Vergrößerung des Fassungsvermögens von Förderrinnen ordnet man an den Längsseiten der Rinnen Leitplanken an. Die Leitplanke ist in der Regel aus Schüssen einer der Länge der Rinnenschüsse entsprechenden Läng zusammengesetzt. Dabei hat man s-Lch zunächst auf eineBefestigung der Leitplankenschüsse an cen den Rinnenacüssen beschränkt. Guard rail for conveyor troughs The invention relates to one in the Length of the channel sections corresponding sections of composite guardrail for Conveyor troughs, especially for mining, the ones connected to the trough sections Shots in the horizontal and in the vertical can be bent against each other to a limited extent are connected to each other0 In particular to increase the capacity of conveyor troughs, guard rails are placed on the long sides of the troughs. The guardrail is usually made up of wefts of a length corresponding to the length of the channel wefts composed. First of all, you have to fix the guardrail shots limited to cen the Rinnenacusses.
Man ist dann auch dazu übergegangen, die Leitplanken zur Führung von Gewinnungsmaschinen, Räum- und Rückeinrichtungen heranzuziehen. Dafür hat sich darnaber allein die Befestigung der Leitplankenschüsse an den Rinnenschüssen als nicht ausreichend erwiesen und es wurde eine zilsätzliche Verbindung der Leitplankenschüsse untereinander erforderlich. Dem Kechnung tragend ist eine Verbindung der Leitplankensohüsse dergestalt vorgeschlagen worden, daß an einem Ende des Schusses ein waagerechtes Längs loch vorgesehen wird und am anderen Ende ein in das Langloch des folgenden Schusses eingreifencier Bolzen, wobei die mit dem Längsloch und dem Bolzen versehenen Enden unter Reduzierung der Wandstarke gegensinnig abgesetzt sind, so daß sich eine fluchtende Anordnung der Leitplankenschüsse ergibt (DT-OS 1 911 130). Diese unmittelbare Verbindung der aufeinander folgenden Leitplankenschüsse soll einerseits den auftretenden Beanspruchungen genügen, andererseits soll sie die Abknickbarkeit dieser Schüsse und damit auch der Rinnenschüsse in der Horizontalen und in der Vertikalen nicht beeinträchtigen. Im laufenden Betrieb hat sich jedoch gezeigt, daß eine solche unmittelbare Verbindung der aufeinander folgenden Leitplankenschüsse die Abknickbarkeit der Schüsse so stark beeinträchtigt, daß die FunitionatUchtigkeit der Gesamtanlage zumindest beeinträchtigt wird.One then also went over to the guard rails for the management of Use extraction machines, clearing and return equipment. For that darnaber has Simply attaching the guard rail sections to the channel sections is not sufficient proved and there was an additional connection of the guardrail shots with each other necessary. A connection between the crash barriers is designed to support the Kechnung has been proposed that a horizontal longitudinal hole at one end of the shot is provided and at the other end a piercer engages in the elongated hole of the following shot Bolts, the ends provided with the longitudinal hole and the bolt under reduction the wall thickness are set off in opposite directions, so that there is an aligned arrangement the guard rail shots results (DT-OS 1 911 130). This immediate connection of the successive guard rail shots should on the one hand the occurring stresses suffice, on the other hand it should be the articulation of these shots and thus also of the channel sections horizontally and vertically. During operation, however, it has been shown that such a direct connection of the successive guard rail shots the articulation of the shots so strong impaired that the functionality of the overall system is at least impaired will.
Der Erfindung liegt in erster Linie die Aufgabe zugrunde, den aufgezeigten Nachteil zu beheben.The invention is primarily based on the object indicated Fix disadvantage.
Die Aufgabe wird erfindungsgemäß bei Leitplanken der eingangs umrissenen Art dergestalt gelöst, daß auf der der Förderrinne zugekehrten Seite an den Stoßkanten der Leitplankenschüsse in einem von der Rinne überdeckten abgesetzten Bereich Nocken vorgesehen werden' die von einem mit Spiel in diesen Bereich eingefügten Kettenglied mit Spiel übergriffen werden.According to the invention, the problem is solved in the case of guard rails as outlined at the beginning Kind of solved in such a way that on the side facing the conveyor trough at the abutting edges the guardrail shots in a stepped area covered by the channel cams are provided 'by a chain link inserted with play in this area be assaulted with play.
Die erfindungsgemäß vorgesehene Verbindung der Leitplankenschüsse gewährleistet eine unbeeinträchtigte Abknickbarkeit der aufeinander folgenden Schüsse und somit eine unbeeinträchtigte Funktionstüchtigkeit der Gesamtanlage.The connection of the guardrail sections provided according to the invention ensures an unimpaired bendability of the successive shots and thus an unimpaired functionality of the entire system.
Ein weiterer Vorteil der erfindungsgemäß ausgestalteten Leitplankenschüsse ist die identische Ausbildung beider Enden der Schüsse woraus fertigungs- und einbauseitig ins Gewicht fallende Ersparnisse resultieren.Another advantage of the guard rail sections designed according to the invention is the identical design of both ends of the sections from which production and installation side significant savings result.
Einer bevorzugten AusSührungsCorm gemäß bestehen die Leitplankenschüsse aus zwei Blechiuschnitten, wobei der abgesetzte Bereich an den Stoßkanten durch eine. entsprechende Aus sparung de-s der Rinne z.ug,ekehrte Bl.echz'schntt'tea ge -bildet wird.According to a preferred embodiment, the guardrail sections exist from two sheet metal cuts, with the stepped area through the edges one. Corresponding recess of the gutter z.ug, ekehrte Bl.echz'schntt'tea ge -forms will.
Wenn auch in erster Linie an einen Einsatz der Leitplanken im Bergbau gedacht ist, schließt das ihre Anwendung in anderen Bereichen nicht aus.Even if primarily due to the use of guard rails in mining is intended, that does not preclude their application in other areas.
In der Zeichnung ist ein Ausführungebeiepiel der erfindungegemäßen Leitplanke dargestellt. Es zeigen: Figur 1 die Seitenansicht eines Leitplankenschusses in Richtung des Pfeiles A in Figur 4, Figur 2 eine der Figur 1 entsprechende Ansicht zweier aufeinander folgender Schüsse, Figur 3 einen Schnitt nach Linie III - III in Figur 2, Figur 4 einen Schnitt nach Linie IV - IV in Figur 2.The drawing shows an example of the embodiment according to the invention Guard rail shown. The figures show: FIG. 1 the side view of a guardrail section in the direction of arrow A in FIG. 4, FIG. 2 is a view corresponding to FIG two successive shots, Figure 3 shows a section along line III - III in FIG. 2 and FIG. 4 a section along line IV - IV in FIG.
Die Leitplankenschüsse 11 bestehen aus den beiden zusammengeschweißten oder -genieteten Blechzuschnitten 111, 111'.The guard rail sections 11 consist of the two welded together or riveted sheet metal blanks 111, 111 '.
Zugeordnet werden sie der Förderrinne 12 in der in Figur 4 u.5 dargestellten Weise und durch die Bohrungen 112 durchdringende, in die Rinne 12 ziehbare Schrauben mit der Rinne 12 verbunden. Anschlagleisten 113, die mit Anschlägen 122 an den Rinnenschenkeln 121 korrespondieren, erleichtern die Zuordnung der Leitplankenschüsse 11 zu den Rinnenschüssen 12 und entlasten die Schraubverbindungen von Scheerkräften.They are assigned to the conveyor trough 12 in the one shown in FIGS. 4 and 5 Way and through the bores 112 penetrating, into the channel 12 Drawable screws connected to the gutter 12. Stop bars 113 with stops 122 correspond to the channel legs 121, facilitate the assignment of the guardrail sections 11 to the channel sections 12 and relieve the screw connections from shear forces.
Das Bestandteil der Leitplankenschüsse 11 bildende, der Rinne 12 zugekehrte Blech 111' ist an den Stoßkanten 114 unter Bildung von Taschen 116 ausgespart, in denen sich ein auf dem zusammen mit dem Blech 11' den Leitplankenschuß 11 bildenden Blech 111 sitzender Nocken 117 befindet. Ein sich mit Spiel in die Taschen 116 der sich stoßenden Leitplankenschüsse 11 einfügendes, die fluchtenden Nocken 117 der Leitplankenschüsse 11 mit Spiel übergreifendes Kettenglied 118 stellt die im wesentlichen in der Vertikalen, aber auch in der Horizontalen, abknickbare Verbindung zwischen den aufeinander folgenden Leitplankenschüssen 11 her.The part of the guardrail sections 11 forming the channel 12 facing Sheet 111 'is recessed at the abutting edges 114 to form pockets 116, in which one on which together with the sheet 11 'the guardrail section 11 is formed Plate 111 seated cam 117 is located. A game in the pockets 116 of the butting guardrail shots 11 inserting, the aligned cams 117 of the Guardrail sections 11 with game-overlapping chain link 118 essentially represents in the vertical, but also in the horizontal, kinkable connection between the successive guardrail shots 11.
Aufrechterhalten wird die Verbindung allein -durch die die Aussparung 116 in den Leitplankenschüssen 11 zumindest teilweise überdeckenden Schenkel 121 der Rinnenschüsse 12.The connection is maintained solely by the recess 116 in the guardrail sections 11 at least partially overlapping legs 121 the gutter section 12.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19722243085 DE2243085A1 (en) | 1972-09-01 | 1972-09-01 | GUIDELINE FOR CHANNELS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19722243085 DE2243085A1 (en) | 1972-09-01 | 1972-09-01 | GUIDELINE FOR CHANNELS |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2243085A1 true DE2243085A1 (en) | 1974-03-07 |
Family
ID=5855246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19722243085 Ceased DE2243085A1 (en) | 1972-09-01 | 1972-09-01 | GUIDELINE FOR CHANNELS |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2243085A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2409377A1 (en) * | 1977-11-18 | 1979-06-15 | Gewerk Eisenhuette Westfalia | COUPLING DEVICE FOR THE BINS OF A CHAIN SQUEEGEE CONVEYOR EQUIPPED ON THE SIDE ORIENTED TOWARDS THE SIZE FRONT, PLANER GUIDANCE SECTIONS FIXED ON THIS CONVEYOR |
US4588072A (en) * | 1980-02-09 | 1986-05-13 | Halbach & Braun | Scraper chain conveyor trough with reinforcing plate |
-
1972
- 1972-09-01 DE DE19722243085 patent/DE2243085A1/en not_active Ceased
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2409377A1 (en) * | 1977-11-18 | 1979-06-15 | Gewerk Eisenhuette Westfalia | COUPLING DEVICE FOR THE BINS OF A CHAIN SQUEEGEE CONVEYOR EQUIPPED ON THE SIDE ORIENTED TOWARDS THE SIZE FRONT, PLANER GUIDANCE SECTIONS FIXED ON THIS CONVEYOR |
US4588072A (en) * | 1980-02-09 | 1986-05-13 | Halbach & Braun | Scraper chain conveyor trough with reinforcing plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1927699B1 (en) | Traffic guide wall | |
EP1418274B1 (en) | Guide rail for motor vehicles | |
DE69206614T2 (en) | PARTITION GRID. | |
EP1544377B1 (en) | Form for curved wall | |
EP0371352A2 (en) | Burglar-proof door or wall | |
DE69204775T2 (en) | Conveyor trough with pegged bottom. | |
DE69807893T2 (en) | ROAD GUIDE FOR BRIDGE IN NEW JERSEY STYLE | |
DE2516082C2 (en) | Channel section for chain scraper conveyor | |
DE2243085A1 (en) | GUIDELINE FOR CHANNELS | |
EP2664712A2 (en) | Traffic guidance barrier element and traffic guidance barrier | |
DE3924402C1 (en) | ||
EP0957290A1 (en) | Connection of both ends of a conveyor belt | |
EP0323623B1 (en) | Method of comporting at least two layers, each consisting of an odd number of bodies, to constitute a transport unit, as well as the transport unit | |
DE2118229C3 (en) | Slide guide for a vehicle seat that can be moved in the longitudinal direction | |
DE202009008981U1 (en) | Bullet trap device | |
DE2030437C3 (en) | Guide track for an extraction device attached to the excavation face of a chain conveyor | |
DE3724246C2 (en) | ||
EP3611305A1 (en) | Wall element for a traffic guiding and/or blocking wall | |
DE20113347U1 (en) | Control threshold line | |
EP0178515A2 (en) | Spacer support for mist eliminator | |
DE3809748C2 (en) | Toggle connection for the add-on parts of conveyor troughs | |
EP2243880A2 (en) | Isolating clip for an insulated joint | |
DE3536523C2 (en) | ||
DE8809303U1 (en) | Fastening claw for gate leaf guide rail | |
DE2749664A1 (en) | Clamping mechanism for coal transporter pipes - has additional coupling accommodating higher loading with great play |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OD | Request for examination | ||
OGA | New person/name/address of the applicant | ||
8131 | Rejection |