DE10323546B4 - Working machine with a boom - Google Patents
Working machine with a boom Download PDFInfo
- Publication number
- DE10323546B4 DE10323546B4 DE2003123546 DE10323546A DE10323546B4 DE 10323546 B4 DE10323546 B4 DE 10323546B4 DE 2003123546 DE2003123546 DE 2003123546 DE 10323546 A DE10323546 A DE 10323546A DE 10323546 B4 DE10323546 B4 DE 10323546B4
- Authority
- DE
- Germany
- Prior art keywords
- luffing jib
- connection
- boom
- connecting device
- machine according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
- B66F11/04—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
- B66F11/044—Working platforms suspended from booms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/88—Safety gear
- B66C23/90—Devices for indicating or limiting lifting moment
- B66C23/905—Devices for indicating or limiting lifting moment electrical
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F17/00—Safety devices, e.g. for limiting or indicating lifting force
- B66F17/006—Safety devices, e.g. for limiting or indicating lifting force for working platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Jib Cranes (AREA)
Abstract
Arbeitsmaschine mit einem Ausleger, insbesondere Mobilkran, an dessen freien Ende eine Anschlussvorrichtung mit Spiel zwischen Anschlussvorichtung und Ausleger für eine Umlenkrolle eines Lastseiles angeordnet ist und einem zwischen dem Ausleger und der Anschlussvorrichtung angeordneten, die Belastung der Anschlussvorrichtung messenden Kraftmessglied, dadurch gekennzeichnet, dass bei Zuordnung eines Wippauslegers (4), welcher schwenkbar an einem an der Arbeitsmaschine schwenkbar abgestützten Ausleger (3) angeschlossen ist, am freien Ende (5) des Wippauslegers (4) eine Anschlussvorrichtung (6) für den Anschluss eines Lastseiles (8) und/oder einer Arbeitsbühne (9) und/oder eines anderen Lastaufnahmemittels angeordnet ist und die Anschlussvorrichtung (6) über zwei ein Gelenkspiel (S1, S2, S3, S4) aufweisende, sowohl orthogonal zur Mittellängsachse (M) des Wippauslegers (4) als auch mit Bezug auf die Längserstreckung des Wippauslegers (4) relativ zueinander versetzt am Wippausleger (4) angeordnete Anschlussbohrungen (13, 14) am Wippausleger (4) angeschlossen ist.working machine with a boom, in particular mobile crane, at the free end a connecting device with play between terminal device and outriggers for a pulley of a load rope is arranged and an intermediate arranged the boom and the connecting device, the burden the connecting device measuring force measuring element, characterized that when assigning a Wippauslegers (4), which pivotally on connected to a pivotally supported on the machine boom (3) is, at the free end (5) of the luffing jib (4) a connection device (6) for the connection of a load rope (8) and / or a working platform (9) and / or another lifting device is arranged and the Connection device (6) via two a joint play (S1, S2, S3, S4), both orthogonal to the central longitudinal axis (M) of the luffing jib (4) and with respect to the longitudinal extent the luffing jib (4) offset relative to each other on the luffing jib (4) arranged connection bores (13, 14) on the luffing jib (4) connected.
Description
Die Erfindung betrifft eine Arbeitsmaschine mit einem Ausleger, insbesondere Mobilkran, an dessen freien Ende eine Anschlussvorrichtung mit Spiel zwischen Anschlussvorrichtung und Ausleger für eine Umlenkrolle eines Lastseiles angeordnet ist und einem zwischen dem Ausleger und der Anschlussvorrichtung angeordneten, die Belastung der Anschlussvorrichtung messenden Kraftmessglied.The The invention relates to a work machine with a boom, in particular Mobile crane, at the free end of a connecting device with game between Connecting device and boom for a deflection roller of a load rope is arranged and one between the boom and the connecting device arranged, the load of the connecting device measuring force measuring element.
Bei Arbeitsmaschinen der eingangs genannten Gattung ist es erforderlich, Vorrichtungen zur Überwachung der Mastfestigkeit bzw. Kippsicherheit während der bestimmungsgemäßen Betriebsphase vorzusehen. Dies erfolgt im Regelfall durch eine Abgleichung der Winkelstellung des Auslegers mit der auf den Hubzylinder des Auslegers wirkenden Kraft. Eine Überwachung der Belastung des gesamten Mastsystems – beispielsweise eine Überwachung eines an den Ausleger schwenkbar angeschlossenen Wippauslegers – auf seine Belastung und die daraus resultierende Durchbiegung ist mit den vorgenannten Maßnahmen nicht möglich. Man hat deshalb bereits bei Mobilkränen mit einer am freien Ende des Wippauslegers angeordneten Umlenkrolle und Lastseil vorgeschlagen, die am Lastseil angreifende Kraft zu messen.at Working machines of the type mentioned above, it is necessary Devices for monitoring the mast resistance or anti-tipping during the intended operating phase provided. This is usually done by a balance of the angular position of the boom with the force acting on the lifting cylinder of the boom Force. A surveillance the load on the entire mast system - for example, monitoring a rocker arm pivotally connected to the boom - on his Load and the resulting deflection is with the the above measures not possible. Therefore one already has mobile cranes with one at the free end the rocker arm arranged deflection roller and load cable proposed to measure the force acting on the load rope.
Bei
einer gattungsgemäßen Vorrichtung nach
Die
Eine
Vorrichtung zum Messen und Überwachendes
Lastmomentes oder Kippmomentes an Krananlagen beschreibt die
Die
Aufgabe der Erfindung ist es, ein am freien Ende eines Auslegers, insbesondere eines Wippauslegers angeordnetes Kraftmessglied vorzuschlagen, mit dem in einfacher Weise die auf den Ausleger einwirkende Kraft sowohl bei Einsatz eines über eine Umlenkrolle geführten Lastseiles als auch beim Einsatz einer am freien Ende des Auslegers angeschlossenen Arbeitsbühne oder beim gleichzeitigen kombinierten Einsatz eines Lastseiles und einer Arbeitsbühne oder eines anderen Lastaufnahmemittels zuverlässig erfasst werden kann. Die Erfindung kann vorteilhaft beispielsweise bei Betonpumpen zur Anwendung gelangen. Da es beim Einsatz einer Arbeitsbühne unter Verwendung eines Wippauslegers in bestimmten Betriebssituationen erforderlich ist, dass der Wippausleger unter den schwenkbar am Chassis eines Mobilkranes abgestützten Ausleger geschwenkt werden muss (wobei der Wippausleger in Bezug auf seine Normalstellung in der Gegenrichtung auf Biegung belastet wird), soll die Anordnung und Ausbildung des Kraftmessgliedes in seiner Grundkonzeption so ausgebildet sein, dass auch in der vorbeschriebenen Betriebsweise die auf den Wippausleger einwirkende Kraft zuverlässig ermittelt wird.task The invention is a, at the free end of a boom, in particular a rocker arm arranged to propose force transducer, with in a simple way the force acting on the boom both when using an over guided a pulley Lastseiles as well as when using a free end of the boom connected working platform or the simultaneous combined use of a load rope and a working platform or another lifting device can be reliably detected. The Invention may be advantageous for example in concrete pumps for use reach. As when using a work platform using a Luffing jib required in certain operating situations is that the rocker arm under the swiveling on the chassis of a mobile crane supported Boom must be swiveled (with the rocker arm in relation loaded to its normal position in the opposite direction on bending is), the arrangement and training of the force transducer in his basic conception be designed so that even in the above Operation, the force acting on the rocker arm force is reliably determined.
Die Erfindung löst die gestellte Aufgabe mit der Lehre nach Anspruch 1.The Invention solves the task with the teaching of claim 1.
Die nachfolgende Beschreibung bezieht sich auf die Anwendung der Erfindung bei einem Mobilkran.The The following description refers to the application of the invention at a mobile crane.
Nach Maßgabe der Erfindung erfolgt quasi eine räumliche Abtrennung einer die Umlenkrolle und/oder Arbeitsbühne tragenden Anschlußvorrichtung vom eigentlichen Ausleger, insbesondere eines Wippauslegers. Grundsätzlich ist die Erfindung auch bei Verwendung nur eines schwenkbar am Chassis angelenkten Auslegers, d.h. bei Verzicht auf einen angeschlossenen Wippausleger, anwendbar, wobei insoweit die Notwendigkeit einer Messung der Belastung eines über 90 Grad nach unten eingeschwenkten Wippauslegers entfällt. Die vorgenannte räumliche Abtrennung ermöglicht im Bereich der Abtrennung die Anordnung eines Kraftmessgliedes, welches einerseits am Ausleger und andererseits an der Anschlussvorrichtung angeschlossen ist und zuverlässig die auf die Anschlussvorrichtung und damit auf das freie Ende des Auslegers wirkende Kraft ermittelt.To proviso The invention is virtually a spatial separation of a Pulley and / or work platform carrying connection device from the actual boom, especially a luffing jib. Basically the invention also hinged when using only one pivotally mounted on the chassis Cantilever, i. waiving a connected luffing jib, applicable, in which respect the need for a measurement of the load one over 90 degrees pivoted down luffing jib is eliminated. The the aforementioned spatial Separation allows in the area of the separation, the arrangement of a force-measuring element, which on the one hand on the boom and on the other hand on the connecting device connected and reliable on the connecting device and thus on the free end of the Cantilever acting force determined.
Weitere bevorzugte Ausführungsformen der Erfindung sind in den Unteransprüchen angegeben.Further preferred embodiments of Invention are specified in the subclaims.
In vorteilhafter Ausgestaltung der Erfindung besteht das Kraftmessglied aus einer einerseits am Wippausleger und andererseits an der Anschlussvorrichtung angeschlossenen Zuglasche, wobei beispielsweise mittels eines der Zuglasche zugeordneten Dehnungmessstreifens die jeweilige Belastung der Zuglasche ermittelt werden kann.In Advantageous embodiment of the invention, the force measuring element from a on the one hand on the rocker arm and on the other hand on the connecting device connected pull tab, wherein for example by means of one of Pull tab associated strain gauge the respective load of Pull tab can be determined.
Der Anschluss der Anschlussvorrichtung am freien Ende des Auslegers gemäß Anspruch 1 kann grundsätzlich unterschiedlich ausgestaltet sein; sofern ausschließlich eine Betriebsweise mit Lastseil (also unter Verzicht auf eine Betriebsweise mit Hubarbeitsbühne) vorgesehen ist, kann die Anschlussvorrichtung über nur eine Anschlussbohrung am Ausleger oder Wippausleger angeschlossen sein, wobei der zweite Anschluss der Anschlussvorrichtung über die am Ausleger angeschlossene Zuglasche erfolgt.Of the Connection of the connecting device at the free end of the jib according to claim 1 can basically be configured differently; if only one Operation with load rope (thus waiving a mode of operation with aerial work platform) is provided, the connecting device via only one connection hole be connected to the boom or luffing jib, wherein the second Connection of the connection device via the boom connected to the boom Pull tab takes place.
Bei Einsatz einer Arbeitsbühne bzw. beim kombinierten Einsatz eines Lastseiles und einer Arbeitsbühne wird nach der Erfindung vorgeschlagen, dass die Anschlussvorrichtung über zwei ein Gelenkspiel aufweisende Anschlussbohrungen an einem Wippausleger angeschlossen ist. Im Sinne der vorliegenden Erfindung ist grundsätzlich unter dem Begriff „Gelenkspiel" oder „Spiel" eine die Längendehnung des Kraftmessgliedes zulassende Ausweichmöglichkeit der Anschlussvorrichtung gegenüber dem freien Ende des Auslegers zu verstehen. In Folge der Anordnung von zwei Anschlussbohrungen ist es erforderlich, die Anschlussbohrungen der Anschlussvorrichtung mit einem geringen Spiel zu versehen, welches ausreicht, um die Funktion der im Ausführungsbeispiel mit einem Dehungsmessstreifen versehenen Zuglasche zu gewährleisten. Dies gilt insbesondere auch für die Funktion der Zuglasche bei der Ermittlung der Belastung eines unter den eigentlichen Ausleger geschwenkten Wippauslegers. Das Gelenkspiel der Anschlussbohrungen kann in einfacher Weise durch die Ausbildung der Anschlussbohrungen als Langlöcher gewährleistet sein.at Use of a work platform or in the combined use of a load rope and a working platform proposed according to the invention that the connecting device via two a joint clearance having connection holes on a luffing jib connected. For the purposes of the present invention is basically under the term "joint play" or "play" a the elongation of the Force measuring element permitting alternative possibility of connection device across from to understand the free end of the boom. In consequence of the arrangement from two connection holes it is necessary to drill the connection holes the connecting device to provide a small game, which sufficient to the function of the embodiment with a strain gauge provided to ensure pull tab. This is especially true for the function of the pull tab when determining the load of a under the actual boom tilted luffing jib. The Joint play of the connecting holes can be done in a simple manner the formation of the connection holes can be guaranteed as slots.
Die Verwendung eines unter den eigentlichen, am Chassis schwenkbar abgestützten Ausleger schwenkbaren Wippauslegers ist – abgesehen von einer notwendigen Einschwenkung für den Transport – nur bei Einsatz einer am freien Ende des Wippauslegers angeschlossenen Arbeitsbühne sinnvoll. Wie vorbeschrieben, wird der Wippausleger durch die daran angeschlossene Arbeitsbühne bei einer Abschwenkung von mehr als etwa 90 Grad gegenüber der Horizontalen in gegenüber der horizontalen Position gegensinniger Richtung belastet. Mit der Erfindung soll sichergestellt werden, dass auch in dieser Position eine zuverlässige Messung durch die Zuglasche erfolgt. Dies erfordert eine besondere Anordnung der Anschlussbohrungen der Anschlussvorrichtung am freien Ende des Wippauslegers.The Use of one under the actual, pivotally supported on the chassis boom pivoting luffing jib is - apart from a necessary Einschwenkung for transport - only at Use of a working platform connected to the free end of the luffing jib makes sense. As described above, the luffing jib is connected by the connected platform at a turn of more than about 90 degrees from the Horizontal in opposite the horizontal position opposite direction loaded. With the Invention should be ensured that even in this position a reliable one Measurement by the pull tab. This requires a special one Arrangement of connection holes of the connection device at the free End of the luffing jib.
Die Erfindung schlägt hierzu vor, dass beide das erforderliche Gelenkspiel aufweisende Anschlussbohrungen der Anschlussvorrichtung sowohl orthogonal zur Mittellängsachse des Wippauslegers als auch mit Bezug auf die Längserstreckung des Wippauslegers relativ zueinander versetzt am Wippausleger angeordnet sind, wobei die vom freien Ende des Wippauslegers abgewandte erste Anschlussbohrung oberhalb und näher der Mittellängsachse des Wippauslegers angeordnet ist als die oberhalb der Mittellängsachse angeordnete, der Umlenkrolle des Wippauslegers zugewandte zweite Anschlussbohrung, derart, dass eine Verbindungslinie der beiden Anschlussbohrungen eine die der Mittellängsachse des Wippauslegers benachbarte Anschlussbohrung und die Drehachse der Umlenkrolle verbindende Wirklinie unter einem Winkel von etwa 30 Grad bis 60 Grad, vorzugsweise von 32 Grad schneidet.The Invention proposes For this purpose, that both have the required joint play Connecting bores of the connecting device both orthogonal to central longitudinal axis the luffing jib as well as with respect to the longitudinal extension of the luffing jib offset relative to each other on the luffing jib are arranged, wherein the first connection hole facing away from the free end of the luffing jib above and closer the central longitudinal axis of the luffing jib is arranged as the above the central longitudinal axis arranged, the deflection roller of the luffing jib facing second Connecting bore, such that a connecting line of the two Connection holes one of the central longitudinal axis of the luffing jib adjacent connecting bore and the axis of rotation of the guide roller connecting Wirklinie at an angle of about 30 degrees to 60 degrees, preferably of 32 degrees.
Mit einer derartigen Anordung der Anschlussbohrungen der Anschlussvorrichtung am freien Ende des Wippauslegers kann in jeder Stellung des Wippauslegers die an der Anschlussvorrichtung anstehende Kraft gemessen werden.With Such an arrangement of the connection bores of the connection device at the free end of the luffing jib can in any position of the luffing jib the force applied to the connecting device is measured.
In vorteilhafter konstruktiver Ausgestaltung der vorstehend beschriebenen technischen Lehre wird weiter vorgeschlagen, dass die Anschlussvorrichtung zwei am Wippausleger anliegende Schenkel aufweist, dass die beiden Anschlussbohrungen an den freien Enden der Schenkel angeordnet sind und zwischen den Schenkeln der Anschlusspunkt des Kraftmessgliedes am Wippausleger angeordnet ist.In advantageous structural design of the above-described Technical teaching is further proposed that the connection device two leg adjacent to the luffing jib has the two Connection holes are arranged at the free ends of the legs and between the legs of the connection point of the force measuring element is arranged on the luffing jib.
Die erforderliche Vorspannung des Kraftmessgliedes in einem seiner Anschlusspunkte am freien Ende des Wippauslegers oder an der Anschlussvorrichtung erfolgt zweckmäßig mittels eines die Bohrung im Bereich eines der beiden Anschlusspunkte durchfassenden Exzenterbolzens.The required preload of the load cell in one of its connection points at the free end of the luffing jib or at the connecting device Appropriately by means one through the hole in the area of one of the two connection points Eccentric.
Mit der erfindungsgemäßen Lösung wird eine Kraftmesseinrichtung vorgeschlagen, mit der sowohl die bei Einsatz eines Lastseiles als auch bei Einsatz einer Arbeitsbühne oder bei kombiniertem Einsatz von Lastseil und Arbeitsbühne oder eines anderen Lastaufnahmemittels auf das freie Ende eines Auslegers einwirkende Kraft gemessen werden kann, wobei die Messung auch bei Verwendung eines unter einen Ausleger geschwenkten Wippauslegers gewährleistet ist.With the solution according to the invention becomes a Force measuring device proposed, with both the use a load rope as well as when using a work platform or combined use of load rope and platform or another lifting device on the free end of a boom acting force can be measured, the measurement also at Use of a jib swung under a boom guaranteed is.
Die Erfindung wird nachfolgend anhand eines einem Mobilkran betreffenden Ausführungsbeispieles näher erläutert.The The invention will be described below with reference to a mobile crane embodiment explained in more detail.
Es zeigen:It demonstrate:
Gemäß
Gemäß
- 11
- Mobilkranmobile crane
- 22
- Kraftfahrzeugmotor vehicle
- 33
- Auslegerboom
- 44
- Wippauslegerluffing jib
- 55
- freies Endefree The End
- 66
- Anschlussvorrichtungconnection device
- 77
- Umlenkrolleidler pulley
- 88th
- LastseilLast rope
- 99
- Arbeitsbühneplatform
- 1010
- Korbbügelbasket Ironing
- 1111
- KraftmessgliedForce measuring element
- S1S1
- S2S2
- Spielgame
- S3S3
- S4S4
- 1212
- Zuglaschepull tab
- 1313
- Anschlussbohrungconnection bore
- 1414
- Anschlussbohrungconnection bore
- 1515
- Schenkelleg
- 1616
- Schenkelleg
- 1717
- freies Endefree The End
- 1818
- freies Endefree The End
- 1919
- Anschlusspunktconnection point
- 2020
- Hubzylinderlifting cylinder
- 2121
- Hubzylinderlifting cylinder
- 2222
- Anschlusspunktconnection point
- MM
- Mittellängsachsecentral longitudinal axis
- VV
- Verbindungslinieconnecting line
- DD
- Drehachseaxis of rotation
- WW
- Wirklinieline of action
- XX
- Pfeilrichtungarrow
- αα
- Winkelangle
- YY
- Pfeilrichtungarrow
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003123546 DE10323546B4 (en) | 2003-05-24 | 2003-05-24 | Working machine with a boom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003123546 DE10323546B4 (en) | 2003-05-24 | 2003-05-24 | Working machine with a boom |
Publications (2)
Publication Number | Publication Date |
---|---|
DE10323546A1 DE10323546A1 (en) | 2004-12-23 |
DE10323546B4 true DE10323546B4 (en) | 2007-04-05 |
Family
ID=33482135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2003123546 Expired - Fee Related DE10323546B4 (en) | 2003-05-24 | 2003-05-24 | Working machine with a boom |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10323546B4 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20230076909A1 (en) * | 2020-02-14 | 2023-03-09 | Construction Robotics, Llc | Enhanced Lift Assist Device |
WO2024165962A1 (en) * | 2023-02-06 | 2024-08-15 | Jacques Tranchero | Crane with a system for limiting the pull of the winch |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1880072U (en) * | 1962-01-09 | 1963-10-03 | Juergen Henkel | LOAD MOMENT PROTECTION FOR JIB CRANES. |
DE1172021B (en) * | 1961-03-18 | 1964-06-11 | Ernst Henkel | Device for measuring and monitoring the load moment or overturning moment on crane systems or the like. |
DE1899543U (en) * | 1962-10-30 | 1964-08-27 | Demag Ag | OVERLOAD PROTECTION FOR GRIPPERS AND ELEVATORS ROTATING CRANES WITH RIGID BOOM. |
DE19610662C2 (en) * | 1996-03-08 | 1998-03-19 | Mannesmann Ag | Measuring device with a load measuring element |
-
2003
- 2003-05-24 DE DE2003123546 patent/DE10323546B4/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1172021B (en) * | 1961-03-18 | 1964-06-11 | Ernst Henkel | Device for measuring and monitoring the load moment or overturning moment on crane systems or the like. |
DE1880072U (en) * | 1962-01-09 | 1963-10-03 | Juergen Henkel | LOAD MOMENT PROTECTION FOR JIB CRANES. |
DE1899543U (en) * | 1962-10-30 | 1964-08-27 | Demag Ag | OVERLOAD PROTECTION FOR GRIPPERS AND ELEVATORS ROTATING CRANES WITH RIGID BOOM. |
DE19610662C2 (en) * | 1996-03-08 | 1998-03-19 | Mannesmann Ag | Measuring device with a load measuring element |
Also Published As
Publication number | Publication date |
---|---|
DE10323546A1 (en) | 2004-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1772333B1 (en) | Moveable working device with supporting extension arms | |
EP2799386B1 (en) | Device and method for determination and monitoring a counterweight which is fitted to a crane | |
DE2606240B2 (en) | Load indicator | |
EP3359481B1 (en) | Supporting device for supporting a mobile device | |
DE2208777C3 (en) | Scissor lift table | |
EP2391874B1 (en) | Industrial truck | |
DE3642248A1 (en) | CRANE BOOM WITH EXTENSION ATTACHABLE IN DIFFERENT ANGLES | |
DE2802947A1 (en) | DYNAMOMETRIC MEASURING ARRANGEMENT FOR THE TILTING MOMENT OF A HOIST JIB | |
EP1803678A2 (en) | Operation device for a loading crane | |
DE10323546B4 (en) | Working machine with a boom | |
EP3456887A1 (en) | Excavator boom and excavator | |
DE2438439A1 (en) | Slewing jib crane - has tailweight unit with travel gear slewing superstructure with main jib and gantry | |
EP1382562B1 (en) | Load measuring device | |
DE102005018522B4 (en) | Device for changing the counterweight distance of a tower crane, without changing the counter-jib | |
DE3209295A1 (en) | Load-measuring device for lifting appliances | |
DE3338235A1 (en) | METHOD FOR TESTING THE LOADABILITY OF COVERING PARTS FOR REAR FRAME AND DEVICE FOR IMPLEMENTING THE METHOD | |
DE3822690C1 (en) | Stop device for hoisting, hauling or lashing means | |
EP0004254A1 (en) | Arrangement for measuring the load moment of a working machine for the purpose of indication and/or giving an alarm | |
DE202007008383U1 (en) | Commercial vehicle support means | |
DE1156211B (en) | Device for measuring and monitoring the load torque on crane systems or the like. | |
DE202009008727U1 (en) | Pillar jib crane | |
DE1285900B (en) | Weight compensation device, especially for swiveling cabs of trucks | |
EP1369299A1 (en) | Loading tailgate with spring assisted folding of the platform | |
DE102008037715B4 (en) | Mobile machine with swiveling outriggers | |
DE1106050B (en) | Arrangement for weighing the load in cranes by means of a load cell arranged on the boom head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8364 | No opposition during term of opposition | ||
R081 | Change of applicant/patentee |
Owner name: BOECKER AG, DE Free format text: FORMER OWNER: ALBERT BOECKER GMBH & CO KG, 59368 WERNE, DE Effective date: 20120723 |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |