CN218204660U - Auxiliary leveling excavator bucket - Google Patents

Auxiliary leveling excavator bucket Download PDF

Info

Publication number
CN218204660U
CN218204660U CN202222454025.1U CN202222454025U CN218204660U CN 218204660 U CN218204660 U CN 218204660U CN 202222454025 U CN202222454025 U CN 202222454025U CN 218204660 U CN218204660 U CN 218204660U
Authority
CN
China
Prior art keywords
bucket
connecting frame
leveling
auxiliary
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222454025.1U
Other languages
Chinese (zh)
Inventor
郭春雨
张文婷
李正
呼彦飞
任义
张晋华
李凯
乔永朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN202222454025.1U priority Critical patent/CN218204660U/en
Application granted granted Critical
Publication of CN218204660U publication Critical patent/CN218204660U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Shovels (AREA)

Abstract

The utility model relates to an excavator technical field more specifically relates to an auxiliary leveling bucket. Comprises a bucket body and an auxiliary component arranged on the bucket body; the auxiliary component includes that at least one levels subassembly and bracket component, levels the subassembly and passes through the bracket component and set up on the lateral wall of bucket body, levels the subassembly and is used for leveling the side slope of earthwork. The leveling assembly comprises a steel plate and at least one connecting frame, one end of the connecting frame is connected with the inner side wall of the steel plate, and the other end of the connecting frame is connected with the support assembly. The construction method can complete earth excavation, slope repairing and leveling at one time, and can reduce the construction time of the foundation pit, thereby improving the construction speed, saving the construction period, improving the efficiency and reducing the cost. The utility model discloses mainly be applied to the supplementary aspect of leveling of bucket.

Description

Supplementary bucket that levels
Technical Field
The utility model relates to an excavator technical field more specifically relates to an auxiliary leveling bucket.
Background
In the current foundation pit construction process, after the foundation pit is excavated, secondary manual slope repairing needs to be carried out on the foundation pit, the slope and the surface meet the requirements, the processes are multiple and unsafe, particularly in the lower column pier engineering, the slope needs to be excavated for secondary manual leveling every time, multiple or even hundreds of column piers are arranged in one project, and the secondary manual slope repairing method is extremely low in efficiency while the labor intensity of workers is increased.
Disclosure of Invention
For overcoming exist among the above-mentioned prior art not enough, the utility model provides an auxiliary levelling bucket can avoid the artifical slope of repairing of secondary of foundation ditch, reduces workman intensity of labour and improves the operating efficiency, need not to destroy the bucket body, and appurtenance installation, dismantlement convenient and fast level effectually.
In order to solve the technical problem, the utility model discloses the technical scheme who takes does:
an auxiliary leveling bucket comprises a bucket body and an auxiliary component arranged on the bucket body; the auxiliary component includes that at least one levels subassembly and bracket component, level the subassembly and pass through the bracket component and set up on the lateral wall of bucket body, level the subassembly and be used for leveling the side slope of earthwork.
The leveling assembly comprises a steel plate and at least one connecting frame, one end of the connecting frame is connected with the inner side wall of the steel plate, and the other end of the connecting frame is connected with the support assembly.
The end face of the connecting frame, which is connected with the steel plate, is an inclined face, and the steel plate is fixedly connected with the connecting frame.
The link includes first link and second link, first link is longer than the second link, just a plurality of locating holes of evenly having arranged on first link and the second link, the locating hole is used for being connected with the bracket component.
The support component with the link one-to-one, the support component includes support body and bolt, the support body is the platelike structure who has the mounting hole, the bolt runs through mounting hole and locating hole set up.
The bucket body is including the scraper bowl and the bucket tooth that are provided with the cavity, the bucket tooth be provided with a plurality ofly and evenly arrange in on the bottom plate of scraper bowl, the bucket tooth deviates from the bottom of bottom plate one end is provided with the flat shovel.
One end of the support body is longitudinally and fixedly connected with the outer side wall of the bucket.
Compared with the prior art, the utility model following beneficial effect has:
the application provides bucket appurtenance has overcome the defect of current artifical repair slope of secondary, can effectively solve the foundation ditch side slope and need repair the lower problem of slope construction work efficiency by artifical secondary after earthwork excavation accomplishes, can dig and repair slope flattening and once accomplish, reducible foundation ditch engineering time to construction speed has been improved, the time limit for a project saved, raise the efficiency, reduce cost.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a portion of a bucket of the present invention;
FIG. 3 is a schematic view of a portion of the leveling assembly of the present invention;
FIG. 4 is a schematic view of a portion of the blade of the present invention;
in the figure: 1 is a steel plate, 2 is a first connecting frame, 3 is a second connecting frame, 4 is a positioning hole, 5 is a bracket body, 6 is a bolt, 7 is a bucket, 8 is a bucket tooth, and 9 is a flat shovel.
Detailed Description
In order that the above objects, features and advantages of the present invention can be more clearly understood, a more particular description of the invention, taken in conjunction with the accompanying drawings and detailed description thereof, is provided below. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced otherwise than as specifically described and thus the scope of the present invention is not limited by the specific embodiments disclosed below.
As shown in fig. 1 to 4, an auxiliary leveling bucket comprises a bucket body and an auxiliary component arranged on the bucket body, wherein the auxiliary component comprises at least one leveling component and a support component, the leveling component is arranged on the outer side wall of the bucket body through the support component, and the leveling component is used for leveling a side slope of earth. And (3) discharging an excavation side slope line according to design, fixing the leveling component to the edge of the excavator bucket of the excavator, and leveling the side slope by the leveling component while excavating the earthwork downwards through the excavator side teeth, so that the side slope is leveled in place in one step.
Preferably, the leveling assembly comprises a steel plate 1 and at least one connecting frame, one end of the connecting frame is connected with the inner side wall of the steel plate 1, and the other end of the connecting frame is connected with the support assembly. The steel plate 1 is fixed to the edge of the excavator bucket in advance, and the steel plate 1 levels the side slope while the earthwork is dug downwards through the side teeth of the excavator
Preferably, the end face of the connecting frame connected with the steel plate 1 is an inclined face, and the steel plate 1 is fixedly connected with the connecting frame.
Preferably, the connecting frame comprises a first connecting frame 2 and a second connecting frame 3, the first connecting frame 2 is longer than the second connecting frame 3, a plurality of positioning holes 4 are uniformly distributed on the first connecting frame 2 and the second connecting frame 3, and the positioning holes 4 are used for connecting with the bracket component.
Preferably, the support assemblies correspond to the connecting frames one by one, each support assembly comprises a support body 5 and a bolt 6, each support body 5 is of a plate-shaped structure with a mounting hole 10, and the bolt 6 penetrates through the mounting hole 10 and the positioning hole 4. The inclination angle of the steel plate 1 can be adjusted by adjusting the connecting position of the positioning hole 4 and the mounting hole 10, and the inclination angle of the steel plate 1 is controlled according to the slope requirement of the side slope.
Preferably, the bucket body is including the scraper bowl 7 and the bucket tooth 8 that are provided with the cavity, and bucket tooth 8 is provided with a plurality ofly and evenly arranges on the bottom plate of scraper bowl 7, and the bottom that bucket tooth 8 deviates from bottom plate one end is provided with flat shovel 9, and flat shovel 9 bottom flushes with scraper bowl 7 bottom surface.
Preferably, one end of the bracket body 5 is fixedly connected with the outer side wall of the bucket 7 in the longitudinal direction.
In the process of digging, when the earthwork digs through the excavator side teeth, according to the slope of the side slope, the inclination angle of the steel plate 1 is adjusted, the steel plate 1 assists the leveling device to level the side slope and the slope angle, and the flat shovel 9 levels the dug plane to make the digging surface level. Do not need artifical secondary to repair slope flattening, not only save the manual work, improved earthwork excavation efficiency and quality moreover, eliminated the potential safety hazard.
Although only the preferred embodiments of the present invention have been described in detail, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art, and all changes are encompassed in the scope of the present invention.

Claims (7)

1. The utility model provides an auxiliary leveling bucket which characterized in that: including the bucket body with set up the auxiliary component on the bucket body, the auxiliary component includes that at least one levels subassembly and bracket component, level the subassembly and pass through the bracket component and set up on the lateral wall of bucket body, level the subassembly and be used for leveling the side slope of earthwork.
2. An auxiliary grading bucket according to claim 1 wherein: the leveling assembly comprises a steel plate (1) and at least one connecting frame, one end of the connecting frame is connected with the inner side wall of the steel plate (1), and the other end of the connecting frame is connected with the support assembly.
3. An auxiliary grading bucket according to claim 2 wherein: the end face of the connecting frame connected with the steel plate (1) is an inclined face, and the steel plate (1) is fixedly connected with the connecting frame.
4. A secondary grading bucket according to claim 3 wherein: the connecting frame comprises a first connecting frame (2) and a second connecting frame (3), wherein the first connecting frame (2) is longer than the second connecting frame (3), a plurality of positioning holes (4) are uniformly distributed in the first connecting frame (2) and the second connecting frame (3), and the positioning holes (4) are used for being connected with the support component.
5. An auxiliary grading bucket according to claim 4 wherein: the support component with the link one-to-one, the support component includes support body (5) and bolt (6), support body (5) are for having the platelike structure of mounting hole (10), bolt (6) run through mounting hole (10) and locating hole (4) set up.
6. An auxiliary grading bucket according to claim 5 wherein: the excavator bucket body is including bucket (7) and bucket tooth (8) that are provided with the cavity, bucket tooth (8) be provided with a plurality ofly and evenly arrange in on the bottom plate of bucket (7), bucket tooth (8) deviate from the bottom of bottom plate one end is provided with flat shovel (9).
7. An auxiliary grading bucket according to claim 6 wherein: one end of the bracket body (5) is longitudinally and fixedly connected with the outer side wall of the bucket (7).
CN202222454025.1U 2022-09-16 2022-09-16 Auxiliary leveling excavator bucket Active CN218204660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222454025.1U CN218204660U (en) 2022-09-16 2022-09-16 Auxiliary leveling excavator bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222454025.1U CN218204660U (en) 2022-09-16 2022-09-16 Auxiliary leveling excavator bucket

Publications (1)

Publication Number Publication Date
CN218204660U true CN218204660U (en) 2023-01-03

Family

ID=84634017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222454025.1U Active CN218204660U (en) 2022-09-16 2022-09-16 Auxiliary leveling excavator bucket

Country Status (1)

Country Link
CN (1) CN218204660U (en)

Similar Documents

Publication Publication Date Title
CN110485473A (en) Rectangle active well and its construction method can be recycled in a kind of assembled that presetting detachable door opening
CN218204660U (en) Auxiliary leveling excavator bucket
CN112627840B (en) Leading guiding mechanism of pipe jacking engineering
CN211773723U (en) Welding-free and dismantling-free bracket for steel sheet pile
CN110468873A (en) Piles underpinning structure and application method under a kind of small space
KR100476842B1 (en) soldier beam installed according to axial force in excavating work
CN1782239A (en) Blade apparatus for work machine and work machine having the same
JP2977805B1 (en) Straightening method and straightening device for buildings with uneven settlement
CN1088487C (en) Method for forming retaining wall
CN211200453U (en) Integrated station structure of middle cover digging method
CN210827482U (en) Foundation ditch ramp reinforcing and supporting structure under heavy load current condition
CN113216235A (en) Construction method for large open caisson water storage settlement
CN110485471A (en) It is a kind of sliding rear by the recyclable rectangle active well of the integrated assembled of wall and its construction method
CN218374105U (en) Excavator bucket suitable for scale excavation
JP3975438B2 (en) Inclined repair method for dirt concrete building
JPH0768707B2 (en) Open caisson method
CN111877429B (en) Grooving device, grooving machine and grooving method suitable for construction of local diaphragm wall under cable trench
CN218479242U (en) River course excavating gear for river course improvement
CN110485469A (en) Round-seal reservoir and its construction method can be recycled by the integrated assembled of wall after one kind
CN218437085U (en) Trench excavation prestressing force assembled supporting device
CN110777859B (en) Horizontal foundation replacement and pile body jacking reinforcement deviation rectifying method
CN221422104U (en) Grab bucket structure for drainage engineering
CN110485466A (en) Circular work hole and its construction method can be recycled in a kind of assembled of reserved door opening
JP7461443B1 (en) How to assemble an open shield machine
CN112252331B (en) Deep foundation pit inclined support supporting structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant