CN210238555U - Offshore wind turbine foundation platform steel grating fixing device - Google Patents

Offshore wind turbine foundation platform steel grating fixing device Download PDF

Info

Publication number
CN210238555U
CN210238555U CN201920646429.6U CN201920646429U CN210238555U CN 210238555 U CN210238555 U CN 210238555U CN 201920646429 U CN201920646429 U CN 201920646429U CN 210238555 U CN210238555 U CN 210238555U
Authority
CN
China
Prior art keywords
connecting piece
wind turbine
fixing device
offshore wind
foundation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920646429.6U
Other languages
Chinese (zh)
Inventor
Caiyun Huan
郇彩云
Bing Liu
刘兵
Zhenqiang Jiang
姜贞强
Xiaohui Shan
单晓辉
Ben He
何奔
Sanxia Xu
徐三峡
Tao Li
李涛
Dong Cai
蔡东
Feng Si
斯锋
Shushu Peng
彭姝姝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Gorges New Energy Yancheng Dafeng Co ltd
PowerChina Huadong Engineering Corp Ltd
Original Assignee
Three Gorges New Energy Yancheng Dafeng Co ltd
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Three Gorges New Energy Yancheng Dafeng Co ltd, PowerChina Huadong Engineering Corp Ltd filed Critical Three Gorges New Energy Yancheng Dafeng Co ltd
Priority to CN201920646429.6U priority Critical patent/CN210238555U/en
Application granted granted Critical
Publication of CN210238555U publication Critical patent/CN210238555U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model relates to an offshore wind turbine foundation platform steel grating fixing device. The utility model aims at providing a simple structure, simple to operate, safe and reliable's offshore wind turbine foundation platform steel grating fixing device. The technical scheme of the utility model is that: the utility model provides an offshore wind turbine foundation platform steel grating fixing device for be fixed in the foundation platform roof beam with the steel grating on, its characterized in that: the fixing device is provided with a grid fixing piece, a connecting piece I and a connecting piece II, wherein the grid fixing piece is arranged on the steel grid and sequentially penetrates through the steel grid through the connecting pieces I and II to be connected with a foundation platform beam, and the connecting piece I is coaxially connected with the connecting piece II through threads. The utility model is suitable for a marine wind power technical field.

Description

Offshore wind turbine foundation platform steel grating fixing device
Technical Field
The utility model relates to an offshore wind turbine foundation platform steel grating fixing device. The method is suitable for the technical field of offshore wind power.
Background
In recent years, by virtue of the characteristics of stable offshore resources, high power generation, convenience in consumption and the like, the offshore wind power generation industry has been rapidly developed, and the offshore wind power generation has a wide market prospect. The offshore wind turbine mainly comprises three parts: fan basis, tower section of thick bamboo, upper portion unit. In order to facilitate the wind turbine landing, a wind turbine foundation is usually provided with a ship-leaning system, a platform and other components in a matching manner. With the development of offshore wind power, the requirements on the basic accessory components of the wind turbine are higher and higher.
The offshore wind turbine foundation platform has less wind acting force and increases the rigidity of the platform, and generally adopts a grid structure; to facilitate grid installation, the grid size is typically combined with the platform beam system. Due to the complexity of offshore operations and construction time conditions, grilles often have no way to guarantee a 25 year life and are therefore typically designed as replaceable structures.
The traditional grid and fan platform beam system is fixed by saddle clamps, grid fixing hooks and other modes. The saddle clamp is generally used for connecting 2 grids, and the grids cannot be connected and fixed with the platform beam; the grid fixing hook is designed and synthesized by a saddle clamp and a beam hook by adopting round steel matched with a beam system, and the beam is fixedly connected with the adjacent grid. In the actual construction process, the problem of adaptation between the grid fixing hook and the beam system is more prominent, and if the fixing hook is completely matched with the beam system, the construction operation is difficult; if the fixed hook is slightly larger than the beam system, the problems of looseness and the like easily occur in the construction process.
Disclosure of Invention
The to-be-solved technical problem of the utility model is: aiming at the problems, the offshore wind turbine foundation platform steel grating fixing device is simple in structure, convenient to install, safe and reliable.
The utility model adopts the technical proposal that: the utility model provides an offshore wind turbine foundation platform steel grating fixing device for be fixed in the foundation platform roof beam with the steel grating on, its characterized in that: the fixing device is provided with a grid fixing piece, a connecting piece I and a connecting piece II, wherein the grid fixing piece is arranged on the steel grid and sequentially penetrates through the steel grid through the connecting pieces I and II to be connected with a foundation platform beam, and the connecting piece I is coaxially connected with the connecting piece II through threads.
The center of the grid fixing piece is provided with a through hole for the connecting piece I to pass through, the upper end of the connecting piece I is provided with a flat-head clamping plate directly larger than the through hole, and the lower end of the connecting piece II is welded and fixed on the foundation platform beam.
And a rubber gasket is arranged between the flat head clamping plate at the upper end of the connecting piece I and the grid fixing piece.
The connecting piece I adopts an inner hexagonal flat-head clamping plate long nut, and the connecting piece II adopts a beam middle fixing bolt.
The thickness of the grid fixing piece is gradually thinned from the center to the outer side.
The grid fixing piece, the connecting piece I and the connecting piece II are all made of stainless steel materials.
The utility model has the advantages that: the utility model discloses a grid stationary blade cooperation connecting piece I, connecting piece II are fixed in the steel grating on the basic platform roof beam, and connecting piece I, II coaxial threaded connection of connecting piece, simple structure, installation change convenience, safe and reliable. The utility model discloses well grid stationary blade thickness is by the outside attenuate gradually of center, prevents that personnel from walking to stumble.
Drawings
Fig. 1 is a schematic structural diagram of the embodiment.
FIG. 2 is a schematic view showing the structure of the grid fixing pieces in the embodiment.
FIG. 3 is a sectional view of a grid fixing piece in the embodiment.
Fig. 4 is a schematic structural diagram of the long nut of the inner hexagonal flat head clamping plate in the embodiment.
FIG. 5 is a schematic structural diagram of a fixing bolt in a beam in the embodiment.
Detailed Description
As shown in fig. 1, the present embodiment is a steel grating fixing device for fixing a steel grating on a foundation platform beam of an offshore wind turbine, the fixing device comprises a grating fixing piece 4, a connecting piece i and a connecting piece ii, the grating fixing piece 4 is disposed on the steel grating 6, and the grating fixing piece passes through the steel grating 6 via the connecting pieces i and ii in sequence and then is connected with the foundation platform beam 5, so as to clamp and fix the steel grating 6 on the foundation platform beam 5.
As shown in fig. 2 and 3, in the present embodiment, a through hole 401 is formed at the center of the grid fixing piece 4, and in order to prevent people from stumbling, the thickness of the grid fixing piece 4 in this embodiment is gradually reduced from the center to the outer side.
In this embodiment, the connecting member i adopts the long nut 2 of the inner hexagonal flat-head clamping plate, as shown in fig. 4, the length of the long nut of the inner hexagonal flat-head clamping plate is 30-40 mm, the nut has a cylindrical main body 201 with a diameter slightly smaller than the diameter of the through hole in the grid fixing plate, the flat-head clamping plate 202 with a diameter larger than the diameter of the through hole in the grid fixing plate is manufactured at the upper end of the cylindrical main body 201, the height of the flat-head clamping plate 202 is controlled within 5mm, and the inner thread is manufactured at the lower.
In this example, the connecting part II adopts a fixing bolt 1 in the beam, and as shown in figure 5, the diameter of the fixing bolt 1 in the beam is
Figure BDA0002051389310000031
The length is 30-40 mm, and the external screw thread that the internal thread looks adaptation on the long nut of the flat head splint of hexagon socket is made on fixed double-screw bolt upper portion in this roof beam.
In the embodiment, the columnar main body 201 of the long nut 2 with the hexagon socket flat-head clamping plate penetrates through the grid fixing piece 4 arranged on the steel grid, the flat-head clamping plate at the upper end of the nut compresses the grid fixing piece 4, the lower end of the nut is in threaded connection with the fixing bolt 1 in the beam, the lower end of the fixing bolt 1 in the beam is welded and fixed on the foundation platform beam 5, so that the steel grid 6 is fixed on the foundation platform beam 5, and the rubber gasket 3 is filled between the flat-head clamping plate of the nut and the grid fixing piece.
In order to reduce subsequent replacement, the fixing studs 1, the inner hexagonal flat-head splint long nuts 2 and the grid fixing pieces 4 in the beam in the embodiment can be made of stainless steel materials.
During construction, the fixing stud 1 in the beam is welded on the foundation platform beam 5 in a factory, the steel grating 6 is placed on the foundation platform beam 5, the adjacent 2 steel gratings 6 on the foundation platform beam 5 are tightened by the grating fixing pieces 4, the long nut 2 of the inner hexagonal flat-head clamping plate penetrates through the rubber gasket 3 and the grating fixing pieces 4, and the fixing stud 1 in the beam is screwed and fixed, so that the steel grating fixing work of the foundation platform of the offshore wind turbine can be completed. When the follow-up replacement is carried out, the long nut 2 of the inner hexagonal flat-head clamping plate is screwed out, and the grid fixing piece 4 and the steel grid 6 can be detached.
Of course, the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and those skilled in the art can change, add or replace the above examples within the scope of the present invention.

Claims (6)

1. The utility model provides an offshore wind turbine foundation platform steel grating fixing device for be fixed in basic platform roof beam (5) with steel grating (6) on, its characterized in that: the fixing device is provided with a grating fixing piece (4), a connecting piece I and a connecting piece II, wherein the grating fixing piece (4) is arranged on the steel grating (6), the grating fixing piece sequentially penetrates through the steel grating (6) through the connecting pieces I and II and then is connected with a basic platform beam (5), and the connecting piece I is coaxially connected with the connecting piece II through threads.
2. The offshore wind turbine foundation platform steel grid fixing device of claim 1, wherein: the center of the grid fixing plate (4) is provided with a through hole (401) for the connecting piece I to pass through, the upper end of the connecting piece I is provided with a flat-head clamping plate (202) which is directly larger than the through hole (401), and the lower end of the connecting piece II is welded and fixed on the basic platform beam (5).
3. The offshore wind turbine foundation platform steel grid fixing device of claim 2, wherein: and a rubber gasket (3) is arranged between the flat head clamping plate (202) at the upper end of the connecting piece I and the grid fixing piece (4).
4. The offshore wind turbine foundation platform steel grid fixing device of claim 1, 2 or 3, wherein: the connecting piece I adopts an inner hexagonal flat-head clamping plate long nut (2), and the connecting piece II adopts a beam middle fixing bolt.
5. The offshore wind turbine foundation platform steel grid fixing device of claim 1, wherein: the thickness of the grid fixing sheet (4) is gradually thinned from the center to the outer side.
6. The offshore wind turbine foundation platform steel grid fixing device of claim 1, wherein: the grid fixing piece (4), the connecting piece I and the connecting piece II are all made of stainless steel materials.
CN201920646429.6U 2019-05-07 2019-05-07 Offshore wind turbine foundation platform steel grating fixing device Active CN210238555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920646429.6U CN210238555U (en) 2019-05-07 2019-05-07 Offshore wind turbine foundation platform steel grating fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920646429.6U CN210238555U (en) 2019-05-07 2019-05-07 Offshore wind turbine foundation platform steel grating fixing device

Publications (1)

Publication Number Publication Date
CN210238555U true CN210238555U (en) 2020-04-03

Family

ID=69969749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920646429.6U Active CN210238555U (en) 2019-05-07 2019-05-07 Offshore wind turbine foundation platform steel grating fixing device

Country Status (1)

Country Link
CN (1) CN210238555U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216120A (en) * 2021-05-07 2021-08-06 南通泰胜蓝岛海洋工程有限公司 Steel grating installation process for offshore booster station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216120A (en) * 2021-05-07 2021-08-06 南通泰胜蓝岛海洋工程有限公司 Steel grating installation process for offshore booster station

Similar Documents

Publication Publication Date Title
US9579757B2 (en) Aligning tool in the field of wind turbines for aligning a hole with a fastener
CN210238555U (en) Offshore wind turbine foundation platform steel grating fixing device
CN102102644B (en) Adjustable supporting device for wind power generating unit engine room
CN104453099A (en) Fine adjustment anchor capable of compensating prestress loss and method
CN203063670U (en) Adjustable vehicle-mounted gas bomb binding band connecting structure
CN204754757U (en) Unanimous just screw thread of crotch orientation exposes unanimous hexagonal type theftproof foot nail
CN216447051U (en) A rice word bracing frock for preventing wind power tower cylinder takes place elliptical deformation
CN203051378U (en) Anti-loosening preloaded bolt
CN211900706U (en) Novel gate LVDT
CN205744837U (en) A kind of anti-loosening bolt
CN215990645U (en) Foldable fast-assembling support locking mechanism for solar photovoltaic power station
CN112503082B (en) Flange bolt with locking elastic piece
CN103233965B (en) Fastening bolt component
CN210053102U (en) Combined hardware fitting for quickly repairing lead and installing drainage line
CN203248489U (en) Novel bolt
CN115325009B (en) Lock bolt structure
CN211841821U (en) Tool for correcting dislocation of blade bolt holes of wind generating set
CN220324692U (en) Base station antenna mounting fixture
CN219119580U (en) Tank top flange mounting mechanism for PSA nitrogen making device
CN218625009U (en) Locking bolt device that moves of large-scale mechanical equipment
CN202509794U (en) Fixing frame
CN203297251U (en) Fastening bolt assembly
CN211901221U (en) Long rod screw